Wage determination CA20260019

Residential construction - California, revision 6, modified 2026-09-03

Verify against the official document: this page mirrors WD CA20260019 revision 6 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0016-002 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 1: ALAMEDA, $84.7625.07
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 2: EL DORADO$64.5625.07

ASBE0016-009 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM $34.5611.40
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM $36.539.27

BRCA0003-001 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
MARBLE FINISHER$42.0619.80

BRCA0003-002 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
BRICKLAYER: ( 7) MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SOLANO, SONOMA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND $57.0228.50
BRICKLAYER: ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHO$56.9426.28
BRICKLAYER: ( 9) EL DORADO, PLACER, SACRAMENTO, SUTTER SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUI$52.7625.01
BRICKLAYER: (16) MONTEREY, SANTA CRUZ SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $$54.1827.82

BRCA0003-007 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
TERRAZZO FINISHER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL$44.9320.98
TERRAZZO WORKER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL$60.5829.79

BRCA0003-009 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
MARBLE MASON$61.7230.31

BRCA0003-012 (collectively bargained (union) rate, 04/01/2024)

ClassificationBase rateFringes
TILE FINISHER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO)$37.7519.28
TILE FINISHER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO, YUBA)$35.0017.44
TILE FINISHER (SONOMA)$35.7819.23
TILE LAYER (ALAMEDA, CONTRA COSTA, MARIN, MONTERREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO)$59.9222.62
TILE LAYER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO, YUBA)$55.5521.08
TILE LAYER (SONOMA)$56.7922.54

CARP0022-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN FRANCISCO COUNTY)$60.3933.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN FRANCISCO COUNTY)$60.5433.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO COUNTY)$60.3933.52
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY)$60.4935.11

CARP0035-005 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
DRYWALL INSTALLERS/LATHERS: (AREA 1) AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties$54.8531.93
DRYWALL INSTALLERS/LATHERS: (AREA 2) AREA 2: Monterey, San Benito & Santa Cruz Counties$48.9731.93
DRYWALL INSTALLERS/LATHERS: (AREA 4) AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & YubaCounties$48.1231.93
DRYWALL STOCKER/SCRAPPER: (AREA 1) AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties$27.4318.58
DRYWALL STOCKER/SCRAPPER: (AREA 2) AREA 2: Monterey, San Benito & Santa Cruz Counties$24.4918.58
DRYWALL STOCKER/SCRAPPER: (AREA 4) AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba Counties$24.0718.58

CARP0035-009 (collectively bargained (union) rate, 07/01/2020)

ClassificationBase rateFringes
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTY$52.6530.82
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER MARIN COUNTY$52.8030.82
CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY$52.6530.82
CARPENTER: MILLWRIGHT MARIN COUNTY$52.7532.41

CARP0046-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING H$60.3933.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTN$54.6633.52
CARPENTERS: JOURNEYMAN CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AN$54.5133.52
CARPENTERS: MILLWRIGHT EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORAD$57.0135.11

CARP0046-003 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES)$60.3933.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES$53.3133.52
CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES)$53.1633.52
CARPENTERS: MILLWRIGHT (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES)$55.6635.11

CARP0152-001 (collectively bargained (union) rate, 07/01/2020)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CONTRA COSTA COUNTY)$52.6530.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (CONTRA COSTA COUNTY)$52.8030.82
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA COUNTY)$52.6530.82
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)$52.7532.41

CARP0180-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTY$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER SOLANO COUNTY$55.0031.49
CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY$54.8531.49
CARPENTERS: MILLWRIGHT SOLANO COUNTY$54.9533.08

CARP0217-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN MATEO COUNTY)$60.3933.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN MATEO COUNTY)$60.5433.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY).$ 60.39 33.52 CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)$60.4935.11

CARP0405-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CLARA COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CLARA COUNTY)$55.0031.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA COUNTY)$54.8531.49
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY)$54.9533.08

CARP0405-002 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN BENITO COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN BENITO COUNTY)$49.1231.49
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO COUNTY)$48.9731.49
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)$51.4733.08

CARP0505-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CRUZ COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CRUZ COUNTY)$49.1231.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ COUNTY)$48.9731.49
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)$51.4733.08

CARP0605-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (MONTEREY COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MONTEREY COUNTY)$49.1231.49
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)$48.9731.49
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)$51.4733.08

CARP0713-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (ALAMEDA COUNTY)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (ALAMEDA COUNTY)$55.0031.49
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)$54.8531.49
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY)$54.9533.08

CARP0751-001 (collectively bargained (union) rate, 07/01/2021)

ClassificationBase rateFringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (NAPA AND SONOMA COUNTIES)$54.8531.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (NAPA AND SONOMA COUNTIES)$55.0031.49
CARPENTERS: JOURNEYMAN CARPENTER (NAPA AND SONOMA COUNTIES)$54.8531.49

ELEC0006-003 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DAT$58.8331.51
SOUND & COMMUNICATIONS: TECHNICIAN (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DA$67.6531.78

ELEC0006-005 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (SAN FRANCISCO COUNTY) WORK ON RESIDENTIAL WOOD FRAME REMODEL AND REPAIR IN ALL WOOD-CONSTRUCTED BUILDINGS NOT TO EXCEED 24 LIVING UNITS; AND NEW WOOD FRAME SINGLE STRU$55.5025.64

ELEC0180-002 (collectively bargained (union) rate, 12/01/2023)

ClassificationBase rateFringes
ELECTRICIAN (NAPA & SOLANO COUNTIES)$38.5021.16

ELEC0234-002 (collectively bargained (union) rate, 12/30/2025)

ClassificationBase rateFringes
ELECTRICIAN: ZONE A: (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ZONE A: ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF HIGHWAY 1 AND DOLAN ROAD IN$70.4133.76
ELECTRICIAN: ZONE B: (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ZONE B: ANY AREA OUTSIDE OF ZONE A$77.4533.97

ELEC0234-004 (collectively bargained (union) rate, 12/01/2021)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION$47.9324.09
SOUND & COMMUNICATIONS: TECHNICIAN (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATIO$55.1224.30

ELEC0302-002 (collectively bargained (union) rate, 03/01/2025)

ClassificationBase rateFringes
CABLE SPLICER (CONTRA COSTA COUNTY)$74.5436.09
ELECTRICIAN (CONTRA COSTA COUNTY)$66.2635.84

ELEC0302-004 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA$53.0830.84
SOUND & COMMUNICATIONS: TECHNICIAN (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DAT$61.0431.08

ELEC0332-002 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (SANTA CLARA COUNTY)$47.3523.49

ELEC0332-004 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA $58.3331.00
SOUND & COMMUNICATIONS: TECHNICIAN (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA$67.0831.26

ELEC0340-001 (collectively bargained (union) rate, 02/01/2016)

ClassificationBase rateFringes
ELECTRICIAN: FOUR STORIES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)$39.0624.51
ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3 STORIES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)$23.1012.48

ELEC0340-004 (collectively bargained (union) rate, 03/01/2025)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS: INSTALLER (COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATIO$40.0025.50
SOUND & COMMUNICATIONS: TECHNICIAN (COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATI$46.0025.68

ELEC0401-006 (collectively bargained (union) rate, 01/01/2021)

ClassificationBase rateFringes
ELECTRICIAN (EL DORADO AND PLACER COUNTIES) ZONE PAY: ZONE 1 - 0 TO 70 MILES $0.00 PER HOUR ZONE 2 - 70 TO 90 MILES $5.00 PER HOUR ZONE 3 - 91 MILES AND OVER $7.00 PER HOUR$31.888.46

ELEC0551-003 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (MARIN AND SONOMA COUNTIES)$41.0024.26

ELEC0595-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
CABLE SPLICER (ALAMEDA COUNTY)$87.4049.41
ELECTRICIAN (ALAMEDA COUNTY)$76.0049.07

ELEC0595-007 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
SOUND & COMMUNICATIONS, INSTALLER (ALAMEDA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYST$56.6828.35

ELEC0617-002 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (SAN MATEO COUNTY)$86.0051.07

ELEV0008-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MO$84.0538.44

ENGI0003-009 (collectively bargained (union) rate, 06/30/2025)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7cu. yds. (EL DORADO,$65.5434.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade $64.0934.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant t$62.6934.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (w$61.3634.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounte$60.1534.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Che$58.8834.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixe$57.7934.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckh$56.7134.69
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (ba$54.6934.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: CRANES: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge ped$66.3934.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pede$43.7931.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derric$46.0831.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANES: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and inc$64.7034.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and incl$42.8331.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up$45.0731.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: CRANES: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-typ$63.0634.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULIC: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-$44.4431.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type$42.5531.15
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCK CRANE OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propell$44.8331.15

ENGI0003-010 (collectively bargained (union) rate, 06/30/2025)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. (ALAMEDA, $65.5434.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade $64.0934.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant t$62.6934.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (w$61.3634.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounte$60.1534.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Ch$58.8834.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixe$57.7934.69
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckh$56.7134.69
OPERATOR: POWER EQUIPMENT, AREA 1:GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (back$54.6934.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: CRANES: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge ped$66.3934.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pede$35.5928.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derric$38.0528.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANES: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and inc$64.7034.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and incl$35.3428.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up$37.8328.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: CRANES: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-typ$63.0634.69
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULIC: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-$37.2028.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type$35.1128.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCK CRAINE OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propel$37.5828.03
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 4: CRANES: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic $37.8628.03

ENGI0003-011 (collectively bargained (union) rate, 06/30/2025)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,$55.8528.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY$57.8528.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,$52.2528.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY$54.2528.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,$47.6428.56
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY$49.6428.56

IRON0377-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Cho$45.7826.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lak$55.3335.15

IRON0377-003 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND COUNTY) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Re$45.7826.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (SAN FRANCISCO CITY AND COUNTY) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Cho$55.8335.15

IRON0433-005 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland$45.7826.51
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL (REMAINING COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mount$50.7035.15

LABO0067-007 (collectively bargained (union) rate, 06/30/2025)

ClassificationBase rateFringes
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 (AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO,SANMATEO, SANTA CLARA) SCOPE OF WORK: Covers site mobilization; initial site $39.1530.03
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 (AREA 2: EL DORADO, MONTEREY, PLACE, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) SCOPE OF WORK:$38.1530.03

LABO0185-001 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER$36.2027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit laye$35.5027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHA$35.7227.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (EL DORADO, PLACER, SACR$35.5527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR M$36.0527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER $35.3527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAI$35.2527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$28.9427.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGIN$36.4627.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N$35.9627.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD$35.3727.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAF$35.2527.30
LABORERS:, WRECKING: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows and materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABOR$35.5027.30
LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker (salvaging of other building materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING$35.3527.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR$35.2527.30
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS W$28.9427.30

LABO0185-003 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER: MASON TENDER-BRICK (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)$36.2925.55

LABO0261-001 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER$37.2027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYE$36.5027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHA$36.7227.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (MARIN, SAN FRANCISCO, A$36.5527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR M$37.0527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER $36.3527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAI$36.2527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELT$37.4627.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING$36.9627.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APP$36.3727.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT$36.2527.30
LABORERS:, WRECKING: GROUP 1 SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS ADN MATERIALS (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR$36.5027.30
LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS) (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR F$36.3527.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WIT$29.9427.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS$36.2527.30

LABO0261-008 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER: MASON TENDER-BRICK MARIN COUNTY$37.5425.55

LABO0261-011 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES FOOTNOTES: UNDERGROUND WORK SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, TELEPHONE CONDUITS, TUNNELS AND CUT TRENCH$37.0527.45

LABO0261-012 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTERER TENDER (EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$39.7728.54

LABO0261-013 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTER TENDER (SAN FRANCISCO AND SAN MATEO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$41.9330.32

LABO0270-001 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole f$37.2027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, con$36.5027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon drill$36.7227.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA ""A"" - S$36.5527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 $37.0527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""A"" - SANTA CLARA COUNTY AREA ""B"" - MONTEREY, S$37.0827.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucke$36.3527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector;$36.2527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windo$29.9427.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole f$36.2027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, con$35.5027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon drill$35.7227.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA ""B"" - M$35.5527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 $36.0527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTI$36.0827.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucke$35.3527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector;$35.2527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windo$28.9427.30
LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL NOZZLEMAN (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $37.4627.30
LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging sc$36.9627.30
LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per $36.3727.30
LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 $36.2527.30
LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL NOZZLEMAN (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, $36.4627.30
LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GORUNDMAN (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or fro$35.9627.30
LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMAN (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging s$35.3727.30
LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORER (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swingi$35.2527.30
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or w$36.5027.30
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from$36.3527.30
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE$35.5027.30
LABORERS:, WRECKING - AREA B: GROUP 2 : Semi-skilled wrecker (salvaging of other building materials)(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers $35.3527.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or$29.9427.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n c$36.2527.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Labo$28.9427.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working $35.2527.30

LABO0270-002 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
MASON TENDER, BRICK (SANTA CLARA COUNTY)$35.2926.85
MASON TENDER, BRICK (SANTA CRUZ COUNTY)$35.2926.85

LABO0270-006 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER: MASON TENDER-BRICK (MONTEREY AND SAN BENITO COUNTIES)$36.2925.55

LABO0270-008 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTER TENDER (SANTA CLARA & SANTA CRUZ) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$40.6829.68

LABO0270-009 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTERER TENDER (MONTEREY AND SAN BENITO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$40.6829.68

LABO0304-001 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER;$37.2027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER$36.5027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHAN$36.7227.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (ALAMEDA COUNTY) FOOTNOTE$36.5527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MO$37.0527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS$37.0827.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER A$36.3527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL$36.2527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK $29.9427.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL$37.4627.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER H$36.9627.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL$36.3727.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL$36.2527.30
LABORERS:, WRECKING: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows and materials) (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, S$36.5027.30
LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWI$36.3527.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGI$29.9427.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS,$36.2527.30

LABO0304-006 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
BRICK TENDER (ALAMEDA COUNTY) FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WOR$37.0527.45

LABO0304-007 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTERER TENDER (ALAMEDA AND CONTRA COSTA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$41.9330.32

LABO0324-001 (collectively bargained (union) rate, 06/26/2023)

ClassificationBase rateFringes
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole fo$37.2027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, con$36.5027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-A OY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER$36.7227.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C: (BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE (AREA ""A"" - CONTRA C$36.5527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 $37.0527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers wor$37.0827.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-G CONTRA COSTA COUNTY: Pipelayer (including grade checking on connection with peiplaying); Caulker; Bander; Pipewrapper; Co$36.7027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKE$36.3527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector;$36.2527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windo$29.9427.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole f$36.2027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, con$35.5027.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon drill$35.7227.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA ""B"" - N$35.5527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 $36.0527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE$36.0827.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucke$35.3527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector;$35.2527.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windo$28.9427.30
LABORERS:, GUNITE - AREA A: GROUP 1: Structural nozzleman (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts:$37.4627.30
LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, Gunman, Potman, Groundman (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging s$36.9627.30
LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per$36.3727.30
LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25$36.2527.30
LABORERS:, GUNITE - AREA B: GROUP 1: Structural nozzleman (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts:$36.4627.30
LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, Gunman, Potman, Groundman (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chai$35.9627.30
LABORERS:, GUNITE - AREA B: GROUP 3: Reboundman (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, be$35.3727.30
LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborer (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds$35.2527.30
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE: Laborers working off or$36.5027.30
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE: Laborers working off or with or fr$36.3527.30
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers w$35.5027.30
LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off $35.3527.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with o$29.9427.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE: Laborers working off or with or from bos'n$36.2527.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working$28.9427.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with $35.2527.30

LABO0324-011 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA COUNTIES) FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL$36.8426.24

LABO0324-015 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
BRICK TENDER (CONTRA COSTA COUNTY) FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOL$37.0527.45

LABO0324-017 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
PLASTER TENDER (EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) Work on a swing stage scaffold: $1.00 per hour additional$39.7728.54

PAIN0016-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
PAINTERS: BRUSH (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: $43.4522.80

PAIN0016-009 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
SOFT FLOOR LAYER (ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ AND SONOMA COUNTIES)$59.0033.03

PAIN0016-011 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
DRYWALL FINISHER/TAPER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SAN FRANCISCO, SAN SANTA CLARA, SOLANO AND SONOMA COUNTIES$63.7632.69
DRYWALL FINISHER/TAPER: (AREA 2) AREA 2: EL DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO, BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA COUNTIES$59.6331.29

PAIN0016-013 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
PAINTER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO & SONOMA COUNTIES) FOOTNOTES: SPRAY WORK: $0.50 ADDITIONAL PER HOUR. E$53.3828.04

PAIN0016-019 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
PAINTER (SAN FRANCISCO COUNTY)$57.0028.04

PAIN0169-006 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
GLAZIER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SONOMA COUNTIES;AND SOLANO COUNTY (WEST OF A LINE DEFINED AS F$56.2234.00

PAIN0567-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PAINTER: BRUSH AND ROLLER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEE$39.4316.16
PAINTER: PAPER HANGER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJ$42.1916.16
PAINTER: SPRAY PAINTER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLE$41.4316.16

PAIN0567-008 (collectively bargained (union) rate, 07/01/2022)

ClassificationBase rateFringes
SOFT FLOOR LAYER (EL DORADO AND PLACER COUNTIES)$34.2716.47

PAIN0567-011 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
DRYWALL FINISHER/TAPER (EL DORADO AND PLACER COUNTIES) STEEPLEJACK-DRYWALL FINISHER OVER 40 FT WITH OPEN SPACE BELOW: $1.50 ADDITIONAL PER HOUR$42.7916.12

PAIN0767-002 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
GLAZIER (EL DORADO, PLACER, SACRAMENTO, SOLANO, SUTTER, YOLO AND YUBA COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDE$43.2535.62

PAIN1176-001 (collectively bargained (union) rate, 07/01/2022)

ClassificationBase rateFringes
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER$34.7117.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES$40.8317.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING$35.1117.62

PAIN1237-002 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
SOFT FLOOR LAYER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)$48.5426.59

PLAS0066-001 (collectively bargained (union) rate, 07/01/2019)

ClassificationBase rateFringes
PLASTERER (ALAMEDA, CONTRA COSTA, SAN FRANCISCO AND SAN MATEO COUNTIES)$42.4130.73

PLAS0300-002 (collectively bargained (union) rate, 07/01/2018)

ClassificationBase rateFringes
PLASTERER (AREA 224: SAN BENITO, SANTA CLARA & SANTA CRUZ COUNTIES)$32.8831.68
PLASTERER (AREA 295: EL DORADO, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO & YUBA COUNTIES)$32.7031.68
PLASTERER (AREA 337: MONTEREY COUNTY)$32.8831.68
PLASTERER (AREA 355: MARIN COUNTY)$36.7331.68

PLAS0300-005 (collectively bargained (union) rate, 07/01/2016)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER$32.1523.27

PLUM0038-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (1) Wood Frame Construction in San Francisco, and all work in Marin & Sonoma Counties (MARIN, SAN FRANCISCO & SONOMA COUNTIES)$82.0048.18
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (2) NEW CONSTRUCTION IN SAN FRANCISCO COUNTY (MARIN, SAN FRANCISCO & SONOMA COUNTIES)$91.0049.49

PLUM0038-007 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (MARIN, SAN FRANCISCO & SONOMA COUNTIES)$77.3536.53

PLUM0062-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ COUNTIES)$57.7543.60

PLUM0159-002 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
PLUMBER, PIPEFITTER, STEAMFITTER (CONTRA COSTA COUNTY)$43.7220.29

PLUM0228-002 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
PLUMBER (SUTTER & YUBA COUNTIES)$52.7541.39

PLUM0342-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PLUMBER & STEAMFITTER (ALAMEDA COUNTY)$80.5050.45

PLUM0343-002 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
PLUMBERS AND PIPEFITTERS (NAPA AND SOLANO COUNTIES) FOOTNOTES: WORK FROM TRUSSES, TEMPORARY STAGING, UNGUARDED STRUCTURES 35' FROM THE GROUND OR WATER: $.75 PER HOUR ADDITIONAL. WO$37.3521.15

PLUM0350-002 (collectively bargained (union) rate, 08/01/2023)

ClassificationBase rateFringes
PLUMBERS AND PIPEFITTERS (EL DORADO AND PLACER COUNTIES (LAKE TAHOE BASIN ONLY))$52.1418.71

PLUM0355-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER (ALAMEDA, CONTRA COSTA, EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, SUTTER,$36.0118.50

PLUM0393-002 (collectively bargained (union) rate, 09/01/2013)

ClassificationBase rateFringes
PLUMBERS AND PIPEFITTERS (SAN BENITO & SANTA CLARA COUNTIES)$30.907.90

PLUM0447-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PLUMBERS AND PIPEFITTERS (EL DORADO,PLACER, SACRAMENTO AND YOLO COUNTIES)$55.5824.02

PLUM0467-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)$87.7541.44

ROOF0040-001 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES)$55.3022.97

ROOF0081-003 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
ROOFER (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$54.9423.34

ROOF0081-005 (collectively bargained (union) rate, 08/01/2023)

ClassificationBase rateFringes
ROOFER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)$46.7321.36

ROOF0095-001 (collectively bargained (union) rate, 08/01/2023)

ClassificationBase rateFringes
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$57.1721.51
ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$53.1721.51
ROOFER: KETTLE PERSON (2 KETTLES) (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$55.1721.51

SFCA0483-002 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO AND SONOMA COUNTIES:)$49.8218.05

SFCA0669-006 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)$49.6929.72

SFCA0669-012 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)$52.0629.86

SHEE0104-002 (collectively bargained (union) rate, 06/29/2026)

ClassificationBase rateFringes
SHEET METAL WORKER: (AREA 2) AREA 2: MONTEREY & SAN BENITO$65.0237.46
SHEET METAL WORKER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO & SONOMA$86.3146.75
SHEET METAL WORKER: (AREA 3) AREA 3: SANTA CRUZ$66.1836.93

SHEE0104-017 (collectively bargained (union) rate, 06/29/2026)

ClassificationBase rateFringes
SHEET METAL WORKER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)$56.9638.63

TEAM0094-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUM$43.2634.28
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT $43.5634.28
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TR$43.8634.28
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HEL$44.2134.28
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WI$44.5634.28
Full official text of CA20260019 rev 6
"General Decision Number: CA20260019 09/03/2026


State: California


Construction Types: Residential


Counties: California Counties of 
Alameda, Contra Costa, El Dorado, Marin, 
Monterey, Napa, Placer, Sacramento, San 
Benito, San Francisco, San Mateo, Santa 
Clara, Santa Cruz, Solano, Sonoma, 
Sutter, Yolo and Yuba




RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up
to and  including 4 stories)


Modification Number     Publication Date
          4                01/30/2026
          5                05/18/2026
          6                09/03/2026


 ASBE0016-002 01/01/2024
                                                     Rates                  Fringes
ASBESTOS WORKERS/INSULATOR: INCLUDES THE 
APPLICATION OF ALL  INSULATING MATERIALS, 
PROTECTIVE  COVERINGS, COATINGS, AND FINISHES TO 
ALL TYPES OF MECHANICAL SYSTEMS (AREA 1:  ALAMEDA, 
CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO 
& SANTA CLARA COUNTIES).............................$ 84.76                  25.07
ASBESTOS WORKERS/INSULATOR: INCLUDES THE 
APPLICATION OF ALL  INSULATING MATERIALS, 
PROTECTIVE  COVERINGS, COATINGS, AND FINISHES TO 
ALL TYPES OF MECHANICAL SYSTEMS (AREA 2:  EL 
DORADO,  MONTEREY,  PLACER, SACRAMENTO, SAN BENITO, 
SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, & YUBA 
COUNTIES)...........................................$ 64.56                  25.07
----------------------------------------------------------------

 ASBE0016-009 05/01/2024
                                                     Rates                  Fringes
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: 
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, 
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL 
INSULATION MATERIALS FROM MECHANICAL SYSTEMS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1:  EL 
DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO, 
SANTA CRUZ, SOLANO, SANOMA, SUTTER, YOLO & YUBA 
COUNTIES)...........................................$ 34.56                  11.40
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: 
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, 
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL 
INSULATION MATERIALS FROM MECHANICAL SYSTEMS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2: 
ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, 
SAN MATEO & SANTA CLARA COUNTIES)...................$ 36.53                  9.27
----------------------------------------------------------------

 BRCA0003-001 08/01/2024
                                                     Rates                  Fringes
MARBLE FINISHER.....................................$ 42.06                  19.80
----------------------------------------------------------------

 BRCA0003-002 05/01/2024
                                                     Rates                  Fringes
BRICKLAYER: ( 7) MARIN, NAPA, SAN FRANCISCO, SAN 
MATEO, SOLANO, SONOMA    SPECIALTY PAY:    (A)  
UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, 
MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE 
CONDUIT SHALL BE PAID  $1.25 PER HOUR ABOVE THE 
REGULAR RATE.  WORK IN DIRECT CONTACT WITH RAW 
SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO 
THE ABOVE.  (B)  OPERATING A SAW OR GRINDER SHALL 
RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE.  (C) 
 GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR 
ABOVE THE REGULAR RATE..............................$ 57.02                  28.50
BRICKLAYER: ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO, 
SANTA CLARA    SPECIALTY PAY:    (A)  UNDERGROUND 
WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, 
CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT 
SHALL BE PAID  $1.25 PER HOUR ABOVE THE REGULAR 
RATE.  WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL 
RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE.  
(B)  OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 
PER HOUR ABOVE THE REGULAR RATE.  (C)  GUNITE 
NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE 
THE REGULAR RATE....................................$ 56.94                  26.28
BRICKLAYER: ( 9)  EL DORADO, PLACER, SACRAMENTO, 
SUTTER    SPECIALTY PAY:    (A)  UNDERGROUND WORK 
SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH 
BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE 
PAID  $1.25 PER HOUR ABOVE THE REGULAR RATE.  WORK 
IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE 
$1.25 PER HOUR IN ADDITION TO THE ABOVE.  (B)  
OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER 
HOUR ABOVE THE REGULAR RATE.  (C)  GUNITE NOZZLE 
PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE 
REGULAR RATE........................................$ 52.76                  25.01
BRICKLAYER: (16) MONTEREY, SANTA CRUZ    SPECIALTY 
PAY:    (A)  UNDERGROUND WORK SUCH AS TUNNEL WORK, 
SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND 
TELEPHONE CONDUIT SHALL BE PAID  $1.25 PER HOUR 
ABOVE THE REGULAR RATE.  WORK IN DIRECT CONTACT 
WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN 
ADDITION TO THE ABOVE.  (B)  OPERATING A SAW OR 
GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE 
REGULAR RATE.  (C)  GUNITE NOZZLE PERSON SHALL 
RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE.......$ 54.18                  27.82
----------------------------------------------------------------

 BRCA0003-007 07/01/2024
                                                     Rates                  Fringes
TERRAZZO FINISHER  FOOTNOTE:   BASE MACHINE 
OPERATOR: $1.00 PER HOUR ADDITIONAL.................$ 44.93                  20.98
TERRAZZO WORKER  FOOTNOTE:   BASE MACHINE OPERATOR: 
$1.00 PER HOUR ADDITIONAL...........................$ 60.58                  29.79
----------------------------------------------------------------

 BRCA0003-009 08/01/2024
                                                     Rates                  Fringes
MARBLE MASON........................................$ 61.72                  30.31
----------------------------------------------------------------

 BRCA0003-012 04/01/2024
                                                     Rates                  Fringes
TILE FINISHER (ALAMEDA, CONTRA COSTA, MARIN, 
MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA, SANTA CRUZ, SOLANO).............$ 37.75                  19.28
TILE FINISHER (EL DORADO, PLACER, SACRAMENTO, 
SUTTER, YOLO, YUBA).................................$ 35.00                  17.44
TILE FINISHER (SONOMA)..............................$ 35.78                  19.23
TILE LAYER (ALAMEDA, CONTRA COSTA, MARIN, 
MONTERREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA, SANTA CRUZ, SOLANO).............$ 59.92                  22.62
TILE LAYER (EL DORADO, PLACER, SACRAMENTO, SUTTER, 
YOLO, YUBA).........................................$ 55.55                  21.08
TILE LAYER (SONOMA).................................$ 56.79                  22.54
----------------------------------------------------------------

 CARP0022-001 07/01/2023
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN 
FRANCISCO COUNTY)...................................$ 60.39                  33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SAN FRANCISCO COUNTY)...........$ 60.54                  33.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO 
COUNTY).............................................$ 60.39                  33.52
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY).......$ 60.49                  35.11
----------------------------------------------------------------

 CARP0035-005 07/01/2021
                                                     Rates                  Fringes
DRYWALL INSTALLERS/LATHERS:  (AREA 1) AREA 1: 
Alameda, Contra Costa, Marin, Napa, San Francisco, 
San Mateo, Santa Clara, Solano & Sonoma Counties....$ 54.85                  31.93
DRYWALL INSTALLERS/LATHERS:  (AREA 2) AREA 2: 
Monterey, San Benito & Santa Cruz Counties..........$ 48.97                  31.93
DRYWALL INSTALLERS/LATHERS:  (AREA 4) AREA 4: El 
Dorado, Placer, Sacramento, Sutter, Yolo, & 
YubaCounties........................................$ 48.12                  31.93
DRYWALL STOCKER/SCRAPPER:  (AREA 1) AREA 1: 
Alameda, Contra Costa, Marin, Napa, San Francisco, 
San Mateo, Santa Clara, Solano & Sonoma Counties....$ 27.43                  18.58
DRYWALL STOCKER/SCRAPPER:  (AREA 2) AREA 2: 
Monterey, San Benito & Santa Cruz Counties..........$ 24.49                  18.58
DRYWALL STOCKER/SCRAPPER:  (AREA 4) AREA 4: El 
Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba 
Counties............................................$ 24.07                  18.58
----------------------------------------------------------------

 CARP0035-009 07/01/2020
                                                     Rates                  Fringes
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER   MARIN 
COUNTY..............................................$ 52.65                  30.82
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW 
OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, 
SAW FILER   MARIN COUNTY............................$ 52.80                  30.82
CARPENTER: JOURNEYMAN CARPENTER   MARIN COUNTY......$ 52.65                  30.82
CARPENTER: MILLWRIGHT   MARIN COUNTY................$ 52.75                  32.41
----------------------------------------------------------------

 CARP0046-001 07/01/2023
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER   EL 
DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO 
COUNTIES    FOOTNOTE: PLACER COUNTY (WEST) INCLUDES 
TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL 
DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND 
INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY 
LIMITS OF PLACERVILLE...............................$ 60.39                  33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER   EL DORADO (WEST), PLACER 
(WEST), SACRAMENTO AND YOLO COUNTIES    FOOTNOTE: 
PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND 
INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) 
INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 
AND TERRITORY INSIDE THE CITY LIMITS OF 
PLACERVILLE.........................................$ 54.66                  33.52
CARPENTERS: JOURNEYMAN CARPENTER   EL DORADO 
(WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES 
   FOOTNOTE: PLACER COUNTY (WEST) INCLUDES 
TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL 
DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND 
INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY 
LIMITS OF PLACERVILLE...............................$ 54.51                  33.52
CARPENTERS: MILLWRIGHT   EL DORADO (WEST), PLACER 
(WEST), SACRAMENTO AND YOLO COUNTIES    FOOTNOTE: 
PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND 
INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) 
INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 
AND TERRITORY INSIDE THE CITY LIMITS OF 
PLACERVILLE.........................................$ 57.01                  35.11
----------------------------------------------------------------

 CARP0046-003 07/01/2023
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL 
DORADO (EAST), PLACER (EAST), SUTTER AND YUBA 
COUNTIES)...........................................$ 60.39                  33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER   EL DORADO (EAST), PLACER 
(EAST), SUTTER AND YUBA COUNTIES....................$ 53.31                  33.52
CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO (EAST), 
PLACER (EAST), SUTTER AND YUBA COUNTIES)............$ 53.16                  33.52
CARPENTERS: MILLWRIGHT (EL DORADO (EAST), PLACER 
(EAST), SUTTER AND YUBA COUNTIES)...................$ 55.66                  35.11
----------------------------------------------------------------

 CARP0152-001 07/01/2020
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER 
(CONTRA COSTA COUNTY)...............................$ 52.65                  30.82
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (CONTRA COSTA COUNTY)............$ 52.80                  30.82
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA 
COUNTY).............................................$ 52.65                  30.82
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)........$ 52.75                  32.41
----------------------------------------------------------------

 CARP0180-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER   
SOLANO COUNTY.......................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER   SOLANO COUNTY..................$ 55.00                  31.49
CARPENTERS: JOURNEYMAN CARPENTER   SOLANO COUNTY....$ 54.85                  31.49
CARPENTERS: MILLWRIGHT   SOLANO COUNTY..............$ 54.95                  33.08
----------------------------------------------------------------

 CARP0217-001 07/01/2023
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN 
MATEO COUNTY).......................................$ 60.39                  33.52
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SAN MATEO COUNTY)...............$ 60.54                  33.52
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY).$ 60.39                  33.52
CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)...........$ 60.49                  35.11
----------------------------------------------------------------

 CARP0405-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA 
CLARA COUNTY).......................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SANTA CLARA COUNTY).............$ 55.00                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA 
COUNTY).............................................$ 54.85                  31.49
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY).........$ 54.95                  33.08
----------------------------------------------------------------

 CARP0405-002 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN 
BENITO COUNTY)......................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SAN BENITO COUNTY)..............$ 49.12                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO 
COUNTY).............................................$ 48.97                  31.49
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)..........$ 51.47                  33.08
----------------------------------------------------------------

 CARP0505-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA 
CRUZ COUNTY)........................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (SANTA CRUZ COUNTY)..............$ 49.12                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ 
COUNTY).............................................$ 48.97                  31.49
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)..........$ 51.47                  33.08
----------------------------------------------------------------

 CARP0605-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER 
(MONTEREY COUNTY)...................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (MONTEREY COUNTY)................$ 49.12                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)..$ 48.97                  31.49
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)............$ 51.47                  33.08
----------------------------------------------------------------

 CARP0713-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER 
(ALAMEDA COUNTY)....................................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER (ALAMEDA COUNTY).................$ 55.00                  31.49
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)...$ 54.85                  31.49
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY).............$ 54.95                  33.08
----------------------------------------------------------------

 CARP0751-001 07/01/2021
                                                     Rates                  Fringes
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER   
(NAPA AND SONOMA COUNTIES)..........................$ 54.85                  31.49
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER 
SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING 
ERECTOR, SAW FILER   (NAPA AND SONOMA COUNTIES).....$ 55.00                  31.49
CARPENTERS: JOURNEYMAN CARPENTER   (NAPA AND SONOMA 
COUNTIES)...........................................$ 54.85                  31.49
CARPENTERS: MILLWRIGHT   (NAPA AND SONOMA COUNTIES).$ 54.95                  33.08
----------------------------------------------------------------

 ELEC0006-003 12/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER   (SAN FRANCISCO 
COUNTY)    SCOPE OF WORK: INCLUDING ANY DATA SYSTEM 
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE 
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR  
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR 
POWER SUPPLY; INCLUSION OR EXCLUSION OF 
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED 
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN 
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE  
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL 
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION 
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL 
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING 
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR 
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY 
MANAGEMENT  SYSTEMS.................................$ 58.83                  31.51
SOUND & COMMUNICATIONS: TECHNICIAN   (SAN FRANCISCO 
COUNTY)    SCOPE OF WORK: INCLUDING ANY DATA SYSTEM 
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE 
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR  
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR 
POWER SUPPLY; INCLUSION OR EXCLUSION OF 
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED 
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN 
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE  
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL 
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION 
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL 
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING 
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR 
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY 
MANAGEMENT  SYSTEMS.................................$ 67.65                  31.78
----------------------------------------------------------------

 ELEC0006-005 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN   (SAN FRANCISCO COUNTY)    WORK ON 
RESIDENTIAL WOOD FRAME REMODEL AND REPAIR IN ALL 
WOOD-CONSTRUCTED BUILDINGS NOT TO EXCEED 24 LIVING 
UNITS; AND NEW WOOD FRAME SINGLE STRUCTURE 1 OR 2 
FAMILY HOUSES, OR ON ALL WOOD- CONSTRUCTED 
BUILDINGS NOT TO EXCEED 20 LIVING UNITS UNDER 1 
ROOF EXCLUDING PROJECTS OR TRACTS CONTAINING MORE 
THAN 2 HOUSES, OR MORE THAN 1 BUILDING..............$ 55.50                  25.64
----------------------------------------------------------------

 ELEC0006-009 06/01/2024
                                                     Rates                  Fringes
ELECTRICIAN: ALL OTHER WORK (SAN FRANCISCO COUNTY:).$ 91.25                  48.05
----------------------------------------------------------------

 ELEC0180-002 12/01/2023
                                                     Rates                  Fringes
ELECTRICIAN (NAPA & SOLANO COUNTIES)................$ 38.50                  21.16
----------------------------------------------------------------

 ELEC0234-002 12/30/2025
                                                     Rates                  Fringes
ELECTRICIAN:  ZONE A: (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES) ZONE A: ALL OF SANTA CRUZ, 
MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR 
MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, 
AND AN AREA EXTENDING 5 MILES EAST AND WEST OF 
HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY 
LINE................................................$ 70.41                  33.76
ELECTRICIAN:  ZONE B: (MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES) ZONE B: ANY AREA OUTSIDE OF 
ZONE A..............................................$ 77.45                  33.97
----------------------------------------------------------------

 ELEC0234-004 12/01/2021
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER   (MONTEREY, SAN 
BENITO, AND SANTA CRUZ COUNTIES)    SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR  MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, 
LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY 
SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE 
THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING 
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT  
SYSTEMS.............................................$ 47.93                  24.09
SOUND & COMMUNICATIONS: TECHNICIAN   (MONTEREY, SAN 
BENITO, AND SANTA CRUZ COUNTIES)    SCOPE OF WORK: 
INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO 
TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL 
OTHER DATA SYSTEMS OR  MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, 
LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY 
SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE 
THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING 
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT  
SYSTEMS.............................................$ 55.12                  24.30
----------------------------------------------------------------

 ELEC0302-002 03/01/2025
                                                     Rates                  Fringes
CABLE SPLICER (CONTRA COSTA COUNTY).................$ 74.54                  36.09
ELECTRICIAN (CONTRA COSTA COUNTY)...................$ 66.26                  35.84
----------------------------------------------------------------

 ELEC0302-004 12/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER   (CONTRA COSTA 
COUNTY)    SCOPE OF WORK: INCLUDING ANY DATA SYSTEM 
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE 
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR  
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR 
POWER SUPPLY; INCLUSION OR EXCLUSION OF 
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED 
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN 
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE  
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL 
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION 
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL 
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING 
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR 
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY 
MANAGEMENT  SYSTEMS.................................$ 53.08                  30.84
SOUND & COMMUNICATIONS: TECHNICIAN   (CONTRA COSTA 
COUNTY)    SCOPE OF WORK: INCLUDING ANY DATA SYSTEM 
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE 
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR  
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR 
POWER SUPPLY; INCLUSION OR EXCLUSION OF 
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED 
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN 
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE  
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL 
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION 
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL 
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING 
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR 
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY 
MANAGEMENT  SYSTEMS.................................$ 61.04                  31.08
----------------------------------------------------------------

 ELEC0332-002 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (SANTA CLARA COUNTY)....................$ 47.35                  23.49
----------------------------------------------------------------

 ELEC0332-004 12/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER   (SANTA CLARA 
COUNTY)    SCOPE OF WORK: INCLUDING ANY DATA SYSTEM 
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE 
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR  
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR 
POWER SUPPLY; INCLUSION OR EXCLUSION OF 
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED 
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN 
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE  
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL 
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION 
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL 
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING 
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR 
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY 
MANAGEMENT  SYSTEMS.................................$ 58.33                  31.00
SOUND & COMMUNICATIONS: TECHNICIAN   (SANTA CLARA 
COUNTY)    SCOPE OF WORK: INCLUDING ANY DATA SYSTEM 
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE 
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR  
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR 
POWER SUPPLY; INCLUSION OR EXCLUSION OF 
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED 
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN 
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE  
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL 
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION 
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL 
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING 
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR 
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY 
MANAGEMENT  SYSTEMS.................................$ 67.08                  31.26
----------------------------------------------------------------

 ELEC0340-001 02/01/2016
                                                     Rates                  Fringes
ELECTRICIAN: FOUR STORIES (EL DORADO, PLACER, 
SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES).........$ 39.06                  24.51
ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND 
APARTMENTS UP TO AND INCLUDING 3 STORIES (EL 
DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA 
COUNTIES)...........................................$ 23.10                  12.48
----------------------------------------------------------------

 ELEC0340-004 03/01/2025
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS: INSTALLER   (COLUSA, 
PLACER, SUTTER, YOLO AND YUBA COUNTIES)    SCOPE OF 
WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION 
IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING 
ALL OTHER DATA SYSTEMS OR  MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, 
LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY 
SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE 
THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING 
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT  
SYSTEMS.............................................$ 40.00                  25.50
SOUND & COMMUNICATIONS: TECHNICIAN   (COLUSA, 
PLACER, SUTTER, YOLO AND YUBA COUNTIES)    SCOPE OF 
WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION 
IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING 
ALL OTHER DATA SYSTEMS OR  MULTIPLE SYSTEMS WHICH 
INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION 
OR EXCLUSION OF TERMINATIONS AND TESTINGS OF 
CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING 
FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS 
(INCLUDING WIRE AND CABLE  PULLING) AND WHEN 
PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS 
OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, 
LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY 
SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE 
THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING 
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT  
SYSTEMS.............................................$ 46.00                  25.68
----------------------------------------------------------------

 ELEC0401-006 01/01/2021
                                                     Rates                  Fringes
ELECTRICIAN   (EL DORADO AND PLACER COUNTIES)    
ZONE PAY:    ZONE 1 -  0 TO 70 MILES    $0.00 PER 
HOUR  ZONE 2 - 70 TO 90 MILES    $5.00 PER HOUR  
ZONE 3 - 91 MILES AND OVER $7.00 PER HOUR...........$ 31.88                  8.46
----------------------------------------------------------------

 ELEC0551-003 12/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (MARIN AND SONOMA COUNTIES).............$ 41.00                  24.26
----------------------------------------------------------------

 ELEC0595-004 06/01/2025
                                                     Rates                  Fringes
CABLE SPLICER (ALAMEDA COUNTY)......................$ 87.40                  49.41
ELECTRICIAN (ALAMEDA COUNTY)........................$ 76.00                  49.07
----------------------------------------------------------------

 ELEC0595-007 12/01/2024
                                                     Rates                  Fringes
SOUND & COMMUNICATIONS, INSTALLER   (ALAMEDA 
COUNTY)  SCOPE OF WORK: INCLUDING ANY DATA SYSTEM 
WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE 
INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR  
MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR 
POWER SUPPLY; INCLUSION OR EXCLUSION OF 
TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED 
BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN 
INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE  
PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL 
BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION 
OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL 
WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING 
FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR 
LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY 
MANAGEMENT  SYSTEMS.................................$ 56.68                  28.35
----------------------------------------------------------------

 ELEC0617-002 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (SAN MATEO COUNTY)......................$ 86.00                  51.07
----------------------------------------------------------------

 ELEV0008-001 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC    FOOTNOTE:  A. PAID VACATION:  
EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS 
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 
YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF 
SERVICE.  B. PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER 
THANKSGIVING, AND CHRISTMAS DAY.....................$ 84.05                  38.44
----------------------------------------------------------------

 ENGI0003-009 06/30/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 1: 
Operator of helicopter (when used in erection 
work); Hydraulic excavator, 7 cu. yds. and over; 
Power shovels, over 7cu. yds. (EL DORADO, MONTEREY, 
NAPA,  PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, 
SONOMA, SUTTER,  YOLO AND YUBA COUNTIES  FOOTNOTE: 
Work suspended by ropes or cables, or work on a 
Yo-Yo Cat: $.60 per hour additional.  ""AREA 1"" WAGE 
RATES ARE LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.  (SEE AREA 
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 65.54                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 2: 
Highline cableway; Hydraulic excavator, 3-1/2 cu. 
yds. up to 7 cu. yds.; Licensed construction work 
boat operator, on site; Power blade operator 
(finish); Power shovels, over 1 cu. yd. up to and 
including 7 cu. yds. m.r.c. (EL DORADO, MONTEREY, 
NAPA,  PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, 
SONOMA, SUTTER,  YOLO AND YUBA COUNTIES  FOOTNOTE: 
Work suspended by ropes or cables, or work on a 
Yo-Yo Cat: $.60 per hour additional.  ""AREA 1"" WAGE 
RATES ARE LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.  (SEE AREA 
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 64.09                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 3: 
Asphalt milling machine; Cable backhoe; Combination 
backhoe and loader over 3/4 cu. yds.; Continuous 
flight tie back machine assistant to engineer or 
mechanic; Crane mounted continuous flight tie back 
machine, tonnage to apply; Crane mounted drill 
attachment, tonnage to apply; Dozer, slope brd; 
Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; 
Loader 4 cu. yds. and over; Long reach excavator; 
Multiple engine scraper (when used as push pull); 
Power shovels, up to and including 1 cu. yd.; 
Pre-stress wire wrapping machine; Side boom cat, 
572 or larger; Track loader 4 cu. yds. and over; 
Wheel excavator (up to and including 750 cu. yds. 
per hour) (EL DORADO, MONTEREY, NAPA,  PLACER, 
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, 
 YOLO AND YUBA COUNTIES  FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional.  ""AREA 1"" WAGE RATES ARE 
LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS 
BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE 
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 62.69                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 4: 
Asphalt plant engineer/box person; Chicago boom; 
Combination backhoe and loader up to and including 
3/4 cu. yd.; Concrete batch plant (wet or dry); 
Dozer and/or push cat; Pull- type elevating loader; 
Gradesetter, grade checker (GPS, mechanical or 
otherwise); Grooving and grinding machine; Heading 
shield operator; Heavy-duty drilling equipment, 
Hughes, LDH, Watson 3000 or similar; Heavy-duty 
repairperson and/or welder; Lime spreader; Loader 
under 4 cu. yds.; Lubrication and service engineer 
(mobile and grease rack); Mechanical finishers or 
spreader machine (asphalt, Barber-Greene and 
similar); Miller Formless M-9000 slope paver or 
similar; Portable crushing and screening plants; 
Power blade support; Roller operator, asphalt; 
Rubber-tired scraper, self-loading (paddle-wheels, 
etc.); Rubber- tired earthmoving equipment 
(scrapers); Slip form paver (concrete); Small 
tractor with drag; Soil stabilizer (P & H or 
equal); Spider plow and spider puller; Tubex pile 
rig; Unlicensed constuction work boat operator, on 
site; Timber skidder; Track loader up to 4 yds.; 
Tractor-drawn scraper; Tractor, compressor drill 
combination; Welder; Woods-Mixer (and other similar 
Pugmill equipment) (EL DORADO, MONTEREY, NAPA,  
PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, 
SUTTER,  YOLO AND YUBA COUNTIES  FOOTNOTE: Work 
suspended by ropes or cables, or work on a Yo-Yo 
Cat: $.60 per hour additional.  ""AREA 1"" WAGE RATES 
ARE LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 
PER HOUR ABOVE AREA 1 RATES.  (SEE AREA 
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 61.36                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 5: 
Cast-in-place pipe laying machine; Combination 
slusher and motor operator; Concrete conveyor or 
concrete pump, truck or equipment mounted; Concrete 
conveyor, building site; Concrete pump or pumpcrete 
gun; Drilling equipment, Watson 2000, Texoma 700 or 
similar; Drilling and boring machinery, horizontal 
(not to apply to waterliners, wagon drills or 
jackhammers); Concrete mixer/all; Person and/or 
material hoist; Mechanical finishers (concrete) 
(Clary, Johnson, Bidwell Bridge Deck or similar 
types); Mechanical burm, curb and/or curb and 
gutter machine, concrete or asphalt); Mine or shaft 
hoist; Portable crusher; Power jumbo operator 
(setting slip-forms, etc., in tunnels); Screed 
(automatic or manual); Self-propelled compactor 
with dozer; Tractor with boom D6 or smaller; 
Trenching machine, maximum digging capacity over 5 
ft. depth; Vermeer T-600B rock cutter or similar 
(EL DORADO, MONTEREY, NAPA,  PLACER, SACRAMENTO, 
SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,  YOLO AND 
YUBA COUNTIES FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional.  ""AREA 1"" WAGE RATES ARE LISTED  ""AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.  (SEE AREA DESCRIPTIONS BELOW) AREA 1: 
ALAMEDA, CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, 
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, 
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING 
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 60.15                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 6: 
Armor-Coater (or similar); Ballast jack tamper; 
Boom-type backfilling machine; Assistant plant 
engineer; Bridge and/or gantry crane; Chemical 
grouting machine, truck-mounted; Chip spreading 
machine operator; Concrete saw (self-propelled unit 
on streets, highways, airports and canals); Deck 
engineer; Drilling equipment Texoma 600, Hughes 200 
Series or similar up to and including 30 ft. 
m.r.c.; Drill doctor; Helicopter radio operator; 
Hydro-hammer or similar; Line master; Skidsteer 
loader, Bobcat larger than 743 series or similar 
(with attachments); Locomotive; Lull hi-lift or 
similar; Oiler, truck mounted equipment; Pavement 
breaker, truck-mounted, with compressor 
combination; Paving fabric installation and/or 
laying machine; Pipe bending machine (pipelines 
only); Pipewrapping machine (tractor propelled and 
supported); Screed(except asphaltic concrete 
paving); Self- propelled pipeline wrapping machine; 
Tractor; Self-loading chipper; Concrete barrier 
moving machine (EL DORADO, MONTEREY, NAPA,  PLACER, 
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, 
 YOLO AND YUBA COUNTIES  FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional.  ""AREA 1"" WAGE RATES ARE 
LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS 
BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE 
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 58.88                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 7: 
Ballast regulator; Boom truck or dual-purpose 
A-frame truck, non-rotating - under 15 tons; Cary 
lift or similar; Combination slurry mixer and/or 
cleaner; Drilling equipment, 20 ft. and under 
m.r.c.; Firetender (hot plant); Grouting machine 
operator; Highline cableway signalperson; 
Stationary belt loader (Kolman or similar); Lift 
slab machine (Vagtborg and similar types); Maginnes 
internal full slab vibrator; Material hoist (1 
drum); Mechanical trench shield; Pavement breaker 
with or without compressor combination); Pipe 
cleaning machine (tractor propelled and supported); 
Post driver; Roller (except asphalt); Chip Seal; 
Self-propelled automatically applied concrete 
curing mahcine (on streets, highways, airports and 
canals); Self-propelled compactor (without dozer); 
Signalperson; Slip-form pumps (lifting device for 
concrete forms); Tie spacer; Tower mobile; 
Trenching machine, maximum digging capacity up to 
and including 5 ft. depth; Truck- type loader (EL 
DORADO, MONTEREY, NAPA,  PLACER, SACRAMENTO, SAN 
BENITO, SANTA CRUZ, SONOMA, SUTTER,  YOLO AND YUBA 
COUNTIES  FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional.  ""AREA 1"" WAGE RATES ARE LISTED  ""AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.  (SEE AREA DESCRIPTIONS BELOW) AREA 1: 
ALAMEDA, CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, 
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, 
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING 
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 57.79                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 8: Bit 
sharpener; Boiler tender; Box operator; 
Brakeperson; Combination mixer and compressor 
(shotcrete/gunite); Compressor operator; Deckhand; 
Fire tender; Forklift (under 20 ft.); Generator; 
Gunite/shotcrete equipment operator; Hydraulic 
monitor; Ken seal machine (or similar); 
Mixermobile; Oiler; Pump operator; Refrigeration 
plant; Reservoir-debris tug (self- propelled 
floating); Ross Carrier (construction site); 
Rotomist operator; Self-propelled tape machine; 
Shuttlecar; Self-propelled power sweeper operator 
(includes vacuum sweeper);  Slusher operator; 
Surface heater; Switchperson; Tar pot firetender; 
Tugger hoist, single drum; Vacuum cooling plant; 
Welding machine (powered other than by electricity) 
(EL DORADO, MONTEREY, NAPA,  PLACER, SACRAMENTO, 
SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,  YOLO AND 
YUBA COUNTIES FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional.  ""AREA 1"" WAGE RATES ARE LISTED  ""AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.  (SEE AREA DESCRIPTIONS BELOW) AREA 1: 
ALAMEDA, CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, 
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, 
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING 
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 56.71                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1:: GROUP 8-A: 
Elevator operator; Skidsteer loader-Bobcat 743 
series or smaller, and similar (without 
attachments); Mini excavator under 25 H.P. 
(backhoe-trencher); Tub grinder wood chipper (EL 
DORADO, MONTEREY, NAPA,  PLACER, SACRAMENTO, SAN 
BENITO, SANTA CRUZ, SONOMA, SUTTER,  YOLO AND YUBA 
COUNTIES   FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional.  ""AREA 1"" WAGE RATES ARE LISTED  ""AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.  (SEE AREA DESCRIPTIONS BELOW) AREA 1: 
ALAMEDA, CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, 
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, 
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING 
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 54.69                  34.69
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1: CRANES: Clamshell and dragline 
over 7 cu. yds.; Crane, over 100 tons; Derrick, 
over 100 tons; Derrick barge pedestal-mounted, over 
100 tons; Self-propelled boom-type lifting device, 
over 100 tons (EL DORADO, MONTEREY, NAPA,  PLACER, 
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, 
 YOLO AND YUBA COUNTIES) FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional.  ""AREA 1"" WAGE RATES ARE 
LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS 
BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE 
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 66.39                  34.69
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1: OILER: Clamshell and dragline 
over 7 cu. yds.; Crane, over 100 tons; Derrick, 
over 100 tons; Derrick barge pedestal-mounted, over 
100 tons; Self-propelled boom-type lifting device, 
over 100 tons (EL DORADO, MONTEREY, NAPA,  PLACER, 
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, 
 YOLO AND YUBA COUNTIES) FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional.  ""AREA 1"" WAGE RATES ARE 
LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS 
BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE 
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 43.79                  31.15
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and 
dragline over 7 cu. yds.; Crane, over 100 tons; 
Derrick, over 100 tons; Derrick barge 
pedestal-mounted, over 100 tons; Self-propelled 
boom-type lifting device, over 100 tons (EL DORADO, 
MONTEREY, NAPA,  PLACER, SACRAMENTO, SAN BENITO, 
SANTA CRUZ, SONOMA, SUTTER,  YOLO AND YUBA 
COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional.  ""AREA 1"" WAGE RATES ARE LISTED  ""AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.  (SEE AREA DESCRIPTIONS BELOW) AREA 1: 
ALAMEDA, CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, 
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, 
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING 
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 46.08                  31.15
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2: CRANES: Clamshell and dragline 
over 1 cu. yd. up to and including 7 cu. yds.; 
Crane, over 45 tons up to and including 100 tons; 
Derrick barge, 100 tons and under; Self-propelled 
boom-type lifting device, over 45 tons; Tower crane 
(EL DORADO, MONTEREY, NAPA,  PLACER, SACRAMENTO, 
SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,  YOLO AND 
YUBA COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional.  ""AREA 1"" WAGE RATES ARE LISTED  ""AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.  (SEE AREA DESCRIPTIONS BELOW) AREA 1: 
ALAMEDA, CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, 
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, 
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING 
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 64.70                  34.69
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2: OILER: Clamshell and dragline 
over 1 cu. yd. up to and including 7 cu. yds.; 
Crane, over 45 tons up to and including 100 tons; 
Derrick barge, 100 tons and under; Self-propelled 
boom-type lifting device, over 45 tons; Tower crane 
(EL DORADO, MONTEREY, NAPA,  PLACER, SACRAMENTO, 
SAN BENITO, SANTA CRUZ, SONOMA, SUTTER,  YOLO AND 
YUBA COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional.  ""AREA 1"" WAGE RATES ARE LISTED  ""AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 RATES.  (SEE AREA DESCRIPTIONS BELOW) AREA 1: 
ALAMEDA, CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, 
SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, 
SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING 
COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 42.83                  31.15
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and 
dragline over 1 cu. yd. up to and including 7 cu. 
yds.; Crane, over 45 tons up to and including 100 
tons; Derrick barge, 100 tons and under; 
Self-propelled boom-type lifting device, over 45 
tons; Tower crane (EL DORADO, MONTEREY, NAPA,  
PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, 
SUTTER,  YOLO AND YUBA COUNTIES) FOOTNOTE: Work 
suspended by ropes or cables, or work on a Yo-Yo 
Cat: $.60 per hour additional.  ""AREA 1"" WAGE RATES 
ARE LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 
PER HOUR ABOVE AREA 1 RATES.  (SEE AREA 
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 45.07                  31.15
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3: CRANES: Clamshell and dragline 
up to and including 1 cu. yd.; Cranes 45 tons and 
under; Self-propelled boom-type lifting device 45 
tons and under (EL DORADO, MONTEREY, NAPA,  PLACER, 
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, 
 YOLO AND YUBA COUNTIES) FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional. ""AREA 1"" WAGE RATES ARE LISTED 
 ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR 
ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS BELOW) 
AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE 
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 63.06                  34.69
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3: HYDRAULIC: Clamshell and 
dragline up to and including 1 cu. yd.; Cranes 45 
tons and under; Self-propelled boom-type lifting 
device 45 tons and under (EL DORADO, MONTEREY, 
NAPA,  PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, 
SONOMA, SUTTER,  YOLO AND YUBA COUNTIES) FOOTNOTE: 
Work suspended by ropes or cables, or work on a 
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE 
RATES ARE LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.  (SEE AREA 
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 44.44                  31.15
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3: OILER: Clamshell and dragline up 
to and including 1 cu. yd.; Cranes 45 tons and 
under; Self-propelled boom-type lifting device 45 
tons and under (EL DORADO, MONTEREY, NAPA,  PLACER, 
SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, 
 YOLO AND YUBA COUNTIES) FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional. ""AREA 1"" WAGE RATES ARE LISTED 
 ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR 
ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS BELOW) 
AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE 
REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 42.55                  31.15
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3: TRUCK CRANE OILER: Clamshell and 
dragline up to and including 1 cu. yd.; Cranes 45 
tons and under; Self-propelled boom-type lifting 
device 45 tons and under (EL DORADO, MONTEREY, 
NAPA,  PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, 
SONOMA, SUTTER,  YOLO AND YUBA COUNTIES) FOOTNOTE: 
Work suspended by ropes or cables, or work on a 
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE 
RATES ARE LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 RATES.  (SEE AREA 
DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: 
SONOMA 
Area 1: All but the Northwestern 
Area 2: Reaminder...................................$ 44.83                  31.15
----------------------------------------------------------------

 ENGI0003-010 06/30/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 1: 
Operator of helicopter (when used in erection 
work); Hydraulic excavator, 7 cu. yds. and over; 
Power shovels, over 7 cu. yds. (ALAMEDA, CONTRA 
COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA 
AND SOLANO COUNTIES  ""AREA 1"" WAGE RATES ARE LISTED 
BELOW  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  SEE AREA DESCRIPTIONS 
BELOW) FOOTNOTE: Work suspended by ropes or cables, 
or work on a Yo-Yo Cat: $.60 per hour additional.  
""AREA 1"" WAGE RATES ARE LISTED  ""AREA 2"" RECEIVES 
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work 
suspended by ropes or cables, or work on a Yo-Yo 
Cat: $.60 per hour additional. AREA 1: ALAMEDA, 
CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, SAN BENITO, 
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
YOLO, AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 65.54                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 2: 
Highline cableway; Hydraulic excavator, 3-1/2 cu. 
yds. up to 7 cu. yds.; Licensed construction work 
boat operator, on site; Power blade operator 
(finish); Power shovels, over 1 cu. yd. up to and 
including 7 cu. yds. m.r.c. (ALAMEDA, CONTRA COSTA, 
MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND 
SOLANO COUNTIES  ""AREA 1"" WAGE RATES ARE LISTED 
BELOW  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  SEE AREA DESCRIPTIONS 
BELOW) FOOTNOTE: Work suspended by ropes or cables, 
or work on a Yo-Yo Cat: $.60 per hour additional.  
""AREA 1"" WAGE RATES ARE LISTED  ""AREA 2"" RECEIVES 
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work 
suspended by ropes or cables, or work on a Yo-Yo 
Cat: $.60 per hour additional. AREA 1: ALAMEDA, 
CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, SAN BENITO, 
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
YOLO, AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 64.09                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 3: 
Asphalt milling machine; Cable backhoe; Combination 
backhoe and loader over 3/4 cu. yds.; Continuous 
flight tie back machine assistant to engineer or 
mechanic; Crane mounted continuous flight tie back 
machine, tonnage to apply; Crane mounted drill 
attachment, tonnage to apply; Dozer, slope brd; 
Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; 
Loader 4 cu. yds. and over; Long reach excavator; 
Multiple engine scraper (when used as push pull); 
Power shovels, up to and including 1 cu. yd.; 
Pre-stress wire wrapping machine; Side boom cat, 
572 or larger; Track loader 4 cu. yds. and over; 
Wheel excavator (up to and including 750 cu. yds. 
per hour) (ALAMEDA, CONTRA COSTA, MARIN, SAN 
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES  ""AREA 1"" WAGE RATES ARE LISTED BELOW  
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR 
ABOVE AREA 1 RATES.  SEE AREA DESCRIPTIONS BELOW) 
FOOTNOTE: Work suspended by ropes or cables, or 
work on a Yo-Yo Cat: $.60 per hour additional.  
""AREA 1"" WAGE RATES ARE LISTED  ""AREA 2"" RECEIVES 
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work 
suspended by ropes or cables, or work on a Yo-Yo 
Cat: $.60 per hour additional. AREA 1: ALAMEDA, 
CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, SAN BENITO, 
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
YOLO, AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 62.69                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 4: 
Asphalt plant engineer/box person; Chicago boom; 
Combination backhoe and loader up to and including 
3/4 cu. yd.; Concrete batch plant (wet or dry); 
Dozer and/or push cat; Pull- type elevating loader; 
Gradesetter, grade checker (GPS, mechanical or 
otherwise); Grooving and grinding machine; Heading 
shield operator; Heavy-duty drilling equipment, 
Hughes, LDH, Watson 3000 or similar; Heavy-duty 
repairperson and/or welder; Lime spreader; Loader 
under 4 cu. yds.; Lubrication and service engineer 
(mobile and grease rack); Mechanical finishers or 
spreader machine (asphalt, Barber-Greene and 
similar); Miller Formless M-9000 slope paver or 
similar; Portable crushing and screening plants; 
Power blade support; Roller operator, asphalt; 
Rubber-tired scraper, self-loading (paddle-wheels, 
etc.); Rubber- tired earthmoving equipment 
(scrapers); Slip form paver (concrete); Small 
tractor with drag; Soil stabilizer (P & H or 
equal); Spider plow and spider puller; Tubex pile 
rig; Unlicensed constuction work boat operator, on 
site; Timber skidder; Track loader up to 4 yds.; 
Tractor-drawn scraper; Tractor, compressor drill 
combination; Welder; Woods-Mixer (and other similar 
Pugmill equipment) (ALAMEDA, CONTRA COSTA, MARIN, 
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES  ""AREA 1"" WAGE RATES ARE LISTED BELOW  
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR 
ABOVE AREA 1 RATES.  SEE AREA DESCRIPTIONS BELOW) 
FOOTNOTE: Work suspended by ropes or cables, or 
work on a Yo-Yo Cat: $.60 per hour additional.  
""AREA 1"" WAGE RATES ARE LISTED  ""AREA 2"" RECEIVES 
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work 
suspended by ropes or cables, or work on a Yo-Yo 
Cat: $.60 per hour additional. AREA 1: ALAMEDA, 
CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, SAN BENITO, 
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
YOLO, AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 61.36                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 5: 
Cast-in-place pipe laying machine; Combination 
slusher and motor operator; Concrete conveyor or 
concrete pump, truck or equipment mounted; Concrete 
conveyor, building site; Concrete pump or pumpcrete 
gun; Drilling equipment, Watson 2000, Texoma 700 or 
similar; Drilling and boring machinery, horizontal 
(not to apply to waterliners, wagon drills or 
jackhammers); Concrete mixer/all; Person and/or 
material hoist; Mechanical finishers (concrete) 
(Clary, Johnson, Bidwell Bridge Deck or similar 
types); Mechanical burm, curb and/or curb and 
gutter machine, concrete or asphalt); Mine or shaft 
hoist; Portable crusher; Power jumbo operator 
(setting slip-forms, etc., in tunnels); Screed 
(automatic or manual); Self-propelled compactor 
with dozer; Tractor with boom D6 or smaller; 
Trenching machine, maximum digging capacity over 5 
ft. depth; Vermeer T-600B rock cutter or similar 
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA AND SOLANO COUNTIES  ""AREA 1"" 
WAGE RATES ARE LISTED BELOW  ""AREA 2"" RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  SEE 
AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional.  ""AREA 1"" WAGE RATES ARE 
LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS 
BELOW) FOOTNOTE: Work suspended by ropes or cables, 
or work on a Yo-Yo Cat: $.60 per hour additional. 
AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 60.15                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 6: 
Armor-Coater (or similar); Ballast jack tamper; 
Boom- type backfilling machine; Assistant plant 
engineer; Bridge and/or gantry crane; Chemical 
grouting machine, truck-mounted; Chip spreading 
machine operator; Concrete saw (self-propelled unit 
on streets, highways, airports and canals); Deck 
engineer; Drilling equipment Texoma 600, Hughes 200 
Series or similar up to and including 30 ft. 
m.r.c.; Drill doctor; Helicopter radio operator; 
Hydro-hammer or similar; Line master; Skidsteer 
loader, Bobcat larger than 743 series or similar 
(with attachments); Locomotive; Lull hi-lift or 
similar; Oiler, truck mounted equipment; Pavement 
breaker, truck-mounted, with compressor 
combination; Paving fabric installation and/or 
laying machine; Pipe bending machine (pipelines 
only); Pipe wrapping machine (tractor propelled and 
supported); Screed (except asphaltic concrete 
paving); Self- propelled pipeline wrapping machine; 
Tractor; Self-loading chipper; Concrete barrier 
moving machine (ALAMEDA, CONTRA COSTA, MARIN, SAN 
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES  ""AREA 1"" WAGE RATES ARE LISTED BELOW  
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR 
ABOVE AREA 1 RATES.  SEE AREA DESCRIPTIONS BELOW) 
FOOTNOTE: Work suspended by ropes or cables, or 
work on a Yo-Yo Cat: $.60 per hour additional.  
""AREA 1"" WAGE RATES ARE LISTED  ""AREA 2"" RECEIVES 
AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  
(SEE AREA DESCRIPTIONS BELOW) FOOTNOTE: Work 
suspended by ropes or cables, or work on a Yo-Yo 
Cat: $.60 per hour additional. AREA 1: ALAMEDA, 
CONTRA COSTA, MARIN,  NAPA, SACRAMENTO, SAN BENITO, 
SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
YOLO, AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 58.88                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 7: 
Ballast regulator; Boom truck or dual-purpose 
A-frame truck, non-rotating - under 15 tons; Cary 
lift or similar; Combination slurry mixer and/or 
cleaner; Drilling equipment, 20 ft. and under 
m.r.c.; Firetender (hot plant); Grouting machine 
operator; Highline cableway signalperson; 
Stationary belt loader (Kolman or similar); Lift 
slab machine (Vagtborg and similar types); Maginnes 
internal full slab vibrator; Material hoist (1 
drum); Mechanical trench shield; Pavement breaker 
with or without compressor combination); Pipe 
cleaning machine (tractor propelled and supported); 
Post driver; Roller (except asphalt); Chip Seal; 
Self-propelled automatically applied concrete 
curing mahcine (on streets, highways, airports and 
canals); Self-propelled compactor (without dozer); 
Signalperson; Slip-form pumps (lifting device for 
concrete forms); Tie spacer; Tower mobile; 
Trenching machine, maximum digging capacity up to 
and including 5 ft. depth; Truck- type loader 
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA AND SOLANO COUNTIES  ""AREA 1"" 
WAGE RATES ARE LISTED BELOW  ""AREA 2"" RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  SEE 
AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional.  ""AREA 1"" WAGE RATES ARE 
LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS 
BELOW) FOOTNOTE: Work suspended by ropes or cables, 
or work on a Yo-Yo Cat: $.60 per hour additional. 
AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 57.79                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1: GROUP 8: Bit 
sharpener; Boiler tender; Box operator; 
Brakeperson; Combination mixer and compressor 
(shotcrete/gunite); Compressor operator; Deckhand; 
Fire tender; Forklift (under 20 ft.); Generator; 
Gunite/shotcrete equipment operator; Hydraulic 
monitor; Ken seal machine (or similar); 
Mixermobile; Oiler; Pump operator; Refrigeration 
plant; Reservoir-debris tug (self- propelled 
floating); Ross Carrier (construction site); 
Rotomist operator; Self-propelled tape machine; 
Shuttlecar; Self-propelled power sweeper operator 
(includes vacuum sweeper);  Slusher operator; 
Surface heater; Switchperson; Tar pot firetender; 
Tugger hoist, single drum; Vacuum cooling plant; 
Welding machine (powered other than by electricity) 
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA AND SOLANO COUNTIES  ""AREA 1"" 
WAGE RATES ARE LISTED BELOW  ""AREA 2"" RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  SEE 
AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional.  ""AREA 1"" WAGE RATES ARE 
LISTED  ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER 
HOUR ABOVE AREA 1 RATES.  (SEE AREA DESCRIPTIONS 
BELOW) FOOTNOTE: Work suspended by ropes or cables, 
or work on a Yo-Yo Cat: $.60 per hour additional. 
AREA 1: ALAMEDA, CONTRA COSTA, MARIN,  NAPA, 
SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, 
SANTA CRUZ, SOLANO, YOLO, AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 56.71                  34.69
OPERATOR:  POWER EQUIPMENT, AREA 1:GROUP 8-A: 
Elevator operator; Skidsteer loader-Bobcat 743 
series or smaller, and similar (without 
attachments); Mini excavator under 25 H.P. 
(backhoe-trencher); Tub grinder wood chipper 
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA AND SOLANO COUNTIES)  ""AREA 1"" 
WAGE RATES ARE LISTED  ""AREA 2"" RECEIVES AN 
ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.  (SEE 
AREA DESCRIPTIONS BELOW) FOOTNOTE: Work suspended 
by ropes or cables, or work on a Yo-Yo Cat: $.60 
per hour additional. AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 54.69                  34.69
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1: CRANES: Clamshell and dragline 
over 7 cu. yds.; Crane, over 100 tons; Derrick, 
over 100 tons; Derrick barge pedestal-mounted, over 
100 tons; Self-propelled boom-type lifting device, 
over 100 tons (ALAMEDA, CONTRA COSTA, MARIN, SAN 
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 66.39                  34.69
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1: OILER: Clamshell and dragline 
over 7 cu. yds.; Crane, over 100 tons; Derrick, 
over 100 tons; Derrick barge pedestal-mounted, over 
100 tons; Self-propelled boom-type lifting device, 
over 100 tons (ALAMEDA, CONTRA COSTA, MARIN, SAN 
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 35.59                  28.03
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and 
dragline over 7 cu. yds.; Crane, over 100 tons; 
Derrick, over 100 tons; Derrick barge 
pedestal-mounted, over 100 tons; Self-propelled 
boom-type lifting device, over 100 tons (ALAMEDA, 
CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, 
SANTA CLARA AND SOLANO COUNTIES) FOOTNOTE: Work 
suspended by ropes or cables, or work on a Yo-Yo 
Cat: $.60 per hour additional. ""AREA 1"" WAGES RATES 
ARE LISTED. AREA 2"" RECEIVES AN ADDITIONAL $2.00 
PER HOUR ABOVE AREA 1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 38.05                  28.03
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2: CRANES: Clamshell and dragline 
over 1 cu. yd. up to and including 7 cu. yds.; 
Crane, over 45 tons up to and including 100 tons; 
Derrick barge, 100 tons and under; Self-propelled 
boom-type lifting device, over 45 tons; Tower crane 
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA AND SOLANO COUNTIES) FOOTNOTE: 
Work suspended by ropes or cables, or work on a 
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGES 
RATES ARE LISTED. AREA 2"" RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 64.70                  34.69
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2: OILER: Clamshell and dragline 
over 1 cu. yd. up to and including 7 cu. yds.; 
Crane, over 45 tons up to and including 100 tons; 
Derrick barge, 100 tons and under; Self-propelled 
boom-type lifting device, over 45 tons; Tower crane 
(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA AND SOLANO COUNTIES) FOOTNOTE: 
Work suspended by ropes or cables, or work on a 
Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGES 
RATES ARE LISTED. AREA 2"" RECEIVES AN ADDITIONAL 
$2.00 PER HOUR ABOVE AREA 1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 35.34                  28.03
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and 
dragline over 1 cu. yd. up to and including 7 cu. 
yds.; Crane, over 45 tons up to and including 100 
tons; Derrick barge, 100 tons and under; 
Self-propelled boom-type lifting device, over 45 
tons; Tower crane (ALAMEDA, CONTRA COSTA, MARIN, 
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 37.83                  28.03
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3:  CRANES: Clamshell and dragline 
up to and including 1 cu. yd.; Cranes 45 tons and 
under; Self-propelled boom-type lifting device 45 
tons and under (ALAMEDA, CONTRA COSTA, MARIN, SAN 
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 63.06                  34.69
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3:  HYDRAULIC: Clamshell and 
dragline up to and including 1 cu. yd.; Cranes 45 
tons and under; Self-propelled boom-type lifting 
device 45 tons and under (ALAMEDA, CONTRA COSTA, 
MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND 
SOLANO COUNTIES) FOOTNOTE: Work suspended by ropes 
or cables, or work on a Yo-Yo Cat: $.60 per hour 
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 37.20                  28.03
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3:  OILER: Clamshell and dragline 
up to and including 1 cu. yd.; Cranes 45 tons and 
under; Self-propelled boom-type lifting device 45 
tons and under (ALAMEDA, CONTRA COSTA, MARIN, SAN 
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 35.11                  28.03
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 3:  TRUCK CRAINE OILER: Clamshell 
and dragline up to and including 1 cu. yd.; Cranes 
45 tons and under; Self-propelled boom-type lifting 
device 45 tons and under (ALAMEDA, CONTRA COSTA, 
MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND 
SOLANO COUNTIES) FOOTNOTE: Work suspended by ropes 
or cables, or work on a Yo-Yo Cat: $.60 per hour 
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 37.58                  28.03
OPERATOR:  POWER EQUIPMENT, CRANES AND ATTACHMENTS 
- AREA 1: GROUP 4:  CRANES: Boom Truck or dual 
purpose A-frame truck, non-rotating over 15 tons; 
Truck-mounted rotating telescopic boom type lifting 
device, Manitex or similar (boom truck) over 15 
tons; Truck-mounted rotating telescopic boom type 
lifting device, Manitex or similar (boom truck) - 
under 15 tons;(ALAMEDA, CONTRA COSTA, MARIN, SAN 
FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO 
COUNTIES) FOOTNOTE: Work suspended by ropes or 
cables, or work on a Yo-Yo Cat: $.60 per hour 
additional. ""AREA 1"" WAGES RATES ARE LISTED. AREA 
2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 
1 
AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, 
AND YUBA 
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND 
AREA 2 
NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 37.86                  28.03
----------------------------------------------------------------

 ENGI0003-011 06/30/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 1 (AREA 1)  AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 55.85                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 1 (AREA 2) THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 57.85                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 2 (AREA 1)  AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 52.25                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 2 (AREA 2) THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS  NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 54.25                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 3 (AREA 1)  AREA 1: ALAMEDA, CONTRA COSTA, 
MARIN,  NAPA, SACRAMENTO, SAN BENITO, SAN 
FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, 
AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 47.64                  28.56
OPERATOR:  POWER EQUIPMENT, LANDSCAPE WORK ONLY: 
GROUP 3 (AREA 2) THE REMAINING COUNTIES ARE SPLIT 
BETWEEN AREA 1 AND AREA 2 AS  NOTED 
ELDORADO 
Area 1: North Central 
Area 2: 
MONTEREY COUNTY 
Area 1: Remainder 
Area 2: Southwestern 
PLACER 
Area 1: All but the Central 
Area 2: Remainder...................................$ 49.64                  28.56
----------------------------------------------------------------

 IRON0377-001 01/01/2025
                                                     Rates                  Fringes
IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA, 
SAN MATEO, SANTA CLARA COUNTIES) PREMIUM 
$6.00 additional per hour at the following 
locations: China Lake Naval Test Station, Chocolate 
Mountains Naval Reserve-Niland, Edwards AFB, Fort 
Irwin Military Station, Fort Irwin Training 
Center-Goldstone, San Clemente Island, San Nicholas 
Island, Susanville Federal Prison, 29 Palms - 
Marine Corps, U.S. Marine Base - Barstow, U.S. 
Naval Air Facility - Sealey, Vandenberg 
$4.00 additional per hour at the following 
locations: Army Defense Language Institute - 
Monterey, Fallon Air Base, Naval Post Graduate 
School - Monterey, Yermo Marine Corps Logistics 
$2.00 additional per hour at the following 
locations: Port Hueneme, Port Mugu, U.S. Coast 
Guard Station - Two Rock............................$ 45.78                  26.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL 
(ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA 
COUNTIES) PREMIUM 
$6.00 additional per hour at the following 
locations: China Lake Naval Test Station, Chocolate 
Mountains Naval Reserve-Niland, Edwards AFB, Fort 
Irwin Military Station, Fort Irwin Training 
Center-Goldstone, San Clemente Island, San Nicholas 
Island, Susanville Federal Prison, 29 Palms - 
Marine Corps, U.S. Marine Base - Barstow, U.S. 
Naval Air Facility - Sealey, Vandenberg 
$4.00 additional per hour at the following 
locations: Army Defense Language Institute - 
Monterey, Fallon Air Base, Naval Post Graduate 
School - Monterey, Yermo Marine Corps Logistics 
$2.00 additional per hour at the following 
locations: Port Hueneme, Port Mugu, U.S. Coast 
Guard Station - Two Rock............................$ 55.33                  35.15
----------------------------------------------------------------

 IRON0377-003 01/01/2025
                                                     Rates                  Fringes
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND 
COUNTY) PREMIUM 
$6.00 additional per hour at the following 
locations: China Lake Naval Test Station, Chocolate 
Mountains Naval Reserve-Niland, Edwards AFB, Fort 
Irwin Military Station, Fort Irwin Training 
Center-Goldstone, San Clemente Island, San Nicholas 
Island, Susanville Federal Prison, 29 Palms - 
Marine Corps, U.S. Marine Base - Barstow, U.S. 
Naval Air Facility - Sealey, Vandenberg 
$4.00 additional per hour at the following 
locations: Army Defense Language Institute - 
Monterey, Fallon Air Base, Naval Post Graduate 
School - Monterey, Yermo Marine Corps Logistics 
$2.00 additional per hour at the following 
locations: Port Hueneme, Port Mugu, U.S. Coast 
Guard Station - Two Rock............................$ 45.78                  26.51
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL 
(SAN FRANCISCO CITY AND COUNTY) PREMIUM 
$6.00 additional per hour at the following 
locations: China Lake Naval Test Station, Chocolate 
Mountains Naval Reserve-Niland, Edwards AFB, Fort 
Irwin Military Station, Fort Irwin Training 
Center-Goldstone, San Clemente Island, San Nicholas 
Island, Susanville Federal Prison, 29 Palms - 
Marine Corps, U.S. Marine Base - Barstow, U.S. 
Naval Air Facility - Sealey, Vandenberg 
$4.00 additional per hour at the following 
locations: Army Defense Language Institute - 
Monterey, Fallon Air Base, Naval Post Graduate 
School - Monterey, Yermo Marine Corps Logistics 
$2.00 additional per hour at the following 
locations: Port Hueneme, Port Mugu, U.S. Coast 
Guard Station - Two Rock............................$ 55.83                  35.15
----------------------------------------------------------------

 IRON0433-005 01/01/2025
                                                     Rates                  Fringes
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) 
PREMIUM 
$6.00 additional per hour at the following 
locations: China Lake Naval Test Station, Chocolate 
Mountains Naval Reserve-Niland, Edwards AFB, Fort 
Irwin Military Station, Fort Irwin Training 
Center-Goldstone, San Clemente Island, San Nicholas 
Island, Susanville Federal Prison, 29 Palms - 
Marine Corps, U.S. Marine Base - Barstow, U.S. 
Naval Air Facility - Sealey, Vandenberg 
$4.00 additional per hour at the following 
locations: Army Defense Language Institute - 
Monterey, Fallon Air Base, Naval Post Graduate 
School - Monterey, Yermo Marine Corps Logistics 
$2.00 additional per hour at the following 
locations: Port Hueneme, Port Mugu, U.S. Coast 
Guard Station - Two Rock............................$ 45.78                  26.51
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL 
(REMAINING COUNTIES) PREMIUM 
$6.00 additional per hour at the following 
locations: China Lake Naval Test Station, Chocolate 
Mountains Naval Reserve-Niland, Edwards AFB, Fort 
Irwin Military Station, Fort Irwin Training 
Center-Goldstone, San Clemente Island, San Nicholas 
Island, Susanville Federal Prison, 29 Palms - 
Marine Corps, U.S. Marine Base - Barstow, U.S. 
Naval Air Facility - Sealey, Vandenberg 
$4.00 additional per hour at the following 
locations: Army Defense Language Institute - 
Monterey, Fallon Air Base, Naval Post Graduate 
School - Monterey, Yermo Marine Corps Logistics 
$2.00 additional per hour at the following 
locations: Port Hueneme, Port Mugu, U.S. Coast 
Guard Station - Two Rock............................$ 50.70                  35.15
----------------------------------------------------------------

 LABO0067-007 06/30/2025
                                                     Rates                  Fringes
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 (AREA 
1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN 
FRANCISCO,SANMATEO, SANTA CLARA) SCOPE OF WORK: 
Covers site mobilization; initial site clean-up; 
site preparation; removal of asbestos-containing 
materials from walls and ceilings; or from pipes, 
boilers and mechanical systems only if they are 
being scrapped; encapsulation, enclosure and 
disposal of asbestos-containing materials by hand 
or with equipment or machinery; scaffolding; 
fabrication of temporary wooden barriers; and 
assembly of decontamination stations................$ 39.15                  30.03
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 (AREA 
2: EL DORADO, MONTEREY, PLACE, SACRAMENTO, SAN 
BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, 
AND YUBA COUNTIES) SCOPE OF WORK: Covers site 
mobilization; initial site clean-up; site 
preparation; removal of asbestos-containing 
materials from walls and ceilings; or from pipes, 
boilers and mechanical systems only if they are 
being scrapped; encapsulation, enclosure and 
disposal of asbestos-containing materials by hand 
or with equipment or machinery; scaffolding; 
fabrication of temporary wooden barriers; and 
assembly of decontamination stations................$ 38.15                  30.03
----------------------------------------------------------------

 LABO0185-001 06/26/2023
                                                     Rates                  Fringes
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST:   ASPHALT IRONER AND RAKER; CHAINSAW; 
LASER BEAM IN CONNECTION WITH LABORERS' WORK; 
CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL    
(EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND 
YUBA COUNTIES)    FOOTNOTE: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO 
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): 
$0.25 PER HOUR ADDITIONAL...........................$ 36.20                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: 
Asphalt spreader boxes (all types); Barko, Wacker 
and similar type tampers; Buggymobile; Caulker, 
bander, pipewrapper, conduit layer, plastic 
pipelayer; Certified hazardous waste worker 
including Leade Abatement; Compactors of all types; 
Concrete and magnesite mixer, 1/2 yd. and under; 
Concrete pan work; Concrete sander; Concrete saw; 
Cribber and/or shoring; Cut granite curb setter; 
Dri-pak-it machine; Faller, logloader and bucker; 
Form raiser, slip forms; Green cutter; Headerboard, 
Hubsetter, aligner, by any method; High pressure 
blow pipe (1-1/2"""" or over, 100 lbs. 
pressure/over); Hydro seeder and similar type; 
Jackhammer operator; Jacking of pipe over 12 
inches; Jackson and similar type compactor; Kettle 
tender, pot and worker applying asphalt, lay-kold, 
creosote, lime, caustic and similar type materials 
(applying means applying, dipping or handling of 
such materials); Lagging, sheeting, whaling, 
bracing, trenchjacking, lagging hammer; Magnesite, 
epoxyresin, fiberglass, mastic worker (wet or dry); 
No joint pipe and stripping of same, including 
repair of voids; Pavement breaker and spader, 
including tool grinder; Perma curb; Pipelayer 
(including grade checking in connection with 
pipelaying); Precast-manhole setter; Pressure pipe 
tester; Post hole digger, air, gas and electric; 
Power broom sweeper; Power tampers of all types 
(except as shown in Group 2); Ram set gun and stud 
gun; Riprap stonepaver and rock-slinger, including 
placing of sacked concrete and/or sand (wet or dry) 
and gabions and similar type; Rotary scarifier or 
multiple head concrete chipping scarifier; Roto and 
Ditch Witch; Rototiller; Sandblaster, pot, gun, 
nozzle operators; Signalling and rigging; Tank 
cleaner; Tree climber; Turbo blaster; Vibrascreed, 
bull float in connection with laborers' work; 
Vibrator; Hazardous waste worker (lead removal); 
Asbestos and mold removal worker (EL DORADO, 
PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) 
  FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT 
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE 
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL..........................................$ 35.50                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A:  
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER  (EL DORADO, PLACER, SACRAMENTO, 
SUTTER, YOLO AND YUBA COUNTIES)  FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL...............$ 35.72                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING (EL DORADO, PLACER, SACRAMENTO, SUTTER, 
YOLO AND YUBA COUNTIES)  FOOTNOTE: LABORERS WORKING 
OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL.              
         ...........................................$ 35.55                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION. (EL DORADO, PLACER, 
SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)  
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT 
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE 
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL..........................................$ 36.05                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES  (EL DORADO, PLACER, SACRAMENTO, SUTTER, 
YOLO AND YUBA COUNTIES)   FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL...............$ 35.35                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY)  (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO 
AND YUBA COUNTIES)  FOOTNOTE: LABORERS WORKING OFF 
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO 
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): 
$0.25 PER HOUR ADDITIONAL...........................$ 35.25                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: 
ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER 
JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE 
JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL 
CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE 
PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING 
AND MOVING TO THE NEXT POINT OF ERECTION"".  (EL 
DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA 
COUNTIES)   FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE 
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL. ........................................$ 28.94                  27.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN  
(EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND 
YUBA COUNTIES)  FOOTNOTE: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS : $0.25 PER HOUR ADDITIONAL...................$ 36.46                  27.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN  (EL DORADO, PLACER, SACRAMENTO, 
SUTTER, YOLO AND YUBA COUNTIES)  FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL........$ 35.96                  27.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN  (EL DORADO, 
PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) 
  FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER 
HOUR ADDITIONAL.....................................$ 35.37                  27.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER   (EL 
DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA 
COUNTIES)   FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : 
$0.25 PER HOUR ADDITIONAL.        ..................$ 35.25                  27.30
LABORERS:, WRECKING: GROUP 1 Skilled wrecker 
(removing and salvaging of sash, windows and 
materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, 
YOLO AND YUBA COUNTIES)   FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS): $0.25 PER HOUR ADDITIONAL........$ 35.50                  27.30
LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker 
(salvaging of other building materials)  (EL 
DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA 
COUNTIES)   FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: 
$0.25 PER HOUR ADDITIONAL...........................$ 35.35                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS: NEW CONSTRUCTION   (EL DORADO, 
PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) 
   FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER 
HOUR ADDITIONAL.....................................$ 35.25                  27.30
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD   
(EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND 
YUBA COUNTIES)    FOOTNOTE: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS : $0.25 PER HOUR ADDITIONAL...................$ 28.94                  27.30
----------------------------------------------------------------

 LABO0185-003 07/01/2023
                                                     Rates                  Fringes
LABORER: MASON TENDER-BRICK (EL DORADO, PLACER, 
SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES).........$ 36.29                  25.55
----------------------------------------------------------------

 LABO0261-001 06/26/2023
                                                     Rates                  Fringes
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; 
LASER BEAM IN CONNECTION WITH LABORERS' WORK; 
CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL    
(MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES)    
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT 
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE 
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.              SEWER CLEANERS SHALL 
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR 
COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER 
SEWERS.  THOSE WHO WORK INSIDE RECENTLY ACTIVE, 
LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE 
SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.    MAINTENANCE AND REPAIR TRACK 
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.                 .............$ 37.20                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1:  
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER    (MARIN, SAN 
FRANCISCO, AND SAN MATEO COUNTIES)  FOOTNOTE: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO 
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH 
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL.      
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE RATES.  
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED..............................................$ 36.50                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER  (MARIN, SAN FRANCISCO, AND SAN MATEO 
COUNTIES)  FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE 
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.      SEWER CLEANERS SHALL RECEIVE $4.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER CLEANER"" 
MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT 
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  THOSE 
WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER 
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, 
SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED..............................................$ 36.72                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING  (MARIN, SAN FRANCISCO, AND SAN MATEO 
COUNTIES)  FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE 
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.      SEWER CLEANERS SHALL RECEIVE $4.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER CLEANER"" 
MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT 
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  THOSE 
WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER 
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, 
SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED..............................................$ 36.55                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  (MARIN, SAN FRANCISCO, AND 
SAN MATEO COUNTIES)  FOOTNOTE: LABORERS WORKING OFF 
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO 
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): 
$0.25 PER HOUR ADDITIONAL.      SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS (UNDERGROUND 
STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED 
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR 
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND 
STRUCTURES NOT SPECIFICALLY COVERED HEREIN.  THIS 
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK 
BELOW GROUND LEVEL IN OPEN CUT.  IT SHALL APPLY TO 
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE 
TEMPORARY COVER HAS BEEN PLACED.....................$ 37.05                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES  (MARIN, SAN FRANCISCO, AND SAN MATEO 
COUNTIES)  FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE 
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.      SEWER CLEANERS SHALL RECEIVE $4.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER CLEANER"" 
MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT 
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  THOSE 
WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER 
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, 
SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED..............................................$ 36.35                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY)  (MARIN, SAN FRANCISCO, AND SAN MATEO 
COUNTIES)  FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE 
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.      SEWER CLEANERS SHALL RECEIVE $4.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER CLEANER"" 
MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT 
WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  THOSE 
WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER 
SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, 
SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED..............................................$ 36.25                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: 
ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE        SALVAGED AND STOCKED TO BE REUSED ON 
ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE 
MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. 
THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE 
USED IN THE PERFORMANCE OF ""FORM STRIPPING, 
CLEANING AND OILING AND      MOVING TO THE NEXT 
POINT OF ERECTION"". (MARIN, SAN FRANCISCO, AND SAN 
MATEO COUNTIES)  FOOTNOTE: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO 
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): 
$0.25 PER HOUR ADDITIONAL.      SEWER CLEANERS 
SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE 
RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.  MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS (UNDERGROUND 
STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED 
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR 
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND 
STRUCTURES NOT SPECIFICALLY COVERED HEREIN.  THIS 
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK 
BELOW GROUND LEVEL IN OPEN CUT.  IT SHALL APPLY TO 
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE 
TEMPORARY COVER HAS BEEN PLACED.....................$ 29.94                  27.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN  
(MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES)   
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT 
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE 
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL..........................................$ 37.46                  27.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN   (MARIN, SAN FRANCISCO, AND SAN 
MATEO COUNTIES)  FOOTNOTE: LABORERS WORKING OFF OR 
WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO 
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): 
$0.25 PER HOUR ADDITIONAL...........................$ 36.96                  27.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN  (MARIN, SAN 
FRANCISCO, AND SAN MATEO COUNTIES)   FOOTNOTE: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO 
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH 
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL............$ 36.37                  27.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER  (MARIN, 
SAN FRANCISCO, AND SAN MATEO COUNTIES)   FOOTNOTE: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO 
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH 
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL............$ 36.25                  27.30
LABORERS:, WRECKING: GROUP 1 SKILLED WRECKER 
(REMOVING AND SALVAGING OF SASH, WINDOWS ADN 
MATERIALS  (MARIN, SAN FRANCISCO, AND SAN MATEO 
COUNTIES)  FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: 
$0.25 PER HOUR ADDITIONAL.                ..........$ 36.50                  27.30
LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER 
(SALVAGING OF OTHER BUILDING MATERIALS)  (MARIN, 
SAN FRANCISCO, AND SAN MATEO COUNTIES)   FOOTNOTE: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS ): $0.25 PER HOUR 
ADDITIONAL..........................................$ 36.35                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD   
(MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES)    
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER 
HOUR ADDITIONAL.....................................$ 29.94                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS: NEW CONSTRUCTION   (MARIN, SAN 
FRANCISCO, AND SAN MATEO COUNTIES)    FOOTNOTE: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS): $0.25 PER HOUR 
ADDITIONAL..........................................$ 36.25                  27.30
----------------------------------------------------------------

 LABO0261-008 07/01/2023
                                                     Rates                  Fringes
LABORER: MASON TENDER-BRICK   MARIN COUNTY..........$ 37.54                  25.55
----------------------------------------------------------------

 LABO0261-011 07/01/2023
                                                     Rates                  Fringes
MASON TENDER, BRICK   SAN FRANCISCO AND SAN MATEO 
COUNTIES    FOOTNOTES: UNDERGROUND WORK SUCH AS 
SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, 
TELEPHONE CONDUITS, TUNNELS AND CUT TRENCHES: $5.00 
PER DAY ADDITIONAL. WORK IN LIVE SEWAGE: $2.50 PER 
DAY ADDITIONAL......................................$ 37.05                  27.45
----------------------------------------------------------------

 LABO0261-012 07/01/2023
                                                     Rates                  Fringes
PLASTERER TENDER (EL DORADO, MARIN, NAPA, PLACER, 
SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA 
COUNTIES)    WORK ON A SWING STAGE SCAFFOLD: $1.00 
PER HOUR ADDITIONAL.................................$ 39.77                  28.54
----------------------------------------------------------------

 LABO0261-013 07/01/2023
                                                     Rates                  Fringes
PLASTER TENDER (SAN FRANCISCO AND SAN MATEO 
COUNTIES)    WORK ON A SWING STAGE SCAFFOLD: $1.00 
PER HOUR ADDITIONAL.................................$ 41.93                  30.32
----------------------------------------------------------------

 LABO0270-001 06/26/2023
                                                     Rates                  Fringes
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; 
Chainsaw; Laser beam in connection with laborers' 
work; Cast-in- place manhole form setter; Pressure 
pipelayer; Davis trencher - 300 or similar type 
(and all small trenchers); Blaster; Diamond 
driller; Multiple unit drill; Hydraulic drill (AREA 
""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional. Sewer 
cleaners shall receive $4.00 per day above Group 1 
wage rates.  ""Sewer cleaner"" means any worker who 
handles or comes in contact with raw sewage in 
small diameter sewers.  Those who work inside 
recently active, large diameter sewers, and all 
recently active sewer manholes, shall receive $5.00 
per day above Group 1 wage rates. Maintenance and 
repair track and road beds (underground 
structures). All employees performing work covered 
herein shall receive $ .25 per hour above their 
regular rate for all work performed on underground 
structures not specifically covered herein.  This 
paragraph shall not be construed to apply to work 
below ground level in open cut.  It shall apply to 
cut and cover work of subway construction after the 
temporary cover has been placed.....................$ 37.20                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1: Asphalt spreader boxes (all types); Barko, 
Wacker and similar type tampers; Buggymobile; 
Caulker, bander, pipewrapper, conduit layer, 
plastic pipelayer; Certified hazardous waste worker 
including Leade Abatement; Compactors of all types; 
Concrete and magnesite mixer, 1/2 yd. and under; 
Concrete pan work; Concrete sander; Concrete saw; 
Cribber and/or shoring; Cut granite curb setter; 
Dri-pak-it machine; Faller, logloader and bucker; 
Form raiser, slip forms; Green cutter; Headerboard, 
Hubsetter, aligner, by any method; High pressure 
blow pipe (1-1/2"""" or over, 100 lbs. 
pressure/over); Hydro seeder and similar type; 
Jackhammer operator; Jacking of pipe over 12 
inches; Jackson and similar type compactor; Kettle 
tender, pot and worker applying asphalt, lay-kold, 
creosote, lime, caustic and similar type materials 
(applying means applying, dipping or handling of 
such materials); Lagging, sheeting, whaling, 
bracing, trenchjacking, lagging hammer; Magnesite, 
epoxyresin, fiberglass, mastic worker (wet or dry); 
No joint pipe and stripping of same, including 
repair of voids; Pavement breaker and spader, 
including tool grinder; Perma curb; Pipelayer 
(including grade checking in connection with 
pipelaying); Precast-manhole setter; Pressure pipe 
tester; Post hole digger, air, gas and electric; 
Power broom sweeper; Power tampers of all types 
(except as shown in Group 2); Ram set gun and stud 
gun; Riprap stonepaver and rock-slinger, including 
placing of sacked concrete and/or sand (wet or dry) 
and gabions and similar type; Rotary scarifier or 
multiple head concrete chipping scarifier; Roto and 
Ditch Witch; Rototiller; Sandblaster, pot, gun, 
nozzle operators; Signalling and rigging; Tank 
cleaner; Tree climber; Turbo blaster; Vibrascreed, 
bull float in connection with laborers' work; 
Vibrator; Hazardous waste worker (lead removal); 
Asbestos and mold removal worker  (AREA ""A"" - SANTA 
CLARA COUNTY) FOOTNOTE: Laborers working off or 
with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. Sewer cleaners 
shall receive $4.00 per day above Group 1 wage 
rates.  ""Sewer cleaner"" means any worker who 
handles or comes in contact with raw sewage in 
small diameter sewers.  Those who work inside 
recently active, large diameter sewers, and all 
recently active sewer manholes, shall receive $5.00 
per day above Group 1 wage rates. Maintenance and 
repair track and road beds (underground 
structures). All employees performing work covered 
herein shall receive $ .25 per hour above their 
regular rate for all work performed on underground 
structures not specifically covered herein.  This 
paragraph shall not be construed to apply to work 
below ground level in open cut.  It shall apply to 
cut and cover work of subway construction after the 
temporary cover has been placed.....................$ 36.50                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-A:  Joy drill model TWM-2A; Gardner-Denver 
model DH143 and similar type drills; Track driller; 
Jack leg driller; Wagon driller; Mechanical 
drillers, all types regardless of type or method of 
power; Mechanical pipe layers, all types regardless 
of type or method of power; Blaster and powder; All 
work of loading, placing and blasting of all powder 
and explosives of whatever type regardless of 
method used for such loading and placing; High 
scalers (including drilling of same); Tree topper; 
Bit grinder (AREA ""A"" - SANTA CLARA COUNTY) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional. Sewer cleaners shall receive $4.00 
per day above Group 1 wage rates.  ""Sewer cleaner"" 
means any worker who handles or comes in contact 
with raw sewage in small diameter sewers.  Those 
who work inside recently active, large diameter 
sewers, and all recently active sewer manholes, 
shall receive $5.00 per day above Group 1 wage 
rates. Maintenance and repair track and road beds 
(underground structures). All employees performing 
work covered herein shall receive $ .25 per hour 
above their regular rate for all work performed on 
underground structures not specifically covered 
herein.  This paragraph shall not be construed to 
apply to work below ground level in open cut.  It 
shall apply to cut and cover work of subway 
construction after the temporary cover has been 
placed..............................................$ 36.72                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-C: Burning and welding in connection with 
laborers' work; Synthetic thermoplastics and 
similar type welding (AREA ""A"" - SANTA CLARA 
COUNTY) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional. Sewer cleaners shall 
receive $4.00 per day above Group 1 wage rates.  
""Sewer cleaner"" means any worker who handles or 
comes in contact with raw sewage in small diameter 
sewers.  Those who work inside recently active, 
large diameter sewers, and all recently active 
sewer manholes, shall receive $5.00 per day above 
Group 1 wage rates. Maintenance and repair track 
and road beds (underground structures). All 
employees performing work covered herein shall 
receive $ .25 per hour above their regular rate for 
all work performed on underground structures not 
specifically covered herein.  This paragraph shall 
not be construed to apply to work below ground 
level in open cut.  It shall apply to cut and cover 
work of subway construction after the temporary 
cover has been placed...............................$ 36.55                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-E: Work on and/or in bell hole footings and 
shafts thereof, and work on and in deep footings.  
(A deep footing is a hole 15 feet or more in 
depth.)  In the event the depth of the footing is 
unknown at the commencement of excavation, and the 
final depth exceeds 15 feet, the deep footing wage 
rate would apply to all employees for each and 
every day worked on or in the excavation of the 
footing from the date of inception. (AREA ""A"" - 
SANTA CLARA COUNTY) FOOTNOTE: Laborers working off 
or with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. Sewer cleaners 
shall receive $4.00 per day above Group 1 wage 
rates.  ""Sewer cleaner"" means any worker who 
handles or comes in contact with raw sewage in 
small diameter sewers.  Those who work inside 
recently active, large diameter sewers, and all 
recently active sewer manholes, shall receive $5.00 
per day above Group 1 wage rates. Maintenance and 
repair track and road beds (underground 
structures). All employees performing work covered 
herein shall receive $ .25 per hour above their 
regular rate for all work performed on underground 
structures not specifically covered herein.  This 
paragraph shall not be construed to apply to work 
below ground level in open cut.  It shall apply to 
cut and cover work of subway construction after the 
temporary cover has been placed.....................$ 37.05                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-F: Wire winding machine in connection with 
guniting or shot crete (AREA ""A"" - SANTA CLARA 
COUNTY  AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA 
CRUZ COUNTIES) FOOTNOTE: Laborers working off or 
with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. Sewer cleaners 
shall receive $4.00 per day above Group 1 wage 
rates.  ""Sewer cleaner"" means any worker who 
handles or comes in contact with raw sewage in 
small diameter sewers.  Those who work inside 
recently active, large diameter sewers, and all 
recently active sewer manholes, shall receive $5.00 
per day above Group 1 wage rates. Maintenance and 
repair track and road beds (underground 
structures). All employees performing work covered 
herein shall receive $ .25 per hour above their 
regular rate for all work performed on underground 
structures not specifically covered herein.  This 
paragraph shall not be construed to apply to work 
below ground level in open cut.  It shall apply to 
cut and cover work of subway construction after the 
temporary cover has been placed.....................$ 37.08                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 2: Asphalt shoveler; Cement dumper and 
handling dry cement or gypsum; Choke-setter and 
rigger (clearing work); Concrete bucket dumper and 
chute; Concrete chipping and grinding; Concrete 
laborer (wet or dry); Driller tender, chuck tender, 
nipper; Guinea chaser (stake), grout crew; High 
pressure nozzle, adductor; Hydraulic monitor (over 
100 lbs. pressure); Loading and unloading, carrying 
and hauling of all rods and materials for use in 
reinforcing concrete construction; Pittsburgh 
chipper and similar type brush shredders; Sloper; 
Single foot, hand-held, pneumatic tamper; All 
pneumatic, air, gas and electric tools not listed 
in Groups 1 through 1-f; Jacking of pipe - under 12 
inches  (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: 
Laborers working off or with or from bos'n chairs, 
swinging scaffolds, belts:  $0.25 per hour 
additional. Sewer cleaners shall receive $4.00 per 
day above Group 1 wage rates.  ""Sewer cleaner"" 
means any worker who handles or comes in contact 
with raw sewage in small diameter sewers.  Those 
who work inside recently active, large diameter 
sewers, and all recently active sewer manholes, 
shall receive $5.00 per day above Group 1 wage 
rates. Maintenance and repair track and road beds 
(underground structures). All employees performing 
work covered herein shall receive $ .25 per hour 
above their regular rate for all work performed on 
underground structures not specifically covered 
herein.  This paragraph shall not be construed to 
apply to work below ground level in open cut.  It 
shall apply to cut and cover work of subway 
construction after the temporary cover has been 
placed..............................................$ 36.35                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 3: Construction laborers, including bridge 
and general laborer; Dump, load spotter; Flag 
person; Fire watcher; Fence erector; Guardrail 
erector; Gardener, horticultural and landscape 
laborer; Jetting; Limber, brush loader and piler; 
Pavement marker (button setter); Maintenance, 
repair track and road beds; Streetcar and railroad 
construction track laborer; Temporary air and water 
lines, Victaulic or similar; Tool room attendant 
(jobsite only) (AREA ""A"" - SANTA CLARA COUNTY) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional. Sewer cleaners shall receive $4.00 
per day above Group 1 wage rates.  ""Sewer cleaner"" 
means any worker who handles or comes in contact 
with raw sewage in small diameter sewers.  Those 
who work inside recently active, large diameter 
sewers, and all recently active sewer manholes, 
shall receive $5.00 per day above Group 1 wage 
rates. Maintenance and repair track and road beds 
(underground structures). All employees performing 
work covered herein shall receive $ .25 per hour 
above their regular rate for all work performed on 
underground structures not specifically covered 
herein.  This paragraph shall not be construed to 
apply to work below ground level in open cut.  It 
shall apply to cut and cover work of subway 
construction after the temporary cover has been 
placed..............................................$ 36.25                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 4: All clean-up work of debris, grounds and 
building including but not limited to: street 
cleaner; cleaning and  washing windows; brick 
cleaner (jobsite only); material cleaner (jobsite 
only).  The classification ""material cleaner"" is to 
be utilized under the following conditions: A: at 
demolition site for the salvage of the material.  
B: at the conclusion of a job where the material is 
to be salvaged and stocked to be reused on another 
job. C: for the cleaning of salvage material at the 
jobsite or temporary jobsite yard. The material 
cleaner classification should not be used in the 
performance of """"form stripping, cleaning and 
oiling and      moving to the next point of 
erection"".  (AREA ""A"" - SANTA CLARA COUNTY) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional. Sewer cleaners shall receive $4.00 
per day above Group 1 wage rates.  ""Sewer cleaner"" 
means any worker who handles or comes in contact 
with raw sewage in small diameter sewers.  Those 
who work inside recently active, large diameter 
sewers, and all recently active sewer manholes, 
shall receive $5.00 per day above Group 1 wage 
rates. Maintenance and repair track and road beds 
(underground structures). All employees performing 
work covered herein shall receive $ .25 per hour 
above their regular rate for all work performed on 
underground structures not specifically covered 
herein.  This paragraph shall not be construed to 
apply to work below ground level in open cut.  It 
shall apply to cut and cover work of subway 
construction after the temporary cover has been 
placed..............................................$ 29.94                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; 
Chainsaw; Laser beam in connection with laborers' 
work; Cast-in- place manhole form setter; Pressure 
pipelayer; Davis trencher - 300 or similar type 
(and all small trenchers); Blaster; Diamond 
driller; Multiple unit drill; Hydraulic drill  
(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional. .........................$ 36.20                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1: Asphalt spreader boxes (all types); Barko, 
Wacker and similar type tampers; Buggymobile; 
Caulker, bander, pipewrapper, conduit layer, 
plastic pipelayer; Certified hazardous waste worker 
including Leade Abatement; Compactors of all types; 
Concrete and magnesite mixer, 1/2 yd. and under; 
Concrete pan work; Concrete sander; Concrete saw; 
Cribber and/or shoring; Cut granite curb setter; 
Dri-pak-it machine; Faller, logloader and bucker; 
Form raiser, slip forms; Green cutter; Headerboard, 
Hubsetter, aligner, by any method; High pressure 
blow pipe (1-1/2"""" or over, 100 lbs. 
pressure/over); Hydro seeder and similar type; 
Jackhammer operator; Jacking of pipe over 12 
inches; Jackson and similar type compactor; Kettle 
tender, pot and worker applying asphalt, lay-kold, 
creosote, lime, caustic and similar type materials 
(applying means applying, dipping or handling of 
such materials); Lagging, sheeting, whaling, 
bracing, trenchjacking, lagging hammer; Magnesite, 
epoxyresin, fiberglass, mastic worker (wet or dry); 
No joint pipe and stripping of same, including 
repair of voids; Pavement breaker and spader, 
including tool grinder; Perma curb; Pipelayer 
(including grade checking in connection with 
pipelaying); Precast-manhole setter; Pressure pipe 
tester; Post hole digger, air, gas and electric; 
Power broom sweeper; Power tampers of all types 
(except as shown in Group 2); Ram set gun and stud 
gun; Riprap stonepaver and rock-slinger, including 
placing of sacked concrete and/or sand (wet or dry) 
and gabions and similar type; Rotary scarifier or 
multiple head concrete chipping scarifier; Roto and 
Ditch Witch; Rototiller; Sandblaster, pot, gun, 
nozzle operators; Signalling and rigging; Tank 
cleaner; Tree climber; Turbo blaster; Vibrascreed, 
bull float in connection with laborers' work; 
Vibrator; Hazardous waste worker (lead removal); 
Asbestos and mold removal worker (AREA ""B"" - 
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional. ...................................$ 35.50                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver 
model DH143 and similar type drills; Track driller; 
Jack leg driller; Wagon driller; Mechanical 
drillers, all types regardless of type or method of 
power; Mechanical pipe layers, all types regardless 
of type or method of power; Blaster and powder; All 
work of loading, placing and blasting of all powder 
and explosives of whatever type regardless of 
method used for such loading and placing; High 
scalers (including drilling of same); Tree topper; 
Bit grinder (AREA ""B"" - MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off 
or with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. .................$ 35.72                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1-C: Burning and welding in connection with 
laborers' work; Synthetic thermoplastics and 
similar type welding  (AREA ""B"" - MONTEREY, SAN 
BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional. ......$ 35.55                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1-E: Work on and/or in bell hole footings and 
shafts thereof, and work on and in deep footings.  
(A deep footing is a hole 15 feet or more in 
depth.)  In the event the depth of the footing is 
unknown at the commencement of excavation, and the 
final depth exceeds 15 feet, the deep footing wage 
rate would apply to all employees for each and 
every day worked on or in the excavation of the 
footing from the date of inception. (AREA ""B"" - 
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional. ...................................$ 36.05                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1-F: Wire winding machine in connection with 
guniting or shot crete (AREA ""B"" - MONTEREY, SAN 
BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional. ......$ 36.08                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 2: Asphalt shoveler; Cement dumper and 
handling dry cement or gypsum; Choke-setter and 
rigger (clearing work); Concrete bucket dumper and 
chute; Concrete chipping and grinding; Concrete 
laborer (wet or dry); Driller tender, chuck tender, 
nipper; Guinea chaser (stake), grout crew; High 
pressure nozzle, adductor; Hydraulic monitor (over 
100 lbs. pressure); Loading and unloading, carrying 
and hauling of all rods and materials for use in 
reinforcing concrete construction; Pittsburgh 
chipper and similar type brush shredders; Sloper; 
Single foot, hand-held, pneumatic tamper; All 
pneumatic, air, gas and electric tools not listed 
in Groups 1 through 1-f; Jacking of pipe - under 12 
inches (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA 
CRUZ COUNTIES) FOOTNOTE: Laborers working off or 
with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. .................$ 35.35                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 3: Construction laborers, including bridge 
and general laborer; Dump, load spotter; Flag 
person; Fire watcher; Fence erector; Guardrail 
erector; Gardener, horticultural and landscape 
laborer; Jetting; Limber, brush loader and piler; 
Pavement marker (button setter); Maintenance, 
repair track and road beds; Streetcar and railroad 
construction track laborer; Temporary air and water 
lines, Victaulic or similar; Tool room attendant 
(jobsite only) (AREA ""B"" - MONTEREY, SAN BENITO, 
AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working 
off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional. ......$ 35.25                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 4: All clean-up work of debris, grounds and 
building including but not limited to: street 
cleaner; cleaning and  washing windows; brick 
cleaner (jobsite only); material cleaner (jobsite 
only).  The classification ""material cleaner"" is to 
be utilized under the following conditions: A: at 
demolition site for the salvage of the material.  
B: at the conclusion of a job where the material is 
to be salvaged and stocked to be reused on another 
job. C: for the cleaning of salvage material at the 
jobsite or temporary jobsite yard. The material 
cleaner classification should not be used in the 
performance of """"form stripping, cleaning and 
oiling and      moving to the next point of 
erection"". (AREA ""B"" - MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off 
or with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. .................$ 28.94                  27.30
LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL 
NOZZLEMAN (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: 
Laborers working off or with or from bos'n chairs, 
swinging scaffolds, belts:  $0.25 per hour 
additional..........................................$ 37.46                  27.30
LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, 
GUNMAN, POTMAN, GROUNDMAN (AREA ""A"" - SANTA CLARA 
COUNTY) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional...........................$ 36.96                  27.30
LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN 
(AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 36.37                  27.30
LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER 
(AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 36.25                  27.30
LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL 
NOZZLEMAN (AREA ""B"" - MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off 
or with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional...................$ 36.46                  27.30
LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, 
GUNMAN, POTMAN, GORUNDMAN (AREA ""B"" - MONTEREY, SAN 
BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 35.96                  27.30
LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMAN 
(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional...........................$ 35.37                  27.30
LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORER 
(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional...........................$ 35.25                  27.30
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled 
wrecker (removing and salvaging of sash, windows 
and materials) (AREA ""A"" - SANTA CLARA COUNTY) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.....................................$ 36.50                  27.30
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled 
wrecker (salvaging of other building materials) 
(AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 36.35                  27.30
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled 
wrecker (removing and salvaging of sash, windows 
and materials) (AREA ""B"" - MONTEREY, SAN BENITO, 
AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working 
off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 35.50                  27.30
LABORERS:, WRECKING - AREA B: GROUP 2 : 
Semi-skilled wrecker (salvaging of other building 
materials)(AREA ""B"" - MONTEREY, SAN BENITO, AND 
SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off 
or with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional...................$ 35.35                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY 
PERIOD (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: 
Laborers working off or with or from bos'n chairs, 
swinging scaffolds, belts:  $0.25 per hour 
additional..........................................$ 29.94                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA 
""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 36.25                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY 
PERIOD (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA 
CRUZ COUNTIES) FOOTNOTE: Laborers working off or 
with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional...................$ 28.94                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION (AREA 
""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ 
COUNTIES) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional...........................$ 35.25                  27.30
----------------------------------------------------------------

 LABO0270-002 07/01/2023
                                                     Rates                  Fringes
MASON TENDER, BRICK (SANTA CLARA COUNTY)............$ 35.29                  26.85
MASON TENDER, BRICK (SANTA CRUZ COUNTY).............$ 35.29                  26.85
----------------------------------------------------------------

 LABO0270-006 07/01/2023
                                                     Rates                  Fringes
LABORER: MASON TENDER-BRICK (MONTEREY AND SAN 
BENITO COUNTIES)....................................$ 36.29                  25.55
----------------------------------------------------------------

 LABO0270-008 07/01/2023
                                                     Rates                  Fringes
PLASTER TENDER   (SANTA CLARA & SANTA CRUZ)    WORK 
ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR 
ADDITIONAL..........................................$ 40.68                  29.68
----------------------------------------------------------------

 LABO0270-009 07/01/2023
                                                     Rates                  Fringes
PLASTERER TENDER   (MONTEREY AND SAN BENITO 
COUNTIES)    WORK ON A SWING STAGE SCAFFOLD: $1.00 
PER HOUR ADDITIONAL.................................$ 40.68                  29.68
----------------------------------------------------------------

 LABO0304-001 06/26/2023
                                                     Rates                  Fringes
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION 
SPECIALIST   ASPHALT IRONER AND RAKER; CHAINSAW; 
LASER BEAM IN CONNECTION WITH LABORERS' WORK; 
CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE 
PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE 
(AND ALL SMALL TRENCHERS); BLASTER; DIAMOND 
DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL    
(ALAMEDA COUNTY)    FOOTNOTE: LABORERS WORKING OFF 
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO 
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): 
$0.25 PER HOUR ADDITIONAL.             SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL 
RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 
PER DAY ABOVE GROUP 1 WAGE RATES.    MAINTENANCE 
AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND 
STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED 
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR 
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND 
STRUCTURES NOT SPECIFICALLY COVERED HEREIN.  THIS 
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK 
BELOW GROUND LEVEL IN OPEN CUT.  IT SHALL APPLY TO 
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE 
TEMPORARY COVER HAS BEEN PLACED.....................$ 37.20                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 
ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER 
AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, 
BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC 
PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER 
INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; 
CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; 
CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; 
CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; 
DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; 
FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, 
HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE 
BLOW PIPE (1-1/2"" OR OVER, 100 LBS. PRESSURE/OVER); 
HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; 
JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR 
TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER 
APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC 
AND SIMILAR TYPE MATERIALS (APPLYING MEANS 
APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); 
LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, 
LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, 
MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND 
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; 
PAVEMENT BREAKER AND SPADER, INCLUDING TOOL 
GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE 
CHECKING IN CONNECTION WITH PIPELAYING); 
PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST 
HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM 
SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS 
SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP 
STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF 
SACKED CONCRETE AND/OR SAND (WET OR DRY) AND 
GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR 
MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND 
DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, 
NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK 
CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, 
BULL FLOAT IN CONNECTION WITH LABORERS' WORK; 
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); 
ASBESTOS AND MOLD REMOVAL WORKER   (ALAMEDA COUNTY) 
  FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT 
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE 
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.       SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED..............................................$ 36.50                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A 
JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 
AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG 
DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL 
TYPES REGARDLESS OF TYPE OR METHOD OF POWER; 
MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF 
TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT GRINDER  (ALAMEDA COUNTY)   FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL.       SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK 
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED.     .........................$ 36.72                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C 
BURNING AND WELDING IN CONNECTION WITH LABORERS' 
WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE 
WELDING  (ALAMEDA COUNTY)   FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL.       SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK 
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED...............................$ 36.55                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E 
WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS 
THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  (A DEEP 
FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.)  IN 
THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT 
THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH 
EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD 
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY 
WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM 
THE DATE OF INCEPTION.  (ALAMEDA COUNTY)   
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT 
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE 
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.       SEWER CLEANERS SHALL RECEIVE 
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES.  ""SEWER 
CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN 
CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS.  
THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED..............................................$ 37.05                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F 
WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR 
SHOT CRETE  (ALAMEDA COUNTY)   FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL.       SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK 
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED...............................$ 37.08                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2 
ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY 
CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING 
WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE 
CHIPPING AND GRINDING; CONCRETE LABORER (WET OR 
DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA 
CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, 
ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. 
PRESSURE); LOADING AND UNLOADING, CARRYING AND 
HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
INCHES  (ALAMEDA COUNTY)   FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL.  SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK 
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED...............................$ 36.35                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 
CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL 
LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE 
WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; 
GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; 
JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT 
MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK 
AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION 
TRACK LABORER; TEMPORARY AIR AND WATER LINES, 
VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE 
ONLY)  (ALAMEDA COUNTY)   FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL.       SEWER 
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 
WAGE RATES.  ""SEWER CLEANER"" MEANS ANY WORKER WHO 
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN 
SMALL DIAMETER SEWERS.  THOSE WHO WORK INSIDE 
RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK 
AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL 
EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL 
RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR 
ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT 
SPECIFICALLY COVERED HEREIN.  THIS PARAGRAPH SHALL 
NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND 
LEVEL IN OPEN CUT.  IT SHALL APPLY TO CUT AND COVER 
WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY 
COVER HAS BEEN PLACED...............................$ 36.25                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL 
CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING 
INCLUDING BUT NOT LIMITED TO: STREET CLEANER; 
CLEANING AND WASHING WINDOWS; BRICK CLEANER 
(JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY).  
THE CLASSIFICATION ""MATERIAL CLEANER"" IS TO BE 
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT 
DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL.  
B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS 
TO BE        SALVAGED AND STOCKED TO BE REUSED ON 
ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE 
MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. 
THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE 
USED IN THE PERFORMANCE OF ""FORM STRIPPING, 
CLEANING AND OILING AND      MOVING TO THE NEXT 
POINT OF ERECTION"".  (ALAMEDA COUNTY)   FOOTNOTE: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO 
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH 
IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL.       
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND 
REPAIR TRACK AND ROAD BEDS (UNDERGROUND 
STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED 
HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR 
REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND 
STRUCTURES NOT SPECIFICALLY COVERED HEREIN.  THIS 
PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK 
BELOW GROUND LEVEL IN OPEN CUT.  IT SHALL APPLY TO 
CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE 
TEMPORARY COVER HAS BEEN PLACED.....................$ 29.94                  27.30
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN  
(ALAMEDA COUNTY)   FOOTNOTE: LABORERS WORKING OFF 
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS: $0.25 PER HOUR ADDITIONAL....................$ 37.46                  27.30
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, 
POTMAN, GROUNDMAN  (ALAMEDA COUNTY)   FOOTNOTE: 
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, 
SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR 
ADDITIONAL..........................................$ 36.96                  27.30
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN  (ALAMEDA 
COUNTY)   FOOTNOTE: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 
PER HOUR ADDITIONAL.................................$ 36.37                  27.30
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER  (ALAMEDA 
COUNTY)   FOOTNOTE: LABORERS WORKING OFF OR WITH OR 
FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 
PER HOUR ADDITIONAL.................................$ 36.25                  27.30
LABORERS:, WRECKING: GROUP 1 Skilled wrecker 
(removing and salvaging of sash, windows and 
materials) (ALAMEDA COUNTY)  FOOTNOTE: LABORERS 
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING 
SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS 
ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN 
GROUP 1-A): $0.25 PER HOUR ADDITIONAL...............$ 36.50                  27.30
LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled 
wrecker (salvaging of other building materials) 
(ALAMEDA COUNTY)   FOOTNOTE: LABORERS WORKING OFF 
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO 
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): 
$0.25 PER HOUR ADDITIONAL...........................$ 36.35                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD   
(ALAMEDA COUNTY)    FOOTNOTE: LABORERS WORKING OFF 
OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, 
BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO 
RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): 
$0.25 PER HOUR ADDITIONAL...........................$ 29.94                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS: NEW CONSTRUCTION   (ALAMEDA 
COUNTY)    FOOTNOTE: LABORERS WORKING OFF OR WITH 
OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS 
(NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE 
WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL..........................................$ 36.25                  27.30
----------------------------------------------------------------

 LABO0304-006 07/01/2023
                                                     Rates                  Fringes
BRICK TENDER (ALAMEDA COUNTY)    FOOTNOTES: WORK ON 
JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: 
$2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 
PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY 
ADDITIONAL..........................................$ 37.05                  27.45
----------------------------------------------------------------

 LABO0304-007 07/01/2023
                                                     Rates                  Fringes
PLASTERER TENDER (ALAMEDA AND CONTRA COSTA 
COUNTIES)    WORK ON A SWING STAGE SCAFFOLD: $1.00 
PER HOUR ADDITIONAL.................................$ 41.93                  30.32
----------------------------------------------------------------

 LABO0324-001 06/26/2023
                                                     Rates                  Fringes
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
CONSTRUCTION SPECIALIST Asphalt ironer and raker; 
Chainsaw; Laser beam in connection with laborers' 
work; Cast-in- place manhole form setter; Pressure 
pipelayer; Davis trencher - 300 or similar type 
(and all small trenchers); Blaster; Diamond 
driller; Multiple unit drill; Hydraulic drill (AREA 
""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional. Sewer 
cleaners shall receive $4.00 per day above Group 1 
wage rates.  ""Sewer cleaner"" means any worker who 
handles or comes in contact with raw sewage in 
small diameter sewers.  Those who work inside 
recently active, large diameter sewers, and all 
recently active sewer manholes, shall receive $5.00 
per day above Group 1 wage rates. Maintenance and 
repair track and road beds (underground 
structures). All employees performing work covered 
herein shall receive $ .25 per hour above their 
regular rate for all work performed on underground 
structures not specifically covered herein.  This 
paragraph shall not be construed to apply to work 
below ground level in open cut.  It shall apply to 
cut and cover work of subway construction after the 
temporary cover has been placed.....................$ 37.20                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1: Asphalt spreader boxes (all types); Barko, 
Wacker and similar type tampers; Buggymobile; 
Caulker, bander, pipewrapper, conduit layer, 
plastic pipelayer; Certified hazardous waste worker 
including Leade Abatement; Compactors of all types; 
Concrete and magnesite mixer, 1/2 yd. and under; 
Concrete pan work; Concrete sander; Concrete saw; 
Cribber and/or shoring; Cut granite curb setter; 
Dri-pak-it machine; Faller, logloader and bucker; 
Form raiser, slip forms; Green cutter; Headerboard, 
Hubsetter, aligner, by any method; High pressure 
blow pipe (1-1/2"""" or over, 100 lbs. 
pressure/over); Hydro seeder and similar type; 
Jackhammer operator; Jacking of pipe over 12 
inches; Jackson and similar type compactor; Kettle 
tender, pot and worker applying asphalt, lay-kold, 
creosote, lime, caustic and similar type materials 
(applying means applying, dipping or handling of 
such materials); Lagging, sheeting, whaling, 
bracing, trenchjacking, lagging hammer; Magnesite, 
epoxyresin, fiberglass, mastic worker (wet or dry); 
No joint pipe and stripping of same, including 
repair of voids; Pavement breaker and spader, 
including tool grinder; Perma curb; Pipelayer 
(including grade checking in connection with 
pipelaying); Precast-manhole setter; Pressure pipe 
tester; Post hole digger, air, gas and electric; 
Power broom sweeper; Power tampers of all types 
(except as shown in Group 2); Ram set gun and stud 
gun; Riprap stonepaver and rock-slinger, including 
placing of sacked concrete and/or sand (wet or dry) 
and gabions and similar type; Rotary scarifier or 
multiple head concrete chipping scarifier; Roto and 
Ditch Witch; Rototiller; Sandblaster, pot, gun, 
nozzle operators; Signalling and rigging; Tank 
cleaner; Tree climber; Turbo blaster; Vibrascreed, 
bull float in connection with laborers' work; 
Vibrator; Hazardous waste worker (lead removal); 
Asbestos and mold removal worker (AREA ""A"" - CONTRA 
COSTA COUNTY) FOOTNOTE: Laborers working off or 
with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. Sewer cleaners 
shall receive $4.00 per day above Group 1 wage 
rates.  ""Sewer cleaner"" means any worker who 
handles or comes in contact with raw sewage in 
small diameter sewers.  Those who work inside 
recently active, large diameter sewers, and all 
recently active sewer manholes, shall receive $5.00 
per day above Group 1 wage rates. Maintenance and 
repair track and road beds (underground 
structures). All employees performing work covered 
herein shall receive $ .25 per hour above their 
regular rate for all work performed on underground 
structures not specifically covered herein.  This 
paragraph shall not be construed to apply to work 
below ground level in open cut.  It shall apply to 
cut and cover work of subway construction after the 
temporary cover has been placed.....................$ 36.50                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-A OY DRILL MODEL TWM-2A; GARDNER-DENVER 
MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; 
JACK LEG DRILLER; WAGON DRILLER; MECHANICAL 
DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF 
POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS 
OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL 
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER 
AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF 
METHOD USED FOR SUCH LOADING AND PLACING; HIGH 
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; 
BIT 
(AREA ""A"" - CONTRA COSTA COUNTY) 
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.        .....................................$ 36.72                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-C: (BURNING AND WELDING IN CONNECTION WITH 
LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND 
SIMILAR TYPE 
(AREA ""A"" - CONTRA COSTA COUNTY) 
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT 
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE 
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.     
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.        .....................................$ 36.55                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND 
SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS.  
(A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN 
DEPTH.)  IN THE EVENT THE DEPTH OF THE FOOTING IS 
UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE 
FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE 
RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND 
EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE 
FOOTING FROM THE DATE OF 
(AREA ""A"" - CONTRA COSTA COUNTY) 
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT 
APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE 
RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR 
ADDITIONAL.     
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.                  ...........................$ 37.05                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-F: Wire winding machine in connection with 
guniting or shot crete (AREA ""A"" - CONTRA COSTA 
COUNTY) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional. Sewer cleaners shall 
receive $4.00 per day above Group 1 wage rates.  
""Sewer cleaner"" means any worker who handles or 
comes in contact with raw sewage in small diameter 
sewers.  Those who work inside recently active, 
large diameter sewers, and all recently active 
sewer manholes, shall receive $5.00 per day above 
Group 1 wage rates. Maintenance and repair track 
and road beds (underground structures). All 
employees performing work covered herein shall 
receive $ .25 per hour above their regular rate for 
all work performed on underground structures not 
specifically covered herein.  This paragraph shall 
not be construed to apply to work below ground 
level in open cut.  It shall apply to cut and cover 
work of subway construction after the temporary 
cover has been placed...............................$ 37.08                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 1-G CONTRA COSTA COUNTY: Pipelayer (including 
grade checking on connection with peiplaying); 
Caulker; Bander; Pipewrapper; Conduit layer; 
Plastic pipe layer; pressure pipe tester; No joint 
pipe and stripping of same, including repair of 
voids; Precast manhole setters, cast in place 
manhole from setters (AREA ""A"" - CONTRA COSTA 
COUNTY) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional. Sewer cleaners shall 
receive $4.00 per day above Group 1 wage rates.  
""Sewer cleaner"" means any worker who handles or 
comes in contact with raw sewage in small diameter 
sewers.  Those who work inside recently active, 
large diameter sewers, and all recently active 
sewer manholes, shall receive $5.00 per day above 
Group 1 wage rates. Maintenance and repair track 
and road beds (underground structures). All 
employees performing work covered herein shall 
receive $ .25 per hour above their regular rate for 
all work performed on underground structures not 
specifically covered herein.  This paragraph shall 
not be construed to apply to work below ground 
level in open cut.  It shall apply to cut and cover 
work of subway construction after the temporary 
cover has been placed...............................$ 36.70                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND 
HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND 
RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND 
CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE 
LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, 
NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH 
PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 
100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING 
AND HAULING OF ALL RODS AND MATERIALS FOR USE IN 
REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH 
CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; 
SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL 
PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED 
IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 
(AREA ""A"" - CONTRA COSTA COUNTY) 
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM 
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER 
HOUR ADDITIONAL.     
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE 
GROUP 1 WAGE RATES.  ""SEWER CLEANER"" MEANS ANY 
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW 
SEWAGE IN SMALL DIAMETER SEWERS.  THOSE WHO WORK 
INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND 
ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE 
$5.00 PER DAY ABOVE GROUP 1 WAGE 
MAINTENANCE AND REPAIR TRACK AND ROAD BEDS 
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING 
WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR 
ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON 
UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED 
HEREIN.  THIS PARAGRAPH SHALL NOT BE CONSTRUED TO 
APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT.  IT 
SHALL APPLY TO CUT AND COVER WORK OF SUBWAY 
CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN 
PLACED.                  ...........................$ 36.35                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 3:  Construction laborers, including bridge 
and general laborer; Dump, load spotter; Flag 
person; Fire watcher; Fence erector; Guardrail 
erector; Gardener, horticultural and landscape 
laborer; Jetting; Limber, brush loader and piler; 
Pavement marker (button setter); Maintenance, 
repair track and road beds; Streetcar and railroad 
construction track laborer; Temporary air and water 
lines, Victaulic or similar; Tool room attendant 
(jobsite only) (AREA ""A"" - CONTRA COSTA COUNTY) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.  Sewer cleaners shall receive 
$4.00 per day above Group 1 wage rates.  ""Sewer 
cleaner"" means any worker who handles or comes in 
contact with raw sewage in small diameter sewers.  
Those who work inside recently active, large 
diameter sewers, and all recently active sewer 
manholes, shall receive $5.00 per day above Group 1 
wage rates. Maintenance and repair track and road 
beds (underground structures). All employees 
performing work covered herein shall receive $ .25 
per hour above their regular rate for all work 
performed on underground structures not 
specifically covered herein.  This paragraph shall 
not be construed to apply to work below ground 
level in open cut.  It shall apply to cut and cover 
work of subway construction after the temporary 
cover has been placed...............................$ 36.25                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: 
GROUP 4: All clean-up work of debris, grounds and 
building including but not limited to: street 
cleaner; cleaning and washing windows; brick 
cleaner (jobsite only); material cleaner (jobsite 
only).  The classification ""material cleaner"" is to 
be utilized under the following conditions: A: at 
demolition site for the salvage of the material.  
B: at the conclusion of a job where the material is 
to be salvaged and stocked to be reused on another 
job. C: for the cleaning of salvage material at the 
jobsite or temporary jobsite yard. The material 
cleaner classification should not be used in the 
performance of ""form stripping, cleaning and oiling 
and moving to the next point of erection"". (AREA 
""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional.  
Sewer cleaners shall receive $4.00 per day above 
Group 1 wage rates.  ""Sewer cleaner"" means any 
worker who handles or comes in contact with raw 
sewage in small diameter sewers.  Those who work 
inside recently active, large diameter sewers, and 
all recently active sewer manholes, shall receive 
$5.00 per day above Group 1 wage rates. Maintenance 
and repair track and road beds (underground 
structures). All employees performing work covered 
herein shall receive $ .25 per hour above their 
regular rate for all work performed on underground 
structures not specifically covered herein.  This 
paragraph shall not be construed to apply to work 
below ground level in open cut.  It shall apply to 
cut and cover work of subway construction after the 
temporary cover has been placed.....................$ 29.94                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
CONSTRUCTION SPECIALIST: Asphalt ironer and raker; 
Chainsaw; Laser beam in connection with laborers' 
work; Cast-in- place manhole form setter; Pressure 
pipelayer; Davis trencher - 300 or similar type 
(and all small trenchers); Blaster; Diamond 
driller; Multiple unit drill; Hydraulic drill (AREA 
""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: 
Laborers working off or with or from bos'n chairs, 
swinging scaffolds, belts:  $0.25 per hour 
additional. ........................................$ 36.20                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1: Asphalt spreader boxes (all types); Barko, 
Wacker and similar type tampers; Buggymobile; 
Caulker, bander, pipewrapper, conduit layer, 
plastic pipelayer; Certified hazardous waste worker 
including Leade Abatement; Compactors of all types; 
Concrete and magnesite mixer, 1/2 yd. and under; 
Concrete pan work; Concrete sander; Concrete saw; 
Cribber and/or shoring; Cut granite curb setter; 
Dri-pak-it machine; Faller, logloader and bucker; 
Form raiser, slip forms; Green cutter; Headerboard, 
Hubsetter, aligner, by any method; High pressure 
blow pipe (1-1/2"""" or over, 100 lbs. 
pressure/over); Hydro seeder and similar type; 
Jackhammer operator; Jacking of pipe over 12 
inches; Jackson and similar type compactor; Kettle 
tender, pot and worker applying asphalt, lay-kold, 
creosote, lime, caustic and similar type materials 
(applying means applying, dipping or handling of 
such materials); Lagging, sheeting, whaling, 
bracing, trenchjacking, lagging hammer; Magnesite, 
epoxyresin, fiberglass, mastic worker (wet or dry); 
No joint pipe and stripping of same, including 
repair of voids; Pavement breaker and spader, 
including tool grinder; Perma curb; Pipelayer 
(including grade checking in connection with 
pipelaying); Precast-manhole setter; Pressure pipe 
tester; Post hole digger, air, gas and electric; 
Power broom sweeper; Power tampers of all types 
(except as shown in Group 2); Ram set gun and stud 
gun; Riprap stonepaver and rock-slinger, including 
placing of sacked concrete and/or sand (wet or dry) 
and gabions and similar type; Rotary scarifier or 
multiple head concrete chipping scarifier; Roto and 
Ditch Witch; Rototiller; Sandblaster, pot, gun, 
nozzle operators; Signalling and rigging; Tank 
cleaner; Tree climber; Turbo blaster; Vibrascreed, 
bull float in connection with laborers' work; 
Vibrator; Hazardous waste worker (lead removal); 
Asbestos and mold removal worker (AREA ""B"" - NAPA, 
SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional. ......$ 35.50                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver 
model DH143 and similar type drills; Track driller; 
Jack leg driller; Wagon driller; Mechanical 
drillers, all types regardless of type or method of 
power; Mechanical pipe layers, all types regardless 
of type or method of power; Blaster and powder; All 
work of loading, placing and blasting of all powder 
and explosives of whatever type regardless of 
method used for such loading and placing; High 
scalers (including drilling of same); Tree topper; 
Bit grinder (AREA ""B"" - NAPA, SOLANO, AND SONOMA 
COUNTIES) ..........................................$ 35.72                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1-C: Burning and welding in connection with 
laborers' work; Synthetic thermoplastics and 
similar type welding (AREA ""B"" - NAPA, SOLANO, AND 
SONOMA COUNTIES) FOOTNOTE: Laborers working off or 
with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. .................$ 35.55                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1-E: Work on and/or in bell hole footings and 
shafts thereof, and work on and in deep footings.  
(A deep footing is a hole 15 feet or more in 
depth.)  In the event the depth of the footing is 
unknown at the commencement of excavation, and the 
final depth exceeds 15 feet, the deep footing wage 
rate would apply to all employees for each and 
every day worked on or in the excavation of the 
footing from the date of inception. (AREA ""B"" - 
NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: 
Laborers working off or with or from bos'n chairs, 
swinging scaffolds, belts:  $0.25 per hour 
additional. ........................................$ 36.05                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 1-F: Wire winding machine in connection with 
guniting or shot crete (AREA ""B"" - NAPA, SOLANO, 
AND SONOMA COUNTIES) FOOTNOTE: Laborers working off 
or with or from bos'n chairs, swinging scaffolds, 
belts:  $0.25 per hour additional. .................$ 36.08                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 2: Asphalt shoveler; Cement dumper and 
handling dry cement or gypsum; Choke-setter and 
rigger (clearing work); Concrete bucket dumper and 
chute; Concrete chipping and grinding; Concrete 
laborer (wet or dry); Driller tender, chuck tender, 
nipper; Guinea chaser (stake), grout crew; High 
pressure nozzle, adductor; Hydraulic monitor (over 
100 lbs. pressure); Loading and unloading, carrying 
and hauling of all rods and materials for use in 
reinforcing concrete construction; Pittsburgh 
chipper and similar type brush shredders; Sloper; 
Single foot, hand-held, pneumatic tamper; All 
pneumatic, air, gas and electric tools not listed 
in Groups 1 through 1-f; Jacking of pipe - under 12 
inches (AREA ""B"" - NAPA, SOLANO, AND SONOMA 
COUNTIES) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional. .........................$ 35.35                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 3: Construction laborers, including bridge 
and general laborer; Dump, load spotter; Flag 
person; Fire watcher; Fence erector; Guardrail 
erector; Gardener, horticultural and landscape 
laborer; Jetting; Limber, brush loader and piler; 
Pavement marker (button setter); Maintenance, 
repair track and road beds; Streetcar and railroad 
construction track laborer; Temporary air and water 
lines, Victaulic or similar; Tool room attendant 
(jobsite only) (AREA ""B"" - NAPA, SOLANO, AND SONOMA 
COUNTIES) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional. .........................$ 35.25                  27.30
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: 
GROUP 4: All clean-up work of debris, grounds and 
building including but not limited to: street 
cleaner; cleaning and washing windows; brick 
cleaner (jobsite only); material cleaner (jobsite 
only).  The classification ""material cleaner"" is to 
be utilized under the following conditions: A: at 
demolition site for the salvage of the material.  
B: at the conclusion of a job where the material is 
to be salvaged and stocked to be reused on another 
job. C: for the cleaning of salvage material at the 
jobsite or temporary jobsite yard. The material 
cleaner classification should not be used in the 
performance of ""form stripping, cleaning and oiling 
and moving to the next point of erection"". (AREA 
""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: 
Laborers working off or with or from bos'n chairs, 
swinging scaffolds, belts:  $0.25 per hour 
additional. ........................................$ 28.94                  27.30
LABORERS:, GUNITE - AREA A: GROUP 1: Structural 
nozzleman (AREA ""A"" - CONTRA COSTA COUNTY) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.....................................$ 37.46                  27.30
LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, 
Gunman, Potman, Groundman (AREA ""A"" - CONTRA COSTA 
COUNTY) FOOTNOTE: Laborers working off or with or 
from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional...........................$ 36.96                  27.30
LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman 
(AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 36.37                  27.30
LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer 
(AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 36.25                  27.30
LABORERS:, GUNITE - AREA B: GROUP 1: Structural 
nozzleman (AREA ""A"" - CONTRA COSTA COUNTY) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.....................................$ 36.46                  27.30
LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, 
Gunman, Potman, Groundman (AREA ""B"" - NAPA, SOLANO, 
AND SONOMA COUNTIES)  FOOTNOTE: Laborers working 
off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 35.96                  27.30
LABORERS:, GUNITE - AREA B: GROUP 3: Reboundman 
(AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES)  
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.....................................$ 35.37                  27.30
LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborer 
(AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.....................................$ 35.25                  27.30
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled 
wrecker (removing and salvaging of sash, windows 
and materials) (AREA ""A"" - CONTRA COSTA COUNTY )  
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.....................................$ 36.50                  27.30
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled 
wrecker (salvaging of other building materials) 
(AREA ""A"" - CONTRA COSTA COUNTY )  FOOTNOTE: 
Laborers working off or with or from bos'n chairs, 
swinging scaffolds, belts:  $0.25 per hour 
additional..........................................$ 36.35                  27.30
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled 
wrecker (removing and salvaging of sash, windows 
and materials) (AREA ""B"" - NAPA, SOLANO, AND SONOMA 
COUNTIES)  FOOTNOTE: Laborers working off or with 
or from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional...........................$ 35.50                  27.30
LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled 
wrecker (salvaging of other building materials) 
(AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES)  
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.....................................$ 35.35                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY 
PERIOD (AREA ""A"" - CONTRA COSTA COUNTY)  FOOTNOTE: 
Laborers working off or with or from bos'n chairs, 
swinging scaffolds, belts:  $0.25 per hour 
additional..........................................$ 29.94                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA 
""A"" - CONTRA COSTA COUNTY )  FOOTNOTE: Laborers 
working off or with or from bos'n chairs, swinging 
scaffolds, belts:  $0.25 per hour additional........$ 36.25                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY 
PERIOD (AREA ""B"" - NAPA, SOLANO, AND SONOMA 
COUNTIES)  FOOTNOTE: Laborers working off or with 
or from bos'n chairs, swinging scaffolds, belts:  
$0.25 per hour additional...........................$ 28.94                  27.30
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & 
LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION  
(AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) 
FOOTNOTE: Laborers working off or with or from 
bos'n chairs, swinging scaffolds, belts:  $0.25 per 
hour additional.....................................$ 35.25                  27.30
----------------------------------------------------------------

 LABO0324-011 07/01/2023
                                                     Rates                  Fringes
LABORER: MASON TENDER-BRICK   (SOLANO AND SONOMA 
COUNTIES)    FOOTNOTE: REFRACTORY WORK WHERE 
HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER 
HOUR ADDITIONAL.....................................$ 36.84                  26.24
----------------------------------------------------------------

 LABO0324-015 07/01/2023
                                                     Rates                  Fringes
BRICK TENDER   (CONTRA COSTA COUNTY)    FOOTNOTES: 
WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS 
REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT 
GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK: 
$2.00 PER DAY ADDITIONAL............................$ 37.05                  27.45
----------------------------------------------------------------

 LABO0324-017 07/01/2023
                                                     Rates                  Fringes
PLASTER TENDER (EL DORADO, MARIN, NAPA, PLACER, 
SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA 
COUNTIES) Work on a swing stage scaffold: $1.00 per 
hour additional.....................................$ 39.77                  28.54
----------------------------------------------------------------

 PAIN0016-002 01/01/2025
                                                     Rates                  Fringes
PAINTERS: BRUSH (EL DORADO, PLACER, SACRAMENTO, 
SUTTER, YOLO AND YUBA COUNTIES)    SPRAY/SANDBLAST: 
$0.50 ADDITIONAL PER HOUR.  EXOTIC MATERIALS: $1.25 
ADDITIONAL PER HOUR.  HIGH TIME:  OVER 50 FT ABOVE 
GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR.  
100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 
ADDITIONAL PER HOUR.  OVER 180 FT ABOVE GROUND OR 
WATER LEVEL $6.00 ADDITIONAL PER HOUR...............$ 43.45                  22.80
----------------------------------------------------------------

 PAIN0016-009 01/01/2024
                                                     Rates                  Fringes
SOFT FLOOR LAYER (ALAMEDA, CONTRA COSTA, MONTEREY, 
SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, 
SANTA CRUZ AND SONOMA COUNTIES).....................$ 59.00                  33.03
----------------------------------------------------------------

 PAIN0016-011 01/01/2025
                                                     Rates                  Fringes
DRYWALL FINISHER/TAPER:  (AREA 1) AREA 1: ALAMEDA, 
CONTRA COSTA, NAPA, SAN FRANCISCO, SAN 
SANTA CLARA, SOLANO AND SONOMA COUNTIES.............$ 63.76                  32.69
DRYWALL FINISHER/TAPER:  (AREA 2) AREA 2:  EL 
DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO, 
BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA 
COUNTIES............................................$ 59.63                  31.29
----------------------------------------------------------------

 PAIN0016-013 01/01/2025
                                                     Rates                  Fringes
PAINTER   (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, 
NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA 
CRUZ, SOLANO & SONOMA  COUNTIES)    FOOTNOTES:  
SPRAY WORK: $0.50 ADDITIONAL PER HOUR.  EXOTIC 
MATERIALS: $1.25 ADDITIONAL PER HOUR................$ 53.38                  28.04
----------------------------------------------------------------

 PAIN0016-019 01/01/2025
                                                     Rates                  Fringes
PAINTER (SAN FRANCISCO COUNTY)......................$ 57.00                  28.04
----------------------------------------------------------------

 PAIN0169-006 01/01/2024
                                                     Rates                  Fringes
GLAZIER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, 
NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, SONOMA COUNTIES;AND SOLANO 
COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80 
CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD, 
INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY; 
GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH 
ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY. 
80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE 
GRIZZLY ISLAND MANAGEMENT AREA).....................$ 56.22                  34.00
----------------------------------------------------------------

 PAIN0567-002 07/01/2025
                                                     Rates                  Fringes
PAINTER: BRUSH AND ROLLER   (EL DORADO AND PLACER 
COUNTIES)    PREMIUMS:  SPRAY & PAPERHANGER = 
$0.85/HR  SPECIAL COATINGS (BRUSH), & SANDBLAST = 
$0.50/HR  SPECIAL COATINGS (SPRAY), & STEEPLEJACK = 
$1.00/HR  SWING STAGE = $2.00/HR  *A SPECIAL 
COATING IS A COATING THAT REQUIRES THE MIXING OF 2 
OR MORE PRODUCTS....................................$ 39.43                  16.16
PAINTER: PAPER HANGER   (EL DORADO AND PLACER 
COUNTIES)    PREMIUMS:  SPRAY & PAPERHANGER = 
$0.85/HR  SPECIAL COATINGS (BRUSH), & SANDBLAST = 
$0.50/HR  SPECIAL COATINGS (SPRAY), & STEEPLEJACK = 
$1.00/HR  SWING STAGE = $2.00/HR  *A SPECIAL 
COATING IS A COATING THAT REQUIRES THE MIXING OF 2 
OR MORE PRODUCTS....................................$ 42.19                  16.16
PAINTER: SPRAY PAINTER   (EL DORADO AND PLACER 
COUNTIES)    PREMIUMS:  SPRAY & PAPERHANGER = 
$0.85/HR  SPECIAL COATINGS (BRUSH), & SANDBLAST = 
$0.50/HR  SPECIAL COATINGS (SPRAY), & STEEPLEJACK = 
$1.00/HR  SWING STAGE = $2.00/HR  *A SPECIAL 
COATING IS A COATING THAT REQUIRES THE MIXING OF 2 
OR MORE PRODUCTS....................................$ 41.43                  16.16
----------------------------------------------------------------

 PAIN0567-008 07/01/2022
                                                     Rates                  Fringes
SOFT FLOOR LAYER (EL DORADO AND PLACER COUNTIES)....$ 34.27                  16.47
----------------------------------------------------------------

 PAIN0567-011 07/01/2024
                                                     Rates                  Fringes
DRYWALL FINISHER/TAPER (EL DORADO AND PLACER 
COUNTIES)    STEEPLEJACK-DRYWALL FINISHER OVER 40 
FT WITH OPEN SPACE BELOW: $1.50 ADDITIONAL PER 
HOUR................................................$ 42.79                  16.12
----------------------------------------------------------------

 PAIN0767-002 01/01/2024
                                                     Rates                  Fringes
GLAZIER   (EL DORADO, PLACER, SACRAMENTO, SOLANO, 
SUTTER, YOLO AND YUBA COUNTIES)    PAID HOLIDAYS: 
NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.    FOOTNOTE: EMPLOYEE REQUIRED TO 
WEAR A BODY HARNESS SHALL RECEIVE $1.50 ABOVE THE 
BASIC HOURLY RATE AT ANY ELEVATION..................$ 43.25                  35.62
----------------------------------------------------------------

 PAIN1176-001 07/01/2022
                                                     Rates                  Fringes
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY 
IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND 
INSTALLER...........................................$ 34.71                  17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY 
IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND 
APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; 
HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND 
MARKINGS............................................$ 40.83                  17.62
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY 
IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT 
SEALING.............................................$ 35.11                  17.62
----------------------------------------------------------------

 PAIN1237-002 01/01/2024
                                                     Rates                  Fringes
SOFT FLOOR LAYER (EL DORADO, PLACER, SACRAMENTO, 
SUTTER, YOLO AND YUBA COUNTIES).....................$ 48.54                  26.59
----------------------------------------------------------------

 PLAS0066-001 07/01/2019
                                                     Rates                  Fringes
PLASTERER (ALAMEDA, CONTRA COSTA, SAN FRANCISCO AND 
SAN MATEO COUNTIES).................................$ 42.41                  30.73
----------------------------------------------------------------

 PLAS0300-002 07/01/2018
                                                     Rates                  Fringes
PLASTERER (AREA 224: SAN BENITO, SANTA CLARA & 
SANTA CRUZ COUNTIES)................................$ 32.88                  31.68
PLASTERER (AREA 295: EL DORADO, NAPA, PLACER, 
SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO & YUBA 
COUNTIES)...........................................$ 32.70                  31.68
PLASTERER (AREA 337: MONTEREY COUNTY)...............$ 32.88                  31.68
PLASTERER (AREA 355: MARIN COUNTY)..................$ 36.73                  31.68
----------------------------------------------------------------

 PLAS0300-005 07/01/2016
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 32.15                  23.27
----------------------------------------------------------------

 PLUM0038-003 07/01/2025
                                                     Rates                  Fringes
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (1) 
Wood Frame Construction in San Francisco, and all 
work in Marin & Sonoma Counties   (MARIN, SAN 
FRANCISCO & SONOMA COUNTIES)........................$ 82.00                  48.18
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (2)  
NEW CONSTRUCTION IN SAN FRANCISCO COUNTY   (MARIN, 
SAN FRANCISCO & SONOMA COUNTIES)....................$ 91.00                  49.49
----------------------------------------------------------------

 PLUM0038-007 07/01/2025
                                                     Rates                  Fringes
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY 
FITTER (MARIN, SAN FRANCISCO & SONOMA COUNTIES).....$ 77.35                  36.53
----------------------------------------------------------------

 PLUM0062-001 01/01/2026
                                                     Rates                  Fringes
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ 
COUNTIES)...........................................$ 57.75                  43.60
----------------------------------------------------------------

 PLUM0159-002 07/01/2024
                                                     Rates                  Fringes
PLUMBER, PIPEFITTER, STEAMFITTER (CONTRA COSTA 
COUNTY).............................................$ 43.72                  20.29
----------------------------------------------------------------

 PLUM0228-002 01/01/2026
                                                     Rates                  Fringes
PLUMBER (SUTTER & YUBA COUNTIES)....................$ 52.75                  41.39
----------------------------------------------------------------

 PLUM0342-002 07/01/2025
                                                     Rates                  Fringes
PLUMBER & STEAMFITTER (ALAMEDA COUNTY)..............$ 80.50                  50.45
----------------------------------------------------------------

 PLUM0343-002 01/01/2026
                                                     Rates                  Fringes
PLUMBERS AND PIPEFITTERS   (NAPA AND SOLANO 
COUNTIES)    FOOTNOTES: WORK FROM TRUSSES, 
TEMPORARY STAGING, UNGUARDED STRUCTURES 35' FROM 
THE GROUND OR WATER: $.75 PER HOUR ADDITIONAL. WORK 
FROM SWINGING SCAFFOLDS, BOATSWAINS CHAIRS OR 
SIMILAR DEVICES: $.75 PER HOUR ADDITIONAL...........$ 37.35                  21.15
----------------------------------------------------------------

 PLUM0350-002 08/01/2023
                                                     Rates                  Fringes
PLUMBERS AND PIPEFITTERS (EL DORADO AND PLACER 
COUNTIES (LAKE TAHOE BASIN ONLY))...................$ 52.14                  18.71
----------------------------------------------------------------

 PLUM0355-002 07/01/2025
                                                     Rates                  Fringes
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER 
(ALAMEDA, CONTRA COSTA, EL DORADO,  MONTEREY, NAPA, 
PLACER, SACRAMENTO, SAN BENITO, SAN MATEO, SANTA 
CLARA, SANTA CRUZ, SOLANO, SUTTER, YOLO AND YUBA 
COUNTIES)...........................................$ 36.01                  18.50
----------------------------------------------------------------

 PLUM0393-002 09/01/2013
                                                     Rates                  Fringes
PLUMBERS AND PIPEFITTERS (SAN BENITO & SANTA CLARA 
COUNTIES)...........................................$ 30.90                  7.90
----------------------------------------------------------------

 PLUM0447-003 07/01/2025
                                                     Rates                  Fringes
PLUMBERS AND PIPEFITTERS (EL DORADO,PLACER, 
SACRAMENTO AND YOLO COUNTIES).......................$ 55.58                  24.02
----------------------------------------------------------------

 PLUM0467-001 07/01/2025
                                                     Rates                  Fringes
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)...$ 87.75                  41.44
----------------------------------------------------------------

 ROOF0040-001 08/01/2024
                                                     Rates                  Fringes
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES).........$ 55.30                  22.97
----------------------------------------------------------------

 ROOF0081-003 08/01/2024
                                                     Rates                  Fringes
ROOFER (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SOLANO, 
AND SONOMA COUNTIES)................................$ 54.94                  23.34
----------------------------------------------------------------

 ROOF0081-005 08/01/2023
                                                     Rates                  Fringes
ROOFER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO 
AND YUBA COUNTIES)..................................$ 46.73                  21.36
----------------------------------------------------------------

 ROOF0095-001 08/01/2023
                                                     Rates                  Fringes
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND 
MASTIC WORKER (MONTEREY, SAN BENITO, SANTA CLARA, 
AND SANTA CRUZ COUNTIES)............................$ 57.17                  21.51
ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA 
CLARA, AND SANTA CRUZ COUNTIES).....................$ 53.17                  21.51
ROOFER: KETTLE PERSON (2 KETTLES) (MONTEREY, SAN 
BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES).......$ 55.17                  21.51
----------------------------------------------------------------

 SFCA0483-002 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER (ALAMEDA, CONTRA COSTA, MARIN, 
NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO 
AND SONOMA COUNTIES:)...............................$ 49.82                  18.05
----------------------------------------------------------------

 SFCA0669-006 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER (MONTEREY, SAN BENITO AND SANTA 
CRUZ COUNTIES)......................................$ 49.69                  29.72
----------------------------------------------------------------

 SFCA0669-012 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER (EL DORADO, PLACER, SACRAMENTO, 
SUTTER, YOLO AND YUBA COUNTIES).....................$ 52.06                  29.86
----------------------------------------------------------------

 SHEE0104-002 06/29/2026
                                                     Rates                  Fringes
SHEET METAL WORKER:  (AREA 2) AREA 2: MONTEREY & 
SAN BENITO..........................................$ 65.02                  37.46
SHEET METAL WORKER: (AREA 1) AREA 1: ALAMEDA, 
CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN 
MATEO, SANTA CLARA, SOLANO & SONOMA.................$ 86.31                  46.75
SHEET METAL WORKER: (AREA 3) AREA 3: SANTA CRUZ.....$ 66.18                  36.93
----------------------------------------------------------------

 SHEE0104-017 06/29/2026
                                                     Rates                  Fringes
SHEET METAL WORKER (EL DORADO, PLACER, SACRAMENTO, 
SUTTER, YOLO AND YUBA COUNTIES).....................$ 56.96                  38.63
----------------------------------------------------------------

 TEAM0094-001 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; 
SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK 
(WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK 
SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK 
TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); 
CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; 
FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; 
SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL 
DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; 
TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK 
TENDER (INCLUDING LOADING AND UNLOADING); TEAM 
DRIVER; TOOL ROOM ATTENDANT (REFINERIES)  
FOOTNOTES:     ARTICULATED DUMP TRUCK; BULK CEMENT 
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; 
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX 
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE 
DUMP TRUCK YARDAGE RATE.      HEATER PLANER; 
ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT 
TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP 
TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR 
THE EQUIPMENT UTILIZED.       ......................$ 43.26                  34.28
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND 
UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; 
WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, 
UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE 
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; 
RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); 
RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME 
DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD 
OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER 
AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED 
TRACTOR  FOOTNOTES:     ARTICULATED DUMP TRUCK; 
BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); 
DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY 
PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR 
TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE.    
  HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; 
INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); 
UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE 
FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED.   ....$ 43.56                  34.28
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND 
INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; 
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 
7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 
GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL 
TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY 
TRANSPORT TILLER PERSON; SELF- PROPELLED STREET 
SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK 
- HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR 
RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING 
TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON 
AND ROAD OILER; DRY DISTRIBUTION TRUCK (A 
BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL 
RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION 
OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE 
DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW  
FOOTNOTES:     ARTICULATED DUMP TRUCK; BULK CEMENT 
SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; 
SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX 
TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE 
DUMP TRUCK YARDAGE RATE.      HEATER PLANER; 
ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT 
TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP 
TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR 
THE EQUIPMENT UTILIZED.                .............$ 43.86                  34.28
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. 
AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 
21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING 
AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS 
(WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK 
HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; 
DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, 
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID 
AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR 
GREASE TANK TRAILERS OR OTHER MISCELLANEOUS 
TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND 
TRUCK REPAIRMAN  FOOTNOTES:     ARTICULATED DUMP 
TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT 
AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); 
DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR 
SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE 
RATE.      HEATER PLANER; ASPHALT BURNER; SCARIFIER 
BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL 
TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE 
APPROPRIATE RATE FOR THE POWER UNIT OR THE 
EQUIPMENT UTILIZED.       ..........................$ 44.21                  34.28
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND 
OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT 
OVER 7 AXLES  FOOTNOTES:     ARTICULATED DUMP 
TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT 
AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); 
DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR 
SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE 
RATE.      HEATER PLANER; ASPHALT BURNER; SCARIFIER 
BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL 
TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE 
APPROPRIATE RATE FOR THE POWER UNIT OR THE 
EQUIPMENT UTILIZED.   ..............................$ 44.56                  34.28
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"

All California determinations: county index · California prevailing wage · compute pay with the calculator.