Building, Heavy construction - Alaska, revision 1, modified 2026-05-18

Verify against the official document: this page mirrors WD AK20260001 revision 1 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0007-006 (collectively bargained (union) rate, 02/27/2023)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS$37.3819.55
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS)$41.3516.46

BOIL0502-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$58.3328.79

BRAK0001-002 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
TILE & TERRAZZO FINISHER$40.9112.48
BRICKLAYER, BLOCKLAYER, STONEMASON, MARBLE MASON, TILE SETTER, TERRAZZO WORKER$52.7712.36

CARP1281-001 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
CARPENTER (INCLUDING LATHER AND DRYWALL HANGING)$50.7926.42

CARP1281-002 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
MILLWRIGHT$56.4425.87

CARP2520-003 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
PILEDRIVER (WELDER)$54.2826.42
PILEDRIVER (SHEET STABBER)$48.7226.42
PILEDRIVER (PILEDRIVER; SKIFF OPERATOR AND RIGGER) $ 48.72 26.42 DIVER (WORKING) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2$92.8326.42
DIVER (TENDER) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT: 5-50 F$53.0325.34
DIVER (STAND BY) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT: 5-50$61.4225.34

ELEC1547-004 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
ELECTRICIAN$55.4430.33
CABLE SPLICER$55.4430.33

ELEC1547-005 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
TREE TRIMMER, LINE CONSTRUCTION$42.2330.10
POWDERMAN, LINE CONSTRUCTION$70.5935.59
LINEMEN: LINE CONSTRUCTION (INCLUDING EQUIPMENT OPERATORS, TECHNICIAN)$72.5935.65
CABLE SPLICER (LINE CONSTRUCTION)$74.3435.70

ELEV0019-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC FOOTNOTE: A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VAC$71.4438.44

ENGI0302-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: GROUP 1 (TUNNEL WORK) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK AND SIMILAR CO$58.5529.50
POWER EQUIPMENT OPERATOR GROUP 4 (TUNNEL WORK) RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER$48.4729.50
POWER EQUIPMENT OPERATOR GROUP 3 (TUNNEL WORK) ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRES$56.6029.50
POWER EQUIPMENT OPERATOR GROUP 2 (TUNNEL WORK) BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL ERECTION; TOWERMOBILES$57.5529.50
POWER EQUIPMENT OPERATOR GROUP 1A (TUNNEL WORK) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES$60.8629.50
POWER EQUIPMENT OPERATOR (GROUP 4) RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEA$44.0629.50
POWER EQUIPMENT OPERATOR (GROUP 3) ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM TR$51.4629.50
POWER EQUIPMENT OPERATOR (GROUP 2) BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUG$52.3229.50
POWER EQUIPMENT OPERATOR (GROUP 1A) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 YAR$55.3329.50
POWER EQUIPMENT OPERATOR (GROUP 1) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK AND SIMILAR CONVEYORS; BEND$53.2329.50

IRON0751-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER (HELICOPTER, TOWER)$47.8939.48
IRONWORKER (GUARDRAIL LAYOUT MAN)$44.2239.48
IRONWORKER (GUARDRAIL INSTALLERS)$44.4839.48
IRONWORKER (FENCE, BARRIER INSTALLER)$43.4839.48
IRONWORKER (BRIDGE, STRUCTURAL, ORNAMENTAL, REINFORCING MACHINERY MOVER, RIGGER, SHEETER, STAGE RIGGER, BENDER OPERATOR)$46.9839.48
IRONWORKER (BENDER OPERATOR)$46.9839.48

LABO0341-001 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE)$59.4128.81
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); $51.1834.26
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND $46.3734.26
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK)$45.3834.26
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE L$44.2834.26
LABORER: GROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS$29.8234.26
LABORER: GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE)$54.0128.81
LABORER: GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT$46.5334.26
LABORER: GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MU$42.1534.26
LABORER: GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDE$41.2534.26
LABORER: GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; C$40.2534.26

LABO0942-001 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3B (TUNNELS, SHAFTS, AND RAISES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE)$59.4128.81
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 3 (TUNNELS, SHAFTS, AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AN$46.3734.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 2 (TUNNELS, SHAFTS, AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BUL$45.3834.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 1 (TUNNELS, SHAFTS, AND RAISES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE$44.2834.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 4) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS$29.8234.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3B) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE)$54.0128.81
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3A) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NO$46.5334.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; M$42.1534.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 2) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTEND$41.2534.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 1) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; $40.2534.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3A (TUNNELS, SHAFTS, AND RAISES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD)$51.1834.26

PAIN1959-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PAINTER: TAPING, TEXTURING, STRUCTURAL PAINTING, SANDBLASTING, POT TENDER, FINISH METAL, SPRAY, BUFFER OPERATOR, RADON MITIGATION, LEAD BASED PAINT ABATEMENT, HAZARDOUS MATERIAL HA$43.5726.45
PAINTER: BRUSH/ROLLER PAINT OR WALL COVERER (NORTH OF THE 63RD PARALLEL)$43.0526.45

PAIN1959-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PAINTER: TAPER / PAPER & VINYL HANGER (SOUTH OF THE 63RD PARALLEL)$38.5430.20
PAINTER: INDUSTRIAL PAINTER (SOUTH OF THE 63RD PARALLEL)$38.6430.20
PAINTER: GENERAL PAINTER (SOUTH OF THE 63RD PARALLEL)$37.2930.20

PAIN1959-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
GLAZIER (NORTH OF THE 63RD PARALLEL)$46.7630.46

PAIN1959-004 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
FLOOR LAYER: CARPET$39.4816.25

PAIN1959-006 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
GLAZIER (SOUTH OF THE 63RD PARALLEL)$47.4229.10

PLAS0528-006 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
PLASTERER (SOUTH OF THE 63RD PARALLEL)$49.2822.28
PLASTERER (NORTH OF THE 63RD PARALLEL)$49.2822.28

PLAS0528-007 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (SOUTH OF THE 63RD PARALLEL)$49.2822.28
CEMENT MASON/CONCRETE FINISHER (NORTH OF THE 63RD PARALLEL)$49.2822.28

PLUM0669-002 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
SPRINKLER FITTER$60.6731.39

ROOF0189-006 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
ROOFER$52.0719.62

SHEE0023-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER (SOUTH OF THE 63RD PARALLEL)$52.0830.81

SHEE0023-004 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER (NORTH OF THE 63RD PARALLEL)$58.7329.54

TEAM0959-003 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER (GROUP 5) GRAVEL SPREADER BOX OPERATOR ON TRUCK; FLAT BEDS, SINGLE REAR AXLE; BOOM TRUCK/KNUCKLE TRUCK UP TO AND INCLUDING 5 TONS; PICKUPS (PILOT CARS AND ALL LIGHT DU$47.6226.43
TRUCK DRIVER (GROUP 4) BUGGYMOBILE; SEMI OR TRUCK AND TRAILER; DUMPSTER; TIREMAN (LIGHT DUTY); DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCK WITH PUPS) UP TO AND INCLUDING 10 YARDS; T$48.5026.43
TRUCK DRIVER (GROUP 3) DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 10 YARDS UP TO AND INCLUDING 20 YARDS; BATCH TRUCKS 8 YARDS AND UP; OIL DISTRIBUTOR DRIVERS; OIL $49.1726.43
TRUCK DRIVER (GROUP 2) TURN-O-WAGON OR DW-10 NOT SELF-LOADING; ALL DELTAS, COMMANDERS, ROLLOGANS, AND SIMILAR EQUIPMENT; MECHANICS; DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH$50.1226.43
TRUCK DRIVER (GROUP 1A) DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 60 YARDS UP TO AND INCLUDING 100 YARDS; JEEPS (DRIVER UNDER LOAD)$53.0526.43
TRUCK DRIVER (GROUP 1) SEMI WITH DOUBLE BOX MIXER; DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 40 YARDS UP TO AND INCLUDING 60 YARDS; DELTAS, COMMANDERS, ROLLOGANS $51.5826.43
Full official text of AK20260001 rev 1
"General Decision Number: AK20260001 05/18/2026


State: Alaska


Construction Types: Building and Heavy


Counties: Alaska Counties of 
Aleutians East, Aleutians West, 
Anchorage, Denali, 
Skagway-Yakutat-Angoon, Bethel, Bristol 
Bay, Dillingham, Fairbanks North Star, 
Haines, Juneau, Kenai Peninsula, 
Ketchikan Gateway, Kodiak Island, 
Peninsula & Lake, Matanuska-Susitna, 
Nome, North Slope, Northwest Artic, 
Prince Of Wales-Outer Ketchika, Sitka, 
Southeast Fairbanks, 
Wrangell-Petersburg, Yukon-Koyukuk, 
Valdez-Cordova and Wade Hampton




Building Construction Projects

Heavy Construction Projects


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026


 ASBE0007-006 02/27/2023
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, 
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUMING, 
BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM 
MECHANICAL SYSTEMS).................................$ 37.38                  19.55
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF 
ALL INSULATING MATERIALS  PROTECTIVE COVERINGS, 
COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL 
SYSTEMS)............................................$ 41.35                  16.46
----------------------------------------------------------------

 BOIL0502-002 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 58.33                  28.79
----------------------------------------------------------------

 BRAK0001-002 07/01/2024
                                                     Rates                  Fringes
TILE & TERRAZZO FINISHER............................$ 40.91                  12.48
BRICKLAYER, BLOCKLAYER, STONEMASON, MARBLE MASON, 
TILE SETTER, TERRAZZO WORKER........................$ 52.77                  12.36
----------------------------------------------------------------

 CARP1281-001 04/01/2025
                                                     Rates                  Fringes
CARPENTER (INCLUDING LATHER AND DRYWALL HANGING)....$ 50.79                  26.42
----------------------------------------------------------------

 CARP1281-002 06/01/2025
                                                     Rates                  Fringes
MILLWRIGHT..........................................$ 56.44                  25.87
----------------------------------------------------------------

 CARP2520-003 04/01/2025
                                                     Rates                  Fringes
PILEDRIVER (WELDER).................................$ 54.28                  26.42
PILEDRIVER (SHEET STABBER)..........................$ 48.72                  26.42
PILEDRIVER (PILEDRIVER; SKIFF OPERATOR AND RIGGER)  $ 48.72                  26.42
DIVER (WORKING)  DEPTH PAY PREMIUM FOR DIVERS BELOW 
WATER SURFACE:  50-100 FEET                         
    $1.00 PER FOOT  101 FEET AND DEEPER         
$2.00 PER FOOT  ENCLOSURE PAY PREMIUM WITH NO 
VERTICAL ASCENT:  5-50 FEET                         
       $1.00 PER FOOT/DAY  51-100 FEET              
              $2.00 PER FOOT/DAY  101 FEET AND 
ABOVE          $3.00 PER FOOT/DAY  SATURATION 
DIVING:  THE STANDBY RATE APPLIES UNTIL SATURATION 
STARTS. THE SATURATION DIVING RATE APPLIES WHEN 
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK 
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE 
SHALL BE PAID FOR ALL SATURATION HOURS.  WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT......................................$ 92.83                  26.42
DIVER (TENDER)  DEPTH PAY PREMIUM FOR DIVERS BELOW 
WATER SURFACE:  50-100 FEET                         
    $1.00 PER FOOT  101 FEET AND DEEPER         
$2.00 PER FOOT  ENCLOSURE PAY PREMIUM WITH NO 
VERTICAL ASCENT:  5-50 FEET                         
       $1.00 PER FOOT/DAY  51-100 FEET              
              $2.00 PER FOOT/DAY  101 FEET AND 
ABOVE          $3.00 PER FOOT/DAY  SATURATION 
DIVING:  THE STANDBY RATE APPLIES UNTIL SATURATION 
STARTS. THE SATURATION DIVING RATE APPLIES WHEN 
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK 
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE 
SHALL BE PAID FOR ALL SATURATION HOURS.  WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT......................................$ 53.03                  25.34
DIVER (STAND BY)  DEPTH PAY PREMIUM FOR DIVERS 
BELOW WATER SURFACE:  50-100 FEET                   
          $1.00 PER FOOT  101 FEET AND DEEPER       
  $2.00 PER FOOT  ENCLOSURE PAY PREMIUM WITH NO 
VERTICAL ASCENT:  5-50 FEET                         
       $1.00 PER FOOT/DAY  51-100 FEET              
              $2.00 PER FOOT/DAY  101 FEET AND 
ABOVE          $3.00 PER FOOT/DAY  SATURATION 
DIVING:  THE STANDBY RATE APPLIES UNTIL SATURATION 
STARTS. THE SATURATION DIVING RATE APPLIES WHEN 
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK 
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE 
SHALL BE PAID FOR ALL SATURATION HOURS.  WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT......................................$ 61.42                  25.34
----------------------------------------------------------------

 ELEC1547-004 09/01/2025
                                                     Rates                  Fringes
ELECTRICIAN.........................................$ 55.44                  30.33
CABLE SPLICER.......................................$ 55.44                  30.33
----------------------------------------------------------------

 ELEC1547-005 04/01/2025
                                                     Rates                  Fringes
TREE TRIMMER, LINE CONSTRUCTION.....................$ 42.23                  30.10
POWDERMAN, LINE CONSTRUCTION........................$ 70.59                  35.59
LINEMEN: LINE CONSTRUCTION (INCLUDING EQUIPMENT 
OPERATORS, TECHNICIAN)..............................$ 72.59                  35.65
CABLE SPLICER (LINE CONSTRUCTION)...................$ 74.34                  35.70
----------------------------------------------------------------

 ELEV0019-002 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC  FOOTNOTE:   A.  EMPLOYER 
CONTRIBUTES 8% OF THE BASIC HOURLY RATE      FOR 
OVER 5 YEAR'S SERVICE AND 6% OF THE BASIC      
HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE     
 AS VACATION PAID CREDIT.     B. EIGHT PAID 
HOLIDAYS:      NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY;      LABOR DAY; VETERAN'S DAY; 
THANKSGIVING DAY; FRIDAY AFTER      THANKSGIVING, 
AND CHRISTMAS DAY...................................$ 71.44                  38.44
----------------------------------------------------------------

 ENGI0302-002 01/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: GROUP 1 (TUNNEL WORK) 
ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND 
FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); 
BELTCRETE WITH POWER PACK AND SIMILAR CONVEYORS; 
BENDING MACHINE; BOAT COXWAINS; BULLDOZERS; 
CABLEWAYS, HIGHLINES AND CABLECARS; CLEANING 
MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; 
CRANES-45 TONS AND UNDER OR 150 FOOT BOOM AND UNDER 
(INCLUDING JIB AND ATTACHMENTS): (A) HYDRALIFTS OR 
TRANSPORTERS, ALL TRACK OR TRUCK TYPE,(B) DERRICKS; 
CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR 
TRENCHING MACHINE (16 INCH OR OVER); DRILLING 
MACHINES, CORE, CABLE, ROTARY AND EXPLORATION; 
FINISHING MACHINE OPERATOR, CONCRETE PAVING, LASER 
SCREED, SIDEWALK, CURB AND GUTTER MACHINE; 
HELICOPTERS; HOVER CRAFT, FLEX CRAFT, LOADMASTER, 
AIR CUSHION, ALL TERRAIN VEHICLE, ROLLAGON, 
BARGECABLE, NODWELL, AND SNOW CAT; HYDRO AX: FELLER 
BUNCHER AND SIMILAR; LOADERS (2 1/2 YARDS THROUGH 5 
YARDS, INCLUDING ALL ATTACHMENTS): FORKLIFTS WITH 
TELESCOPIC BOOM AND SWING ATTACHMENT, OVERHEAD AND 
FRONT END, 2 1/2 YARDS THROUGH 5 YARDS, LOADERS 
WITH FORKS OR PIPE CLAMPS; LOADERS, ELEVATING BELT 
TYPE, EUCLID AND SIMILAR TYPES; MECHANICS, BODYMAN; 
MICRO TUNNELING MACHINE; MIXERS: MOBILE TYPE 
W/HOIST COMBINATION; MOTOR PATROL GRADER; MUCKING 
MACHINES: MOLE, TUNNEL DRILL, 
HORIZONTAL/DIRECTIONAL DRILL OPERATOR, AND/OR 
SHIELD; OPERATOR ON DREDGES; PILEDRIVER ENGINEERS, 
L. B. FOSTER, PULLER OR SIMILAR PAVING BREAKER; 
POWER PLANT, TURBINE OPERATOR, 200 K.W. AND OVER 
(POWER PLANTS OR COMBINATION OF POWER UNITS OVER 
300 K.W.); SCRAPERS-THROUGH 40 YARDS; SERVICE 
OILER/SERVICE ENGINEER; SIDEBOOMS-UNDER 45 TONS; 
SHOT BLAST MACHINE; SHOVELS, BACKHOES, EXCAVATORS 
WITH ALL ATTACHMENTS, AND GRADEALLS (3 YARDS AND 
UNDER), SPREADERS, BLAW KNOX, CEDARAPIDS, BARBER 
GREENE, SLURRY MACHINE; SUB-GRADER (GURRIES, 
RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK 
MOUNTED CONCRETE PUMPS, CONVEYOR, CRETER; WATER 
KOTE MACHINE; UNLICENSED OFF ROAD HAULER  FOOTNOTE: 
 GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING 
TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE 
ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 
85 TONS OR OVER 100 FEET OF BOOM....................$ 58.55                  29.50
POWER EQUIPMENT OPERATOR GROUP 4 (TUNNEL WORK) RIG 
OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT 
COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR 
SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; 
DRILL HELPER.  FOOTNOTE:  GROUPS 1-4 RECEIVE 10% 
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND 
WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE 
REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF 
BOOM.  FOOTNOTE:  GROUPS 1-4 RECEIVE 10% PREMIUM 
WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG 
OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON 
CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM........$ 48.47                  29.50
POWER EQUIPMENT OPERATOR GROUP 3 (TUNNEL WORK) ""A"" 
FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; 
BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; 
BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM 
TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR 
WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; 
GRADE CHECKER AND STAKE HOPPER; HOIST, AIR TUGGERS, 
ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER 
GREEN AND SIMILAR TYPES  (B) FORKLIFTS OR LUMBER 
CARRIER (ON CONSTRUCTION JOB SITE)  (C) FORKLIFTS 
WITH TOWER  (D) OVERHEAD AND FRONT-END, UNDER 2 1/2 
YDS. LOCOMOTIVES:DINKEY (AIR, STEAM, GAS AND 
ELECTRIC) SPEEDERS; MECHANICS (LIGHT DUTY); OIL, 
BLOWER DISTRIBUTION; POST HOLE DIGGERS, MECHANICAL; 
POT FIREMAN (POWER AGITATED); POWER PLANT, TURBINE 
OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLER-OTHER 
THAN PLANTMIX; SAWS, CONCRETE; SKID STEER WITH ALL 
ATTACHMENTS; STRAIGHTENING MACHINE; TOW TRACTOR  
FOOTNOTE:  GROUPS 1-4 RECEIVE 10% PREMIUM WHILE 
PERFORMING TUNNEL OR UNDERGROUND WORK. RIG 
OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON 
CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM........$ 56.60                  29.50
POWER EQUIPMENT OPERATOR GROUP 2 (TUNNEL WORK) 
BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP 
OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); 
HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR 
TUGGERS; HORIZONTAL/DIRECTIONAL DRILL 
LOCATOR;LICENSED GRADE TECHNICIAN; LOADERS, (I.E., 
ELEVATING GRADER AND MATERIAL TRANSFER VEHICLE); 
LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; 
SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK 
DRILL REGARDLESS OF SIZE); SKIDDER; TRENCING 
MACHINE UNDER 16 INCHES; WASTE/ WASTE WATER 
TREATMENT OPERATOR.  FOOTNOTE:  GROUPS 1-4 RECEIVE 
10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND 
WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE 
REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF 
BOOM................................................$ 57.55                  29.50
POWER EQUIPMENT OPERATOR GROUP 1A (TUNNEL WORK) 
CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 
45 TONS OR 150 FOOT (INCLUDING JIB AND 
ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 
YARDS), (B) TOWER CRANES; LICENSED WATER/WASTE 
WATER TREATMENT OPERATOR; LOADERS OVER 5 YDS.; 
CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP 
MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); 
MOTOR PATROL GRADER, DOZER, GRADE TRACTOR, 
ROTO-MILL/PROFILER (FINISH: WHEN FINISHING TO FINAL 
GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER 
PLANTS: 1000 K.W. AND OVER; QUAD; SCREED; SHOVELS, 
BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 
YARDS), SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, 
C.M.I. AND SIMILAR TYPES; SCRAPERS OVER 40 YARDS;...$ 60.86                  29.50
POWER EQUIPMENT OPERATOR (GROUP 4) RIG OILER/CRANE 
ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; 
SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE 
EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER.  
FOOTNOTE:  GROUPS 1-4 RECEIVE 10% PREMIUM WHILE 
PERFORMING TUNNEL OR UNDERGROUND WORK. RIG 
OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON 
CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM........$ 44.06                  29.50
POWER EQUIPMENT OPERATOR (GROUP 3) ""A"" FRAME 
TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER 
(TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; 
BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, 
INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH 
POLES WHEN USED FOR HOISTING; GRADE CHECKER AND 
STAKE HOPPER; HOIST, AIR TUGGERS, ELEVATORS; 
LOADERS: (A) ELEVATING-ATHEY, BARBER GREEN AND 
SIMILAR TYPES  (B) FORKLIFTS OR LUMBER CARRIER (ON 
CONSTRUCTION JOB SITE)  (C) FORKLIFTS WITH TOWER  
(D) OVERHEAD AND FRONT-END, UNDER 2 1/2 YDS. 
LOCOMOTIVES:DINKEY (AIR, STEAM, GAS AND ELECTRIC) 
SPEEDERS; MECHANICS (LIGHT DUTY); OIL, BLOWER 
DISTRIBUTION; POST HOLE DIGGERS, MECHANICAL; POT 
FIREMAN (POWER AGITATED); POWER PLANT, TURBINE 
OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLER-OTHER 
THAN PLANTMIX; SAWS, CONCRETE; SKID STEER WITH ALL 
ATTACHMENTS; STRAIGHTENING MACHINE; TOW TRACTOR.....$ 51.46                  29.50
POWER EQUIPMENT OPERATOR (GROUP 2) BOILER-FIREMAN; 
CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS 
(EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL 
ERECTION; TOWERMOBILES AND AIR TUGGERS; 
HORIZONTAL/DIRECTIONAL DRILL LOCATOR;LICENSED GRADE 
TECHNICIAN; LOADERS, (I.E., ELEVATING GRADER AND 
MATERIAL TRANSFER VEHICLE); LOCOMOTIVES: ROD AND 
GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; 
SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); 
SKIDDER; TRENCING MACHINE UNDER 16 INCHES; WASTE/ 
WASTE WATER TREATMENT OPERATOR......................$ 52.32                  29.50
POWER EQUIPMENT OPERATOR (GROUP 1A) 
CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 
45 TONS OR 150 FOOT (INCLUDING JIB AND 
ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 
YARDS), (B) TOWER CRANES; LICENSED WATER/WASTE 
WATER TREATMENT OPERATOR; LOADERS OVER 5 YDS.; 
CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP 
MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); 
MOTOR PATROL GRADER, DOZER, GRADE TRACTOR, 
ROTO-MILL/PROFILER (FINISH: WHEN FINISHING TO FINAL 
GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER 
PLANTS: 1000 K.W. AND OVER; QUAD; SCREED; SHOVELS, 
BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 
YARDS), SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, 
C.M.I. AND SIMILAR TYPES; SCRAPERS OVER 40 YARDS;...$ 55.33                  29.50
POWER EQUIPMENT OPERATOR (GROUP 1) ASPHALT ROLLER: 
BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; 
BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK 
AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT 
COXWAINS; BULLDOZERS; CABLEWAYS, HIGHLINES AND 
CABLECARS; CLEANING MACHINE; COATING MACHINE; 
CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 
150 FOOT BOOM AND UNDER (INCLUDING JIB AND 
ATTACHMENTS): (A) HYDRALIFTS OR TRANSPORTERS, ALL 
TRACK OR TRUCK TYPE,(B) DERRICKS; CRUSHERS; DECK 
WINCHES-DOUBLE DRUM; DITCHING OR TRENCHING MACHINE 
(16 INCH OR OVER); DRILLING MACHINES, CORE, CABLE, 
ROTARY AND EXPLORATION; FINISHING MACHINE OPERATOR, 
CONCRETE PAVING, LASER SCREED, SIDEWALK, CURB AND 
GUTTER MACHINE; HELICOPTERS; HOVER CRAFT, FLEX 
CRAFT, LOADMASTER, AIR CUSHION, ALL TERRAIN 
VEHICLE, ROLLAGON, BARGECABLE, NODWELL, AND SNOW 
CAT; HYDRO AX: FELLER BUNCHER AND SIMILAR; LOADERS 
(2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL 
ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND 
SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2 
YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE 
CLAMPS; LOADERS, ELEVATING BELT TYPE, EUCLID AND 
SIMILAR TYPES; MECHANICS, BODYMAN; MICRO TUNNELING 
MACHINE; MIXERS: MOBILE TYPE W/HOIST COMBINATION; 
MOTOR PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL 
DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR, 
AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER 
ENGINEERS, L. B. FOSTER, PULLER OR SIMILAR PAVING 
BREAKER; POWER PLANT, TURBINE OPERATOR, 200 K.W. 
AND OVER (POWER PLANTS OR COMBINATION OF POWER 
UNITS OVER 300 K.W.); SCRAPERS-THROUGH 40 YARDS; 
SERVICE OILER/SERVICE ENGINEER; SIDEBOOMS-UNDER 45 
TONS; SHOT BLAST MACHINE; SHOVELS, BACKHOES, 
EXCAVATORS WITH ALL ATTACHMENTS, AND GRADEALLS (3 
YARDS AND UNDER), SPREADERS, BLAW KNOX, CEDARAPIDS, 
BARBER GREENE, SLURRY MACHINE; SUB-GRADER (GURRIES, 
RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK 
MOUNTED CONCRETE PUMPS, CONVEYOR, CRETER; WATER 
KOTE MACHINE; UNLICENSED OFF ROAD HAULER............$ 53.23                  29.50
----------------------------------------------------------------

 IRON0751-003 07/01/2025
                                                     Rates                  Fringes
IRONWORKER (HELICOPTER, TOWER)......................$ 47.89                  39.48
IRONWORKER (GUARDRAIL LAYOUT MAN)...................$ 44.22                  39.48
IRONWORKER (GUARDRAIL INSTALLERS)...................$ 44.48                  39.48
IRONWORKER (FENCE, BARRIER INSTALLER)...............$ 43.48                  39.48
IRONWORKER (BRIDGE, STRUCTURAL, ORNAMENTAL, 
REINFORCING MACHINERY MOVER, RIGGER, SHEETER, STAGE 
RIGGER, BENDER OPERATOR)............................$ 46.98                  39.48
IRONWORKER (BENDER OPERATOR)........................$ 46.98                  39.48
----------------------------------------------------------------

 LABO0341-001 04/01/2025
                                                     Rates                  Fringes
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3B 
(SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 
DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF 
GRADE MARKS, LINE AND GRADE)........................$ 59.41                  28.81
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3A 
(SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 
DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY 
DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS 
(INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR 
TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER 
DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); 
PIPELAYERS..........................................$ 51.18                  34.26
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3 (SOUTH 
OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 
DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL 
MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH 
SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN........$ 46.37                  34.26
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 2 (SOUTH 
OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 
DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME 
DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; 
CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); 
CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, 
PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE 
LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL 
LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, 
SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE 
OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE 
OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT 
BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE 
BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 
ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER 
WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT 
FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD 
SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; 
SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC 
APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, 
FILER; TIMBERMAN....................................$ 45.38                  34.26
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 1 (SOUTH 
OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 
DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); 
BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER 
TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, 
SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE 
HANDLER, GROUTING, CURING, SCREEDING); CRUSHER 
PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; 
DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED 
TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC 
WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH 
LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; 
GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; 
HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); 
LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK 
(RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET 
AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER 
TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP 
MAN OR MIXER MAN; RAILROAD TRACK LABORER; 
SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD 
BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; 
STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER 
OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR 
LABORER AND CONDUIT INSTALLER; WATCHMAN 
(CONSTRUCTION PROJECTS); WINDOW CLEANER.............$ 44.28                  34.26
LABORER: GROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST 
OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP  
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS.........$ 29.82                  34.26
LABORER: GROUP 3B (SOUTH OF THE 63RD PARALLEL & 
WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER 
(SETTING OR TRANSFERING OF GRADE MARKS, LINE AND 
GRADE)..............................................$ 54.01                  28.81
LABORER: GROUP 3A (SOUTH OF THE 63RD PARALLEL & 
WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, 
ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE 
FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, 
WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); 
POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER 
(ALL TYPE DRILLS); PIPELAYERS.......................$ 46.53                  34.26
LABORER: GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST 
OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT 
GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER 
AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY 
SEAL SQUEEGEE MAN...................................$ 42.15                  34.26
LABORER: GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST 
OF LONGITUDE 138 DEGREES) BURNING AND CUTTING 
TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR 
BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK 
AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER 
BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, 
VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE 
PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL 
SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM 
GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM 
WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER 
OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING 
OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED 
DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND 
MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, 
BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW 
OPERATOR; RAILROAD SWITCH LAYOUT LABORER; 
SANDBLASTER; SEWER CAULKERS; SEWER PLANT 
MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER 
FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN........$ 41.25                  34.26
LABORER: GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST 
OF LONGITUDE 138 DEGREES) ASPHALT WORKERS 
(SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP 
MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE 
SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE 
LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, 
CURING, SCREEDING); CRUSHER PLANT LABORER; 
DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; 
ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO 
NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, 
OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; 
FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL 
LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER 
NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR 
PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING 
WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); 
MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; 
PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR 
MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT 
TENDER; SAW TENDERS; SCAFFOLD BUILDING AND 
ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR 
WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK 
CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT 
INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW 
CLEANER.............................................$ 40.25                  34.26
----------------------------------------------------------------

 LABO0942-001 04/01/2025
                                                     Rates                  Fringes
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES; GROUP 3B (TUNNELS, SHAFTS, 
AND RAISES) GRADE CHECKER (SETTING OR TRANSFERING 
OF GRADE MARKS, LINE AND GRADE).....................$ 59.41                  28.81
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES: GROUP 3 (TUNNELS, SHAFTS, 
AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL 
MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH 
SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN........$ 46.37                  34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES: GROUP 2 (TUNNELS, SHAFTS, 
AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR 
LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER 
SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC 
DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE 
SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT 
PIPE LABORER; CURED IN PLACE PIPELAYER; 
ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL 
SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR 
FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); 
GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR 
PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF 
DECORATIVE BLOCK (RETAINING WALLS, FLOWERED 
DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND 
MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, 
BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW 
OPERATOR; RAILROAD SWITCH LAYOUT LABORER; 
SANDBLASTER; SEWER CAULKERS; SEWER PLANT 
MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER 
FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN........$ 45.38                  34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES: GROUP 1 (TUNNELS, SHAFTS, 
AND RAISES) ASPHALT WORKERS (SHOVELMAN, PLANT 
CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; 
CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, 
RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND 
GUTTER, CHUTE HANDLER, GROUTING, CURING, 
SCREEDING); CRUSHER PLANT LABORER; DEMOLITION 
LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL 
LABORER (ASBESTOS (LIMITED TO NONMECHANICAL 
SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); 
FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM 
STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, 
BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; 
LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING 
OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED 
DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL 
HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR 
CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; 
RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW 
TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY 
WORK; STAKE HOPPER; STEAM POINT OR WATER JET 
OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; 
UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; 
WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER....$ 44.28                  34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES (GROUP 4) FINAL BUILDING 
CLEANUP  TUNNELS, SHAFTS, AND RAISES 
CLASSIFICATIONS.....................................$ 29.82                  34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES (GROUP 3B) GRADE CHECKER 
(SETTING OR TRANSFERING OF GRADE MARKS, LINE AND 
GRADE)..............................................$ 54.01                  28.81
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES (GROUP 3A) ASPHALT RAKER, 
ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE 
FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, 
WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); 
POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER 
(ALL TYPE DRILLS); PIPELAYERS.......................$ 46.53                  34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES (GROUP 3) ALARM INSTALLER; 
BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH 
RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; 
SLURRY SEAL SQUEEGEE MAN............................$ 42.15                  34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES (GROUP 2) BURNING AND CUTTING 
TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR 
BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK 
AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER 
BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, 
VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE 
PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL 
SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM 
GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM 
WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER 
OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING 
OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED 
DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND 
MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, 
BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW 
OPERATOR; RAILROAD SWITCH LAYOUT LABORER; 
SANDBLASTER; SEWER CAULKERS; SEWER PLANT 
MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER 
FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN........$ 41.25                  34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES (GROUP 1) ASPHALT WORKERS 
(SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP 
MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE 
SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE 
LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, 
CURING, SCREEDING); CRUSHER PLANT LABORER; 
DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; 
ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO 
NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, 
OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; 
FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL 
LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER 
NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR 
PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING 
WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); 
MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; 
PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR 
MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT 
TENDER; SAW TENDERS; SCAFFOLD BUILDING AND 
ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR 
WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK 
CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT 
INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW 
CLEANER.............................................$ 40.25                  34.26
LABORERS:  NORTH OF THE 63RD PARALLEL & EAST OF 
LONGITUDE 138 DEGREES; GROUP 3A (TUNNELS, SHAFTS, 
AND RAISES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY 
DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS 
(INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR 
TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER 
DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); 
PIPELAYERS..........................................$ 51.18                  34.26
----------------------------------------------------------------

 PAIN1959-001 07/01/2025
                                                     Rates                  Fringes
PAINTER: TAPING, TEXTURING, STRUCTURAL PAINTING, 
SANDBLASTING, POT TENDER, FINISH METAL, SPRAY, 
BUFFER OPERATOR, RADON MITIGATION, LEAD BASED PAINT 
ABATEMENT, HAZARDOUS MATERIAL HANDLER   (NORTH OF 
THE 63RD PARALLEL)..................................$ 43.57                  26.45
PAINTER: BRUSH/ROLLER PAINT OR WALL COVERER   
(NORTH OF THE 63RD PARALLEL)........................$ 43.05                  26.45
----------------------------------------------------------------

 PAIN1959-002 07/01/2025
                                                     Rates                  Fringes
PAINTER: TAPER / PAPER & VINYL HANGER   (SOUTH OF 
THE 63RD PARALLEL)..................................$ 38.54                  30.20
PAINTER: INDUSTRIAL PAINTER   (SOUTH OF THE 63RD 
PARALLEL)...........................................$ 38.64                  30.20
PAINTER: GENERAL PAINTER   (SOUTH OF THE 63RD 
PARALLEL)...........................................$ 37.29                  30.20
----------------------------------------------------------------

 PAIN1959-003 07/01/2025
                                                     Rates                  Fringes
GLAZIER   (NORTH OF THE 63RD PARALLEL)..............$ 46.76                  30.46
----------------------------------------------------------------

 PAIN1959-004 07/01/2025
                                                     Rates                  Fringes
FLOOR LAYER:  CARPET................................$ 39.48                  16.25
----------------------------------------------------------------

 PAIN1959-006 07/01/2025
                                                     Rates                  Fringes
GLAZIER   (SOUTH OF THE 63RD PARALLEL)..............$ 47.42                  29.10
----------------------------------------------------------------

 PLAS0528-006 04/01/2025
                                                     Rates                  Fringes
PLASTERER   (SOUTH OF THE 63RD PARALLEL)............$ 49.28                  22.28
PLASTERER   (NORTH OF THE 63RD PARALLEL)............$ 49.28                  22.28
----------------------------------------------------------------

 PLAS0528-007 04/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER   (SOUTH OF THE 63RD 
PARALLEL)...........................................$ 49.28                  22.28
CEMENT MASON/CONCRETE FINISHER   (NORTH OF THE 63RD 
PARALLEL)...........................................$ 49.28                  22.28
----------------------------------------------------------------

 PLUM0262-002 01/01/2023
                                                     Rates                  Fringes
PLUMBER; STEAMFITTER   (EAST OF THE 141ST MERIDIAN).$ 41.50                  27.62
----------------------------------------------------------------

 PLUM0367-002 09/01/2025
                                                     Rates                  Fringes
PLUMBER; STEAMFITTER   (SOUTH OF THE 63RD PARALLEL).$ 50.00                  33.20
----------------------------------------------------------------

 PLUM0375-002 07/01/2025
                                                     Rates                  Fringes
PLUMBER; STEAMFITTER   (NORTH OF THE 63RD PARALLEL).$ 55.66                  34.90
----------------------------------------------------------------

 PLUM0669-002 04/01/2025
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 60.67                  31.39
----------------------------------------------------------------

 ROOF0189-006 04/01/2025
                                                     Rates                  Fringes
ROOFER..............................................$ 52.07                  19.62
----------------------------------------------------------------

 SHEE0023-003 07/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER   (SOUTH OF THE 63RD PARALLEL)...$ 52.08                  30.81
----------------------------------------------------------------

 SHEE0023-004 07/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER   (NORTH OF THE 63RD PARALLEL)...$ 58.73                  29.54
----------------------------------------------------------------

 TEAM0959-003 01/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER (GROUP 5) GRAVEL SPREADER BOX OPERATOR 
ON TRUCK; FLAT BEDS, SINGLE REAR AXLE; BOOM 
TRUCK/KNUCKLE TRUCK UP TO AND INCLUDING 5 TONS; 
PICKUPS (PILOT CARS AND ALL LIGHT DUTY VEHICLES); 
WATER WAGON (BELOW 250 BBLS); GIN POLE TRUCK, WINCH 
TRUCK, WRECKER, TRUCK MOUNTED ""A"" FRAME, 
MANUFACTURED RATING 5 TONS AND UNDER; BULL LIFTS 
AND FORK LIFTS (FORK LIFTS WITH POWER BROOM AND 
SWING ATTACHMENTS UP TO AND INCLUDING 5 TONS); 
BUFFER TRUCK; TACK TRUCK; FARM TYPE RUBBER TIRED 
TRACTOR (WHEN MATERIAL HANDLING OR PULLING WAGONS 
ON A CONSTRUCTION PROJECT); FOAM DISTRIBUTOR, 
SINGLE AXLE; HYDRO-SEEDERS, SINGLE AXLE; TEAM 
DRIVERS (HORSES, MULES AND SIMILAR EQUIPMENT); FUEL 
HANDLER (STATION/BULK ATTENDANT); BATCH TRUCK, UP 
TO AND INCLUDING 7 YARDS; GEAR/SUPPLY TRUCK; BUS 
OPERATOR, UP TO 30 PASSENGERS; RIGGER/SWAMPER.......$ 47.62                  26.43
TRUCK DRIVER (GROUP 4) BUGGYMOBILE; SEMI OR TRUCK 
AND TRAILER; DUMPSTER; TIREMAN (LIGHT DUTY); DUMP 
TRUCKS (INCLUDING ROCKBUGGY AND TRUCK WITH PUPS) UP 
TO AND INCLUDING 10 YARDS; TRACK TRUCK EQUIPMENT; 
GREASE TRUCK; FLAT BEDS, DUAL REAR AXLE; HYSTER 
OPERATORS (HANDLING BULK AGGREGATE); LUMBER 
CARRIER; WATER WAGON, SEMI; WATER TRUCK, DUAL AXLE; 
GIN POLE TRUCK, WINCH TRUCK, WRECKER, TRUCK MOUNTED 
""A"" FRAME MANUFACTURED RATING OVER 5 TONS; BULL 
LIFTS AND FORK LIFTS WITH POWER BOOM AND SWING 
ATTACHMENTS, OVER 5 TONS; FRONT END LOADER WITH 
FORKS; BUS OPERATOR OVER 30 PASSENGERS; ALL TERRAIN 
VEHICLES; BOOM TRUCK/KNUCKLE TRUCK OVER 5 TONS; 
FOAM DISTRIBUTOR TRUCK/DUAL AXLE; HYDRO-SEEDERS, 
DUAL AXLE; VACUUM TRUCKS, TRUCK VACUUM SWEEPERS; 
LOADMASTER (AIR AND WATER); AIR CUSHION OR SIMILAR 
TYPE VEHICLE; FIRE TRUCK/AMBULANCE DRIVER; 
COMBINATION TRUCK-FUEL AND GREASE; COMPACTOR (WHEN 
PULLED BY RUBBER TIRED EQUIPMENT); RIGGER 
(AIR/WATER/OILFIELD); READY MIX, UP TO AND 
INCLUDING 7 YARDS;..................................$ 48.50                  26.43
TRUCK DRIVER (GROUP 3) DUMP TRUCKS (INCLUDING 
ROCKBUGGY AND TRUCKS WITH PUPS) OVER 10 YARDS UP TO 
AND INCLUDING 20 YARDS; BATCH TRUCKS 8 YARDS AND 
UP; OIL DISTRIBUTOR DRIVERS; OIL DISTRIBUTOR 
DRIVERS; TRUCKS/JEEPS (PUSH OR PULL); TRAFFIC 
CONTROL TECHNICIAN..................................$ 49.17                  26.43
TRUCK DRIVER (GROUP 2) TURN-O-WAGON OR DW-10 NOT 
SELF-LOADING; ALL DELTAS, COMMANDERS, ROLLOGANS, 
AND SIMILAR EQUIPMENT; MECHANICS; DUMP TRUCKS 
(INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 20 
YARDS UP TO AND INCLUDING 40 YARDS; LOWBOYS 
INCLUDING ATTACHED TRAILERS AND JEEPS UP TO AND 
INCLUDING 8 AXLES; SUPER VAC TRUCK/CACASCO 
TRUCK/HEAT STRESS TRUCK; READY-MIX OVER 7 YARDS UP 
TO AND INCLUDING 12 YARDS; PARTSMAN; STRINGING 
TRUCK...............................................$ 50.12                  26.43
TRUCK DRIVER (GROUP 1A) DUMP TRUCKS (INCLUDING 
ROCKBUGGY AND TRUCKS WITH PUPS) OVER 60 YARDS UP TO 
AND INCLUDING 100 YARDS; JEEPS (DRIVER UNDER LOAD)..$ 53.05                  26.43
TRUCK DRIVER (GROUP 1) SEMI WITH DOUBLE BOX MIXER; 
DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH 
PUPS) OVER 40 YARDS UP TO AND INCLUDING 60 YARDS; 
DELTAS, COMMANDERS, ROLLOGANS AND SIMILAR EQUIPMENT 
WHEN PULLING SLEDS, TRAILERS OR SIMILAR EQUIPMENT; 
BOAT COXSWAIN; LOWBOYS INCLUDING ATTACHED TRAILERS 
AND JEEPS, UP TO AND INCLUDING 12 AXLES; READY-MIX 
OVER 12 YARDS UP TO AND INCLUDING 15 YARDS); WATER 
WAGON (250 BBLS AND ABOVE); TIREMAN, HEAVY 
DUTY/FUELER.........................................$ 51.58                  26.43
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).


----------------------------------------------------------------

The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
""""SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The """"SU"""" identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The """"SA"""" identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the ?SA? identifier took
effect under state law in the state from which the rates were
adopted.

-----------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can
be:

           a) a survey underlying a wage determination
           b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination

On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:

            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:

            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:

            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.



================================================================

          END OF GENERAL DECISION"

All Alaska determinations: county index · Alaska prevailing wage · compute pay with the calculator.