Prevailing Wage Index
HomeTradesHeavy Equipment Operator › Missouri

Heavy Equipment Operator prevailing wage rates in Missouri

Federal Davis-Bacon rates published in 60 active determinations, 2026

The official source: binding Davis-Bacon and Service Contract Act wage determinations are published by the U.S. Department of Labor at SAM.gov Wage Determinations. This site indexes them and links every determination to its official document - the determination incorporated into a contract governs.

This page collects every classification in Missouri's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.

Published rates by determination

MO20260001 rev 4 · Heavy, Highway · Adair, Andrew, Atchison, Audrain, Barry, Barton and 109 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATORS: GROUP 1 - ASPHALT ROLLER OPERATOR, FINISH; ASPHALT PAVER AND SPREADER; ASPHALT PLANT OPERATOR; AUTO GRADER OR TRIMMER OR SUB-GRADER; BACKHOE; BLADE OPERA$38.8321.87ENGI0101-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 2 - A-FRAME TRUCK OPERATOR; ARTICULATED DUMP TRUCK; BACK FILLER OPERATOR; BOILERS; CHIP SPREADER; CHURN DRILL OPERATOR; COMPRESSOR; CONCRETE MIXER $38.4321.87ENGI0101-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 3 - OILER; OILER DRIVER; MECHANIC. (AREA 1: ANDREW, ATCHISON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL, CHARITON, CLINTON, COOPER, DAVIESS, DEKAL$36.4321.87ENGI0101-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 1: ASPHALT ROLLER OPERATOR, FINISH; ASPHALT PAVER AND SPREADER; ASPHALT PLANT OPERATOR; AUTO GRADER OR TRIMMER OR SUB-GRADER; BACKHOE; BLADE OPERAT$40.1722.29ENGI0101-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 2: ""A"" FRAME TRUCK OPERATOR; BACK FILLER OPERATOR; BOILERS (1); CHIP SPREADER;CHURN DRILL OPERATOR; CONCRETE MIXER OPERATOR, SKIP LOADER; CONCRET$39.1322.29ENGI0101-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 3: OILERS (CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES)$34.6622.29ENGI0101-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 4: OILER DRIVER (ALL TYPES) (CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES)$38.0122.29ENGI0101-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 1: ASPHALT FINISHING MACHINE & TRENCH WIDENING SPREADER; ASPHALT PLANT CONSOLE OPERATOR; AUTOGRADER; AUTOMATIC SLIPFORM PAVER; BACKHOE; BLADE OPERA$36.6019.32ENGI0101-022
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 2: A-FRAME; ASPHALT HOT-MIX SILO; ASPHALT PLANT FIREMAN (DRUM OR BOILER); ASPHALT PLANT MAN; ASPHALT PLANT MAN; ASPHALT PLANT MIXER OPERATOR; ASPHA$36.2519.32ENGI0101-022
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 3: BOILERS - 1; CHIP SPREADER (FRONT MAN); CHURN DRILL OPERATOR; CLEF PLANE OPERATOR; CONCRETE SAW OPERATOR (SELF- PROPELLED); CURB FINISHING MACHI$36.0519.32ENGI0101-022
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 4: GRAD CHECKER; OILER; OILER-DRIVER (BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HICKORY, JASPER, LACLEDE, LAWRENCE, M$34.0019.32ENGI0101-022
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 1: BACKHOE, CABLE; BACKHOE, HYDRAULIC (2 CU YDS BUCKET AND UNDER REGARDLESS OF ATTACHMENT, ONE OILER FOR 2 OR 3, TWO OILERS FOR 4 THROUGH 6); BACKH$45.9630.96ENGI0513-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 2: AIR TUGGER WITH PLANT AIR; BOILER (FOR POWER OR HEATING SHELL OF BUILDING OR TEMPORARY ENCLOSURES IN CONNECTION WITH CONSTRUCTION WORK); BOILER,$45.9630.96ENGI0513-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 3: BOAT OPERATOR - OUTBOARD MOTOR, JOB SITE; CONVEYORS (SUCH AS CON-VAY-IT) REGARDLESS OF HOW USED; ELEVATOR (INSIDE); HEATER OPERATOR, 2 THROUGH 6$44.6630.96ENGI0513-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 4: CRANE TYPE (FRANKLIN, JEFFERSON, LINCOLN, ST CHARLES, AND WARREN COUNTIES)$44.2230.96ENGI0513-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 1: ASPHALT FINISHING MACHINE & TRENCH WIDENING SPREADER, ASPHALT PLANT CONSOLE OPERATOR; AUTO-GRADER; AUTOMATIC SLIPFORM PAVER; BACK HOE; BLADE OPE$40.3930.33ENGI0513-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 2: A-FRAME; ASPHALT HOT-MIX SILO; ASPHALT ROLLER OPERATOR ASPHALT PLANT FIREMAN (DRUM OR BOILER); ASPHALT PLANT MAN; ASPHALT PLANT MIXER OPERATOR; $40.0430.33ENGI0513-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 3: SPREADER BOX OPERATOR, SELF-PROPELLED NOT ASPHALT; TRACTOR OPERATOR (50 H.P. OR LESS); BOILERS ONE; CHIP SPREADER (FRONT MAN); CHURN DRILL OPERA$39.8430.33ENGI0513-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 4: OILER; GROUT MACHINE; OILER DRIVER; COMPRESSOR OVER 105 CFM ONE; CONVEYOR OPERATOR ONE; MAINTENANCE OPERATOR; PUMP 4"""" & OVER ONE. (ADAIR, AUD$36.1930.33ENGI0513-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 1: BACKHOE, CABLE OR HYDRAULIC; CABLEWAY; CRANE CRAWLER OR TRUCK; CRANE, HYDRAULIC-TRUCK OR CRUISER MOUNTED 16 TONS & OVER; CRANE LOCOMOTIVE; DERRI$45.9630.96ENGI0513-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 2: AIR TUGGER W/AIR COMPRESSOR; ANCHOR-PLACING BARGE; ASPHALT SPREADER; ATHEY FORCE FEEDER LOADER (SELF- PROPELLED); BACKFILLING MACHINE; BACKHOE-L$45.9630.96ENGI0513-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 3: CONVEYOR, LARGE (NOT SELF-PROPELLED); CONVEYOR, LARGE (NOT SELF-PROPELLED) MOVING BRICK AND CONCRETE DISTRIBUTING) ON FLOOR LEVEL; MIXER TWO OR $44.6630.96ENGI0513-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GROUP 4: BOAT OPERATOR-OUTBOARD MOTOR (JOB SITE); CONVEYOR (SUCH AS CON-VAY-IT) REGARDLESS OF HOW USED; SWEEPER, FLOOR (ST. LOUIS CITY AND COUNTY)$44.2230.96ENGI0513-007
collectively bargained (union) rate

Official document: MO20260001 on SAM.gov.

MO20260002 rev 1 · Building · Audrain

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$39.0630.38ENGI0513-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-009
collectively bargained (union) rate
OPERATOR: BACKHOE/TRACKHOE$31.120.00SUMO2010-001
DOL wage survey rate

Official document: MO20260002 on SAM.gov.

MO20260004 rev 1 · Building · Butler

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-003
DOL wage survey rate

Official document: MO20260004 on SAM.gov.

MO20260005 rev 1 · Building · Camden

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$30.9118.07ENGI0101-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$31.6218.07ENGI0101-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$31.6218.07ENGI0101-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$33.4118.07ENGI0101-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$27.9118.07ENGI0101-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$31.6218.07ENGI0101-004
collectively bargained (union) rate

Official document: MO20260005 on SAM.gov.

MO20260007 rev 2 · Building · Carroll

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$45.4822.42ENGI0101-021
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$45.4822.42ENGI0101-021
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$45.4822.42ENGI0101-021
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$45.4822.42ENGI0101-021
collectively bargained (union) rate
OPERATOR: BACKHOE/TRACKHOE$31.120.00SUMO2010-006
DOL wage survey rate

Official document: MO20260007 on SAM.gov.

MO20260008 rev 1 · Building · Cedar

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$30.9118.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$31.6218.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$31.6218.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$31.6218.07ENGI0101-008
collectively bargained (union) rate
OPERATOR: WATER TRUCK$28.370.00SUMO2010-007
DOL wage survey rate
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.470.00SUMO2010-007
DOL wage survey rate
OPERATOR: BACKHOE/TRACKHOE$23.557.47SUMO2010-007
DOL wage survey rate

Official document: MO20260008 on SAM.gov.

MO20260009 rev 2 · Building · Chariton

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$45.4822.42ENGI0101-021
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$45.4822.42ENGI0101-021
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$45.4822.42ENGI0101-021
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$45.4822.42ENGI0101-021
collectively bargained (union) rate
OPERATOR: BACKHOE/TRACKHOE$31.120.00SUMO2010-008
DOL wage survey rate

Official document: MO20260009 on SAM.gov.

MO20260010 rev 2 · Building · Cooper

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$45.4822.42ENGI0101-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$45.4822.42ENGI0101-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$45.4822.42ENGI0101-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$45.4822.42ENGI0101-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$45.4822.42ENGI0101-015
collectively bargained (union) rate

Official document: MO20260010 on SAM.gov.

MO20260011 rev 1 · Building · Dunklin

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-010
DOL wage survey rate

Official document: MO20260011 on SAM.gov.

MO20260012 rev 2 · Building · Johnson

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$45.4822.42ENGI0101-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$45.4822.42ENGI0101-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$45.4822.42ENGI0101-012
collectively bargained (union) rate
OPERATOR: WATER TRUCK$28.370.00SUMO2010-011
DOL wage survey rate
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.470.00SUMO2010-011
DOL wage survey rate
OPERATOR: BACKHOE/TRACKHOE$23.557.47SUMO2010-011
DOL wage survey rate

Official document: MO20260012 on SAM.gov.

MO20260013 rev 1 · Building · Lawrence

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$30.9118.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$31.6218.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$31.6218.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$31.6218.07ENGI0101-008
collectively bargained (union) rate
OPERATOR: WATER TRUCK$28.370.00SUMO2010-012
DOL wage survey rate
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.470.00SUMO2010-012
DOL wage survey rate
OPERATOR: BACKHOE/TRACKHOE$19.807.47SUMO2010-012
DOL wage survey rate

Official document: MO20260013 on SAM.gov.

MO20260014 rev 1 · Building · Mississippi

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-013
DOL wage survey rate

Official document: MO20260014 on SAM.gov.

MO20260015 rev 1 · Building · New Madrid

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-014
DOL wage survey rate

Official document: MO20260015 on SAM.gov.

MO20260016 rev 1 · Building · Pemiscot

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-015
DOL wage survey rate

Official document: MO20260016 on SAM.gov.

MO20260017 rev 2 · Building · Pettis

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$45.4822.42ENGI0101-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$45.4822.42ENGI0101-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$45.4822.42ENGI0101-012
collectively bargained (union) rate
OPERATOR: WATER TRUCK$28.370.00SUMO2010-016
DOL wage survey rate
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.470.00SUMO2010-016
DOL wage survey rate
OPERATOR: BACKHOE/TRACKHOE$23.557.47SUMO2010-016
DOL wage survey rate

Official document: MO20260017 on SAM.gov.

MO20260018 rev 1 · Building · Phelps

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$35.7630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.0630.38ENGI0513-001
collectively bargained (union) rate

Official document: MO20260018 on SAM.gov.

MO20260019 rev 1 · Building · Pulaski

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$35.7630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.0630.38ENGI0513-001
collectively bargained (union) rate

Official document: MO20260019 on SAM.gov.

MO20260020 rev 1 · Building · Ralls

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$39.0630.38ENGI0513-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-009
collectively bargained (union) rate
OPERATOR: BACKHOE/TRACKHOE$31.120.00SUMO2010-019
DOL wage survey rate

Official document: MO20260020 on SAM.gov.

MO20260021 rev 1 · Building · Ripley

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-020
DOL wage survey rate

Official document: MO20260021 on SAM.gov.

MO20260022 rev 1 · Building · Scott

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-014
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-021
DOL wage survey rate

Official document: MO20260022 on SAM.gov.

MO20260023 rev 1 · Building · Shannon

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.0630.38ENGI0513-010
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-022
DOL wage survey rate

Official document: MO20260023 on SAM.gov.

MO20260024 rev 1 · Building · Stoddard

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/TRACKHOE)$39.0630.38ENGI0513-015
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-023
DOL wage survey rate

Official document: MO20260024 on SAM.gov.

MO20260025 rev 1 · Building · Texas

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$39.0630.38ENGI0513-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.0630.38ENGI0513-010
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-024
DOL wage survey rate

Official document: MO20260025 on SAM.gov.

MO20260026 rev 1 · Building · Vernon

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$30.9118.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$31.6218.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$31.6218.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$31.6218.07ENGI0101-008
collectively bargained (union) rate
OPERATOR: WATER TRUCK$28.370.00SUMO2010-025
DOL wage survey rate
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.470.00SUMO2010-025
DOL wage survey rate
OPERATOR: BACKHOE/TRACKHOE$23.557.47SUMO2010-025
DOL wage survey rate

Official document: MO20260026 on SAM.gov.

MO20260027 rev 1 · Building · Wright

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$30.9118.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$31.6218.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$31.6218.07ENGI0101-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$31.6218.07ENGI0101-008
collectively bargained (union) rate
OPERATOR: WATER TRUCK$28.370.00SUMO2010-026
DOL wage survey rate
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.470.00SUMO2010-026
DOL wage survey rate
OPERATOR: BACKHOE/TRACKHOE$23.557.47SUMO2010-026
DOL wage survey rate

Official document: MO20260027 on SAM.gov.

MO20260028 rev 2 · Building · Adair, Atchison

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER (ATCHISON COUNTY)$45.4822.42ENGI0101-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: PAVER (ATCHISON COUNTY)$45.4822.42ENGI0101-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (ATCHISON COUNTY)$45.4822.42ENGI0101-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE (ATCHISON COUNTY)$45.4822.42ENGI0101-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ROLLER (ADAIR COUNTY)$39.0630.38ENGI0513-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: PAVER (ADAIR COUNTY)$39.0630.38ENGI0513-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (ADAIR COUNTY)$39.0630.38ENGI0513-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE (ADAIR COUNTY)$39.0630.38ENGI0513-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER (ADAIR COUNTY)$39.0630.38ENGI0513-011
collectively bargained (union) rate
OPERATOR: BACKHOE/TRACKHOE$31.120.00SUMO2010-027
DOL wage survey rate

Official document: MO20260028 on SAM.gov.

MO20260029 rev 1 · Building · Barry, Barton, Benton

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER (BARRY & BARTON COUNTIES)$30.9118.07ENGI0101-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (BARRY & BARTON COUNTIES)$31.6218.07ENGI0101-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE (BARRY & BARTON COUNTIES)$31.6218.07ENGI0101-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER (BARRY & BARTON COUNTIES)$31.6218.07ENGI0101-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ROLLER (BENTON COUNTY)$45.4822.42ENGI0101-017
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (BENTON COUNTY)$45.4822.42ENGI0101-017
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE (BENTON COUNTY)$45.4822.42ENGI0101-017
collectively bargained (union) rate
OPERATOR: WATER TRUCK$28.370.00SUMO2010-028
DOL wage survey rate
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.470.00SUMO2010-028
DOL wage survey rate
OPERATOR: BACKHOE/TRACKHOE$23.557.47SUMO2010-028
DOL wage survey rate

Official document: MO20260029 on SAM.gov.

MO20260030 rev 1 · Building · Carter, Howell, Iron, Madison, Oregon, Perry and 4 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER (HOWELL & OREGON COUNTIES)$39.0630.38ENGI0513-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: PAVER (HOWELL & OREGON COUNTIES)$39.0630.38ENGI0513-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (HOWELL & OREGON COUNTIES)$39.0630.38ENGI0513-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER (HOWELL & OREGON COUNTIES)$39.0630.38ENGI0513-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (HOWELL & OREGON COUNTIES)$39.0630.38ENGI0513-012
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ROLLER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.0630.38ENGI0513-016
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: PAVER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.0630.38ENGI0513-016
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.0630.38ENGI0513-016
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.0630.38ENGI0513-016
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES)$39.0630.38ENGI0513-016
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$22.8010.78SUMO2010-029
DOL wage survey rate

Official document: MO20260030 on SAM.gov.

MO20260031 rev 3 · Building · Clark, Daviess, Gentry, Grundy, Harrison, Holt and 18 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER (DAVIESS, GENTRY, GRUNDY, HARRISON, HOLT, LINN, LIVINGSTON, MERCER, NODAWAY, SALINE, SULLIVAN & WORTH COUNTIES)$45.4822.42ENGI0101-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: PAVER (DAVIESS, GENTRY, GRUNDY, HARRISON, HOLT, LINN, LIVINGSTON, MERCER, NODAWAY, SALINE, SULLIVAN & WORTH COUNTIES)$45.4822.42ENGI0101-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (DAVIESS, GENTRY, GRUNDY, HARRISON, HOLT, LINN, LIVINGSTON, MERCER, NODAWAY, SALINE, SULLIVAN & WORTH COUNTIES)$45.4822.42ENGI0101-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ROLLER (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES)$39.0630.38ENGI0513-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: PAVER (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES)$39.0630.38ENGI0513-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES)$39.0630.38ENGI0513-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES)$39.0630.38ENGI0513-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES)$39.0630.38ENGI0513-013
collectively bargained (union) rate
OPERATOR: BACKHOE/TRACKHOE$31.120.00SUMO2010-030
DOL wage survey rate

Official document: MO20260031 on SAM.gov.

MO20260032 rev 2 · Building · Dade, Douglas, Henry, Hickory, Laclede, Ozark and 3 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES)$30.9118.07ENGI0101-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: LOADER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES)$31.6218.07ENGI0101-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES)$31.6218.07ENGI0101-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES)$31.6218.07ENGI0101-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR:: ROLLER (HENRY COUNTY)$45.4822.42ENGI0101-019
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR:: LOADER (HENRY COUNTY)$45.8422.42ENGI0101-019
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR:: GRADER/BLADE (HENRY COUNTY)$45.4822.42ENGI0101-019
collectively bargained (union) rate
OPERATOR: WATER TRUCK$28.370.00SUMO2010-031
DOL wage survey rate
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.470.00SUMO2010-031
DOL wage survey rate
OPERATOR: BACKHOE/TRACKHOE$23.557.47SUMO2010-031
DOL wage survey rate

Official document: MO20260032 on SAM.gov.

MO20260033 rev 1 · Building · Dent, Gasconade, Maries, Miller, Montgomery, Morgan

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$35.7630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GRADER/BLADE$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (PAVER)$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.0630.38ENGI0513-001
collectively bargained (union) rate

Official document: MO20260033 on SAM.gov.

MO20260056 rev 1 · Building · Crawford

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATORS: ROLLER$39.0630.38ENGI0513-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: PAVER$39.0630.38ENGI0513-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: LOADER$39.0630.38ENGI0513-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: GRADER/BLADE$39.0630.38ENGI0513-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: FORKLIFT$39.0630.38ENGI0513-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: CRANE$39.0630.38ENGI0513-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER$39.0630.38ENGI0513-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR$39.0630.38ENGI0513-005
collectively bargained (union) rate
OPERATOR: HOIST$26.0213.01SUMO2023-001
DOL wage survey rate

Official document: MO20260056 on SAM.gov.

MO20260062 rev 1 · Residential · Franklin

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$41.0129.63ENGI0513-018
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR$41.0129.63ENGI0513-018
collectively bargained (union) rate

Official document: MO20260062 on SAM.gov.

MO20260063 rev 1 · Residential · Jackson

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$45.4822.42ENGI0101-031
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR$45.4822.42ENGI0101-031
collectively bargained (union) rate

Official document: MO20260063 on SAM.gov.

MO20260064 rev 1 · Residential · St Louis City

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$41.0129.63ENGI0513-018
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR$41.0129.63ENGI0513-018
collectively bargained (union) rate

Official document: MO20260064 on SAM.gov.

MO20260065 rev 1 · Residential · Andrew, Buchanan, De Kalb

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER (ANDREW & DE KALB COUNTIES)$45.4822.42ENGI0101-032
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (ANDREW & DE KALB COUNTIES)$45.4822.42ENGI0101-032
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ROLLER (BUCHANAN COUNTY)$45.4822.42ENGI0101-033
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (BUCHANAN COUNTY)$45.4822.42ENGI0101-033
collectively bargained (union) rate

Official document: MO20260065 on SAM.gov.

MO20260066 rev 1 · Residential · Bates, Caldwell, Cass, Clay, Clinton, Lafayette and 2 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER (CASS, CLAY, CLINTON, LAFAYETTE, PLATTE & RAY COUNTIES)$45.4822.42ENGI0101-034
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (CASS, CLAY, CLINTON, LAFAYETTE, PLATTE & RAY COUNTIES)$45.4822.42ENGI0101-034
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ROLLER (BATES & CALDWELL COUNTIES)$45.4822.42ENGI0101-035
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (BATES & CALDWELL COUNTIES)$45.4822.42ENGI0101-035
collectively bargained (union) rate

Official document: MO20260066 on SAM.gov.

MO20260067 rev 1 · Residential · Boone, Howard

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER (HOWARD COUNTY)$45.4822.42ENGI0101-036
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (HOWARD COUNTY)$45.4822.42ENGI0101-036
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ROLLER (BOONE COUNTY)$34.6129.50ENGI0513-021
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (BOONE COUNTY)$34.6129.50ENGI0513-021
collectively bargained (union) rate

Official document: MO20260067 on SAM.gov.

MO20260068 rev 1 · Residential · Callaway, Cole, Moniteau, Osage

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$34.6129.50ENGI0513-017
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR$34.6129.50ENGI0513-017
collectively bargained (union) rate

Official document: MO20260068 on SAM.gov.

MO20260069 rev 1 · Residential · Christian, Dallas, Greene, Polk, Webster

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$45.4822.42ENGI0101-030
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR$45.4822.42ENGI0101-030
collectively bargained (union) rate

Official document: MO20260069 on SAM.gov.

MO20260070 rev 1 · Residential · Crawford, Jefferson, Lincoln, St Charles, St Louis, Warren and 1 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:: ROLLER (CRAWFORD & WASHINGTON COUNTIES)$34.6129.50ENGI0513-019
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR:: BACKHOE/EXCAVATOR (CRAWFORD & WASHINGTON COUNTIES)$34.6129.50ENGI0513-019
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR:: ROLLER (JEFFERSON, LINCOLN, ST CHARLES, ST LOUIS & WARREN COUNTIES)$41.0129.63ENGI0513-020
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR:: BACKHOE/EXCAVATOR (JEFFERSON, LINCOLN, ST CHARLES, ST LOUIS & WARREN COUNTIES)$41.0129.63ENGI0513-020
collectively bargained (union) rate

Official document: MO20260070 on SAM.gov.

MO20260071 rev 1 · Residential · Jasper, McDonald, Newton

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ROLLER$45.4822.42ENGI0101-030
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR$45.4822.42ENGI0101-030
collectively bargained (union) rate

Official document: MO20260071 on SAM.gov.

MO20260072 rev 2 · Building · Cass

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$44.1422.42ENGI0101-052
collectively bargained (union) rate
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$45.4822.42ENGI0101-054
collectively bargained (union) rate
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$45.4822.42ENGI0101-054
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: LOADER$38.3917.55SUMO2020-001
DOL wage survey rate
OPERATOR: ROLLER$39.6130.15SUMO2020-001
DOL wage survey rate

Official document: MO20260072 on SAM.gov.

MO20260073 rev 2 · Building · Clinton

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$44.1422.42ENGI0101-052
collectively bargained (union) rate
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$45.4822.42ENGI0101-054
collectively bargained (union) rate
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$45.4822.42ENGI0101-054
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: LOADER$38.3917.55SUMO2020-002
DOL wage survey rate
OPERATOR: ROLLER$39.6130.15SUMO2020-002
DOL wage survey rate

Official document: MO20260073 on SAM.gov.

MO20260074 rev 1 · Building · Franklin

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-025
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$45.9630.57ENGI0513-028
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SHEE0036-036
collectively bargained (union) rate

Official document: MO20260074 on SAM.gov.

MO20260075 rev 1 · Building · Greene

Classification as publishedBase rateFringesRate schedule
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-025
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SUMO2020-004
DOL wage survey rate

Official document: MO20260075 on SAM.gov.

MO20260076 rev 1 · Building · Jasper

Classification as publishedBase rateFringesRate schedule
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-025
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SUMO2020-005
DOL wage survey rate

Official document: MO20260076 on SAM.gov.

MO20260077 rev 1 · Building · Jefferson

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-025
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$45.9630.57ENGI0513-028
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SHEE0036-036
collectively bargained (union) rate

Official document: MO20260077 on SAM.gov.

MO20260078 rev 1 · Building · Moniteau

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: FORKLIFT$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SUMO2020-007
DOL wage survey rate

Official document: MO20260078 on SAM.gov.

MO20260079 rev 2 · Building · Platte

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$44.1422.42ENGI0101-052
collectively bargained (union) rate
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$45.4822.42ENGI0101-054
collectively bargained (union) rate
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$45.4822.42ENGI0101-054
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: LOADER$38.3917.55SUMO2020-008
DOL wage survey rate
OPERATOR: ROLLER$39.6130.15SUMO2020-008
DOL wage survey rate

Official document: MO20260079 on SAM.gov.

MO20260080 rev 2 · Building · St Louis City

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-025
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$45.9630.57ENGI0513-028
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SUMO2020-009
DOL wage survey rate

Official document: MO20260080 on SAM.gov.

MO20260081 rev 2 · Building · Andrew, Buchanan, De Kalb

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$44.1422.42ENGI0101-052
collectively bargained (union) rate
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$45.4822.42ENGI0101-054
collectively bargained (union) rate
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$45.4822.42ENGI0101-054
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: LOADER$38.3917.55SUMO2020-010
DOL wage survey rate
OPERATOR: ROLLER$39.6130.15SUMO2020-010
DOL wage survey rate

Official document: MO20260081 on SAM.gov.

MO20260082 rev 2 · Building · Bates, Caldwell, Clay, Jackson, Lafayette, Ray

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$44.1422.42ENGI0101-052
collectively bargained (union) rate
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$45.4822.42ENGI0101-054
collectively bargained (union) rate
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$45.4822.42ENGI0101-054
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: LOADER$38.3917.55SUMO2020-011
DOL wage survey rate
OPERATOR: ROLLER$39.6130.15SUMO2020-011
DOL wage survey rate

Official document: MO20260082 on SAM.gov.

MO20260083 rev 1 · Building · Bollinger, Cape Girardeau

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-025
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$45.9630.57ENGI0513-028
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SHEE0036-036
collectively bargained (union) rate

Official document: MO20260083 on SAM.gov.

MO20260084 rev 1 · Building · Boone, Howard

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: FORKLIFT$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SUMO2020-013
DOL wage survey rate

Official document: MO20260084 on SAM.gov.

MO20260085 rev 1 · Building · Callaway, Cole, Osage

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: FORKLIFT$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (LOADER)$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.0630.38ENGI0513-024
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SUMO2020-014
DOL wage survey rate

Official document: MO20260085 on SAM.gov.

MO20260086 rev 1 · Building · Christian, Dallas, Polk, Webster

Classification as publishedBase rateFringesRate schedule
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SUMO2020-015
DOL wage survey rate

Official document: MO20260086 on SAM.gov.

MO20260087 rev 1 · Building · Lincoln, St Charles, Warren

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$45.9630.57ENGI0513-028
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SHEE0036-036
collectively bargained (union) rate

Official document: MO20260087 on SAM.gov.

MO20260088 rev 1 · Building · McDonald, Newton

Classification as publishedBase rateFringesRate schedule
OPERATOR: CRANE$47.2922.42ENGI0101-053
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
OPERATOR: ROLLER$39.6130.15SUMO2020-017
DOL wage survey rate

Official document: MO20260088 on SAM.gov.

MO20260089 rev 1 · Building · St Louis, Washington

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: FORKLIFT$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.4630.22ENGI0513-023
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: OILER$39.0630.38ENGI0513-026
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: BULLDOZER$45.9630.57ENGI0513-027
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: CRANE$45.9630.57ENGI0513-028
collectively bargained (union) rate

Official document: MO20260089 on SAM.gov.

Showing the first 400 of 401 published heavy equipment operator rates. The rest are on the individual determination pages linked above, each of which carries the full official text.

Where to go next

Heavy Equipment Operator rates in every state · Missouri prevailing wage and state law · Missouri determinations by county · pay calculator

Other trades in Missouri