Traffic Control / Striping prevailing wage rates in Maine
Federal Davis-Bacon rates published in 16 active determinations, 2026
- Active federal Davis-Bacon determinations for Maine publish 47 traffic control / striping classification rates, across 16 determinations covering 16 counties.
- Those published base rates run from $9.00 to $17.84 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Highway.
- Last determination revision affecting traffic control / striping rates in Maine: .
This page collects every classification in Maine's active federal determinations that is a form of traffic control / striping work (pavement marking, signing and work-zone traffic control) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
ME20260034 rev 1 · Highway · Aroostook
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.48 | 5.37 | SUME2014-029 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.00 | 0.00 | SUME2014-029 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.29 | 1.89 | SUME2014-029 DOL wage survey rate |
Official document: ME20260034 on SAM.gov.
ME20260035 rev 1 · Highway · Franklin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.47 | 4.80 | SUME2014-030 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.38 | 0.00 | SUME2014-030 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.80 | 1.27 | SUME2014-030 DOL wage survey rate |
Official document: ME20260035 on SAM.gov.
ME20260036 rev 1 · Highway · Hancock
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.48 | 5.37 | SUME2014-031 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.00 | 0.00 | SUME2014-031 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.24 | 2.06 | SUME2014-031 DOL wage survey rate |
Official document: ME20260036 on SAM.gov.
ME20260037 rev 1 · Highway · Kennebec
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.47 | 4.80 | SUME2014-032 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.38 | 0.00 | SUME2014-032 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.80 | 1.27 | SUME2014-032 DOL wage survey rate |
Official document: ME20260037 on SAM.gov.
ME20260038 rev 1 · Highway · Knox
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.47 | 4.80 | SUME2014-033 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.38 | 0.00 | SUME2014-033 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.80 | 1.27 | SUME2014-033 DOL wage survey rate |
Official document: ME20260038 on SAM.gov.
ME20260039 rev 1 · Highway · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.47 | 4.80 | SUME2014-034 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.38 | 0.00 | SUME2014-034 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.80 | 1.27 | SUME2014-034 DOL wage survey rate |
Official document: ME20260039 on SAM.gov.
ME20260040 rev 1 · Highway · Oxford
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.47 | 4.80 | SUME2014-035 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.38 | 0.00 | SUME2014-035 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.80 | 1.27 | SUME2014-035 DOL wage survey rate |
Official document: ME20260040 on SAM.gov.
ME20260041 rev 1 · Highway · Piscataquis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.48 | 5.37 | SUME2014-036 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.00 | 0.00 | SUME2014-036 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $15.81 | 3.24 | SUME2014-036 DOL wage survey rate |
Official document: ME20260041 on SAM.gov.
ME20260042 rev 1 · Highway · Somerset
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.47 | 4.80 | SUME2014-037 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.38 | 0.00 | SUME2014-037 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.80 | 1.27 | SUME2014-037 DOL wage survey rate |
Official document: ME20260042 on SAM.gov.
ME20260043 rev 1 · Highway · Waldo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.47 | 4.80 | SUME2014-038 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.38 | 0.00 | SUME2014-038 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.80 | 1.27 | SUME2014-038 DOL wage survey rate |
Official document: ME20260043 on SAM.gov.
ME20260044 rev 1 · Highway · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.48 | 5.37 | SUME2014-039 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.00 | 0.00 | SUME2014-039 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $14.24 | 2.06 | SUME2014-039 DOL wage survey rate |
Official document: ME20260044 on SAM.gov.
ME20260045 rev 1 · Highway · Androscoggin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.02 | 5.37 | SUME2014-040 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.06 | 0.00 | SUME2014-040 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $15.53 | 2.04 | SUME2014-040 DOL wage survey rate |
Official document: ME20260045 on SAM.gov.
ME20260046 rev 1 · Highway · Cumberland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.02 | 5.37 | SUME2014-041 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.00 | 0.00 | SUME2014-041 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $15.53 | 2.04 | SUME2014-041 DOL wage survey rate |
Official document: ME20260046 on SAM.gov.
ME20260047 rev 2 · Highway · Penobscot
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.02 | 5.37 | SUME2014-042 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $9.00 | 0.00 | SUME2014-042 DOL wage survey rate |
Official document: ME20260047 on SAM.gov.
ME20260048 rev 1 · Highway · Sagadahoc
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.02 | 5.37 | SUME2014-043 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $10.33 | 0.00 | SUME2014-043 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $15.53 | 2.04 | SUME2014-043 DOL wage survey rate |
Official document: ME20260048 on SAM.gov.
ME20260049 rev 1 · Highway · York
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.84 | 5.91 | SUME2014-044 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $10.33 | 0.00 | SUME2014-044 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: LABORER | $16.27 | 2.19 | SUME2014-044 DOL wage survey rate |
Official document: ME20260049 on SAM.gov.
Where to go next
Traffic Control / Striping rates in every state · Maine prevailing wage and state law · Maine determinations by county · pay calculator
Other trades in Maine
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Painter · Drywall Finisher / Taper · Elevator Constructor