Building, Heavy, Highway construction - California, revision 7, modified 2026-09-03
Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of CA20260018 rev 7
"General Decision Number: CA20260018 09/03/2026
State: California
Construction Types: Building, Heavy and Highway
Counties: California Counties of
Alameda, Calaveras, Contra Costa,
Fresno, Kings, Madera, Mariposa, Merced,
Monterey, San Benito, San Francisco, San
Joaquin, San Mateo, Santa Clara, Santa
Cruz, Stanislaus and Tuolumne
Building Construction Projects
Dredging Projects-Includes Dredging Projects (does not include hopper dredge work)
Heavy Construction Projects (excludes water well drilling)
Highway Construction Projects
Modification Number Publication Date
4 01/30/2026
5 05/18/2026
6 07/14/2026
7 09/03/2026
ASBE0016-004 05/01/2025
Rates Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1:
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ,
STANISLAUS, & TOULMNE COUNTIES).....................$ 34.56 11.40
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2:
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, &
SANTA CLARA COUNTIES)...............................$ 44.73 12.75
----------------------------------------------------------------
ASBE0016-008 01/01/2024
Rates Fringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS (AREA 1: ALAMEDA, CONTRA COSTA,
MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO,
SANTA CLARA, & SANTA CRUZ).........................$ 84.76 25.07
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS (AREA 2: CALAVERAS, FRESNO,
KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN,
STANISLAUS, & TUOLUMNE).............................$ 64.56 25.07
----------------------------------------------------------------
BOIL0549-001 01/01/2021
Rates Fringes
BOILERMAKER (AREA 1: ALAMEDA, CONTRA COSTA, SAN
FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES)........$ 49.62 41.27
BOILERMAKER (AREA 2: REMAINING COUNTIES)............$ 45.60 38.99
----------------------------------------------------------------
BRCA0003-001 08/01/2024
Rates Fringes
MARBLE FINISHER.....................................$ 42.06 19.80
----------------------------------------------------------------
BRCA0003-003 08/01/2024
Rates Fringes
MARBLE MASON........................................$ 61.72 30.31
----------------------------------------------------------------
BRCA0003-005 05/01/2024
Rates Fringes
BRICKLAYER ( 1) FRESNO, KINGS, MADERA, MARIPOSA,
MERCED..............................................$ 51.17 25.80
BRICKLAYER ( 7) SAN FRANCISCO, SAN MATEO............$ 57.02 28.50
BRICKLAYER ( 9) CALAVERAS, SAN JOAQUIN, STANISLAUS,
TOULUMNE............................................$ 52.76 25.01
BRICKLAYER (16) MONTEREY, SANTA CRUZ................$ 54.18 27.82
BRICKLAYER (8) ALAMEDA, CONTRA COSTA, SAN BENITO,
SANTA CLARA)........................................$ 56.94 26.28
----------------------------------------------------------------
BRCA0003-008 07/01/2024
Rates Fringes
TERRAZZO FINISHER...................................$ 44.93 20.98
TERRAZZO WORKER/SETTER..............................$ 60.58 29.79
----------------------------------------------------------------
BRCA0003-011 04/01/2024
Rates Fringes
TILE FINISHER (AREA 1: ALAMEDA, CONTRA COSTA,
MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO,
SANTA CLARA, SANTA CRUZ)............................$ 37.75 19.28
TILE FINISHER (AREA 2: CALAVERAS, SAN JOAQUIN,
STANISLAUS, TUOLUMNE)...............................$ 34.76 19.22
TILE FINISHER (AREA 3: FRESNO, KINGS, MADERA,
MARIPOSA, MERCED)...................................$ 32.68 18.32
TILE LAYER (AREA 1: ALAMEDA, CONTRA COSTA,
MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO,
SANTA CLARA, SANTA CRUZ)............................$ 59.92 22.62
TILE LAYER (AREA 2: CALAVERAS, SAN JOAQUIN,
STANISLAUS, TUOLUMNE)...............................$ 55.17 22.52
TILE LAYER (AREA 3: FRESNO, KINGS, MADERA,
MARIPOSA, MERCED)...................................$ 50.28 22.05
----------------------------------------------------------------
CARP0022-001 07/01/2023
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
FRANCISCO COUNTY)...................................$ 60.39 33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN FRANCISCO COUNTY)...........$ 60.54 33.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO
COUNTY).............................................$ 60.39 33.52
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY).......$ 60.49 35.11
----------------------------------------------------------------
CARP0034-001 07/01/2021
Rates Fringes
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN.
DEPTH PAY (SURFACE DIVING): 50 TO 100 FT, $2.00 PER
FOOT; 101 TO 150 FT, $3.00 PER FOOT; 151 TO 220
FT, $4.00 PER FOOT; 221 FT. AND DEEPER, $5.00 PER
FOOT. (SATURATION DIVING: THE STANDBY RATE SHALL
APPLY UNTIL SATURATION STARTS. THE SATURATION
DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE
CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE
COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL
SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT
IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS,
OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL
ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID:
DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300
FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A
DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE
LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00
PER FOOT.) (WORK IN COMBINATION OF
CLASSIFICATIONS: EMPLOYEES WORKING IN ANY
COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING
CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID
IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR
THAT SHIFT.)........................................$ 54.10 34.69
DIVER: DIVER STANDBY. DEPTH PAY (SURFACE DIVING):
50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00
PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT.
AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING:
THE STANDBY RATE SHALL APPLY UNTIL SATURATION
STARTS. THE SATURATION DIVING RATE APPLIES WHEN
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE
SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT.)....................................$ 60.51 34.69
DIVER: DIVER TENDER. DEPTH PAY (SURFACE DIVING):
50 TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00
PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT.
AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING:
THE STANDBY RATE SHALL APPLY UNTIL SATURATION
STARTS. THE SATURATION DIVING RATE APPLIES WHEN
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE
SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT.)....................................$ 59.51 34.69
DIVER: DIVER WET. DEPTH PAY (SURFACE DIVING): 50
TO 100 FT, $2.00 PER FOOT; 101 TO 150 FT, $3.00
PER FOOT; 151 TO 220 FT, $4.00 PER FOOT; 221 FT.
AND DEEPER, $5.00 PER FOOT. (SATURATION DIVING:
THE STANDBY RATE SHALL APPLY UNTIL SATURATION
STARTS. THE SATURATION DIVING RATE APPLIES WHEN
DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK
TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE
SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN
ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO
ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE
THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM
SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26
FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS
NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR
OTHER ENCLOSURE LESS THAN 48"" IN HEIGHT, THE
PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN
COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING
IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE
PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE
FOR THAT SHIFT.)....................................$ 103.62 34.69
DIVER: MANIFOLD OPERATOR (MIXED GAS). DEPTH PAY
(SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT;
101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00
PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT.
(SATURATION DIVING: THE STANDBY RATE SHALL APPLY
UNTIL SATURATION STARTS. THE SATURATION DIVING
RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE
CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE
COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL
SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT
IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS,
OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL
ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID:
DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300
FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A
DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE
LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00
PER FOOT.) (WORK IN COMBINATION OF
CLASSIFICATIONS: EMPLOYEES WORKING IN ANY
COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING
CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID
IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR
THAT SHIFT.)........................................$ 64.51 34.69
DIVER: MANIFOLD OPERATOR (STANDBY). DEPTH PAY
(SURFACE DIVING): 50 TO 100 FT, $2.00 PER FOOT;
101 TO 150 FT, $3.00 PER FOOT; 151 TO 220 FT, $4.00
PER FOOT; 221 FT. AND DEEPER, $5.00 PER FOOT.
(SATURATION DIVING: THE STANDBY RATE SHALL APPLY
UNTIL SATURATION STARTS. THE SATURATION DIVING
RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE
CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE
COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL
SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT
IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS,
OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL
ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID:
DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300
FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A
DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE
LESS THAN 48"" IN HEIGHT, THE PREMIUM WILL BE $1.00
PER FOOT.) (WORK IN COMBINATION OF
CLASSIFICATIONS: EMPLOYEES WORKING IN ANY
COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING
CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID
IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR
THAT SHIFT.)........................................$ 59.51 34.69
----------------------------------------------------------------
CARP0034-003 07/01/2021
Rates Fringes
PILEDRIVER..........................................$ 54.10 34.69
----------------------------------------------------------------
CARP0035-007 07/01/2020
Rates Fringes
MODULAR FURNITURE INSTALLER: INSTALLER (AREA 1:
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO,
SANTA CLARA COUNTIES)...............................$ 28.76 22.53
MODULAR FURNITURE INSTALLER: INSTALLER (AREA 2:
MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES)..........$ 26.11 22.53
MODULAR FURNITURE INSTALLER: INSTALLER (AREA 3:
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).........$ 25.16 22.53
MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA
2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES).......$ 29.08 23.03
MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA
3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).$ 27.96 23.03
MODULAR FURNITURE INSTALLER: LEAD INSTALLER (AREA
1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO,
SANTA CLARA COUNTIES)...............................$ 32.21 23.03
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA
1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO,
SANTA CLARA COUNTIES)...............................$ 36.43 23.03
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA
2: MONTEREY, SAN BENITO, SANTA CRUZ COUNTIES).......$ 32.71 23.03
MODULAR FURNITURE INSTALLER: MASTER INSTALLER (AREA
3: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAUS, TUOLUMNE COUNTIES).$ 31.38 23.03
----------------------------------------------------------------
CARP0035-008 08/01/2020
Rates Fringes
DRYWALL INSTALLERS/LATHERS (AREA 1: ALAMEDA, CONTRA
COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA
COUNTIES)...........................................$ 52.65 31.26
DRYWALL INSTALLERS/LATHERS (AREA 2: MONTEREY, SAN
BENITO, SANTA CRUZ COUNTIES)........................$ 46.77 31.26
DRYWALL INSTALLERS/LATHERS (AREA 3: SAN JOAQUIN)....$ 47.27 31.26
DRYWALL INSTALLERS/LATHERS (AREA 4: CALAVERAS,
FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
STANISLAUS, TUOLUMNE COUNTIES)......................$ 45.92 31.26
DRYWALL STOCKER/SCRAPPER (AREA 1: ALAMEDA, CONTRA
COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA
COUNTIES)...........................................$ 26.33 18.22
DRYWALL STOCKER/SCRAPPER (AREA 2: MONTEREY, SAN
BENITO, SANTA CRUZ COUNTIES)........................$ 23.39 18.22
DRYWALL STOCKER/SCRAPPER (AREA 3: SAN JOAQUIN)......$ 23.64 18.22
DRYWALL STOCKER/SCRAPPER (AREA 4: CALAVERAS,
FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
STANISLAUS, TUOLUMNE COUNTIES)......................$ 22.97 18.22
----------------------------------------------------------------
CARP0152-001 07/01/2020
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(CONTRA COSTA COUNTY)...............................$ 52.65 30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (CONTRA COSTA COUNTY)............$ 52.80 30.82
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA
COUNTY).............................................$ 52.65 30.82
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)........$ 52.75 32.41
----------------------------------------------------------------
CARP0152-002 07/01/2020
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
JOAQUIN COUNTY).....................................$ 52.65 30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN JOAQUIN COUNTY)...........$ 46.92 30.82
CARPENTERS: JOURNEYMAN CARPENTER (SAN JOAQUIN
COUNTY).............................................$ 46.77 30.82
CARPENTERS: MILLWRIGHT (SAN JOAQUIN COUNTY).........$ 49.27 32.41
----------------------------------------------------------------
CARP0152-004 07/01/2020
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(CALAVERAS, MARIPOSA, MERCED, STANISLAUS AND
TUOLUMNE COUNTIES)..................................$ 52.65 30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER CALAVERAS, MARIPOSA, MERCED,
STANISLAUS AND TUOLUMNE COUNTIES....................$ 45.57 30.82
CARPENTERS: JOURNEYMAN CARPENTER (CALAVERAS,
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES).$ 45.42 30.82
CARPENTERS: MILLWRIGHT (CALAVERAS, MARIPOSA,
MERCED, STANISLAUS AND TUOLUMNE COUNTIES)...........$ 47.92 32.41
----------------------------------------------------------------
CARP0217-001 07/01/2023
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
MATEO COUNTY).......................................$ 60.39 33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN MATEO COUNTY)...............$ 60.54 33.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY).$ 60.39 33.52
CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)...........$ 60.49 35.11
----------------------------------------------------------------
CARP0405-001 07/01/2021
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA
CLARA COUNTY).......................................$ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SANTA CLARA COUNTY).............$ 55.00 31.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA
COUNTY).............................................$ 54.85 31.49
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY).........$ 54.95 33.08
----------------------------------------------------------------
CARP0405-002 07/01/2021
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN
BENITO COUNTY)......................................$ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SAN BENITO COUNTY)..............$ 49.12 31.49
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO
COUNTY).............................................$ 48.97 31.49
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)..........$ 51.47 33.08
----------------------------------------------------------------
CARP0505-001 07/01/2021
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA
CRUZ COUNTY)........................................$ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (SANTA CRUZ COUNTY)..............$ 49.12 31.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ
COUNTY).............................................$ 48.97 31.49
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)..........$ 51.47 33.08
----------------------------------------------------------------
CARP0605-001 07/01/2021
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(MONTEREY COUNTY)...................................$ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (MONTEREY COUNTY)................$ 49.12 31.49
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)..$ 48.97 31.49
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)............$ 51.47 33.08
----------------------------------------------------------------
CARP0701-001 07/01/2021
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(FRESNO AND MADERA COUNTIES)........................$ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (FRESNO AND MADERA COUNTIES)...$ 47.77 31.49
CARPENTERS: JOURNEYMAN CARPENTER (FRESNO AND MADERA
COUNTIES)...........................................$ 47.62 31.49
CARPENTERS: MILLWRIGHT (FRESNO AND MADERA COUNTIES).$ 50.12 33.08
----------------------------------------------------------------
CARP0713-001 07/01/2021
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER
(ALAMEDA COUNTY)....................................$ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER (ALAMEDA COUNTY).................$ 55.00 31.49
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)...$ 54.85 31.49
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY).............$ 54.95 33.08
----------------------------------------------------------------
CARP1109-001 07/01/2021
Rates Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (KINGS
COUNTY).............................................$ 54.85 31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING
ERECTOR, SAW FILER KINGS COUNTY...................$ 47.77 31.49
CARPENTERS: JOURNEYMAN CARPENTER (KINGS COUNTY).....$ 47.62 31.49
CARPENTERS: MILLWRIGHT (KINGS COUNTY)...............$ 50.12 33.08
----------------------------------------------------------------
ELEC0006-004 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: INSTALLER. (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN
FRANCISCO COUNTY)...................................$ 58.83 31.51
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN
FRANCISCO COUNTY) (SAN FRANCISCO COUNTY) ...........$ 67.65 31.78
----------------------------------------------------------------
ELEC0006-007 06/01/2024
Rates Fringes
ELECTRICIAN (SAN FRANCISCO COUNTY)..................$ 91.25 48.05
----------------------------------------------------------------
ELEC0100-002 09/01/2025
Rates Fringes
ELECTRICIAN (FRESNO, KINGS, AND MADERA COUNTIES)....$ 50.00 30.15
----------------------------------------------------------------
ELEC0100-005 12/01/2024
Rates Fringes
COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK:
INCLUDES THE INSTALLATION TESTING, SERVICE AND
MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE
THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE,
SOUND, VISION AND DIGITAL FOR COMMERCIAL,
EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR
THE FOLLOWING: TV MONITORING AND SURVEILLANCE,
BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE
INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE
TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL
SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND,
BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK
SYSTEMS. A. SOUND AND VOICE
TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND
FOREGROUND MUSIC, INTERCOM AND TELEPHONE
INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL
SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND
SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE,
MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX
SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS,
RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE ALARM
SYSTEMS INSTALLATION, WIRE PULLING AND TESTING. C.
TELEVISION AND VIDEO SYSTEMS TELEVISION MONITORING
AND SURVEILLANCE SYSTEMS VIDEO SECURITY SYSTEMS,
VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL
SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND
CCTV. D. SECURITY SYSTEMS PERIMETER SECURITY
SYSTEMS VIBRATION SENSOR SYSTEMS CARD ACCESS
SYSTEMS ACCESS CONTROL SYSTEMS, SONAR/INFRARED
MONITORING EQUIPMENT. E. COMMUNICATIONS SYSTEMS
THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL
SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED
SYSTEMS SCADA (SUPERVISORY CONTROL AND DATA
ACQUISITION) PCM (PULSE CODE MODULATION) INVENTORY
CONTROL SYSTEMS, DIGITAL DATA SYSTEMS BROADBAND
AND BASEBAND AND CARRIERS POINT OF SALE SYSTEMS,
VSAT DATA SYSTEMS DATA COMMUNICATION SYSTEMS RF
AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA
SYSTEMS. WORK EXCLUDED RACEWAY SYSTEMS ARE NOT
COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF
THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES
(NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN
WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA
(SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT
INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE
SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN
RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL
BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN
EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY:
1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL
BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS
FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN
CONDUIT.) (FRESNO, KINGS, MADERA) ................$ 45.28 28.01
COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK:
INCLUDES THE INSTALLATION TESTING, SERVICE AND
MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE
THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE,
SOUND, VISION AND DIGITAL FOR COMMERCIAL,
EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR
THE FOLLOWING: TV MONITORING AND SURVEILLANCE,
BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE
INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE
TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL
SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND,
BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK
SYSTEMS. A. SOUND AND VOICE
TRANSMISSION/TRANSFERENCE SYSTEMS BACKGROUND
FOREGROUND MUSIC, INTERCOM AND TELEPHONE
INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS NURSE CALL
SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND
SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE,
MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX
SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS,
RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE ALARM
SYSTEMS INSTALLATION, WIRE PULLING AND TESTING. C.
TELEVISION AND VIDEO SYSTEMS TELEVISION MONITORING
AND SURVEILLANCE SYSTEMS VIDEO SECURITY SYSTEMS,
VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL
SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND
CCTV. D. SECURITY SYSTEMS PERIMETER SECURITY
SYSTEMS VIBRATION SENSOR SYSTEMS CARD ACCESS
SYSTEMS ACCESS CONTROL SYSTEMS, SONAR/INFRARED
MONITORING EQUIPMENT. E. COMMUNICATIONS SYSTEMS
THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL
SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED
SYSTEMS SCADA (SUPERVISORY CONTROL AND DATA
ACQUISITION) PCM (PULSE CODE MODULATION) INVENTORY
CONTROL SYSTEMS, DIGITAL DATA SYSTEMS BROADBAND
AND BASEBAND AND CARRIERS POINT OF SALE SYSTEMS,
VSAT DATA SYSTEMS DATA COMMUNICATION SYSTEMS RF
AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA
SYSTEMS. WORK EXCLUDED RACEWAY SYSTEMS ARE NOT
COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF
THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES
(NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN
WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA
(SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT
INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE
SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN
RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL
BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN
EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY:
1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL
BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS
FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN
CONDUIT.) (FRESNO, KINGS, MADERA) ................$ 52.07 28.21
----------------------------------------------------------------
ELEC0234-001 12/30/2025
Rates Fringes
ELECTRICIAN ZONE A : ALL OF SANTA CRUZ, MONTEREY,
AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF
HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN
AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101
SOUTH TO THE SAN LUIS OBISPO COUNTY LINE (MONTEREY,
SAN BENITO AND SANTA CRUZ COUNTIES).................$ 70.41 33.76
ELECTRICIAN ZONE B: ANY AREA OUTSIDE OF ZONE A
(MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)......$ 77.45 33.97
----------------------------------------------------------------
ELEC0234-003 12/01/2021
Rates Fringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING
PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT;
EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE
VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75'
ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.)
(FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN
RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON
PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL
BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR
THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT,
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.)
(MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ....$ 47.93 24.09
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING
PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT;
EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE
VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75'
ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.)
(FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN
RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON
PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL
BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR
THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT,
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.)
(MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ....$ 55.12 24.30
----------------------------------------------------------------
ELEC0302-001 03/01/2025
Rates Fringes
CABLE SPLICER (CONTRA COSTA COUNTY).................$ 74.54 36.09
ELECTRICIAN (CONTRA COSTA COUNTY)...................$ 66.26 35.84
----------------------------------------------------------------
ELEC0302-003 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (CONTRA
COSTA COUNTY) ......................................$ 53.08 30.84
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (CONTRA
COSTA COUNTY) ......................................$ 61.04 31.08
----------------------------------------------------------------
ELEC0332-001 06/01/2025
Rates Fringes
CABLE SPLICER (FOOTNOTES: WORK UNDER COMPRESSED
AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON
LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR
OTHER STRUCTURES AND WHERE THE WORKERS ARE NOT
PROTECTED BY PERMANENT GUARD RAILS AT A DISTANCE OF
40 TO 60 FT. FROM THE GROUND OR SUPPORTING
STRUCTURES: TO BE PAID ONE AND ONE-HALF TIMES THE
STRAIGHT-TIME RATE OF PAY. WORK ON STRUCTURES OF
60 FT. OR OVER (AS DESCRIBED ABOVE): TO BE PAID
TWICE THE STRAIGHT-TIME RATE OF PAY.) (SANTA CLARA
COUNTY).............................................$ 104.68 49.46
ELECTRICIAN (FOOTNOTES: WORK UNDER COMPRESSED AIR
OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS,
SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER
STRUCTURES AND WHERE THE WORKERS ARE NOT PROTECTED
BY PERMANENT GUARD RAILS AT A DISTANCE OF 40 TO 60
FT. FROM THE GROUND OR SUPPORTING STRUCTURES: TO BE
PAID ONE AND ONE-HALF TIMES THE STRAIGHT-TIME RATE
OF PAY. WORK ON STRUCTURES OF 60 FT. OR OVER (AS
DESCRIBED ABOVE): TO BE PAID TWICE THE
STRAIGHT-TIME RATE OF PAY.) (SANTA CLARA COUNTY)...$ 91.03 49.05
----------------------------------------------------------------
ELEC0332-003 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (SANTA
CLARA COUNTY).......................................$ 58.33 31.00
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (SANTA
CLARA COUNTY).......................................$ 67.08 31.26
----------------------------------------------------------------
ELEC0595-001 06/01/2025
Rates Fringes
CABLE SPLICER (ALAMEDA COUNTY)......................$ 87.40 49.41
ELECTRICIAN (ALAMEDA COUNTY)........................$ 76.00 49.07
----------------------------------------------------------------
ELEC0595-002 06/01/2024
Rates Fringes
CABLE SPLICER (CALAVERAS AND SAN JOAQUIN COUNTIES)..$ 59.34 32.26
ELECTRICIAN: ALL OTHER WORK (CALAVERAS AND SAN
JOAQUIN COUNTIES)...................................$ 49.45 31.96
ELECTRICIAN: TUNNEL WORK (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 51.92 32.04
----------------------------------------------------------------
ELEC0595-006 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (ALAMEDA
COUNTY).............................................$ 58.33 31.00
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (ALAMEDA
COUNTY).............................................$ 67.08 31.26
----------------------------------------------------------------
ELEC0595-008 12/01/2024
Rates Fringes
COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (CALAVERAS
AND SAN JOAQUIN COUNTIES) ..........................$ 45.28 28.01
COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (CALAVERAS
AND SAN JOAQUIN COUNTIES) ..........................$ 52.07 28.21
----------------------------------------------------------------
ELEC0617-001 06/01/2025
Rates Fringes
ELECTRICIAN (SAN MATEO COUNTY)......................$ 86.00 51.07
----------------------------------------------------------------
ELEC0617-003 12/01/2025
Rates Fringes
SOUND & COMMUNICATIONS: INSTALLER (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN MATEO
COUNTY).............................................$ 58.33 31.00
SOUND & COMMUNICATIONS: TECHNICIAN (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING) AND WHEN
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS
OR JOBS FOR WHICH THE CONDUCTORS FOR THE FIRE ALARM
SYSTEM ARE INSTALLED IN CONDUIT; EXCLUDING
INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK,
INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS
HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE
LOWEST FLOOR LEVEL HAVING BUILDING ACCESS);
EXCLUDING ENERGY MANAGEMENT SYSTEMS.) (FOOTNOTE:
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS
(INCLUDING WIRE AND CABLE PULLING), ON PROJECTS
WHICH INVOLVE NEW OR MAJOR REMODEL BUILDING
CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR THE FIRE
ALARM SYSTEM ARE INSTALLED IN THE CONDUIT, SHALL BE
PERFORMED BY THE INSIDE ELECTRICIAN.) (SAN MATEO
COUNTY).............................................$ 67.08 31.26
----------------------------------------------------------------
ELEC0684-001 12/01/2024
Rates Fringes
ELECTRICIAN (MARIPOSA, MERCED, STANISLAUS AND
TUOLUMNE COUNTIES) CABLE SPLICER = 110% OF
JOURNEYMAN ELECTRICIAN..............................$ 48.50 30.09
----------------------------------------------------------------
ELEC0684-004 12/01/2024
Rates Fringes
COMMUNICATIONS SYSTEM: INSTALLER (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY;
INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS
OF CONDUCTORS DETERMINED BY THEIR FUNCTION;
EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN
RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND
WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING
PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT;
EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE
VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75'
ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.)
(FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN
RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON
PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL
BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR
THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT,
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.)
(MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE
COUNTIES)...........................................$ 45.28 28.01
COMMUNICATIONS SYSTEM: TECHNICIAN (SCOPE OF WORK:
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL
OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH
INCLUDE CONTROL FUNCTION OR POWER SUPPLY;
INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS
OF CONDUCTORS DETERMINED BY THEIR FUNCTION;
EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN
RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND
WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING
PROJECTS OR JOBS FOR WHICH THE CONDUCTORS FOR THE
FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT;
EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE
VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS
(ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75'
ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING
ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS.)
(FOOTNOTE: FIRE ALARM WORK WHEN INSTALLED IN
RACEWAYS (INCLUDING WIRE AND CABLE PULLING), ON
PROJECTS WHICH INVOLVE NEW OR MAJOR REMODEL
BUILDING CONSTRUCTION, FOR WHICH THE CONDUCTORS FOR
THE FIRE ALARM SYSTEM ARE INSTALLED IN THE CONDUIT,
SHALL BE PERFORMED BY THE INSIDE ELECTRICIAN.)
(MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE
COUNTIES)...........................................$ 52.07 28.21
----------------------------------------------------------------
ELEC1245-001 01/01/2025
Rates Fringes
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER
(HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY AND DAY AFTER THANKSGIVING,
CHRISTMAS DAY)......................................$ 70.16 24.71
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST
(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR
VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND
BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE
EQUIPMENT) (HOLIDAYS: NEW YEAR'S DAY, M.L. KING
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
VETERANS DAY, THANKSGIVING DAY AND DAY AFTER
THANKSGIVING, CHRISTMAS DAY)........................$ 53.30 22.26
LINE CONSTRUCTION: (3) GROUNDMAN (HOLIDAYS: NEW
YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY AND DAY AFTER THANKSGIVING,
CHRISTMAS DAY)......................................$ 40.76 21.76
----------------------------------------------------------------
ELEV0008-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC (FOOTNOTE: ADD TO FRINGE
BENEFITS A+B: A. PAID VACATION: EMPLOYER
CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION
PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF
SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE.
B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY,
THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND
CHRISTMAS DAY.).....................................$ 84.05 38.44
----------------------------------------------------------------
ENGI0003-001 06/29/2020
Rates Fringes
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1
(LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED
OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.;
SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE OVER 100
TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED
OVER 100 TONS.......................................$ 52.64 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1
(OILER)- DERRICK BARGE PEDESTAL MOUNTED OVER 100
TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED
BOOM-TYHPE LIFTING DEVICE OVER 100 TONS; TRUCK
CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100
TONS................................................$ 43.38 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 1
(TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED
OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.;
SELF-PROPELLED BOOM-TYHPE LIFTING DEVICE OVER 100
TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED
OVER 100 TONS.......................................$ 45.66 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2
(LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED
45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO
AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE
LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR
CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO
AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE
RIG.................................................$ 50.82 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2
(OILER)- DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO
AND INCLUDING 100 TONS; CLAMSHELL UP TO AND
INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE
LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR
CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO
AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE
RIG.................................................$ 43.11 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 2
(TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED
45 TONS TO AND INCLUDING 100 TONS; CLAMSHELL UP TO
AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE
LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR
CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO
AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE
RIG.................................................$ 45.41 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3
(LIFTING DEVICES)- DERRICK BARGE PEDESTAL MOUNTED
UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING
DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY
TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE
MOUNTED 45 TONS AND UNDER...........................$ 49.14 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3
(OILER)- DERRICK BARGE PEDESTAL MOUNTED UNDER 45
TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45
TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE;
TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45
TONS AND UNDER......................................$ 42.89 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 3
(TRUCK CRANE OILER)- DERRICK BARGE PEDESTAL MOUNTED
UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING
DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY
TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE
MOUNTED 45 TONS AND UNDER...........................$ 45.12 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 4
(LIFTING DEVICES)- ASSISTANT OPERATOR IN LIEU OF
ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS AND OVER;
HEAVY-DUTY REPAIR PERSON/WELDER.....................$ 47.37 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 5
(LIFTING DEVICES)- DECK ENGINEER....................$ 44.73 31.15
OPERATOR: POWER EQUIPMENT, PILEDRIVING: GROUP 6
(LIFTING DEVICES)- DECKHAND; FIRE TENDER............$ 42.50 31.15
----------------------------------------------------------------
ENGI0003-001 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 1 (CRANES)- CLAMSHELL AND DRAGLINE
OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK,
OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER
100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE,
OVER 100 TONS. (AREA 1: LISTED WAGE RATES. AREA 2:
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART),
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 68.59 32.53
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 1 (OILER)- CLAMSHELL AND DRAGLINE
OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK,
OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER
100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE,
OVER 100 TONS. (AREA 1: LISTED WAGE RATES. AREA 2:
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART),
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 43.79 31.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 1 (TRUCK CRANE OILER)- CLAMSHELL
AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS;
DERRICK, OVER 100 TONS; DERRICK BARGE
PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED
BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. (AREA 1:
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1:
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART),
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS
(EASTERN PART), FRESNO (EASTERN PART), MADERA
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 46.08 31.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 2 (CRANES)- CLAMSHELL AND DRAGLINE
OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.;
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS;
DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED
BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER
CRANE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 66.08 32.53
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 2 (OILER)- CLAMSHELL AND DRAGLINE
OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.;
CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS;
DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED
BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER
CRANE. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 42.83 31.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 2 (TRUCK CRANE OILER)- CLAMSHELL
AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7
CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING
100 TONS; DERRICK BARGE, 100 TONS AND UNDER;
SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45
TONS; TOWER CRANE. (AREA 1: LISTED WAGE RATES. AREA
2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT
EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN
PART), KINGS, MADERA (EXCEPT EASTERN PART),
MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY
(EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN
FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN
PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART),
FRESNO (EASTERN PART), MADERA (EASTERN PART),
MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN
PART), TUOLUMNE (EASTERN PART) COUNTIES)............$ 45.07 31.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 3 (CRANES) CLAMSHELL AND DRAGLINE
UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND
UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45
TONS AND UNDER. (AREA 1: LISTED WAGE RATES. AREA 2:
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART),
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 64.34 32.53
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 3 (HYDRAULIC) CLAMSHELL AND
DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45
TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING
DEVICE 45 TONS AND UNDER. (AREA 1: LISTED WAGE
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA,
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA,
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART),
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN
PART), FRESNO (EASTERN PART), MADERA (EASTERN
PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 59.98 32.53
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 3 (OILER) CLAMSHELL AND DRAGLINE UP
TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND
UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45
TONS AND UNDER. (AREA 1: LISTED WAGE RATES. AREA 2:
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART),
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 42.55 31.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 3 (TRUCK CRANE OILER) CLAMSHELL AND
DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45
TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING
DEVICE 45 TONS AND UNDER. (AREA 1: LISTED WAGE
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA,
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA,
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART),
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN
PART), FRESNO (EASTERN PART), MADERA (EASTERN
PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 44.83 31.15
OPERATOR: POWER EQUIPMENT- CRANES AND ATTACHMENTS
- AREA 1: GROUP 4 (CRANES)- BOOM TRUCK OR DUAL
PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS;
TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING
DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15
TONS. (AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 61.30 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2-
HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3.5 CU.
YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK
BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR
(FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AN
DINCLUDING 7 CU. YDS. M.R.C. (AREA 1: LISTED WAGE
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA,
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA,
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART),
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN
PART), FRESNO (EASTERN PART), MADERA (EASTERN
PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 65.43 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3-
ASPHALT MILLING MACHINE; CABLE BACKHOE; COMBINATION
BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS
FLIGHT TIE BACK MACHINE ASSISTNAT TO ENGINEER OR
MECHANIC; CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK
MACHINE, TONNAGE TO APPLY; CRANE MOUNTED DRILL
ATTACHMENT, TONNAGE TO APPLY; DOZER, SLOPE BRD;
GRADALL; HYDRAULIC EXCAVATOR, UP TO 3.5 CU. YDS.;
LOADER 4 CU. YDS. AND OVER; LONG REACH EXCAVATOR;
MULTIPLE ENGINE SCRAPER (WHEN USED AS PUSH PULL);
POWER SHOVELS, UP TO AND INCLUDING 1 CU. YD.;
PRE-STRESS WIRE WRAPPING MACHINE; SIDE BOOM CAT,
572 OR LARGER; TRACK LOADER 4 CU. YDS. AND OVER;
WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS.
PER HOUR) (AREA 1: LISTED WAGE RATES. AREA 2:
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART),
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 63.95 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4-
ASPHALT PLANT ENGINEER/BOX PERSON; CHICAGO BOOM;
COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING
.75 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY);
DOZER AND/OR PUSH CAT; PULL-TYPE ELEVATING LOADER;
GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR
OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING
SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT,
HUGHS, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY
REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER
UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER
(MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR
SPREADER MACHINE (ASPHALT, BARBER-GREENE AND
SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR
SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS;
POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT;
RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS,
ETC.); RUBBER-TIRED EARTHMOVING EQUIPMENT
(SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL
TRACTOR WITH DRAG; SOIL STABILIZER (P&H OR EQUAL);
SPIDER PLOW AND SPIDER PULLER; TUBEX PILE RIG;
UNLICENSED CONSTRUCTION WORK BOAT OPERATOR, ON
SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.;
TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL
COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR
PUGMILL EQUIPMENT. (AREA 1: LISTED WAGE RATES. AREA
2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA
1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT
EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN
PART), KINGS, MADERA (EXCEPT EASTERN PART),
MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY
(EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN
FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN
PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART),
FRESNO (EASTERN PART), MADERA (EASTERN PART),
MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN
PART), TUOLUMNE (EASTERN PART) COUNTIES)............$ 62.57 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5-
CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION
SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR
CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE
CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE
GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR
SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL
(NOT TO APPLY TO WATERLINES, WAGON DRILLS, OR
JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR
MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE
(CLARY, JOHNSON, BIDWELL BRIDGE DECK, OR SIMILAR
TYPES); MECHANICAL BURM, CURB, AND/OR CURB AND
GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT
HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR
(SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED
(AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR
WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER;
TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5
FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR.
(AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 61.30 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6-
ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER;
BOOM-TYPE BACKFILLING MACHINE; ASSISTANT PLANT
ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL
GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING
MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT
ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); DECK
ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHS 200
SERIES OR SIMILAR UP TO AND INCLUDING 30 FT.
M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR;
HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER
LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR
(WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR
SIMILAR; OILER, TRUCK MOUNTED; PAVEMENT BREAKER,
TRUCK-MOUNTED, WITH COMPRESSOR COMBINATION; PAVING
FABRIC INSTALLATION AND/OR LAYING MACHINE; PIPE
BENDING MACHINE (PIPELINES ONLY); PIPE WRAPPING
MACHINE (TRACTOR PRPELLED AND SUPPORTED); SCREED
(EXCEPT ASPHALTIC CONCRETE PAVING); SELF-PROPELLED
PIPELINE WRAPPING MACHINE; TRACTOR; SELF-LOADING
CHIPPER; CONCRETE BARRIER MOVING MACHINE. (AREA 1:
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1:
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART),
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS
(EASTERN PART), FRESNO (EASTERN PART), MADERA
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 59.98 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7-
BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE
A-FRAME TRUCK, NON-ROTATING-UNDER 15 TONS; CARY IFT
OR SIMILAR; COMBINATION SLURRY MIER AND/OR CLEANER;
DRILLING EQUIPMENT, 20 FT AND UNDER M.R.C.;
FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR;
HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT
LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE
(VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL
FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM);
MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR
WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING
MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST
DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL;
SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE
CURING MACHINE (ON STREETS, HIGHWAYS, AIRPORTS, AND
CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER);
SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR
CONCRETE FORMS); TIE SPACE; TOWER MOBILE; TRENCHING
MACHINE, MAXIMUM DIGGING CAPACITY UP TO AND
INCLUDING 5 FT. DEPTH; TRUCK-TYPE LOADER. (AREA 1:
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1:
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART),
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS
(EASTERN PART), FRESNO (EASTERN PART), MADERA
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 58.84 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8- BIT
SHARPENER; BOILER TENDER; BOX OPERATOR;
BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR
(SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND;
FIRE TENDER; FORKLIFT (UNDER 20 FT); GENERATOR;
GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC
MONITOR; KEN SEAL MACHINE (OR SIMILAR);
MIXERMOBILE; OILER; PUMPOPERATOR; REFRIGERATOR
PLANT; RESERVOIR-DEBRIS TUG (SELF-PROPELLED
FLOATING); ROSS CARRIER (CONSTRUCTION SITE);
ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE;
SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR
(INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR;
SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER;
TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT;
WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY.
(AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 57.70 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A -
ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743
SERIES OR SMALLER, AND SIMILAR (WITHOUT
ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P.
(BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER. (AREA
1: LISTED WAGE RATES. AREA 2: RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 55.49 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1
(CRANES)- CRANE OVER 100 TONS; DERRICK OVER 100
TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER
100 TONS............................................$ 68.81 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1
(OILER)- CRANE OVER 100 TONS; DERRICK OVER 100
TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER
100 TONS............................................$ 43.72 31.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1
(TRUCK CRANE OILER)- CRANE OVER 100 TONS; DERRICK
OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING
DEVICE OVER 100 TONS................................$ 45.95 31.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2
(CRANES)- CRANE OVER 45 TONS TO 100 TONS; DERRICK
UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING
DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE........$ 67.04 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2
(OILER)- CRANE OVER 45 TONS TO 100 TONS; DERRICK
UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING
DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE........$ 43.45 31.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2
(TRUCK CRANE OILER)- CRANE OVER 45 TONS TO 100
TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED
BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS;
TOWER CRANE.........................................$ 45.73 31.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3
(CRANES)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED
BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER.........$ 65.56 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3
(HYDRAULIC)- CRANE, 45 TONS AND UNDER;
SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS
AND UNDER...........................................$ 45.07 31.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3
(OILER)- CRANE, 45 TONS AND UNDER; SELF-PROPELLED
BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER.........$ 43.23 31.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3
(TRUCK CRANE OILER)- CRANE, 45 TONS AND UNDER;
SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS
AND UNDER...........................................$ 45.46 31.15
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4
(CRANES)- CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER;
HEAVY-DUTY REPAIR PERSON/WELDER.....................$ 63.54 32.53
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5
(CRANES)- BOOM CAT..................................$ 62.24 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 1-
HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON;
MUCKING MACHINE (RUBBER TIRED, RAIL OR TRACK TYPE);
RAISED BORE OPERATOR (TUNNELS); TUNNEL MOLE BORE
OPERATOR. (AREA 1: LISTED WAGE RATES. AREA 2:
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART),
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 63.06 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 1-A-
TUNNEL BORE MACHINE OPERATOR 20' DIAMETER OR MORE.
(AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 65.53 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 2-
COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE
PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. (AREA
1: LISTED WAGE RATES. AREA 2: RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 61.80 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 3-
DRILL DOCTOR; MINE OR SHAFT HOIST. (AREA 1: LISTED
WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00
PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA,
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA,
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART),
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN
PART), FRESNO (EASTERN PART), MADERA (EASTERN
PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 60.47 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 4-
COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE
OPERATOR; MOTORMAN. (AREA 1: LISTED WAGE RATES.
AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE
AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT
EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN
PART), KINGS, MADERA (EXCEPT EASTERN PART),
MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY
(EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN
FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN
PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART),
FRESNO (EASTERN PART), MADERA (EASTERN PART),
MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN
PART), TUOLUMNE (EASTERN PART) COUNTIES)............$ 59.33 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- SHAFTS, STOPES, RAISES: AREA 1, GROUP 5- BIT
SHARPENER; BRAKEMAN; COMBINATION MIXER AND
COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER;
PUMP OPERATOR; SLUSHER OPERATOR. (AREA 1: LISTED
WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00
PER HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA,
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA,
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART),
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN
PART), FRESNO (EASTERN PART), MADERA (EASTERN
PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 58.19 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- UNDERGOUND: AREA 1, GROUP 1- HEADING SHIELD
OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE
(RUBBER TIRED, RAIL OR TRACK TYPE); RAISED BORE
OPERATOR (TUNNELS); TUNNEL MOLE BORE OPERATOR.
(AREA 1: LISTED WAGE RATES. AREA 2: RECEIVES AN
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.)
(AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN PART),
CONTRA COSTA, FRESNO (EXCEPT EASTERN PART), KINGS,
MADERA (EXCEPT EASTERN PART), MARIPOSA (EXCEPT
EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 62.96 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- UNDERGOUND: AREA 1, GROUP 1-A- TUNNEL BORE
MACHINE OPERATOR 20' DIAMETER OR MORE. (AREA 1:
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1:
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART),
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS
(EASTERN PART), FRESNO (EASTERN PART), MADERA
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 65.43 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- UNDERGOUND: AREA 1, GROUP 2- COMBINATION
SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR
PUMPCRETE GUN; POWER JUMBO OPERATOR. (AREA 1:
LISTED WAGE RATES. AREA 2: RECEIVES AN ADDITIONAL
$2.00 PER HOUR ABOVE AREA 1 RATES.) (AREA 1:
ALAMEDA, CALAVERAS (EXCEPT EASTERN PART), CONTRA
COSTA, FRESNO (EXCEPT EASTERN PART), KINGS, MADERA
(EXCEPT EASTERN PART), MARIPOSA (EXCEPT EASTERN
PART), MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART),
SAN BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE
(EXCEPT EASTERN PART) COUNTIES. AREA 2: CALAVERAS
(EASTERN PART), FRESNO (EASTERN PART), MADERA
(EASTERN PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 61.70 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- UNDERGOUND: AREA 1, GROUP 3- DRILL DOCTOR;
MINE OR SHAFT HOIST. (AREA 1: LISTED WAGE RATES.
AREA 2: RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE
AREA 1 RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT
EASTERN PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN
PART), KINGS, MADERA (EXCEPT EASTERN PART),
MARIPOSA (EXCEPT EASTERN PART), MERCED, MONTEREY
(EXCEPT SOUTHWESTERN PART), SAN BENITO, SAN
FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT EASTERN
PART) COUNTIES. AREA 2: CALAVERAS (EASTERN PART),
FRESNO (EASTERN PART), MADERA (EASTERN PART),
MARIPOSA (EASTERN PART), MONTEREY (SOUTHWESTERN
PART), TUOLUMNE (EASTERN PART) COUNTIES)............$ 60.37 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- UNDERGOUND: AREA 1, GROUP 4- COMBINATION
SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR;
MOTORMAN. (AREA 1: LISTED WAGE RATES. AREA 2:
RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.) (AREA 1: ALAMEDA, CALAVERAS (EXCEPT EASTERN
PART), CONTRA COSTA, FRESNO (EXCEPT EASTERN PART),
KINGS, MADERA (EXCEPT EASTERN PART), MARIPOSA
(EXCEPT EASTERN PART), MERCED, MONTEREY (EXCEPT
SOUTHWESTERN PART), SAN BENITO, SAN FANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE (EXCEPT EASTERN PART)
COUNTIES. AREA 2: CALAVERAS (EASTERN PART), FRESNO
(EASTERN PART), MADERA (EASTERN PART), MARIPOSA
(EASTERN PART), MONTEREY (SOUTHWESTERN PART),
TUOLUMNE (EASTERN PART) COUNTIES)...................$ 59.23 32.53
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND
WORK- UNDERGOUND: AREA 1, GROUP 5- BIT SHARPENER;
BRAKEMAN; COMBINATION MIXER AND COMPRESSOR
(GUNITE); COMPRESSOR OPERATOR; OILER; PUMP
OPERATOR; SLUSHER OPERATOR. (AREA 1: LISTED WAGE
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA,
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA,
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART),
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN
PART), FRESNO (EASTERN PART), MADERA (EASTERN
PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 58.09 32.53
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1-
OPERATOR OF HELICOPTER (WHEN USED IN ERECTION
WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER;
POWER SHOVELS, OVER 7 CU. YDS. (AREA 1: LISTED WAGE
RATES. AREA 2: RECEIVES AN ADDITIONAL $2.00 PER
HOUR ABOVE AREA 1 RATES.) (AREA 1: ALAMEDA,
CALAVERAS (EXCEPT EASTERN PART), CONTRA COSTA,
FRESNO (EXCEPT EASTERN PART), KINGS, MADERA (EXCEPT
EASTERN PART), MARIPOSA (EXCEPT EASTERN PART),
MERCED, MONTEREY (EXCEPT SOUTHWESTERN PART), SAN
BENITO, SAN FANCISCO, SAN JOAQUIN, SAN MATEO, SANTA
CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE (EXCEPT
EASTERN PART) COUNTIES. AREA 2: CALAVERAS (EASTERN
PART), FRESNO (EASTERN PART), MADERA (EASTERN
PART), MARIPOSA (EASTERN PART), MONTEREY
(SOUTHWESTERN PART), TUOLUMNE (EASTERN PART)
COUNTIES)...........................................$ 66.96 32.53
----------------------------------------------------------------
ENGI0003-008 08/01/2024
Rates Fringes
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING- (1) LEVERMAN. AREA 1: ALAMEDA,
CONTRA COSTA, KINGS, MERCED, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA,
SANTA CRUZ, AND STANISLAUS COUNTIES. CALAVERAS
COUNTY-EXCEPT EASTERN PART. FRESNO COUNTY-EXCEPT
EASTERN PART. MADERA COUNTY-EXCEPT EASTERN PART.
MARIPOSA COUNTY-EXCEPT EASTERN PART. MONTERREY
COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE
COUNTY-EXCEPT EASTERN PART..........................$ 60.61 39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING- (1) LEVERMAN. AREA 2: CALAVERAS
COUNTY-EASTERN PART; FRESNO COUNTY-EASTERN PART;
MADERA COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN
PART; MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE
COUNTY-EASTERN PART.................................$ 62.61 39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING- (2) DREDGE DOZER; HEAVY DUTY
REPAIRMAN. AREA 2: CALAVERAS COUNTY-EASTERN
PART; FRESNO COUNTY-EASTERN PART; MADERA
COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN PART;
MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE
COUNTY-EASTERN PART.................................$ 57.65 39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING- (2) DREDGE DOZER; HEAVY DUTY
REPAIRMAN. AREA 1: ALAMEDA, CONTRA COSTA, KINGS,
MERCED, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, AND STANISLAUS
COUNTIES. CALAVERAS COUNTY-EXCEPT EASTERN PART.
FRESNO COUNTY-EXCEPT EASTERN PART. MADERA
COUNTY-EXCEPT EASTERN PART. MARIPOSA COUNTY-EXCEPT
EASTERN PART. MONTERREY COUNTY-EXCEPT SOUTHWESTERN
PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART...........$ 55.65 39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING- (3) BOOSTER PUMP OPERATOR; DECK
ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR.
AREA 1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES.
CALAVERAS COUNTY-EXCEPT EASTERN PART. FRESNO
COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT
EASTERN PART. MARIPOSA COUNTY-EXCEPT EASTERN PART.
MONTERREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE
COUNTY-EXCEPT EASTERN PART..........................$ 54.53 39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING- (3) BOOSTER PUMP OPERATOR; DECK
ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR.
AREA 2: CALAVERAS COUNTY-EASTERN PART; FRESNO
COUNTY-EASTERN PART; MADERA COUNTY-EASTERN PART;
MARIPOSA COUNTY-EASTERN PART; MONTERREY
COUNTY-SOUTHWESTERN PART; TUOLUMNE COUNTY-EASTERN
PART................................................$ 56.53 39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING- (4) BARGEMAN; DECKHAND; FIREMAN;
LEVEEHAND; OILER. AREA 1: ALAMEDA, CONTRA COSTA,
KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND
STANISLAUS COUNTIES. CALAVERAS COUNTY-EXCEPT
EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART.
MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSA
COUNTY-EXCEPT EASTERN PART. MONTERREY COUNTY-EXCEPT
SOUTHWESTERN PART. TUOLUMNE COUNTY-EXCEPT EASTERN
PART................................................$ 51.23 39.55
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC
SUCTION DREDGING- (4) BARGEMAN; DECKHAND; FIREMAN;
LEVEEHAND; OILER. AREA 2: CALAVERAS COUNTY-EASTERN
PART; FRESNO COUNTY-EASTERN PART; MADERA
COUNTY-EASTERN PART; MARIPOSA COUNTY-EASTERN PART;
MONTERREY COUNTY-SOUTHWESTERN PART; TUOLUMNE
COUNTY-EASTERN PART.................................$ 53.23 39.55
----------------------------------------------------------------
ENGI0003-019 06/30/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 1- LANDSCAPE FINISH GRADE OPERATOR: ALL
FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND
ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA
1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES.
CALAVARAS COUNTY-EXCEPT EASTERN PART. FRESNO
COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT
EASTERN PART. MARIPOSAL-EXCEPT EASTERN PART.
MONTEREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE
COUNTY-EXCEPT EASTERN PART.)........................$ 55.85 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 1- LANDSCAPE FINISH GRADE OPERATOR: ALL
FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND
ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA
2: CALAVERAS COUNTY-EASTERN PART. FRESNO
COUNTY-EASTERN PART. MADERA COUNTY-EASTERN PART.
MARIPOSA COUNTY-EASTERN PART. MONTEREY
COUNTY-SOUTHWESTERN PART. TUOLUMNE COUNTY-EASTERN
PART.)..............................................$ 57.85 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 2- LANDSCAPE OPERATOR UP TO 65 HP: ALL
EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR
LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP
3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT
WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S
RATING IS 65 HP OR LESS: A-FRAME AND WINCH TRUCK,
BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE,
ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING
EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER
31 HP UP TO 65 HP. (AREA 1: ALAMEDA, CONTRA COSTA,
KINGS, MERCED, SAN BENITO, SAN FRANCISCO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, AND
STANISLAUS COUNTIES. CALAVARAS COUNTY-EXCEPT
EASTERN PART. FRESNO COUNTY-EXCEPT EASTERN PART.
MADERA COUNTY-EXCEPT EASTERN PART. MARIPOSAL-EXCEPT
EASTERN PART. MONTEREY COUNTY-EXCEPT SOUTHWESTERN
PART. TUOLUMNE COUNTY-EXCEPT EASTERN PART.).........$ 52.25 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 2- LANDSCAPE OPERATOR UP TO 65 HP: ALL
EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR
LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP
3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT
WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S
RATING IS 65 HP OR LESS: A-FRAME AND WINCH TRUCK,
BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE,
ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING
EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER
31 HP UP TO 65 HP. (AREA 2: CALAVERAS
COUNTY-EASTERN PART. FRESNO COUNTY-EASTERN PART.
MADERA COUNTY-EASTERN PART. MARIPOSA COUNTY-EASTERN
PART. MONTEREY COUNTY-SOUTHWESTERN PART. TUOLUMNE
COUNTY-EASTERN PART.)...............................$ 54.25 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 3- LANDSCAPE UTILITY OPERATOR: SMALL
RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA
1: ALAMEDA, CONTRA COSTA, KINGS, MERCED, SAN
BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, AND STANISLAUS COUNTIES.
CALAVARAS COUNTY-EXCEPT EASTERN PART. FRESNO
COUNTY-EXCEPT EASTERN PART. MADERA COUNTY-EXCEPT
EASTERN PART. MARIPOSAL-EXCEPT EASTERN PART.
MONTEREY COUNTY-EXCEPT SOUTHWESTERN PART. TUOLUMNE
COUNTY-EXCEPT EASTERN PART.)........................$ 47.64 28.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY:
GROUP 3- LANDSCAPE UTILITY OPERATOR: SMALL
RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA
2: CALAVERAS COUNTY-EASTERN PART. FRESNO
COUNTY-EASTERN PART. MADERA COUNTY-EASTERN PART.
MARIPOSA COUNTY-EASTERN PART. MONTEREY
COUNTY-SOUTHWESTERN PART. TUOLUMNE COUNTY-EASTERN
PART.)..............................................$ 49.64 28.56
----------------------------------------------------------------
IRON0377-001 01/01/2025
Rates Fringes
IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA,
SAN MATEO, SANTA CLARA COUNTIES). PREMIUM PAY:
$6.00 ADDITIONAL PER HOUR AT THE FOLLOWING
LOCATIONS: CHINA LAKE NAVAL TEST STATION, CHOCOLATE
MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS AFB, FORT
IRWIN MILITARY STATION, FORT IRWIN TRAINING
CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS
ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE
CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR
FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL
PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE
LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL
POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S.
COAST GUARD STATION-TWO ROCK........................$ 45.78 26.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL
(ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA
COUNTIES) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT
THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST
STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND,
EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT
IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE
ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL
PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE
BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY,
VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE
INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST
GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S.
COAST GUARD STATION-TWO ROCK........................$ 55.33 35.15
----------------------------------------------------------------
IRON0377-003 01/01/2025
Rates Fringes
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND
COUNTY) PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT
THE FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST
STATION, CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND,
EDWARDS AFB, FORT IRWIN MILITARY STATION, FORT
IRWIN TRAINING CENTER-GOLDSTONE, SAN CLEMENTE
ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE FEDERAL
PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE
BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY,
VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE
INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST
GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S.
COAST GUARD STATION-TWO ROCK........................$ 45.78 26.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL
(SAN FRANCISCO CITY AND COUNTY) PREMIUM PAY: $6.00
ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS:
CHINA LAKE NAVAL TEST STATION, CHOCOLATE MOUNTAINS
NAVAL RESERVE-NILAND, EDWARDS AFB, FORT IRWIN
MILITARY STATION, FORT IRWIN TRAINING
CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN NICHOLAS
ISLAND, SUSANVILLE FEDERAL PRISON, 29 PALMS-MARINE
CORPS, U.S. MARINE BASE-BARSTOW, U.S. NAVAL AIR
FACILITY-SEALY, VENDENBERG AFB. $4.00 ADDITIONAL
PER HOUR AT THE FOLLOWING LOCATIONS: ARMY DEENSE
LANGUAGE INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL
POST GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S.
COAST GUARD STATION-TWO ROCK........................$ 55.83 35.15
----------------------------------------------------------------
IRON0433-005 01/01/2025
Rates Fringes
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES)
PREMIUM PAY: $6.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: CHINA LAKE NAVAL TEST STATION,
CHOCOLATE MOUNTAINS NAVAL RESERVE-NILAND, EDWARDS
AFB, FORT IRWIN MILITARY STATION, FORT IRWIN
TRAINING CENTER-GOLDSTONE, SAN CLEMENTE ISLAND, SAN
NICHOLAS ISLAND, SUSANVILLE FEDERAL PRISON, 29
PALMS-MARINE CORPS, U.S. MARINE BASE-BARSTOW, U.S.
NAVAL AIR FACILITY-SEALY, VENDENBERG AFB. $4.00
ADDITIONAL PER HOUR AT THE FOLLOWING LOCATIONS:
ARMY DEENSE LANGUAGE INSTITUTE-MONTEREY, FALLON AIR
BASE, NAVAL POST GRADUATE SCHOOL-MONTEREY, YERMO
MARINE CORPS LOGISTICS CENTER. $2.00 ADDITIONAL PER
HOUR AT THE FOLLOWING LOCATIONS: PORT HUENEME, PORT
MUGU, U.S. COAST GUARD STATION-TWO ROCK.............$ 45.78 26.51
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL
(REMAINING COUNTIES) PREMIUM PAY: $6.00 ADDITIONAL
PER HOUR AT THE FOLLOWING LOCATIONS: CHINA LAKE
NAVAL TEST STATION, CHOCOLATE MOUNTAINS NAVAL
RESERVE-NILAND, EDWARDS AFB, FORT IRWIN MILITARY
STATION, FORT IRWIN TRAINING CENTER-GOLDSTONE, SAN
CLEMENTE ISLAND, SAN NICHOLAS ISLAND, SUSANVILLE
FEDERAL PRISON, 29 PALMS-MARINE CORPS, U.S. MARINE
BASE-BARSTOW, U.S. NAVAL AIR FACILITY-SEALY,
VENDENBERG AFB. $4.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: ARMY DEENSE LANGUAGE
INSTITUTE-MONTEREY, FALLON AIR BASE, NAVAL POST
GRADUATE SCHOOL-MONTEREY, YERMO MARINE CORPS
LOGISTICS CENTER. $2.00 ADDITIONAL PER HOUR AT THE
FOLLOWING LOCATIONS: PORT HUENEME, PORT MUGU, U.S.
COAST GUARD STATION-TWO ROCK........................$ 50.70 35.15
----------------------------------------------------------------
LABO0067-006 06/30/2025
Rates Fringes
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS
REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL
SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF
ASBESTOS-CONTAINING MATERIALS FROM WALLS AND
CEILINGS; OR FROM PIPES, BOILERS, AND MECHANICAL
SYSTEMS ONLY IF THEY ARE BEING SCRAPPED;
ENCAPSULATION, ENCLOSURE AND DISPOSAL OF
ASBESTOS-CONTAINING MATERIALS BY HAND OR WITH
EQUIPMENT OR MACHINERY; SCAFFOLDING; FABRICATION OF
TEMPORARY WOODEN BARRIERS; AND ASSEMBLY OF
DECONTAMINATION STATIONS. (AREA 1: ALAMEDA, CONTRA
COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA
COUNTIES)...........................................$ 39.15 30.03
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS
REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL
SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF
ASBESTOS-CONTAINING MATERIALS FROM WALLS AND
CEILINGS; OR FROM PIPES, BOILERS, AND MECHANICAL
SYSTEMS ONLY IF THEY ARE BEING SCRAPPED;
ENCAPSULATION, ENCLOSURE AND DISPOSAL OF
ASBESTOS-CONTAINING MATERIALS BY HAND OR WITH
EQUIPMENT OR MACHINERY; SCAFFOLDING; FABRICATION OF
TEMPORARY WOODEN BARRIERS; AND ASSEMBLY OF
DECONTAMINATION STATIONS. (AREA 2: CALAVERAS,
FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY,
SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 38.15 30.03
----------------------------------------------------------------
LABO0073-002 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 36.26 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(CALAVERAS AND SAN JOAQUIN COUNTIES)................$ 36.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II- INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 34.06 27.30
----------------------------------------------------------------
LABO0073-003 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK (SAN JOAQUIN COUNTY)....$ 36.29 25.55
----------------------------------------------------------------
LABO0073-005 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN..$ 45.89 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL)..............................................$ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE............................$ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD).....................$ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN.......................$ 44.42 27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.....$ 46.41 27.72
----------------------------------------------------------------
LABO0073-007 06/30/2025
Rates Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F-
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED.(CALAVERAS AND SAN JOAQUIN COUNTIES).........$ 30.37 29.89
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP- ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES).......$ 38.85 29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN
COUNTIES) ..........................................$ 38.15 29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A-
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN
COUNTIES) ..........................................$ 38.37 29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C-
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES).......$ 38.20 29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E-
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 38.70 29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2-
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES).......$ 38.00 29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3-
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY). FOOTNOTES: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CALAVERAS AND SAN JOAQUIN COUNTIES).......$ 37.90 29.89
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4-
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT
THE JOBSITE OR TEMPORARY JOBSITE YARD. THE
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING
AND OILING AND MOVING TO THE NEXT POINT OF
ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 31.59 29.89
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES).........$ 39.11 29.89
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. (CALAVERAS AND SAN
JOAQUIN COUNTIES)...................................$ 38.61 29.89
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS
AND SAN JOAQUIN COUNTIES)...........................$ 38.02 29.89
LABORER, GUNITE: GROUP 4- GUINTE LABORER.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES).........$ 37.90 29.89
LABORER, WRECKING: GROUP 1- SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND
MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 38.15 29.89
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS).
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)..........$ 38.00 29.89
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (1) New Construction. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (CALAVERAS AND
SAN JOAQUIN COUNTIES)...............................$ 37.90 29.89
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (2) Establishment Warranty Period.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (CALAVERAS AND SAN JOAQUIN COUNTIES)..........$ 31.59 29.89
----------------------------------------------------------------
LABO0073-009 07/01/2023
Rates Fringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE
SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS AND
SAN JOAQUIN COUNTIES)...............................$ 39.77 28.54
----------------------------------------------------------------
LABO0261-003 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (SAN FRANCISCO AND SAN MATEO
COUNTIES)...........................................$ 37.26 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(SAN FRANCISCO AND SAN MATEO COUNTIES)..............$ 37.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II- INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. (SAN FRANCISCO AND SAN MATEO
COUNTIES)...........................................$ 35.06 27.30
----------------------------------------------------------------
LABO0261-005 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN
(SAN FRANCISCO AND SAN MATEO COUNTIES)..............$ 45.89 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL) (SAN FRANCISCO AND SAN MATEO COUNTIES).......$ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE (SAN FRANCISCO AND SAN
MATEO COUNTIES).....................................$ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD) (SAN FRANCISCO AND
SAN MATEO COUNTIES).................................$ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (SAN FRANCISCO AND
SAN MATEO COUNTIES).................................$ 44.42 27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
(SAN FRANCISCO AND SAN MATEO COUNTIES)..............$ 46.41 27.72
----------------------------------------------------------------
LABO0261-009 06/26/2023
Rates Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F-
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES).....$ 31.37 23.20
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP- ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)....$ 37.20 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN
MATEO COUNTIES).....................................$ 36.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A-
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN
MATEO COUNTIES).....................................$ 36.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C-
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)....$ 36.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E-
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN
MATEO COUNTIES).....................................$ 37.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2-
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)....$ 36.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3-
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY). FOOTNOTES: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SAN FRANCISCO AND SAN MATEO COUNTIES)....$ 36.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4-
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT
THE JOBSITE OR TEMPORARY JOBSITE YARD. THE
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING
AND OILING AND MOVING TO THE NEXT POINT OF
ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (SAN FRANCISCO AND SAN
MATEO COUNTIES).....................................$ 29.94 27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)......$ 37.46 27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN
MATEO COUNTIES).....................................$ 36.96 27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN
FRANCISCO AND SAN MATEO COUNTIES)...................$ 36.37 27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES)......$ 36.25 27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND
MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. (SAN FRANCISCO AND SAN MATEO
COUNTIES)...........................................$ 36.50 27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS).
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES).......$ 36.35 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (1) New Construction. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (SAN
FRANCISCO AND SAN MATEO COUNTIES)...................$ 36.25 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (2) Establishment Warranty Period.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (SAN FRANCISCO AND SAN MATEO COUNTIES).......$ 29.94 27.30
----------------------------------------------------------------
LABO0261-011 07/01/2023
Rates Fringes
MASON TENDER, BRICK. FOOTNOTES: UNDERGROUND WORK
SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER
PIPES, TELEPHONE CONDUITS, TUNNELS AND CUT
TRENCHES: $5.00 PER DAY ADDITIONAL. WORK IN LIVE
SEWAGE: $2.50 PER DAY ADDITIONAL. (SAN FRANCISCO
AND SAN MATEO COUNTIES).............................$ 37.05 27.45
----------------------------------------------------------------
LABO0261-014 07/01/2023
Rates Fringes
PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD:
$1.00 PER HOUR ADDITIONAL. (SAN FRANCISCO AND SAN
MATEO COUNTIES) ....................................$ 41.93 30.32
----------------------------------------------------------------
LABO0270-003 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES)................................$ 36.26 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (SANTA CALARA COUNTY)...........$ 37.26 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES).....$ 36.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(SANTA CALARA COUNTY)...............................$ 37.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II- INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS,
AND CRASH CUSHIONS. (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES)................................$ 34.06 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II- INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS,
AND CRASH CUSHIONS. (SANTA CALARA COUNTY)...........$ 35.06 27.30
----------------------------------------------------------------
LABO0270-004 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN.
(MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ
COUNTIES)...........................................$ 45.89 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL). (MONTEREY, SAN BENITO, SANTA CLARA, AND
SANTA CRUZ COUNTIES)................................$ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE. (MONTEREY, SAN BENITO,
SANTA CLARA, AND SANTA CRUZ COUNTIES)...............$ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD). (MONTEREY, SAN
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES).......$ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN. (MONTEREY, SAN
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES).......$ 44.42 27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.
(MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ
COUNTIES)...........................................$ 46.41 27.72
----------------------------------------------------------------
LABO0270-005 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK. (MONTEREY AND SAN
BENITO COUNTIES)....................................$ 36.29 25.55
----------------------------------------------------------------
LABO0270-007 06/26/2023
Rates Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F-
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 36.08 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP- ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 36.20 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES)................................$ 35.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A-
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES)................................$ 35.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C-
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 35.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E-
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES)................................$ 36.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2-
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 35.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3-
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY). FOOTNOTES: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 35.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4-
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT
THE JOBSITE OR TEMPORARY JOBSITE YARD. THE
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING
AND OILING AND MOVING TO THE NEXT POINT OF
ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES)................................$ 28.94 27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 36.46 27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO,
AND SANTA CRUZ COUNTIES)............................$ 35.96 27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY,
SAN BENITO, AND SANTA CRUZ COUNTIES)................$ 35.37 27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 35.25 27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND
MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. (MONTEREY, SAN BENITO, AND
SANTA CRUZ COUNTIES)................................$ 35.50 27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS).
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 35.35 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (1) New Construction. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (MONTEREY,
SAN BENITO, AND SANTA CRUZ COUNTIES)................$ 35.25 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (2) Establishment Warranty Period.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (MONTEREY, SAN BENITO, AND SANTA CRUZ
COUNTIES)...........................................$ 28.94 27.30
----------------------------------------------------------------
LABO0270-010 06/26/2023
Rates Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F-
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SANTA CLARA COUNTY).......................$ 37.08 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP- ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SANTA CLARA COUNTY)......................$ 37.20 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)........$ 36.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A-
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)........$ 36.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C-
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SANTA CLARA COUNTY)......................$ 36.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E-
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (SANTA CLARA COUNTY).......$ 37.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2-
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SANTA CLARA COUNTY)......................$ 36.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3-
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY). FOOTNOTES: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (SANTA CLARA COUNTY).......................$ 36.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4-
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT
THE JOBSITE OR TEMPORARY JOBSITE YARD. THE
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING
AND OILING AND MOVING TO THE NEXT POINT OF
ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (SANTA CLARA COUNTY)........$ 29.94 27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (SANTA CLARA COUNTY)........................$ 37.46 27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. (SANTA CLARA COUNTY).....$ 36.96 27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA
COUNTY).............................................$ 36.37 27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (SANTA CLARA COUNTY)........................$ 36.25 27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND
MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. (SANTA CLARA COUNTY).........$ 36.50 27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS).
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (SANTA CLARA COUNTY)..........................$ 36.35 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (1) New Construction. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (SANTA CLARA
COUNTY).............................................$ 36.25 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (2) Establishment Warranty Period.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (SANTA CLARA COUNTY).........................$ 29.94 27.30
----------------------------------------------------------------
LABO0270-011 07/01/2023
Rates Fringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE
SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MONTEREY, SAN
BENITO, SANTA CRUZ, SANTA CLARA COUNTIES) ..........$ 40.68 29.68
----------------------------------------------------------------
LABO0294-001 07/01/2023
Rates Fringes
LABORER, BRICK: MASON TENDER-BRICK. (FRESNO,
KINGS AND MADERA COUNTIES)..........................$ 36.29 25.55
----------------------------------------------------------------
LABO0294-002 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (FRESNO, KINGS, AND MADERA
COUNTIES)...........................................$ 36.26 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(FRESNO, KINGS, AND MADERA COUNTIES)................$ 36.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II- INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. (FRESNO, KINGS, AND MADERA
COUNTIES)...........................................$ 34.06 27.30
----------------------------------------------------------------
LABO0294-005 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN.
(FRESNO, KINGS, AND MADERA COUNTIES)................$ 45.89 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL). (FRESNO, KINGS, AND MADERA COUNTIES)........$ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE. (FRESNO, KINGS, AND
MADERA COUNTIES)....................................$ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD). (FRESNO, KINGS,
AND MADERA COUNTIES)................................$ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN. (FRESNO, KINGS, AND
MADERA COUNTIES)....................................$ 44.42 27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST.
(FRESNO, KINGS, AND MADERA COUNTIES)................$ 46.41 27.72
----------------------------------------------------------------
LABO0294-008 06/26/2023
Rates Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F-
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (FRESNO, KINGS, AND MADERA COUNTIES).......$ 36.08 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP- ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)......$ 36.20 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA
COUNTIES)...........................................$ 35.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A-
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA
COUNTIES)...........................................$ 35.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C-
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)......$ 35.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E-
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA
COUNTIES)...........................................$ 36.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2-
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (FRESNO, KINGS, AND MADERA COUNTIES)......$ 35.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3-
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY). FOOTNOTES: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (FRESNO, KINGS, AND MADERA COUNTIES).......$ 35.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4-
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT
THE JOBSITE OR TEMPORARY JOBSITE YARD. THE
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING
AND OILING AND MOVING TO THE NEXT POINT OF
ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (FRESNO, KINGS, AND MADERA
COUNTIES)...........................................$ 28.94 27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (FRESNO, KINGS, AND MADERA COUNTIES)........$ 36.46 27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. (FRESNO, KINGS, AND
MADERA COUNTIES)....................................$ 35.96 27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO,
KINGS, AND MADERA COUNTIES).........................$ 35.37 27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (FRESNO, KINGS, AND MADERA COUNTIES)........$ 35.25 27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND
MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. (FRESNO, KINGS, AND MADERA
COUNTIES)...........................................$ 35.50 27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS).
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (FRESNO, KINGS, AND MADERA COUNTIES)..........$ 35.35 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (1) New Construction. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (FRESNO,
KINGS, AND MADERA COUNTIES).........................$ 35.25 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (2) Establishment Warranty Period.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (FRESNO, KINGS, AND MADERA COUNTIES).........$ 28.94 27.30
----------------------------------------------------------------
LABO0294-010 07/01/2023
Rates Fringes
PLASTERER TENDER. WORK ON A SWING STAGE SCAFFOLD:
$1.00 PER HOUR ADDITIONAL. (CALAVERAS, FRESNO,
KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN,
STANISLAUS & TUOLUMNE COUNTIES).....................$ 39.77 28.54
----------------------------------------------------------------
LABO0294-011 07/01/2023
Rates Fringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE
SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (FRESNO,
KINGS, AND MADERA COUNTIES).........................$ 39.77 28.54
----------------------------------------------------------------
LABO0304-002 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (ALAMEDA COUNTY)................$ 37.26 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(ALAMEDA COUNTY)....................................$ 37.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II- INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. (ALAMEDA COUNTY)...................$ 35.06 27.30
----------------------------------------------------------------
LABO0304-003 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN
(ALAMEDA COUNTY)....................................$ 45.89 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL) (ALAMEDA COUNTY).............................$ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE (ALAMEDA COUNTY)...........$ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD) (ALAMEDA COUNTY)....$ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (ALAMEDA COUNTY).....$ 44.42 27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
(ALAMEDA COUNTY)....................................$ 46.41 27.72
----------------------------------------------------------------
LABO0304-004 06/26/2023
Rates Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F-
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (ALAMEDA COUNTY)...........................$ 37.08 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP- ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (ALAMEDA COUNTY)..........................$ 37.20 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (ALAMEDA COUNTY)............$ 36.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A-
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (ALAMEDA COUNTY)............$ 36.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C-
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (ALAMEDA COUNTY)..........................$ 36.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E-
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (ALAMEDA COUNTY)...........$ 37.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2-
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (ALAMEDA COUNTY)..........................$ 36.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3-
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY). FOOTNOTES: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (ALAMEDA COUNTY)...........................$ 36.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4-
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT
THE JOBSITE OR TEMPORARY JOBSITE YARD. THE
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING
AND OILING AND MOVING TO THE NEXT POINT OF
ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (ALAMEDA COUNTY)............$ 29.94 27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (ALAMEDA COUNTY)............................$ 37.46 27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. (ALAMEDA COUNTY).........$ 36.96 27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA
COUNTY).............................................$ 36.37 27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (ALAMEDA COUNTY)............................$ 36.25 27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND
MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. (ALAMEDA COUNTY).............$ 36.50 27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS).
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (ALAMEDA COUNTY)..............................$ 36.35 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (1) New Construction. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (ALAMEDA
COUNTY).............................................$ 36.25 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (2) Establishment Warranty Period.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (ALAMEDA COUNTY).............................$ 29.94 27.30
----------------------------------------------------------------
LABO0304-005 07/01/2023
Rates Fringes
BRICK TENDER. FOOTNOTES: WORK ON JOBS WHERE
HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER
HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR
ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL.
(ALAMEDA COUNTY) ...................................$ 37.05 27.45
----------------------------------------------------------------
LABO0304-008 07/01/2023
Rates Fringes
PLASTERER TENDER. WORK ON A SWING STAGE SCAFFOLD:
$1.00 PER HOUR ADDITIONAL. (ALAMEDA AND CONTRA
COSTA COUNTIES) .................................$ 41.93 30.32
----------------------------------------------------------------
LABO0324-002 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON. (CONTRA COSTA COUNTY).........$ 37.26 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(CONTRA COSTA COUNTY)...............................$ 37.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II- INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. (CONTRA COSTA COUNTY)..............$ 35.06 27.30
----------------------------------------------------------------
LABO0324-006 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN
(CONTRA COSTA COUNTY)...............................$ 45.89 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL) (CONTRA COSTA COUNTY)........................$ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE (CONTRA COSTA COUNTY).....$ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD) (CONTRA COSTA
COUNTY).............................................$ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (CONTRA COSTA COUNTY).$ 44.42 27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
(CONTRA COSTA COUNTY)...............................$ 46.41 27.72
----------------------------------------------------------------
LABO0324-012 06/26/2023
Rates Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F-
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CONTRA COSTA COUNTY)(CONTRA COSTA
COUNTY).............................................$ 37.08 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP- ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CONTRA COSTA COUNTY).....................$ 37.20 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY).......$ 36.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A-
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY).......$ 36.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C-
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CONTRA COSTA COUNTY).....................$ 36.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E-
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY)......$ 37.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-G-
PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION
WITH PIPELAYING); CAULKER; BANDER; PIPEWRAPPER;
CONDUIT LAYER; PLASTIC PIPE LAYER; PRESSURE PIPE
TESTER; NO JOINT PIPE AND STRIPPING OF SAME,
INCLUDING REPAIR OF VOIDS; PRECAST MANHOLE SETTERS,
CAST IN PLACE MANHOLE FORM SETTERS. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY) ....$ 36.70 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2-
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CONTRA COSTA COUNTY).....................$ 36.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3-
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY). FOOTNOTES: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (CONTRA COSTA COUNTY)......................$ 36.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4-
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT
THE JOBSITE OR TEMPORARY JOBSITE YARD. THE
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING
AND OILING AND MOVING TO THE NEXT POINT OF
ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (CONTRA COSTA COUNTY).......$ 29.94 27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (CONTRA COSTA COUNTY).......................$ 37.46 27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)....$ 36.96 27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA
COSTA COUNTY).......................................$ 36.37 27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (CONTRA COSTA COUNTY).......................$ 36.25 27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND
MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. (CONTRA COSTA COUNTY)........$ 36.50 27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS).
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (CONTRA COSTA COUNTY).........................$ 36.35 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (1) New Construction. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (CONTRA COSTA
COUNTY).............................................$ 36.25 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (2) Establishment Warranty Period.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (CONTRA COSTA COUNTY)........................$ 29.94 27.30
----------------------------------------------------------------
LABO0324-014 07/01/2023
Rates Fringes
BRICK TENDER. FOOTNOTES: WORK ON JOBS WHERE
HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER
HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR
ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL.
(CONTRA COSTA COUNTY) .............................$ 37.05 27.45
----------------------------------------------------------------
LABO0324-018 07/01/2023
Rates Fringes
PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD:
$1.00 PER HOUR ADDITIONAL. (ALAMEDA AND CONTRA
COSTA COUNTIES).....................................$ 41.93 30.32
----------------------------------------------------------------
LABO1130-002 07/01/2023
Rates Fringes
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT
DRIVER, FLAG PERSON (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 36.26 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH
CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE.
(MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 36.56 27.30
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC
CONTROL PERSON II- INSTALLATION AND REMOVAL OF
TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND
CRASH CUSHIONS. (MARIPOSA, MERCED, STANISLAUS,
AND TUOLUMNE COUNTIES)..............................$ 34.06 27.30
----------------------------------------------------------------
LABO1130-003 06/26/2023
Rates Fringes
TUNNEL AND SHAFT LABORERS: GROUP 1- DIAMOND
DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN
(MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 45.89 27.72
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT
WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND
LEVEL) (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 45.66 27.72
TUNNEL AND SHAFT LABORERS: GROUP 3- BIT GRINDER;
BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY
PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER
IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN;
HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL,
INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE
WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER
- POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT
ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND
SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR
SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL
LABORER WORK); CABLE TENDER; CHUCK TENDER;
POWDERMAN - PRIMER HOUSE (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 45.41 27.72
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR
OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS,
TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND
SPREADING, DUMPMEN (ANY METHOD) (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 44.96 27.72
TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW;
REBOUNDMAN; SWAMPER/ BRAKEMAN (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 44.42 27.72
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST
(MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 46.41 27.72
----------------------------------------------------------------
LABO1130-005 07/01/2023
Rates Fringes
LABORER: MASON TENDER-BRICK (MARIPOSA, MERCED,
STANISLAUS AND TUOLUMNE COUNTIES)...................$ 36.29 25.55
----------------------------------------------------------------
LABO1130-007 06/26/2023
Rates Fringes
LABORER (CONSTRUCTION CRAFT LABORERS) GROUP 1-F-
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR
SHOT CRETE. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MARIPOSA, MERCED, STANISLAUS, AND
TUOLUMNE COUNTIES)..................................$ 36.08 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION
SPECIALIST GROUP- ASPHALT IRONER AND RAKER;
CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS'
WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MARIPOSA, MERCED, STANISLAUS, AND
TUOLUMNE COUNTIES)..................................$ 36.20 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER,
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES;
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER;
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW;
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER;
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER;
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD,
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER);
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR;
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC
AND SIMILAR TYPE MATERIALS (APPLYING MEANS
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS);
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING,
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS,
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS;
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE
CHECKING IN CONNECTION WITH PIPELAYING);
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN,
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED,
BULL FLOAT IN CONNECTION WITH LABORERS' WORK;
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL);
ASBESTOS AND MOLD REMOVAL WORKER. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. GROUP 1-B:
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE
GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW
SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND
ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 35.50 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A-
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL
TYPES REGARDLESS OF TYPE OR METHOD OF POWER;
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF
METHOD USED FOR SUCH LOADING AND PLACING; HIGH
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER;
BIT GRINDER. GROUP 1-B: SEWER CLEANERS SHALL
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER
SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE,
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE
SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE
GROUP 1 WAGE RATES. GROUP 1-D: MAINTENANCE AND
REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES
PERFORMING WORK COVERED HEREIN SHALL RECEIVE $0.25
PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK
PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 35.72 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-C-
BURNING AND WELDING IN CONNECTION WITH LABORERS'
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE
WELDING. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MARIPOSA, MERCED, STANISLAUS, AND
TUOLUMNE COUNTIES)..................................$ 35.55 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E-
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS
THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM
THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. GROUP 1-B: SEWER
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1
WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 36.05 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2-
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE,
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS.
PRESSURE); LOADING AND UNLOADING, CARRYING AND
HAULING OF ALL RODS AND MATERIALS FOR USE IN
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER;
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12
INCHES. FOOTNOTES: LABORERS WORKING OFF OR WITH
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS
SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE
WAGE RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MARIPOSA, MERCED, STANISLAUS, AND
TUOLUMNE COUNTIES)..................................$ 35.35 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3-
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR;
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER;
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION
TRACK LABORER; TEMPORARY AIR AND WATER LINES,
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE
ONLY). FOOTNOTES: LABORERS WORKING OFF OR WITH OR
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. GROUP 1-B: SEWER CLEANERS SHALL RECEIVE
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE
DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER
MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1
WAGE RATES. GROUP 1-D: MAINTENANCE AND REPAIR
TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK
COVERED HEREIN SHALL RECEIVE $0.25 PER HOUR ABOVE
THEIR REGULAR RATE FOR ALL WORK PERFORMED ON
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED
HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN
PLACED. (MARIPOSA, MERCED, STANISLAUS, AND
TUOLUMNE COUNTIES)..................................$ 35.25 27.30
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4-
FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING
INCLUDING BUT NOT LIMITED TO: STREET CLEANER;
CLEANING AND WASHING WINDOWS; BRICK CLEANER
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT
THE JOBSITE OR TEMPORARY JOBSITE YARD. THE
MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED
IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING
AND OILING AND MOVING TO THE NEXT POINT OF
ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. GROUP 1-B: SEWER CLEANERS
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE
RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN
SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL
RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00
PER DAY ABOVE GROUP 1 WAGE RATES. GROUP 1-D:
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL
RECEIVE $0.25 PER HOUR ABOVE THEIR REGULAR RATE FOR
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT
SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND
LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY
COVER HAS BEEN PLACED. (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 28.94 27.30
LABORER, GUNITE: GROUP 1- STRUCTURAL NOZZLEMAN.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 36.46 27.30
LABORER, GUNITE: GROUP 2- NOZZLEMAN, GUNMAN,
POTMAN, GROUNDMAN. FOOTNOTES: LABORERS WORKING
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING
SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE
THE APPLICABLE WAGE RATE. (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 35.96 27.30
LABORER, GUNITE: GROUP 3- REBOUNDMAN. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA,
MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)..........$ 35.37 27.30
LABORER, GUNITE: GROUP 4- GUINTE LABORER.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 35.25 27.30
LABORER, WRECKING: GROUP 1- SKILLED WRECKER
(REMOVING AND SALVAGING OF SASH, WINDOWS, AND
MATERIALS). FOOTNOTES: LABORERS WORKING OFF OR
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,
BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE
APPLICABLE WAGE RATE. (MARIPOSA, MERCED,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 35.50 27.30
LABORER, WRECKING: GROUP 2- SEMI-SKILLED WRECKER
(SALVAGING OF OTHER BUILDING MATERIALS).
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 35.35 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (1) New Construction. FOOTNOTES:
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS,
SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER
HOUR ABOVE THE APPLICABLE WAGE RATE. (MARIPOSA,
MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)..........$ 35.25 27.30
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - (2) Establishment Warranty Period.
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL
RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE
RATE. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE
COUNTIES)...........................................$ 28.94 27.30
----------------------------------------------------------------
LABO1130-008 07/01/2023
Rates Fringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE
SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS,
FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS, & TUOLUMNE COUNTIES) ..........$ 39.77 28.54
----------------------------------------------------------------
LABO1130-009 07/01/2023
Rates Fringes
LABORER, PLASTER TENDER. WORK ON A SWING STAGE
SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MARIPOSA,
MERCED, STANISLAUS, AND TUOLUMNE COUNTIES) .........$ 39.77 28.54
----------------------------------------------------------------
PAIN0016-001 01/01/2025
Rates Fringes
PAINTERS. PREMIUMS: EXOTIC MATERIALS - $1.25
ADDITIONAL PER HOUR. SPRAY WORK: - $0.50
ADDITIONAL PER HOUR. INDUSTRIAL PAINTING - $0.25
ADDITIONAL PER HOUR [WORK ON INDUSTRIAL BUILDINGS
USED FOR THE MANUFACTURE AND PROCESSING OF GOODS
FOR SALE OR SERVICE; STEEL CONSTRUCTION (BRIDGES),
STACKS, TOWERS, TANKS, AND SIMILAR STRUCTURES].
HIGH WORK: OVER 50 FEET - $2.00 PER HOUR
ADDITIONAL 100 TO 180 FEET - $4.00 PER HOUR
ADDITIONAL OVER 180 FEET - $6.00 PER HOUIR
ADDITIONAL (ALAMEDA, CONTRA COSTA, MONTEREY, SAN
BENITO, SAN MATEO, SANTA CLARA, AND SANTA CRUZ
COUNTIES)...........................................$ 53.38 28.04
----------------------------------------------------------------
PAIN0016-003 01/01/2025
Rates Fringes
DRYWALL FINISHER/TAPER. (ALAMDEA, CONTRA COSTA,
SAN FRANCISCO, SAN MATEO, & SANTA CLARA COUNTIES)...$ 63.76 32.69
DRYWALL FINISHER/TAPER. (CALAVERAS, MARIPOSA,
MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA
CRUZ, STANISLAUS, & TUOLUMNE COUNTIES)..............$ 59.63 31.29
----------------------------------------------------------------
PAIN0016-012 01/01/2024
Rates Fringes
SOFT FLOOR LAYER (ALAMEDA, CONTRA COSTA, MARIPOSA,
MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES).........$ 59.00 33.03
----------------------------------------------------------------
PAIN0016-015 01/01/2025
Rates Fringes
PAINTER: BRUSH. FOOTNOTES: SPRAY/SANDBLAST: $0.50
ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25
ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE
GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR.
100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00
ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR
WATER LEVEL $6.00 ADDITIONAL PER HOUR.
(CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN,
STANISLAUS & TUOLUMNE COUNTIES).....................$ 43.45 22.80
----------------------------------------------------------------
PAIN0016-022 01/01/2025
Rates Fringes
PAINTER (SAN FRANCISCO COUNTY)......................$ 57.00 28.04
----------------------------------------------------------------
PAIN0169-001 01/01/2023
Rates Fringes
GLAZIER (FRESNO, KINGS, MADERA, MARIPOSA AND MERCED
COUNTIES)...........................................$ 44.33 28.88
----------------------------------------------------------------
PAIN0169-005 01/01/2024
Rates Fringes
GLAZIER (ALAMEDA CONTRA COSTA, MONTEREY, SAN
BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA &
SANTA CRUZ COUNTIES)................................$ 56.22 34.00
----------------------------------------------------------------
PAIN0294-004 07/01/2023
Rates Fringes
PAINTER: BRUSH, ROLLER. FOOTNOTE: SPRAY PAINTERS
& PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR.
PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25
ADDITIONAL PER HOUR. LEAD ABATERS & SANDBLASTERS
RECEIVE $1.50 ADDITIONAL PER HOUR. HIGH TIME -
OVER 30 FEET (DOES NOT INCLUDE WORK FROM A LIFT)
$0.75 PER HOUR ADDITIONAL. (FRESNO, KINGS AND
MADERA COUNTIES) ...................................$ 34.49 21.80
PAINTER: DRYWALL FINISHER/TAPER. FOOTNOTE:
SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00
ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL
PATCHING RECEIVE $1.25 ADDITIONAL PER HOUR. LEAD
ABATERS & SANDBLASTERS RECEIVE $1.50 ADDITIONAL PER
HOUR. HIGH TIME - OVER 30 FEET (DOES NOT INCLUDE
WORK FROM A LIFT) $0.75 PER HOUR ADDITIONAL.
(FRESNO, KINGS AND MADERA COUNTIES) ................$ 35.74 21.80
----------------------------------------------------------------
PAIN0294-005 01/01/2023
Rates Fringes
SOFT FLOOR LAYER (FRESNO, KINGS & MADERA COUNTIES)..$ 38.53 23.19
----------------------------------------------------------------
PAIN0767-001 01/01/2024
Rates Fringes
GLAZIER. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN
LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEE
REQUIRED TO WEAR A BODY HARNESS SHALL RECEIVE $1.50
PER HOUR ABOVE THE BASIC HOURLY RATE AT ANY
ELEVATION. (CALAVERAS, SAN JOAQUIN, STANISLAUS AND
TUOLUMNE COUNTIES) .................................$ 43.25 35.62
----------------------------------------------------------------
PAIN1176-001 07/01/2022
Rates Fringes
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
IMPROVEMEMT: GROUP 2- GAMECOURT & PLAYGROUND
INSTALLER...........................................$ 34.71 17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
IMPROVEMENT: GROUP 1- STRIPER: LAYOUT AND
APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING;
HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND
MARKINGS............................................$ 40.83 17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY
IMPROVEMENT: GROUP 3- PROTECTIVE COATING, PAVEMENT
SEALING.............................................$ 35.11 17.62
----------------------------------------------------------------
PAIN1237-003 01/01/2024
Rates Fringes
SOFT FLOOR LAYER (CALAVERAS; SAN JOAQUIN
COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES).........$ 48.54 26.59
----------------------------------------------------------------
PLAS0066-002 07/01/2019
Rates Fringes
PLASTERER (ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN
FRANCISCO COUNTIES).................................$ 42.41 30.73
----------------------------------------------------------------
PLAS0300-001 07/01/2018
Rates Fringes
PLASTERER (AREA 188: FRESNO).......................$ 32.70 31.68
PLASTERER (AREA 224: SAN BENITO, SANTA CLARA,
SANTA CRUZ).........................................$ 32.88 31.68
PLASTERER (AREA 295: CALAVERAS & SAN JOAQUIN
COUNTIES)...........................................$ 32.70 31.68
PLASTERER (AREA 337: MONTEREY COUNTY)..............$ 32.88 31.68
PLASTERER (AREA 429: MARIPOSA, MERCED, STANISLAUS,
TUOLUMNE COUNTIES)..................................$ 32.70 31.68
----------------------------------------------------------------
PLAS0300-005 07/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 32.15 23.27
----------------------------------------------------------------
PLUM0038-001 07/01/2023
Rates Fringes
PLUMBER (PLUMBER, STEAMFITTER, REFRIGERATION
FITTER) (SAN FRANCISCO COUNTY)......................$ 85.50 48.98
----------------------------------------------------------------
PLUM0038-005 07/01/2025
Rates Fringes
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY
FITTER (SAN FRANCISCO COUNTY).......................$ 77.35 36.53
----------------------------------------------------------------
PLUM0062-001 01/01/2026
Rates Fringes
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ
COUNTIES)...........................................$ 57.75 43.60
----------------------------------------------------------------
PLUM0159-001 07/01/2025
Rates Fringes
PLUMBER AND STEAMFITTER: (1) REFRIGERATION (CONTRA
COSTA COUNTY).......................................$ 67.68 49.04
PLUMBER AND STEAMFITTER: (2) ALL OTHER WORK (CONTRA
COSTA COUNTY).......................................$ 68.57 49.04
----------------------------------------------------------------
PLUM0246-001 01/01/2026
Rates Fringes
PLUMBER & STEAMFITTER (FRESNO, KINGS & MADERA
COUNTIES)...........................................$ 54.50 42.54
----------------------------------------------------------------
PLUM0246-004 01/01/2017
Rates Fringes
PLUMBER: PIPE TRADESMAN. (PIPE TRADESMAN SCOPE OF
WORK: INSTALLATION OF CORRUGATED METAL PIPING FOR
DRAINAGE, AS WELL AS INSTALLATION OF CORRUGATED
METAL PIPING FOR CULVERTS IN CONNECTION WITH STORM
SEWERS AND DRAINS; GROUTING, DRY PACKING AND
DIAPERING OF JOINTS, HOLES OR CHASES INCLUDING
PAVING OVER JOINTS, IN PIPING; TEMPORARY PIPING FOR
DIRT WORK FOR BUILDING SITE PREPARATION; OPERATING
JACK HAMMERS, PAVEMENT BREAKERS, CHIPPING GUNS,
CONCRETE SAWS AND SPADES TO CUT HOLES, CHASES AND
CHANNELS FOR PIPING SYSTEMS; DIGGING, GRADING,
BACKFILLING AND GROUND PREPARATION FOR ALL TYPES OF
PIPE TO ALL POINTS OF THE JOBSITE; GROUND
PREPARATION INCLUDING GROUND LEVELING, LAYOUT AND
PLANTING OF SHRUBBERY, TREES AND GROUND COVER,
INCLUDING WATERING, MOWING, EDGING, PRUNING AND
FERTILIZING, THE BREAKING OF CONCRETE, DIGGING,
BACKFILLING AND TAMPING FOR THE PREPARATION AND
COMPLETION OF ALL WORK IN CONNECTION WITH LAWN
SPRINKLER AND LANDSCAPING; LOADING, UNLOADING AND
DISTRIBUTING MATERIALS AT JOBSITE; PUTTING AWAY
MATERIALS IN STORAGE BINS IN JOBSITE SECURE STORAGE
AREA; DEMOLITION OF PIPING AND FIXTURES FOR
REMODELING AND ADDITIONS; SETTING UP AND TEARING
DOWN WORK BENCHES, LADDERS AND JOB SHACKS; CLEAN-UP
AND SWEEPING OF JOBSITE; PIPE WRAPPING AND
WATERPROOFING WHERE TAR OR SIMILAR MATERIAL IS
APPLIED FOR PROTECTION OF BURIED PIPING; FLAGMAN)
(FRESNO, MERCED, & SAN JOAQUIN COUNTIES)............$ 13.00 10.74
----------------------------------------------------------------
PLUM0342-001 07/01/2025
Rates Fringes
PIPEFITTER (CONTRA COSTA COUNTY)....................$ 80.50 50.45
PLUMBER, PIPEFITTER, STEAMFITTER (ALAMEDA COUNTY)...$ 80.50 50.45
----------------------------------------------------------------
PLUM0355-004 07/01/2025
Rates Fringes
UNDERGROUND UTILITY WORKER /LANDSCAPE FITTER
(ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS,
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, AND TUOLUMNE COUNTIES)..................$ 36.01 18.50
----------------------------------------------------------------
PLUM0393-001 07/01/2021
Rates Fringes
PLUMBER/PIPEFITTER (SAN BENITO AND SANTA CLARA
COUNTIES)...........................................$ 68.76 46.63
----------------------------------------------------------------
PLUM0442-001 01/01/2026
Rates Fringes
PLUMBER & STEAMFITTER (CALAVERAS, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES)...........................................$ 58.45 38.74
----------------------------------------------------------------
PLUM0467-001 07/01/2025
Rates Fringes
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)...$ 87.75 41.44
----------------------------------------------------------------
ROOF0027-002 09/01/2024
Rates Fringes
ROOFER. FOOTNOTE: WORK WITH PITCH, PITCH BASE OF
PITCH IMPREGNANTED PRODUCTS OR ANY MATERIAL
CONTAINING COAL TAR PITCH, ON ANY BUILDING OLD OR
NEW, WHERE BOTH ASPHALT AND PITCHERS ARE USED IN
THE APPLICATION OF A BUILT-UP ROOF OR TEAR OFF:
$2.00 PER HOUR ADDITIONAL. (FRESNO, KINGS, AND
MADERA COUNTIES)....................................$ 45.76 16.86
----------------------------------------------------------------
ROOF0040-002 08/01/2024
Rates Fringes
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES).........$ 55.30 22.97
----------------------------------------------------------------
ROOF0081-001 08/01/2024
Rates Fringes
ROOFER (ALAMEDA AND CONTRA COSTA COUNTIES)..........$ 54.94 23.34
----------------------------------------------------------------
ROOF0081-004 08/01/2024
Rates Fringes
ROOFER (CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN,
STANISLAUS AND TUOLUMNE COUNTIES)...................$ 49.65 22.19
----------------------------------------------------------------
ROOF0095-002 08/01/2023
Rates Fringes
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND
MASTIC WORKER (MONTEREY, SAN BENITO, SANTA CLARA,
AND SANTA CRUZ COUNTIES)............................$ 57.17 21.51
ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA
CLARA, AND SANTA CRUZ COUNTIES).....................$ 53.17 21.51
ROOFER: KETTLE PERSON (2 KETTLES) (MONTEREY, SAN
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:)......$ 55.17 21.51
----------------------------------------------------------------
SFCA0483-001 01/01/2026
Rates Fringes
SPRINKLER FITTER: FIRE (ALAMEDA, CONTRA COSTA,
SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES)..$ 81.54 41.35
----------------------------------------------------------------
SFCA0669-011 01/01/2026
Rates Fringes
SPRINKLER FITTER (CALAVERAS, FRESNO, KINGS,
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE
COUNTIES)...........................................$ 49.69 29.72
----------------------------------------------------------------
SHEE0104-001 06/29/2026
Rates Fringes
SHEET METAL WORKER (MONTEREY & SAN BENITO
COUNTIES)...........................................$ 65.02 37.47
SHEET METAL WORKER (SANTA CRUZ COUNTY)..............$ 66.18 36.93
SHEET METAL WORKER: ALL OTHER WORK (ALAMEDA, CONTRA
COSTA, SAN FRANSICO, SAN MATEO, SANTA CLARA
COUNTIES))..........................................$ 86.31 46.75
SHEET METAL WORKER: MECHANICAL CONTRACTS UNDER
$200,000 (ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN
MATEO, SANTA CLARA COUNTIES)).......................$ 73.19 46.00
----------------------------------------------------------------
SHEE0104-003 06/29/2026
Rates Fringes
SHEET METAL WORKER (CALAVERAS AND SAN JOAQUIN
COUNTIES)...........................................$ 56.96 38.63
----------------------------------------------------------------
SHEE0104-005 06/29/2026
Rates Fringes
SHEET METAL WORKER: EXCLUDING METAL DECK AND SIDING
(MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE
COUNTIES)...........................................$ 57.06 42.15
----------------------------------------------------------------
SHEE0104-007 06/29/2026
Rates Fringes
SHEET METAL WORKER (FRESNO, KINGS, AND MADERA
COUNTIES)...........................................$ 54.49 42.39
----------------------------------------------------------------
SHEE0104-015 07/01/2024
Rates Fringes
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY.
(ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ
COUNTIES)...........................................$ 56.23 37.52
----------------------------------------------------------------
SHEE0104-018 07/01/2024
Rates Fringes
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY.
(CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE
COUNTIES)...........................................$ 56.23 37.52
----------------------------------------------------------------
TEAM0094-001 07/01/2025
Rates Fringes
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.;
SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK
(WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK
SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK
TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY);
CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS;
FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON;
SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL
DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK;
TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK
TENDER (INCLUDING LOADING AND UNLOADING); TEAM
DRIVER; TOOL ROOM ATTENDANT (REFINERIES).
FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK;
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE
DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT
BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK
(MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK:
USE APPROPRIATE RATE FOR THE POWER UNIT OR THE
EQUIPMENT UTILIZED. ................................$ 43.26 34.28
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND
UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.;
WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS,
UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK;
RUBBER-TIRED MUCK CAR (NOT SELF-LOADED);
RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME
DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD
OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER
AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED
TRACTOR. FOOTNOTES: ARTICULATED DUMP TRUCK; BULK
CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE
TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH
CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE;
SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER
PLANER; ASPHALT BURNER; SCARIFIER BURNER;
INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE);
UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. ......$ 43.56 34.28
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND
INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.;
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS,
7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500
GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL
TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY
TRANSPORT TILLER PERSON; SELF- PROPELLED STREET
SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK
- HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR
RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING
TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON
AND ROAD OILER; DRY DISTRIBUTION TRUCK (A
BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL
RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION
OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE
DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW.
FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK;
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE
DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT
BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK
(MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK:
USE APPROPRIATE RATE FOR THE POWER UNIT OR THE
EQUIPMENT UTILIZED. ................................$ 43.86 34.28
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS.
AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S,
21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING
AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS
(WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK
HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES;
DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE,
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID
AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR
GREASE TANK TRAILERS OR OTHER MISCELLANEOUS
TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND
TRUCK REPAIRMAN. FOOTNOTES: ARTICULATED DUMP
TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT
AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX);
DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR
SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE
RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER
BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL
TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE
APPROPRIATE RATE FOR THE POWER UNIT OR THE
EQUIPMENT UTILIZED. ................................$ 44.21 34.28
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND
OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT
OVER 7 AXLES. FOOTNOTES: ARTICULATED DUMP TRUCK;
BULK CEMENT SPREADER (WITH OR WITHOUT AUGER);
DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY
PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR
TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE.
HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER;
INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE);
UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. ......$ 44.56 34.28
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"