Heavy, Highway construction - District of Columbia, revision 6, modified 2026-08-27
Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of DC20260001 rev 6
"General Decision Number: DC20260001 08/27/2026
State: District of Columbia
Construction Types: Heavy and Highway
Counties: District of Columbia Counties of
Washington, D.C.
Heavy Construction
Highway Construction
Modification Number Publication Date
3 01/23/2026
4 05/18/2026
5 07/30/2026
6 08/27/2026
ASBE0024-001 10/01/2024
Rates Fringes
ASBESTOS WORKER/HEAT AND FROST INSULATOR (INCLUDES
THE APPLICATION OF ALL INSULATING MATERIALS,
PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL
TYPES OF MECHANICAL SYSTEMS.) (PAID HOLIDAYS: NEW
YEAR'S DAY, MARTIN LUTHER KIND DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY,
THANKSGIVING DAY, THE DAY AFTER THANKSGIVING AND
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE
REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY).$ 40.77 20.17
----------------------------------------------------------------
ASBE0024-002 10/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING,
BAGGING AND DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS.) (A. PAID HOLIDAYS: NEW YEAR'S
DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY,
THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE
REGULAR WORK DAY BEFORE AND AFTER THE PAID
HOLIDAY.)...........................................$ 24.46 10.19
----------------------------------------------------------------
ASBE0024-005 10/01/2024
Rates Fringes
FIRE STOP TECHNICIAN (INCLUDES THE APPLICATION OF
MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS
AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES,
IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF
OTHER GASES. THE APPLICATION INCLUDES ALL
COMPONENTS INVOLVED IN CREATING THE RATED BARRIER
AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE
HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS
BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF
PENETRATING ITEMS AND BLANK OPENINGS) (A. PAID
HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER
THANKSGIVING AND CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND
AFTER THE PAID HOLIDAY.)............................$ 30.21 10.43
----------------------------------------------------------------
BOIL0193-001 01/01/2025
Rates Fringes
BOILERMAKERS........................................$ 47.37 25.60
----------------------------------------------------------------
BRDC0001-001 04/27/2025
Rates Fringes
BRICKLAYER..........................................$ 38.80 15.17
----------------------------------------------------------------
BRMD0001-004 04/27/2025
Rates Fringes
BRICKLAYER: REFRACTORY (FIREBRICK)..................$ 43.94 17.74
----------------------------------------------------------------
CARP0197-010 05/01/2024
Rates Fringes
CARPENTER/LATHER....................................$ 34.41 14.33
----------------------------------------------------------------
CARP0219-001 05/01/2025
Rates Fringes
MILLWRIGHT..........................................$ 39.50 17.32
----------------------------------------------------------------
CARP0474-006 05/01/2024
Rates Fringes
PILEDRIVERMAN.......................................$ 36.60 14.47
----------------------------------------------------------------
CARP0474-007 05/01/2024
Rates Fringes
DIVER...............................................$ 43.92 14.47
DIVER TENDER........................................$ 36.60 14.47
----------------------------------------------------------------
ELEC0026-001 06/02/2025
Rates Fringes
ELECTRICIANS........................................$ 59.50 23.06
----------------------------------------------------------------
ELEC0070-001 05/05/2024
Rates Fringes
LINE CONSTRUCTION: CABLE SPLICERS...................$ 44.56 17.50
LINE CONSTRUCTION: EQUIPMENT OPERATORS..............$ 44.56 17.50
LINE CONSTRUCTION: GROUNDMEN........................$ 18.00 11.66
LINE CONSTRUCTION: LINEMEN..........................$ 44.56 17.50
LINE CONSTRUCTION: TRUCK DRIVER.....................$ 23.00 12.76
----------------------------------------------------------------
ENGI0077-001 05/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY
CONSTRUCTION: GROUP 1 - TOWER CRANES AND CRANES 100
TON AND OVER. (PAID HOLIDAYS: NEW YEARS DAY,
INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY,
LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS'
DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING
AND CHRISTMAS DAY.).................................$ 45.76 13.27
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY
CONSTRUCTION: GROUP 2 - 35 TON CRANES & ABOVE,
DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000
LBS TORQUE), MOLE, MECHANIC. (PAID HOLIDAYS: NEW
YEARS DAY, INAUGURAL DAY, DECORATION DAY,
INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S
BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY
AFTER THANKSGIVING AND CHRISTMAS DAY.)..............$ 43.44 13.27
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY
CONSTRUCTION: GROUP 3 - CRANES, HOISTS, DRILL RIGS
(UNDER 50,000 LBS TORQUE), TIE BACK MACHINES,
PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS,
SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING
MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES,
WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG
BOATS. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL
DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY,
THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND
CHRISTMAS DAY.).....................................$ 40.73 13.27
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY
CONSTRUCTION: GROUP 4 - FRONT END LOADERS, BOOM
TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER
DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS,
MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES,
BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD,
NARROW GAUGE, TUGGERS). (PAID HOLIDAYS: NEW YEARS
DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE
DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY,
VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER
THANKSGIVING AND CHRISTMAS DAY.)....................$ 36.31 13.27
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY
CONSTRUCTION: GROUP 5 - BOILERS (SKELTON), ASPHALT
SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE
FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE
MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC
PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR
DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN,
ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM
OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL
LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS
(LULL TYPE LIFTS). (PAID HOLIDAYS: NEW YEARS DAY,
INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY,
LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS'
DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING
AND CHRISTMAS DAY.).................................$ 31.09 13.27
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY
CONSTRUCTION: GROUP 6 - FORK LIFTS, DITCH WITCH,
BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS,
ASSISTANT ENGINEERS, OILERS, SERVICE UNIT
EQUIPMENT, ROLLER. (PAID HOLIDAYS: NEW YEARS DAY,
INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY,
LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS'
DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING
AND CHRISTMAS DAY.).................................$ 28.39 13.27
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY
CONSTRUCTION: GROUP 7 - MASTER MECHANIC. (PAID
HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION
DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER
KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY,
FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.).......$ 47.18 13.27
----------------------------------------------------------------
ENGI0077-002 06/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL
GRADING: GROUP 1 - GRADALL OPERATOR, CRANE..........$ 37.07 11.17
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL
GRADING: GROUP 2 - BOOM TRUCK, MILLING MACHINE,
EXCAVATOR, RUBBER TIRE BACKHOE, ASPHALT PAVER,
ASPHALT PLANT ENGINEER, MOTOR GRADER, TRACK LOADER,
RUBBER TIRE LOADER, TRACK DOZER, CONCRETE PAVER.....$ 32.89 11.17
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL
GRADING: GROUP 3 - BROOM TRUCK, ASPHALT ROLLER......$ 28.09 11.17
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL
GRADING: GROUP 4 - AIR COMPRESSOR, GRADE ROLLERS....$ 25.14 11.17
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL
GRADING: GROUP 5 - MECHANIC.........................$ 37.93 10.97
----------------------------------------------------------------
ENGI0077-003 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER
LINE CONSTRUCTION: GROUP 1 - CRANES 50 TON AND
ABOVE. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL
DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY
AFTER THANKSGIVING AND CHRISTMAS DAY)...............$ 41.40 11.55
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER
LINE CONSTRUCTION: GROUP 2 - CRANES UNDER 50 TON
CAPACITY, BOOM TRUCKS. (PAID HOLIDAYS: NEW YEAR'S
DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
DAY AFTER THANKSGIVING AND CHRISTMAS DAY)...........$ 35.00 11.55
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER
LINE CONSTRUCTION: GROUP 3 - GRADALL, LEAD
MECHANIC. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL
DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY
AFTER THANKSGIVING AND CHRISTMAS DAY)...............$ 33.80 11.55
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER
LINE CONSTRUCTION: GROUP 4 - EXCAVATORS, BACKHOES,
FRONT-END LOADERS, FORK LIFT/LULL, BULLDOZERS,
MOTOR GRADERS, MECHANIC 1, HYDRAULIC TAMPER AND HOE
PACK, PAVING MIXERS, PILE DRIVING ENGINES, BATCH
PLANT, CONCRETE PUMPS, LOW-BOY DRIVER, LUBE TRUCK.
(PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY,
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING AND CHRISTMAS DAY).....................$ 33.26 11.55
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER
LINE CONSTRUCTION: GROUP 5 - KNUCKLE BOOM,
TRENCHING MACHINE, WELL DRILLING MACHINES, CONCRETE
MIXERS, ASSISTANT MECHANIC, MINI EXCAVATOR UNDER
10,000 LBS. GROSS WEIGHT. (PAID HOLIDAYS: NEW
YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING AND
CHRISTMAS DAY)......................................$ 31.16 11.55
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER
LINE CONSTRUCTION: GROUP 6 - OILER, DUMP TRUCK,
SKID STEER/BOBCAT, ROLLERS. (PAID HOLIDAYS: NEW
YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING AND
CHRISTMAS DAY)......................................$ 25.89 11.55
----------------------------------------------------------------
IRON0005-005 06/01/2024
Rates Fringes
IRONWORKER, STRUCTURAL AND ORNAMENTAL...............$ 37.86 25.86
----------------------------------------------------------------
IRON0005-012 05/01/2024
Rates Fringes
IRONWORKER, REINFORCING.............................$ 31.88 23.78
----------------------------------------------------------------
LABO0011-003 06/01/2025
Rates Fringes
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES
CONSTRUCTION: GROUP 1 - CARLAODERS, CHOKER SETTER,
CONCRETE CREWMAN, CRUSHED FEEDER, DEMOLITION
LABORERS, INCLUDING SALVAGING ALL MATERIAL,
LOADING, CLEANING UP, WRECKING, DUMPMENT, FLAGMENT,
FENCE ERECTOR AND INSTALLER (OTHER THAN CHAIN
LINK), INCLUDING INSTALLATION AND ERECTION OF
FENCE, GUARD RAILS, MEDIAL RAILS, REFERENCE POSTS,
GUIDE POSTS AND RIGHT-OF-WAY MARKERS, FORM
STRIPPERS, GENERAL LABORERS, RAILROAD TRACK
LABORERS, RIPRAP MAN, SCALE MAN, STAKE JUMPER,
STRUCTURE MOVER, INCLUDES FOUNDATION, SEPARATION,
PREPARATION, CRIBBING, SHORING, JACKING AND
UNLOADING OF STRUCTURES, WATER NOZZLEMAN, TIMBER
BUCKER AND FALLER, TRUCK LOADER, WATER BOYS, TOOL
ROOM MEN............................................$ 33.25 8.70
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES
CONSTRUCTION: GROUP 2 - COMBINED AIR AND WATER
NOZZLEMAN, CEMENT HANDLER, DOPE POT FIREMAN
(NONMECHANICAL), FORM CLEANING MACHINE, MECHANICAL
RAILROAD EQUIPMENT (INCLUDES SPIKER, PULLER, TILE
CLEANER, TAMPER, PIPE WRAPPER, POWER DRIVEN
WHEELBARROWS, OPERATORS OF HAND DERRICKS,
TOWMASTERS, SCOOTSCRETES, BUGGYMOBILES, AND SIMILAR
EQUIPMENT), TAMPER OR RAMMER OPERATOR, TRESTLE
SCAFFOLD BUILDERS OVER ONE TIER HIGH, POWER TOOL
OPERATOR (GAS, ELECTRIC, OR PNEUMATIC), SANDBLAST
OR GUNNITE TAILHOSE MAN, SCAFFOLD ERECTOR (STEEL OR
WOOD), VIBRATOR OPERATOR (UP TO 4 FEET), ASPHALT
CUTTER, MORTAR MEN, SHORER AND LAGGER, CREOSOTE
MATERIAL HANDLER, CORROSIVE ENAMEL OR EQUAL, PAVER
BREAKER AND JACKHAMMER OPERATORS....................$ 34.27 8.70
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES
CONSTRUCTION: GROUP 3 - MULTI-SECTION PIPE LAYER,
NON-METALLIC CLAY AND CONCRETE PIPE LAYER
(INCLUDING CAULKER, COLLARMAN, JOINTER, RIGGER AND
JACKER, THERMAL WELDER AND CORRUGATED METAL CULVERT
PIPE LAYER..........................................$ 34.27 8.70
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES
CONSTRUCTION: GROUP 4 - ASPHALT BLOCK PNEUMATIC
CUTTER, ASPHALT ROLLER, WALKER, CHAINSAW OPERATOR
WITH ATTACHMENT, CONCRETE SAW (WALKING), HIGH
SCALERS, JACKHAMMER OPERATOR *USING OVER 6 FEET OF
STEEL), VIBRATORY OPERATOR (4 FEET AND OVER), WELL
POINT INSTALLER, AIR TRAC OPERATOR..................$ 34.32 8.70
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES
CONSTRUCTION: GROUP 5 - ASPHALT SCREEDER, BIG
DRILLS, CUT OF THE HOLE DRILLS (1 1/2"" PISTON OR
LARGER), DOWN THE HOLE DRILLS (3 1/2"" PISTON OR
LARGER) GUNNITE OR SANDBLASTER NOZZLEMAN, ASPHALT
RAKER, ASPHALT TAMPER, FORM SETTER, DEMOLITION
TORCH OPERATOR, SHOTCRETE NOZZLEMEN AND POTMAN......$ 35.00 8.70
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES
CONSTRUCTION: GROUP 6 - POWDERMAN, MASTER FORM
SETTERS.............................................$ 35.93 8.70
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES
CONSTRUCTION: GROUP 7 - BRICK PAVER (ASPHALT BLOCK
PAVER, ASPHALT BLOCK SAWMAN, ASPHALT BLOCK GRINDER,
HASTINGS BLOCK OR SIMILAR TYPE).....................$ 36.81 8.70
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES
CONSTRUCTION: GROUP 8 - LICENSED POWDERMEN..........$ 37.95 8.70
----------------------------------------------------------------
LABO0011-004 06/01/2025
Rates Fringes
LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS
(HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL
SYSTEMS: PREPARATION FOR, REMOVING AND
ENCAPSULATION OF HAZARDOUS MATERIALS FROM
NON-MECHANICAL SYSTEMS).............................$ 32.25 8.70
LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE
REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT
ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING
AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM
NON-MECHANICAL SYSTEMS).............................$ 32.25 8.70
----------------------------------------------------------------
LABO0011-005 06/01/2025
Rates Fringes
LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR
HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP
1 - BRAKEMAN, BULL GANG, DUMPER, TRACKMEN, CONCRETE
MAN.................................................$ 34.41 8.70
LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR
HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP
2 - CHUCK TENDER, POWDERMEN IN PRIME HOUSE, FORM
SETTERS AND MOVERS, NIPPERS, CABLEMAN, HOUSEMAN,
GROUTMAN, BELL OR SIGNALMAN, TOP OR BOTTOM
VIBRATORY OPERATOR..................................$ 35.48 8.70
LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR
HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP
3 - MINERS, RE-BAR UNDERGROUND, CONCRETE OR GUNNITE
NOZZLEMEN, POWDERMEN, TIMBERMEN AND RE-TIMBERMEN,
WOOD STEEL INCLUDING LINER PLATE OR OTHER SUPPORT,
MATERIAL MOTORMAN, CAULKERS, DIAMOND DRILL
OPERATORS, RIGGERS, CEMENT FINISHERS-UNDERGROUND,
WELDERS AND BURNERS, SHIELD DRIVER, AIR TRAC
OPERATOR, SHOT CRETE NOZZLEMAN AND POTMAN...........$ 38.17 8.70
LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR
HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP
4 - MUCKING MACHINE OPERATOR (AIR)..................$ 39.29 8.70
----------------------------------------------------------------
LABO0011-006 06/01/2025
Rates Fringes
LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR)
FOR HEAVY CONSTRUCTION ONLY, POUNDS (1-14) AND
HOURS (7)...........................................$ 44.04 8.70
LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR)
FOR HEAVY CONSTRUCTION ONLY, POUNDS (14-18) AND
HOURS (6)...........................................$ 51.82 8.70
----------------------------------------------------------------
LABO0011-007 09/01/2025
Rates Fringes
LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR
(PAVING AND INCIDENTAL GRADING).....................$ 24.30 8.74
LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER
(PAVING AND INCIDENTAL GRADING).....................$ 23.86 8.74
LABORERS: JACK HAMMER (PAVING AND INCIDENTAL
GRADING)............................................$ 23.89 8.74
LABORERS: LABORER (PAVING AND INCIDENTAL GRADING)...$ 23.06 8.74
LABORERS: SAND SETTER & FORM SETTER (PAVING AND
INCIDENTAL GRADING).................................$ 25.10 8.74
LABORERS: ASPHALT SHOVELER (PAVING AND INCIDENTAL
GRADING)............................................$ 23.27 8.74
----------------------------------------------------------------
LABO0011-008 06/01/2025
Rates Fringes
LABORERS: BRICK MASONRY WORK (MASON TENDERS)........$ 24.31 8.70
LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS,
MORTARMEN)..........................................$ 24.96 8.70
----------------------------------------------------------------
MARB0002-003 04/27/2025
Rates Fringes
MARBLE & STONE MASON (INCLUDES POINTING, CAULKING
AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE
AND CEMENT STRUCTURES)..............................$ 45.65 21.21
----------------------------------------------------------------
MARB0003-001 04/27/2025
Rates Fringes
MOSAIC & TERRAZZO WORKER, TILE LAYER................$ 34.34 14.20
----------------------------------------------------------------
MARB0003-004 04/27/2025
Rates Fringes
MARBLE, TILE & TERRAZZO FINISHER....................$ 28.85 12.55
----------------------------------------------------------------
PAIN0051-001 06/01/2025
Rates Fringes
PAINTERS: COMMERCIAL AND MOLD REMEDIATION,
PAINTERS, WALLCOVERS AND DRYWALL FINISHERS..........$ 29.16 11.86
PAINTERS: ALL INDUSTRIAL WORK.......................$ 34.30 12.98
PAINTERS: BRIDGES, HEAVY HIGHWAY, LEAD ABATEMENT
AND FLAME/THERMAL SPRAY.............................$ 42.93 13.77
METAL POLISHING AND REFINISHING.....................$ 28.46 11.56
----------------------------------------------------------------
PLAS0891-001 03/01/2025
Rates Fringes
CEMENT MASONS: (HEAVY CONSTRUCTION ONLY)............$ 30.50 14.23
----------------------------------------------------------------
PLAS0891-002 06/01/2025
Rates Fringes
CEMENT MASONS: CEMENT MASONS (PAVING & INCIDENTAL
GRADING)............................................$ 23.50 9.75
CEMENT MASONS: CONCRETE SAW OPERATORS (PAVING &
INCIDENTAL GRADING).................................$ 23.50 9.75
CEMENT MASONS: FORM SETTERS (PAVING & INCIDENTAL
GRADING)............................................$ 23.50 9.75
----------------------------------------------------------------
PLUM0005-001 08/01/2025
Rates Fringes
PLUMBERS (PAID HOLIDAYS: LABOR DAY, VETERANS' DAY,
THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING,
CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER
KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF
JULY.)..............................................$ 53.30 23.71
----------------------------------------------------------------
PLUM0602-005 08/01/2025
Rates Fringes
STEAMFITTER, REFRIGERATION & AIR CONDITIONING
MECHANIC (PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN
LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND
THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY).......$ 55.00 24.46
----------------------------------------------------------------
SHEE0100-001 11/01/2025
Rates Fringes
SHEET METAL WORKER (PAID HOLIDAYS: NEW YEAR'S DAY,
MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY AND CHRISTMAS DAY).................$ 53.42 23.20
----------------------------------------------------------------
TEAM0639-001 06/01/2025
Rates Fringes
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION -
TRACTOR TRAILER, LOW BOY (VACATION: EMPLOYEES
WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE
(1) YEAR OF SERVICE.)...............................$ 33.75 7.30
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRUCK
DRIVERS (VACATION: EMPLOYEES WILL RECEIVE ONE (1)
WEEK'S PAID VACATION AFTER ONE (1) YEAR OF
SERVICE.)...........................................$ 31.75 7.30
----------------------------------------------------------------
TEAM0639-005 06/01/2025
Rates Fringes
TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL
PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO
THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE
ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF
SERVICE.............................................$ 31.75 7.30
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to
the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at
least $13.65 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the
contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"