Heavy Equipment Operator prevailing wage rates in Missouri
Federal Davis-Bacon rates published in 60 active determinations, 2026
- Active federal Davis-Bacon determinations for Missouri publish 401 heavy equipment operator classification rates, across 60 determinations covering 115 counties.
- Those published base rates run from $19.80 to $47.29 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in Missouri: .
This page collects every classification in Missouri's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
MO20260001 rev 4 · Heavy, Highway · Adair, Andrew, Atchison, Audrain, Barry, Barton and 109 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 - ASPHALT ROLLER OPERATOR, FINISH; ASPHALT PAVER AND SPREADER; ASPHALT PLANT OPERATOR; AUTO GRADER OR TRIMMER OR SUB-GRADER; BACKHOE; BLADE OPERA | $38.83 | 21.87 | ENGI0101-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 - A-FRAME TRUCK OPERATOR; ARTICULATED DUMP TRUCK; BACK FILLER OPERATOR; BOILERS; CHIP SPREADER; CHURN DRILL OPERATOR; COMPRESSOR; CONCRETE MIXER | $38.43 | 21.87 | ENGI0101-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 - OILER; OILER DRIVER; MECHANIC. (AREA 1: ANDREW, ATCHISON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL, CHARITON, CLINTON, COOPER, DAVIESS, DEKAL | $36.43 | 21.87 | ENGI0101-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1: ASPHALT ROLLER OPERATOR, FINISH; ASPHALT PAVER AND SPREADER; ASPHALT PLANT OPERATOR; AUTO GRADER OR TRIMMER OR SUB-GRADER; BACKHOE; BLADE OPERAT | $40.17 | 22.29 | ENGI0101-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2: ""A"" FRAME TRUCK OPERATOR; BACK FILLER OPERATOR; BOILERS (1); CHIP SPREADER;CHURN DRILL OPERATOR; CONCRETE MIXER OPERATOR, SKIP LOADER; CONCRET | $39.13 | 22.29 | ENGI0101-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3: OILERS (CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES) | $34.66 | 22.29 | ENGI0101-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4: OILER DRIVER (ALL TYPES) (CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES) | $38.01 | 22.29 | ENGI0101-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1: ASPHALT FINISHING MACHINE & TRENCH WIDENING SPREADER; ASPHALT PLANT CONSOLE OPERATOR; AUTOGRADER; AUTOMATIC SLIPFORM PAVER; BACKHOE; BLADE OPERA | $36.60 | 19.32 | ENGI0101-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2: A-FRAME; ASPHALT HOT-MIX SILO; ASPHALT PLANT FIREMAN (DRUM OR BOILER); ASPHALT PLANT MAN; ASPHALT PLANT MAN; ASPHALT PLANT MIXER OPERATOR; ASPHA | $36.25 | 19.32 | ENGI0101-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3: BOILERS - 1; CHIP SPREADER (FRONT MAN); CHURN DRILL OPERATOR; CLEF PLANE OPERATOR; CONCRETE SAW OPERATOR (SELF- PROPELLED); CURB FINISHING MACHI | $36.05 | 19.32 | ENGI0101-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4: GRAD CHECKER; OILER; OILER-DRIVER (BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HICKORY, JASPER, LACLEDE, LAWRENCE, M | $34.00 | 19.32 | ENGI0101-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1: BACKHOE, CABLE; BACKHOE, HYDRAULIC (2 CU YDS BUCKET AND UNDER REGARDLESS OF ATTACHMENT, ONE OILER FOR 2 OR 3, TWO OILERS FOR 4 THROUGH 6); BACKH | $45.96 | 30.96 | ENGI0513-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2: AIR TUGGER WITH PLANT AIR; BOILER (FOR POWER OR HEATING SHELL OF BUILDING OR TEMPORARY ENCLOSURES IN CONNECTION WITH CONSTRUCTION WORK); BOILER, | $45.96 | 30.96 | ENGI0513-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3: BOAT OPERATOR - OUTBOARD MOTOR, JOB SITE; CONVEYORS (SUCH AS CON-VAY-IT) REGARDLESS OF HOW USED; ELEVATOR (INSIDE); HEATER OPERATOR, 2 THROUGH 6 | $44.66 | 30.96 | ENGI0513-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4: CRANE TYPE (FRANKLIN, JEFFERSON, LINCOLN, ST CHARLES, AND WARREN COUNTIES) | $44.22 | 30.96 | ENGI0513-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1: ASPHALT FINISHING MACHINE & TRENCH WIDENING SPREADER, ASPHALT PLANT CONSOLE OPERATOR; AUTO-GRADER; AUTOMATIC SLIPFORM PAVER; BACK HOE; BLADE OPE | $40.39 | 30.33 | ENGI0513-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2: A-FRAME; ASPHALT HOT-MIX SILO; ASPHALT ROLLER OPERATOR ASPHALT PLANT FIREMAN (DRUM OR BOILER); ASPHALT PLANT MAN; ASPHALT PLANT MIXER OPERATOR; | $40.04 | 30.33 | ENGI0513-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3: SPREADER BOX OPERATOR, SELF-PROPELLED NOT ASPHALT; TRACTOR OPERATOR (50 H.P. OR LESS); BOILERS ONE; CHIP SPREADER (FRONT MAN); CHURN DRILL OPERA | $39.84 | 30.33 | ENGI0513-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4: OILER; GROUT MACHINE; OILER DRIVER; COMPRESSOR OVER 105 CFM ONE; CONVEYOR OPERATOR ONE; MAINTENANCE OPERATOR; PUMP 4"""" & OVER ONE. (ADAIR, AUD | $36.19 | 30.33 | ENGI0513-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1: BACKHOE, CABLE OR HYDRAULIC; CABLEWAY; CRANE CRAWLER OR TRUCK; CRANE, HYDRAULIC-TRUCK OR CRUISER MOUNTED 16 TONS & OVER; CRANE LOCOMOTIVE; DERRI | $45.96 | 30.96 | ENGI0513-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2: AIR TUGGER W/AIR COMPRESSOR; ANCHOR-PLACING BARGE; ASPHALT SPREADER; ATHEY FORCE FEEDER LOADER (SELF- PROPELLED); BACKFILLING MACHINE; BACKHOE-L | $45.96 | 30.96 | ENGI0513-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3: CONVEYOR, LARGE (NOT SELF-PROPELLED); CONVEYOR, LARGE (NOT SELF-PROPELLED) MOVING BRICK AND CONCRETE DISTRIBUTING) ON FLOOR LEVEL; MIXER TWO OR | $44.66 | 30.96 | ENGI0513-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4: BOAT OPERATOR-OUTBOARD MOTOR (JOB SITE); CONVEYOR (SUCH AS CON-VAY-IT) REGARDLESS OF HOW USED; SWEEPER, FLOOR (ST. LOUIS CITY AND COUNTY) | $44.22 | 30.96 | ENGI0513-007 collectively bargained (union) rate |
Official document: MO20260001 on SAM.gov.
MO20260002 rev 1 · Building · Audrain
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | 0.00 | SUMO2010-001 DOL wage survey rate |
Official document: MO20260002 on SAM.gov.
MO20260004 rev 1 · Building · Butler
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-003 DOL wage survey rate |
Official document: MO20260004 on SAM.gov.
MO20260005 rev 1 · Building · Camden
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | 18.07 | ENGI0101-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | 18.07 | ENGI0101-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | 18.07 | ENGI0101-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $33.41 | 18.07 | ENGI0101-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $27.91 | 18.07 | ENGI0101-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | 18.07 | ENGI0101-004 collectively bargained (union) rate |
Official document: MO20260005 on SAM.gov.
MO20260007 rev 2 · Building · Carroll
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | 22.42 | ENGI0101-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | 22.42 | ENGI0101-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $45.48 | 22.42 | ENGI0101-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | 22.42 | ENGI0101-021 collectively bargained (union) rate |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | 0.00 | SUMO2010-006 DOL wage survey rate |
Official document: MO20260007 on SAM.gov.
MO20260008 rev 1 · Building · Cedar
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| OPERATOR: WATER TRUCK | $28.37 | 0.00 | SUMO2010-007 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | 0.00 | SUMO2010-007 DOL wage survey rate |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | 7.47 | SUMO2010-007 DOL wage survey rate |
Official document: MO20260008 on SAM.gov.
MO20260009 rev 2 · Building · Chariton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | 22.42 | ENGI0101-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | 22.42 | ENGI0101-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $45.48 | 22.42 | ENGI0101-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | 22.42 | ENGI0101-021 collectively bargained (union) rate |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | 0.00 | SUMO2010-008 DOL wage survey rate |
Official document: MO20260009 on SAM.gov.
MO20260010 rev 2 · Building · Cooper
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | 22.42 | ENGI0101-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | 22.42 | ENGI0101-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | 22.42 | ENGI0101-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $45.48 | 22.42 | ENGI0101-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | 22.42 | ENGI0101-015 collectively bargained (union) rate |
Official document: MO20260010 on SAM.gov.
MO20260011 rev 1 · Building · Dunklin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-010 DOL wage survey rate |
Official document: MO20260011 on SAM.gov.
MO20260012 rev 2 · Building · Johnson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | 22.42 | ENGI0101-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | 22.42 | ENGI0101-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | 22.42 | ENGI0101-012 collectively bargained (union) rate |
| OPERATOR: WATER TRUCK | $28.37 | 0.00 | SUMO2010-011 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | 0.00 | SUMO2010-011 DOL wage survey rate |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | 7.47 | SUMO2010-011 DOL wage survey rate |
Official document: MO20260012 on SAM.gov.
MO20260013 rev 1 · Building · Lawrence
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| OPERATOR: WATER TRUCK | $28.37 | 0.00 | SUMO2010-012 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | 0.00 | SUMO2010-012 DOL wage survey rate |
| OPERATOR: BACKHOE/TRACKHOE | $19.80 | 7.47 | SUMO2010-012 DOL wage survey rate |
Official document: MO20260013 on SAM.gov.
MO20260014 rev 1 · Building · Mississippi
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-013 DOL wage survey rate |
Official document: MO20260014 on SAM.gov.
MO20260015 rev 1 · Building · New Madrid
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-014 DOL wage survey rate |
Official document: MO20260015 on SAM.gov.
MO20260016 rev 1 · Building · Pemiscot
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-015 DOL wage survey rate |
Official document: MO20260016 on SAM.gov.
MO20260017 rev 2 · Building · Pettis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | 22.42 | ENGI0101-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | 22.42 | ENGI0101-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | 22.42 | ENGI0101-012 collectively bargained (union) rate |
| OPERATOR: WATER TRUCK | $28.37 | 0.00 | SUMO2010-016 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | 0.00 | SUMO2010-016 DOL wage survey rate |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | 7.47 | SUMO2010-016 DOL wage survey rate |
Official document: MO20260017 on SAM.gov.
MO20260018 rev 1 · Building · Phelps
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $35.76 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
Official document: MO20260018 on SAM.gov.
MO20260019 rev 1 · Building · Pulaski
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $35.76 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
Official document: MO20260019 on SAM.gov.
MO20260020 rev 1 · Building · Ralls
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-009 collectively bargained (union) rate |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | 0.00 | SUMO2010-019 DOL wage survey rate |
Official document: MO20260020 on SAM.gov.
MO20260021 rev 1 · Building · Ripley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-020 DOL wage survey rate |
Official document: MO20260021 on SAM.gov.
MO20260022 rev 1 · Building · Scott
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-014 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-021 DOL wage survey rate |
Official document: MO20260022 on SAM.gov.
MO20260023 rev 1 · Building · Shannon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-022 DOL wage survey rate |
Official document: MO20260023 on SAM.gov.
MO20260024 rev 1 · Building · Stoddard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/TRACKHOE) | $39.06 | 30.38 | ENGI0513-015 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-023 DOL wage survey rate |
Official document: MO20260024 on SAM.gov.
MO20260025 rev 1 · Building · Texas
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | 30.38 | ENGI0513-010 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-024 DOL wage survey rate |
Official document: MO20260025 on SAM.gov.
MO20260026 rev 1 · Building · Vernon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| OPERATOR: WATER TRUCK | $28.37 | 0.00 | SUMO2010-025 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | 0.00 | SUMO2010-025 DOL wage survey rate |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | 7.47 | SUMO2010-025 DOL wage survey rate |
Official document: MO20260026 on SAM.gov.
MO20260027 rev 1 · Building · Wright
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | 18.07 | ENGI0101-008 collectively bargained (union) rate |
| OPERATOR: WATER TRUCK | $28.37 | 0.00 | SUMO2010-026 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | 0.00 | SUMO2010-026 DOL wage survey rate |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | 7.47 | SUMO2010-026 DOL wage survey rate |
Official document: MO20260027 on SAM.gov.
MO20260028 rev 2 · Building · Adair, Atchison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (ATCHISON COUNTY) | $45.48 | 22.42 | ENGI0101-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ATCHISON COUNTY) | $45.48 | 22.42 | ENGI0101-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (ATCHISON COUNTY) | $45.48 | 22.42 | ENGI0101-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ATCHISON COUNTY) | $45.48 | 22.42 | ENGI0101-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ADAIR COUNTY) | $39.06 | 30.38 | ENGI0513-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ADAIR COUNTY) | $39.06 | 30.38 | ENGI0513-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (ADAIR COUNTY) | $39.06 | 30.38 | ENGI0513-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ADAIR COUNTY) | $39.06 | 30.38 | ENGI0513-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER (ADAIR COUNTY) | $39.06 | 30.38 | ENGI0513-011 collectively bargained (union) rate |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | 0.00 | SUMO2010-027 DOL wage survey rate |
Official document: MO20260028 on SAM.gov.
MO20260029 rev 1 · Building · Barry, Barton, Benton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (BARRY & BARTON COUNTIES) | $30.91 | 18.07 | ENGI0101-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (BARRY & BARTON COUNTIES) | $31.62 | 18.07 | ENGI0101-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BARRY & BARTON COUNTIES) | $31.62 | 18.07 | ENGI0101-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER (BARRY & BARTON COUNTIES) | $31.62 | 18.07 | ENGI0101-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER (BENTON COUNTY) | $45.48 | 22.42 | ENGI0101-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (BENTON COUNTY) | $45.48 | 22.42 | ENGI0101-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BENTON COUNTY) | $45.48 | 22.42 | ENGI0101-017 collectively bargained (union) rate |
| OPERATOR: WATER TRUCK | $28.37 | 0.00 | SUMO2010-028 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | 0.00 | SUMO2010-028 DOL wage survey rate |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | 7.47 | SUMO2010-028 DOL wage survey rate |
Official document: MO20260029 on SAM.gov.
MO20260030 rev 1 · Building · Carter, Howell, Iron, Madison, Oregon, Perry and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (HOWELL & OREGON COUNTIES) | $39.06 | 30.38 | ENGI0513-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (HOWELL & OREGON COUNTIES) | $39.06 | 30.38 | ENGI0513-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (HOWELL & OREGON COUNTIES) | $39.06 | 30.38 | ENGI0513-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER (HOWELL & OREGON COUNTIES) | $39.06 | 30.38 | ENGI0513-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (HOWELL & OREGON COUNTIES) | $39.06 | 30.38 | ENGI0513-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES) | $39.06 | 30.38 | ENGI0513-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES) | $39.06 | 30.38 | ENGI0513-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES) | $39.06 | 30.38 | ENGI0513-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES) | $39.06 | 30.38 | ENGI0513-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST FRANCOIS, STE GENEVIEVE & WAYNE COUNTIES) | $39.06 | 30.38 | ENGI0513-016 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.80 | 10.78 | SUMO2010-029 DOL wage survey rate |
Official document: MO20260030 on SAM.gov.
MO20260031 rev 3 · Building · Clark, Daviess, Gentry, Grundy, Harrison, Holt and 18 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (DAVIESS, GENTRY, GRUNDY, HARRISON, HOLT, LINN, LIVINGSTON, MERCER, NODAWAY, SALINE, SULLIVAN & WORTH COUNTIES) | $45.48 | 22.42 | ENGI0101-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (DAVIESS, GENTRY, GRUNDY, HARRISON, HOLT, LINN, LIVINGSTON, MERCER, NODAWAY, SALINE, SULLIVAN & WORTH COUNTIES) | $45.48 | 22.42 | ENGI0101-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (DAVIESS, GENTRY, GRUNDY, HARRISON, HOLT, LINN, LIVINGSTON, MERCER, NODAWAY, SALINE, SULLIVAN & WORTH COUNTIES) | $45.48 | 22.42 | ENGI0101-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES) | $39.06 | 30.38 | ENGI0513-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES) | $39.06 | 30.38 | ENGI0513-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES) | $39.06 | 30.38 | ENGI0513-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES) | $39.06 | 30.38 | ENGI0513-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER (CLARK, KNOX, LEWIS, MACON, MARION, MONROE, PIKE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND & SHELBY COUNTIES) | $39.06 | 30.38 | ENGI0513-013 collectively bargained (union) rate |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | 0.00 | SUMO2010-030 DOL wage survey rate |
Official document: MO20260031 on SAM.gov.
MO20260032 rev 2 · Building · Dade, Douglas, Henry, Hickory, Laclede, Ozark and 3 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $30.91 | 18.07 | ENGI0101-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | 18.07 | ENGI0101-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | 18.07 | ENGI0101-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | 18.07 | ENGI0101-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:: ROLLER (HENRY COUNTY) | $45.48 | 22.42 | ENGI0101-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:: LOADER (HENRY COUNTY) | $45.84 | 22.42 | ENGI0101-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:: GRADER/BLADE (HENRY COUNTY) | $45.48 | 22.42 | ENGI0101-019 collectively bargained (union) rate |
| OPERATOR: WATER TRUCK | $28.37 | 0.00 | SUMO2010-031 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | 0.00 | SUMO2010-031 DOL wage survey rate |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | 7.47 | SUMO2010-031 DOL wage survey rate |
Official document: MO20260032 on SAM.gov.
MO20260033 rev 1 · Building · Dent, Gasconade, Maries, Miller, Montgomery, Morgan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $35.76 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | 30.38 | ENGI0513-001 collectively bargained (union) rate |
Official document: MO20260033 on SAM.gov.
MO20260056 rev 1 · Building · Crawford
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: ROLLER | $39.06 | 30.38 | ENGI0513-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: PAVER | $39.06 | 30.38 | ENGI0513-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: LOADER | $39.06 | 30.38 | ENGI0513-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GRADER/BLADE | $39.06 | 30.38 | ENGI0513-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: FORKLIFT | $39.06 | 30.38 | ENGI0513-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: CRANE | $39.06 | 30.38 | ENGI0513-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER | $39.06 | 30.38 | ENGI0513-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR | $39.06 | 30.38 | ENGI0513-005 collectively bargained (union) rate |
| OPERATOR: HOIST | $26.02 | 13.01 | SUMO2023-001 DOL wage survey rate |
Official document: MO20260056 on SAM.gov.
MO20260062 rev 1 · Residential · Franklin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $41.01 | 29.63 | ENGI0513-018 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $41.01 | 29.63 | ENGI0513-018 collectively bargained (union) rate |
Official document: MO20260062 on SAM.gov.
MO20260063 rev 1 · Residential · Jackson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | 22.42 | ENGI0101-031 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $45.48 | 22.42 | ENGI0101-031 collectively bargained (union) rate |
Official document: MO20260063 on SAM.gov.
MO20260064 rev 1 · Residential · St Louis City
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $41.01 | 29.63 | ENGI0513-018 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $41.01 | 29.63 | ENGI0513-018 collectively bargained (union) rate |
Official document: MO20260064 on SAM.gov.
MO20260065 rev 1 · Residential · Andrew, Buchanan, De Kalb
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (ANDREW & DE KALB COUNTIES) | $45.48 | 22.42 | ENGI0101-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (ANDREW & DE KALB COUNTIES) | $45.48 | 22.42 | ENGI0101-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER (BUCHANAN COUNTY) | $45.48 | 22.42 | ENGI0101-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (BUCHANAN COUNTY) | $45.48 | 22.42 | ENGI0101-033 collectively bargained (union) rate |
Official document: MO20260065 on SAM.gov.
MO20260066 rev 1 · Residential · Bates, Caldwell, Cass, Clay, Clinton, Lafayette and 2 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (CASS, CLAY, CLINTON, LAFAYETTE, PLATTE & RAY COUNTIES) | $45.48 | 22.42 | ENGI0101-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (CASS, CLAY, CLINTON, LAFAYETTE, PLATTE & RAY COUNTIES) | $45.48 | 22.42 | ENGI0101-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER (BATES & CALDWELL COUNTIES) | $45.48 | 22.42 | ENGI0101-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (BATES & CALDWELL COUNTIES) | $45.48 | 22.42 | ENGI0101-035 collectively bargained (union) rate |
Official document: MO20260066 on SAM.gov.
MO20260067 rev 1 · Residential · Boone, Howard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (HOWARD COUNTY) | $45.48 | 22.42 | ENGI0101-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (HOWARD COUNTY) | $45.48 | 22.42 | ENGI0101-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER (BOONE COUNTY) | $34.61 | 29.50 | ENGI0513-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (BOONE COUNTY) | $34.61 | 29.50 | ENGI0513-021 collectively bargained (union) rate |
Official document: MO20260067 on SAM.gov.
MO20260068 rev 1 · Residential · Callaway, Cole, Moniteau, Osage
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $34.61 | 29.50 | ENGI0513-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $34.61 | 29.50 | ENGI0513-017 collectively bargained (union) rate |
Official document: MO20260068 on SAM.gov.
MO20260069 rev 1 · Residential · Christian, Dallas, Greene, Polk, Webster
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | 22.42 | ENGI0101-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $45.48 | 22.42 | ENGI0101-030 collectively bargained (union) rate |
Official document: MO20260069 on SAM.gov.
MO20260070 rev 1 · Residential · Crawford, Jefferson, Lincoln, St Charles, St Louis, Warren and 1 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:: ROLLER (CRAWFORD & WASHINGTON COUNTIES) | $34.61 | 29.50 | ENGI0513-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:: BACKHOE/EXCAVATOR (CRAWFORD & WASHINGTON COUNTIES) | $34.61 | 29.50 | ENGI0513-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:: ROLLER (JEFFERSON, LINCOLN, ST CHARLES, ST LOUIS & WARREN COUNTIES) | $41.01 | 29.63 | ENGI0513-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:: BACKHOE/EXCAVATOR (JEFFERSON, LINCOLN, ST CHARLES, ST LOUIS & WARREN COUNTIES) | $41.01 | 29.63 | ENGI0513-020 collectively bargained (union) rate |
Official document: MO20260070 on SAM.gov.
MO20260071 rev 1 · Residential · Jasper, McDonald, Newton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | 22.42 | ENGI0101-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $45.48 | 22.42 | ENGI0101-030 collectively bargained (union) rate |
Official document: MO20260071 on SAM.gov.
MO20260072 rev 2 · Building · Cass
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $44.14 | 22.42 | ENGI0101-052 collectively bargained (union) rate |
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: LOADER | $38.39 | 17.55 | SUMO2020-001 DOL wage survey rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-001 DOL wage survey rate |
Official document: MO20260072 on SAM.gov.
MO20260073 rev 2 · Building · Clinton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $44.14 | 22.42 | ENGI0101-052 collectively bargained (union) rate |
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: LOADER | $38.39 | 17.55 | SUMO2020-002 DOL wage survey rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-002 DOL wage survey rate |
Official document: MO20260073 on SAM.gov.
MO20260074 rev 1 · Building · Franklin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $45.96 | 30.57 | ENGI0513-028 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SHEE0036-036 collectively bargained (union) rate |
Official document: MO20260074 on SAM.gov.
MO20260075 rev 1 · Building · Greene
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-004 DOL wage survey rate |
Official document: MO20260075 on SAM.gov.
MO20260076 rev 1 · Building · Jasper
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-005 DOL wage survey rate |
Official document: MO20260076 on SAM.gov.
MO20260077 rev 1 · Building · Jefferson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $45.96 | 30.57 | ENGI0513-028 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SHEE0036-036 collectively bargained (union) rate |
Official document: MO20260077 on SAM.gov.
MO20260078 rev 1 · Building · Moniteau
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-007 DOL wage survey rate |
Official document: MO20260078 on SAM.gov.
MO20260079 rev 2 · Building · Platte
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $44.14 | 22.42 | ENGI0101-052 collectively bargained (union) rate |
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: LOADER | $38.39 | 17.55 | SUMO2020-008 DOL wage survey rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-008 DOL wage survey rate |
Official document: MO20260079 on SAM.gov.
MO20260080 rev 2 · Building · St Louis City
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $45.96 | 30.57 | ENGI0513-028 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-009 DOL wage survey rate |
Official document: MO20260080 on SAM.gov.
MO20260081 rev 2 · Building · Andrew, Buchanan, De Kalb
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $44.14 | 22.42 | ENGI0101-052 collectively bargained (union) rate |
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: LOADER | $38.39 | 17.55 | SUMO2020-010 DOL wage survey rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-010 DOL wage survey rate |
Official document: MO20260081 on SAM.gov.
MO20260082 rev 2 · Building · Bates, Caldwell, Clay, Jackson, Lafayette, Ray
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $44.14 | 22.42 | ENGI0101-052 collectively bargained (union) rate |
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.48 | 22.42 | ENGI0101-054 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: LOADER | $38.39 | 17.55 | SUMO2020-011 DOL wage survey rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-011 DOL wage survey rate |
Official document: MO20260082 on SAM.gov.
MO20260083 rev 1 · Building · Bollinger, Cape Girardeau
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $45.96 | 30.57 | ENGI0513-028 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SHEE0036-036 collectively bargained (union) rate |
Official document: MO20260083 on SAM.gov.
MO20260084 rev 1 · Building · Boone, Howard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-013 DOL wage survey rate |
Official document: MO20260084 on SAM.gov.
MO20260085 rev 1 · Building · Callaway, Cole, Osage
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | 30.38 | ENGI0513-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-014 DOL wage survey rate |
Official document: MO20260085 on SAM.gov.
MO20260086 rev 1 · Building · Christian, Dallas, Polk, Webster
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-015 DOL wage survey rate |
Official document: MO20260086 on SAM.gov.
MO20260087 rev 1 · Building · Lincoln, St Charles, Warren
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $45.96 | 30.57 | ENGI0513-028 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SHEE0036-036 collectively bargained (union) rate |
Official document: MO20260087 on SAM.gov.
MO20260088 rev 1 · Building · McDonald, Newton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: CRANE | $47.29 | 22.42 | ENGI0101-053 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| OPERATOR: ROLLER | $39.61 | 30.15 | SUMO2020-017 DOL wage survey rate |
Official document: MO20260088 on SAM.gov.
MO20260089 rev 1 · Building · St Louis, Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | 30.22 | ENGI0513-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | 30.38 | ENGI0513-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | 30.57 | ENGI0513-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $45.96 | 30.57 | ENGI0513-028 collectively bargained (union) rate |
Official document: MO20260089 on SAM.gov.
Showing the first 400 of 401 published heavy equipment operator rates. The rest are on the individual determination pages linked above, each of which carries the full official text.
Where to go next
Heavy Equipment Operator rates in every state · Missouri prevailing wage and state law · Missouri determinations by county · pay calculator
Other trades in Missouri
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Glazier · Insulator (Heat & Frost) · Elevator Constructor · Sprinkler Fitter · Tile Setter · Floor Layer · Line Constructor / Lineman