Prevailing Wage Index
HomePrevailing wage by stateCaliforniaDeterminations › CA20260002

Wage determination CA20260002

Building, Heavy, Highway construction - California, revision 4, modified 2026-07-14

Verify against the official document: this page mirrors WD CA20260002 revision 4 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0005-002 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$56.3226.52

ASBE0005-002 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
FIRE STOP TECHNICIAN (APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS)$39.9420.65

ASBE0005-004 (collectively bargained (union) rate, 07/04/2022)

ClassificationBase rateFringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM $23.5213.37

BRCA0004-002 (collectively bargained (union) rate, 11/01/2024)

ClassificationBase rateFringes
BRICKLAYER; MARBLE SETTER$58.8119.14

BRCA0018-004 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
MARBLE FINISHER$43.3815.36
TILE FINISHER$37.9613.77
TILE LAYER$51.8219.32

BRCA0018-010 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
TERRAZZO FINISHER$42.1114.67
TERRAZZO WORKER/SETTER$49.6215.26

CARP0213-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CARPENTER: (1) CARPENTER, CABINET INSTALLER, INSULATION INSTALLER, HARDWOOD FLOOR WORKER AND ACOUSTICAL INSTALLER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS O$52.2426.18
CARPENTER: (2) MILLWRIGHT FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH ST$52.2426.68
CARPENTER: (3) PILEDRIVERMEN/DERRICK BARGEMAN, BRIDGE OR DOCK CARPENTER, HEAVY FRAMER, ROCK BARGEMAN OR SCOWMAN, ROCKSLINGER, SHINGLER (COMMERCIAL) FOOTNOTE: WORK OF FORMING IN THE$52.3726.18
CARPENTER: (4) PNEUMATIC NAILER, POWER STAPLER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED I$52.3726.18
CARPENTER: (5) SAWFILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEE$52.3426.18
CARPENTER: (6) SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION W$45.3725.43
CARPENTER: (7) TABLE POWER SAW OPERATOR FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJU$52.3426.18

CARP0213-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
DIVER: (1) WET AMOUNTS IN ""RATES' COLUMN ARE PER DAY$901.9226.18
DIVER: (2) STANDBY AMOUNTS IN ""RATES' COLUMN ARE PER DAY$450.9626.18
DIVER: (3) TENDER AMOUNTS IN ""RATES' COLUMN ARE PER DAY$442.9626.18
DIVER: (4) ASSISTANT TENDER AMOUNTS IN ""RATES' COLUMN ARE PER DAY$418.9626.18

CARP0213-004 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
DRYWALL (DRYWALL INSTALLER/LATHER)$52.2426.18
DRYWALL (STOCKER/SCRAPPER)$21.4511.27

CARP0721-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
MODULAR FURNITURE INSTALLER$25.0013.06

ELEC0569-002 (collectively bargained (union) rate, 08/31/2020)

ClassificationBase rateFringes
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 AND OVER): CABLE SPLICER$51.4016.42
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 AND OVER): CABLE SPLICER (TUNNEL WORK)$57.3616.60
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 AND OVER): ELECTRICIAN$50.6516.40
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 AND OVER): ELECTRICIAN (TUNNEL WORK)$56.6116.58
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 OR LESS): CABLE SPLICER$48.4016.33
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 OR LESS): CABLE SPLICER (TUNNEL WORK)$54.3616.51
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 OR LESS): ELECTRICIAN$47.6516.31
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 OR LESS): ELECTRICIAN (TUNNEL WORK)$53.6116.49

ELEC0569-005 (collectively bargained (union) rate, 06/03/2024)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: SOUND TECHNICIAN SOUND TECHNICIAN: TERMINATING, OPERATING AND PERFORMING FINAL CHECK-OUT SCOPE OF WORK: ASSEMBLY, INSTALLATION, OPERATION, SERVICE AND MAINT$43.7815.39

ELEC0569-006 (collectively bargained (union) rate, 06/02/2025)

ClassificationBase rateFringes
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #1 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTABLISHED EASEMENTS OUTSIDE OF B$43.6214.41
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: UTILITY TECHNICIAN #2 WORK ON STREET LIGHTING; TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR ESTABLISHED EASEMENTS OUTSIDE OF B$33.1014.09

ELEC1245-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK$70.1624.71
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT$53.3022.26
LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI$40.7621.76

ELEV0018-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MO$69.4338.44

ENGI0012-004 (collectively bargained (union) rate, 08/01/2025)

ClassificationBase rateFringes
OPERATOR, POWER EQUIPMENT: (1) LEVERMAN (DREDGING)$67.9040.95
OPERATOR, POWER EQUIPMENT: (2) DREDGE DOZER (DREDGING)$61.9340.95
OPERATOR, POWER EQUIPMENT: (3) DECKMATE (DREDGING)$61.8240.95
OPERATOR, POWER EQUIPMENT: (4) WINCH OPERATOR (STERN WINCH ON DREDGE) (DREDGING)$61.2740.95
OPERATOR, POWER EQUIPMENT: (5) FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND (DREDGING)$60.7340.95
OPERATOR, POWER EQUIPMENT: (6) BARGE MATE (DREDGING)$61.3440.95

ENGI0012-024 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1- BARGEMAN; BRAKEMAN; COMPRESSOR OPERATOR; DITCH WITCH, WITH SEAT OR SIMILAR TYPE EQUIPMENT; ELEVATOR OPERATOR-INSIDE; ENGINEER OI$63.4033.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR (NURSE TANK OPERATOR);COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYOR OPERAT$64.1833.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE (SKID STEER); EQUIPMENT GREASER (RACK); FORD FERGUSON (WITH DRAGTYPE ATTAC$64.6733.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR (MINI-MAX OR SIMILAR TYPE); BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN (ASPHALT OR CONC$65.9633.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRETE JOINT MACHINE OPERATOR (CANA$66.1833.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8- ASPHALT OR CONCRETE SPREADING OPERATOR (TAMPING OR FINISHING); ASPHALT PAVING MACHINE OPERATOR (BARBER GREENE OR SIMILAR TYPE); $66.2933.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10- DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 200 B BUCKET OR SIMILAR TYPES-WATSON 3000 OR 5000 AUGER OR SIMILAR TY$66.4133.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD, AUGER 200 CA OR $66.5833.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 Y$66.6833.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR (OPERATING A SECOND PIECE OF EQUI$66.7133.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, AT$66.7933.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); R$66.9133.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR A$67.0833.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, $67.1833.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR (OR SIMILAR TYPES); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, B$67.2933.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2-0 RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, $67.4133.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN ANY COMBINATION, $67.5833.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, UP TO AND IN$67.6833.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, CATERPILLAR,$67.7933.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 24- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTEM (SINGLE ENGINE, OVER 50 YDS.$67.9133.20
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PU$64.7533.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWN$65.5333.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator (jobsite) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON A$65.8233.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAI$65.9633.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5 HYDRAULIC BOOM TRUCK; STINGER CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER HOIST OPERATOR (1 DRUM) PREMIUM PAY:$66.1833.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6 Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operato$66.2933.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7 PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU. YDS. MRC); TOWER CRANE REPAIR;$66.4133.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8 Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to$66.5833.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9 Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and$66.7533.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to $67.7533.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up t$68.7533.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to an$69.7533.20
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff $70.7533.20
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader (wheel type up to 3/4 yd. without attachment) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator$65.2533.20
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the foll$66.0333.20
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson (up to and including 10 tons) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Op$66.3233.20
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms)$66.4633.20
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shiel$66.6833.20
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases$66.7933.20
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng$66.9133.20

IRON0229-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
IRONWORKER (FENCE ERECTOR)$45.7826.51

LABO0300-005 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AND TOXIC WASTE, ENCAPSULATION, $46.4825.93

LABO0345-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
LABORER, GUNITE: GROUP 1 RODMEN, NOZZLEMEN FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABO$55.8823.77
LABORER, GUNITE: GROUP 2 GUNMEN FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FORE$54.9323.77
LABORER, GUNITE: GROUP 3 REBOUNDMEN FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE $51.3923.77

LABO1184-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.9420.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.1120.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.9620.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.9620.86
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND $49.3023.97
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDI$50.6023.97
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, G$52.6123.97
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC C$54.3523.97

LABO1184-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$46.4825.95
LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, TH$47.0325.95
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$47.5825.95
LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER$49.1325.95
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$49.4825.95
LABORER, TUNNEL: GROUP 1 Batch plant laborer; Changehouse person; Dump person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials hand$53.6025.74
LABORER, TUNNEL: GROUP 2 Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic tools (except driller); Bull gang mucker, track pers$53.9225.74
LABORER, TUNNEL: GROUP 3 Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; J$54.3825.74
LABORER, TUNNEL: GROUP 4 Diamond driller; Sandblaster; Shaft and raise work$55.0725.74

LABO1184-004 (collectively bargained (union) rate, 11/01/2025)

ClassificationBase rateFringes
BRICK TENDER$42.6022.13

LABO1414-003 (collectively bargained (union) rate, 08/06/2025)

ClassificationBase rateFringes
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FOR$46.1725.97
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, M$48.7225.97

PAIN0036-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK$38.5218.64

PAIN0036-008 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
DRYWALL FINISHER/TAPER$49.3326.82

PAIN0036-013 (collectively bargained (union) rate, 10/01/2024)

ClassificationBase rateFringes
GLAZIER$52.9022.16

PAIN0036-019 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
SOFT FLOOR LAYER$40.7719.37

PLAS0200-004 (collectively bargained (union) rate, 08/03/2022)

ClassificationBase rateFringes
PLASTERER WORK AT NAVAL AIR FACILITY SEELEY: $3.00 ADDITIONAL PER HOUR$47.3719.64

PLAS0500-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER$47.7027.07

PLUM0016-008 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
PLUMBER/PIPEFITTER (ALL OTHER WORK EXCEPT WORK ON NEW ADDITIONS AND REMODELING OF BARS, RESTAURANT, STORES AND COMMERCIAL BUILDINGS NOT TO EXCEED 5,000 SQ. FT. OF FLOOR SPACE AND W$61.7326.81
PLUMBER/PIPEFITTER (SEELEY NAVAL AIR STATION)$72.2326.81
PLUMBER/PIPEFITTER (WORK ONLY ON STRIP MALLS, LIGHT COMMERCIAL, TENANT IMPROVEMENT AND REMODEL WORK)$44.2924.16
PLUMBER/PIPEFITTER: WORK ONLY ON NEW ADDITIONS AND REMODELING OF BARS, RESTAURANTS, STORES AND COMMERCIAL BUILDINGS, NOT TO EXCEED 5,000 SQ. FT. OF FLOOR SPACE$59.8525.83

PLUM0345-001 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
PLUMBER (LANDSCAPE/IRRIGATION FITTER)$44.7526.20
PLUMBER (SEWER & STORM DRAIN WORK)$48.8423.58

ROOF0045-001 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
ROOFER$42.8012.64

SFCA0669-002 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER$50.7929.80

SHEE0206-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
SHEET METAL TECHNICIAN SHEET METAL TECHNICIAN - SCOPE: LIGHT COMMERCIAL WORK: ANY SHEET METAL, HEATING AND AIR CONDITIONING WORK PERFORMED ON A PROJECT WHERE THE TOTAL CONSTRUCTION$38.6510.31
SHEET METAL WORKER SHEET METAL TECHNICIAN - SCOPE: LIGHT COMMERCIAL WORK: ANY SHEET METAL, HEATING AND AIR CONDITIONING WORK PERFORMED ON A PROJECT WHERE THE TOTAL CONSTRUCTION COS$51.4530.92

TEAM0011-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER GROUP 1 TRUCK DRIVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL $41.5935.69
TRUCK DRIVER GROUP 2 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 2 AXLES; TRAFFIC CONTROL PILOT CAR EXCLUDING MOVING HEAVY EQUIPMENT PERMIT LOAD; TRUCK MOUNTED BROOM WORK ON ALL$41.7435.69
TRUCK DRIVER GROUP 3 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 3 AXLES; BOOT PERSON; CEMENT MASON DISTRIBUTION TRUCK; FUEL TRUCK DRIVER; WATER TRUCK - 2 AXLE; DUMP TRUCK, LESS$41.8735.69
TRUCK DRIVER GROUP 4 DRIVER OF TRANSIT MIX TRUCK, UNDER 3 YDS.; DUMPCRETE TRUCK, LESS THAN 6-1/2 YDS. WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL$42.0635.69
TRUCK DRIVER GROUP 5 WATER TRUCK, 3 OR MORE AXLES; TRUCK GREASER AND TIRE PERSON ($0.50 ADDITIONAL FOR TIRE PERSON); PIPELINE AND UTILITY WORKING TRUCK DRIVER, INCLUDING WINCH TRUC$42.0935.69
TRUCK DRIVER GROUP 6 TRANSIT MIX TRUCK, 3 YDS. OR MORE; DUMPCRETE TRUCK, 6-1/2 YDS. WATER LEVEL AND OVER; VEHICLE OR COMBINATION OF VEHICLES - 4 OR MORE AXLES; OIL SPREADER TRUCK; $42.1235.69
TRUCK DRIVER GROUP 7$42.3735.69
TRUCK DRIVER GROUP 8 DUMP TRUCK, 25 YDS. TO 49 YDS. WATER LEVEL; TRUCK REPAIR PERSON; WATER PULL - SINGLE ENGINE; WELDER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADD$42.6235.69
TRUCK DRIVER GROUP 9 TRUCK REPAIR PERSON/WELDER; LOW BED DRIVER, 9 AXLES OR OVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROB$42.8235.69
TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 P$43.1235.69
TRUCK DRIVER GROUP 11 WATER PULL - TWIN ENGINE; WATER PULL - TWIN ENGINE WITH ATTACHMENTS; WINCH TRUCK DRIVER - $1.25 ADDITIONAL WHEN OPERATING WINCH OR SIMILAR SPECIAL ATTACHMENTS$43.6235.69
TRUCK DRIVER GROUP 12 BOOM TRUCK 17K AND ABOVE WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL $44.0535.69
Full official text of CA20260002 rev 4
"General Decision Number: CA20260002 07/14/2026


State: California


Construction Types: Building, Heavy and Highway


Counties: California Counties of 
Imperial




Building Construction Projects 
Dredging Projects-Includes Dredging Projects (does not include hopper dredge work)
Heavy Construction Projects (excludes water well drilling)
Highway Construction Projects



Modification Number     Publication Date
          2                01/23/2026
          3                05/18/2026
          4                07/14/2026


 ASBE0005-002 07/01/2024
                                                     Rates                  Fringes
ASBESTOS WORKERS/INSULATOR   (INCLUDES THE 
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE 
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF 
MECHANICAL SYSTEMS).................................$ 56.32                  26.52
----------------------------------------------------------------

 ASBE0005-002 09/01/2024
                                                     Rates                  Fringes
FIRE STOP TECHNICIAN   (APPLICATION OF FIRESTOPPING 
MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN 
WALLS, FLOORS, CEILINGS AND CURTAIN WALLS)..........$ 39.94                  20.65
----------------------------------------------------------------

 ASBE0005-004 07/04/2022
                                                     Rates                  Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER  
 (INCLUDES PREPARATION, WETTING, STRIPPING, 
REMOVAL, SCRAPPING, VACUUMING, BAGGING AND 
DISPOSING OF ALL INSULATION MATERIALS FROM  
MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS 
OR NOT).............................................$ 23.52                  13.37
----------------------------------------------------------------

 BRCA0004-002 11/01/2024
                                                     Rates                  Fringes
BRICKLAYER; MARBLE SETTER...........................$ 58.81                  19.14
----------------------------------------------------------------

 BRCA0018-004 06/01/2024
                                                     Rates                  Fringes
MARBLE FINISHER.....................................$ 43.38                  15.36
TILE FINISHER.......................................$ 37.96                  13.77
TILE LAYER..........................................$ 51.82                  19.32
----------------------------------------------------------------

 BRCA0018-010 09/01/2024
                                                     Rates                  Fringes
TERRAZZO FINISHER...................................$ 42.11                  14.67
TERRAZZO WORKER/SETTER..............................$ 49.62                  15.26
----------------------------------------------------------------

 CARP0213-001 07/01/2025
                                                     Rates                  Fringes
CARPENTER: (1) CARPENTER, CABINET INSTALLER, 
INSULATION INSTALLER, HARDWOOD FLOOR WORKER AND 
ACOUSTICAL INSTALLER    FOOTNOTE: WORK OF FORMING 
IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM 
DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING 
IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR 
PLACED IN PRE- DRILLED HOLES, FOR THAT PORTION OF A 
LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED, 
NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK 
IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR 
ADDITIONAL..........................................$ 52.24                  26.18
CARPENTER: (2) MILLWRIGHT    FOOTNOTE: WORK OF 
FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR 
STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL 
LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS 
DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT 
PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE 
IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS 
(WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER 
HOUR ADDITIONAL.....................................$ 52.24                  26.68
CARPENTER: (3) PILEDRIVERMEN/DERRICK BARGEMAN, 
BRIDGE OR DOCK CARPENTER, HEAVY FRAMER,  ROCK 
BARGEMAN OR SCOWMAN, ROCKSLINGER, SHINGLER 
(COMMERCIAL)    FOOTNOTE: WORK OF FORMING IN THE 
CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON 
OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN 
CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN 
PRE- DRILLED HOLES, FOR THAT PORTION OF A LAGGED 
TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS 
A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS 
PERFORMED BY PILEDRIVERS): $0.13 PER HOUR 
ADDITIONAL.  .......................................$ 52.37                  26.18
CARPENTER: (4) PNEUMATIC NAILER, POWER STAPLER    
FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF 
OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN 
WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION 
WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED 
HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST 
WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE 
FOR BACK FORMS (WHICH WORK IS PERFORMED BY 
PILEDRIVERS): $0.13 PER HOUR ADDITIONAL.............$ 52.37                  26.18
CARPENTER: (5)  SAWFILER    FOOTNOTE: WORK OF 
FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR 
STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL 
LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS 
DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT 
PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE 
IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS 
(WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER 
HOUR ADDITIONAL.....................................$ 52.34                  26.18
CARPENTER: (6)  SCAFFOLD BUILDER    FOOTNOTE: WORK 
OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS 
OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL 
LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS 
DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT 
PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE 
IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS 
(WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER 
HOUR ADDITIONAL.....................................$ 45.37                  25.43
CARPENTER: (7)  TABLE POWER SAW OPERATOR    
FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF 
OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN 
WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION 
WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED 
HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST 
WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE 
FOR BACK FORMS (WHICH WORK IS PERFORMED BY 
PILEDRIVERS): $0.13 PER HOUR ADDITIONAL.............$ 52.34                  26.18
----------------------------------------------------------------

 CARP0213-002 07/01/2025
                                                     Rates                  Fringes
DIVER: (1) WET  AMOUNTS IN ""RATES' COLUMN ARE PER 
DAY.................................................$ 901.92                  26.18
DIVER: (2) STANDBY  AMOUNTS IN ""RATES' COLUMN ARE 
PER DAY.............................................$ 450.96                  26.18
DIVER: (3) TENDER  AMOUNTS IN ""RATES' COLUMN ARE 
PER DAY.............................................$ 442.96                  26.18
DIVER: (4) ASSISTANT TENDER  AMOUNTS IN ""RATES' 
COLUMN ARE PER DAY..................................$ 418.96                  26.18
----------------------------------------------------------------

 CARP0213-004 07/01/2025
                                                     Rates                  Fringes
DRYWALL (DRYWALL INSTALLER/LATHER)..................$ 52.24                  26.18
DRYWALL (STOCKER/SCRAPPER)..........................$ 21.45                  11.27
----------------------------------------------------------------

 CARP0721-001 07/01/2025
                                                     Rates                  Fringes
MODULAR FURNITURE INSTALLER.........................$ 25.00                  13.06
----------------------------------------------------------------

 ELEC0569-002 08/31/2020
                                                     Rates                  Fringes
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 AND 
OVER): CABLE SPLICER................................$ 51.40                  16.42
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 AND 
OVER): CABLE SPLICER (TUNNEL WORK)..................$ 57.36                  16.60
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 AND 
OVER): ELECTRICIAN..................................$ 50.65                  16.40
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 AND 
OVER): ELECTRICIAN (TUNNEL WORK)....................$ 56.61                  16.58
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 OR 
LESS): CABLE SPLICER................................$ 48.40                  16.33
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 OR 
LESS): CABLE SPLICER (TUNNEL WORK)..................$ 54.36                  16.51
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 OR 
LESS): ELECTRICIAN..................................$ 47.65                  16.31
ELECTRICIANS (ELECTRICAL CONTRACTS OF $500,000 OR 
LESS): ELECTRICIAN (TUNNEL WORK)....................$ 53.61                  16.49
----------------------------------------------------------------

 ELEC0569-005 06/03/2024
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: SOUND TECHNICIAN  SOUND 
TECHNICIAN: TERMINATING, OPERATING AND PERFORMING  
FINAL CHECK-OUT    SCOPE OF WORK: ASSEMBLY, 
INSTALLATION, OPERATION, SERVICE AND MAINTENANCE OF 
COMPONENTS OR SYSTEMS AS USED IN CLOSED CIRCUIT 
TELEVISION, AMPLIFIED MASTER TELEVISION 
DISTRIBUTION, CATV ON PRIVATE PROPERTY, 
INTERCOMMUNICATION, BURGLAR ALARM, FIRE ALARM, LIFE 
SUPPORT AND ALL SECURITY ALARMS, PRIVATE AND PUBLIC 
TELEPHONE AND RELATED TELEPHONE INTERCONNECT, 
PUBLIC ADDRESS, PAGING, AUDIO, LANGUAGE, 
ELECTRONIC, BACKGROUND MUSIC SYSTEM LESS THAN LINE 
VOLTAGE OR ANY SYSTEM ACCEPTABLE FOR CLASS TWO 
WIRING FOR PRIVATE, COMMERCIAL, OR INDUSTRIAL USE 
FURNISHED BY LEASED WIRE, FREUENCY MODULATION OR 
OTHER RECORDING DEVICES, ELECTRICAL APPARATUS BY 
MEANS OF WHICH ELECTRICITY IS APPLIED TO THE 
AMPLIFICATION, TRANSMISSION, TRANSFERENCE, 
RECORDING OR REPRODUCTION OF VOICE, MUSIC, SOUND, 
IMPULSES AND VIDEO.  EXCLUDED FROM THIS SCOPE OF 
WORK - TRANSMISSION, SERVICE AND MAINTENANCE OF 
BACKGROUND MUSIC.  ALL OF THE ABOVE SHALL INCLUDE 
THE INSTALLATION AND TRANSMISSION OVER FIBER 
OPTICS..............................................$ 43.78                  15.39
----------------------------------------------------------------

 ELEC0569-006 06/02/2025
                                                     Rates                  Fringes
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: 
UTILITY TECHNICIAN #1  WORK ON STREET LIGHTING; 
TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR 
ESTABLISHED EASEMENTS OUTSIDE OF BUILDINGS    
STREET LIGHT & TRAFFIC SIGNAL WORK:  UTILITY 
TECHNICIAN #1: INSTALLATION OF STREET LIGHTS AND 
TRAFFIC SIGNALS, INCLUDING ELECTRICAL CIRCUITRY, 
PROGRAMMABLE CONTROLLER, PEDESTAL-MOUNTED 
ELECTRICAL METER ENCLOSURES AND LAYING OF 
PRE-ASSEMBLED CABLE IN DUCTS.  THE LAYOUT OF 
ELECTRICAL SYSTEMS AND COMMUNICATION INSTALLATION 
INCLUDING PROPER POSITION OF TRENCH DEPTHS, AND 
RADIUS AT DUCT BANKS, LOCATION FOR MANHOLES, STREET 
LIGHTS AND TRAFFIC SIGNALS..........................$ 43.62                  14.41
TRAFFIC SIGNAL, STREET LIGHT AND UNDERGROUND WORK: 
UTILITY TECHNICIAN #2  WORK ON STREET LIGHTING; 
TRAFFIC SIGNALS; AND UNDERGROUND SYSTEMS AND/OR 
ESTABLISHED EASEMENTS OUTSIDE OF BUILDINGS    
STREET LIGHT & TRAFFIC SIGNAL WORK:  UTILITY 
TECHNICIAN #2: DISTRIBUTION OF MATERIAL AT JOBSITE, 
INSTALLATION OF UNDERGROUND DUCTS FOR ELECTRICAL, 
TELEPHONE, CABLE TV LAND COMMUNICATION SYSTEMS. THE 
SETTING, LEVELING, GROUNDING AND RACKING OF PRECAST 
MANHOLES, HANDHOLES AND TRANSFORMER PADS............$ 33.10                  14.09
----------------------------------------------------------------

 ELEC1245-001 01/01/2025
                                                     Rates                  Fringes
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER    
HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, 
THANKSGIVING DAY AND DAY AFTER THANKSGIVING, 
CHRISTMAS DAY.......................................$ 70.16                  24.71
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST   
(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR 
VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND 
BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE 
EQUIPMENT)    HOLIDAYS: NEW YEAR'S DAY, M.L. KING 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERANS DAY, THANKSGIVING DAY AND DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 53.30                  22.26
LINE CONSTRUCTION: (3) GROUNDMAN    HOLIDAYS: NEW 
YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, 
THANKSGIVING DAY AND DAY AFTER THANKSGIVING, 
CHRISTMAS DAY.......................................$ 40.76                  21.76
----------------------------------------------------------------

 ELEV0018-001 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC    FOOTNOTE:  A. PAID VACATION:  
EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS 
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 
YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF 
SERVICE.  B. PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER 
THANKSGIVING, AND CHRISTMAS DAY.....................$ 69.43                  38.44
----------------------------------------------------------------

 ENGI0012-004 08/01/2025
                                                     Rates                  Fringes
OPERATOR, POWER EQUIPMENT: (1) LEVERMAN (DREDGING)..$ 67.90                  40.95
OPERATOR, POWER EQUIPMENT: (2) DREDGE DOZER 
(DREDGING)..........................................$ 61.93                  40.95
OPERATOR, POWER EQUIPMENT: (3) DECKMATE (DREDGING)..$ 61.82                  40.95
OPERATOR, POWER EQUIPMENT: (4) WINCH OPERATOR 
(STERN WINCH ON DREDGE) (DREDGING)..................$ 61.27                  40.95
OPERATOR, POWER EQUIPMENT: (5) FIREMAN-OILER, 
DECKHAND, BARGEMAN, LEVEEHAND (DREDGING)............$ 60.73                  40.95
OPERATOR, POWER EQUIPMENT: (6) BARGE MATE 
(DREDGING)..........................................$ 61.34                  40.95
----------------------------------------------------------------

 ENGI0012-024 07/01/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP  
1- BARGEMAN; BRAKEMAN; COMPRESSOR OPERATOR; DITCH 
WITCH, WITH SEAT OR SIMILAR TYPE EQUIPMENT; 
ELEVATOR OPERATOR-INSIDE; ENGINEER OILER; FORKLIFT 
OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES 
UNDER 5 TONS; GENERATOR OPERATOR; GENERATOR, PUMP 
OR COMPRESSOR PLANT OPERATOR; PUMP OPERATOR; 
SIGNALMAN; SWITCHMAN  PREMIUM PAY:  $10.00 PER HOUR 
SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK 
ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL 
RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY 
NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, 
MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 
PALMS MARINE BASE AND CAMP PENDLETON    WORKERS 
REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 63.40                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP  
2- ASPHALT-RUBBER PLANT OPERATOR (NURSE TANK 
OPERATOR);COIL TUBING RIG OPERATOR, CONCRETE MIXER 
OPERATOR-SKIP TYPE; CONVEYOR OPERATOR; FIREMAN; 
FORKLIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR 
TYPES OVER 5 TONS; HYDROSTATIC PUMP OPERATOR; OILER 
CRUSHER (ASPHALT OR CONCRETE PLANT); PETROMAT 
LAYDOWN MACHINE; PJU SIDE DUM JACK; SCREENING AND 
CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPES); 
SKIPLOADER (WHEEL TYPE UP TO 3/4 YD. WITHOUT 
ATTACHMENT); TAR POT FIREMAN; TEMPORARY HEATING 
PLANT OPERATOR; TRENCHING MACHINE OILER  PREMIUM 
PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL POWER 
EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY 
BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, 
POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO 
ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE 
YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP 
PENDLETON    WORKERS REQUIRED TO SUIT UP AND WORK 
IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR 
ADDITIONAL.  COMBINATION MIXER AND COMPRESSOR 
OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A 
CONCRETE MOBILE MIXER OPERATOR......................$ 64.18                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP  
3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR 
TYPE (SKID STEER); EQUIPMENT GREASER (RACK); FORD 
FERGUSON (WITH DRAGTYPE ATTACHMENTS); HELICOPTER 
RADIOMAN (GROUND); STATIONARY PIPE WRAPPING AND 
CLEANING MACHINE OPERATOR  PREMIUM PAY:  $10.00 PER 
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR 
WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE 
NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, 
SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE 
BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS 
AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON    
WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 64.67                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP  
4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR 
(MINI-MAX OR SIMILAR TYPE); BORING MACHINE 
OPERATOR; BOXMAN OR MIXERMAN (ASPHALT OR CONCRETE); 
CHIP SPREADING MACHINE OPERATOR; CONCRETE CLEANING 
DECONTAMINATION MACHINE OPERATOR; CONCRETE PUMP 
OPERATOR (SMALL PORTABLE);DIRECT PUSH OPERATOR 
(GEOPROBE OR SIMILAR TYPES) DRILLING MACHINE 
OPERATOR, SMALL AUGER TYPES (TEXOMA SUPER 
ECONOMATIC OR SIMILAR TYPES - HUGHES 100 OR 200 OR 
SIMILAR TYPES - DRILLING DEPTH OF 30' MAXIMUM); 
EQUIPMENT GREASER (GREASE TRUCK); GUARD RAIL POST 
DRIVER OPERATOR; HIGHLINE CABLEWAY SIGNALMAN; 
HYDRA-HAMMER-AERO STOMPER; MICRO TUNNELING (ABOVE 
GROUND TUNNEL); POWER CONCRETE CURING MACHINE 
OPERATOR; POWER CONCRETE SAW OPERATOR; POWER-DRIVEN 
JUMBO FORM SETTER OPERATOR; POWER SWEEPER OPERATOR; 
ROCK WHEEL SAW/TRENCHER; ROLLER OPERATOR 
(COMPACTING); SCREED OPERATOR (ASPHALT OR 
CONCRETE); TRENCHING MACHINE OPERATOR (UP TO 6 
FT.); VACUUM OR MUCH TRUCK  PREMIUM PAY:  $10.00 
PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT 
OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA 
LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, 
SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE 
BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS 
AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON    
WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 65.96                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP  
6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT 
ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; 
CONCRETE JOINT MACHINE OPERATOR (CANAL AND SIMILAR 
TYPE); CONCRETE PLANER OPERATOR; DANDY DIGGER; DECK 
ENGINE OPERATOR; DERRICKMAN (OILFIELD TYPE); 
DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES 
(CALWELD 100 BUCKET OR SIMILAR TYPES - WATSON 1000 
AUGER OR SIMILAR TYPES - TEXOMA 330, 500 OR 600 
AUGER OR SIMILAR TYPES - DRILLING DEPTH OF 45' 
MAXIMUM); DRILLING MACHINE OPERATOR; HYDROGRAPHIC 
SEEDER MACHINE OPERATOR (STRAW, PULP OR SEED), 
JACKSON TRACK MAINTAINER, OR SIMILAR TYPE; 
KALAMAZOO SWITCH TAMPER, OR SIMILAR TYPE; MACHINE 
TOOL OPERATOR; MAGINNIS INTERNAL FULL SLAB 
VIBRATOR, MECHANICAL BERM, CURB OR GUTTER(CONCRETE 
OR ASPHALT); MECHANICAL FINISHER OPERATOR 
(CONCRETE, CLARY-JOHNSON-BIDWELL OR SIMILAR); MICRO 
TUNNEL SYSTEM (BELOW GROUND); PAVEMENT BREAKER 
OPERATOR (TRUCK MOUNTED); ROAD OIL MIXING MACHINE 
OPERATOR; ROLLER OPERATOR (ASPHALT OR FINISH), 
RUBBER-TIRED EARTH MOVING EQUIPMENT (SINGLE ENGINE, 
UP TO AND INCLUDING 25 YDS. STRUCK); SELF-PROPELLED 
TAR PIPELINING MACHINE OPERATOR; SKIPLOADER 
OPERATOR (CRAWLER AND WHEEL TYPE, OVER 3/4 YD. AND 
UP TO AND INCLUDING 1-1/2 YDS.); SLIP FORM PUMP 
OPERATOR (POWER DRIVEN HYDRAULIC LIFTING DEVICE FOR 
CONCRETE FORMS); TRACTOR OPERATOR-BULLDOZER, 
TAMPER-SCRAPER (SINGLE ENGINE, UP TO 100 H.P. 
FLYWHEEL AND SIMILAR TYPES, UP TO AND INCLUDING D-5 
AND SIMILAR TYPES); TUGGER HOIST OPERATOR (1 DRUM); 
ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM 
OPERATOR; VACUUM BLASTING MACHINE OPERATOR  PREMIUM 
PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL POWER 
EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY 
BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, 
POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO 
ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE 
YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP 
PENDLETON    WORKERS REQUIRED TO SUIT UP AND WORK 
IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR 
ADDITIONAL.  COMBINATION MIXER AND COMPRESSOR 
OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A 
CONCRETE MOBILE MIXER OPERATOR......................$ 66.18                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP  
8- ASPHALT OR CONCRETE SPREADING OPERATOR (TAMPING 
OR FINISHING); ASPHALT PAVING MACHINE OPERATOR 
(BARBER GREENE OR SIMILAR TYPE); ASPHALT-RUBBER 
DISTRIBUTION OPERATOR; BACKHOE OPERATOR (UP TO AND 
INCLUDING 3/4 YD.), SMALL FORD, CASE OR SIMILAR 
TYPES; CABLE BUNDLING MACHINE OPERATOR (EXCLUDING 
HANDHELD); CABLE TRENCHING MACHINE OPERATOR (SPIDER 
PLOW OR SIMILAR TYPES) CAST-IN-PLACE PIPE LAYING 
MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR 
OPERATOR (GUNITE WORK); COMPACTOR OPERATOR 
(SELF-PROPELLED); CONCRETE MIXER OPERATOR (PAVING); 
CRUSHING PLANT OPERATOR; DRILL DOCTOR; DRILLING 
MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD 
150 BUCKET OR SIMILAR TYPES - WATSON 1500, 2000 
2500 AUGER OR SIMILAR TYPES - TEXOMA 700, 800 AUGER 
OR SIMILAR TYPES - DRILLING DEPTH OF 60' MAXIMUM); 
ELEVATING GRADER OPERATOR; GRADE CHECKER; GRADALL 
OPERATOR; GROUTING MACHINE OPERATOR; HEAVY-DUTY 
REPAIRMAN; HEAVY EQUIPMENT ROBOTICS OPERATOR; 
KALAMAZOO BALLISTE REGULATOR OR SIMILAR TYPE; 
KOLMAN BELT LOADER AND SIMILAR TYPE; LE TOURNEAU 
BLOB COMPACTOR OR SIMILAR TYPE; LOADER OPERATOR 
(ATHEY, EUCLID, SIERRA AND SIMILAR TYPES); MOBARK 
CHIPPER OR SIMILAR; OZZIE PADDER OR SIMILAR TYPES; 
P.C. SLOT SAW; PNEUMATIC CONCRETE PLACING MACHINE 
OPERATOR (HACKLEY-PRESSWELL OR SIMILAR TYPE); 
PUMPCRETE GUN OPERATOR; RCM CEMENTING UNIT 
OPERATOR, RAIL/SWITCH GRINDER OPERATOR (HARSCO OR 
SIMILAR TYPES)   ROCK DRILL OR SIMILAR TYPES; 
ROTARY DRILL OPERATOR (EXCLUDING CAISSON TYPE); 
RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR 
(SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON 
AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 
25 YDS. UP TO AND INCLUDING 50 CU. YDS. STRUCK); 
RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR 
(MULTIPLE ENGINE UP TO AND INCLUDING 25 YDS. 
STRUCK); RUBBER-TIRED SCRAPER OPERATOR 
(SELF-LOADING PADDLE WHEEL TYPE-JOHN DEERE, 1040 
AND SIMILAR SINGLE UNIT); SELF- PROPELLED CURB AND 
GUTTER MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER 
OPERATOR (CRAWLER AND WHEEL TYPE OVER 1-1/2 YDS. UP 
TO AND INCLUDING 6-1/2 YDS.); SOIL REMEDIATION 
PLANT OPERATOR; SURFACE HEATERS AND PLANER 
OPERATOR; TRACTOR COMPRESSOR DRILL COMBINATION 
OPERATOR; TRACTOR OPERATOR (ANY TYPE LARGER THAN 
D-5 - 100 FLYWHEEL H.P. AND OVER, OR 
SIMILAR-BULLDOZER, TAMPER, SCRAPER AND PUSH TRACTOR 
SINGLE ENGINE); TRACTOR OPERATOR (BOOM 
ATTACHMENTS), TRAVELING PIPE WRAPPING, CLEANING AND 
BENDNG MACHINE OPERATOR; TRENCHING MACHINE OPERATOR 
(OVER 6 FT. DEPTH CAPACITY, MANUFACTURER'S RATING); 
TRENCHING MACHINE WITH ROAD MINER ATTACHMENT (OVER 
6 FT DEPTH CAPACITY): ULTRA HIGH PRESSURE WATERJET 
CUTTING TOOL SYSTEM MECHANIC; WATER PULL 
(COMPACTION) OPERATOR  PREMIUM PAY:  $10.00 PER 
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR 
WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE 
NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, 
SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE 
BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS 
AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON    
WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 66.29                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
10- DRILLING MACHINE OPERATOR, BUCKET OR AUGER 
TYPES (CALWELD 200 B BUCKET OR SIMILAR TYPES-WATSON 
3000 OR 5000 AUGER OR SIMILAR TYPES-TEXOMA 900 
AUGER OR SIMILAR TYPES-DRILLING DEPTH OF 105' 
MAXIMUM); DUAL DRUM MIXER, DYNAMIC COMPACTOR LDC350 
(OR SIMILAR TYPES); MONORAIL LOCOMOTIVE OPERATOR 
(DIESEL, GAS OR ELECTRIC); MOTOR PATROL-BLADE 
OPERATOR (SINGLE ENGINE); MULTIPLE ENGINE TRACTOR 
OPERATOR (EUCLID AND SIMILAR TYPE-EXCEPT QUAD 9 
CAT.); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR 
(SINGLE ENGINE, OVER 50 YDS. STRUCK); PNEUMATIC 
PIPE RAMMING TOOL AND SIMILAR TYPES; PRESTRESSED 
WRAPPING MACHINE OPERATOR; RUBBER-TIRED 
EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, 
OVER 50 YDS. STRUCK); RUBBER TIRED EARTH MOVING 
EQUIPMENT OPERATOR (MULTIPLE ENGINE, EUCLID, 
CATERPILLAR AND SIMILAR OVER 25 YDS. AND UP TO 50 
YDS. STRUCK), TOWER CRANE REPAIRMAN; TRACTOR LOADER 
OPERATOR (CRAWLER AND WHEEL TYPE OVER 6-1/2 YDS.); 
WOODS MIXER OPERATOR (AND SIMILAR PUGMILL 
EQUIPMENT)  PREMIUM PAY:  $10.00 PER HOUR SHALL BE 
PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.41                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM 
OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR 
AUGER TYPES (CALWELD, AUGER 200 CA OR SIMILAR TYPES 
- WATSON, AUGER 6000 OR SIMILAR TYPES - HUGHES 
SUPER DUTY, AUGER 200 OR SIMILAR TYPES - DRILLING 
DEPTH OF 175' MAXIMUM); HOE RAM OR SIMILAR WITH 
COMPRESSOR; MASS EXCAVATOR OPERATOR LESS THA 750 
CU. YARDS; MECHANICAL FINISHING MACHINE OPERATOR; 
MOBILE FORM TRAVELER OPERATOR; MOTOR PATROL 
OPERATOR (MULTI-ENGINE); PIPE MOBILE MACHINE 
OPERATOR; RUBBER-TIRED EARTH- MOVING EQUIPMENT 
OPERATOR (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND 
SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); 
RUBBER-TIRED SELF- LOADING SCRAPER OPERATOR 
(PADDLE-WHEEL-AUGER TYPE SELF-LOADING - TWO (2) OR 
MORE UNITS)  PREMIUM PAY:  $10.00 PER HOUR SHALL BE 
PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.58                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR 
OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE 
ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)  
PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.68                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; 
REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR 
(OPERATING A SECOND PIECE OF EQUIPMENT: $1.00 PER 
HOUR ADDITIONAL); WHEEL EXCAVATOR OPERATOR (OVER 
750 CU. YDS.)  PREMIUM PAY:  $10.00 PER HOUR SHALL 
BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.71                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE 
ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND 
SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25 
YDS. AND UP TO AND INCLUDING 50 YDS. STRUCK); 
RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE 
ENGINE-UP TO AND INCLUDING 25 YDS. STRUCK)  PREMIUM 
PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL POWER 
EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY 
BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, 
POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO 
ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE 
YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP 
PENDLETON    WORKERS REQUIRED TO SUIT UP AND WORK 
IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR 
ADDITIONAL.  COMBINATION MIXER AND COMPRESSOR 
OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A 
CONCRETE MOBILE MIXER OPERATOR......................$ 66.79                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE 
ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED 
EARTH-MOVING EQUIPMENT OPERATOR, OPERATING 
EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE, 
EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND 
UP TO 50 YDS. STRUCK)  PREMIUM PAY:  $10.00 PER 
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR 
WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE 
NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, 
SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE 
BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS 
AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON    
WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 66.91                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE 
ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 50 
CU. YDS. STRUCK); TANDEM TRACTOR OPERATOR 
(OPERATING CRAWLER TYPE TRACTORS IN TANDEM - QUAD 9 
AND SIMILAR TYPE)  PREMIUM PAY:  $10.00 PER HOUR 
SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK 
ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL 
RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY 
NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, 
MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 
PALMS MARINE BASE AND CAMP PENDLETON    WORKERS 
REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 67.08                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
18- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND 
SIMILAR TYPES IN ANY COMBINATION, EXCLUDING 
COMPACTION UNITS - SINGLE ENGINE, UP TO AND 
INCLUDING 25 YDS. STRUCK)  PREMIUM PAY:  $10.00 PER 
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR 
WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE 
NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, 
SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE 
BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS 
AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON    
WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 67.18                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
19- ROTEX CONCRETE BELT OPERATOR (OR SIMILAR 
TYPES); RUBBER-TIRED EARTH-MOVING EQUIPMENT 
OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY 
DUMPS AND SIMILAR TYPES IN ANY COMBINATION, 
EXCLUDING COMPACTION UNITS - SINGLE ENGINE, 
CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES 
WITH ANY AND ALL ATTACHMENTS OVER 25 YDS.AND UP TO 
AND INCLUDING 50 CU. YDS. STRUCK); RUBBER-TIRED 
EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN 
TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN 
ANY COMBINATION, EXCLUDING COMPACTION UNITS - 
MULTIPLE ENGINE, UP TO AND INCLUDING 25 YDS. 
STRUCK)  PREMIUM PAY:  $10.00 PER HOUR SHALL BE 
PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.29                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
2-0 RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND 
SIMILAR TYPES IN ANY COMBINATION, EXCLUDING 
COMPACTION UNITS - SINGLE ENGINE, OVER 50 YDS. 
STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT 
OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY 
DUMPS, AND SIMILAR TYPES IN ANY COMBINATION, 
EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE, 
EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND 
UP TO 50 YDS. STRUCK)  PREMIUM PAY:  $10.00 PER 
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR 
WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE 
NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, 
SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE 
BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS 
AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON    
WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 67.41                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND 
SIMILAR TYPES IN ANY COMBINATION, EXCLUDING 
COMPACTION UNITS - MULTIPLE ENGINE, EUCLID, 
CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS. 
STRUCK)  PREMIUM PAY:  $10.00 PER HOUR SHALL BE 
PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.58                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL 
SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS. 
STRUCK)  PREMIUM PAY:  $10.00 PER HOUR SHALL BE 
PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.68                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL 
SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY 
WAGON AND SIMILAR TYPES WITH ANY AND ALL 
ATTACHMENTS OVER 25 YDS. AND UP TO AND INCLUDING 50 
YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT 
OPERATOR, OPERATING WITH THE TANDEM PUSH-PULL 
SYSTEM (MULTIPLE ENGINE, UP TO AND INCLUDING 25 
YDS. STRUCK)  PREMIUM PAY:  $10.00 PER HOUR SHALL 
BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.79                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
24- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL 
SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK); 
RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL 
SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND 
SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK)  
PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.91                  33.20
OPERATOR:  POWER EQUIPMENT, ALL OTHER WORK: GROUP 
25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; 
RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, 
OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL 
SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND 
SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); SPYDER 
EXCAVATOR OPERATOR, WITH ALL ATTACHMENTS       
PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR.     $ 68.08                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  1-  Engineer oiler; Fork lift 
operator (includes loed,  lull   or similar types)  
PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR.     
         ...........................................$ 64.75                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  2- Truck crane oiler  PREMIUM PAY: 
 $10.00 PER HOUR SHALL BE PAID ON ALL POWER 
EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY 
BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, 
POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO 
ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE 
YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP 
PENDLETON    WORKERS REQUIRED TO SUIT UP AND WORK 
IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR 
ADDITIONAL.  COMBINATION MIXER AND COMPRESSOR 
OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A 
CONCRETE MOBILE MIXER OPERATOR......................$ 65.53                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  3- A-frame or winch truck 
operator; Ross carrier    operator (jobsite)  
PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 65.82                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  4- Bridge-type unloader and 
turntable operator;  Helicopter hoist operator  
PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 65.96                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  5 HYDRAULIC BOOM TRUCK; STINGER 
CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER 
HOIST OPERATOR (1 DRUM)  PREMIUM PAY:  $10.00 PER 
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR 
WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE 
NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, 
SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE 
BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS 
AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON    
WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 66.18                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  6 Bridge crane operator; Cretor 
crane operator; Hoist operator (Chicago boom and 
similar type); Lift mobile operator; Lift slab 
machine operator (Vagtborg and similar types); 
Material hoist and/or manlift operator; Polar 
gantry crane operator; Self Climbing scaffold (or 
similar type); Shovel, backhoe, dragline, clamshell 
operator (over  3/4 yd. and up to 5 cu. yds. mrc); 
Tugger hoist operator  PREMIUM PAY:  $10.00 PER 
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR 
WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE 
NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, 
SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE 
BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS 
AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON    
WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 66.29                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  7 PEDESTAL CRANE OPERATOR; SHOVEL, 
BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU. 
YDS. MRC); TOWER CRANE REPAIR; TUGGER HOIST 
OPERATOR (3 DRUM)  PREMIUM PAY:  $10.00 PER HOUR 
SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK 
ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL 
RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY 
NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, 
MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29 
PALMS MARINE BASE AND CAMP PENDLETON    WORKERS 
REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS 
MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.  
COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE 
WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER 
OPERATOR............................................$ 66.41                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  8 Crane operator (up to and 
including 25 ton capacity); Crawler transporter 
operator; Derrick barge operator (up to and 
including 25 ton capacity); Hoist operator, stiff 
legs, Guy derrick or similar type (up to and 
including 25 ton capacity); Shovel, backhoe, 
dragline, clamshell operator (over 7 cu. yds., 
M.R.C.)  PREMIUM PAY:  $10.00 PER HOUR SHALL BE 
PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.58                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP  9 Crane operator (over 25 tons and 
up to and including 50 tons mrc); Derrick barge 
operator (over 25 tons up to and including 50 tons 
mrc); Highline cableway operator; Hoist operator, 
stiff legs, Guy derrick or similar type (over 25 
tons up to and including 50 tons mrc); K-crane 
operator; Polar crane operator; Self erecting tower 
crane operator maximum lifting capacity ten tons  
PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.75                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP 10- Crane operator (over 50 tons 
and up to and including 100 tons mrc); Derrick 
barge operator (over 50 tons up to and including 
100 tons mrc); Hoist operator, stiff legs, Guy 
derrick or similar type (over 50 tons up to and 
including 100 tons mrc), Mobile tower crane 
operator (over 50 tons, up to and including 100 
tons M.R.C.)  PREMIUM PAY:  $10.00 PER HOUR SHALL 
BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE 
FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.75                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP 11- Crane operator (over 100 tons 
and up to and including 200 tons mrc); Derrick 
barge operator (over 100 tons up to and including 
200 tons mrc); Hoist operator, stiff legs, Guy 
derrick or similar type (over 100 tons up to and 
including 200 tons mrc); Mobile tower crane 
operator (over 100 tons up to and including 200 
tons mrc) ; Tower crane operator and tower gantry   
 PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 68.75                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP 12- Crane operator (over 200 tons 
up to and including 300 tons mrc); Derrick barge 
operator (over 200 tons up to and including 300 
tons mrc); Hoist operator, stiff legs, Guy derrick 
or similar type (over 200 tons, up to and including 
300 tons mrc); Mobile tower crane operator (over 
200 tons, up to and including 300 tons mrc)    
PREMIUM PAY:  $10.00 PER HOUR SHALL BE PAID ON ALL 
POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG 
MILITARY BASES: CHINA LAKE NAVAL RESERVE, 
VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, 
FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP 
LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE 
BASE AND CAMP PENDLETON    WORKERS REQUIRED TO SUIT 
UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT: 
$2.00 PER HOUR ADDITIONAL.  COMBINATION MIXER AND 
COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE 
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 69.75                  33.20
OPERATOR:  POWER EQUIPMENT, CRANES, PILEDRIVING & 
HOISTING: GROUP 13 Crane operator (over 300 tons); 
Derrick barge operator (over 300 tons); Helicopter 
pilot; Hoist operator, stiff legs, Guy derrick or 
similar type (over 300 tons); Mobile tower crane 
operator (over 300 tons)............................$ 70.75                  33.20
OPERATOR:  POWER EQUIPMENT, TUNNEL WORK: GROUP  1- 
Skiploader (wheel type up to 3/4 yd. without 
attachment)  PREMIUM PAY:  $10.00 per hour shall be 
paid on all Power Equipment Operator work on the 
followng Military Bases: China Lake Naval Reserve, 
Vandenberg AFB, Point Arguello, Seely Naval Base, 
Fort Irwin, Nebo Annex Marine Base, Marine Corp 
Logistics Base Yermo, Edwards AFB, 29 Palms Marine 
Base and Camp Pendleton   Workers required to suit 
up and work in a hazardous material environment: 
$2.00 per hour additional.  Combination mixer and 
compressor operator on gunite work shall be 
classified as a concrete mobile mixer operator......$ 65.25                  33.20
OPERATOR:  POWER EQUIPMENT, TUNNEL WORK: GROUP  2- 
Power-driven jumbo form setter operator  PREMIUM 
PAY:  $10.00 per hour shall be paid on all Power 
Equipment Operator work on the followng Military 
Bases: China Lake Naval Reserve, Vandenberg AFB, 
Point Arguello, Seely Naval Base, Fort Irwin, Nebo 
Annex Marine Base, Marine Corp Logistics Base 
Yermo, Edwards AFB, 29 Palms Marine Base and Camp 
Pendleton   Workers required to suit up and work in 
a hazardous material environment: $2.00 per hour 
additional.  Combination mixer and compressor 
operator on gunite work shall be classified as a 
concrete mobile mixer operator......................$ 66.03                  33.20
OPERATOR:  POWER EQUIPMENT, TUNNEL WORK: GROUP  3- 
Dinkey locomotive or motorperson (up to and 
including 10 tons)  PREMIUM PAY:  $10.00 per hour 
shall be paid on all Power Equipment Operator work 
on the followng Military Bases: China Lake Naval 
Reserve, Vandenberg AFB, Point Arguello, Seely 
Naval Base, Fort Irwin, Nebo Annex Marine Base, 
Marine Corp Logistics Base Yermo, Edwards AFB, 29 
Palms Marine Base and Camp Pendleton   Workers 
required to suit up and work in a hazardous 
material environment: $2.00 per hour additional.  
Combination mixer and compressor operator on gunite 
work shall be classified as a concrete mobile mixer 
operator............................................$ 66.32                  33.20
OPERATOR:  POWER EQUIPMENT, TUNNEL WORK: GROUP  4- 
Bit sharpener; Equipment greaser (grease truck); 
Slip form pump operator (power-driven hydraulic 
lifting device for concrete forms); Tugger hoist 
operator (1 drum); Tunnel locomotive operator (over 
10 and up to and including 30 tons)  PREMIUM PAY:  
$10.00 per hour shall be paid on all Power 
Equipment Operator work on the followng Military 
Bases: China Lake Naval Reserve, Vandenberg AFB, 
Point Arguello, Seely Naval Base, Fort Irwin, Nebo 
Annex Marine Base, Marine Corp Logistics Base 
Yermo, Edwards AFB, 29 Palms Marine Base and Camp 
Pendleton   Workers required to suit up and work in 
a hazardous material environment: $2.00 per hour 
additional.  Combination mixer and compressor 
operator on gunite work shall be classified as a 
concrete mobile mixer operator......................$ 66.46                  33.20
OPERATOR:  POWER EQUIPMENT, TUNNEL WORK: GROUP  5-  
Backhoe operator (up to and including 3/4 yd.); 
Small Ford, Case or similar; Drill doctor; Grouting 
machine operator; Heading shield operator; 
Heavy-duty repairperson; Loader operator (Athey, 
Euclid, Sierra and similar types); Mucking machine 
operator (1/4 yd., rubber-tired, rail or track 
type); Pneumatic concrete placing machine operator 
(Hackley-Presswell or similar type); Pneumatic 
heading shield (tunnel); Pumpcrete gun operator; 
Tractor compressor drill combination operator; 
Tugger hoist operator (2 drum); Tunnel locomotive 
operator (over 30 tons)  PREMIUM PAY:  $10.00 per 
hour shall be paid on all Power Equipment Operator 
work on the followng Military Bases: China Lake 
Naval Reserve, Vandenberg AFB, Point Arguello, 
Seely Naval Base, Fort Irwin, Nebo Annex Marine 
Base, Marine Corp Logistics Base Yermo, Edwards 
AFB, 29 Palms Marine Base and Camp Pendleton   
Workers required to suit up and work in a hazardous 
material environment: $2.00 per hour additional.  
Combination mixer and compressor operator on gunite 
work shall be classified as a concrete mobile mixer 
operator............................................$ 66.68                  33.20
OPERATOR:  POWER EQUIPMENT, TUNNEL WORK: GROUP  6- 
Heavy Duty Repairman   PREMIUM PAY:  $10.00 per 
hour shall be paid on all Power Equipment Operator 
work on the followng Military Bases: China Lake 
Naval Reserve, Vandenberg AFB, Point Arguello, 
Seely Naval Base, Fort Irwin, Nebo Annex Marine 
Base, Marine Corp Logistics Base Yermo, Edwards 
AFB, 29 Palms Marine Base and Camp Pendleton   
Workers required to suit up and work in a hazardous 
material environment: $2.00 per hour additional.  
Combination mixer and compressor operator on gunite 
work shall be classified as a concrete mobile mixer 
operator............................................$ 66.79                  33.20
OPERATOR:  POWER EQUIPMENT, TUNNEL WORK: GROUP  7- 
Tunnel mole boring machine operator  PREMIUM PAY:  
$10.00 per hour shall be paid on all Power 
Equipment Operator work on the followng Military 
Bases: China Lake Naval Reserve, Vandenberg AFB, 
Point Arguello, Seely Naval Base, Fort Irwin, Nebo 
Annex Marine Base, Marine Corp Logistics Base 
Yermo, Edwards AFB, 29 Palms Marine Base and Camp 
Pendleton   Workers required to suit up and work in 
a hazardous material environment: $2.00 per hour 
additional.  Combination mixer and compressor 
operator on gunite work shall be classified as a 
concrete mobile mixer operator......................$ 66.91                  33.20
----------------------------------------------------------------

 IRON0229-001 01/01/2025
                                                     Rates                  Fringes
IRONWORKER (FENCE ERECTOR)..........................$ 45.78                  26.51
IRONWORKER (ORNAMENTAL, REINFORCING AND STRUCTURAL).$ 50.70                  35.15
----------------------------------------------------------------

 LABO0300-005 07/01/2025
                                                     Rates                  Fringes
ASBESTOS REMOVAL LABORER  SCOPE OF WORK:  INCLUDES 
SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE 
PREPARATION, REMOVAL OF ASBESTOS-CONTAINING 
MATERIAL AND TOXIC WASTE, ENCAPSULATION, ENCLOSURE 
AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AND 
TOXIC WASTE BY HAND OR WITH EQUIPMENT OR MACHINERY; 
SCAFFOLDING, FABRICATION OF TEMPORARY WOODEN 
BARRIERS AND ASSEMBLY OF DECONTAMINATION STATIONS...$ 46.48                  25.93
----------------------------------------------------------------

 LABO0345-001 07/01/2025
                                                     Rates                  Fringes
LABORER, GUNITE: GROUP 1 RODMEN, NOZZLEMEN  
FOOTNOTE: GUNITE PREMIUM PAY:   WORKERS WORKING 
FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A  ROPE OR 
CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE 
FOREGOING APPLICABLE CLASSIFICATION RATES.   
WORKERS DOING GUNITE AND/OR SHOTCRETE WORK IN A 
TUNNEL SHALL  RECEIVE 35 CENTS PER HOUR ABOVE THE 
FOREGOING APPLICABLE CLASSIFICATION RATES, PAID ON 
A PORTAL-TO-PORTAL BASIS.   ANY WORK PERFORMED ON, 
IN OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR 
OR SIMILAR TYPE OF STRUCTURE, WHEN SUCH  STRUCTURE 
IS IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH 
WORK MUST BE PERFORMED IN WHOLE OR IN PART MORE 
THAN 75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED 
ABOVE THE 75'-0"" LEVEL  SHALL BE COMPENSATED FOR AT 
35 CENTS PER HOUR ABOVE THE  APPLICABLE 
CLASSIFICATION WAGE RATE............................$ 55.88                  23.77
LABORER, GUNITE: GROUP 2 GUNMEN  FOOTNOTE: GUNITE 
PREMIUM PAY:   WORKERS WORKING FROM A BOSN'N'S 
CHAIR OR SUSPENDED FROM A  ROPE OR CABLE SHALL 
RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING 
APPLICABLE CLASSIFICATION RATES.   WORKERS DOING 
GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL  
RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING 
APPLICABLE CLASSIFICATION RATES, PAID ON A 
PORTAL-TO-PORTAL BASIS.   ANY WORK PERFORMED ON, IN 
OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR 
SIMILAR TYPE OF STRUCTURE, WHEN SUCH  STRUCTURE IS 
IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH WORK 
MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 
75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE 
THE 75'-0"" LEVEL  SHALL BE COMPENSATED FOR AT 35 
CENTS PER HOUR ABOVE THE  APPLICABLE CLASSIFICATION 
WAGE RATE...........................................$ 54.93                  23.77
LABORER, GUNITE: GROUP 3 REBOUNDMEN  FOOTNOTE: 
GUNITE PREMIUM PAY:   WORKERS WORKING FROM A 
BOSN'N'S CHAIR OR SUSPENDED FROM A  ROPE OR CABLE 
SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING 
APPLICABLE CLASSIFICATION RATES.   WORKERS DOING 
GUNITE AND/OR SHOTCRETE WORK IN A TUNNEL SHALL  
RECEIVE 35 CENTS PER HOUR ABOVE THE FOREGOING 
APPLICABLE CLASSIFICATION RATES, PAID ON A 
PORTAL-TO-PORTAL BASIS.   ANY WORK PERFORMED ON, IN 
OR ABOVE ANY SMOKE STACK, SILO, STORAGE ELEVATOR OR 
SIMILAR TYPE OF STRUCTURE, WHEN SUCH  STRUCTURE IS 
IN EXCESS OF 75'-0"" ABOVE BASE LEVEL AND WHICH WORK 
MUST BE PERFORMED IN WHOLE OR IN PART MORE THAN 
75'-0"" ABOVE BASE LEVEL, THAT WORK PERFORMED ABOVE 
THE 75'-0"" LEVEL  SHALL BE COMPENSATED FOR AT 35 
CENTS PER HOUR ABOVE THE  APPLICABLE CLASSIFICATION 
WAGE RATE...........................................$ 51.39                  23.77
----------------------------------------------------------------

 LABO1184-001 07/01/2025
                                                     Rates                  Fringes
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) 
DRILLING CREW LABORER...............................$ 47.94                  20.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) 
VEHICLE OPERATOR/HAULER.............................$ 48.11                  20.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) 
HORIZONTAL DIRECTIONAL DRILL OPERATOR...............$ 49.96                  20.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) 
ELECTRONIC TRACKING LOCATOR.........................$ 51.96                  20.86
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE 
COATING, PAVEMENT SEALING, INCLUDING REPAIR AND 
FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN 
PARKING LOTS, GAME COURTS AND PLAYGROUNDS; 
CARSTOPS; OPERATION OF ALL RELATED MACHINERY AND 
EQUIPMENT; EQUIPMENT REPAIR TECHNICIAN..............$ 49.30                  23.97
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC 
SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF 
ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD 
(SANDBLASTING, WATERBLASTING, GRINDING, ETC.) AND 
PREPARATION OF SURFACE FOR COATINGS.  TRAFFIC 
CONTROL PERSON: CONTROLLING AND DIRECTING TRAFFIC 
THROUGH BOTH CONVENTIONAL AND MOVING LANE CLOSURES; 
OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT....$ 50.60                  23.97
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC 
DELINEATING DEVICE APPLICATOR: LAYOUT AND 
APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, 
RUMBLE AND TRAFFIC BARS, ADHESIVES, GUIDE MARKERS, 
OTHER TRAFFIC DELINEATING DEVICES INCLUDING TRAFFIC 
CONTROL. THIS CATEGORY INCLUDES ALL TRAFFIC RELATED 
SURFACE PREPARATION (SANDBLASTING, WATERBLASTING, 
GRINDING) AS PART OF THE APPLICATION PROCESS. 
TRAFFIC PROTECTIVE DELINEATING SYSTEM INSTALLER: 
REMOVES, RELOCATES, INSTALLS, PERMANENTLY AFFIXED 
ROADSIDE AND PARKING DELINEATION BARRICADES, 
FENCING, CABLE ANCHOR, GUARD RAIL, REFERENCE SIGNS, 
MONUMENT MARKERS; OPERATION OF ALL RELATED 
MACHINERY AND EQUIPMENT; POWER BROOM SWEEPER........$ 52.61                  23.97
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: 
LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND 
MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES 
AND MARKINGS, INCLUDING TRAFFIC CONTROL; OPERATION 
OF ALL RELATED MACHINERY AND EQUIPMENT..............$ 54.35                  23.97
----------------------------------------------------------------

 LABO1184-002 07/01/2025
                                                     Rates                  Fringes
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL 
FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; 
CONCRETE, WATER CURING; DEMOLITION LABORER, THE 
CLEANING OF BRICK IF PERFORMED BY A WORKER 
PERFORMING ANY OTHER PHASE OF DEMOLITION WORK, AND 
THE CLEANING OF LUMBER; FIRE WATCHER, LIMBER, BRUSH 
LOADER, PILER AND DEBRIS HANDLER; FLAG PERSON; GAS, 
OIL AND/OR WATER PIPELINE LABORER; LABORER, 
ASPHALT-RUBBER MATERIAL LOADER; LABORER, GENERAL OR 
CONSTRUCTION; LABORER, GENERAL CLEAN-UP; LABORER, 
LANDSCAPING; LABORER, JETTING; LABORER, TEMPORARY 
WATER AND AIR LINES; MATERIAL HOSE OPERATOR (WALLS, 
SLABS, FLOORS AND DECKS); PLUGGING, FILLING OF SHEE 
BOLT HOLES; DRY PACKING OF CONCRETE; RAILROAD 
MAINTENANCE, REPAIR TRACK PERSON AND ROAD BEDS; 
STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORERS; 
RIGGING AND SIGNALING; SCALER; SLIP FORM RAISER; 
TAR AND MORTAR; TOOL CRIB OR TOOL HOUSE LABORER; 
TRAFFIC CONTROL BY ANY METHOD; WINDOW CLEANER; WIRE 
MESH PULLING - ALL CONCRETE POURING OPERATIONS......$ 46.48                  25.95
LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 
1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); 
CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE 
HANDLER, POURING CONCRETE, THE HANDLING OF THE 
CHUTE FROM READYMIX TRUCKS, SUCH AS WALLS, SLABS, 
DECKS, FLOORS, FOUNDATION, FOOTINGS, CURBS, GUTTERS 
AND SIDEWALKS; CONCRETE CURER, IMPERVIOUS MEMBRANE 
AND FORM OILER; CUTTING TORCH OPERATOR 
(DEMOLITION); FINE GRADER, HIGHWAYS AND STREET 
PAVING, AIRPORT, RUNWAYS AND SIMILAR TYPE HEAVY 
CONSTRUCTION; GAS, OIL AND/OR WATER PIPELINE 
WRAPPER - POT TENDER AND FORM PERSON; GUINEA 
CHASER; HEADERBOARD PERSON - ASPHALT; LABORER, 
PACKING ROD STEEL AND PANS; MEMBRANE VAPOR BARRIER 
INSTALLER; POWER BROOM SWEEPER (SMALL); RIPRAP 
STONEPAVER, PLACING STONE OR WET SACKED CONCRETE; 
ROTO SCRAPER AND TILLER; SANDBLASTER (POT TENDER); 
SEPTIC TANK DIGGER AND INSTALLER(LEAD); TANK SCALER 
AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW 
OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH 
SHREDDER; UNDERGROUND LABORER, INCLUDING CAISSON 
BELLOWER............................................$ 47.03                  25.95
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE 
CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, 
JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; 
DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PIPELINE 
WRAPPER, 6-IN. PIPE AND OVER, BY ANY METHOD, INSIDE 
AND OUT; HIGH SCALER (INCLUDING DRILLING OF SAME); 
HYDRO SEEDER AND SIMILAR TYPE; IMPACT WRENCH 
MULTI-PLATE; KETTLE PERSON, POT PERSON AND WORKERS 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME CAUSTIC 
AND SIMILAR TYPE MATERIALS (""APPLYING"" MEANS 
APPLYING, DIPPING, BRUSHING OR HANDLING OF SUCH 
MATERIALS FOR PIPE WRAPPING AND WATERPROOFING); 
OPERATOR OF PNEUMATIC, GAS, ELECTRIC TOOLS, 
VIBRATING MACHINE, PAVEMENT BREAKER, AIR BLASTING, 
COME-ALONGS, AND SIMILAR MECHANICAL TOOLS NOT 
SEPARATELY CLASSIFIED HEREIN; PIPELAYER'S BACKUP 
PERSON, COATING, GROUTING, MAKING OF JOINTS, 
SEALING, CAULKING, DIAPERING AND INCLUDING RUBBER 
GASKET JOINTS, POINTING AND ANY AND ALL OTHER 
SERVICES; ROCK SLINGER; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; STEEL 
HEADERBOARD AND GUIDELINE SETTER; TAMPER, BARKO, 
WACKER AND SIMILAR TYPE; TRENCHING MACHINE, 
HAND-PROPELLED......................................$ 47.58                  25.95
LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, 
ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES 
(ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR 
CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, 
CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW 
CONCRETE; CRIBBER, SHORER, LAGGING, SHEETING AND 
TRENCH BRACING, HAND-GUIDED LAGGING HAMMER; HEAD 
ROCK SLINGER; LABORER, ASPHALT- RUBBER DISTRIBUTOR 
BOOT PERSON; LASER BEAM IN CONNECTION WITH 
LABORERS' WORK; OVERSIZE CONCRETE VIBRATOR 
OPERATOR, 70 LBS. AND OVER; PIPELAYER PERFORMING 
ALL SERVICES IN THE LAYING AND INSTALLATION OF PIPE 
FROM THE POINT OF RECEIVING PIPE IN THE DITCH UNTIL 
COMPLETION OF OPERATION, INCLUDING ANY AND ALL 
FORMS OF TUBULAR MATERIAL, WHETHER PIPE, METALLIC 
OR NON-METALLIC, CONDUIT AND ANY OTHER STATIONARY 
TYPE OF TUBULAR DEVICE USED FOR THE CONVEYING OF 
ANY SUBSTANCE OR ELEMENT, WHETHER WATER, SEWAGE, 
SOLID GAS, AIR, OR OTHER PRODUCT WHATSOEVER AND 
WITHOUT REGARD TO THE NATURE OF MATERIAL FROM WHICH 
THE TUBULAR MATERIAL IS FABRICATED; NO-JOINT PIPE 
AND STRIPPING OF SAME; PREFABRICATED MANHOLE 
INSTALLER; SANDBLASTER (NOZZLE PERSON), WATER 
BLASTING, PORTA SHOT-BLAST..........................$ 49.13                  25.95
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING 
HOLES, PLACING AND BLASTING OF ALL POWDER AND 
EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD 
USED FOR SUCH LOADING AND PLACING; DRILLER: ALL 
POWER DRILLS, EXCLUDING JACKHAMMER, WHETHER CORE, 
DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND 
ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD 
TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL    
                TUNNEL LABORER CLASSIFICATIONS......$ 49.48                  25.95
LABORER, TUNNEL: GROUP 1 Batch plant laborer; 
Changehouse person; Dump person; Dump person 
(outside); Swamper (brake person and switch person 
on tunnel work); Tunnel materials handling person; 
Nipper; Pot tender, using mastic or other materials 
(for example, but not by way of limitation, 
shotcrete, etc.)....................................$ 53.60                  25.74
LABORER, TUNNEL: GROUP 2 Chucktender, cabletender; 
Loading and unloading agitator cars; Vibrator 
person, jack hammer, pneumatic tools (except 
driller);  Bull gang mucker, track person; Concrete 
crew, including rodder and spreader.................$ 53.92                  25.74
LABORER, TUNNEL: GROUP 3 Blaster, driller, powder 
person; Chemical grout jet person; Cherry picker 
person; Grout gun person; Grout mixer person; Grout 
pump person; Jackleg miner; Jumbo person; Kemper 
and other pneumatic concrete placer operator; 
Miner, tunnel (hand or machine); Nozzle person; 
Operating of troweling and/or grouting machines; 
Powder person (primer house); Primer person; 
Sandblaster; Shotcrete person; Steel form raiser 
and setter; Timber person, retimber person, wood or 
steel; Tunnel Concrete finisher.....................$ 54.38                  25.74
LABORER, TUNNEL: GROUP 4 Diamond driller; 
Sandblaster; Shaft and raise work...................$ 55.07                  25.74
----------------------------------------------------------------

 LABO1184-004 11/01/2025
                                                     Rates                  Fringes
BRICK TENDER........................................$ 42.60                  22.13
----------------------------------------------------------------

 LABO1414-003 08/06/2025
                                                     Rates                  Fringes
LABORER: PLASTER CLEAN-UP LABORER    WORK ON A 
SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL.  
WORK AT MILITARY BASES -  $3.00 ADDITIONAL PER 
HOUR:  CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, 
MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH 
NAVAL AIR STATION, MARINE CORPS LOGISTICS SUPPLY 
BASE, MARINE CORPS PICKLE MEADOWS,  MOUNTAIN 
WARFARE TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, 
NORTH ISLAND NAVAL AIR STATION, VANDENBERG AFB......$ 46.17                  25.97
LABORER: PLASTER TENDER    WORK ON A SWING STAGE 
SCAFFOLD: $1.00 PER HOUR ADDITIONAL.  WORK AT 
MILITARY BASES -  $3.00 ADDITIONAL PER HOUR:  
CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, MARINE 
CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAVAL 
AIR STATION, MARINE CORPS LOGISTICS SUPPLY BASE, 
MARINE CORPS PICKLE MEADOWS,  MOUNTAIN WARFARE 
TRAINING CENTER, NAVAL AIR FACILITY-SEELEY, NORTH 
ISLAND NAVAL AIR STATION, VANDENBERG AFB............$ 48.72                  25.97
----------------------------------------------------------------

 PAIN0036-001 07/01/2023
                                                     Rates                  Fringes
PAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER 
WORK  ..............................................$ 38.52                  18.64
----------------------------------------------------------------

 PAIN0036-008 09/01/2024
                                                     Rates                  Fringes
DRYWALL FINISHER/TAPER..............................$ 49.33                  26.82
----------------------------------------------------------------

 PAIN0036-013 10/01/2024
                                                     Rates                  Fringes
GLAZIER.............................................$ 52.90                  22.16
----------------------------------------------------------------

 PAIN0036-019 01/01/2025
                                                     Rates                  Fringes
SOFT FLOOR LAYER....................................$ 40.77                  19.37
----------------------------------------------------------------

 PLAS0200-004 08/03/2022
                                                     Rates                  Fringes
PLASTERER    WORK AT NAVAL AIR FACILITY SEELEY:  
$3.00 ADDITIONAL PER HOUR...........................$ 47.37                  19.64
----------------------------------------------------------------

 PLAS0500-002 07/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 47.70                  27.07
----------------------------------------------------------------

 PLUM0016-008 09/01/2025
                                                     Rates                  Fringes
PLUMBER/PIPEFITTER (ALL OTHER WORK EXCEPT WORK ON 
NEW ADDITIONS AND REMODELING OF BARS, RESTAURANT, 
STORES AND COMMERCIAL BUILDINGS NOT TO EXCEED 5,000 
SQ. FT. OF FLOOR SPACE AND WORK ON STRIP MALLS, 
LIGHT COMMERCIAL, TENANT IMPROVEMENT AND REMODEL 
WORK)...............................................$ 61.73                  26.81
PLUMBER/PIPEFITTER (SEELEY NAVAL AIR STATION).......$ 72.23                  26.81
PLUMBER/PIPEFITTER (WORK ONLY ON STRIP MALLS, LIGHT 
COMMERCIAL, TENANT IMPROVEMENT AND REMODEL WORK)....$ 44.29                  24.16
PLUMBER/PIPEFITTER: WORK ONLY ON NEW ADDITIONS AND 
REMODELING OF BARS, RESTAURANTS, STORES AND 
COMMERCIAL BUILDINGS, NOT TO EXCEED 5,000 SQ. FT. 
OF FLOOR SPACE......................................$ 59.85                  25.83
----------------------------------------------------------------

 PLUM0345-001 09/01/2025
                                                     Rates                  Fringes
PLUMBER (LANDSCAPE/IRRIGATION FITTER)...............$ 44.75                  26.20
PLUMBER (SEWER & STORM DRAIN WORK)..................$ 48.84                  23.58
----------------------------------------------------------------

 ROOF0045-001 07/01/2024
                                                     Rates                  Fringes
ROOFER..............................................$ 42.80                  12.64
----------------------------------------------------------------

 SFCA0669-002 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 50.79                  29.80
----------------------------------------------------------------

 SHEE0206-002 01/01/2025
                                                     Rates                  Fringes
SHEET METAL TECHNICIAN    SHEET METAL TECHNICIAN - 
SCOPE:  LIGHT COMMERCIAL WORK: ANY SHEET METAL, 
HEATING AND AIR CONDITIONING WORK PERFORMED ON A 
PROJECT WHERE THE TOTAL CONSTRUCTION COST, 
EXCLUDING LAND, IS UNDER $1,000,000. TENANT 
IMPROVEMENT WORK: ANY WORK NECESSARY TO FINISH 
INTERIOR SPACES TO CONFORM TO THE OCCUPANTS OF 
COMMERCIAL BUILDINGS, AFTER COMPLETION OF THE 
BUILDING SHELL......................................$ 38.65                  10.31
SHEET METAL WORKER    SHEET METAL TECHNICIAN - 
SCOPE:  LIGHT COMMERCIAL WORK: ANY SHEET METAL, 
HEATING AND AIR CONDITIONING WORK PERFORMED ON A 
PROJECT WHERE THE TOTAL CONSTRUCTION COST, 
EXCLUDING LAND, IS UNDER $1,000,000. TENANT 
IMPROVEMENT WORK: ANY WORK NECESSARY TO FINISH 
INTERIOR SPACES TO CONFORM TO THE OCCUPANTS OF 
COMMERCIAL BUILDINGS, AFTER COMPLETION OF THE 
BUILDING SHELL......................................$ 51.45                  30.92
----------------------------------------------------------------

 TEAM0011-002 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER GROUP  1 TRUCK DRIVER  WORK ON ALL 
MILITARY BASES:  PREMIUM PAY:  $3.00 PER HOUR 
ADDITIONAL.  [29 PALMS MARINE BASE, CAMP ROBERTS, 
CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, 
FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & 
YERMO, MOUNTAIN WARFARE TRAINING CENTER, 
BRIDGEPORT,   POINT ARGUELLO, POINT CONCEPTION, 
VANDENBERG AFB].....................................$ 41.59                  35.69
TRUCK DRIVER GROUP  2 DRIVER OF VEHICLE OR 
COMBINATION OF VEHICLES - 2 AXLES; TRAFFIC CONTROL 
PILOT CAR EXCLUDING MOVING HEAVY EQUIPMENT PERMIT 
LOAD; TRUCK MOUNTED BROOM  WORK ON ALL MILITARY 
BASES:  PREMIUM PAY:  $3.00 PER HOUR ADDITIONAL.  
[29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, 
EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, 
MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, 
MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT,   
POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]...$ 41.74                  35.69
TRUCK DRIVER GROUP  3 DRIVER OF VEHICLE OR 
COMBINATION OF VEHICLES - 3 AXLES; BOOT PERSON; 
CEMENT MASON DISTRIBUTION TRUCK;  FUEL TRUCK 
DRIVER; WATER TRUCK - 2 AXLE; DUMP TRUCK, LESS THAN 
16 YDS. WATER LEVEL; EROSION CONTROL DRIVER  WORK 
ON ALL MILITARY BASES:  PREMIUM PAY:  $3.00 PER 
HOUR ADDITIONAL.  [29 PALMS MARINE BASE, CAMP 
ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL 
FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE 
AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, 
BRIDGEPORT,   POINT ARGUELLO, POINT CONCEPTION, 
VANDENBERG AFB].....................................$ 41.87                  35.69
TRUCK DRIVER GROUP  4 DRIVER OF TRANSIT MIX TRUCK, 
UNDER 3 YDS.; DUMPCRETE TRUCK, LESS THAN 6-1/2 YDS. 
WATER LEVEL  WORK ON ALL MILITARY BASES:  PREMIUM 
PAY:  $3.00 PER HOUR ADDITIONAL.  [29 PALMS MARINE 
BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL 
CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS 
LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE 
TRAINING CENTER, BRIDGEPORT,   POINT ARGUELLO, 
POINT CONCEPTION, VANDENBERG AFB]...................$ 42.06                  35.69
TRUCK DRIVER GROUP  5 WATER TRUCK, 3 OR MORE AXLES; 
TRUCK GREASER AND TIRE PERSON ($0.50 ADDITIONAL FOR 
TIRE PERSON); PIPELINE AND UTILITY WORKING TRUCK 
DRIVER, INCLUDING WINCH TRUCK AND PLASTIC FUSION, 
LIMITED TO PIPELINE AND UTILITY WORK; SLURRY TRUCK 
DRIVER  WORK ON ALL MILITARY BASES:  PREMIUM PAY:  
$3.00 PER HOUR ADDITIONAL.  [29 PALMS MARINE BASE, 
CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO 
NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS 
BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING 
CENTER, BRIDGEPORT,   POINT ARGUELLO, POINT 
CONCEPTION, VANDENBERG AFB].........................$ 42.09                  35.69
TRUCK DRIVER GROUP  6 TRANSIT MIX TRUCK, 3 YDS. OR 
MORE; DUMPCRETE TRUCK, 6-1/2 YDS. WATER LEVEL AND 
OVER; VEHICLE OR COMBINATION OF VEHICLES - 4 OR 
MORE AXLES; OIL SPREADER TRUCK; DUMP TRUCK, 16 YDS. 
TO 25 YDS. WATER LEVEL  WORK ON ALL MILITARY BASES: 
 PREMIUM PAY:  $3.00 PER HOUR ADDITIONAL.  [29 
PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, 
EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, 
MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, 
MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT,   
POINT ARGUELLO, POINT CONCEPTION, VANDENBERG AFB]...$ 42.12                  35.69
TRUCK DRIVER GROUP  7...............................$ 42.37                  35.69
TRUCK DRIVER GROUP  8 DUMP TRUCK, 25 YDS. TO 49 
YDS. WATER LEVEL; TRUCK REPAIR PERSON; WATER PULL - 
SINGLE ENGINE; WELDER  WORK ON ALL MILITARY BASES:  
PREMIUM PAY:  $3.00 PER HOUR ADDITIONAL.  [29 PALMS 
MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, 
EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS 
LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE 
TRAINING CENTER, BRIDGEPORT,   POINT ARGUELLO, 
POINT CONCEPTION, VANDENBERG AFB]...................$ 42.62                  35.69
TRUCK DRIVER GROUP  9 TRUCK REPAIR PERSON/WELDER; 
LOW BED DRIVER, 9 AXLES OR OVER  WORK ON ALL 
MILITARY BASES:  PREMIUM PAY:  $3.00 PER HOUR 
ADDITIONAL.  [29 PALMS MARINE BASE, CAMP ROBERTS, 
CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, 
FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & 
YERMO, MOUNTAIN WARFARE TRAINING CENTER, 
BRIDGEPORT,   POINT ARGUELLO, POINT CONCEPTION, 
VANDENBERG AFB].....................................$ 42.82                  35.69
TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE 
WATER LEVEL; WATER PULL - SINGLE ENGINE WITH 
ATTACHMENT  WORK ON ALL MILITARY BASES:  PREMIUM 
PAY:  $3.00 PER HOUR ADDITIONAL.  [29 PALMS MARINE 
BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL 
CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS 
LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE 
TRAINING CENTER, BRIDGEPORT,   POINT ARGUELLO, 
POINT CONCEPTION, VANDENBERG AFB]...................$ 43.12                  35.69
TRUCK DRIVER GROUP 11 WATER PULL - TWIN ENGINE; 
WATER PULL - TWIN ENGINE WITH ATTACHMENTS; WINCH 
TRUCK DRIVER - $1.25 ADDITIONAL WHEN OPERATING 
WINCH OR SIMILAR SPECIAL ATTACHMENTS  WORK ON ALL 
MILITARY BASES:  PREMIUM PAY:  $3.00 PER HOUR 
ADDITIONAL.  [29 PALMS MARINE BASE, CAMP ROBERTS, 
CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, 
FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & 
YERMO, MOUNTAIN WARFARE TRAINING CENTER, 
BRIDGEPORT,   POINT ARGUELLO, POINT CONCEPTION, 
VANDENBERG AFB].....................................$ 43.62                  35.69
TRUCK DRIVER GROUP 12 BOOM TRUCK 17K AND ABOVE  
WORK ON ALL MILITARY BASES:  PREMIUM PAY:  $3.00 
PER HOUR ADDITIONAL.  [29 PALMS MARINE BASE, CAMP 
ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL 
FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE 
AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, 
BRIDGEPORT,   POINT ARGUELLO, POINT CONCEPTION, 
VANDENBERG AFB].....................................$ 44.05                  35.69
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION"

All California determinations: county index · California prevailing wage · compute pay with the calculator.