Heavy Equipment Operator prevailing wage rates in South Dakota
Federal Davis-Bacon rates published in 30 active determinations, 2026
- Active federal Davis-Bacon determinations for South Dakota publish 97 heavy equipment operator classification rates, across 30 determinations covering 66 counties.
- Those published base rates run from $11.32 to $34.96 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in South Dakota: .
This page collects every classification in South Dakota's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
SD20260001 rev 3 · Heavy, Highway · Aurora, Beadle, Bennett, Bon Homme, Brookings, Brown and 60 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: Group 1 - Tractor (farm type with attachments, including loaders but excluding Backhoe); Self Propelled Broom; Concrete Routing Machine; Paver Feeder; Pug | $31.73 | 0.00 | SASD2025-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: Group 3 - Asphalt Distributor; Bulldozer over 80 HP; Backhoes/Excavators 20 tons or less; crusher (may include internal screening plant); Front End Loader | $31.56 | 0.00 | SASD2025-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: Group 4 - Concrete Paving Fnishing Machine; Asphalt Paving Machine Screed; Asphalt Paving Machine; Cranes/Derricks/Draglines/Pile Drivers/Shovels-30 to 50 | $32.49 | 0.00 | SASD2025-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: Group 5 - Asphalt Plant; Concrete Batch Plant; Backhoes/Excavators over 40 Tons; Cranes/Derricks/Draglines/Pile Drivers/Shovels over 50 tons; Heavy Duty M | $34.96 | 8.36 | SASD2025-001 collectively bargained (union) rate |
Official document: SD20260001 on SAM.gov.
SD20260003 rev 1 · Residential · Aurora, Beadle, Bennett, Bon Homme, Brookings, Brown and 57 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $11.53 | 0.00 | SUSD2000-007 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $11.32 | 0.00 | SUSD2000-007 DOL wage survey rate |
Official document: SD20260003 on SAM.gov.
SD20260004 rev 2 · Building · Aurora
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.57 | 0.00 | SUSD2012-001 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-001 DOL wage survey rate |
Official document: SD20260004 on SAM.gov.
SD20260005 rev 2 · Building · Brookings
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-002 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-002 DOL wage survey rate |
Official document: SD20260005 on SAM.gov.
SD20260006 rev 2 · Building · Brown
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-003 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-003 DOL wage survey rate |
Official document: SD20260006 on SAM.gov.
SD20260007 rev 2 · Building · Buffalo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-004 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-004 DOL wage survey rate |
Official document: SD20260007 on SAM.gov.
SD20260008 rev 1 · Building · Butte
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-005 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-005 DOL wage survey rate |
Official document: SD20260008 on SAM.gov.
SD20260009 rev 1 · Building · Campbell
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-006 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-006 DOL wage survey rate |
Official document: SD20260009 on SAM.gov.
SD20260010 rev 2 · Building · Charles Mix
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.57 | 0.00 | SUSD2012-007 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-007 DOL wage survey rate |
Official document: SD20260010 on SAM.gov.
SD20260011 rev 2 · Building · Codington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-008 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-008 DOL wage survey rate |
Official document: SD20260011 on SAM.gov.
SD20260012 rev 1 · Building · Dewey
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-009 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-009 DOL wage survey rate |
Official document: SD20260012 on SAM.gov.
SD20260013 rev 1 · Building · Haakon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-010 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-010 DOL wage survey rate |
Official document: SD20260013 on SAM.gov.
SD20260014 rev 1 · Building · Harding
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-011 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-011 DOL wage survey rate |
Official document: SD20260014 on SAM.gov.
SD20260015 rev 1 · Building · Hughes
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-012 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-012 DOL wage survey rate |
Official document: SD20260015 on SAM.gov.
SD20260016 rev 1 · Building · Lawrence
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-013 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-013 DOL wage survey rate |
Official document: SD20260016 on SAM.gov.
SD20260017 rev 2 · Building · Oglala Lakota
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.08 | 0.00 | SUSD2012-014 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-014 DOL wage survey rate |
Official document: SD20260017 on SAM.gov.
SD20260018 rev 2 · Building · Todd
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.08 | 0.00 | SUSD2012-015 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-015 DOL wage survey rate |
Official document: SD20260018 on SAM.gov.
SD20260019 rev 1 · Building · Walworth
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-016 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-016 DOL wage survey rate |
Official document: SD20260019 on SAM.gov.
SD20260020 rev 1 · Building · Yankton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.57 | 0.00 | SUSD2012-017 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-017 DOL wage survey rate |
Official document: SD20260020 on SAM.gov.
SD20260021 rev 2 · Building · Beadle, Clark, Day, Deuel, Edmunds, Faulk and 10 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-018 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-018 DOL wage survey rate |
Official document: SD20260021 on SAM.gov.
SD20260022 rev 2 · Building · Bennett, Brule, Fall River, Gregory, Jackson, Jones and 3 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.08 | 0.00 | SUSD2012-019 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-019 DOL wage survey rate |
Official document: SD20260022 on SAM.gov.
SD20260023 rev 2 · Building · Bon Homme, Clay, Davison, Douglas, Hanson, Hutchinson and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.57 | 0.00 | SUSD2012-020 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-020 DOL wage survey rate |
Official document: SD20260023 on SAM.gov.
SD20260024 rev 1 · Building · Corson, Perkins, Potter, Stanley, Sully, Ziebach
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FR | $34.08 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM | $34.38 | 18.71 | ENGI0049-009 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | 0.00 | SUSD2012-021 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | 0.00 | SUSD2012-021 DOL wage survey rate |
Official document: SD20260024 on SAM.gov.
SD20260025 rev 1 · Building · Custer
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.80 | 0.00 | SUSD2012-022 DOL wage survey rate |
Official document: SD20260025 on SAM.gov.
SD20260026 rev 2 · Building · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.90 | 0.00 | SUSD2012-023 DOL wage survey rate |
Official document: SD20260026 on SAM.gov.
SD20260027 rev 1 · Building · Meade
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.80 | 0.00 | SUSD2012-024 DOL wage survey rate |
Official document: SD20260027 on SAM.gov.
SD20260028 rev 2 · Building · Minnehaha
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.90 | 0.00 | SUSD2012-025 DOL wage survey rate |
Official document: SD20260028 on SAM.gov.
SD20260029 rev 1 · Building · Pennington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.80 | 0.00 | SUSD2012-026 DOL wage survey rate |
Official document: SD20260029 on SAM.gov.
SD20260030 rev 2 · Building · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.90 | 0.00 | SUSD2012-027 DOL wage survey rate |
Official document: SD20260030 on SAM.gov.
SD20260031 rev 2 · Building · McCook, Turner
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.90 | 0.00 | SUSD2012-028 DOL wage survey rate |
Official document: SD20260031 on SAM.gov.
Where to go next
Heavy Equipment Operator rates in every state · South Dakota prevailing wage and state law · South Dakota determinations by county · pay calculator
Other trades in South Dakota
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Hanger · Insulator (Heat & Frost) · Sprinkler Fitter