Prevailing Wage Index
HomePrevailing wage by stateCaliforniaDeterminations › CA20260018

Wage determination CA20260018

Building, Heavy, Highway construction - California, revision 7, modified 2026-09-03

Verify against the official document: this page mirrors WD CA20260018 revision 7 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0016-004 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM $34.5611.40
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM $44.7312.75

ASBE0016-008 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 1: ALAMEDA, $84.7625.07
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 2: CALAVERAS$64.5625.07

BOIL0549-001 (collectively bargained (union) rate, 01/01/2021)

ClassificationBase rateFringes
BOILERMAKER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES)$49.6241.27
BOILERMAKER (AREA 2: REMAINING COUNTIES)$45.6038.99

BRCA0003-001 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
MARBLE FINISHER$42.0619.80

BRCA0003-003 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
MARBLE MASON$61.7230.31

BRCA0003-005 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
BRICKLAYER ( 1) FRESNO, KINGS, MADERA, MARIPOSA, MERCED$51.1725.80
BRICKLAYER ( 7) SAN FRANCISCO, SAN MATEO$57.0228.50
BRICKLAYER ( 9) CALAVERAS, SAN JOAQUIN, STANISLAUS, TOULUMNE$52.7625.01
BRICKLAYER (16) MONTEREY, SANTA CRUZ$54.1827.82
BRICKLAYER (8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA)$56.9426.28

BRCA0003-008 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
TERRAZZO FINISHER$44.9320.98
TERRAZZO WORKER/SETTER$60.5829.79

BRCA0003-011 (collectively bargained (union) rate, 04/01/2024)

ClassificationBase rateFringes
TILE FINISHER (AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ)$37.7519.28
TILE FINISHER (AREA 2: CALAVERAS, SAN JOAQUIN, STANISLAUS, TUOLUMNE)$34.7619.22
TILE FINISHER (AREA 3: FRESNO, KINGS, MADERA, MARIPOSA, MERCED)$32.6818.32
TILE LAYER (AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ)$59.9222.62
TILE LAYER (AREA 2: CALAVERAS, SAN JOAQUIN, STANISLAUS, TUOLUMNE)$55.1722.52
TILE LAYER (AREA 3: FRESNO, KINGS, MADERA, MARIPOSA, MERCED)$50.2822.05

CARP0022-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN FRANCISCO COUNTY)$60.3933.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN FRANCISCO COUNTY)$60.5433.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO COUNTY)$60.3933.52
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY)$60.4935.11

CARP0034-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN. DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND $54.1034.69
DIVER: DIVER STANDBY. DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (S$60.5134.69
DIVER: DIVER TENDER. DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (SA$59.5134.69
DIVER: DIVER WET. DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT. (SATUR$103.6234.69
DIVER: MANIFOLD OPERATOR (MIXED GAS). DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5$64.5134.69
DIVER: MANIFOLD OPERATOR (STANDBY). DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.0$59.5134.69

CARP0034-003 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
PILEDRIVER$54.1034.69

CARP0035-007 (collectively bargained (union) rate, 07/01/2020)

ClassificationBase rateFringes
MODULAR FURNITURE INSTALLER: INSTALLER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)$28.7622.53
MODULAR FURNITURE INSTALLER: INSTALLER (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)$26.1122.53
MODULAR FURNITURE INSTALLER: INSTALLER (AREA 3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES)$25.1622.53
MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)$29.0823.03
MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA 3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).$ 27.96 23.03 MODULAR FURNITURE$32.2123.03
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)$36.4323.03
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)$32.7123.03

CARP0035-008 (collectively bargained (union) rate, 08/01/2020)

ClassificationBase rateFringes
DRYWALL INSTALLERS/LATHERS (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)$52.6531.26
DRYWALL INSTALLERS/LATHERS (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)$46.7731.26
DRYWALL INSTALLERS/LATHERS (AREA 3: SAN JOAQUIN)$47.2731.26
DRYWALL INSTALLERS/LATHERS (AREA 4: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, STANISLAUS, TUOLUMNE COUNTIES)$45.9231.26
DRYWALL STOCKER/SCRAPPER (AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES)$26.3318.22
DRYWALL STOCKER/SCRAPPER (AREA 2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)$23.3918.22
DRYWALL STOCKER/SCRAPPER (AREA 3: SAN JOAQUIN)$23.6418.22
DRYWALL STOCKER/SCRAPPER (AREA 4: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, STANISLAUS, TUOLUMNE COUNTIES)$22.9718.22

CARP0152-001 (collectively bargained (union) rate, 07/01/2020)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CONTRA COSTA COUNTY)$52.6530.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (CONTRA COSTA COUNTY)$52.8030.82
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA COUNTY)$52.6530.82
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)$52.7532.41

CARP0152-002 (collectively bargained (union) rate, 07/01/2020)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN JOAQUIN COUNTY)$52.6530.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN JOAQUIN COUNTY)$46.9230.82
CARPENTERS: JOURNEYMAN CARPENTER (SAN JOAQUIN COUNTY)$46.7730.82
CARPENTERS: MILLWRIGHT (SAN JOAQUIN COUNTY)$49.2732.41

CARP0152-004 (collectively bargained (union) rate, 07/01/2020)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)$52.6530.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES$45.5730.82
CARPENTERS: JOURNEYMAN CARPENTER (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES).$ 45.42 30.82 CARPENTERS: MILLWRIGHT (CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND T$47.9232.41

CARP0217-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN MATEO COUNTY)$60.3933.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN MATEO COUNTY)$60.5433.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY).$ 60.39 33.52 CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)$60.4935.11

CARP0405-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CLARA COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CLARA COUNTY)$55.0031.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA COUNTY)$54.8531.49
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY)$54.9533.08

CARP0405-002 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN BENITO COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN BENITO COUNTY)$49.1231.49
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO COUNTY)$48.9731.49
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)$51.4733.08

CARP0505-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CRUZ COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CRUZ COUNTY)$49.1231.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ COUNTY)$48.9731.49
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)$51.4733.08

CARP0605-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (MONTEREY COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MONTEREY COUNTY)$49.1231.49
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)$48.9731.49
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)$51.4733.08

CARP0701-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (FRESNO AND MADERA COUNTIES)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (FRESNO AND MADERA COUNTIES)$47.7731.49
CARPENTERS: JOURNEYMAN CARPENTER (FRESNO AND MADERA COUNTIES)$47.6231.49

CARP0713-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (ALAMEDA COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (ALAMEDA COUNTY)$55.0031.49
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)$54.8531.49
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY)$54.9533.08

CARP1109-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (KINGS COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER KINGS COUNTY$47.7731.49
CARPENTERS: JOURNEYMAN CARPENTER (KINGS COUNTY)$47.6231.49
CARPENTERS: MILLWRIGHT (KINGS COUNTY)$50.1233.08

ELEC0006-004 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER. (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE$58.8331.51
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE$67.6531.78

ELEC0006-007 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
ELECTRICIAN (SAN FRANCISCO COUNTY)$91.2548.05

ELEC0100-002 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (FRESNO, KINGS, AND MADERA COUNTIES)$50.0030.15

ELEC0100-005 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK: INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFER$45.2828.01
COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK: INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFE$52.0728.21

ELEC0234-001 (collectively bargained (union) rate, 12/30/2025)

ClassificationBase rateFringes
ELECTRICIAN ZONE A : ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA EXTENDING 5 MILES EAST AND WE$70.4133.76
ELECTRICIAN ZONE B: ANY AREA OUTSIDE OF ZONE A (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)$77.4533.97

ELEC0234-003 (collectively bargained (union) rate, 12/01/2021)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE $47.9324.09
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE$55.1224.30

ELEC0302-001 (collectively bargained (union) rate, 03/01/2025)

ClassificationBase rateFringes
CABLE SPLICER (CONTRA COSTA COUNTY)$74.5436.09
ELECTRICIAN (CONTRA COSTA COUNTY)$66.2635.84

ELEC0302-003 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE $53.0830.84
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE$61.0431.08

ELEC0332-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
CABLE SPLICER (FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER STRUCTURES AND WHERE THE WOR$104.6849.46
ELECTRICIAN (FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER STRUCTURES AND WHERE THE WORKE$91.0349.05

ELEC0332-003 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE $58.3331.00
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE$67.0831.26

ELEC0595-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
CABLE SPLICER (ALAMEDA COUNTY)$87.4049.41
ELECTRICIAN (ALAMEDA COUNTY)$76.0049.07

ELEC0595-002 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
CABLE SPLICER (CALAVERAS AND SAN JOAQUIN COUNTIES)$59.3432.26
ELECTRICIAN: ALL OTHER WORK (CALAVERAS AND SAN JOAQUIN COUNTIES)$49.4531.96
ELECTRICIAN: TUNNEL WORK (CALAVERAS AND SAN JOAQUIN COUNTIES)$51.9232.04

ELEC0595-006 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE $58.3331.00
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE$67.0831.26

ELEC0595-008 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE S$45.2828.01
COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE $52.0728.21

ELEC0617-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (SAN MATEO COUNTY)$86.0051.07

ELEC0617-003 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE $58.3331.00
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE$67.0831.26

ELEC0684-001 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
ELECTRICIAN (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES) CABLE SPLICER = 110% OF JOURNEYMAN ELECTRICIAN$48.5030.09

ELEC0684-004 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE S$45.2828.01
COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE $52.0728.21

ELEC1245-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THAN$70.1624.71
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT$53.3022.26
LINE CONSTRUCTION: (3) GROUNDMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHR$40.7621.76

ELEV0008-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC (FOOTNOTE: ADD TO FRINGE BENEFITS A+B: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEAR$84.0538.44

ENGI0003-001 (collectively bargained (union) rate, 06/29/2020)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1 (LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE$52.6431.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1 (OILER)- DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE OVER 100 $43.3831.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1 (TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYHPE LIFTING DEVI$45.6631.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2 (LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-$50.8231.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2 (OILER)- DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED $43.1131.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2 (TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SEL$45.4131.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3 (LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCO$49.1431.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3 (OILER)- DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIV$42.8931.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3 (TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/S$45.1231.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 4 (LIFTING DEVICES)- ASSISTANT OPERATOR IN LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER$47.3731.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 5 (LIFTING DEVICES)- DECK ENGINEER$44.7331.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 6 (LIFTING DEVICES)- DECKHAND; FIRE TENDER$42.5031.15

ENGI0003-001 (collectively bargained (union) rate, 06/30/2025)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (CRANES)- CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PE$68.5932.53
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (OILER)- CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PED$43.7931.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (TRUCK CRANE OILER)- CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRI$46.0831.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (CRANES)- CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND IN$66.0832.53
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (OILER)- CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INC$42.8331.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (TRUCK CRANE OILER)- CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS U$45.0731.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (CRANES) CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYP$64.3432.53
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (HYDRAULIC) CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-$59.9832.53
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (OILER) CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE$42.5531.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (TRUCK CRANE OILER) CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELL$44.8331.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS - AREA 1: GROUP 4 (CRANES)- BOOM TRUCK OR DUAL PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC$61.3032.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2- HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3.5 CU. YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; POWER BLADE OP$65.4332.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3- ASPHALT MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE BACK MACHINE ASSISTNAT T$63.9532.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4- ASPHALT PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING .75 CU. YD.; CONCRETE BATCH PLANT (W$62.5732.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5- CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTE$61.3032.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6- ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; BOOM-TYPE BACKFILLING MACHINE; ASSISTANT PLANT ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHE$59.9832.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7- BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME TRUCK, NON-ROTATING-UNDER 15 TONS; CARY IFT OR SIMILAR; COMBINATION SLURRY MIER AN$58.8432.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8- BIT SHARPENER; BOILER TENDER; BOX OPERATOR; BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR (SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKH$57.7032.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A - ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 SERIES OR SMALLER, AND SIMILAR (WITHOUT ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. (BA$55.4932.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 (CRANES)- CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS$68.8132.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 (OILER)- CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS$43.7231.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 (TRUCK CRANE OILER)- CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS$45.9531.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 (CRANES)- CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TON$67.0432.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 (OILER)- CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS$43.4531.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 (TRUCK CRANE OILER)- CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS$45.7331.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (CRANES)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER$65.5632.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (HYDRAULIC)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER$45.0731.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (OILER)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER$43.2331.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 (TRUCK CRANE OILER)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER$45.4631.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4 (CRANES)- CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER$63.5432.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5 (CRANES)- BOOM CAT$62.2432.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 1- HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE (RUBBER TIRED, RA$63.0632.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 1-A- TUNNEL BORE MACHINE OPERATOR 20' DIAMETER OR MORE. (AREA 1: LISTED WAGE RATES. AR$65.5332.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 2- COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; POWER JUMBO$61.8032.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 3- DRILL DOCTOR; MINE OR SHAFT HOIST. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN $60.4732.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 4- COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; MOTORMAN. (AREA 1: LIS$59.3332.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 5- BIT SHARPENER; BRAKEMAN; COMBINATION MIXER AND COMPRESSOR (GUNITE); COMPRESSOR OPER$58.1932.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 1- HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE (RUBBER TIRED, RAIL OR TRACK $62.9632.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 1-A- TUNNEL BORE MACHINE OPERATOR 20' DIAMETER OR MORE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIV$65.4332.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 2- COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. ($61.7032.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 3- DRILL DOCTOR; MINE OR SHAFT HOIST. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $$60.3732.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 4- COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; MOTORMAN. (AREA 1: LISTED WAGE RAT$59.2332.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK- UNDERGOUND: AREA 1, GROUP 5- BIT SHARPENER; BRAKEMAN; COMBINATION MIXER AND COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER;$58.0932.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1- OPERATOR OF HELICOPTER (WHEN USED IN ERECTION WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; POWER SHOVELS, OVER 7 CU. YDS. (AREA 1: L$66.9632.53

ENGI0003-008 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (1) LEVERMAN. AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SA$60.6139.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (1) LEVERMAN. AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN PART; MADERA COUNTY-EASTERN PART; MARI$62.6139.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN. AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN PART; MADERA$57.6539.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN. AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN FRANCISCO, $55.6539.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR. AREA 1: ALAMEDA, CONTRA COSTA$54.5339.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR. AREA 2: CALAVERAS COUNTY-EAST$56.5339.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER. AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN $51.2339.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING- (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER. AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN P$53.2339.55

ENGI0003-019 (collectively bargained (union) rate, 06/30/2025)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1- LANDSCAPE FINISH GRADE OPERATOR: ALL FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND ALL EQUIPMENT WITH A RATING MORE T$55.8528.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1- LANDSCAPE FINISH GRADE OPERATOR: ALL FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND ALL EQUIPMENT WITH A RATING MORE T$57.8528.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2- LANDSCAPE OPERATOR UP TO 65 HP: ALL EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR LESS EXCEPT EQUIPMENT COVERED BY GRO$52.2528.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2- LANDSCAPE OPERATOR UP TO 65 HP: ALL EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR LESS EXCEPT EQUIPMENT COVERED BY GRO$54.2528.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3- LANDSCAPE UTILITY OPERATOR: SMALL RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED$47.6428.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3- LANDSCAPE UTILITY OPERATOR: SMALL RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA 2: CALAVERAS COUNTY-EASTERN PART. FRESN$49.6428.56

IRON0377-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES). PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATIO$45.7826.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHIN$55.3335.15

IRON0377-003 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND COUNTY) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAV$45.7826.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (SAN FRANCISCO CITY AND COUNTY) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION$55.8335.15

IRON0433-005 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-N$45.7826.51
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL (REMAINING COUNTIES) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE $50.7035.15

LABO0067-006 (collectively bargained (union) rate, 06/30/2025)

ClassificationBase rateFringes
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF ASBESTOS-CONTAINING MATERIALS FROM WALLS$39.1530.03
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF ASBESTOS-CONTAINING MATERIALS FROM WALLS$38.1530.03

LABO0073-002 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (CALAVERAS AND SAN JOAQUIN COUNTIES)$36.2627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (CALAVERAS AND SAN JOAQUIN COUNT$36.5627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (CALAVERAS AND SAN$34.0627.30

LABO0073-003 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER: MASON TENDER-BRICK (SAN JOAQUIN COUNTY)$36.2925.55

LABO0073-005 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN$45.8927.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL)$45.6627.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROU$45.4127.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD)$44.9627.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN$44.4227.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST$46.4127.72

LABO0073-007 (collectively bargained (union) rate, 06/30/2025)

ClassificationBase rateFringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWING$30.3729.89
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$38.8529.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$38.1529.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$38.3729.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. FOOTNOTES: LABORERS WORKI$38.2029.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$38.7029.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$38.0029.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $37.9029.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$31.5929.89
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLI$39.1129.89
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR$38.6129.89
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE$38.0229.89
LABORER, GUNITE: GROUP 4- GUINTE LABORER. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE $37.9029.89
LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL$38.1529.89
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SH$38.0029.89
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE$37.9029.89
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $31.5929.89

LABO0073-009 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS AND SAN JOAQUIN COUNTIES)$39.7728.54

LABO0261-003 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (SAN FRANCISCO AND SAN MATEO COUNTIES)$37.2627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (SAN FRANCISCO AND SAN MATEO COU$37.5627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (SAN FRANCISCO AND$35.0627.30

LABO0261-005 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (SAN FRANCISCO AND SAN MATEO COUNTIES)$45.8927.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (SAN FRANCISCO AND SAN MATEO COUNTIES)$45.6627.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROU$45.4127.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (SAN FR$44.9627.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (SAN FRANCISCO AND SAN MATEO COUNTIES)$44.4227.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (SAN FRANCISCO AND SAN MATEO COUNTIES)$46.4127.72

LABO0261-009 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWING$31.3723.20
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$37.2027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$36.5027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$36.7227.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. FOOTNOTES: LABORERS WORKI$36.5527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$37.0527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$36.3527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $36.2527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLI$37.4627.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR$36.9627.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE$36.3727.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE $36.2527.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL$36.5027.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SH$36.3527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE$36.2527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $29.9427.30

LABO0261-011 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
MASON TENDER, BRICK. FOOTNOTES: UNDERGROUND WORK SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, TELEPHONE CONDUITS, TUNNELS AND CUT TRENCHES: $5.00 PER DAY ADDITIONAL. WORK I$37.0527.45

LABO0261-014 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (SAN FRANCISCO AND SAN MATEO COUNTIES)$41.9330.32

LABO0270-003 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)$36.2627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (SANTA CALARA COUNTY)$37.2627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MONTEREY, SAN BENITO, AND SANTA$36.5627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (SANTA CALARA COUNTY)$37.5627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS, AND CRASH CUSHIONS. (MONTEREY, SAN BE$34.0627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS, AND CRASH CUSHIONS. (SANTA CALARA COU$35.0627.30

LABO0270-004 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN. (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$45.8927.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL). (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$45.6627.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROU$45.4127.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD). (MONTE$44.9627.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN. (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$44.4227.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST. (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$46.4127.72

LABO0270-005 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER: MASON TENDER-BRICK. (MONTEREY AND SAN BENITO COUNTIES)$36.2925.55

LABO0270-007 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWING$36.0827.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$36.2027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$35.5027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$35.7227.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. FOOTNOTES: LABORERS WORKI$35.5527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$36.0527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$35.3527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $35.2527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$28.9427.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLI$36.4627.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR$35.9627.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE$35.3727.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE $35.2527.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL$35.5027.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SH$35.3527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE$35.2527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $28.9427.30

LABO0270-010 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWING$37.0827.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$37.2027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$36.5027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$36.7227.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. FOOTNOTES: LABORERS WORKI$36.5527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$37.0527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$36.3527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $36.2527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLI$37.4627.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR$36.9627.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE$36.3727.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE $36.2527.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL$36.5027.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SH$36.3527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE$36.2527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $29.9427.30

LABO0270-011 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES)$40.6829.68

LABO0294-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, BRICK: MASON TENDER-BRICK. (FRESNO, KINGS AND MADERA COUNTIES)$36.2925.55

LABO0294-002 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (FRESNO, KINGS, AND MADERA COUNTIES)$36.2627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (FRESNO, KINGS, AND MADERA COUNT$36.5627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (FRESNO, KINGS, AN$34.0627.30

LABO0294-005 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN. (FRESNO, KINGS, AND MADERA COUNTIES)$45.8927.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL). (FRESNO, KINGS, AND MADERA COUNTIES)$45.6627.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROU$45.4127.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD). (FRESN$44.9627.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN. (FRESNO, KINGS, AND MADERA COUNTIES)$44.4227.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST. (FRESNO, KINGS, AND MADERA COUNTIES)$46.4127.72

LABO0294-008 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWING$36.0827.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$36.2027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$35.5027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$35.7227.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. FOOTNOTES: LABORERS WORKI$35.5527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$36.0527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$35.3527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $35.2527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$28.9427.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLI$36.4627.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR$35.9627.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE$35.3727.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE $35.2527.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL$35.5027.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SH$35.3527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE$35.2527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $28.9427.30

LABO0294-010 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTERER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES)$39.7728.54

LABO0294-011 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (FRESNO, KINGS, AND MADERA COUNTIES)$39.7728.54

LABO0304-002 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (ALAMEDA COUNTY)$37.2627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (ALAMEDA COUNTY)$37.5627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (ALAMEDA COUNTY)$35.0627.30

LABO0304-003 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (ALAMEDA COUNTY)$45.8927.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (ALAMEDA COUNTY)$45.6627.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROU$45.4127.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (ALAMED$44.9627.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (ALAMEDA COUNTY)$44.4227.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (ALAMEDA COUNTY)$46.4127.72

LABO0304-004 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWING$37.0827.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$37.2027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$36.5027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$36.7227.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. FOOTNOTES: LABORERS WORKI$36.5527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$37.0527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$36.3527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $36.2527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLI$37.4627.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR$36.9627.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE$36.3727.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE $36.2527.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL$36.5027.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SH$36.3527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE$36.2527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $29.9427.30

LABO0304-005 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
BRICK TENDER. FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY$37.0527.45

LABO0304-008 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTERER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (ALAMEDA AND CONTRA COSTA COUNTIES)$41.9330.32

LABO0324-002 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON. (CONTRA COSTA COUNTY)$37.2627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (CONTRA COSTA COUNTY)$37.5627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (CONTRA COSTA COUN$35.0627.30

LABO0324-006 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (CONTRA COSTA COUNTY)$45.8927.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (CONTRA COSTA COUNTY)$45.6627.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROU$45.4127.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (CONTRA$44.9627.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (CONTRA COSTA COUNTY).$ 44.42 27.72 TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (CONTRA COSTA COUN$46.4127.72

LABO0324-012 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWING$37.0827.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$37.2027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$36.5027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$36.7227.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. FOOTNOTES: LABORERS WORKI$36.5527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$37.0527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-G- PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); CAULKER; BANDER; PIPEWRAPPER; CONDUIT LAYER; PLASTIC PIPE LAYER$36.7027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$36.3527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $36.2527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLI$37.4627.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR$36.9627.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE$36.3727.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE $36.2527.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL$36.5027.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SH$36.3527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE$36.2527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $29.9427.30

LABO0324-014 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
BRICK TENDER. FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY$37.0527.45

LABO0324-018 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (ALAMEDA AND CONTRA COSTA COUNTIES)$41.9330.32

LABO1130-002 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)$36.2627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MARIPOSA, MERCED, STANISLAUS, A$36.5627.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (MARIPOSA, MERCED,$34.0627.30

LABO1130-003 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)$45.8927.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)$45.6627.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROU$45.4127.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (MARIPO$44.9627.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)$44.4227.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)$46.4127.72

LABO1130-005 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER: MASON TENDER-BRICK (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)$36.2925.55

LABO1130-007 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWING$36.0827.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$36.2027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$35.5027.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$35.7227.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. FOOTNOTES: LABORERS WORKI$35.5527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$36.0527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$35.3527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $35.2527.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$28.9427.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLI$36.4627.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR$35.9627.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE$35.3727.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE $35.2527.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS, AND MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL$35.5027.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SH$35.3527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (1) New Construction. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE$35.2527.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - (2) Establishment Warranty Period. FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $28.9427.30

LABO1130-008 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE COUNTIE$39.7728.54

LABO1130-009 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)$39.7728.54

PAIN0016-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
PAINTERS. PREMIUMS: EXOTIC MATERIALS - $1.25 ADDITIONAL PER HOUR. SPRAY WORK: - $0.50 ADDITIONAL PER HOUR. INDUSTRIAL PAINTING - $0.25 ADDITIONAL PER HOUR [WORK ON INDUSTRIAL BUILD$53.3828.04

PAIN0016-003 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
DRYWALL FINISHER/TAPER. (ALAMDEA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, & SANTA CLARA COUNTIES)$63.7632.69
DRYWALL FINISHER/TAPER. (CALAVERAS, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS, & TUOLUMNE COUNTIES)$59.6331.29

PAIN0016-012 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
SOFT FLOOR LAYER (ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES)$59.0033.03

PAIN0016-015 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
PAINTER: BRUSH. FOOTNOTES: SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITION$43.4522.80

PAIN0016-022 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
PAINTER (SAN FRANCISCO COUNTY)$57.0028.04

PAIN0169-001 (collectively bargained (union) rate, 01/01/2023)

ClassificationBase rateFringes
GLAZIER (FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES)$44.3328.88

PAIN0169-005 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
GLAZIER (ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA & SANTA CRUZ COUNTIES)$56.2234.00

PAIN0294-004 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PAINTER: BRUSH, ROLLER. FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 ADDITIONAL PER HOUR. LEAD ABATERS & $34.4921.80
PAINTER: DRYWALL FINISHER/TAPER. FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 ADDITIONAL PER HOUR. LEAD A$35.7421.80

PAIN0294-005 (collectively bargained (union) rate, 01/01/2023)

ClassificationBase rateFringes
SOFT FLOOR LAYER (FRESNO, KINGS & MADERA COUNTIES)$38.5323.19

PAIN0767-001 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
GLAZIER. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.$43.2535.62

PAIN1176-001 (collectively bargained (union) rate, 07/01/2022)

ClassificationBase rateFringes
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2- GAMECOURT & PLAYGROUND INSTALLER$34.7117.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1- STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPE$40.8317.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3- PROTECTIVE COATING, PAVEMENT SEALING$35.1117.62

PAIN1237-003 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
SOFT FLOOR LAYER (CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES)$48.5426.59

PLAS0066-002 (collectively bargained (union) rate, 07/01/2019)

ClassificationBase rateFringes
PLASTERER (ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES)$42.4130.73

PLAS0300-001 (collectively bargained (union) rate, 07/01/2018)

ClassificationBase rateFringes
PLASTERER (AREA 188: FRESNO)$32.7031.68
PLASTERER (AREA 224: SAN BENITO, SANTA CLARA, SANTA CRUZ)$32.8831.68
PLASTERER (AREA 295: CALAVERAS & SAN JOAQUIN COUNTIES)$32.7031.68
PLASTERER (AREA 337: MONTEREY COUNTY)$32.8831.68
PLASTERER (AREA 429: MARIPOSA, MERCED, STANISLAUS, TUOLUMNE COUNTIES)$32.7031.68

PLAS0300-005 (collectively bargained (union) rate, 07/01/2016)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER$32.1523.27

PLUM0038-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLUMBER (PLUMBER, STEAMFITTER, REFRIGERATION FITTER) (SAN FRANCISCO COUNTY)$85.5048.98

PLUM0038-005 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (SAN FRANCISCO COUNTY)$77.3536.53

PLUM0062-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ COUNTIES)$57.7543.60

PLUM0159-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PLUMBER AND STEAMFITTER: (1) REFRIGERATION (CONTRA COSTA COUNTY)$67.6849.04
PLUMBER AND STEAMFITTER: (2) ALL OTHER WORK (CONTRA COSTA COUNTY)$68.5749.04

PLUM0246-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
PLUMBER & STEAMFITTER (FRESNO, KINGS & MADERA COUNTIES)$54.5042.54

PLUM0246-004 (collectively bargained (union) rate, 01/01/2017)

ClassificationBase rateFringes
PLUMBER: PIPE TRADESMAN. (PIPE TRADESMAN SCOPE OF WORK: INSTALLATION OF CORRUGATED METAL PIPING FOR DRAINAGE, AS WELL AS INSTALLATION OF CORRUGATED METAL PIPING FOR CULVERTS IN CON$13.0010.74

PLUM0342-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PIPEFITTER (CONTRA COSTA COUNTY)$80.5050.45
PLUMBER, PIPEFITTER, STEAMFITTER (ALAMEDA COUNTY)$80.5050.45

PLUM0355-004 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
UNDERGROUND UTILITY WORKER /LANDSCAPE FITTER (ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, $36.0118.50

PLUM0393-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
PLUMBER/PIPEFITTER (SAN BENITO AND SANTA CLARA COUNTIES)$68.7646.63

PLUM0442-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
PLUMBER & STEAMFITTER (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES)$58.4538.74

PLUM0467-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)$87.7541.44

ROOF0027-002 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
ROOFER. FOOTNOTE: WORK WITH PITCH, PITCH BASE OF PITCH IMPREGNANTED PRODUCTS OR ANY MATERIAL CONTAINING COAL TAR PITCH, ON ANY BUILDING OLD OR NEW, WHERE BOTH ASPHALT AND PITCHERS $45.7616.86

ROOF0040-002 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES)$55.3022.97

ROOF0081-001 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
ROOFER (ALAMEDA AND CONTRA COSTA COUNTIES)$54.9423.34

ROOF0081-004 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
ROOFER (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES)$49.6522.19

ROOF0095-002 (collectively bargained (union) rate, 08/01/2023)

ClassificationBase rateFringes
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$57.1721.51
ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$53.1721.51
ROOFER: KETTLE PERSON (2 KETTLES) (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:)$55.1721.51

SFCA0483-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER: FIRE (ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES)$81.5441.35

SFCA0669-011 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES)$49.6929.72

SHEE0104-001 (collectively bargained (union) rate, 06/29/2026)

ClassificationBase rateFringes
SHEET METAL WORKER (MONTEREY & SAN BENITO COUNTIES)$65.0237.47
SHEET METAL WORKER (SANTA CRUZ COUNTY)$66.1836.93
SHEET METAL WORKER: ALL OTHER WORK (ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO, SANTA CLARA COUNTIES))$86.3146.75
SHEET METAL WORKER: MECHANICAL CONTRACTS UNDER $200,000 (ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA COUNTIES))$73.1946.00

SHEE0104-003 (collectively bargained (union) rate, 06/29/2026)

ClassificationBase rateFringes
SHEET METAL WORKER (CALAVERAS AND SAN JOAQUIN COUNTIES)$56.9638.63

SHEE0104-005 (collectively bargained (union) rate, 06/29/2026)

ClassificationBase rateFringes
SHEET METAL WORKER: EXCLUDING METAL DECK AND SIDING (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)$57.0642.15

SHEE0104-007 (collectively bargained (union) rate, 06/29/2026)

ClassificationBase rateFringes
SHEET METAL WORKER (FRESNO, KINGS, AND MADERA COUNTIES)$54.4942.39

SHEE0104-015 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY. (ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES)$56.2337.52

SHEE0104-018 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY. (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES)$56.2337.52

TEAM0094-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUM$43.2634.28
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT $43.5634.28
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TR$43.8634.28
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HEL$44.2134.28
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES. FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR W$44.5634.28
Full official text of CA20260018 rev 7
"General Decision Number: CA20260018 09/03/2026


State: California


Construction Types: Building, Heavy and Highway


Counties: California Counties of 
Alameda, Calaveras, Contra Costa, 
Fresno, Kings, Madera, Mariposa, Merced, 
Monterey, San Benito, San Francisco, San 
Joaquin, San Mateo, Santa Clara, Santa 
Cruz, Stanislaus and Tuolumne




Building Construction Projects 
Dredging Projects-Includes Dredging Projects (does not include hopper dredge work)
Heavy Construction Projects (excludes water well drilling)
Highway Construction Projects



Modification Number     Publication Date
          4                01/30/2026
          5                05/18/2026
          6                07/14/2026
          7                09/03/2026


 ASBE0016-004 05/01/2025
                                                     Rates                  Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: 
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, 
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL 
INSULATION MATERIALS FROM MECHANICAL SYSTEMS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1: 
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, 
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, 
STANISLAUS, & TOULMNE COUNTIES).....................$ 34.56                  11.40
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: 
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, 
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL 
INSULATION MATERIALS FROM MECHANICAL SYSTEMS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2: 
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, & 
SANTA CLARA COUNTIES)...............................$ 44.73                  12.75
----------------------------------------------------------------

 ASBE0016-008 01/01/2024
                                                     Rates                  Fringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE 
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE 
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF 
MECHANICAL SYSTEMS (AREA 1: ALAMEDA, CONTRA COSTA, 
MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, 
SANTA CLARA, &  SANTA CRUZ).........................$ 84.76                  25.07
ASBESTOS WORKERS/INSULATOR: INCLUDES THE 
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE 
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF 
MECHANICAL SYSTEMS (AREA 2: CALAVERAS, FRESNO, 
KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, 
STANISLAUS, & TUOLUMNE).............................$ 64.56                  25.07
----------------------------------------------------------------

 BOIL0549-001 01/01/2021
                                                     Rates                  Fringes
BOILERMAKER (AREA 1: ALAMEDA, CONTRA COSTA, SAN 
FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES)........$ 49.62                  41.27
BOILERMAKER (AREA 2: REMAINING COUNTIES)............$ 45.60                  38.99
----------------------------------------------------------------

 BRCA0003-001 08/01/2024
                                                     Rates                  Fringes
MARBLE FINISHER.....................................$ 42.06                  19.80
----------------------------------------------------------------

 BRCA0003-003 08/01/2024
                                                     Rates                  Fringes
MARBLE MASON........................................$ 61.72                  30.31
----------------------------------------------------------------

 BRCA0003-005 05/01/2024
                                                     Rates                  Fringes
BRICKLAYER ( 1) FRESNO, KINGS, MADERA, MARIPOSA, 
MERCED..............................................$ 51.17                  25.80
BRICKLAYER ( 7) SAN FRANCISCO, SAN MATEO............$ 57.02                  28.50
BRICKLAYER ( 9) CALAVERAS, SAN JOAQUIN, STANISLAUS, 
TOULUMNE............................................$ 52.76                  25.01
BRICKLAYER (16) MONTEREY, SANTA CRUZ................$ 54.18                  27.82
BRICKLAYER (8) ALAMEDA, CONTRA COSTA, SAN BENITO, 
SANTA CLARA)........................................$ 56.94                  26.28
----------------------------------------------------------------

 BRCA0003-008 07/01/2024
                                                     Rates                  Fringes
TERRAZZO FINISHER...................................$ 44.93                  20.98
TERRAZZO WORKER/SETTER..............................$ 60.58                  29.79
----------------------------------------------------------------

 BRCA0003-011 04/01/2024
                                                     Rates                  Fringes
TILE FINISHER (AREA 1: ALAMEDA, CONTRA COSTA, 
MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, 
SANTA CLARA, SANTA CRUZ)............................$ 37.75                  19.28
TILE FINISHER (AREA 2: CALAVERAS, SAN JOAQUIN, 
STANISLAUS, TUOLUMNE)...............................$ 34.76                  19.22
TILE FINISHER (AREA 3: FRESNO, KINGS, MADERA, 
MARIPOSA, MERCED)...................................$ 32.68                  18.32
TILE LAYER (AREA 1: ALAMEDA, CONTRA COSTA, 
MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, 
SANTA CLARA, SANTA CRUZ)............................$ 59.92                  22.62
TILE LAYER (AREA 2: CALAVERAS, SAN JOAQUIN, 
STANISLAUS, TUOLUMNE)...............................$ 55.17                  22.52
TILE LAYER (AREA 3: FRESNO, KINGS, MADERA, 
MARIPOSA, MERCED)...................................$ 50.28                  22.05
----------------------------------------------------------------

 CARP0022-001 07/01/2023
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN 
FRANCISCO COUNTY)...................................$ 60.39                  33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SAN FRANCISCO COUNTY)...........$ 60.54                  33.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO 
COUNTY).............................................$ 60.39                  33.52
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY).......$ 60.49                  35.11
----------------------------------------------------------------

 CARP0034-001 07/01/2021
                                                     Rates                  Fringes
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN.  
DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER 
FOOT;  101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 
FT, $4.00 PER FOOT;  221 FT. AND DEEPER, $5.00 PER 
FOOT.  (SATURATION DIVING: THE STANDBY RATE SHALL 
APPLY UNTIL SATURATION STARTS.  THE SATURATION 
DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE 
CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE 
COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL 
SATURATION HOURS.) (DIVING IN ENCLOSURES:  WHERE IT 
IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, 
OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL 
ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID:  
DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 
FEET:  $1.00 PER FOOT.  WHEN IT IS NECESSARY FOR A 
DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE 
LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 
PER FOOT.)  (WORK IN COMBINATION OF 
CLASSIFICATIONS:  EMPLOYEES WORKING IN ANY 
COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING 
CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID 
IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR 
THAT SHIFT.)........................................$ 54.10                  34.69
DIVER: DIVER STANDBY.  DEPTH PAY (SURFACE DIVING): 
50 TO 100 FT, $2.00 PER FOOT;  101 TO 150 FT, $3.00 
PER FOOT; 151 TO 220 FT, $4.00 PER FOOT;  221 FT. 
AND DEEPER, $5.00 PER FOOT.  (SATURATION DIVING: 
THE STANDBY RATE SHALL APPLY UNTIL SATURATION 
STARTS.  THE SATURATION DIVING RATE APPLIES WHEN 
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK 
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE 
SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN 
ENCLOSURES:  WHERE IT IS NECESSARY FOR DIVERS TO 
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE 
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM 
SHALL BE PAID:  DISTANCE TRAVELED FROM ENTRANCE 26 
FEET TO 300 FEET:  $1.00 PER FOOT.  WHEN IT IS 
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR 
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE 
PREMIUM WILL BE $1.00 PER FOOT.)  (WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT.)....................................$ 60.51                  34.69
DIVER: DIVER TENDER.  DEPTH PAY (SURFACE DIVING): 
50 TO 100 FT, $2.00 PER FOOT;  101 TO 150 FT, $3.00 
PER FOOT; 151 TO 220 FT, $4.00 PER FOOT;  221 FT. 
AND DEEPER, $5.00 PER FOOT.  (SATURATION DIVING: 
THE STANDBY RATE SHALL APPLY UNTIL SATURATION 
STARTS.  THE SATURATION DIVING RATE APPLIES WHEN 
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK 
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE 
SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN 
ENCLOSURES:  WHERE IT IS NECESSARY FOR DIVERS TO 
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE 
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM 
SHALL BE PAID:  DISTANCE TRAVELED FROM ENTRANCE 26 
FEET TO 300 FEET:  $1.00 PER FOOT.  WHEN IT IS 
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR 
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE 
PREMIUM WILL BE $1.00 PER FOOT.)  (WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT.)....................................$ 59.51                  34.69
DIVER: DIVER WET.  DEPTH PAY (SURFACE DIVING): 50 
TO 100 FT, $2.00 PER FOOT;  101 TO 150 FT, $3.00 
PER FOOT; 151 TO 220 FT, $4.00 PER FOOT;  221 FT. 
AND DEEPER, $5.00 PER FOOT.  (SATURATION DIVING: 
THE STANDBY RATE SHALL APPLY UNTIL SATURATION 
STARTS.  THE SATURATION DIVING RATE APPLIES WHEN 
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK 
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE 
SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN 
ENCLOSURES:  WHERE IT IS NECESSARY FOR DIVERS TO 
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE 
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM 
SHALL BE PAID:  DISTANCE TRAVELED FROM ENTRANCE 26 
FEET TO 300 FEET:  $1.00 PER FOOT.  WHEN IT IS 
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR 
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE 
PREMIUM WILL BE $1.00 PER FOOT.)  (WORK IN 
COMBINATION OF CLASSIFICATIONS:  EMPLOYEES WORKING 
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE 
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE 
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE 
FOR THAT SHIFT.)....................................$ 103.62                  34.69
DIVER: MANIFOLD OPERATOR (MIXED GAS).  DEPTH PAY 
(SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT;  
101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 
PER FOOT;  221 FT. AND DEEPER, $5.00 PER FOOT.  
(SATURATION DIVING: THE STANDBY RATE SHALL APPLY 
UNTIL SATURATION STARTS.  THE SATURATION DIVING 
RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE 
CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE 
COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL 
SATURATION HOURS.) (DIVING IN ENCLOSURES:  WHERE IT 
IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, 
OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL 
ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID:  
DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 
FEET:  $1.00 PER FOOT.  WHEN IT IS NECESSARY FOR A 
DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE 
LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 
PER FOOT.)  (WORK IN COMBINATION OF 
CLASSIFICATIONS:  EMPLOYEES WORKING IN ANY 
COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING 
CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID 
IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR 
THAT SHIFT.)........................................$ 64.51                  34.69
DIVER: MANIFOLD OPERATOR (STANDBY).  DEPTH PAY 
(SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT;  
101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00 
PER FOOT;  221 FT. AND DEEPER, $5.00 PER FOOT.  
(SATURATION DIVING: THE STANDBY RATE SHALL APPLY 
UNTIL SATURATION STARTS.  THE SATURATION DIVING 
RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE 
CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE 
COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL 
SATURATION HOURS.) (DIVING IN ENCLOSURES:  WHERE IT 
IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, 
OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL 
ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID:  
DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 
FEET:  $1.00 PER FOOT.  WHEN IT IS NECESSARY FOR A 
DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE 
LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00 
PER FOOT.)  (WORK IN COMBINATION OF 
CLASSIFICATIONS:  EMPLOYEES WORKING IN ANY 
COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING 
CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID 
IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR 
THAT SHIFT.)........................................$ 59.51                  34.69
----------------------------------------------------------------

 CARP0034-003 07/01/2021
                                                     Rates                  Fringes
PILEDRIVER..........................................$ 54.10                  34.69
----------------------------------------------------------------

 CARP0035-007 07/01/2020
                                                     Rates                  Fringes
MODULAR FURNITURE INSTALLER: INSTALLER  (AREA 1: 
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, 
SANTA CLARA COUNTIES)...............................$ 28.76                  22.53
MODULAR FURNITURE INSTALLER: INSTALLER  (AREA 2: 
MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)..........$ 26.11                  22.53
MODULAR FURNITURE INSTALLER: INSTALLER  (AREA 3: 
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, 
SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).........$ 25.16                  22.53
MODULAR FURNITURE INSTALLER: LEAD INSTALLER  (AREA 
2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES).......$ 29.08                  23.03
MODULAR FURNITURE INSTALLER: LEAD INSTALLER  (AREA 
3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, 
MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).$ 27.96                  23.03
MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA 
1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, 
SANTA CLARA COUNTIES)...............................$ 32.21                  23.03
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA 
1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, 
SANTA CLARA COUNTIES)...............................$ 36.43                  23.03
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA 
2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES).......$ 32.71                  23.03
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA 
3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, 
MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).$ 31.38                  23.03
----------------------------------------------------------------

 CARP0035-008 08/01/2020
                                                     Rates                  Fringes
DRYWALL INSTALLERS/LATHERS (AREA 1: ALAMEDA, CONTRA 
COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA 
COUNTIES)...........................................$ 52.65                  31.26
DRYWALL INSTALLERS/LATHERS (AREA 2: MONTEREY, SAN 
BENITO, SANTA CRUZ COUNTIES)........................$ 46.77                  31.26
DRYWALL INSTALLERS/LATHERS (AREA 3: SAN JOAQUIN)....$ 47.27                  31.26
DRYWALL INSTALLERS/LATHERS (AREA 4: CALAVERAS, 
FRESNO, KINGS, MADERA, MARIPOSA, MERCED, 
STANISLAUS, TUOLUMNE COUNTIES)......................$ 45.92                  31.26
DRYWALL STOCKER/SCRAPPER (AREA 1: ALAMEDA, CONTRA 
COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA 
COUNTIES)...........................................$ 26.33                  18.22
DRYWALL STOCKER/SCRAPPER (AREA 2: MONTEREY, SAN 
BENITO, SANTA CRUZ COUNTIES)........................$ 23.39                  18.22
DRYWALL STOCKER/SCRAPPER (AREA 3: SAN JOAQUIN)......$ 23.64                  18.22
DRYWALL STOCKER/SCRAPPER (AREA 4: CALAVERAS, 
FRESNO, KINGS, MADERA, MARIPOSA, MERCED, 
STANISLAUS, TUOLUMNE COUNTIES)......................$ 22.97                  18.22
----------------------------------------------------------------

 CARP0152-001 07/01/2020
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER 
(CONTRA COSTA COUNTY)...............................$ 52.65                  30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (CONTRA COSTA COUNTY)............$ 52.80                  30.82
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA 
COUNTY).............................................$ 52.65                  30.82
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)........$ 52.75                  32.41
----------------------------------------------------------------

 CARP0152-002 07/01/2020
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN 
JOAQUIN COUNTY).....................................$ 52.65                  30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER   (SAN JOAQUIN COUNTY)...........$ 46.92                  30.82
CARPENTERS: JOURNEYMAN CARPENTER (SAN JOAQUIN 
COUNTY).............................................$ 46.77                  30.82
CARPENTERS: MILLWRIGHT (SAN JOAQUIN COUNTY).........$ 49.27                  32.41
----------------------------------------------------------------

 CARP0152-004 07/01/2020
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER   
(CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND 
TUOLUMNE COUNTIES)..................................$ 52.65                  30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER   CALAVERAS, MARIPOSA, MERCED, 
STANISLAUS AND TUOLUMNE COUNTIES....................$ 45.57                  30.82
CARPENTERS: JOURNEYMAN CARPENTER   (CALAVERAS, 
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES).$ 45.42                  30.82
CARPENTERS: MILLWRIGHT   (CALAVERAS, MARIPOSA, 
MERCED, STANISLAUS AND TUOLUMNE COUNTIES)...........$ 47.92                  32.41
----------------------------------------------------------------

 CARP0217-001 07/01/2023
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN 
MATEO COUNTY).......................................$ 60.39                  33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SAN MATEO COUNTY)...............$ 60.54                  33.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY).$ 60.39                  33.52
CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)...........$ 60.49                  35.11
----------------------------------------------------------------

 CARP0405-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA 
CLARA COUNTY).......................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SANTA CLARA COUNTY).............$ 55.00                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA 
COUNTY).............................................$ 54.85                  31.49
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY).........$ 54.95                  33.08
----------------------------------------------------------------

 CARP0405-002 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN 
BENITO COUNTY)......................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SAN BENITO COUNTY)..............$ 49.12                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO 
COUNTY).............................................$ 48.97                  31.49
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)..........$ 51.47                  33.08
----------------------------------------------------------------

 CARP0505-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA 
CRUZ COUNTY)........................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SANTA CRUZ COUNTY)..............$ 49.12                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ 
COUNTY).............................................$ 48.97                  31.49
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)..........$ 51.47                  33.08
----------------------------------------------------------------

 CARP0605-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER 
(MONTEREY COUNTY)...................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (MONTEREY COUNTY)................$ 49.12                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)..$ 48.97                  31.49
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)............$ 51.47                  33.08
----------------------------------------------------------------

 CARP0701-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER 
(FRESNO AND MADERA COUNTIES)........................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER   (FRESNO AND MADERA COUNTIES)...$ 47.77                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (FRESNO AND MADERA 
COUNTIES)...........................................$ 47.62                  31.49
CARPENTERS: MILLWRIGHT (FRESNO AND MADERA COUNTIES).$ 50.12                  33.08
----------------------------------------------------------------

 CARP0713-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER 
(ALAMEDA COUNTY)....................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (ALAMEDA COUNTY).................$ 55.00                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)...$ 54.85                  31.49
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY).............$ 54.95                  33.08
----------------------------------------------------------------

 CARP1109-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (KINGS 
COUNTY).............................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER   KINGS COUNTY...................$ 47.77                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (KINGS COUNTY).....$ 47.62                  31.49
CARPENTERS: MILLWRIGHT (KINGS COUNTY)...............$ 50.12                  33.08
----------------------------------------------------------------

 ELEC0006-004 12/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER.  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR  RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN 
FRANCISCO COUNTY)...................................$ 58.83                  31.51
SOUND & COMMUNICATIONS: TECHNICIAN  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR  RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN 
FRANCISCO COUNTY) (SAN FRANCISCO COUNTY) ...........$ 67.65                  31.78
----------------------------------------------------------------

 ELEC0006-007 06/01/2024
                                                     Rates                  Fringes
ELECTRICIAN (SAN FRANCISCO COUNTY)..................$ 91.25                  48.05
----------------------------------------------------------------

 ELEC0100-002 09/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (FRESNO, KINGS, AND MADERA COUNTIES)....$ 50.00                  30.15
----------------------------------------------------------------

 ELEC0100-005 12/01/2024
                                                     Rates                  Fringes
COMMUNICATIONS SYSTEM: INSTALLER  (SCOPE OF WORK: 
INCLUDES THE INSTALLATION TESTING, SERVICE AND 
MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE 
THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, 
SOUND, VISION AND DIGITAL FOR COMMERCIAL, 
EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR 
THE FOLLOWING: TV MONITORING AND SURVEILLANCE, 
BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE 
INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE 
TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL 
SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, 
BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK 
SYSTEMS.  A. SOUND AND VOICE 
TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND 
FOREGROUND MUSIC, INTERCOM AND TELEPHONE 
INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL 
SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND 
SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE, 
MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX 
SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, 
RF SYSTEMS, ANTENNAS AND WAVE GUIDE.  B. FIRE ALARM 
SYSTEMS INSTALLATION, WIRE PULLING AND TESTING.  C. 
TELEVISION AND VIDEO SYSTEMS TELEVISION MONITORING 
AND SURVEILLANCE SYSTEMS  VIDEO SECURITY SYSTEMS, 
VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL 
SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND 
CCTV.  D. SECURITY SYSTEMS PERIMETER SECURITY 
SYSTEMS VIBRATION SENSOR SYSTEMS CARD ACCESS 
SYSTEMS ACCESS CONTROL SYSTEMS, SONAR/INFRARED 
MONITORING EQUIPMENT.  E. COMMUNICATIONS SYSTEMS 
THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL 
SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED 
SYSTEMS SCADA (SUPERVISORY CONTROL AND DATA 
ACQUISITION)  PCM (PULSE CODE MODULATION) INVENTORY 
CONTROL SYSTEMS, DIGITAL DATA SYSTEMS  BROADBAND 
AND BASEBAND AND CARRIERS POINT OF SALE SYSTEMS, 
VSAT DATA SYSTEMS  DATA COMMUNICATION SYSTEMS  RF 
AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA 
SYSTEMS.  WORK EXCLUDED RACEWAY SYSTEMS ARE NOT 
COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF 
THE ABOVE LISTED SYSTEMS).  CHASES AND/OR NIPPLES 
(NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN 
WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS.  SCADA 
(SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT 
INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE 
SCOPE).  FIRE ALARM SYSTEMS WHEN INSTALLED IN 
RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL 
BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN 
EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY:  
1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL 
BUILDING TRADES CONSTRUCTION.  2.  THE CONDUCTORS 
FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN 
CONDUIT.)  (FRESNO, KINGS, MADERA)  ................$ 45.28                  28.01
COMMUNICATIONS SYSTEM: TECHNICIAN  (SCOPE OF WORK: 
INCLUDES THE INSTALLATION TESTING, SERVICE AND 
MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE 
THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, 
SOUND, VISION AND DIGITAL FOR COMMERCIAL, 
EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR 
THE FOLLOWING: TV MONITORING AND SURVEILLANCE, 
BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE 
INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE 
TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL 
SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, 
BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK 
SYSTEMS.  A. SOUND AND VOICE 
TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND 
FOREGROUND MUSIC, INTERCOM AND TELEPHONE 
INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL 
SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND 
SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE, 
MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX 
SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, 
RF SYSTEMS, ANTENNAS AND WAVE GUIDE.  B. FIRE ALARM 
SYSTEMS INSTALLATION, WIRE PULLING AND TESTING.  C. 
TELEVISION AND VIDEO SYSTEMS TELEVISION MONITORING 
AND SURVEILLANCE SYSTEMS  VIDEO SECURITY SYSTEMS, 
VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL 
SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND 
CCTV.  D. SECURITY SYSTEMS PERIMETER SECURITY 
SYSTEMS VIBRATION SENSOR SYSTEMS CARD ACCESS 
SYSTEMS ACCESS CONTROL SYSTEMS, SONAR/INFRARED 
MONITORING EQUIPMENT.  E. COMMUNICATIONS SYSTEMS 
THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL 
SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED 
SYSTEMS SCADA (SUPERVISORY CONTROL AND DATA 
ACQUISITION)  PCM (PULSE CODE MODULATION) INVENTORY 
CONTROL SYSTEMS, DIGITAL DATA SYSTEMS  BROADBAND 
AND BASEBAND AND CARRIERS POINT OF SALE SYSTEMS, 
VSAT DATA SYSTEMS  DATA COMMUNICATION SYSTEMS  RF 
AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA 
SYSTEMS.  WORK EXCLUDED RACEWAY SYSTEMS ARE NOT 
COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF 
THE ABOVE LISTED SYSTEMS).  CHASES AND/OR NIPPLES 
(NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN 
WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS.  SCADA 
(SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT 
INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE 
SCOPE).  FIRE ALARM SYSTEMS WHEN INSTALLED IN 
RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL 
BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN 
EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY:  
1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL 
BUILDING TRADES CONSTRUCTION.  2.  THE CONDUCTORS 
FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN 
CONDUIT.)  (FRESNO, KINGS, MADERA)  ................$ 52.07                  28.21
----------------------------------------------------------------

 ELEC0234-001 12/30/2025
                                                     Rates                  Fringes
ELECTRICIAN  ZONE A : ALL OF SANTA CRUZ, MONTEREY, 
AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF 
HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN 
AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101 
SOUTH TO THE SAN LUIS OBISPO COUNTY LINE (MONTEREY, 
SAN BENITO AND SANTA CRUZ COUNTIES).................$ 70.41                  33.76
ELECTRICIAN  ZONE B: ANY AREA OUTSIDE OF ZONE A 
(MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)......$ 77.45                  33.97
----------------------------------------------------------------

 ELEC0234-003 12/01/2021
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM  WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING  
PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE 
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; 
EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE 
VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS 
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' 
ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING 
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  
(FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN 
RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON 
PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL 
BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR 
THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, 
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.)   
(MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ....$ 47.93                  24.09
SOUND & COMMUNICATIONS: TECHNICIAN  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM  WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING  
PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE 
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; 
EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE 
VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS 
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' 
ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING 
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  
(FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN 
RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON 
PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL 
BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR 
THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, 
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.)   
(MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ....$ 55.12                  24.30
----------------------------------------------------------------

 ELEC0302-001 03/01/2025
                                                     Rates                  Fringes
CABLE SPLICER (CONTRA COSTA COUNTY).................$ 74.54                  36.09
ELECTRICIAN (CONTRA COSTA COUNTY)...................$ 66.26                  35.84
----------------------------------------------------------------

 ELEC0302-003 12/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.)  (CONTRA 
COSTA COUNTY) ......................................$ 53.08                  30.84
SOUND & COMMUNICATIONS: TECHNICIAN  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.)  (CONTRA 
COSTA COUNTY) ......................................$ 61.04                  31.08
----------------------------------------------------------------

 ELEC0332-001 06/01/2025
                                                     Rates                  Fringes
CABLE SPLICER  (FOOTNOTES: WORK UNDER COMPRESSED 
AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON 
LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR 
OTHER STRUCTURES AND WHERE THE WORKERS ARE NOT 
PROTECTED BY PERMANENT GUARD RAILS AT A DISTANCE OF 
40 TO 60 FT. FROM THE GROUND OR SUPPORTING 
STRUCTURES: TO BE PAID ONE AND ONE-HALF TIMES THE 
STRAIGHT-TIME RATE OF PAY.   WORK ON STRUCTURES OF 
60 FT. OR OVER (AS DESCRIBED ABOVE): TO BE PAID 
TWICE THE STRAIGHT-TIME RATE OF PAY.)  (SANTA CLARA 
COUNTY).............................................$ 104.68                  49.46
ELECTRICIAN  (FOOTNOTES: WORK UNDER COMPRESSED AIR 
OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, 
SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER 
STRUCTURES AND WHERE THE WORKERS ARE NOT PROTECTED 
BY PERMANENT GUARD RAILS AT A DISTANCE OF 40 TO 60 
FT. FROM THE GROUND OR SUPPORTING STRUCTURES: TO BE 
PAID ONE AND ONE-HALF TIMES THE STRAIGHT-TIME RATE 
OF PAY.   WORK ON STRUCTURES OF 60 FT. OR OVER (AS 
DESCRIBED ABOVE): TO BE PAID TWICE THE 
STRAIGHT-TIME RATE OF PAY.)  (SANTA CLARA COUNTY)...$ 91.03                  49.05
----------------------------------------------------------------

 ELEC0332-003 12/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.)   (SANTA 
CLARA COUNTY).......................................$ 58.33                  31.00
SOUND & COMMUNICATIONS: TECHNICIAN  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.)   (SANTA 
CLARA COUNTY).......................................$ 67.08                  31.26
----------------------------------------------------------------

 ELEC0595-001 06/01/2025
                                                     Rates                  Fringes
CABLE SPLICER (ALAMEDA COUNTY)......................$ 87.40                  49.41
ELECTRICIAN (ALAMEDA COUNTY)........................$ 76.00                  49.07
----------------------------------------------------------------

 ELEC0595-002 06/01/2024
                                                     Rates                  Fringes
CABLE SPLICER (CALAVERAS AND SAN JOAQUIN COUNTIES)..$ 59.34                  32.26
ELECTRICIAN: ALL OTHER WORK (CALAVERAS AND SAN 
JOAQUIN COUNTIES)...................................$ 49.45                  31.96
ELECTRICIAN: TUNNEL WORK (CALAVERAS AND SAN JOAQUIN 
COUNTIES)...........................................$ 51.92                  32.04
----------------------------------------------------------------

 ELEC0595-006 12/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM  WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.) (ALAMEDA 
COUNTY).............................................$ 58.33                  31.00
SOUND & COMMUNICATIONS: TECHNICIAN  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM  WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.) (ALAMEDA 
COUNTY).............................................$ 67.08                  31.26
----------------------------------------------------------------

 ELEC0595-008 12/01/2024
                                                     Rates                  Fringes
COMMUNICATIONS SYSTEM: INSTALLER  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM  WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.)  (CALAVERAS 
AND SAN JOAQUIN COUNTIES) ..........................$ 45.28                  28.01
COMMUNICATIONS SYSTEM: TECHNICIAN  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM  WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.)  (CALAVERAS 
AND SAN JOAQUIN COUNTIES) ..........................$ 52.07                  28.21
----------------------------------------------------------------

 ELEC0617-001 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (SAN MATEO COUNTY)......................$ 86.00                  51.07
----------------------------------------------------------------

 ELEC0617-003 12/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM  WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.)  (SAN MATEO 
COUNTY).............................................$ 58.33                  31.00
SOUND & COMMUNICATIONS: TECHNICIAN  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM  WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM 
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING 
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, 
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS 
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE 
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); 
EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  (FOOTNOTE: 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS 
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING 
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE 
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE 
PERFORMED BY THE INSIDE ELECTRICIAN.)  (SAN MATEO 
COUNTY).............................................$ 67.08                  31.26
----------------------------------------------------------------

 ELEC0684-001 12/01/2024
                                                     Rates                  Fringes
ELECTRICIAN   (MARIPOSA, MERCED, STANISLAUS AND 
TUOLUMNE COUNTIES)  CABLE SPLICER = 110% OF 
JOURNEYMAN ELECTRICIAN..............................$ 48.50                  30.09
----------------------------------------------------------------

 ELEC0684-004 12/01/2024
                                                     Rates                  Fringes
COMMUNICATIONS SYSTEM: INSTALLER  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY;  
INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS 
OF  CONDUCTORS DETERMINED BY THEIR FUNCTION; 
EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN 
RACEWAYS (INCLUDING WIRE AND CABLE  PULLING) AND 
WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING 
PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE 
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; 
EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE 
VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS 
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' 
ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING 
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  
(FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN 
RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON 
PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL 
BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR 
THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, 
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.)  
(MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE 
COUNTIES)...........................................$ 45.28                  28.01
COMMUNICATIONS SYSTEM: TECHNICIAN  (SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY;  
INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS 
OF  CONDUCTORS DETERMINED BY THEIR FUNCTION; 
EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN 
RACEWAYS (INCLUDING WIRE AND CABLE  PULLING) AND 
WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING 
PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE 
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT; 
EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE 
VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS 
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' 
ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING 
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.)  
(FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN 
RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON 
PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL 
BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR 
THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, 
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.)  
(MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE 
COUNTIES)...........................................$ 52.07                  28.21
----------------------------------------------------------------

 ELEC1245-001 01/01/2025
                                                     Rates                  Fringes
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER  
(HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, 
THANKSGIVING DAY AND DAY AFTER THANKSGIVING, 
CHRISTMAS DAY)......................................$ 70.16                  24.71
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST 
(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR 
VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND 
BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE 
EQUIPMENT)  (HOLIDAYS: NEW YEAR'S DAY, M.L. KING 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERANS DAY, THANKSGIVING DAY AND DAY AFTER 
THANKSGIVING, CHRISTMAS DAY)........................$ 53.30                  22.26
LINE CONSTRUCTION: (3) GROUNDMAN  (HOLIDAYS: NEW 
YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, 
THANKSGIVING DAY AND DAY AFTER THANKSGIVING, 
CHRISTMAS DAY)......................................$ 40.76                  21.76
----------------------------------------------------------------

 ELEV0008-001 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC  (FOOTNOTE: ADD TO FRINGE 
BENEFITS A+B:  A. PAID VACATION: EMPLOYER 
CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION 
PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF 
SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. 
 B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, 
THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND 
CHRISTMAS DAY.).....................................$ 84.05                  38.44
----------------------------------------------------------------

 ENGI0003-001 06/29/2020
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 1 
(LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED 
OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; 
SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE OVER 100 
TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 
OVER 100 TONS.......................................$ 52.64                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 1 
(OILER)- DERRICK BARGE PEDESTAL MOUNTED OVER 100 
TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED 
BOOM-TYHPE LIFTING DEVICE OVER 100 TONS; TRUCK 
CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 
TONS................................................$ 43.38                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 1 
(TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED 
OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; 
SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE OVER 100 
TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 
OVER 100 TONS.......................................$ 45.66                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 2 
(LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED 
45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO 
AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE 
LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR 
CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO 
AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE 
RIG.................................................$ 50.82                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 2 
(OILER)- DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO 
AND INCLUDING 100 TONS; CLAMSHELL UP TO AND 
INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE 
LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR 
CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO 
AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE 
RIG.................................................$ 43.11                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 2 
(TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED 
45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO 
AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE 
LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR 
CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO 
AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE 
RIG.................................................$ 45.41                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 3 
(LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED 
UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING 
DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY 
TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE 
MOUNTED 45 TONS AND UNDER...........................$ 49.14                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 3 
(OILER)- DERRICK BARGE PEDESTAL MOUNTED UNDER 45 
TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 
TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; 
TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 
TONS AND UNDER......................................$ 42.89                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 3 
(TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED 
UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING 
DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY 
TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE 
MOUNTED 45 TONS AND UNDER...........................$ 45.12                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 4 
(LIFTING DEVICES)- ASSISTANT OPERATOR IN LIEU OF 
ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS AND OVER; 
HEAVY-DUTY REPAIR PERSON/WELDER.....................$ 47.37                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 5 
(LIFTING DEVICES)- DECK ENGINEER....................$ 44.73                  31.15
OPERATOR:  POWER EQUIPMENT, PILEDRIVING: GROUP 6 
(LIFTING DEVICES)- DECKHAND; FIRE TENDER............$ 42.50                  31.15
----------------------------------------------------------------

 ENGI0003-001 06/30/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1 (CRANES)- CLAMSHELL AND DRAGLINE 
OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, 
OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 
100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 
OVER 100 TONS. (AREA 1: LISTED WAGE RATES. AREA 2: 
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN 
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), 
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA 
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 68.59                  32.53
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1 (OILER)- CLAMSHELL AND DRAGLINE 
OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, 
OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 
100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 
OVER 100 TONS. (AREA 1: LISTED WAGE RATES. AREA 2: 
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN 
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), 
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA 
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 43.79                  31.15
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1 (TRUCK CRANE OILER)- CLAMSHELL 
AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; 
DERRICK, OVER 100 TONS; DERRICK BARGE 
PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED 
BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. (AREA 1: 
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: 
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA 
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA 
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN 
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), 
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE 
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS 
(EASTERN PART), FRESNO (EASTERN PART), MADERA 
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 46.08                  31.15
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2 (CRANES)- CLAMSHELL AND DRAGLINE 
OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; 
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; 
DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED 
BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER 
CRANE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES 
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 66.08                  32.53
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2 (OILER)- CLAMSHELL AND DRAGLINE 
OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; 
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; 
DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED 
BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER 
CRANE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES 
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 42.83                  31.15
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2 (TRUCK CRANE OILER)- CLAMSHELL 
AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 
CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 
100 TONS; DERRICK BARGE, 100 TONS AND UNDER; 
SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 
TONS; TOWER CRANE. (AREA 1: LISTED WAGE RATES. AREA 
2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT 
EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN 
PART), KINGS, MADERA (EXCEPT EASTERN PART), 
MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY 
(EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN 
FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN 
PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), 
FRESNO (EASTERN PART), MADERA (EASTERN PART), 
MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN 
PART), TUOLUMNE (EASTERN PART) COUNTIES)............$ 45.07                  31.15
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3 (CRANES) CLAMSHELL AND DRAGLINE 
UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND 
UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 
TONS AND UNDER. (AREA 1: LISTED WAGE RATES. AREA 2: 
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN 
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), 
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA 
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 64.34                  32.53
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3 (HYDRAULIC) CLAMSHELL AND 
DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 
TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING 
DEVICE 45 TONS AND UNDER. (AREA 1: LISTED WAGE 
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, 
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, 
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT 
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), 
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN 
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT 
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN 
PART), FRESNO (EASTERN PART), MADERA (EASTERN 
PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 59.98                  32.53
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3 (OILER) CLAMSHELL AND DRAGLINE UP 
TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND 
UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 
TONS AND UNDER. (AREA 1: LISTED WAGE RATES. AREA 2: 
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN 
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), 
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA 
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 42.55                  31.15
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3 (TRUCK CRANE OILER) CLAMSHELL AND 
DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 
TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING 
DEVICE 45 TONS AND UNDER. (AREA 1: LISTED WAGE 
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, 
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, 
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT 
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), 
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN 
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT 
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN 
PART), FRESNO (EASTERN PART), MADERA (EASTERN 
PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 44.83                  31.15
OPERATOR:  POWER EQUIPMENT- CRANES AND ATTACHMENTS 
- AREA 1: GROUP 4 (CRANES)- BOOM TRUCK OR DUAL 
PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; 
TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING 
DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15 
TONS. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES 
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 61.30                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 2- 
HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3.5 CU. 
YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK 
BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR 
(FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AN 
DINCLUDING 7 CU. YDS. M.R.C.  (AREA 1: LISTED WAGE 
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, 
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, 
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT 
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), 
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN 
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT 
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN 
PART), FRESNO (EASTERN PART), MADERA (EASTERN 
PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 65.43                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 3- 
ASPHALT MILLING MACHINE; CABLE BACKHOE; COMBINATION 
BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS 
FLIGHT TIE BACK MACHINE ASSISTNAT TO ENGINEER OR 
MECHANIC; CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK 
MACHINE, TONNAGE TO APPLY; CRANE MOUNTED DRILL 
ATTACHMENT, TONNAGE TO APPLY; DOZER, SLOPE BRD; 
GRADALL; HYDRAULIC EXCAVATOR, UP TO 3.5 CU. YDS.; 
LOADER 4 CU. YDS. AND OVER; LONG REACH EXCAVATOR; 
MULTIPLE ENGINE SCRAPER (WHEN USED AS PUSH PULL); 
POWER SHOVELS, UP TO AND INCLUDING 1 CU. YD.; 
PRE-STRESS WIRE WRAPPING MACHINE; SIDE BOOM CAT, 
572 OR LARGER; TRACK LOADER 4 CU. YDS. AND OVER; 
WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. 
PER HOUR) (AREA 1: LISTED WAGE RATES. AREA 2: 
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN 
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), 
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA 
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 63.95                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 4- 
ASPHALT PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; 
COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING 
.75 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY); 
DOZER AND/OR PUSH CAT; PULL-TYPE ELEVATING LOADER; 
GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR 
OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING 
SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT, 
HUGHS, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY 
REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER 
UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER 
(MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR 
SPREADER MACHINE (ASPHALT, BARBER-GREENE AND 
SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR 
SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS; 
POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT; 
RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS, 
ETC.); RUBBER-TIRED EARTHMOVING EQUIPMENT 
(SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL 
TRACTOR WITH DRAG; SOIL STABILIZER (P&H OR EQUAL); 
SPIDER PLOW AND SPIDER PULLER; TUBEX PILE RIG; 
UNLICENSED CONSTRUCTION WORK BOAT OPERATOR, ON 
SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.; 
TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL 
COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR 
PUGMILL EQUIPMENT. (AREA 1: LISTED WAGE RATES. AREA 
2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT 
EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN 
PART), KINGS, MADERA (EXCEPT EASTERN PART), 
MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY 
(EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN 
FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN 
PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), 
FRESNO (EASTERN PART), MADERA (EASTERN PART), 
MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN 
PART), TUOLUMNE (EASTERN PART) COUNTIES)............$ 62.57                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 5- 
CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION 
SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR 
CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE 
CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE 
GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR 
SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL 
(NOT TO APPLY TO WATERLINES, WAGON DRILLS, OR 
JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR 
MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE 
(CLARY, JOHNSON, BIDWELL BRIDGE DECK, OR SIMILAR 
TYPES); MECHANICAL BURM, CURB, AND/OR CURB AND 
GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT 
HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR 
(SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED 
(AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR 
WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER; 
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5 
FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR. 
(AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 61.30                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 6- 
ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; 
BOOM-TYPE BACKFILLING MACHINE; ASSISTANT PLANT 
ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL 
GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING 
MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT 
ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); DECK 
ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHS 200 
SERIES OR SIMILAR UP TO AND INCLUDING 30 FT. 
M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR; 
HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER 
LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR 
(WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR 
SIMILAR; OILER, TRUCK MOUNTED; PAVEMENT BREAKER, 
TRUCK-MOUNTED, WITH COMPRESSOR COMBINATION; PAVING 
FABRIC INSTALLATION AND/OR LAYING MACHINE; PIPE 
BENDING MACHINE (PIPELINES ONLY); PIPE WRAPPING 
MACHINE (TRACTOR PRPELLED AND SUPPORTED); SCREED 
(EXCEPT ASPHALTIC CONCRETE PAVING); SELF-PROPELLED 
PIPELINE WRAPPING MACHINE; TRACTOR; SELF-LOADING 
CHIPPER; CONCRETE BARRIER MOVING MACHINE. (AREA 1: 
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: 
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA 
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA 
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN 
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), 
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE 
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS 
(EASTERN PART), FRESNO (EASTERN PART), MADERA 
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 59.98                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 7- 
BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE 
A-FRAME TRUCK, NON-ROTATING-UNDER 15 TONS; CARY IFT 
OR SIMILAR; COMBINATION SLURRY MIER AND/OR CLEANER; 
DRILLING EQUIPMENT, 20 FT AND UNDER M.R.C.; 
FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR; 
HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT 
LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE 
(VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL 
FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM); 
MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR 
WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING 
MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST 
DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL; 
SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE 
CURING MACHINE (ON STREETS, HIGHWAYS, AIRPORTS, AND 
CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER); 
SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR 
CONCRETE FORMS); TIE SPACE; TOWER MOBILE; TRENCHING 
MACHINE, MAXIMUM DIGGING CAPACITY UP TO AND 
INCLUDING 5 FT. DEPTH; TRUCK-TYPE LOADER. (AREA 1: 
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: 
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA 
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA 
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN 
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), 
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE 
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS 
(EASTERN PART), FRESNO (EASTERN PART), MADERA 
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 58.84                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 8- BIT 
SHARPENER; BOILER TENDER; BOX OPERATOR; 
BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR 
(SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND; 
FIRE TENDER; FORKLIFT (UNDER 20 FT); GENERATOR; 
GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC 
MONITOR; KEN SEAL MACHINE (OR SIMILAR); 
MIXERMOBILE; OILER; PUMPOPERATOR; REFRIGERATOR 
PLANT; RESERVOIR-DEBRIS TUG (SELF-PROPELLED 
FLOATING); ROSS CARRIER (CONSTRUCTION SITE); 
ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE; 
SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR 
(INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR; 
SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER; 
TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT; 
WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY. 
 (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 57.70                  32.53
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 8-A - 
ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 
SERIES OR SMALLER, AND SIMILAR (WITHOUT 
ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. 
(BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER. (AREA 
1: LISTED WAGE RATES. AREA 2: RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 55.49                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 1 
(CRANES)- CRANE OVER 100 TONS; DERRICK OVER 100 
TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 
100 TONS............................................$ 68.81                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 1 
(OILER)- CRANE OVER 100 TONS; DERRICK OVER 100 
TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 
100 TONS............................................$ 43.72                  31.15
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 1 
(TRUCK CRANE OILER)- CRANE OVER 100 TONS; DERRICK 
OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING 
DEVICE OVER 100 TONS................................$ 45.95                  31.15
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 2 
(CRANES)- CRANE OVER 45 TONS TO 100 TONS; DERRICK 
UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING 
DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE........$ 67.04                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 2 
(OILER)- CRANE OVER 45 TONS TO 100 TONS; DERRICK 
UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING 
DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE........$ 43.45                  31.15
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 2 
(TRUCK CRANE OILER)- CRANE OVER 45 TONS TO 100 
TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED 
BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS; 
TOWER CRANE.........................................$ 45.73                  31.15
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 3 
(CRANES)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED 
BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER.........$ 65.56                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 3 
(HYDRAULIC)- CRANE, 45 TONS AND UNDER; 
SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS 
AND UNDER...........................................$ 45.07                  31.15
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 3 
(OILER)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED 
BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER.........$ 43.23                  31.15
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 3 
(TRUCK CRANE OILER)- CRANE, 45 TONS AND UNDER; 
SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS 
AND UNDER...........................................$ 45.46                  31.15
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 4 
(CRANES)- CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; 
HEAVY-DUTY REPAIR PERSON/WELDER.....................$ 63.54                  32.53
OPERATOR:  POWER EQUIPMENT, STEEL ERECTION: GROUP 5 
(CRANES)- BOOM CAT..................................$ 62.24                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 1- 
HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; 
MUCKING MACHINE (RUBBER TIRED, RAIL OR TRACK TYPE); 
RAISED BORE OPERATOR (TUNNELS); TUNNEL MOLE BORE 
OPERATOR. (AREA 1: LISTED WAGE RATES. AREA 2: 
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN 
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), 
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA 
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 63.06                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 1-A- 
TUNNEL BORE MACHINE OPERATOR 20' DIAMETER OR MORE. 
(AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 65.53                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 2- 
COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE 
PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. (AREA 
1: LISTED WAGE RATES. AREA 2: RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 61.80                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 3- 
DRILL DOCTOR; MINE OR SHAFT HOIST. (AREA 1: LISTED 
WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 
PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, 
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, 
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT 
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), 
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN 
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT 
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN 
PART), FRESNO (EASTERN PART), MADERA (EASTERN 
PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 60.47                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 4- 
COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE 
OPERATOR; MOTORMAN. (AREA 1: LISTED WAGE RATES. 
AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE 
AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT 
EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN 
PART), KINGS, MADERA (EXCEPT EASTERN PART), 
MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY 
(EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN 
FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN 
PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), 
FRESNO (EASTERN PART), MADERA (EASTERN PART), 
MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN 
PART), TUOLUMNE (EASTERN PART) COUNTIES)............$ 59.33                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 5- BIT 
SHARPENER; BRAKEMAN; COMBINATION MIXER AND 
COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER; 
PUMP OPERATOR; SLUSHER OPERATOR. (AREA 1: LISTED 
WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 
PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, 
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, 
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT 
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), 
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN 
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT 
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN 
PART), FRESNO (EASTERN PART), MADERA (EASTERN 
PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 58.19                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- UNDERGOUND: AREA 1, GROUP 1- HEADING SHIELD 
OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE 
(RUBBER TIRED, RAIL OR TRACK TYPE); RAISED BORE 
OPERATOR (TUNNELS); TUNNEL MOLE BORE OPERATOR. 
(AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.) 
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), 
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, 
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT 
EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 62.96                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- UNDERGOUND: AREA 1, GROUP 1-A- TUNNEL BORE 
MACHINE OPERATOR 20' DIAMETER OR MORE. (AREA 1: 
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: 
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA 
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA 
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN 
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), 
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE 
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS 
(EASTERN PART), FRESNO (EASTERN PART), MADERA 
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 65.43                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- UNDERGOUND: AREA 1, GROUP 2- COMBINATION 
SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR 
PUMPCRETE GUN; POWER JUMBO OPERATOR. (AREA 1: 
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1: 
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA 
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA 
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN 
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), 
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE 
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS 
(EASTERN PART), FRESNO (EASTERN PART), MADERA 
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 61.70                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- UNDERGOUND: AREA 1, GROUP 3- DRILL DOCTOR; 
MINE OR SHAFT HOIST. (AREA 1: LISTED WAGE RATES. 
AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE 
AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT 
EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN 
PART), KINGS, MADERA (EXCEPT EASTERN PART), 
MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY 
(EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN 
FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN 
PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART), 
FRESNO (EASTERN PART), MADERA (EASTERN PART), 
MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN 
PART), TUOLUMNE (EASTERN PART) COUNTIES)............$ 60.37                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- UNDERGOUND: AREA 1, GROUP 4- COMBINATION 
SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; 
MOTORMAN. (AREA 1: LISTED WAGE RATES. AREA 2: 
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN 
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), 
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA 
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT 
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART) 
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO 
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA 
(EASTERN PART), MONTEREY (SOUTHWESTERN PART), 
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 59.23                  32.53
OPERATOR:  POWER EQUIPMENT, TUNNEL AND UNDERGROUND 
WORK- UNDERGOUND: AREA 1, GROUP 5- BIT SHARPENER; 
BRAKEMAN; COMBINATION MIXER AND COMPRESSOR 
(GUNITE); COMPRESSOR OPERATOR; OILER; PUMP 
OPERATOR; SLUSHER OPERATOR. (AREA 1: LISTED WAGE 
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, 
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, 
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT 
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), 
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN 
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT 
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN 
PART), FRESNO (EASTERN PART), MADERA (EASTERN 
PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 58.09                  32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1- 
OPERATOR OF HELICOPTER (WHEN USED IN ERECTION 
WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; 
POWER SHOVELS, OVER 7 CU. YDS. (AREA 1: LISTED WAGE 
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA, 
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA, 
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT 
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART), 
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN 
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT 
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN 
PART), FRESNO (EASTERN PART), MADERA (EASTERN 
PART), MARIPOSA (EASTERN PART), MONTEREY 
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART) 
COUNTIES)...........................................$ 66.96                  32.53
----------------------------------------------------------------

 ENGI0003-008 08/01/2024
                                                     Rates                  Fringes
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC 
SUCTION DREDGING- (1) LEVERMAN.  AREA 1: ALAMEDA, 
CONTRA COSTA, KINGS, MERCED,  SAN BENITO, SAN 
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, 
SANTA CRUZ, AND  STANISLAUS COUNTIES. CALAVERAS 
COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT 
EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART. 
MARIPOSA COUNTY-EXCEPT EASTERN PART. MONTERREY 
COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE 
COUNTY-EXCEPT EASTERN PART..........................$ 60.61                  39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC 
SUCTION DREDGING- (1) LEVERMAN.  AREA 2: CALAVERAS 
COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN PART; 
MADERA COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN 
PART; MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE 
COUNTY-EASTERN PART.................................$ 62.61                  39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC 
SUCTION DREDGING- (2) DREDGE DOZER; HEAVY DUTY 
REPAIRMAN.    AREA 2: CALAVERAS COUNTY-EASTERN 
PART; FRESNO COUNTY-EASTERN PART; MADERA 
COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN PART; 
MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE 
COUNTY-EASTERN PART.................................$ 57.65                  39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC 
SUCTION DREDGING- (2) DREDGE DOZER; HEAVY DUTY 
REPAIRMAN. AREA 1: ALAMEDA, CONTRA COSTA, KINGS, 
MERCED,  SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, 
SAN MATEO, SANTA CLARA, SANTA CRUZ, AND  STANISLAUS 
COUNTIES. CALAVERAS COUNTY-EXCEPT EASTERN PART. 
FRESNO COUNTY-EXCEPT EASTERN PART. MADERA 
COUNTY-EXCEPT EASTERN PART. MARIPOSA COUNTY-EXCEPT 
EASTERN PART. MONTERREY COUNTY-EXCEPT SOUTHWESTERN 
PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART...........$ 55.65                  39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC 
SUCTION DREDGING- (3) BOOSTER PUMP OPERATOR; DECK 
ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR. 
 AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED,  SAN 
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, AND  STANISLAUS COUNTIES. 
CALAVERAS COUNTY-EXCEPT EASTERN PART. FRESNO 
COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT 
EASTERN PART. MARIPOSA COUNTY-EXCEPT EASTERN PART. 
MONTERREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE 
COUNTY-EXCEPT EASTERN PART..........................$ 54.53                  39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC 
SUCTION DREDGING- (3) BOOSTER PUMP OPERATOR; DECK 
ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR. 
 AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO 
COUNTY-EASTERN PART; MADERA COUNTY-EASTERN PART; 
MARIPOSA COUNTY-EASTERN PART; MONTERREY 
COUNTY-SOUTHWESTERN PART; TUOLUMNE COUNTY-EASTERN 
PART................................................$ 56.53                  39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC 
SUCTION DREDGING- (4) BARGEMAN; DECKHAND; FIREMAN; 
LEVEEHAND; OILER.  AREA 1: ALAMEDA, CONTRA COSTA, 
KINGS, MERCED,  SAN BENITO, SAN FRANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND  
STANISLAUS COUNTIES. CALAVERAS COUNTY-EXCEPT 
EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. 
MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSA 
COUNTY-EXCEPT EASTERN PART. MONTERREY COUNTY-EXCEPT 
SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN 
PART................................................$ 51.23                  39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC 
SUCTION DREDGING- (4) BARGEMAN; DECKHAND; FIREMAN; 
LEVEEHAND; OILER.  AREA 2: CALAVERAS COUNTY-EASTERN 
PART; FRESNO COUNTY-EASTERN PART; MADERA 
COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN PART; 
MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE 
COUNTY-EASTERN PART.................................$ 53.23                  39.55
----------------------------------------------------------------

 ENGI0003-019 06/30/2025
                                                     Rates                  Fringes
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 1- LANDSCAPE FINISH GRADE OPERATOR: ALL 
FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND 
ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA 
1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN 
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. 
CALAVARAS COUNTY-EXCEPT EASTERN PART. FRESNO 
COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT 
EASTERN PART. MARIPOSAL-EXCEPT EASTERN PART. 
MONTEREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE 
COUNTY-EXCEPT EASTERN PART.)........................$ 55.85                  28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 1- LANDSCAPE FINISH GRADE OPERATOR: ALL 
FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND 
ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA 
2: CALAVERAS COUNTY-EASTERN PART. FRESNO 
COUNTY-EASTERN PART. MADERA COUNTY-EASTERN PART. 
MARIPOSA COUNTY-EASTERN PART. MONTEREY 
COUNTY-SOUTHWESTERN PART. TUOLUMNE COUNTY-EASTERN 
PART.)..............................................$ 57.85                  28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 2- LANDSCAPE OPERATOR UP TO 65 HP: ALL 
EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR 
LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP 
3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT 
WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S 
RATING IS 65 HP OR LESS: A-FRAME AND WINCH TRUCK, 
BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE, 
ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING 
EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER 
31 HP UP TO 65 HP. (AREA 1: ALAMEDA, CONTRA COSTA, 
KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND 
STANISLAUS COUNTIES. CALAVARAS COUNTY-EXCEPT 
EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART. 
MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSAL-EXCEPT 
EASTERN PART. MONTEREY COUNTY-EXCEPT SOUTHWESTERN 
PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART.).........$ 52.25                  28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 2- LANDSCAPE OPERATOR UP TO 65 HP: ALL 
EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR 
LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP 
3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT 
WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S 
RATING IS 65 HP OR LESS: A-FRAME AND WINCH TRUCK, 
BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE, 
ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING 
EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER 
31 HP UP TO 65 HP. (AREA 2: CALAVERAS 
COUNTY-EASTERN PART. FRESNO COUNTY-EASTERN PART. 
MADERA COUNTY-EASTERN PART. MARIPOSA COUNTY-EASTERN 
PART. MONTEREY COUNTY-SOUTHWESTERN PART. TUOLUMNE 
COUNTY-EASTERN PART.)...............................$ 54.25                  28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 3- LANDSCAPE UTILITY OPERATOR: SMALL 
RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA 
1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN 
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, 
SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES. 
CALAVARAS COUNTY-EXCEPT EASTERN PART. FRESNO 
COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT 
EASTERN PART. MARIPOSAL-EXCEPT EASTERN PART. 
MONTEREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE 
COUNTY-EXCEPT EASTERN PART.)........................$ 47.64                  28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 3- LANDSCAPE UTILITY OPERATOR: SMALL 
RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA 
2: CALAVERAS COUNTY-EASTERN PART. FRESNO 
COUNTY-EASTERN PART. MADERA COUNTY-EASTERN PART. 
MARIPOSA COUNTY-EASTERN PART. MONTEREY 
COUNTY-SOUTHWESTERN PART. TUOLUMNE COUNTY-EASTERN 
PART.)..............................................$ 49.64                  28.56
----------------------------------------------------------------

 IRON0377-001 01/01/2025
                                                     Rates                  Fringes
IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA, 
SAN MATEO, SANTA CLARA COUNTIES). PREMIUM PAY: 
$6.00 ADDITIONAL PER HOUR AT THE FOLLOWING 
LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE 
MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS AFB, FORT 
IRWIN MILITARY STATION, FORT IRWIN TRAINING 
CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS 
ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE 
CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR 
FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL 
PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE 
LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL 
POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS 
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. 
COAST GUARD STATION-TWO ROCK........................$ 45.78                  26.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL 
(ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA 
COUNTIES) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT 
THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST 
STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, 
EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT 
IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE 
ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL 
PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE 
BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, 
VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE 
INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST 
GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS 
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. 
COAST GUARD STATION-TWO ROCK........................$ 55.33                  35.15
----------------------------------------------------------------

 IRON0377-003 01/01/2025
                                                     Rates                  Fringes
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND 
COUNTY) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT 
THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST 
STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, 
EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT 
IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE 
ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL 
PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE 
BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, 
VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE 
INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST 
GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS 
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. 
COAST GUARD STATION-TWO ROCK........................$ 45.78                  26.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL 
(SAN FRANCISCO CITY AND COUNTY) PREMIUM PAY: $6.00 
ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: 
CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS 
NAVAL RESERVE-NILAND, EDWARDS AFB, FORT IRWIN 
MILITARY STATION, FORT IRWIN TRAINING 
CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS 
ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE 
CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR 
FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL 
PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE 
LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL 
POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS 
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. 
COAST GUARD STATION-TWO ROCK........................$ 55.83                  35.15
----------------------------------------------------------------

 IRON0433-005 01/01/2025
                                                     Rates                  Fringes
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) 
PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION, 
CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS 
AFB, FORT IRWIN MILITARY STATION, FORT IRWIN 
TRAINING CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN 
NICHOLAS ISLAND, SUSANVILLE FEDERAL PRISON, 29 
PALMS-MARINE CORPS, U.S. MARINE BASE-BARSTOW, U.S. 
NAVAL AIR FACILITY-SEALY, VENDENBERG AFB. $4.00 
ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS: 
ARMY DEENSE LANGUAGE INSTITUTE-MONTEREY, FALLON AIR 
BASE, NAVAL POST GRADUATE SCHOOL-MONTEREY, YERMO 
MARINE CORPS LOGISTICS CENTER. $2.00 ADDITIONAL PER 
HOUR AT THE FOLLOWING LOCATIONS: PORT HUENEME, PORT 
MUGU, U.S. COAST GUARD STATION-TWO ROCK.............$ 45.78                  26.51
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL 
(REMAINING COUNTIES) PREMIUM PAY: $6.00 ADDITIONAL 
PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE 
NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL 
RESERVE-NILAND, EDWARDS AFB, FORT IRWIN MILITARY 
STATION, FORT IRWIN TRAINING CENTER-GOLDSTONE, SAN 
CLEMENTE ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE 
FEDERAL PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE 
BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY, 
VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE 
INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST 
GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS 
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE 
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S. 
COAST GUARD STATION-TWO ROCK........................$ 50.70                  35.15
----------------------------------------------------------------

 LABO0067-006 06/30/2025
                                                     Rates                  Fringes
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS 
REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL 
SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF 
ASBESTOS-CONTAINING MATERIALS FROM WALLS AND 
CEILINGS; OR FROM PIPES, BOILERS, AND MECHANICAL 
SYSTEMS ONLY IF THEY ARE BEING SCRAPPED; 
ENCAPSULATION, ENCLOSURE AND DISPOSAL OF 
ASBESTOS-CONTAINING MATERIALS BY HAND OR WITH 
EQUIPMENT OR MACHINERY; SCAFFOLDING; FABRICATION OF 
TEMPORARY WOODEN BARRIERS; AND ASSEMBLY OF 
DECONTAMINATION STATIONS.  (AREA 1: ALAMEDA, CONTRA 
COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA 
COUNTIES)...........................................$ 39.15                  30.03
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS 
REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL 
SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF 
ASBESTOS-CONTAINING MATERIALS FROM WALLS AND 
CEILINGS; OR FROM PIPES, BOILERS, AND MECHANICAL 
SYSTEMS ONLY IF THEY ARE BEING SCRAPPED; 
ENCAPSULATION, ENCLOSURE AND DISPOSAL OF 
ASBESTOS-CONTAINING MATERIALS BY HAND OR WITH 
EQUIPMENT OR MACHINERY; SCAFFOLDING; FABRICATION OF 
TEMPORARY WOODEN BARRIERS; AND ASSEMBLY OF 
DECONTAMINATION STATIONS.  (AREA 2: CALAVERAS, 
FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, 
SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 38.15                  30.03
----------------------------------------------------------------

 LABO0073-002 07/01/2023
                                                     Rates                  Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT 
DRIVER, FLAG PERSON   (CALAVERAS AND SAN JOAQUIN 
COUNTIES)...........................................$ 36.26                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH 
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.  
(CALAVERAS AND SAN JOAQUIN COUNTIES)................$ 36.56                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON II- INSTALLATION AND REMOVAL OF 
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND 
CRASH CUSHIONS.  (CALAVERAS AND SAN JOAQUIN 
COUNTIES)...........................................$ 34.06                  27.30
----------------------------------------------------------------

 LABO0073-003 07/01/2023
                                                     Rates                  Fringes
LABORER: MASON TENDER-BRICK (SAN JOAQUIN COUNTY)....$ 36.29                  25.55
----------------------------------------------------------------

 LABO0073-005 06/26/2023
                                                     Rates                  Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND 
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN..$ 45.89                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT 
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND 
LEVEL)..............................................$ 45.66                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; 
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY 
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER 
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND 
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; 
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, 
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE 
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER 
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT 
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND 
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR 
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL 
LABORER WORK); CABLE TENDER; CHUCK TENDER; 
POWDERMAN - PRIMER HOUSE............................$ 45.41                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR 
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, 
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND 
SPREADING, DUMPMEN (ANY METHOD).....................$ 44.96                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; 
REBOUNDMAN; SWAMPER/ BRAKEMAN.......................$ 44.42                  27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.....$ 46.41                  27.72
----------------------------------------------------------------

 LABO0073-007 06/30/2025
                                                     Rates                  Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.(CALAVERAS AND SAN JOAQUIN COUNTIES).........$ 30.37                  29.89
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST GROUP- ASPHALT IRONER AND RAKER; 
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' 
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.  
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (CALAVERAS AND SAN JOAQUIN COUNTIES).......$ 38.85                  29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN 
COUNTIES) ..........................................$ 38.15                  29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  GROUP 1-D: MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS.  ALL EMPLOYEES 
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK 
PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN 
COUNTIES) ..........................................$ 38.37                  29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING.  FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (CALAVERAS AND SAN JOAQUIN COUNTIES).......$ 38.20                  29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  FOOTNOTES: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  GROUP 1-B: SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (CALAVERAS AND SAN JOAQUIN 
COUNTIES)...........................................$ 38.70                  29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES.   FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (CALAVERAS AND SAN JOAQUIN COUNTIES).......$ 38.00                  29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY).  FOOTNOTES: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (CALAVERAS AND SAN JOAQUIN COUNTIES).......$ 37.90                  29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- 
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS:  A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB.  C: FOR THE CLEANING OF SALVAGE MATERIAL AT 
THE JOBSITE OR TEMPORARY JOBSITE YARD.  THE 
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE  USED 
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING  
AND OILING AND MOVING TO THE NEXT POINT OF 
ERECTION"".   FOOTNOTES: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  GROUP 1-B: SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (CALAVERAS AND SAN JOAQUIN 
COUNTIES)...........................................$ 31.59                  29.89
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (CALAVERAS AND SAN JOAQUIN COUNTIES).........$ 39.11                  29.89
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN.  FOOTNOTES:  LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  (CALAVERAS AND SAN 
JOAQUIN COUNTIES)...................................$ 38.61                  29.89
LABORER, GUNITE: GROUP 3- REBOUNDMAN.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  (CALAVERAS 
AND SAN JOAQUIN COUNTIES)...........................$ 38.02                  29.89
LABORER, GUNITE: GROUP 4- GUINTE LABORER.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (CALAVERAS AND SAN JOAQUIN COUNTIES).........$ 37.90                  29.89
LABORER, WRECKING: GROUP 1- SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND 
MATERIALS).  FOOTNOTES:  LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN 
COUNTIES)...........................................$ 38.15                  29.89
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS).  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)..........$ 38.00                  29.89
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (1) New Construction.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND 
SAN JOAQUIN COUNTIES)...............................$ 37.90                  29.89
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (2) Establishment Warranty Period.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)..........$ 31.59                  29.89
----------------------------------------------------------------

 LABO0073-009 07/01/2023
                                                     Rates                  Fringes
LABORER, PLASTER TENDER.  WORK ON A SWING STAGE 
SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS AND 
SAN JOAQUIN COUNTIES)...............................$ 39.77                  28.54
----------------------------------------------------------------

 LABO0261-003 07/01/2023
                                                     Rates                  Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT 
DRIVER, FLAG PERSON   (SAN FRANCISCO AND SAN MATEO 
COUNTIES)...........................................$ 37.26                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH 
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.  
(SAN FRANCISCO AND SAN MATEO COUNTIES)..............$ 37.56                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON II- INSTALLATION AND REMOVAL OF 
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND 
CRASH CUSHIONS.  (SAN FRANCISCO AND SAN MATEO 
COUNTIES)...........................................$ 35.06                  27.30
----------------------------------------------------------------

 LABO0261-005 06/26/2023
                                                     Rates                  Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND 
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN 
(SAN FRANCISCO AND SAN MATEO COUNTIES)..............$ 45.89                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT 
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND 
LEVEL) (SAN FRANCISCO AND SAN MATEO COUNTIES).......$ 45.66                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; 
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY 
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER 
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND 
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; 
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, 
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE 
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER 
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT 
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND 
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR 
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL 
LABORER WORK); CABLE TENDER; CHUCK TENDER; 
POWDERMAN - PRIMER HOUSE  (SAN FRANCISCO AND SAN 
MATEO COUNTIES).....................................$ 45.41                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR 
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, 
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND 
SPREADING, DUMPMEN (ANY METHOD) (SAN FRANCISCO AND 
SAN MATEO COUNTIES).................................$ 44.96                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; 
REBOUNDMAN; SWAMPER/ BRAKEMAN (SAN FRANCISCO AND 
SAN MATEO COUNTIES).................................$ 44.42                  27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST   
(SAN FRANCISCO AND SAN MATEO COUNTIES)..............$ 46.41                  27.72
----------------------------------------------------------------

 LABO0261-009 06/26/2023
                                                     Rates                  Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (SAN FRANCISCO AND SAN MATEO COUNTIES).....$ 31.37                  23.20
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST GROUP- ASPHALT IRONER AND RAKER; 
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' 
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.  
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (SAN FRANCISCO AND SAN MATEO COUNTIES)....$ 37.20                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (SAN FRANCISCO AND SAN 
MATEO COUNTIES).....................................$ 36.50                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  GROUP 1-D: MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS.  ALL EMPLOYEES 
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK 
PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (SAN FRANCISCO AND SAN 
MATEO COUNTIES).....................................$ 36.72                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING.  FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (SAN FRANCISCO AND SAN MATEO COUNTIES)....$ 36.55                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  FOOTNOTES: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  GROUP 1-B: SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (SAN FRANCISCO AND SAN 
MATEO COUNTIES).....................................$ 37.05                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES.   FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (SAN FRANCISCO AND SAN MATEO COUNTIES)....$ 36.35                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY).  FOOTNOTES: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (SAN FRANCISCO AND SAN MATEO COUNTIES)....$ 36.25                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- 
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS:  A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB.  C: FOR THE CLEANING OF SALVAGE MATERIAL AT 
THE JOBSITE OR TEMPORARY JOBSITE YARD.  THE 
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE  USED 
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING  
AND OILING AND MOVING TO THE NEXT POINT OF 
ERECTION"".   FOOTNOTES: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  GROUP 1-B: SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (SAN FRANCISCO AND SAN 
MATEO COUNTIES).....................................$ 29.94                  27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (SAN FRANCISCO AND SAN MATEO COUNTIES)......$ 37.46                  27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN.  FOOTNOTES:  LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  (SAN FRANCISCO AND SAN 
MATEO COUNTIES).....................................$ 36.96                  27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.   (SAN 
FRANCISCO AND SAN MATEO COUNTIES)...................$ 36.37                  27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (SAN FRANCISCO AND SAN MATEO COUNTIES)......$ 36.25                  27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND 
MATERIALS).  FOOTNOTES:  LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  (SAN FRANCISCO AND SAN MATEO 
COUNTIES)...........................................$ 36.50                  27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS).  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (SAN FRANCISCO AND SAN MATEO COUNTIES).......$ 36.35                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (1) New Construction.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  (SAN 
FRANCISCO AND SAN MATEO COUNTIES)...................$ 36.25                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (2) Establishment Warranty Period.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (SAN FRANCISCO AND SAN MATEO COUNTIES).......$ 29.94                  27.30
----------------------------------------------------------------

 LABO0261-011 07/01/2023
                                                     Rates                  Fringes
MASON TENDER, BRICK.  FOOTNOTES: UNDERGROUND WORK 
SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER 
PIPES, TELEPHONE CONDUITS, TUNNELS AND CUT 
TRENCHES: $5.00 PER DAY ADDITIONAL. WORK IN LIVE 
SEWAGE: $2.50 PER DAY ADDITIONAL.  (SAN FRANCISCO 
AND SAN MATEO COUNTIES).............................$ 37.05                  27.45
----------------------------------------------------------------

 LABO0261-014 07/01/2023
                                                     Rates                  Fringes
PLASTER TENDER.  WORK ON A SWING STAGE SCAFFOLD: 
$1.00 PER HOUR ADDITIONAL.  (SAN FRANCISCO AND SAN 
MATEO COUNTIES) ....................................$ 41.93                  30.32
----------------------------------------------------------------

 LABO0270-003 07/01/2023
                                                     Rates                  Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT 
DRIVER, FLAG PERSON (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES)................................$ 36.26                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT 
DRIVER, FLAG PERSON (SANTA CALARA COUNTY)...........$ 37.26                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH 
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. 
(MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES).....$ 36.56                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH 
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. 
(SANTA CALARA COUNTY)...............................$ 37.56                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON II- INSTALLATION AND REMOVAL OF 
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS, 
AND CRASH CUSHIONS. (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES)................................$ 34.06                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON II- INSTALLATION AND REMOVAL OF 
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS, 
AND CRASH CUSHIONS. (SANTA CALARA COUNTY)...........$ 35.06                  27.30
----------------------------------------------------------------

 LABO0270-004 06/26/2023
                                                     Rates                  Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND 
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN. 
(MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ 
COUNTIES)...........................................$ 45.89                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT 
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND 
LEVEL). (MONTEREY, SAN BENITO, SANTA CLARA, AND 
SANTA CRUZ COUNTIES)................................$ 45.66                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; 
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY 
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER 
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND 
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; 
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, 
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE 
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER 
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT 
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND 
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR 
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL 
LABORER WORK); CABLE TENDER; CHUCK TENDER; 
POWDERMAN - PRIMER HOUSE. (MONTEREY, SAN BENITO, 
SANTA CLARA, AND SANTA CRUZ COUNTIES)...............$ 45.41                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR 
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, 
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND 
SPREADING, DUMPMEN (ANY METHOD). (MONTEREY, SAN 
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES).......$ 44.96                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; 
REBOUNDMAN; SWAMPER/ BRAKEMAN. (MONTEREY, SAN 
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES).......$ 44.42                  27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.  
(MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ 
COUNTIES)...........................................$ 46.41                  27.72
----------------------------------------------------------------

 LABO0270-005 07/01/2023
                                                     Rates                  Fringes
LABORER: MASON TENDER-BRICK. (MONTEREY AND SAN 
BENITO COUNTIES)....................................$ 36.29                  25.55
----------------------------------------------------------------

 LABO0270-007 06/26/2023
                                                     Rates                  Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 36.08                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST GROUP- ASPHALT IRONER AND RAKER; 
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' 
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.  
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 36.20                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES)................................$ 35.50                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  GROUP 1-D: MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS.  ALL EMPLOYEES 
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK 
PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES)................................$ 35.72                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING.  FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 35.55                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  FOOTNOTES: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  GROUP 1-B: SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES)................................$ 36.05                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES.   FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 35.35                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY).  FOOTNOTES: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 35.25                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- 
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS:  A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB.  C: FOR THE CLEANING OF SALVAGE MATERIAL AT 
THE JOBSITE OR TEMPORARY JOBSITE YARD.  THE 
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE  USED 
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING  
AND OILING AND MOVING TO THE NEXT POINT OF 
ERECTION"".   FOOTNOTES: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  GROUP 1-B: SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES)................................$ 28.94                  27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 36.46                  27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN.  FOOTNOTES:  LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  (MONTEREY, SAN BENITO, 
AND SANTA CRUZ COUNTIES)............................$ 35.96                  27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.   (MONTEREY, 
SAN BENITO, AND SANTA CRUZ COUNTIES)................$ 35.37                  27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 35.25                  27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND 
MATERIALS).  FOOTNOTES:  LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES)................................$ 35.50                  27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS).  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 35.35                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (1) New Construction.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  (MONTEREY, 
SAN BENITO, AND SANTA CRUZ COUNTIES)................$ 35.25                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (2) Establishment Warranty Period.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES)...........................................$ 28.94                  27.30
----------------------------------------------------------------

 LABO0270-010 06/26/2023
                                                     Rates                  Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (SANTA CLARA COUNTY).......................$ 37.08                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST GROUP- ASPHALT IRONER AND RAKER; 
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' 
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.  
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (SANTA CLARA COUNTY)......................$ 37.20                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (SANTA CLARA COUNTY)........$ 36.50                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  GROUP 1-D: MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS.  ALL EMPLOYEES 
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK 
PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (SANTA CLARA COUNTY)........$ 36.72                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING.  FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (SANTA CLARA COUNTY)......................$ 36.55                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  FOOTNOTES: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  GROUP 1-B: SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (SANTA CLARA COUNTY).......$ 37.05                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES.   FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (SANTA CLARA COUNTY)......................$ 36.35                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY).  FOOTNOTES: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (SANTA CLARA COUNTY).......................$ 36.25                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- 
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS:  A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB.  C: FOR THE CLEANING OF SALVAGE MATERIAL AT 
THE JOBSITE OR TEMPORARY JOBSITE YARD.  THE 
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE  USED 
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING  
AND OILING AND MOVING TO THE NEXT POINT OF 
ERECTION"".   FOOTNOTES: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  GROUP 1-B: SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (SANTA CLARA COUNTY)........$ 29.94                  27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (SANTA CLARA COUNTY)........................$ 37.46                  27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN.  FOOTNOTES:  LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  (SANTA CLARA COUNTY).....$ 36.96                  27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.   (SANTA CLARA 
COUNTY).............................................$ 36.37                  27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (SANTA CLARA COUNTY)........................$ 36.25                  27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND 
MATERIALS).  FOOTNOTES:  LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  (SANTA CLARA COUNTY).........$ 36.50                  27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS).  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE. (SANTA CLARA COUNTY)..........................$ 36.35                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (1) New Construction.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  (SANTA CLARA 
COUNTY).............................................$ 36.25                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (2) Establishment Warranty Period.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (SANTA CLARA COUNTY).........................$ 29.94                  27.30
----------------------------------------------------------------

 LABO0270-011 07/01/2023
                                                     Rates                  Fringes
LABORER, PLASTER TENDER.  WORK ON A SWING STAGE 
SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MONTEREY, SAN 
BENITO, SANTA CRUZ, SANTA CLARA COUNTIES) ..........$ 40.68                  29.68
----------------------------------------------------------------

 LABO0294-001 07/01/2023
                                                     Rates                  Fringes
LABORER, BRICK: MASON TENDER-BRICK.   (FRESNO, 
KINGS AND MADERA COUNTIES)..........................$ 36.29                  25.55
----------------------------------------------------------------

 LABO0294-002 07/01/2023
                                                     Rates                  Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT 
DRIVER, FLAG PERSON   (FRESNO, KINGS, AND MADERA 
COUNTIES)...........................................$ 36.26                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH 
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.  
(FRESNO, KINGS, AND MADERA COUNTIES)................$ 36.56                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON II- INSTALLATION AND REMOVAL OF 
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND 
CRASH CUSHIONS.  (FRESNO, KINGS, AND MADERA 
COUNTIES)...........................................$ 34.06                  27.30
----------------------------------------------------------------

 LABO0294-005 06/26/2023
                                                     Rates                  Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND 
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN. 
(FRESNO, KINGS, AND MADERA COUNTIES)................$ 45.89                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT 
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND 
LEVEL). (FRESNO, KINGS, AND MADERA COUNTIES)........$ 45.66                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; 
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY 
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER 
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND 
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; 
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, 
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE 
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER 
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT 
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND 
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR 
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL 
LABORER WORK); CABLE TENDER; CHUCK TENDER; 
POWDERMAN - PRIMER HOUSE. (FRESNO, KINGS, AND 
MADERA COUNTIES)....................................$ 45.41                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR 
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, 
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND 
SPREADING, DUMPMEN (ANY METHOD). (FRESNO, KINGS, 
AND MADERA COUNTIES)................................$ 44.96                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; 
REBOUNDMAN; SWAMPER/ BRAKEMAN. (FRESNO, KINGS, AND 
MADERA COUNTIES)....................................$ 44.42                  27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.  
(FRESNO, KINGS, AND MADERA COUNTIES)................$ 46.41                  27.72
----------------------------------------------------------------

 LABO0294-008 06/26/2023
                                                     Rates                  Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (FRESNO, KINGS, AND MADERA COUNTIES).......$ 36.08                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST GROUP- ASPHALT IRONER AND RAKER; 
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' 
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.  
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (FRESNO, KINGS, AND MADERA COUNTIES)......$ 36.20                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (FRESNO, KINGS, AND MADERA 
COUNTIES)...........................................$ 35.50                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  GROUP 1-D: MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS.  ALL EMPLOYEES 
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK 
PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (FRESNO, KINGS, AND MADERA 
COUNTIES)...........................................$ 35.72                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING.  FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (FRESNO, KINGS, AND MADERA COUNTIES)......$ 35.55                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  FOOTNOTES: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  GROUP 1-B: SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (FRESNO, KINGS, AND MADERA 
COUNTIES)...........................................$ 36.05                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES.   FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (FRESNO, KINGS, AND MADERA COUNTIES)......$ 35.35                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY).  FOOTNOTES: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (FRESNO, KINGS, AND MADERA COUNTIES).......$ 35.25                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- 
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS:  A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB.  C: FOR THE CLEANING OF SALVAGE MATERIAL AT 
THE JOBSITE OR TEMPORARY JOBSITE YARD.  THE 
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE  USED 
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING  
AND OILING AND MOVING TO THE NEXT POINT OF 
ERECTION"".   FOOTNOTES: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  GROUP 1-B: SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (FRESNO, KINGS, AND MADERA 
COUNTIES)...........................................$ 28.94                  27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (FRESNO, KINGS, AND MADERA COUNTIES)........$ 36.46                  27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN.  FOOTNOTES:  LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  (FRESNO, KINGS, AND 
MADERA COUNTIES)....................................$ 35.96                  27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.   (FRESNO, 
KINGS, AND MADERA COUNTIES).........................$ 35.37                  27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (FRESNO, KINGS, AND MADERA COUNTIES)........$ 35.25                  27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND 
MATERIALS).  FOOTNOTES:  LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  (FRESNO, KINGS, AND MADERA 
COUNTIES)...........................................$ 35.50                  27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS).  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE. (FRESNO, KINGS, AND MADERA COUNTIES)..........$ 35.35                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (1) New Construction.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  (FRESNO, 
KINGS, AND MADERA COUNTIES).........................$ 35.25                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (2) Establishment Warranty Period.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (FRESNO, KINGS, AND MADERA COUNTIES).........$ 28.94                  27.30
----------------------------------------------------------------

 LABO0294-010 07/01/2023
                                                     Rates                  Fringes
PLASTERER TENDER.  WORK ON A SWING STAGE SCAFFOLD: 
$1.00 PER HOUR ADDITIONAL.   (CALAVERAS, FRESNO, 
KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, 
STANISLAUS & TUOLUMNE COUNTIES).....................$ 39.77                  28.54
----------------------------------------------------------------

 LABO0294-011 07/01/2023
                                                     Rates                  Fringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE 
SCAFFOLD: $1.00 PER HOUR ADDITIONAL.   (FRESNO, 
KINGS, AND MADERA COUNTIES).........................$ 39.77                  28.54
----------------------------------------------------------------

 LABO0304-002 07/01/2023
                                                     Rates                  Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT 
DRIVER, FLAG PERSON (ALAMEDA COUNTY)................$ 37.26                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH 
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.  
(ALAMEDA COUNTY)....................................$ 37.56                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON II- INSTALLATION AND REMOVAL OF 
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND 
CRASH CUSHIONS.  (ALAMEDA COUNTY)...................$ 35.06                  27.30
----------------------------------------------------------------

 LABO0304-003 06/26/2023
                                                     Rates                  Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND 
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN 
(ALAMEDA COUNTY)....................................$ 45.89                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT 
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND 
LEVEL) (ALAMEDA COUNTY).............................$ 45.66                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; 
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY 
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER 
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND 
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; 
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, 
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE 
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER 
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT 
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND 
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR 
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL 
LABORER WORK); CABLE TENDER; CHUCK TENDER; 
POWDERMAN - PRIMER HOUSE (ALAMEDA COUNTY)...........$ 45.41                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR 
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, 
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND 
SPREADING, DUMPMEN (ANY METHOD) (ALAMEDA COUNTY)....$ 44.96                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; 
REBOUNDMAN; SWAMPER/ BRAKEMAN  (ALAMEDA COUNTY).....$ 44.42                  27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST 
(ALAMEDA COUNTY)....................................$ 46.41                  27.72
----------------------------------------------------------------

 LABO0304-004 06/26/2023
                                                     Rates                  Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (ALAMEDA COUNTY)...........................$ 37.08                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST GROUP- ASPHALT IRONER AND RAKER; 
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' 
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.  
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (ALAMEDA COUNTY)..........................$ 37.20                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (ALAMEDA COUNTY)............$ 36.50                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  GROUP 1-D: MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS.  ALL EMPLOYEES 
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK 
PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (ALAMEDA COUNTY)............$ 36.72                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING.  FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (ALAMEDA COUNTY)..........................$ 36.55                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  FOOTNOTES: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  GROUP 1-B: SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (ALAMEDA COUNTY)...........$ 37.05                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES.   FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (ALAMEDA COUNTY)..........................$ 36.35                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY).  FOOTNOTES: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (ALAMEDA COUNTY)...........................$ 36.25                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- 
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS:  A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB.  C: FOR THE CLEANING OF SALVAGE MATERIAL AT 
THE JOBSITE OR TEMPORARY JOBSITE YARD.  THE 
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE  USED 
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING  
AND OILING AND MOVING TO THE NEXT POINT OF 
ERECTION"".   FOOTNOTES: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  GROUP 1-B: SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (ALAMEDA COUNTY)............$ 29.94                  27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (ALAMEDA COUNTY)............................$ 37.46                  27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN.  FOOTNOTES:  LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  (ALAMEDA COUNTY).........$ 36.96                  27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.   (ALAMEDA 
COUNTY).............................................$ 36.37                  27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (ALAMEDA COUNTY)............................$ 36.25                  27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND 
MATERIALS).  FOOTNOTES:  LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  (ALAMEDA COUNTY).............$ 36.50                  27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS).  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE. (ALAMEDA COUNTY)..............................$ 36.35                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (1) New Construction.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  (ALAMEDA 
COUNTY).............................................$ 36.25                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (2) Establishment Warranty Period.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (ALAMEDA COUNTY).............................$ 29.94                  27.30
----------------------------------------------------------------

 LABO0304-005 07/01/2023
                                                     Rates                  Fringes
BRICK TENDER.  FOOTNOTES: WORK ON JOBS WHERE 
HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER 
HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR 
ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL. 
(ALAMEDA COUNTY) ...................................$ 37.05                  27.45
----------------------------------------------------------------

 LABO0304-008 07/01/2023
                                                     Rates                  Fringes
PLASTERER TENDER.  WORK ON A SWING STAGE SCAFFOLD: 
$1.00 PER HOUR ADDITIONAL. (ALAMEDA AND CONTRA 
COSTA COUNTIES)    .................................$ 41.93                  30.32
----------------------------------------------------------------

 LABO0324-002 07/01/2023
                                                     Rates                  Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT 
DRIVER, FLAG PERSON.  (CONTRA COSTA COUNTY).........$ 37.26                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH 
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.  
(CONTRA COSTA COUNTY)...............................$ 37.56                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON II- INSTALLATION AND REMOVAL OF 
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND 
CRASH CUSHIONS.  (CONTRA COSTA COUNTY)..............$ 35.06                  27.30
----------------------------------------------------------------

 LABO0324-006 06/26/2023
                                                     Rates                  Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND 
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN 
(CONTRA COSTA COUNTY)...............................$ 45.89                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT 
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND 
LEVEL) (CONTRA COSTA COUNTY)........................$ 45.66                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; 
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY 
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER 
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND 
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; 
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, 
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE 
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER 
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT 
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND 
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR 
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL 
LABORER WORK); CABLE TENDER; CHUCK TENDER; 
POWDERMAN - PRIMER HOUSE  (CONTRA COSTA COUNTY).....$ 45.41                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR 
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, 
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND 
SPREADING, DUMPMEN (ANY METHOD) (CONTRA COSTA 
COUNTY).............................................$ 44.96                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; 
REBOUNDMAN; SWAMPER/ BRAKEMAN (CONTRA COSTA COUNTY).$ 44.42                  27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST 
(CONTRA COSTA COUNTY)...............................$ 46.41                  27.72
----------------------------------------------------------------

 LABO0324-012 06/26/2023
                                                     Rates                  Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (CONTRA COSTA COUNTY)(CONTRA COSTA 
COUNTY).............................................$ 37.08                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST GROUP- ASPHALT IRONER AND RAKER; 
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' 
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.  
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (CONTRA COSTA COUNTY).....................$ 37.20                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (CONTRA COSTA COUNTY).......$ 36.50                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  GROUP 1-D: MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS.  ALL EMPLOYEES 
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK 
PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (CONTRA COSTA COUNTY).......$ 36.72                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING.  FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (CONTRA COSTA COUNTY).....................$ 36.55                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  FOOTNOTES: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  GROUP 1-B: SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (CONTRA COSTA COUNTY)......$ 37.05                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-G- 
PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION 
WITH PIPELAYING); CAULKER; BANDER; PIPEWRAPPER; 
CONDUIT LAYER; PLASTIC PIPE LAYER; PRESSURE PIPE 
TESTER; NO JOINT PIPE AND STRIPPING OF SAME, 
INCLUDING REPAIR OF VOIDS; PRECAST MANHOLE SETTERS, 
CAST IN PLACE MANHOLE FORM SETTERS.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (CONTRA COSTA COUNTY)  ....$ 36.70                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES.   FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (CONTRA COSTA COUNTY).....................$ 36.35                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY).  FOOTNOTES: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (CONTRA COSTA COUNTY)......................$ 36.25                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- 
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS:  A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB.  C: FOR THE CLEANING OF SALVAGE MATERIAL AT 
THE JOBSITE OR TEMPORARY JOBSITE YARD.  THE 
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE  USED 
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING  
AND OILING AND MOVING TO THE NEXT POINT OF 
ERECTION"".   FOOTNOTES: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  GROUP 1-B: SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (CONTRA COSTA COUNTY).......$ 29.94                  27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (CONTRA COSTA COUNTY).......................$ 37.46                  27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN.  FOOTNOTES:  LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  (CONTRA COSTA COUNTY)....$ 36.96                  27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.   (CONTRA 
COSTA COUNTY).......................................$ 36.37                  27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (CONTRA COSTA COUNTY).......................$ 36.25                  27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND 
MATERIALS).  FOOTNOTES:  LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  (CONTRA COSTA COUNTY)........$ 36.50                  27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS).  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE. (CONTRA COSTA COUNTY).........................$ 36.35                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (1) New Construction.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  (CONTRA COSTA 
COUNTY).............................................$ 36.25                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (2) Establishment Warranty Period.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (CONTRA COSTA COUNTY)........................$ 29.94                  27.30
----------------------------------------------------------------

 LABO0324-014 07/01/2023
                                                     Rates                  Fringes
BRICK TENDER.  FOOTNOTES: WORK ON JOBS WHERE 
HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER 
HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR 
ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL. 
(CONTRA COSTA COUNTY)  .............................$ 37.05                  27.45
----------------------------------------------------------------

 LABO0324-018 07/01/2023
                                                     Rates                  Fringes
PLASTER TENDER.  WORK ON A SWING STAGE SCAFFOLD: 
$1.00 PER HOUR ADDITIONAL.  (ALAMEDA AND CONTRA 
COSTA COUNTIES).....................................$ 41.93                  30.32
----------------------------------------------------------------

 LABO1130-002 07/01/2023
                                                     Rates                  Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT 
DRIVER, FLAG PERSON   (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 36.26                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH 
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.  
(MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 36.56                  27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC 
CONTROL PERSON II- INSTALLATION AND REMOVAL OF 
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND 
CRASH CUSHIONS.    (MARIPOSA, MERCED, STANISLAUS, 
AND TUOLUMNE COUNTIES)..............................$ 34.06                  27.30
----------------------------------------------------------------

 LABO1130-003 06/26/2023
                                                     Rates                  Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND 
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN 
(MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 45.89                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT 
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND 
LEVEL) (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 45.66                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER; 
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY 
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER 
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND 
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; 
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, 
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE 
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER 
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT 
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND 
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR 
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL 
LABORER WORK); CABLE TENDER; CHUCK TENDER; 
POWDERMAN - PRIMER HOUSE (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 45.41                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR 
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, 
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND 
SPREADING, DUMPMEN (ANY METHOD) (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 44.96                  27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; 
REBOUNDMAN; SWAMPER/ BRAKEMAN (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 44.42                  27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST   
(MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 46.41                  27.72
----------------------------------------------------------------

 LABO1130-005 07/01/2023
                                                     Rates                  Fringes
LABORER: MASON TENDER-BRICK (MARIPOSA, MERCED, 
STANISLAUS AND TUOLUMNE COUNTIES)...................$ 36.29                  25.55
----------------------------------------------------------------

 LABO1130-007 06/26/2023
                                                     Rates                  Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F- 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (MARIPOSA, MERCED, STANISLAUS, AND 
TUOLUMNE COUNTIES)..................................$ 36.08                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST GROUP- ASPHALT IRONER AND RAKER; 
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' 
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.  
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (MARIPOSA, MERCED, STANISLAUS, AND 
TUOLUMNE COUNTIES)..................................$ 36.20                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER.  FOOTNOTES: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  GROUP 1-B: 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED. (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 35.50                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  GROUP 1-D: MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS.  ALL EMPLOYEES 
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25 
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK 
PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 35.72                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C- 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING.  FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (MARIPOSA, MERCED, STANISLAUS, AND 
TUOLUMNE COUNTIES)..................................$ 35.55                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  FOOTNOTES: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  GROUP 1-B: SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.   (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 36.05                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES.   FOOTNOTES: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE 
WAGE RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.   (MARIPOSA, MERCED, STANISLAUS, AND 
TUOLUMNE COUNTIES)..................................$ 35.35                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY).  FOOTNOTES: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  GROUP 1-B: SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER 
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  GROUP 1-D: MAINTENANCE AND REPAIR 
TRACK AND ROAD BEDS.  ALL EMPLOYEES PERFORMING WORK 
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE 
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.  (MARIPOSA, MERCED, STANISLAUS, AND 
TUOLUMNE COUNTIES)..................................$ 35.25                  27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- 
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS:  A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB.  C: FOR THE CLEANING OF SALVAGE MATERIAL AT 
THE JOBSITE OR TEMPORARY JOBSITE YARD.  THE 
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE  USED 
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING  
AND OILING AND MOVING TO THE NEXT POINT OF 
ERECTION"".   FOOTNOTES: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  GROUP 1-B: SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  GROUP 1-D: 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS.  ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.  (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 28.94                  27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 36.46                  27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN.  FOOTNOTES:  LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE 
THE APPLICABLE WAGE RATE.  (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 35.96                  27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.   (MARIPOSA, 
MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)..........$ 35.37                  27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.   (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 35.25                  27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND 
MATERIALS).  FOOTNOTES:  LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE 
APPLICABLE WAGE RATE.  (MARIPOSA, MERCED, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 35.50                  27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS).  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 35.35                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (1) New Construction.  FOOTNOTES:  
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER 
HOUR ABOVE THE APPLICABLE WAGE RATE.  (MARIPOSA, 
MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)..........$ 35.25                  27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE 
LABORERS - (2) Establishment Warranty Period.  
FOOTNOTES:  LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL 
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE 
RATE.  (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE 
COUNTIES)...........................................$ 28.94                  27.30
----------------------------------------------------------------

 LABO1130-008 07/01/2023
                                                     Rates                  Fringes
LABORER, PLASTER TENDER.  WORK ON A SWING STAGE 
SCAFFOLD: $1.00 PER HOUR ADDITIONAL.  (CALAVERAS, 
FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN 
JOAQUIN, STANISLAUS, & TUOLUMNE COUNTIES) ..........$ 39.77                  28.54
----------------------------------------------------------------

 LABO1130-009 07/01/2023
                                                     Rates                  Fringes
LABORER, PLASTER TENDER.  WORK ON A SWING STAGE 
SCAFFOLD: $1.00 PER HOUR ADDITIONAL.  (MARIPOSA, 
MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) .........$ 39.77                  28.54
----------------------------------------------------------------

 PAIN0016-001 01/01/2025
                                                     Rates                  Fringes
PAINTERS.  PREMIUMS:  EXOTIC MATERIALS - $1.25 
ADDITIONAL PER HOUR.  SPRAY WORK: - $0.50 
ADDITIONAL PER HOUR.  INDUSTRIAL PAINTING - $0.25 
ADDITIONAL PER HOUR  [WORK ON INDUSTRIAL BUILDINGS 
USED FOR THE MANUFACTURE AND PROCESSING OF GOODS 
FOR SALE OR SERVICE; STEEL CONSTRUCTION (BRIDGES), 
STACKS, TOWERS, TANKS, AND SIMILAR STRUCTURES].  
HIGH WORK:  OVER 50 FEET - $2.00 PER HOUR 
ADDITIONAL  100 TO 180 FEET - $4.00 PER HOUR 
ADDITIONAL  OVER 180 FEET - $6.00 PER HOUIR 
ADDITIONAL  (ALAMEDA, CONTRA COSTA, MONTEREY, SAN 
BENITO, SAN MATEO, SANTA CLARA, AND SANTA CRUZ 
COUNTIES)...........................................$ 53.38                  28.04
----------------------------------------------------------------

 PAIN0016-003 01/01/2025
                                                     Rates                  Fringes
DRYWALL FINISHER/TAPER.  (ALAMDEA, CONTRA COSTA, 
SAN FRANCISCO, SAN MATEO, & SANTA CLARA COUNTIES)...$ 63.76                  32.69
DRYWALL FINISHER/TAPER.  (CALAVERAS, MARIPOSA, 
MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA 
CRUZ, STANISLAUS, & TUOLUMNE COUNTIES)..............$ 59.63                  31.29
----------------------------------------------------------------

 PAIN0016-012 01/01/2024
                                                     Rates                  Fringes
SOFT FLOOR LAYER  (ALAMEDA, CONTRA COSTA, MARIPOSA, 
MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES).........$ 59.00                  33.03
----------------------------------------------------------------

 PAIN0016-015 01/01/2025
                                                     Rates                  Fringes
PAINTER: BRUSH.  FOOTNOTES: SPRAY/SANDBLAST: $0.50 
ADDITIONAL PER HOUR.  EXOTIC MATERIALS: $1.25 
ADDITIONAL PER HOUR.  HIGH TIME:  OVER 50 FT ABOVE 
GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR.  
100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 
ADDITIONAL PER HOUR.  OVER 180 FT ABOVE GROUND OR 
WATER LEVEL $6.00 ADDITIONAL PER HOUR.   
(CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, 
STANISLAUS & TUOLUMNE COUNTIES).....................$ 43.45                  22.80
----------------------------------------------------------------

 PAIN0016-022 01/01/2025
                                                     Rates                  Fringes
PAINTER (SAN FRANCISCO COUNTY)......................$ 57.00                  28.04
----------------------------------------------------------------

 PAIN0169-001 01/01/2023
                                                     Rates                  Fringes
GLAZIER (FRESNO, KINGS, MADERA, MARIPOSA AND MERCED 
COUNTIES)...........................................$ 44.33                  28.88
----------------------------------------------------------------

 PAIN0169-005 01/01/2024
                                                     Rates                  Fringes
GLAZIER   (ALAMEDA CONTRA COSTA, MONTEREY, SAN 
BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA & 
SANTA CRUZ COUNTIES)................................$ 56.22                  34.00
----------------------------------------------------------------

 PAIN0294-004 07/01/2023
                                                     Rates                  Fringes
PAINTER: BRUSH, ROLLER.  FOOTNOTE:   SPRAY PAINTERS 
& PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. 
PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 
ADDITIONAL PER HOUR.  LEAD ABATERS & SANDBLASTERS 
RECEIVE $1.50 ADDITIONAL PER HOUR.  HIGH TIME - 
OVER 30 FEET (DOES NOT INCLUDE WORK FROM A LIFT) 
$0.75 PER HOUR ADDITIONAL.  (FRESNO, KINGS AND 
MADERA COUNTIES) ...................................$ 34.49                  21.80
PAINTER: DRYWALL FINISHER/TAPER.   FOOTNOTE:   
SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 
ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL 
PATCHING RECEIVE $1.25 ADDITIONAL PER HOUR.  LEAD 
ABATERS & SANDBLASTERS RECEIVE $1.50 ADDITIONAL PER 
HOUR.  HIGH TIME - OVER 30 FEET (DOES NOT INCLUDE 
WORK FROM A LIFT) $0.75 PER HOUR ADDITIONAL.  
(FRESNO, KINGS AND MADERA COUNTIES) ................$ 35.74                  21.80
----------------------------------------------------------------

 PAIN0294-005 01/01/2023
                                                     Rates                  Fringes
SOFT FLOOR LAYER (FRESNO, KINGS & MADERA COUNTIES)..$ 38.53                  23.19
----------------------------------------------------------------

 PAIN0767-001 01/01/2024
                                                     Rates                  Fringes
GLAZIER.  PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN 
LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.    EMPLOYEE 
REQUIRED TO WEAR A BODY HARNESS SHALL RECEIVE $1.50 
PER HOUR ABOVE THE BASIC HOURLY RATE AT ANY 
ELEVATION.  (CALAVERAS, SAN JOAQUIN, STANISLAUS AND 
TUOLUMNE COUNTIES) .................................$ 43.25                  35.62
----------------------------------------------------------------

 PAIN1176-001 07/01/2022
                                                     Rates                  Fringes
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY 
IMPROVEMEMT: GROUP 2- GAMECOURT & PLAYGROUND 
INSTALLER...........................................$ 34.71                  17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY 
IMPROVEMENT: GROUP 1- STRIPER: LAYOUT AND 
APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; 
HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND 
MARKINGS............................................$ 40.83                  17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY 
IMPROVEMENT: GROUP 3- PROTECTIVE COATING, PAVEMENT 
SEALING.............................................$ 35.11                  17.62
----------------------------------------------------------------

 PAIN1237-003 01/01/2024
                                                     Rates                  Fringes
SOFT FLOOR LAYER   (CALAVERAS; SAN JOAQUIN 
COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES).........$ 48.54                  26.59
----------------------------------------------------------------

 PLAS0066-002 07/01/2019
                                                     Rates                  Fringes
PLASTERER (ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN 
FRANCISCO COUNTIES).................................$ 42.41                  30.73
----------------------------------------------------------------

 PLAS0300-001 07/01/2018
                                                     Rates                  Fringes
PLASTERER (AREA 188:  FRESNO).......................$ 32.70                  31.68
PLASTERER (AREA 224:  SAN BENITO, SANTA CLARA, 
SANTA CRUZ).........................................$ 32.88                  31.68
PLASTERER (AREA 295:  CALAVERAS & SAN JOAQUIN 
COUNTIES)...........................................$ 32.70                  31.68
PLASTERER (AREA 337:  MONTEREY COUNTY)..............$ 32.88                  31.68
PLASTERER (AREA 429:  MARIPOSA, MERCED, STANISLAUS, 
TUOLUMNE COUNTIES)..................................$ 32.70                  31.68
----------------------------------------------------------------

 PLAS0300-005 07/01/2016
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 32.15                  23.27
----------------------------------------------------------------

 PLUM0038-001 07/01/2023
                                                     Rates                  Fringes
PLUMBER (PLUMBER, STEAMFITTER, REFRIGERATION 
FITTER) (SAN FRANCISCO COUNTY)......................$ 85.50                  48.98
----------------------------------------------------------------

 PLUM0038-005 07/01/2025
                                                     Rates                  Fringes
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY 
FITTER (SAN FRANCISCO COUNTY).......................$ 77.35                  36.53
----------------------------------------------------------------

 PLUM0062-001 01/01/2026
                                                     Rates                  Fringes
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ 
COUNTIES)...........................................$ 57.75                  43.60
----------------------------------------------------------------

 PLUM0159-001 07/01/2025
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER: (1) REFRIGERATION (CONTRA 
COSTA COUNTY).......................................$ 67.68                  49.04
PLUMBER AND STEAMFITTER: (2) ALL OTHER WORK (CONTRA 
COSTA COUNTY).......................................$ 68.57                  49.04
----------------------------------------------------------------

 PLUM0246-001 01/01/2026
                                                     Rates                  Fringes
PLUMBER & STEAMFITTER (FRESNO, KINGS & MADERA 
COUNTIES)...........................................$ 54.50                  42.54
----------------------------------------------------------------

 PLUM0246-004 01/01/2017
                                                     Rates                  Fringes
PLUMBER: PIPE TRADESMAN.  (PIPE TRADESMAN SCOPE OF 
WORK:  INSTALLATION OF CORRUGATED METAL PIPING FOR 
DRAINAGE, AS WELL AS INSTALLATION OF CORRUGATED 
METAL PIPING FOR CULVERTS IN CONNECTION WITH STORM 
SEWERS AND DRAINS; GROUTING, DRY PACKING AND 
DIAPERING OF JOINTS, HOLES OR CHASES INCLUDING 
PAVING OVER JOINTS, IN PIPING; TEMPORARY PIPING FOR 
DIRT WORK FOR BUILDING SITE PREPARATION; OPERATING 
JACK HAMMERS, PAVEMENT BREAKERS, CHIPPING GUNS, 
CONCRETE SAWS AND SPADES TO CUT HOLES, CHASES AND 
CHANNELS FOR PIPING SYSTEMS; DIGGING, GRADING, 
BACKFILLING AND GROUND PREPARATION FOR ALL TYPES OF 
PIPE TO ALL POINTS OF THE JOBSITE; GROUND 
PREPARATION INCLUDING GROUND LEVELING, LAYOUT AND 
PLANTING OF SHRUBBERY, TREES AND GROUND COVER, 
INCLUDING WATERING, MOWING, EDGING, PRUNING AND 
FERTILIZING, THE BREAKING OF CONCRETE, DIGGING, 
BACKFILLING AND TAMPING FOR THE PREPARATION AND 
COMPLETION OF ALL WORK IN CONNECTION WITH LAWN 
SPRINKLER AND LANDSCAPING; LOADING, UNLOADING AND 
DISTRIBUTING MATERIALS AT JOBSITE; PUTTING AWAY 
MATERIALS IN STORAGE BINS IN JOBSITE SECURE STORAGE 
AREA; DEMOLITION OF PIPING AND FIXTURES FOR 
REMODELING AND ADDITIONS; SETTING UP AND TEARING 
DOWN WORK BENCHES, LADDERS AND JOB SHACKS; CLEAN-UP 
AND SWEEPING OF JOBSITE; PIPE WRAPPING AND 
WATERPROOFING WHERE TAR OR SIMILAR MATERIAL IS 
APPLIED FOR PROTECTION OF BURIED PIPING; FLAGMAN) 
(FRESNO, MERCED, & SAN JOAQUIN COUNTIES)............$ 13.00                  10.74
----------------------------------------------------------------

 PLUM0342-001 07/01/2025
                                                     Rates                  Fringes
PIPEFITTER (CONTRA COSTA COUNTY)....................$ 80.50                  50.45
PLUMBER, PIPEFITTER, STEAMFITTER (ALAMEDA COUNTY)...$ 80.50                  50.45
----------------------------------------------------------------

 PLUM0355-004 07/01/2025
                                                     Rates                  Fringes
UNDERGROUND UTILITY WORKER /LANDSCAPE FITTER  
(ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, 
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN 
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, 
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 36.01                  18.50
----------------------------------------------------------------

 PLUM0393-001 07/01/2021
                                                     Rates                  Fringes
PLUMBER/PIPEFITTER (SAN BENITO AND SANTA CLARA 
COUNTIES)...........................................$ 68.76                  46.63
----------------------------------------------------------------

 PLUM0442-001 01/01/2026
                                                     Rates                  Fringes
PLUMBER & STEAMFITTER   (CALAVERAS, MARIPOSA, 
MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE 
COUNTIES)...........................................$ 58.45                  38.74
----------------------------------------------------------------

 PLUM0467-001 07/01/2025
                                                     Rates                  Fringes
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)...$ 87.75                  41.44
----------------------------------------------------------------

 ROOF0027-002 09/01/2024
                                                     Rates                  Fringes
ROOFER.  FOOTNOTE: WORK WITH PITCH, PITCH BASE OF 
PITCH IMPREGNANTED PRODUCTS OR ANY MATERIAL 
CONTAINING COAL TAR PITCH, ON ANY BUILDING OLD OR 
NEW, WHERE BOTH ASPHALT AND PITCHERS ARE USED IN 
THE APPLICATION OF A BUILT-UP ROOF OR TEAR OFF: 
$2.00 PER HOUR ADDITIONAL. (FRESNO, KINGS, AND 
MADERA COUNTIES)....................................$ 45.76                  16.86
----------------------------------------------------------------

 ROOF0040-002 08/01/2024
                                                     Rates                  Fringes
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES).........$ 55.30                  22.97
----------------------------------------------------------------

 ROOF0081-001 08/01/2024
                                                     Rates                  Fringes
ROOFER (ALAMEDA AND CONTRA COSTA COUNTIES)..........$ 54.94                  23.34
----------------------------------------------------------------

 ROOF0081-004 08/01/2024
                                                     Rates                  Fringes
ROOFER   (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, 
STANISLAUS AND TUOLUMNE COUNTIES)...................$ 49.65                  22.19
----------------------------------------------------------------

 ROOF0095-002 08/01/2023
                                                     Rates                  Fringes
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND 
MASTIC WORKER   (MONTEREY, SAN BENITO, SANTA CLARA, 
AND SANTA CRUZ COUNTIES)............................$ 57.17                  21.51
ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA 
CLARA, AND SANTA CRUZ COUNTIES).....................$ 53.17                  21.51
ROOFER: KETTLE PERSON (2 KETTLES)   (MONTEREY, SAN 
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:)......$ 55.17                  21.51
----------------------------------------------------------------

 SFCA0483-001 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER: FIRE   (ALAMEDA, CONTRA COSTA, 
SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES)..$ 81.54                  41.35
----------------------------------------------------------------

 SFCA0669-011 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER  (CALAVERAS, FRESNO, KINGS, 
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN 
JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE 
COUNTIES)...........................................$ 49.69                  29.72
----------------------------------------------------------------

 SHEE0104-001 06/29/2026
                                                     Rates                  Fringes
SHEET METAL WORKER (MONTEREY &  SAN BENITO 
COUNTIES)...........................................$ 65.02                  37.47
SHEET METAL WORKER (SANTA CRUZ COUNTY)..............$ 66.18                  36.93
SHEET METAL WORKER: ALL OTHER WORK (ALAMEDA, CONTRA 
COSTA, SAN FRANSICO, SAN MATEO, SANTA CLARA 
COUNTIES))..........................................$ 86.31                  46.75
SHEET METAL WORKER: MECHANICAL CONTRACTS UNDER 
$200,000 (ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA COUNTIES)).......................$ 73.19                  46.00
----------------------------------------------------------------

 SHEE0104-003 06/29/2026
                                                     Rates                  Fringes
SHEET METAL WORKER (CALAVERAS AND SAN JOAQUIN 
COUNTIES)...........................................$ 56.96                  38.63
----------------------------------------------------------------

 SHEE0104-005 06/29/2026
                                                     Rates                  Fringes
SHEET METAL WORKER: EXCLUDING METAL DECK AND SIDING 
  (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE 
COUNTIES)...........................................$ 57.06                  42.15
----------------------------------------------------------------

 SHEE0104-007 06/29/2026
                                                     Rates                  Fringes
SHEET METAL WORKER (FRESNO, KINGS, AND MADERA 
COUNTIES)...........................................$ 54.49                  42.39
----------------------------------------------------------------

 SHEE0104-015 07/01/2024
                                                     Rates                  Fringes
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY.  
(ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN 
FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ 
COUNTIES)...........................................$ 56.23                  37.52
----------------------------------------------------------------

 SHEE0104-018 07/01/2024
                                                     Rates                  Fringes
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY.  
(CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, 
MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE 
COUNTIES)...........................................$ 56.23                  37.52
----------------------------------------------------------------

 TEAM0094-001 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; 
SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK 
(WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK 
SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK 
TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); 
CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; 
FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; 
SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL 
DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; 
TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK 
TENDER (INCLUDING LOADING AND UNLOADING); TEAM 
DRIVER; TOOL ROOM ATTENDANT (REFINERIES).  
FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT 
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; 
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX 
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE 
DUMP TRUCK YARDAGE RATE.  HEATER PLANER; ASPHALT 
BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK 
(MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: 
USE APPROPRIATE RATE FOR THE POWER UNIT OR THE 
EQUIPMENT UTILIZED. ................................$ 43.26                  34.28
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND 
UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; 
WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, 
UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE 
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; 
RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); 
RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME 
DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD 
OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER 
AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED 
TRACTOR.  FOOTNOTES: ARTICULATED DUMP TRUCK; BULK 
CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE 
TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH 
CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; 
SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE.  HEATER 
PLANER; ASPHALT BURNER; SCARIFIER BURNER; 
INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); 
UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE 
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. ......$ 43.56                  34.28
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND 
INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; 
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 
7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 
GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL 
TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY 
TRANSPORT TILLER PERSON; SELF- PROPELLED STREET 
SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK 
- HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR 
RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING 
TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON 
AND ROAD OILER; DRY DISTRIBUTION TRUCK (A 
BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL 
RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION 
OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE 
DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW. 
 FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT 
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; 
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX 
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE 
DUMP TRUCK YARDAGE RATE.  HEATER PLANER; ASPHALT 
BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK 
(MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: 
USE APPROPRIATE RATE FOR THE POWER UNIT OR THE 
EQUIPMENT UTILIZED. ................................$ 43.86                  34.28
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. 
AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 
21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING 
AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS 
(WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK 
HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; 
DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, 
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID 
AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR 
GREASE TANK TRAILERS OR OTHER MISCELLANEOUS 
TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND 
TRUCK REPAIRMAN.  FOOTNOTES: ARTICULATED DUMP 
TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT 
AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); 
DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR 
SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE 
RATE.  HEATER PLANER; ASPHALT BURNER; SCARIFIER 
BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL 
TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE 
APPROPRIATE RATE FOR THE POWER UNIT OR THE 
EQUIPMENT UTILIZED. ................................$ 44.21                  34.28
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND 
OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT 
OVER 7 AXLES.  FOOTNOTES: ARTICULATED DUMP TRUCK; 
BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); 
DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY 
PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR 
TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE.  
HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; 
INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); 
UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE 
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. ......$ 44.56                  34.28
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION"

All California determinations: county index · California prevailing wage · compute pay with the calculator.