Heavy Equipment Operator prevailing wage rates in Montana
Federal Davis-Bacon rates published in 68 active determinations, 2026
- Active federal Davis-Bacon determinations for Montana publish 395 heavy equipment operator classification rates, across 68 determinations covering 58 counties.
- Those published base rates run from $7.25 to $46.15 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in Montana: .
This page collects every classification in Montana's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
MT20260002 rev 1 · Residential · Granite, Powell
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (GRADALL) | $10.76 | 1.62 | SUMT1992-005 DOL wage survey rate |
Official document: MT20260002 on SAM.gov.
MT20260004 rev 1 · Residential · Lake, Mineral, Sanders
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: SHOVEL/BACKHOE 1 TO 3 CU YD | $7.50 | 0.00 | SUMT1992-006 DOL wage survey rate |
Official document: MT20260004 on SAM.gov.
MT20260005 rev 1 · Residential · Missoula
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FRONT END LOADER: 1 TO 3 CU YD | $12.96 | 2.42 | SUMT1992-009 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER: 1 CU YD OR LESS | $12.67 | 2.42 | SUMT1992-009 DOL wage survey rate |
Official document: MT20260005 on SAM.gov.
MT20260006 rev 1 · Residential · Musselshell, Rosebud, Treasure
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FORKLIFT | $11.27 | 1.57 | SUMT1992-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/LOADER 1 CU YD & UNDER | $11.46 | 1.57 | SUMT1992-004 DOL wage survey rate |
Official document: MT20260006 on SAM.gov.
MT20260007 rev 1 · Residential · Roosevelt
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (3) RUBBER TIRED FRONT END LOADER (OVER 1 CU YD TO 3 CU YD, TRACK TYPE TRACTOR W/WO ATTACHMENTS) | $10.76 | 1.62 | SUMT1990-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: (2) RUBBER TIRED FRONT END LOADER (1 CU YD AND UNDER) | $10.47 | 1.62 | SUMT1990-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: (1) FORKLIFT | $10.57 | 1.62 | SUMT1990-001 DOL wage survey rate |
Official document: MT20260007 on SAM.gov.
MT20260008 rev 1 · Residential · Roosevelt
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (FRONT END LOADER) | $11.46 | 1.92 | SUMT1992-003 DOL wage survey rate |
Official document: MT20260008 on SAM.gov.
MT20260011 rev 1 · Residential · Yellowstone
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: SCRAPER (DW 10) | $11.46 | 1.57 | SUMT1992-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $11.27 | 1.57 | SUMT1992-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE AND LOADER COMBINATION, 1 CU YD AND UNDER | $11.46 | 1.57 | SUMT1992-002 DOL wage survey rate |
Official document: MT20260011 on SAM.gov.
MT20260013 rev 1 · Residential · Beaverhead, Ravalli
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: TRACTOR W/O ATTACHMENTS | $9.36 | 1.30 | SUMT1992-022 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER (OVER 1 CU YD TO 3 CU YD) | $9.36 | 1.30 | SUMT1992-022 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER (1 CU YD AND UNDER) | $9.07 | 1.30 | SUMT1992-022 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $9.17 | 1.30 | SUMT1992-022 DOL wage survey rate |
Official document: MT20260013 on SAM.gov.
MT20260014 rev 1 · Residential · Big Horn
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOE, FRONT END LOADER, SHOVEL | $11.46 | 1.57 | SUMT1992-013 DOL wage survey rate |
Official document: MT20260014 on SAM.gov.
MT20260016 rev 1 · Residential · Broadwater, Jefferson, Madison, Meagher
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADALL, RUBBER-TIRED DOZER, TRACK TYPE TRACTOR | $10.01 | 1.50 | SUMT1990-002 DOL wage survey rate |
Official document: MT20260016 on SAM.gov.
MT20260017 rev 1 · Residential · Carbon, Park, Stillwater, Sweet Grass
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: TRACTOR WITHOUT ATTACHMENTS | $9.36 | 1.30 | SUMT1992-017 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER (OVER 1 CU YD TO 3 CU YD) | $9.36 | 1.30 | SUMT1992-017 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER (1 CU YD AND UNDER) | $9.07 | 1.30 | SUMT1992-017 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $9.17 | 1.30 | SUMT1992-017 DOL wage survey rate |
Official document: MT20260017 on SAM.gov.
MT20260019 rev 1 · Residential · Carter, Custer, Daniels, Dawson, Fallon, Garfield and 6 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (BACKHOE) | $7.25 | 0.00 | SUMT1992-014 DOL wage survey rate |
Official document: MT20260019 on SAM.gov.
MT20260020 rev 1 · Residential · Chouteau, Judith Basin, Liberty, Pondera, Teton, Toole
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: TRACK TYPE FRONT END LOADERS UP TO & INCLUDING 5 CU YD | $10.46 | 1.50 | SUMT1992-018 DOL wage survey rate |
Official document: MT20260020 on SAM.gov.
MT20260025 rev 1 · Building · Beaverhead
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-001 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-001 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-001 DOL wage survey rate |
Official document: MT20260025 on SAM.gov.
MT20260026 rev 1 · Building · Blaine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-002 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-002 DOL wage survey rate |
Official document: MT20260026 on SAM.gov.
MT20260027 rev 1 · Building · Broadwater
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-003 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-003 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-003 DOL wage survey rate |
Official document: MT20260027 on SAM.gov.
MT20260028 rev 1 · Building · Daniels
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-004 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-004 DOL wage survey rate |
Official document: MT20260028 on SAM.gov.
MT20260029 rev 1 · Building · Dawson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-005 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-005 DOL wage survey rate |
Official document: MT20260029 on SAM.gov.
MT20260030 rev 1 · Building · Deer Lodge
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-006 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-006 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-006 DOL wage survey rate |
Official document: MT20260030 on SAM.gov.
MT20260031 rev 1 · Building · Fergus
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-007 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-007 DOL wage survey rate |
Official document: MT20260031 on SAM.gov.
MT20260032 rev 2 · Building · Flathead
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-008 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $20.39 | 4.38 | SUMT2011-008 DOL wage survey rate |
Official document: MT20260032 on SAM.gov.
MT20260033 rev 1 · Building · Gallatin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-009 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-009 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-009 DOL wage survey rate |
Official document: MT20260033 on SAM.gov.
MT20260034 rev 2 · Building · Glacier
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-010 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-010 DOL wage survey rate |
Official document: MT20260034 on SAM.gov.
MT20260035 rev 1 · Building · Golden Valley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-011 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-011 DOL wage survey rate |
Official document: MT20260035 on SAM.gov.
MT20260036 rev 1 · Building · Granite
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-012 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-012 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-012 DOL wage survey rate |
Official document: MT20260036 on SAM.gov.
MT20260037 rev 1 · Building · Hill
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-013 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-013 DOL wage survey rate |
Official document: MT20260037 on SAM.gov.
MT20260038 rev 1 · Building · Jefferson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-014 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-014 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-014 DOL wage survey rate |
Official document: MT20260038 on SAM.gov.
MT20260039 rev 2 · Building · Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-015 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $20.39 | 4.38 | SUMT2011-015 DOL wage survey rate |
Official document: MT20260039 on SAM.gov.
MT20260040 rev 1 · Building · Lewis And Clark
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-016 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-016 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-016 DOL wage survey rate |
Official document: MT20260040 on SAM.gov.
MT20260041 rev 2 · Building · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-017 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $19.10 | 0.43 | SUMT2011-017 DOL wage survey rate |
Official document: MT20260041 on SAM.gov.
MT20260042 rev 1 · Building · Madison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-018 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-018 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-018 DOL wage survey rate |
Official document: MT20260042 on SAM.gov.
MT20260043 rev 1 · Building · McCone
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-019 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-019 DOL wage survey rate |
Official document: MT20260043 on SAM.gov.
MT20260044 rev 2 · Building · Mineral
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-020 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $20.39 | 4.38 | SUMT2011-020 DOL wage survey rate |
Official document: MT20260044 on SAM.gov.
MT20260045 rev 1 · Building · Park
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-021 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-021 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-021 DOL wage survey rate |
Official document: MT20260045 on SAM.gov.
MT20260046 rev 1 · Building · Petroleum
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-022 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-022 DOL wage survey rate |
Official document: MT20260046 on SAM.gov.
MT20260047 rev 1 · Building · Pondera
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-023 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-023 DOL wage survey rate |
Official document: MT20260047 on SAM.gov.
MT20260048 rev 2 · Building · Powell
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-024 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-024 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-024 DOL wage survey rate |
Official document: MT20260048 on SAM.gov.
MT20260049 rev 1 · Building · Richland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-025 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-025 DOL wage survey rate |
Official document: MT20260049 on SAM.gov.
MT20260050 rev 1 · Building · Roosevelt
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-026 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-026 DOL wage survey rate |
Official document: MT20260050 on SAM.gov.
MT20260051 rev 1 · Building · Sheridan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-027 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-027 DOL wage survey rate |
Official document: MT20260051 on SAM.gov.
MT20260052 rev 1 · Building · Silver Bow
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-028 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-028 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-028 DOL wage survey rate |
Official document: MT20260052 on SAM.gov.
MT20260053 rev 1 · Building · Stillwater
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-029 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-029 DOL wage survey rate |
Official document: MT20260053 on SAM.gov.
MT20260054 rev 1 · Building · Treasure
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-030 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-030 DOL wage survey rate |
Official document: MT20260054 on SAM.gov.
MT20260055 rev 1 · Building · Wibaux
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-031 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-031 DOL wage survey rate |
Official document: MT20260055 on SAM.gov.
MT20260056 rev 1 · Building · Big Horn, Prairie
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-032 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-032 DOL wage survey rate |
Official document: MT20260056 on SAM.gov.
MT20260057 rev 1 · Building · Carter, Custer, Fallon, Garfield, Phillips, Powder River and 2 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-033 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-033 DOL wage survey rate |
Official document: MT20260057 on SAM.gov.
MT20260058 rev 1 · Building · Chouteau, Judith Basin, Liberty, Musselshell, Sweet Grass, Teton and 2 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-034 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.98 | 5.57 | SUMT2011-034 DOL wage survey rate |
Official document: MT20260058 on SAM.gov.
MT20260059 rev 1 · Building · Meagher, Yellowstone National Park
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-035 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.20 | 6.75 | SUMT2011-035 DOL wage survey rate |
| OPERATOR: CRANE | $24.04 | 7.41 | SUMT2011-035 DOL wage survey rate |
Official document: MT20260059 on SAM.gov.
MT20260060 rev 2 · Building · Ravalli, Sanders
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: | $42.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI | $40.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $38.00 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T | $21.51 | 16.20 | ENGI0400-003 collectively bargained (union) rate |
| OPERATOR: FORKLIFT | $21.44 | 8.05 | SUMT2011-036 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $20.39 | 4.38 | SUMT2011-036 DOL wage survey rate |
Official document: MT20260060 on SAM.gov.
MT20260061 rev 1 · Building · Carbon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, BACKHOE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $32.88 | 16.20 | ENGI0400-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DET | $31.51 | 16.20 | ENGI0400-005 collectively bargained (union) rate |
Official document: MT20260061 on SAM.gov.
MT20260062 rev 2 · Building · Cascade
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $32.88 | 16.20 | ENGI0400-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DET | $31.51 | 16.20 | ENGI0400-004 collectively bargained (union) rate |
| OPERATOR: BACKHOE | $20.56 | 6.35 | SUMT2011-038 DOL wage survey rate |
Official document: MT20260062 on SAM.gov.
MT20260063 rev 2 · Building · Missoula
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $32.88 | 16.20 | ENGI0400-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DET | $31.51 | 16.20 | ENGI0400-004 collectively bargained (union) rate |
| OPERATOR: BACKHOE | $20.56 | 6.35 | SUMT2011-039 DOL wage survey rate |
Official document: MT20260063 on SAM.gov.
MT20260064 rev 1 · Building · Yellowstone
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, BACKHOE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $32.88 | 16.20 | ENGI0400-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DET | $31.51 | 16.20 | ENGI0400-005 collectively bargained (union) rate |
Official document: MT20260064 on SAM.gov.
MT20260065 rev 1 · Heavy · Carbon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL B | $41.15 | 16.20 | ENGI0400-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $40.07 | 16.20 | ENGI0400-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY | $23.94 | 10.40 | ENGI0400-007 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $26.31 | 8.05 | SUMT2011-041 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $26.54 | 8.05 | SUMT2011-041 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.67 | 8.05 | SUMT2011-041 DOL wage survey rate |
| OPERATOR: ASPHALT ROLLER | $22.39 | 3.96 | SUMT2011-041 DOL wage survey rate |
Official document: MT20260065 on SAM.gov.
MT20260066 rev 1 · Heavy · Cascade
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6)CRANES, 75 TONS TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE T | $41.15 | 16.20 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5)CRANES, 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4)CRANES, 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY | $23.94 | 10.40 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (1) A-FRAME TRUCK CRANE, FORKLIFT, OILER (EXCEPT CRANE). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P | $23.47 | 10.40 | ENGI0400-006 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $22.67 | 6.54 | SUMT2011-042 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.67 | 8.05 | SUMT2011-042 DOL wage survey rate |
| OPERATOR: BACKHOE | $21.99 | 8.55 | SUMT2011-042 DOL wage survey rate |
| OPERATOR: ASPHALT ROLLER | $22.39 | 3.96 | SUMT2011-042 DOL wage survey rate |
Official document: MT20260066 on SAM.gov.
MT20260067 rev 2 · Heavy · Missoula
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6)CRANES, 75 TONS TO AND INCL. 149 TONS; WHIRLEY CRANES. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH | $41.15 | 16.20 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5)CRANES, 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $40.07 | 16.20 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4)CRANES, 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY | $23.94 | 10.40 | ENGI0400-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (1) A-FRAME TRUCK CRANE, FORKLIFT, OILER (EXCEPT CRANE). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P | $23.47 | 10.40 | ENGI0400-006 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $22.67 | 6.54 | SUMT2011-043 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.67 | 8.05 | SUMT2011-043 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.12 | 8.37 | SUMT2011-043 DOL wage survey rate |
| OPERATOR: ASPHALT ROLLER | $22.39 | 3.96 | SUMT2011-043 DOL wage survey rate |
Official document: MT20260067 on SAM.gov.
MT20260068 rev 1 · Heavy · Yellowstone
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $40.07 | 16.20 | ENGI0400-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) BACKHOE, CRANE OILER, EXCAVATOR. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETE | $23.94 | 10.40 | ENGI0400-008 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.67 | 8.05 | SUMT2011-044 DOL wage survey rate |
| OPERATOR: ASPHALT ROLLER | $22.39 | 3.96 | SUMT2011-044 DOL wage survey rate |
Official document: MT20260068 on SAM.gov.
MT20260069 rev 1 · Heavy · Custer
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $24.34 | 10.40 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL | $23.94 | 10.40 | ENGI0400-013 collectively bargained (union) rate |
| OPERATOR: SCRAPER | $23.00 | 6.76 | SUMT2011-045 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $23.02 | 8.05 | SUMT2011-045 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $25.44 | 8.45 | SUMT2011-045 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $23.05 | 8.05 | SUMT2011-045 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | 8.05 | SUMT2011-045 DOL wage survey rate |
Official document: MT20260069 on SAM.gov.
MT20260070 rev 2 · Heavy · Flathead
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO | $23.94 | 10.40 | ENGI0400-009 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $24.20 | 7.84 | SUMT2011-046 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $24.69 | 8.40 | SUMT2011-046 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.94 | 9.05 | SUMT2011-046 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.99 | 8.55 | SUMT2011-046 DOL wage survey rate |
| OPERATOR: BACKHOE | $21.44 | 8.05 | SUMT2011-046 DOL wage survey rate |
Official document: MT20260070 on SAM.gov.
MT20260071 rev 1 · Heavy · Park
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL | $23.94 | 10.40 | ENGI0400-014 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $24.20 | 7.84 | SUMT2011-047 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $24.69 | 8.40 | SUMT2011-047 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $23.12 | 7.81 | SUMT2011-047 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.99 | 8.55 | SUMT2011-047 DOL wage survey rate |
Official document: MT20260071 on SAM.gov.
MT20260072 rev 1 · Heavy · Stillwater
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO | $23.94 | 10.40 | ENGI0400-015 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $25.44 | 8.45 | SUMT2011-048 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.53 | 8.05 | SUMT2011-048 DOL wage survey rate |
| OPERATOR: BACKHOE | $25.71 | 8.05 | SUMT2011-048 DOL wage survey rate |
Official document: MT20260072 on SAM.gov.
MT20260073 rev 1 · Heavy · Toole
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $24.34 | 10.40 | ENGI0400-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING | $23.94 | 10.40 | ENGI0400-017 collectively bargained (union) rate |
| OPERATOR: SCRAPER | $27.69 | 8.55 | SUMT2011-049 DOL wage survey rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $27.29 | 8.55 | SUMT2011-049 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $25.01 | 7.78 | SUMT2011-049 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $25.44 | 8.45 | SUMT2011-049 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $26.84 | 9.89 | SUMT2011-049 DOL wage survey rate |
| OPERATOR: BULLDOZER | $27.29 | 8.55 | SUMT2011-049 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.53 | 8.05 | SUMT2011-049 DOL wage survey rate |
| OPERATOR: BACKHOE | $26.14 | 8.05 | SUMT2011-049 DOL wage survey rate |
Official document: MT20260073 on SAM.gov.
MT20260074 rev 1 · Heavy · Valley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $24.34 | 10.40 | ENGI0400-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL | $23.94 | 10.40 | ENGI0400-013 collectively bargained (union) rate |
| OPERATOR: SCRAPER | $23.00 | 6.76 | SUMT2011-050 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $24.58 | 8.05 | SUMT2011-050 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $25.44 | 8.45 | SUMT2011-050 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $23.62 | 8.05 | SUMT2011-050 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.53 | 8.05 | SUMT2011-050 DOL wage survey rate |
Official document: MT20260074 on SAM.gov.
MT20260075 rev 1 · Heavy · Beaverhead, Broadwater, Deer Lodge, Gallatin, Granite, Jefferson and 6 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO | $23.94 | 10.40 | ENGI0400-009 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $24.20 | 7.84 | SUMT2011-051 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $24.69 | 8.40 | SUMT2011-051 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $23.12 | 7.81 | SUMT2011-051 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.99 | 8.55 | SUMT2011-051 DOL wage survey rate |
| OPERATOR: BACKHOE | $24.16 | 8.05 | SUMT2011-051 DOL wage survey rate |
Official document: MT20260075 on SAM.gov.
MT20260076 rev 1 · Heavy · Big Horn, Carter, Daniels, Dawson, Fallon, Garfield and 10 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE | $24.34 | 10.40 | ENGI0400-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL | $23.94 | 10.40 | ENGI0400-010 collectively bargained (union) rate |
| OPERATOR: SCRAPER | $23.00 | 6.76 | SUMT2011-052 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $24.58 | 8.05 | SUMT2011-052 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $25.44 | 8.45 | SUMT2011-052 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $23.62 | 8.05 | SUMT2011-052 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.53 | 8.05 | SUMT2011-052 DOL wage survey rate |
Official document: MT20260076 on SAM.gov.
MT20260077 rev 1 · Heavy · Blaine, Chouteau, Fergus, Glacier, Golden Valley, Hill and 8 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), EXCAVATOR. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES AP | $23.94 | 10.40 | ENGI0400-011 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $25.01 | 7.78 | SUMT2011-053 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $25.44 | 8.45 | SUMT2011-053 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.53 | 8.05 | SUMT2011-053 DOL wage survey rate |
| OPERATOR: BACKHOE | $25.71 | 8.05 | SUMT2011-053 DOL wage survey rate |
Official document: MT20260077 on SAM.gov.
MT20260078 rev 2 · Heavy · Lake, Lincoln, Mineral, Ravalli, Sanders
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO | $42.23 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC | $41.15 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE | $40.07 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $38.98 | 16.20 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS | $24.34 | 10.40 | ENGI0400-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO | $23.94 | 10.40 | ENGI0400-009 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $24.20 | 7.84 | SUMT2011-054 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $24.69 | 8.40 | SUMT2011-054 DOL wage survey rate |
| OPERATOR: EXCAVATOR | $22.94 | 9.05 | SUMT2011-054 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.99 | 8.55 | SUMT2011-054 DOL wage survey rate |
| OPERATOR: BACKHOE | $21.44 | 8.05 | SUMT2011-054 DOL wage survey rate |
Official document: MT20260078 on SAM.gov.
MT20260080 rev 3 · Highway · Beaverhead, Big Horn, Blaine, Broadwater, Carbon, Carter and 51 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 1 Air Compressor; Auto Fine Graders; Belt Finishing; Boring Machine (small); Cement Silo; Crane, A-Frame Truck Crane; Crusher Conveyor; DW-10, 15, a | $35.72 | 14.05 | SAMT2026-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 Air Doctor; Backhoe/Excavator/Shovel up to and including 3 CU Yard; Bit Grinder; Bituminous Paving Travel Plant; Boring Machine Large; Broom, Self | $38.00 | 14.05 | SAMT2026-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 Asphalt Paving Machine; Asphalt Screed; Backhoe/Excavator/Shovel Over 3 CU Yard; Cableway Highline; Concrete Batch Plant; Concrete Curing Machine; | $39.27 | 14.05 | SAMT2026-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 Asphalt/Hot Plant Operator, Cranes, 25 Tons up to and incl. 44 Tons; Crusher Operator; Finish Motor Patrol; Finish Scraper | $40.60 | 14.05 | SAMT2026-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 5 Cranes, 45 Tons up to and incl. 74 Tons | $41.85 | 14.05 | SAMT2026-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 6 Cranes, 75 Tons up to and incl. 149 Tons; Crane, Whirley (All) | $43.20 | 14.05 | SAMT2026-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 7 Cranes, 150 Tons up to and incl. 250 Tons; Cranes, over 250 tons-add $1.00 for every 100 tons over 250 tons; Crane, Tower (All); Crane Stiff-Leg o | $46.15 | 14.05 | SAMT2026-001 collectively bargained (union) rate |
Official document: MT20260080 on SAM.gov.
Where to go next
Heavy Equipment Operator rates in every state · Montana prevailing wage and state law · Montana determinations by county · pay calculator
Other trades in Montana
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Plasterer · Glazier · Millwright · Boilermaker · Sprinkler Fitter · Tile Setter · Floor Layer · Line Constructor / Lineman