Heavy Equipment Operator prevailing wage rates in Montana

Federal Davis-Bacon rates published in 68 active determinations, 2026

The official source: binding Davis-Bacon and Service Contract Act wage determinations are published by the U.S. Department of Labor at SAM.gov Wage Determinations. This site indexes them and links every determination to its official document - the determination incorporated into a contract governs.

This page collects every classification in Montana's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.

Published rates by determination

MT20260002 rev 1 · Residential · Granite, Powell

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR (GRADALL)$10.761.62SUMT1992-005
DOL wage survey rate

Official document: MT20260002 on SAM.gov.

MT20260004 rev 1 · Residential · Lake, Mineral, Sanders

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: SHOVEL/BACKHOE 1 TO 3 CU YD$7.500.00SUMT1992-006
DOL wage survey rate

Official document: MT20260004 on SAM.gov.

MT20260005 rev 1 · Residential · Missoula

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: FRONT END LOADER: 1 TO 3 CU YD$12.962.42SUMT1992-009
DOL wage survey rate
POWER EQUIPMENT OPERATOR: FRONT END LOADER: 1 CU YD OR LESS$12.672.42SUMT1992-009
DOL wage survey rate

Official document: MT20260005 on SAM.gov.

MT20260006 rev 1 · Residential · Musselshell, Rosebud, Treasure

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: FORKLIFT$11.271.57SUMT1992-004
DOL wage survey rate
POWER EQUIPMENT OPERATOR: BACKHOE/LOADER 1 CU YD & UNDER$11.461.57SUMT1992-004
DOL wage survey rate

Official document: MT20260006 on SAM.gov.

MT20260007 rev 1 · Residential · Roosevelt

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATORS: (3) RUBBER TIRED FRONT END LOADER (OVER 1 CU YD TO 3 CU YD, TRACK TYPE TRACTOR W/WO ATTACHMENTS)$10.761.62SUMT1990-001
DOL wage survey rate
POWER EQUIPMENT OPERATORS: (2) RUBBER TIRED FRONT END LOADER (1 CU YD AND UNDER)$10.471.62SUMT1990-001
DOL wage survey rate
POWER EQUIPMENT OPERATORS: (1) FORKLIFT$10.571.62SUMT1990-001
DOL wage survey rate

Official document: MT20260007 on SAM.gov.

MT20260008 rev 1 · Residential · Roosevelt

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR (FRONT END LOADER)$11.461.92SUMT1992-003
DOL wage survey rate

Official document: MT20260008 on SAM.gov.

MT20260011 rev 1 · Residential · Yellowstone

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: SCRAPER (DW 10)$11.461.57SUMT1992-002
DOL wage survey rate
POWER EQUIPMENT OPERATOR: FORKLIFT$11.271.57SUMT1992-002
DOL wage survey rate
POWER EQUIPMENT OPERATOR: BACKHOE AND LOADER COMBINATION, 1 CU YD AND UNDER$11.461.57SUMT1992-002
DOL wage survey rate

Official document: MT20260011 on SAM.gov.

MT20260013 rev 1 · Residential · Beaverhead, Ravalli

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: TRACTOR W/O ATTACHMENTS$9.361.30SUMT1992-022
DOL wage survey rate
POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER (OVER 1 CU YD TO 3 CU YD)$9.361.30SUMT1992-022
DOL wage survey rate
POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER (1 CU YD AND UNDER)$9.071.30SUMT1992-022
DOL wage survey rate
POWER EQUIPMENT OPERATOR: FORKLIFT$9.171.30SUMT1992-022
DOL wage survey rate

Official document: MT20260013 on SAM.gov.

MT20260014 rev 1 · Residential · Big Horn

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATORS: BACKHOE, FRONT END LOADER, SHOVEL$11.461.57SUMT1992-013
DOL wage survey rate

Official document: MT20260014 on SAM.gov.

MT20260016 rev 1 · Residential · Broadwater, Jefferson, Madison, Meagher

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: GRADALL, RUBBER-TIRED DOZER, TRACK TYPE TRACTOR$10.011.50SUMT1990-002
DOL wage survey rate

Official document: MT20260016 on SAM.gov.

MT20260017 rev 1 · Residential · Carbon, Park, Stillwater, Sweet Grass

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: TRACTOR WITHOUT ATTACHMENTS$9.361.30SUMT1992-017
DOL wage survey rate
POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER (OVER 1 CU YD TO 3 CU YD)$9.361.30SUMT1992-017
DOL wage survey rate
POWER EQUIPMENT OPERATOR: RUBBER TIRE FRONT END LOADER (1 CU YD AND UNDER)$9.071.30SUMT1992-017
DOL wage survey rate
POWER EQUIPMENT OPERATOR: FORKLIFT$9.171.30SUMT1992-017
DOL wage survey rate

Official document: MT20260017 on SAM.gov.

MT20260019 rev 1 · Residential · Carter, Custer, Daniels, Dawson, Fallon, Garfield and 6 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR (BACKHOE)$7.250.00SUMT1992-014
DOL wage survey rate

Official document: MT20260019 on SAM.gov.

MT20260020 rev 1 · Residential · Chouteau, Judith Basin, Liberty, Pondera, Teton, Toole

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: TRACK TYPE FRONT END LOADERS UP TO & INCLUDING 5 CU YD$10.461.50SUMT1992-018
DOL wage survey rate

Official document: MT20260020 on SAM.gov.

MT20260025 rev 1 · Building · Beaverhead

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-001
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-001
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-001
DOL wage survey rate

Official document: MT20260025 on SAM.gov.

MT20260026 rev 1 · Building · Blaine

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-002
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-002
DOL wage survey rate

Official document: MT20260026 on SAM.gov.

MT20260027 rev 1 · Building · Broadwater

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-003
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-003
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-003
DOL wage survey rate

Official document: MT20260027 on SAM.gov.

MT20260028 rev 1 · Building · Daniels

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-004
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-004
DOL wage survey rate

Official document: MT20260028 on SAM.gov.

MT20260029 rev 1 · Building · Dawson

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-005
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-005
DOL wage survey rate

Official document: MT20260029 on SAM.gov.

MT20260030 rev 1 · Building · Deer Lodge

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-006
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-006
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-006
DOL wage survey rate

Official document: MT20260030 on SAM.gov.

MT20260031 rev 1 · Building · Fergus

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-007
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-007
DOL wage survey rate

Official document: MT20260031 on SAM.gov.

MT20260032 rev 2 · Building · Flathead

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-008
DOL wage survey rate
OPERATOR: EXCAVATOR$20.394.38SUMT2011-008
DOL wage survey rate

Official document: MT20260032 on SAM.gov.

MT20260033 rev 1 · Building · Gallatin

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-009
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-009
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-009
DOL wage survey rate

Official document: MT20260033 on SAM.gov.

MT20260034 rev 2 · Building · Glacier

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-010
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-010
DOL wage survey rate

Official document: MT20260034 on SAM.gov.

MT20260035 rev 1 · Building · Golden Valley

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-011
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-011
DOL wage survey rate

Official document: MT20260035 on SAM.gov.

MT20260036 rev 1 · Building · Granite

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-012
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-012
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-012
DOL wage survey rate

Official document: MT20260036 on SAM.gov.

MT20260037 rev 1 · Building · Hill

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-013
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-013
DOL wage survey rate

Official document: MT20260037 on SAM.gov.

MT20260038 rev 1 · Building · Jefferson

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-014
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-014
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-014
DOL wage survey rate

Official document: MT20260038 on SAM.gov.

MT20260039 rev 2 · Building · Lake

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-015
DOL wage survey rate
OPERATOR: EXCAVATOR$20.394.38SUMT2011-015
DOL wage survey rate

Official document: MT20260039 on SAM.gov.

MT20260040 rev 1 · Building · Lewis And Clark

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-016
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-016
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-016
DOL wage survey rate

Official document: MT20260040 on SAM.gov.

MT20260041 rev 2 · Building · Lincoln

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-017
DOL wage survey rate
OPERATOR: EXCAVATOR$19.100.43SUMT2011-017
DOL wage survey rate

Official document: MT20260041 on SAM.gov.

MT20260042 rev 1 · Building · Madison

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-018
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-018
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-018
DOL wage survey rate

Official document: MT20260042 on SAM.gov.

MT20260043 rev 1 · Building · McCone

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-019
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-019
DOL wage survey rate

Official document: MT20260043 on SAM.gov.

MT20260044 rev 2 · Building · Mineral

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-020
DOL wage survey rate
OPERATOR: EXCAVATOR$20.394.38SUMT2011-020
DOL wage survey rate

Official document: MT20260044 on SAM.gov.

MT20260045 rev 1 · Building · Park

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-021
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-021
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-021
DOL wage survey rate

Official document: MT20260045 on SAM.gov.

MT20260046 rev 1 · Building · Petroleum

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-022
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-022
DOL wage survey rate

Official document: MT20260046 on SAM.gov.

MT20260047 rev 1 · Building · Pondera

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-023
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-023
DOL wage survey rate

Official document: MT20260047 on SAM.gov.

MT20260048 rev 2 · Building · Powell

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-024
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-024
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-024
DOL wage survey rate

Official document: MT20260048 on SAM.gov.

MT20260049 rev 1 · Building · Richland

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-025
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-025
DOL wage survey rate

Official document: MT20260049 on SAM.gov.

MT20260050 rev 1 · Building · Roosevelt

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-026
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-026
DOL wage survey rate

Official document: MT20260050 on SAM.gov.

MT20260051 rev 1 · Building · Sheridan

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-027
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-027
DOL wage survey rate

Official document: MT20260051 on SAM.gov.

MT20260052 rev 1 · Building · Silver Bow

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-028
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-028
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-028
DOL wage survey rate

Official document: MT20260052 on SAM.gov.

MT20260053 rev 1 · Building · Stillwater

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-029
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-029
DOL wage survey rate

Official document: MT20260053 on SAM.gov.

MT20260054 rev 1 · Building · Treasure

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-030
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-030
DOL wage survey rate

Official document: MT20260054 on SAM.gov.

MT20260055 rev 1 · Building · Wibaux

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-031
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-031
DOL wage survey rate

Official document: MT20260055 on SAM.gov.

MT20260056 rev 1 · Building · Big Horn, Prairie

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-032
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-032
DOL wage survey rate

Official document: MT20260056 on SAM.gov.

MT20260057 rev 1 · Building · Carter, Custer, Fallon, Garfield, Phillips, Powder River and 2 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-033
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-033
DOL wage survey rate

Official document: MT20260057 on SAM.gov.

MT20260058 rev 1 · Building · Chouteau, Judith Basin, Liberty, Musselshell, Sweet Grass, Teton and 2 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-034
DOL wage survey rate
OPERATOR: EXCAVATOR$22.985.57SUMT2011-034
DOL wage survey rate

Official document: MT20260058 on SAM.gov.

MT20260059 rev 1 · Building · Meagher, Yellowstone National Park

Classification as publishedBase rateFringesRate schedule
OPERATOR: FORKLIFT$21.448.05SUMT2011-035
DOL wage survey rate
OPERATOR: EXCAVATOR$22.206.75SUMT2011-035
DOL wage survey rate
OPERATOR: CRANE$24.047.41SUMT2011-035
DOL wage survey rate

Official document: MT20260059 on SAM.gov.

MT20260060 rev 2 · Building · Ravalli, Sanders

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, TOWER (ALL) ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:$42.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMI$40.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (5) CRANES 45-74 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (4) CRANES 25-44 TONS ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$38.0016.20ENGI0400-003
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: (1) A-FRAME TRUCK CRANE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING T$21.5116.20ENGI0400-003
collectively bargained (union) rate
OPERATOR: FORKLIFT$21.448.05SUMT2011-036
DOL wage survey rate
OPERATOR: EXCAVATOR$20.394.38SUMT2011-036
DOL wage survey rate

Official document: MT20260060 on SAM.gov.

MT20260061 rev 1 · Building · Carbon

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, BACKHOE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$32.8816.20ENGI0400-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DET$31.5116.20ENGI0400-005
collectively bargained (union) rate

Official document: MT20260061 on SAM.gov.

MT20260062 rev 2 · Building · Cascade

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$32.8816.20ENGI0400-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DET$31.5116.20ENGI0400-004
collectively bargained (union) rate
OPERATOR: BACKHOE$20.566.35SUMT2011-038
DOL wage survey rate

Official document: MT20260062 on SAM.gov.

MT20260063 rev 2 · Building · Missoula

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$32.8816.20ENGI0400-004
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DET$31.5116.20ENGI0400-004
collectively bargained (union) rate
OPERATOR: BACKHOE$20.566.35SUMT2011-039
DOL wage survey rate

Official document: MT20260063 on SAM.gov.

MT20260064 rev 1 · Building · Yellowstone

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, BACKHOE ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$32.8816.20ENGI0400-005
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DET$31.5116.20ENGI0400-005
collectively bargained (union) rate

Official document: MT20260064 on SAM.gov.

MT20260065 rev 1 · Heavy · Carbon

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO 144 TONS, WHIRLEY CRANES. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL B$41.1516.20ENGI0400-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$40.0716.20ENGI0400-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-007
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY$23.9410.40ENGI0400-007
collectively bargained (union) rate
OPERATOR: LOADER (FRONT END)$26.318.05SUMT2011-041
DOL wage survey rate
OPERATOR: EXCAVATOR$26.548.05SUMT2011-041
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$25.678.05SUMT2011-041
DOL wage survey rate
OPERATOR: ASPHALT ROLLER$22.393.96SUMT2011-041
DOL wage survey rate

Official document: MT20260065 on SAM.gov.

MT20260066 rev 1 · Heavy · Cascade

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6)CRANES, 75 TONS TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE T$41.1516.20ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5)CRANES, 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4)CRANES, 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY$23.9410.40ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (1) A-FRAME TRUCK CRANE, FORKLIFT, OILER (EXCEPT CRANE). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P$23.4710.40ENGI0400-006
collectively bargained (union) rate
OPERATOR: LOADER (FRONT END)$22.676.54SUMT2011-042
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$25.678.05SUMT2011-042
DOL wage survey rate
OPERATOR: BACKHOE$21.998.55SUMT2011-042
DOL wage survey rate
OPERATOR: ASPHALT ROLLER$22.393.96SUMT2011-042
DOL wage survey rate

Official document: MT20260066 on SAM.gov.

MT20260067 rev 2 · Heavy · Missoula

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6)CRANES, 75 TONS TO AND INCL. 149 TONS; WHIRLEY CRANES. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH $41.1516.20ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5)CRANES, 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$40.0716.20ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4)CRANES, 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY$23.9410.40ENGI0400-006
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (1) A-FRAME TRUCK CRANE, FORKLIFT, OILER (EXCEPT CRANE). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P$23.4710.40ENGI0400-006
collectively bargained (union) rate
OPERATOR: LOADER (FRONT END)$22.676.54SUMT2011-043
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$25.678.05SUMT2011-043
DOL wage survey rate
OPERATOR: BACKHOE$22.128.37SUMT2011-043
DOL wage survey rate
OPERATOR: ASPHALT ROLLER$22.393.96SUMT2011-043
DOL wage survey rate

Official document: MT20260067 on SAM.gov.

MT20260068 rev 1 · Heavy · Yellowstone

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45-74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$40.0716.20ENGI0400-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-008
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) BACKHOE, CRANE OILER, EXCAVATOR. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETE$23.9410.40ENGI0400-008
collectively bargained (union) rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$25.678.05SUMT2011-044
DOL wage survey rate
OPERATOR: ASPHALT ROLLER$22.393.96SUMT2011-044
DOL wage survey rate

Official document: MT20260068 on SAM.gov.

MT20260069 rev 1 · Heavy · Custer

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$24.3410.40ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL$23.9410.40ENGI0400-013
collectively bargained (union) rate
OPERATOR: SCRAPER$23.006.76SUMT2011-045
DOL wage survey rate
OPERATOR: LOADER (FRONT END)$23.028.05SUMT2011-045
DOL wage survey rate
OPERATOR: GRADER/BLADE$25.448.45SUMT2011-045
DOL wage survey rate
OPERATOR: EXCAVATOR$23.058.05SUMT2011-045
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$20.978.05SUMT2011-045
DOL wage survey rate

Official document: MT20260069 on SAM.gov.

MT20260070 rev 2 · Heavy · Flathead

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO$23.9410.40ENGI0400-009
collectively bargained (union) rate
OPERATOR: LOADER (FRONT END)$24.207.84SUMT2011-046
DOL wage survey rate
OPERATOR: GRADER/BLADE$24.698.40SUMT2011-046
DOL wage survey rate
OPERATOR: EXCAVATOR$22.949.05SUMT2011-046
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.998.55SUMT2011-046
DOL wage survey rate
OPERATOR: BACKHOE$21.448.05SUMT2011-046
DOL wage survey rate

Official document: MT20260070 on SAM.gov.

MT20260071 rev 1 · Heavy · Park

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-014
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL$23.9410.40ENGI0400-014
collectively bargained (union) rate
OPERATOR: LOADER (FRONT END)$24.207.84SUMT2011-047
DOL wage survey rate
OPERATOR: GRADER/BLADE$24.698.40SUMT2011-047
DOL wage survey rate
OPERATOR: EXCAVATOR$23.127.81SUMT2011-047
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.998.55SUMT2011-047
DOL wage survey rate

Official document: MT20260071 on SAM.gov.

MT20260072 rev 1 · Heavy · Stillwater

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-015
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO$23.9410.40ENGI0400-015
collectively bargained (union) rate
OPERATOR: GRADER/BLADE$25.448.45SUMT2011-048
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$23.538.05SUMT2011-048
DOL wage survey rate
OPERATOR: BACKHOE$25.718.05SUMT2011-048
DOL wage survey rate

Official document: MT20260072 on SAM.gov.

MT20260073 rev 1 · Heavy · Toole

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-017
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-017
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-017
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-017
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$24.3410.40ENGI0400-017
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING $23.9410.40ENGI0400-017
collectively bargained (union) rate
OPERATOR: SCRAPER$27.698.55SUMT2011-049
DOL wage survey rate
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION)$27.298.55SUMT2011-049
DOL wage survey rate
OPERATOR: LOADER (FRONT END)$25.017.78SUMT2011-049
DOL wage survey rate
OPERATOR: GRADER/BLADE$25.448.45SUMT2011-049
DOL wage survey rate
OPERATOR: EXCAVATOR$26.849.89SUMT2011-049
DOL wage survey rate
OPERATOR: BULLDOZER$27.298.55SUMT2011-049
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$23.538.05SUMT2011-049
DOL wage survey rate
OPERATOR: BACKHOE$26.148.05SUMT2011-049
DOL wage survey rate

Official document: MT20260073 on SAM.gov.

MT20260074 rev 1 · Heavy · Valley

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$24.3410.40ENGI0400-013
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL$23.9410.40ENGI0400-013
collectively bargained (union) rate
OPERATOR: SCRAPER$23.006.76SUMT2011-050
DOL wage survey rate
OPERATOR: LOADER (FRONT END)$24.588.05SUMT2011-050
DOL wage survey rate
OPERATOR: GRADER/BLADE$25.448.45SUMT2011-050
DOL wage survey rate
OPERATOR: EXCAVATOR$23.628.05SUMT2011-050
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$23.538.05SUMT2011-050
DOL wage survey rate

Official document: MT20260074 on SAM.gov.

MT20260075 rev 1 · Heavy · Beaverhead, Broadwater, Deer Lodge, Gallatin, Granite, Jefferson and 6 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO$23.9410.40ENGI0400-009
collectively bargained (union) rate
OPERATOR: LOADER (FRONT END)$24.207.84SUMT2011-051
DOL wage survey rate
OPERATOR: GRADER/BLADE$24.698.40SUMT2011-051
DOL wage survey rate
OPERATOR: EXCAVATOR$23.127.81SUMT2011-051
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.998.55SUMT2011-051
DOL wage survey rate
OPERATOR: BACKHOE$24.168.05SUMT2011-051
DOL wage survey rate

Official document: MT20260075 on SAM.gov.

MT20260076 rev 1 · Heavy · Big Horn, Carter, Daniels, Dawson, Fallon, Garfield and 10 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE$24.3410.40ENGI0400-010
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPL$23.9410.40ENGI0400-010
collectively bargained (union) rate
OPERATOR: SCRAPER$23.006.76SUMT2011-052
DOL wage survey rate
OPERATOR: LOADER (FRONT END)$24.588.05SUMT2011-052
DOL wage survey rate
OPERATOR: GRADER/BLADE$25.448.45SUMT2011-052
DOL wage survey rate
OPERATOR: EXCAVATOR$23.628.05SUMT2011-052
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$23.538.05SUMT2011-052
DOL wage survey rate

Official document: MT20260076 on SAM.gov.

MT20260077 rev 1 · Heavy · Blaine, Chouteau, Fergus, Glacier, Golden Valley, Hill and 8 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-011
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION), EXCAVATOR. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES AP$23.9410.40ENGI0400-011
collectively bargained (union) rate
OPERATOR: LOADER (FRONT END)$25.017.78SUMT2011-053
DOL wage survey rate
OPERATOR: GRADER/BLADE$25.448.45SUMT2011-053
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$23.538.05SUMT2011-053
DOL wage survey rate
OPERATOR: BACKHOE$25.718.05SUMT2011-053
DOL wage survey rate

Official document: MT20260077 on SAM.gov.

MT20260078 rev 2 · Heavy · Lake, Lincoln, Mineral, Ravalli, Sanders

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR:, ZONE 1: (7) CRANES, 150 TONS TO INCLUDING 250 TONS (ADD $1.00 FOR EVERY 100 TONS OVER 250 TONS); CRANE, STIFF-LEG OR DERRICK; HELICOPTER HOIST; CRANE, TO$42.2316.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (6) CRANES 75 TO AND INCL. 149 TONS; CRANES, WHIRLEY (ALL). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EAC$41.1516.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (5) CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE $40.0716.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (4) CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$38.9816.20ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (3) MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEAS$24.3410.40ENGI0400-009
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: ZONE 1: (2) CRANE OILER, BULLDOZER, ROLLER (DIRT AND GRADE COMPACTION). ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO$23.9410.40ENGI0400-009
collectively bargained (union) rate
OPERATOR: LOADER (FRONT END)$24.207.84SUMT2011-054
DOL wage survey rate
OPERATOR: GRADER/BLADE$24.698.40SUMT2011-054
DOL wage survey rate
OPERATOR: EXCAVATOR$22.949.05SUMT2011-054
DOL wage survey rate
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.998.55SUMT2011-054
DOL wage survey rate
OPERATOR: BACKHOE$21.448.05SUMT2011-054
DOL wage survey rate

Official document: MT20260078 on SAM.gov.

MT20260080 rev 3 · Highway · Beaverhead, Big Horn, Blaine, Broadwater, Carbon, Carter and 51 more

Classification as publishedBase rateFringesRate schedule
POWER EQUIPMENT OPERATOR: GROUP 1 Air Compressor; Auto Fine Graders; Belt Finishing; Boring Machine (small); Cement Silo; Crane, A-Frame Truck Crane; Crusher Conveyor; DW-10, 15, a$35.7214.05SAMT2026-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GROUP 2 Air Doctor; Backhoe/Excavator/Shovel up to and including 3 CU Yard; Bit Grinder; Bituminous Paving Travel Plant; Boring Machine Large; Broom, Self$38.0014.05SAMT2026-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GROUP 3 Asphalt Paving Machine; Asphalt Screed; Backhoe/Excavator/Shovel Over 3 CU Yard; Cableway Highline; Concrete Batch Plant; Concrete Curing Machine;$39.2714.05SAMT2026-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GROUP 4 Asphalt/Hot Plant Operator, Cranes, 25 Tons up to and incl. 44 Tons; Crusher Operator; Finish Motor Patrol; Finish Scraper$40.6014.05SAMT2026-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GROUP 5 Cranes, 45 Tons up to and incl. 74 Tons$41.8514.05SAMT2026-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GROUP 6 Cranes, 75 Tons up to and incl. 149 Tons; Crane, Whirley (All)$43.2014.05SAMT2026-001
collectively bargained (union) rate
POWER EQUIPMENT OPERATOR: GROUP 7 Cranes, 150 Tons up to and incl. 250 Tons; Cranes, over 250 tons-add $1.00 for every 100 tons over 250 tons; Crane, Tower (All); Crane Stiff-Leg o$46.1514.05SAMT2026-001
collectively bargained (union) rate

Official document: MT20260080 on SAM.gov.