Prevailing Wage Index
HomePrevailing wage by stateHawaiiDeterminations › HI20260001

Wage determination HI20260001

Building, Heavy, Highway, Residential construction - Hawaii, revision 3, modified 2026-05-27

Verify against the official document: this page mirrors WD HI20260001 revision 3 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0132-001 (collectively bargained (union) rate, 09/07/2025)

ClassificationBase rateFringes
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION O$46.9029.75

BOIL0627-005 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$49.3731.25

BRHI0001-001 (collectively bargained (union) rate, 09/05/2023)

ClassificationBase rateFringes
BRICKLAYER: POINTERS, CAULKERS AND WEATHERPROOFERS$48.2832.23
BRICKLAYERS AND STONEMASONS$48.0332.23

BRHI0001-002 (collectively bargained (union) rate, 09/05/2023)

ClassificationBase rateFringes
TILE, MARBLE & TERRAZZO WORKER (TERRAZZO BASE GRINDERS)$44.6933.00
TILE, MARBLE & TERRAZZO WORKER (TERRAZZO FLOOR GRINDERS AND TENDERS)$43.1433.00
TILE, MARBLE & TERRAZZO WORKER (TILE, MARBLE AND TERRAZZO WORKERS)$46.5033.00

CARP0745-001 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
CARPENTERS: (CARPENTERS; HARDWOOD FLOOR LAYERS; PATENT SCAFFOLD ERECTORS (14 FT. AND OVER); PILEDRIVERS; PNEUMATIC NAILERS; WOOD SHINGLERS AND TRANSIT AND/OR LAYOUT MAN)$55.5029.81
CARPENTERS: MILLWRIGHTS AND MACHINE ERECTORS$55.7529.81
CARPENTERS: POWER SAW OPERATORS (2 H.P. AND OVER)$55.6529.81

CARP0745-002 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
DRYWALL AND ACOUSTICAL WORKERS AND LATHERS$55.7529.81

ELEC1186-001 (collectively bargained (union) rate, 08/24/2025)

ClassificationBase rateFringes
ELECTRICIANS$56.5533.16
ELECTRICIANS: CABLE SPLICERS$63.9033.38
ELECTRICIANS: TELECOMMUNICATION WORKER$41.0016.28

ELEC1186-002 (collectively bargained (union) rate, 08/24/2025)

ClassificationBase rateFringes
LINE CONSTRUCTION: CABLE SPLICERS$63.9033.38
LINE CONSTRUCTION: GROUNDMEN/TRUCK DRIVERS$42.4127.14
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATORS$50.9030.75
LINE CONSTRUCTION: LINEMEN$56.5533.16
LINE CONSTRUCTION: TELECOMMUNICATION WORKER$41.0016.28

ELEV0126-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. $73.8538.44

ENGI0003-002 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
DIVER TENDER: OTHER THAN AQUA LUNG$59.9435.68
DIVER: (AQUA LUNG) (SCUBA) (over 30 feet)$81.7235.68
DIVER: (AQUA LUNG) (SCUBA) (up to 30 feet)$72.3535.68
DIVER: OTHER THAN AQUA LUNG$81.7235.68
HELICOPTER WORK, AIRBORNE HOIST OPERATOR FOR HELICOPTER$61.5235.68
HELICOPTER WORK: CO-PILOT OF HELICOPTER$61.6635.68
HELICOPTER WORK: PILOT OF HELICOPTER$62.8335.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 1: FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED). BOOMS AND/OR LEADS (HOURLY PREMI$57.9635.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 2: CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT). BOOMS AND/OR LEADS (HOURLY $58.0735.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 3: BRAKEMAN; DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CON$58.2435.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 4: BOOM TRUCK OR DUAL PURPOSE ""A"" FRAME TRUCK (5 TONS OR LESS); CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); DINKY OPERATOR; ELEVA$58.5135.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 5: ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING MACHINES (""BANK"" OF 9 OR MORE, INDIVIDUALLY OR COLLECTIVELY); C$58.8235.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 6: BOOM TRUCK OR DUAL PURPOSE ""A""FRAME TRUCK (OVER 5 TONS); COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 CU. YD.); CONCRETE B$59.4735.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 7: CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST AND/OR WINCH (2 DRU$59.7935.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 8: ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE UNITS); CONVEYOR O$59.9035.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9: COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR LADDER TRENCHER (OV$60.0135.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9A: DOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR SPECIFICATIONS WITHOUT THE D$60.2435.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10: CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING AND SIMILAR)$60.3035.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10A: BOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND B$60.4535.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 11: AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); CABLE-OPERATED CRAWLER CRANES ($60.6035.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12: CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE SCRAPERS) (OVER 35 CU. YDS ""$60.9635.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12A: DOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 TONS AND OVER); PIONEERING DOZER/BA$61.3235.68
POWER EQUIPMENT OPERATORS:, GROUP 1: FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OP$57.6635.68
POWER EQUIPMENT OPERATORS:, GROUP 2: CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT). BOOMS AND/OR LEADS (HOURLY PREMIUMS): T$57.7735.68
POWER EQUIPMENT OPERATORS:, GROUP 3: BRAKEMAN; DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CONCRETE CURING$57.9435.68
POWER EQUIPMENT OPERATORS:, GROUP 4: BOOM TRUCK OR DUAL PURPOSE ""A"" FRAME TRUCK (5 TONS OR LESS); CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); DINKY OPERATOR; ELEVATOR OPERATOR$58.2135.68
POWER EQUIPMENT OPERATORS:, GROUP 5: ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING MACHINES (""BANK"" OF 9 OR MORE, INDIVIDUALLY OR COLLECTIVELY); CONCRETE PUMP$58.5235.68
POWER EQUIPMENT OPERATORS:, GROUP 6: BOOM TRUCK OR DUAL PURPOSE ""A""FRAME TRUCK (OVER 5 TONS); COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 CU. YD.); CONCRETE BATCH PLANTS $59.1735.68
POWER EQUIPMENT OPERATORS:, GROUP 7: CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST AND/OR WINCH (2 DRUMS); LOADER $59.4935.68
POWER EQUIPMENT OPERATORS:, GROUP 8: ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE UNITS); CONVEYOR OPERATOR (TUN$59.6035.68
POWER EQUIPMENT OPERATORS:, GROUP 9: COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR LADDER TRENCHER (OVER 6 FEET AN$59.7135.68
POWER EQUIPMENT OPERATORS:, GROUP 9A: DOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR SPECIFICATIONS WITHOUT THE DIRECT SUPERV$59.9435.68
POWER EQUIPMENT OPERATORS:, GROUP 10: CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING AND SIMILAR); LOADER (OV$60.0035.68
POWER EQUIPMENT OPERATORS:, GROUP 10A: BOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (UP T$60.1535.68
POWER EQUIPMENT OPERATORS:, GROUP 11: AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS$60.3035.68
POWER EQUIPMENT OPERATORS:, GROUP 12 CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE SCRAPERS) (OVER 35 CU. YDS ""STRUCK""M.R.C$60.6635.68
POWER EQUIPMENT OPERATORS:, GROUP 12A: DOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 TONS AND OVER); PIONEERING DOZER/BACKHOE (INITI$61.0235.68
POWER EQUIPMENT OPERATORS:, GROUP 13: TRUCK DRIVER (UTILITY, FLATBED, ETC.)$57.9435.68
POWER EQUIPMENT OPERATORS:, GROUP 13A: DUMP TRUCK, 8 CU.YDS. AND UNDER (WATER LEVEL); WATER TRUCK (UP TO AND INCLUDING 2,000 GALLONS)$58.2135.68
POWER EQUIPMENT OPERATORS:, GROUP 13B: WATER TRUCK (OVER 2,000 GALLONS); TANDEM DUMP TRUCK, OVER 8 CU. YDS. (WATER LEVEL)$58.5235.68
POWER EQUIPMENT OPERATORS:, GROUP 13C: TRUCK DRIVER (SEMI-TRAILER. ROCK CANS, SEMI-DUMP OR ROLL-OFFS)$59.1735.68
POWER EQUIPMENT OPERATORS:, GROUP 13D: TRUCK DRIVER (SLIP-IN OR PUP)$59.4935.68
POWER EQUIPMENT OPERATORS:, GROUP 13E: END DUMPS, UNLICENSED (EUCLID, MACK, CATERPILLAR OR SIMILAR); TRACTOR TRAILER (HAULING EQUIPMENT); TANDEM TRUCKS HOOKED UP TO TRAILER (HAULIN$59.6035.68
STAND-BY DIVER: (AQUA LUNG) (SCUBA)$62.9735.68
STAND-BY DIVER: OTHER THAN AQUA LUNG$62.9735.68

ENGI0003-004 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
DREDGING (BOAT OPERATORS): BOAT DECKHAND$57.9435.68
DREDGING (BOAT OPERATORS): BOAT OPERATOR$60.1535.68
DREDGING (BOAT OPERATORS): MASTER BOAT OPERATOR$60.3035.68
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 1: CLAMSHELL OR DIPPER OPERATOR$60.6635.68
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 2: MECHANIC OR WELDER; WATCH ENGINEER$60.0035.68
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 3: BARGE MATE; DECKMATE$59.6035.68
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 4: BARGEMAN; DECKHAND; FIREMAN; OILER. HYDRAULIC SUCTION DREDGING CLASSIFICATIONS$57.9435.68
DREDGING:, DERRICKS: GROUP 1: OPERATORS (DERRICKS, PILEDRIVERS AND CRANES)$60.6635.68
DREDGING:, DERRICKS: GROUP 2: SAURMAN TYPE DRAGLINE (OVER 5 CUBIC YARDS)$60.0035.68
DREDGING:, DERRICKS: GROUP 3: DECKMATE; SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YARDS)$59.6035.68
DREDGING:, DERRICKS: GROUP 4: DECKHAND, FIREMAN, OILER$57.9435.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 1: LEVERMAN$60.3035.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 2: WATCH ENGINEER (STEAM OR ELECTRIC)$60.1535.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 3: MECHANIC OR WELDER$60.0035.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 4: DOZER OPERATOR$59.9435.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 5: DECKMATE$59.6035.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 6: WINCHMAN (STERN WINCH ON DREDGE)$59.4935.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 7: DECKHAND (CAN OPERATE ANCHOR SCOW UNDER DIRECTION OF DECKMATE); FIREMAN; LEVEEMAN; OILER$57.9435.68

ENGI0003-044 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT CONCRETE MATERIAL TRANSFER$58.6734.86
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT PLANT OPERATOR$59.0734.86
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT RAKER$57.6834.86
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT SPREADER OPERATOR$59.1634.86
POWER EQUIPMENT OPERATORS (PAVING): COLD PLANER$59.4734.86
POWER EQUIPMENT OPERATORS (PAVING): COMBINATION LOADER/BACKHOE (OVER 3/4 CU.YD.)$57.6834.86
POWER EQUIPMENT OPERATORS (PAVING): COMBINATION LOADER/BACKHOE (UP TO 3/4 CU.YD.)$56.7034.86
POWER EQUIPMENT OPERATORS (PAVING): CONCRETE SAWS AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS)$58.6434.86
POWER EQUIPMENT OPERATORS (PAVING): GRADER$59.4734.86
POWER EQUIPMENT OPERATORS (PAVING): LABORER, HAND ROLLER$57.1834.86
POWER EQUIPMENT OPERATORS (PAVING): LOADER (2 1/2 CU. YDS. AND UNDER)$58.6434.86
POWER EQUIPMENT OPERATORS (PAVING): LOADER (OVER 2 1/2 CU. YDS. TO AND INCLUDING 5 CU. YDS.)$58.9634.86
POWER EQUIPMENT OPERATORS (PAVING): ROLLER OPERATOR (FIVE TONS AND UNDER)$57.4134.86
POWER EQUIPMENT OPERATORS (PAVING): ROLLER OPERATOR (OVER FIVE TONS)$58.8434.86
POWER EQUIPMENT OPERATORS (PAVING): SCREED PERSON$58.6434.86

IRON0625-001 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
IRONWORKERS A. EMPLOYEES WILL BE PAID $.50 PER HOUR MORE WHILE WORKING IN TUNNELS AND COFFER DAMS; $1.00 PER HOUR MORE WHEN REQUIRED TO WORK UNDER OR ARE COVERED WITH WATER (SUBMER$50.5043.46

LABO0368-001 (collectively bargained (union) rate, 09/02/2024)

ClassificationBase rateFringes
LABORERS: DRILLER$44.7525.96
LABORERS: FINAL CLEAN UP$31.4021.37
LABORERS: GUNITE/SHOTCRETE OPERATOR AND HIGH SCALER.$ 42.25 25.96 LABORERS: MASON TENDER/HOD CARRIER$42.2525.96
LABORERS: POWDERMAN$42.7525.96
LABORERS: WINDOW WASHER (BOSUN CHAIR)$41.2525.96
SEE LABORERS: LABORER I IN FOOTER$41.7525.96
SEE LABORERS: LABORER II IN FOOTER$39.1525.96

LABO0368-002 (collectively bargained (union) rate, 09/03/2024)

ClassificationBase rateFringes
LANDSCAPE & IRRIGATION LABORERS, GROUP 1: INSTALLATION OF NON-POTABLE PERMANENT OR TEMPORARY IRRIGATION WATER SYSTEMS PERFORMED FOR THE PURPOSES OF LANDSCAPING AND IRRIGATION ARCHI$28.4017.15
LANDSCAPE & IRRIGATION LABORERS, GROUP 3: MAINTENANCE OF TREES, SHRUBS, GROUND COVERS, LAWNS AND OTHER PLANTED AREAS, INCLUDING THE REPLANTING OF TREES, SHRUBS, GROUND COVERS, AND $23.0017.15
LANDSCAPE & IRRIGATION LABORERS,GROUP 2: LAYOUT OF IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND OTHER POTABLE IRRIGATION WATER$29.4017.15
LANDSCAPE & IRRIGATION LABORERS: GROUP 2 LAYOUT OF IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND OTHER POTABLE IRRIGATION WATER$29.4017.15

LABO0368-003 (collectively bargained (union) rate, 09/02/2024)

ClassificationBase rateFringes
UNDERGROUND LABORER, GROUP 1: WATCHMEN; CHANGE HOUSE ATTENDANT$42.3525.91
UNDERGROUND LABORER, GROUP 2: SWAMPER; BRAKEMAN; BULL GANG-MUCKERS, TRACKMEN; DUMPMEN (ANY METHOD); CONCRETE CREW (INCLUDES RODDING AND SPREADING); GROUT CREW; REBOUNDMEN$43.8525.91
UNDERGROUND LABORER, GROUP 3: CHUCKTENDERS AND CABLETENDERS; POWDERMAN (PRIME HOUSE); VIBRATORMAN, PAVEMENT BREAKERS$44.3525.91
UNDERGROUND LABORER, GROUP 4: MINERS - TUNNEL (INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK); TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREOF); BLASTE$45.3525.91
UNDERGROUND LABORER, GROUP 5: SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL); DIAMOND DRILLER; GUNITE OR SHOTCRETE NOZZLEMAN; RODMAN; GROUNDMAN$45.7025.91
UNDERGROUND LABORER, GROUP 6: SHIFTER$45.9525.91
UNDERGROUND LABORER, GROUP 7: SHIFTER (SHAFT WORK & RAISER)$46.4025.91

PAIN1791-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PAINTERS: BRUSH$44.0530.05
PAINTERS: SANDBLASTER; SPRAY$44.0530.05

PAIN1889-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
GLAZIERS$48.5040.20

PAIN1926-001 (collectively bargained (union) rate, 03/02/2025)

ClassificationBase rateFringes
SOFT FLOOR LAYERS$43.2735.18

PAIN1944-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
TAPER$47.3632.00

PLAS0630-001 (collectively bargained (union) rate, 09/04/2023)

ClassificationBase rateFringes
PLASTERER$46.1234.53

PLAS0630-002 (collectively bargained (union) rate, 09/04/2023)

ClassificationBase rateFringes
CEMENT MASONS$44.1233.63
CEMENT MASONS: TROWEL MACHINE OPERATORS$44.2733.63

ROOF0221-001 (collectively bargained (union) rate, 11/06/2022)

ClassificationBase rateFringes
ROOFERS (INCLUDING BUILT UP, COMPOSITION AND SINGLE PLY)$43.1521.21

SHEE0293-001 (collectively bargained (union) rate, 03/02/2025)

ClassificationBase rateFringes
SHEET METAL WORKER$50.1633.32

SUHI1997-002 (DOL wage survey rate, 09/15/1997)

ClassificationBase rateFringes
DRAPERY INSTALLER$13.601.20
FENCE ERECTOR (CHAIN LINK FENCE)$9.331.65
Full official text of HI20260001 rev 3
"General Decision Number: HI20260001 05/27/2026


State: Hawaii


Construction Types: Building, Heavy, Highway and Residential


Counties: Hawaii Counties of 
Hawaii, Honolulu, Kalawao, Kauai and 
Maui




	
BUILDING CONSTRUCTION PROJECTS 

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and  including 4 stories)

HIGHWAY CONSTRUCTION PROJECTS

HEAVY CONSTRUCTION PROJECTS


Modification Number     Publication Date
          1                01/16/2026
          2                05/18/2026
          3                05/27/2026


 ASBE0132-001 09/07/2025
                                                     Rates                  Fringes
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF 
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, 
COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL 
SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING 
MATERIAL FOR WALL OPENINGS AND PENETRATIONS IN 
WALLS, FLOORS, CEILINGS AND CURTAIN WALLS.).........$ 46.90                  29.75
----------------------------------------------------------------

 BOIL0627-005 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 49.37                  31.25
----------------------------------------------------------------

 BRHI0001-001 09/05/2023
                                                     Rates                  Fringes
BRICKLAYER: POINTERS, CAULKERS AND WEATHERPROOFERS..$ 48.28                  32.23
BRICKLAYERS AND STONEMASONS.........................$ 48.03                  32.23
----------------------------------------------------------------

 BRHI0001-002 09/05/2023
                                                     Rates                  Fringes
TILE, MARBLE & TERRAZZO WORKER (TERRAZZO BASE 
GRINDERS)...........................................$ 44.69                  33.00
TILE, MARBLE & TERRAZZO WORKER (TERRAZZO FLOOR 
GRINDERS AND TENDERS)...............................$ 43.14                  33.00
TILE, MARBLE & TERRAZZO WORKER (TILE, MARBLE AND 
TERRAZZO WORKERS)...................................$ 46.50                  33.00
----------------------------------------------------------------

 CARP0745-001 09/01/2025
                                                     Rates                  Fringes
CARPENTERS: (CARPENTERS; HARDWOOD FLOOR LAYERS; 
PATENT SCAFFOLD ERECTORS (14 FT. AND OVER); 
PILEDRIVERS; PNEUMATIC NAILERS; WOOD SHINGLERS AND 
TRANSIT AND/OR LAYOUT MAN)..........................$ 55.50                  29.81
CARPENTERS: MILLWRIGHTS AND MACHINE ERECTORS........$ 55.75                  29.81
CARPENTERS: POWER SAW OPERATORS (2 H.P. AND OVER)...$ 55.65                  29.81
----------------------------------------------------------------

 CARP0745-002 09/01/2025
                                                     Rates                  Fringes
DRYWALL AND ACOUSTICAL WORKERS AND LATHERS..........$ 55.75                  29.81
----------------------------------------------------------------

 ELEC1186-001 08/24/2025
                                                     Rates                  Fringes
ELECTRICIANS........................................$ 56.55                  33.16
ELECTRICIANS: CABLE SPLICERS........................$ 63.90                  33.38
ELECTRICIANS: TELECOMMUNICATION WORKER..............$ 41.00                  16.28
----------------------------------------------------------------

 ELEC1186-002 08/24/2025
                                                     Rates                  Fringes
LINE CONSTRUCTION: CABLE SPLICERS...................$ 63.90                  33.38
LINE CONSTRUCTION: GROUNDMEN/TRUCK DRIVERS..........$ 42.41                  27.14
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATORS........$ 50.90                  30.75
LINE CONSTRUCTION: LINEMEN..........................$ 56.55                  33.16
LINE CONSTRUCTION: TELECOMMUNICATION WORKER.........$ 41.00                  16.28
----------------------------------------------------------------

 ELEV0126-001 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC    A. VACATION: EMPLOYER 
CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS 
SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 
5 YEARS SERVICE AS VACATION PAY CREDIT.  B. PAID 
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, 
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY 
AND CHRISTMAS DAY...................................$ 73.85                  38.44
----------------------------------------------------------------

 ENGI0003-002 09/01/2025
                                                     Rates                  Fringes
DIVER TENDER: OTHER THAN AQUA LUNG..................$ 59.94                  35.68
DIVER: (AQUA LUNG) (SCUBA) (over 30 feet)...........$ 81.72                  35.68
DIVER: (AQUA LUNG) (SCUBA) (up to 30 feet)..........$ 72.35                  35.68
DIVER: OTHER THAN AQUA LUNG.........................$ 81.72                  35.68
HELICOPTER WORK, AIRBORNE HOIST OPERATOR FOR 
HELICOPTER..........................................$ 61.52                  35.68
HELICOPTER WORK: CO-PILOT OF HELICOPTER.............$ 61.66                  35.68
HELICOPTER WORK: PILOT OF HELICOPTER................$ 62.83                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  1: 
FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN 
(HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED).  
BOOMS AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR 
OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET 
OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 
TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE 
A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID 
CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE 
FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   
NOT INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO 
BUT   NOT INCLUDING 130 FEET                        
        0.50  BOOMS AND/OR LEADS OF 130 FEET   UP 
TO BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 57.96                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  2: 
CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); 
HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE 
PLANT).  BOOMS AND/OR LEADS (HOURLY PREMIUMS):  THE 
OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 
80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE 
(UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE 
WITH THE FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP 
TO BUT   NOT INCLUDING 130 FEET OR   LEADS OF 100 
FEET UP TO BUT   NOT INCLUDING 130 FEET             
                   0.50  BOOMS AND/OR LEADS OF 130 
FEET   UP TO BUT NOT INCLUDING 180 FEET          
0.75  BOOMS AND/OR LEADS OF 180 FEET UP   TO AND 
INCLUDING 250 FEET                         1.15  
BOOMS AND/OR LEADS OVER 250 FEET      1.50  THE 
OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM 
OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A 
PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 58.07                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  3: 
BRAKEMAN; DECKHAND; FIREMAN; OILER; 
OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE 
CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CONCRETE 
CURING MACHINE (SELF-PROPELLED, AUTOMATICALLY 
APPLIED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND 
CANALS); LEVEEMAN; ROLLER (5 TONS AND UNDER); 
TUGGER HOIST.  BOOMS AND/OR LEADS (HOURLY 
PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 50 TONS) 
WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR 
OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET 
OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH 
HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 58.24                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  4: 
BOOM TRUCK OR DUAL PURPOSE ""A"" FRAME TRUCK (5 TONS 
OR LESS); CONCRETE PLACING BOOM (BUILDING 
CONSTRUCTION); DINKY OPERATOR; ELEVATOR OPERATOR; 
HOIST AND/OR WINCH (ONE DRUM); STRADDLE TRUCK (ROSS 
CARRIER, HYSTER AND SIMILAR  BOOMS AND/OR LEADS 
(HOURLY PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 
50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING 
JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 
100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM 
FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) 
IN ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS 
OF 80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 58.51                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  5: 
ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, 
GENERATORS AND WELDING MACHINES (""BANK"" OF 9 OR 
MORE, INDIVIDUALLY OR COLLECTIVELY); CONCRETE PUMPS 
OR PUMPCRETE GUNS; LUBRICATION AND SERVICE ENGINEER 
(GREASE RACK); SCREEDMAN.  BOOMS AND/OR LEADS 
(HOURLY PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 
50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING 
JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 
100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM 
FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) 
IN ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS 
OF 80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 58.82                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  6: 
BOOM TRUCK OR DUAL PURPOSE ""A""FRAME TRUCK (OVER 5 
TONS); COMBINATION LOADER/BACKHOE (UP TO AND 
INCLUDING 3/4 CU. YD.); CONCRETE BATCH PLANTS (WET 
OR DRY); CONCRETE CUTTER, GROOVER AND/OR GRINDER 
(SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, 
AIRPORTS, AND CANALS); CONVEYOR OR CONCRETE PUMP 
(TRUCK OR EQUIPMENT MOUNTED); DRILLING MACHINERY 
(NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACK 
HAMMERS); FORK LIFT (OVER 10 TONS); LOADER (UP TO 
AND INCLUDING 3 AND 1/2 CU. YDS); LULL HIGH LIFT 
(UNDER 40 FEET); LUBRICATION AND SERVICE ENGINEER 
(MOBILE); MAGINNIS INTERNAL FULL SLAB VIBRATOR (ON 
AIRPORTS, HIGHWAYS, CANALS AND WAREHOUSES); MAN OR 
MATERIAL HOIST; MECHANICAL CONCRETE FINISHER (LARGE 
CLARY, JOHNSON BIDWELL, BRIDGE DECK AND SIMILAR); 
MOBILE TRUCK CRANE DRIVER; PORTABLE SHOTBLAST 
CONCRETE CLEANING MACHINE; PORTABLE BORING MACHINE 
(UNDER STREETS, HIGHWAYS, ETC.); PORTABLE CRUSHER; 
POWER JUMBO OPERATOR (SETTING SLIP FORMS, ETC., IN 
TUNNELS); ROLLERS (OVER 5 TONS); SELF-PROPELLED 
COMPACTOR (SINGLE ENGINE); SELF-PROPELLED PAVEMENT 
BREAKER; SKIDSTEER LOADER WITH ATTACHMENTS; SLIP 
FORM PUMPS (POWER DRIVEN BY HYDRAULIC, ELECTRIC, 
AIR, GAS, ETC., LIFTING DEVICE FOR CONCRETE FORMS); 
SMALL RUBBER TIRED TRACTORS; TRENCHER (UP TO AND 
INCLUDING 6 FEET); UNDERBRIDGE PERSONNEL AERIAL 
PLATFORM (50 FEET OF PLATFORM OR LESS).  BOOMS 
AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A 
CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR 
MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) 
WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER 
HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   NOT 
INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO BUT 
  NOT INCLUDING 130 FEET                            
    0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO 
BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 59.47                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  7: 
CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN 
DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND 
LIFT; HOIST AND/OR WINCH (2 DRUMS); LOADER (OVER 3 
AND 1/2 CU. YDS. UP TO AND INCLUDING 6 YARDS.); 
MECHANICAL FINISHER OR SPREADER MACHINE (ASPHALT), 
(BARBER GREENE AND SIMILAR) (SCREEDMAN REQUIRED); 
MINE OR SHAFT HOIST; MOBILE CONCRETE MIXER (OVER 5 
TONS); PIPE BENDING MACHINE (PIPELINES ONLY); PIPE 
CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); 
PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND 
SUPPORTED); ROLLER OPERATOR (ASPHALT); 
SELF-PROPELLED ELEVATING GRADE PLANE; SLUSHER 
OPERATOR; TRACTOR (WITH BOOM) (D-6, OR SIMILAR); 
TRENCHER (OVER 6 FEET AND LESS THAN 200 H.P.); 
WATER TANKER (PULLED BY EUCLIDS, T-PULLS, DW-10, 20 
OR 21, OR SIMILAR); WINCHMAN (STERN WINCH ON 
DREDGE).  BOOMS AND/OR LEADS (HOURLY PREMIUMS):  
THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM 
OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE 
(UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE 
WITH THE FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP 
TO BUT   NOT INCLUDING 130 FEET OR   LEADS OF 100 
FEET UP TO BUT   NOT INCLUDING 130 FEET             
                   0.50  BOOMS AND/OR LEADS OF 130 
FEET   UP TO BUT NOT INCLUDING 180 FEET          
0.75  BOOMS AND/OR LEADS OF 180 FEET UP   TO AND 
INCLUDING 250 FEET                         1.15  
BOOMS AND/OR LEADS OVER 250 FEET      1.50  THE 
OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM 
OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A 
PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 59.79                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  8: 
ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); 
CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH 
PLANT (MULTIPLE UNITS); CONVEYOR OPERATOR (TUNNEL); 
DECKMATE; DOZER (D-6 AND SIMILAR); FINISHING 
MACHINE OPERATOR (AIRPORTS AND HIGHWAYS); 
GRADESETTER; KOLMAN LOADER (AND SIMILAR); MUCKING 
MACHINE (CRAWLER-TYPE); MUCKING MACHINE 
(CONVEYOR-TYPE); NO-JOINT PIPE LAYING MACHINE; 
PORTABLE CRUSHING AND SCREENING PLANT; POWER BLADE 
OPERATOR (UNDER 12); SAURMAN TYPE DRAGLINE (UP TO 
AND INCLUDING 5 YDS.); STATIONARY PIPE WRAPPING, 
CLEANING AND BENDING MACHINE; SURFACE HEATER AND 
PLANER OPERATOR, TRACTOR (D-6 AND SIMILAR); 
TRI-BATCH PAVER; TUNNEL BADGER; TUNNEL MOLE AND/OR 
BORING MACHINE OPERATOR UNDERBRIDGE PERSONNEL 
AERIAL PLATFORM (OVER 50 FEET OF PLATFORM).  BOOMS 
AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A 
CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR 
MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) 
WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER 
HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   NOT 
INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO BUT 
  NOT INCLUDING 130 FEET                            
    0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO 
BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 59.90                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  9: 
COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR 
LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); 
WHEEL AND/OR LADDER TRENCHER (OVER 6 FEET AND 200 
TO 749 H.P.).  BOOMS AND/OR LEADS (HOURLY 
PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 50 TONS) 
WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR 
OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET 
OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH 
HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 60.01                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP  9A: 
DOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED 
BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR 
SPECIFICATIONS WITHOUT THE DIRECT SUPERVISION OF A 
FOREMAN OR SUPERINTENDENT); PUSH CAT; SCRAPERS (UP 
TO AND INCLUDING 20 CU. YDS); SELF-PROPELLED 
COMPACTOR WITH DOZER; SELF-PROPELLED, RUBBER-TIRED 
EARTHMOVING EQUIPMENT (UP TO AND INCLUDING 20 CU. 
YDS) (621 BAND AND SIMILAR); SHEEP'S FOOT; TRACTOR 
(D-8 AND SIMILAR); TRACTORS WITH BOOM (LARGER THAN 
D-6, AND SIMILAR).  BOOMS AND/OR LEADS (HOURLY 
PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 50 TONS) 
WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR 
OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET 
OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH 
HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 60.24                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10: 
CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR 
WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC 
SKOOPER (KOEHRING AND SIMILAR); LOADER (OVER 6 CU. 
YDS. UP TO AND INCLUDING 12 CU. YDS.); SAURMAN TYPE 
DRAGLINE (OVER 5 CU. YDS.); SELF-PROPELLED, 
RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 20 CU. 
YDS. UP TO AND INCLUDING 31 CU. YDS.) (637D AND 
SIMILAR); SOIL STABILIZER (P & H OR EQUAL); 
SUB-GRADER (GURRIES OR OTHER AUTOMATIC TYPE); 
TRACTORS (D-9 OR EQUIVALENT, ALL ATTACHMENTS); 
TRACTOR (TANDEM SCRAPER); WATCH ENGINEER.  BOOMS 
AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A 
CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR 
MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) 
WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER 
HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   NOT 
INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO BUT 
  NOT INCLUDING 130 FEET                            
    0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO 
BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 60.30                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10A: 
BOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO 
AND INCLUDING 25 TONS); CABLE-OPERATED POWER 
SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (UP TO AND 
INCLUDING 1 CU. YD.); DOZER D9-L; DOZER (D-10, HD41 
AND SIMILAR) (ALL ATTACHMENTS); GRADALL (UP TO AND 
INCLUDING 1 CU. YD.); HYDRAULIC BACKHOE (OVER 3/4 
CU. YDS. UP TO AND INCLUDING 2 CU. YDS.); MOBILE 
TRUCK CRANE OPERATOR (UP TO AND INCLUDING 25 TONS) 
(MOBILE TRUCK CRANE DRIVER REQUIRED); 
SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER 
MOUNT) (UP TO AND INCLUDING 25 TONS) (GROVE, DROTT, 
P&H, PETTIBONE AND SIMILAR; TRENCHER (OVER 6 FEET 
AND 750 H.P. OR MORE); WATCH ENGINEER (STEAM OR 
ELECTRIC).  BOOMS AND/OR LEADS (HOURLY PREMIUMS):  
THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM 
OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE 
(UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE 
WITH THE FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP 
TO BUT   NOT INCLUDING 130 FEET OR   LEADS OF 100 
FEET UP TO BUT   NOT INCLUDING 130 FEET             
                   0.50  BOOMS AND/OR LEADS OF 130 
FEET   UP TO BUT NOT INCLUDING 180 FEET          
0.75  BOOMS AND/OR LEADS OF 180 FEET UP   TO AND 
INCLUDING 250 FEET                         1.15  
BOOMS AND/OR LEADS OVER 250 FEET      1.50  THE 
OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM 
OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A 
PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 60.45                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 11: 
AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); 
BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); 
CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS BUT 
LESS THAN 50 TONS); CABLE-OPERATED POWER SHOVEL, 
CLAMSHELL, DRAGLINE AND BACKHOE (OVER 1 CU. YD. UP 
TO 7 CU. YDS.); GRADALL (OVER 1 CU. YDS. UP TO 7 
CU. YDS.); DW-10, 20, ETC. (TANDEM); EARTHMOVING 
MACHINES (MULTIPLE PROPULSION POWER UNITS AND 2 OR 
MORE SCRAPERS) (UP TO AND INCLUDING 35 CU. YDS.,"" 
STRUCK"" M.R.C.); HIGHLINE CABLEWAY; HYDRAULIC 
BACKHOE (OVER 2 CU. YDS. UP TO AND INCLUDING 4 CU. 
YDS.); LEVERMAN; LIFT SLAB MACHINE; LOADER (OVER 12 
CU. YDS); MASTER BOAT OPERATOR; MOBILE TRUCK CRANE 
OPERATOR (OVER 25 TONS BUT LESS THAN 50 TONS); 
(MOBILE TRUCK CRANE DRIVER REQUIRED); PRE-STRESS 
WIRE WRAPPING MACHINE; SELF-PROPELLED BOOM-TYPE 
LIFTING DEVICE (CENTER MOUNT) (OVER 25 TONS M.R.C); 
SELF-PROPELLED COMPACTOR (WITH MULTIPLE-PROPULSION 
POWER UNITS); SINGLE ENGINE RUBBER TIRED 
EARTHMOVING MACHINE (WITH TANDEM SCRAPER); TANDEM 
CATS; TRENCHER (PULLING ATTACHED SHIELD).  BOOMS 
AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A 
CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR 
MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) 
WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER 
HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   NOT 
INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO BUT 
  NOT INCLUDING 130 FEET                            
    0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO 
BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 60.60                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12: 
CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; 
MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE 
SCRAPERS) (OVER 35 CU. YDS ""STRUCK""M.R.C.); 
OPERATORS (DERRICKS, PILEDRIVERS AND CRANES); POWER 
SHOVELS AND DRAGLINES (7 CU. YDS. M.R.C. AND OVER); 
SELF-PROPELLED RUBBER-TIRED EARTHMOVING EQUIPMENT 
(OVER 31 CU. YDS.) (657B AND SIMILAR); WHEEL 
EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER 
HOUR); WHEEL EXCAVATOR (OVER 750 CU. YDS. PER 
HOUR).  ............................................$ 60.96                  35.68
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12A: 
DOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC 
EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 
TONS AND OVER); PIONEERING DOZER/BACKHOE (INITIAL 
CLEARING AND EXCAVATION FOR THE PURPOSE OF 
PROVIDING ACCESS FOR OTHER EQUIPMENT WHERE THE 
TERRAIN WORKED INVOLVES 1-TO-1 SLOPES THAT ARE 50 
FEET IN HEIGHT OR DEPTH, THE SCOPE OF THIS WORK 
DOES NOT INCLUDE NORMAL CLEARING AND GRUBBING ON 
USUAL HILLY TERRAIN NOR THE EXCAVATION WORK ONCE 
THE ACCESS IS PROVIDED); POWER BLADE OPERATOR (CAT 
12 OR EQUIVALENT OR OVER); STRADDLE LIFTS (OVER 50 
TONS); TOWER CRANE, MOBILE; TRAVELING TRUSS CRANES; 
UNIVERSAL, LIEBHER, LINDEN, AND SIMILAR TYPES OF 
TOWER CRANES (IN THE ERECTION, DISMANTLING, AND 
MOVING OF EQUIPMENT THERE SHALL BE AN ADDITIONAL 
OPERATING ENGINEER OR HEAVY DUTY REPAIRMAN); YO-YO 
CAT OR DOZER.  BOOMS AND/OR LEADS (HOURLY 
PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 50 TONS) 
WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR 
OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET 
OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH 
HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 61.32                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  1: FORK LIFT (UP 
TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY 
REPAIR SHOP PARTS ROOM WHEN NEEDED).  BOOMS AND/OR 
LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A CRANE 
(UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE 
(INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH 
LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 
50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: 
 BOOMS OF 80 FEET UP TO BUT   NOT INCLUDING 130 
FEET OR   LEADS OF 100 FEET UP TO BUT   NOT 
INCLUDING 130 FEET                                
0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO BUT 
NOT INCLUDING 180 FEET          0.75  BOOMS AND/OR 
LEADS OF 180 FEET UP   TO AND INCLUDING 250 FEET    
                     1.15  BOOMS AND/OR LEADS OVER 
250 FEET      1.50  THE OPERATOR OF A CRANE (50 
TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE 
(INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM 
FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND 
OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE:  
BOOMS OF 180 FEET UP TO   AND INCLUDING 250 FEET    
                          1.25  BOOMS OVER 250 FEET 
                                   1.75.............$ 57.66                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  2: CONVEYOR 
OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC 
MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT).  
BOOMS AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR 
OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET 
OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 
TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE 
A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID 
CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE 
FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   
NOT INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO 
BUT   NOT INCLUDING 130 FEET                        
        0.50  BOOMS AND/OR LEADS OF 130 FEET   UP 
TO BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 57.77                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  3: BRAKEMAN; 
DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; 
SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; 
BARGEMAN; BUNKERMAN; CONCRETE CURING MACHINE 
(SELF-PROPELLED, AUTOMATICALLY APPLIED UNIT ON 
STREETS, HIGHWAYS, AIRPORTS AND CANALS); LEVEEMAN; 
ROLLER (5 TONS AND UNDER); TUGGER HOIST.  BOOMS 
AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A 
CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR 
MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) 
WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER 
HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   NOT 
INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO BUT 
  NOT INCLUDING 130 FEET                            
    0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO 
BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 57.94                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  4: BOOM TRUCK OR 
DUAL PURPOSE ""A"" FRAME TRUCK (5 TONS OR LESS); 
CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); 
DINKY OPERATOR; ELEVATOR OPERATOR; HOIST AND/OR 
WINCH (ONE DRUM); STRADDLE TRUCK (ROSS CARRIER, 
HYSTER AND SIMILAR).  BOOMS AND/OR LEADS (HOURLY 
PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 50 TONS) 
WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR 
OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET 
OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH 
HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 58.21                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  5: ASPHALT PLANT 
FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING 
MACHINES (""BANK"" OF 9 OR MORE, INDIVIDUALLY OR 
COLLECTIVELY); CONCRETE PUMPS OR PUMPCRETE GUNS; 
LUBRICATION AND SERVICE ENGINEER (GREASE RACK); 
SCREEDMAN  BOOMS AND/OR LEADS (HOURLY PREMIUMS):  
THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM 
OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE 
(UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE 
WITH THE FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP 
TO BUT   NOT INCLUDING 130 FEET OR   LEADS OF 100 
FEET UP TO BUT   NOT INCLUDING 130 FEET             
                   0.50  BOOMS AND/OR LEADS OF 130 
FEET   UP TO BUT NOT INCLUDING 180 FEET          
0.75  BOOMS AND/OR LEADS OF 180 FEET UP   TO AND 
INCLUDING 250 FEET                         1.15  
BOOMS AND/OR LEADS OVER 250 FEET      1.50  THE 
OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM 
OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A 
PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 58.52                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  6: BOOM TRUCK OR 
DUAL PURPOSE ""A""FRAME TRUCK (OVER 5 TONS); 
COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 
CU. YD.); CONCRETE BATCH PLANTS (WET OR DRY); 
CONCRETE CUTTER, GROOVER AND/OR GRINDER 
(SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, 
AIRPORTS, AND CANALS); CONVEYOR OR CONCRETE PUMP 
(TRUCK OR EQUIPMENT MOUNTED); DRILLING MACHINERY 
(NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACK 
HAMMERS); FORK LIFT (OVER 10 TONS); LOADER (UP TO 
AND INCLUDING 3 AND 1/2 CU. YDS); LULL HIGH LIFT 
(UNDER 40 FEET); LUBRICATION AND SERVICE ENGINEER 
(MOBILE); MAGINNIS INTERNAL FULL SLAB VIBRATOR (ON 
AIRPORTS, HIGHWAYS, CANALS AND WAREHOUSES); MAN OR 
MATERIAL HOIST; MECHANICAL CONCRETE FINISHER (LARGE 
CLARY, JOHNSON BIDWELL, BRIDGE DECK AND SIMILAR); 
MOBILE TRUCK CRANE DRIVER; PORTABLE SHOTBLAST 
CONCRETE CLEANING MACHINE; PORTABLE BORING MACHINE 
(UNDER STREETS, HIGHWAYS, ETC.); PORTABLE CRUSHER; 
POWER JUMBO OPERATOR (SETTING SLIP FORMS, ETC., IN 
TUNNELS); ROLLERS (OVER 5 TONS); SELF-PROPELLED 
COMPACTOR (SINGLE ENGINE); SELF-PROPELLED PAVEMENT 
BREAKER; SKIDSTEER LOADER WITH ATTACHMENTS; SLIP 
FORM PUMPS (POWER DRIVEN BY HYDRAULIC, ELECTRIC, 
AIR, GAS, ETC., LIFTING DEVICE FOR CONCRETE FORMS); 
SMALL RUBBER TIRED TRACTORS; TRENCHER (UP TO AND 
INCLUDING 6 FEET); UNDERBRIDGE PERSONNEL AERIAL 
PLATFORM (50 FEET OF PLATFORM OR LESS).  BOOMS 
AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A 
CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR 
MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) 
WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER 
HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   NOT 
INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO BUT 
  NOT INCLUDING 130 FEET                            
    0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO 
BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 59.17                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  7: CRUSHER PLANT 
ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND 
SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST 
AND/OR WINCH (2 DRUMS); LOADER (OVER 3 AND 1/2 CU. 
YDS. UP TO AND INCLUDING 6 YARDS.); MECHANICAL 
FINISHER OR SPREADER MACHINE (ASPHALT), (BARBER 
GREENE AND SIMILAR) (SCREEDMAN REQUIRED); MINE OR 
SHAFT HOIST; MOBILE CONCRETE MIXER (OVER 5 TONS); 
PIPE BENDING MACHINE (PIPELINES ONLY); PIPE 
CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); 
PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND 
SUPPORTED); ROLLER OPERATOR (ASPHALT); 
SELF-PROPELLED ELEVATING GRADE PLANE; SLUSHER 
OPERATOR; TRACTOR (WITH BOOM) (D-6, OR SIMILAR); 
TRENCHER (OVER 6 FEET AND LESS THAN 200 H.P.); 
WATER TANKER (PULLED BY EUCLIDS, T-PULLS, DW-10, 20 
OR 21, OR SIMILAR); WINCHMAN (STERN WINCH ON 
DREDGE).  BOOMS AND/OR LEADS (HOURLY PREMIUMS):  
THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM 
OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE 
(UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE 
WITH THE FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP 
TO BUT   NOT INCLUDING 130 FEET OR   LEADS OF 100 
FEET UP TO BUT   NOT INCLUDING 130 FEET             
                   0.50  BOOMS AND/OR LEADS OF 130 
FEET   UP TO BUT NOT INCLUDING 180 FEET          
0.75  BOOMS AND/OR LEADS OF 180 FEET UP   TO AND 
INCLUDING 250 FEET                         1.15  
BOOMS AND/OR LEADS OVER 250 FEET      1.50  THE 
OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM 
OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A 
PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 59.49                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  8: ASPHALT PLANT 
OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE 
LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE 
UNITS); CONVEYOR OPERATOR (TUNNEL); DECKMATE; DOZER 
(D-6 AND SIMILAR); FINISHING MACHINE OPERATOR 
(AIRPORTS AND HIGHWAYS); GRADESETTER; KOLMAN LOADER 
(AND SIMILAR); MUCKING MACHINE (CRAWLER-TYPE); 
MUCKING MACHINE (CONVEYOR-TYPE); NO-JOINT PIPE 
LAYING MACHINE; PORTABLE CRUSHING AND SCREENING 
PLANT; POWER BLADE OPERATOR (UNDER 12); SAURMAN 
TYPE DRAGLINE (UP TO AND INCLUDING 5 YDS.); 
STATIONARY PIPE WRAPPING, CLEANING AND BENDING 
MACHINE; SURFACE HEATER AND PLANER OPERATOR, 
TRACTOR (D-6 AND SIMILAR); TRI-BATCH PAVER; TUNNEL 
BADGER; TUNNEL MOLE AND/OR BORING MACHINE OPERATOR 
UNDERBRIDGE PERSONNEL AERIAL PLATFORM (OVER 50 FEET 
OF PLATFORM).  BOOMS AND/OR LEADS (HOURLY 
PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 50 TONS) 
WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR 
OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET 
OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH 
HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 59.60                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  9: COMBINATION 
MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND 
ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR 
LADDER TRENCHER (OVER 6 FEET AND 200 TO 749 H.P.).  
BOOMS AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR 
OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET 
OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 
TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE 
A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID 
CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE 
FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   
NOT INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO 
BUT   NOT INCLUDING 130 FEET                        
        0.50  BOOMS AND/OR LEADS OF 130 FEET   UP 
TO BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 59.71                  35.68
POWER EQUIPMENT OPERATORS:, GROUP  9A: DOZER (D-8 
AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE 
CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR 
SPECIFICATIONS WITHOUT THE DIRECT SUPERVISION OF A 
FOREMAN OR SUPERINTENDENT); PUSH CAT; SCRAPERS (UP 
TO AND INCLUDING 20 CU. YDS); SELF-PROPELLED 
COMPACTOR WITH DOZER; SELF-PROPELLED, RUBBER-TIRED 
EARTHMOVING EQUIPMENT (UP TO AND INCLUDING 20 CU. 
YDS) (621 BAND AND SIMILAR); SHEEP'S FOOT; TRACTOR 
(D-8 AND SIMILAR); TRACTORS WITH BOOM (LARGER THAN 
D-6, AND SIMILAR).  BOOMS AND/OR LEADS (HOURLY 
PREMIUMS):  THE OPERATOR OF A CRANE (UNDER 50 TONS) 
WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR 
OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET 
OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH 
HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
80 FEET UP TO BUT   NOT INCLUDING 130 FEET OR   
LEADS OF 100 FEET UP TO BUT   NOT INCLUDING 130 
FEET                                0.50  BOOMS 
AND/OR LEADS OF 130 FEET   UP TO BUT NOT INCLUDING 
180 FEET          0.75  BOOMS AND/OR LEADS OF 180 
FEET UP   TO AND INCLUDING 250 FEET                 
        1.15  BOOMS AND/OR LEADS OVER 250 FEET      
1.50  THE OPERATOR OF A CRANE (50 TONS AND OVER) 
WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (50 TONS AND OVER) IN 
ACCORDANCE WITH THE FOLLOWING SCHEDULE:  BOOMS OF 
180 FEET UP TO   AND INCLUDING 250 FEET             
                 1.25  BOOMS OVER 250 FEET          
                          1.75......................$ 59.94                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 10: CHICAGO BOOM; 
COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST 
AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING 
AND SIMILAR); LOADER (OVER 6 CU. YDS. UP TO AND 
INCLUDING 12 CU. YDS.); SAURMAN TYPE DRAGLINE (OVER 
5 CU. YDS.); SELF-PROPELLED, RUBBER-TIRED 
EARTHMOVING EQUIPMENT (OVER 20 CU. YDS. UP TO AND 
INCLUDING 31 CU. YDS.) (637D AND SIMILAR); SOIL 
STABILIZER (P & H OR EQUAL); SUB-GRADER (GURRIES OR 
OTHER AUTOMATIC TYPE); TRACTORS (D-9 OR EQUIVALENT, 
ALL ATTACHMENTS); TRACTOR (TANDEM SCRAPER); WATCH 
ENGINEER.  BOOMS AND/OR LEADS (HOURLY PREMIUMS):  
THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM 
OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE 
(UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE 
WITH THE FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP 
TO BUT   NOT INCLUDING 130 FEET OR   LEADS OF 100 
FEET UP TO BUT   NOT INCLUDING 130 FEET             
                   0.50  BOOMS AND/OR LEADS OF 130 
FEET   UP TO BUT NOT INCLUDING 180 FEET          
0.75  BOOMS AND/OR LEADS OF 180 FEET UP   TO AND 
INCLUDING 250 FEET                         1.15  
BOOMS AND/OR LEADS OVER 250 FEET      1.50  THE 
OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM 
OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A 
PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 60.00                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 10A: BOAT 
OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND 
INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, 
CLAMSHELL, DRAGLINE AND BACKHOE (UP TO AND 
INCLUDING 1 CU. YD.); DOZER D9-L; DOZER (D-10, HD41 
AND SIMILAR) (ALL ATTACHMENTS); GRADALL (UP TO AND 
INCLUDING 1 CU. YD.); HYDRAULIC BACKHOE (OVER 3/4 
CU. YDS. UP TO AND INCLUDING 2 CU. YDS.); MOBILE 
TRUCK CRANE OPERATOR (UP TO AND INCLUDING 25 TONS) 
(MOBILE TRUCK CRANE DRIVER REQUIRED); 
SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER 
MOUNT) (UP TO AND INCLUDING 25 TONS) (GROVE, DROTT, 
P&H, PETTIBONE AND SIMILAR; TRENCHER (OVER 6 FEET 
AND 750 H.P. OR MORE); WATCH ENGINEER (STEAM OR 
ELECTRIC).  BOOMS AND/OR LEADS (HOURLY PREMIUMS):  
THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM 
OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE 
(UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE 
WITH THE FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP 
TO BUT   NOT INCLUDING 130 FEET OR   LEADS OF 100 
FEET UP TO BUT   NOT INCLUDING 130 FEET             
                   0.50  BOOMS AND/OR LEADS OF 130 
FEET   UP TO BUT NOT INCLUDING 180 FEET          
0.75  BOOMS AND/OR LEADS OF 180 FEET UP   TO AND 
INCLUDING 250 FEET                         1.15  
BOOMS AND/OR LEADS OVER 250 FEET      1.50  THE 
OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM 
OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A 
PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 60.15                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 11: AUTOMATIC 
SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON 
(IN CONJUNCTION WITH WHEEL EXCAVATOR); 
CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS BUT 
LESS THAN 50 TONS); CABLE-OPERATED POWER SHOVEL, 
CLAMSHELL, DRAGLINE AND BACKHOE (OVER 1 CU. YD. UP 
TO 7 CU. YDS.); GRADALL (OVER 1 CU. YDS. UP TO 7 
CU. YDS.); DW-10, 20, ETC. (TANDEM); EARTHMOVING 
MACHINES (MULTIPLE PROPULSION POWER UNITS AND 2 OR 
MORE SCRAPERS) (UP TO AND INCLUDING 35 CU. YDS.,"" 
STRUCK"" M.R.C.); HIGHLINE CABLEWAY; HYDRAULIC 
BACKHOE (OVER 2 CU. YDS. UP TO AND INCLUDING 4 CU. 
YDS.); LEVERMAN; LIFT SLAB MACHINE; LOADER (OVER 12 
CU. YDS); MASTER BOAT OPERATOR; MOBILE TRUCK CRANE 
OPERATOR (OVER 25 TONS BUT LESS THAN 50 TONS); 
(MOBILE TRUCK CRANE DRIVER REQUIRED); PRE-STRESS 
WIRE WRAPPING MACHINE; SELF-PROPELLED BOOM-TYPE 
LIFTING DEVICE (CENTER MOUNT) (OVER 25 TONS M.R.C); 
SELF-PROPELLED COMPACTOR (WITH MULTIPLE-PROPULSION 
POWER UNITS); SINGLE ENGINE RUBBER TIRED 
EARTHMOVING MACHINE (WITH TANDEM SCRAPER); TANDEM 
CATS; TRENCHER (PULLING ATTACHED SHIELD).  BOOMS 
AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A 
CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR 
MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) 
WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER 
HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   NOT 
INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO BUT 
  NOT INCLUDING 130 FEET                            
    0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO 
BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 60.30                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 12 CLAMSHELL OR 
DIPPER OPERATOR; DERRICKS; DRILL RIGS; 
MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE 
SCRAPERS) (OVER 35 CU. YDS ""STRUCK""M.R.C.); 
OPERATORS (DERRICKS, PILEDRIVERS AND CRANES); POWER 
SHOVELS AND DRAGLINES (7 CU. YDS. M.R.C. AND OVER); 
SELF-PROPELLED RUBBER-TIRED EARTHMOVING EQUIPMENT 
(OVER 31 CU. YDS.) (657B AND SIMILAR); WHEEL 
EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER 
HOUR); WHEEL EXCAVATOR (OVER 750 CU. YDS. PER 
HOUR).  BOOMS AND/OR LEADS (HOURLY PREMIUMS):  THE 
OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 
80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE 
(UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, 
SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR 
WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE 
WITH THE FOLLOWING SCHEDULE:  BOOMS OF 80 FEET UP 
TO BUT   NOT INCLUDING 130 FEET OR   LEADS OF 100 
FEET UP TO BUT   NOT INCLUDING 130 FEET             
                   0.50  BOOMS AND/OR LEADS OF 130 
FEET   UP TO BUT NOT INCLUDING 180 FEET          
0.75  BOOMS AND/OR LEADS OF 180 FEET UP   TO AND 
INCLUDING 250 FEET                         1.15  
BOOMS AND/OR LEADS OVER 250 FEET      1.50  THE 
OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM 
OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A 
PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 60.66                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 12A: DOZER (D-11 
OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 
CU. YDS.); LIFTING CRANES (50 TONS AND OVER); 
PIONEERING DOZER/BACKHOE (INITIAL CLEARING AND 
EXCAVATION FOR THE PURPOSE OF PROVIDING ACCESS FOR 
OTHER EQUIPMENT WHERE THE TERRAIN WORKED INVOLVES 
1-TO-1 SLOPES THAT ARE 50 FEET IN HEIGHT OR DEPTH, 
THE SCOPE OF THIS WORK DOES NOT INCLUDE NORMAL 
CLEARING AND GRUBBING ON USUAL HILLY TERRAIN NOR 
THE EXCAVATION WORK ONCE THE ACCESS IS PROVIDED); 
POWER BLADE OPERATOR (CAT 12 OR EQUIVALENT OR 
OVER); STRADDLE LIFTS (OVER 50 TONS); TOWER CRANE, 
MOBILE; TRAVELING TRUSS CRANES; UNIVERSAL, LIEBHER, 
LINDEN, AND SIMILAR TYPES OF TOWER CRANES (IN THE 
ERECTION, DISMANTLING, AND MOVING OF EQUIPMENT 
THERE SHALL BE AN ADDITIONAL OPERATING ENGINEER OR 
HEAVY DUTY REPAIRMAN); YO-YO CAT OR DOZER.   BOOMS 
AND/OR LEADS (HOURLY PREMIUMS):  THE OPERATOR OF A 
CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR 
MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) 
WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER 
HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE 
(UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 80 FEET UP TO BUT   NOT 
INCLUDING 130 FEET OR   LEADS OF 100 FEET UP TO BUT 
  NOT INCLUDING 130 FEET                            
    0.50  BOOMS AND/OR LEADS OF 130 FEET   UP TO 
BUT NOT INCLUDING 180 FEET          0.75  BOOMS 
AND/OR LEADS OF 180 FEET UP   TO AND INCLUDING 250 
FEET                         1.15  BOOMS AND/OR 
LEADS OVER 250 FEET      1.50  THE OPERATOR OF A 
CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR 
MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR 
PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS 
AND OVER) IN ACCORDANCE WITH THE FOLLOWING 
SCHEDULE:  BOOMS OF 180 FEET UP TO   AND INCLUDING 
250 FEET                              1.25  BOOMS 
OVER 250 FEET                                    
1.75................................................$ 61.02                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 13: TRUCK DRIVER 
(UTILITY, FLATBED, ETC.)............................$ 57.94                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 13A: DUMP TRUCK, 
8 CU.YDS. AND UNDER (WATER LEVEL); WATER TRUCK (UP 
TO AND INCLUDING 2,000 GALLONS).....................$ 58.21                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 13B: WATER TRUCK 
(OVER 2,000 GALLONS); TANDEM DUMP TRUCK, OVER 8 CU. 
YDS. (WATER LEVEL)..................................$ 58.52                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 13C: TRUCK DRIVER 
(SEMI-TRAILER. ROCK CANS, SEMI-DUMP OR ROLL-OFFS)...$ 59.17                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 13D: TRUCK DRIVER 
(SLIP-IN OR PUP)....................................$ 59.49                  35.68
POWER EQUIPMENT OPERATORS:, GROUP 13E: END DUMPS, 
UNLICENSED (EUCLID, MACK, CATERPILLAR OR SIMILAR); 
TRACTOR TRAILER (HAULING  EQUIPMENT); TANDEM TRUCKS 
HOOKED UP TO TRAILER (HAULING EQUIPMENT)            
  ..................................................$ 59.60                  35.68
STAND-BY DIVER: (AQUA LUNG) (SCUBA).................$ 62.97                  35.68
STAND-BY DIVER: OTHER THAN AQUA LUNG................$ 62.97                  35.68
----------------------------------------------------------------

 ENGI0003-004 09/01/2025
                                                     Rates                  Fringes
DREDGING (BOAT OPERATORS): BOAT DECKHAND............$ 57.94                  35.68
DREDGING (BOAT OPERATORS): BOAT OPERATOR............$ 60.15                  35.68
DREDGING (BOAT OPERATORS): MASTER BOAT OPERATOR.....$ 60.30                  35.68
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 1: 
CLAMSHELL OR DIPPER OPERATOR........................$ 60.66                  35.68
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 2: 
MECHANIC OR WELDER; WATCH ENGINEER..................$ 60.00                  35.68
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 3: 
BARGE MATE; DECKMATE................................$ 59.60                  35.68
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 4: 
BARGEMAN; DECKHAND; FIREMAN; OILER.  HYDRAULIC 
SUCTION DREDGING CLASSIFICATIONS....................$ 57.94                  35.68
DREDGING:, DERRICKS: GROUP  1: OPERATORS (DERRICKS, 
PILEDRIVERS AND CRANES).  ..........................$ 60.66                  35.68
DREDGING:, DERRICKS: GROUP  2: SAURMAN TYPE 
DRAGLINE (OVER 5 CUBIC YARDS).  ....................$ 60.00                  35.68
DREDGING:, DERRICKS: GROUP  3: DECKMATE; SAURMAN 
TYPE DRAGLINE (UP TO AND INCLUDING 5 YARDS).  ......$ 59.60                  35.68
DREDGING:, DERRICKS: GROUP  4: DECKHAND, FIREMAN, 
OILER...............................................$ 57.94                  35.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP  1: 
LEVERMAN.  .........................................$ 60.30                  35.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP  2: 
WATCH ENGINEER (STEAM OR ELECTRIC).  ...............$ 60.15                  35.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP  3: 
MECHANIC OR WELDER.  ...............................$ 60.00                  35.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP  4: 
DOZER OPERATOR.  ...................................$ 59.94                  35.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP  5: 
DECKMATE.  .........................................$ 59.60                  35.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP  6: 
WINCHMAN (STERN WINCH ON DREDGE)....................$ 59.49                  35.68
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 7: 
DECKHAND (CAN OPERATE ANCHOR SCOW UNDER DIRECTION 
OF DECKMATE); FIREMAN; LEVEEMAN; OILER..............$ 57.94                  35.68
----------------------------------------------------------------

 ENGI0003-044 09/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT 
CONCRETE MATERIAL TRANSFER..........................$ 58.67                  34.86
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT PLANT 
OPERATOR............................................$ 59.07                  34.86
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT RAKER...$ 57.68                  34.86
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT 
SPREADER OPERATOR...................................$ 59.16                  34.86
POWER EQUIPMENT OPERATORS (PAVING): COLD PLANER.....$ 59.47                  34.86
POWER EQUIPMENT OPERATORS (PAVING): COMBINATION 
LOADER/BACKHOE (OVER 3/4 CU.YD.)....................$ 57.68                  34.86
POWER EQUIPMENT OPERATORS (PAVING): COMBINATION 
LOADER/BACKHOE (UP TO 3/4 CU.YD.)...................$ 56.70                  34.86
POWER EQUIPMENT OPERATORS (PAVING): CONCRETE SAWS 
AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, 
HIGHWAYS, AIRPORTS AND CANALS)......................$ 58.64                  34.86
POWER EQUIPMENT OPERATORS (PAVING): GRADER..........$ 59.47                  34.86
POWER EQUIPMENT OPERATORS (PAVING): LABORER, HAND 
ROLLER..............................................$ 57.18                  34.86
POWER EQUIPMENT OPERATORS (PAVING): LOADER (2 1/2 
CU. YDS. AND UNDER).................................$ 58.64                  34.86
POWER EQUIPMENT OPERATORS (PAVING): LOADER (OVER 2 
1/2 CU. YDS. TO AND INCLUDING 5 CU. YDS.)...........$ 58.96                  34.86
POWER EQUIPMENT OPERATORS (PAVING): ROLLER OPERATOR 
(FIVE TONS AND UNDER)...............................$ 57.41                  34.86
POWER EQUIPMENT OPERATORS (PAVING): ROLLER OPERATOR 
(OVER FIVE TONS)....................................$ 58.84                  34.86
POWER EQUIPMENT OPERATORS (PAVING): SCREED PERSON...$ 58.64                  34.86
POWER EQUIPMENT OPERATORS (PAVING): SOIL STABILIZER.$ 59.47                  34.86
----------------------------------------------------------------

 IRON0625-001 09/01/2025
                                                     Rates                  Fringes
IRONWORKERS  A. EMPLOYEES WILL BE PAID $.50 PER 
HOUR MORE WHILE WORKING IN TUNNELS AND COFFER DAMS; 
$1.00 PER HOUR MORE WHEN REQUIRED TO WORK UNDER OR 
ARE COVERED WITH WATER (SUBMERGED) AND WHEN THEY 
ARE REQUIRED TO WORK ON THE SUMMIT OF MAUNA KEA, 
MAUNA LOA OR HALEAKALA..............................$ 50.50                  43.46
----------------------------------------------------------------

 LABO0368-001 09/02/2024
                                                     Rates                  Fringes
LABORERS: DRILLER...................................$ 44.75                  25.96
LABORERS: FINAL CLEAN UP............................$ 31.40                  21.37
LABORERS: GUNITE/SHOTCRETE OPERATOR AND HIGH SCALER.$ 42.25                  25.96
LABORERS: MASON TENDER/HOD CARRIER..................$ 42.25                  25.96
LABORERS: POWDERMAN.................................$ 42.75                  25.96
LABORERS: WINDOW WASHER (BOSUN CHAIR)...............$ 41.25                  25.96
SEE LABORERS: LABORER I IN FOOTER...................$ 41.75                  25.96
SEE LABORERS: LABORER II IN FOOTER..................$ 39.15                  25.96
----------------------------------------------------------------

 LABO0368-002 09/03/2024
                                                     Rates                  Fringes
LANDSCAPE & IRRIGATION LABORERS, GROUP 1: 
INSTALLATION OF NON-POTABLE PERMANENT OR TEMPORARY 
IRRIGATION WATER SYSTEMS PERFORMED FOR THE PURPOSES 
OF LANDSCAPING AND IRRIGATION ARCHITECTURAL 
HORTICULTURAL WORK; THE INSTALLATION OF DRINKING 
FOUNTAINS AND PERMANENT OR TEMPORARY IRRIGATION 
SYSTEMS USING POTABLE WATER FOR LANDSCAPING AND 
IRRIGATION ARCHITECTURAL HORTICULTURAL PURPOSES 
ONLY. THIS WORK INCLUDES (A) THE INSTALLATION OF 
ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM 
BREAKERS (PRESSURE AND NON-PRESSURE), LOW VOLTAGE 
ELECTRICAL LINES AND, PROVIDED SUCH WORK INVOLVES 
ELECTRICAL WIRING THAT WILL CARRY 24 VOLTS OR LESS, 
THE INSTALLATION OF SENSORS, MASTER CONTROL PANELS, 
DISPLAY BOARDS, JUNCTION BOXES, CONDUCTORS, 
INCLUDING ALL OTHER COMPONENTS FOR CONTROLLERS, (B) 
AND METALLIC (COPPER, BRASS, GALVANIZED, OR 
SIMILAR) PIPE, AS WELL AS PVC OR OTHER PLASTIC PIPE 
INCLUDING ALL WORK INCIDENTAL THERETO, I.E., 
UNLOADING, HANDLING AND DISTRIBUTION OF ALL PIPES 
FITTINGS, TOOLS, MATERIALS AND EQUIPMENT, (C) ALL 
SOLDERING WORK IN CONNECTION WITH THE ABOVE WHETHER 
DONE BY TORCH, SOLDERING IRON, OR OTHER MEANS; (D) 
TIE-IN TO MAIN LINES, THRUST BLOCKS (BOTH PRECAST 
AND POURED IN PLACE), PIPE HANGERS AND SUPPORTS 
INCIDENTAL TO INSTALLATION OF THE ENTIRE IRRIGATION 
SYSTEM, (E) MAKING OF PRESSURE TESTS, START-UP 
TESTING, FLUSHING, PURGING, WATER BALANCING, 
PLACING INTO OPERATION ALL IRRIGATION EQUIPMENT, 
FIXTURES AND APPURTENANCES INSTALLED UNDER THIS 
AGREEMENT, AND (F) THE FABRICATION, REPLACEMENT, 
REPAIR AND SERVICING OFLANDSCAPING AND IRRIGATION 
SYSTEMS.  OPERATION OF HAND-HELD GAS, AIR, 
ELECTRIC, OR SELF-POWERED TOOLS AND EQUIPMENT USED 
IN THE PERFORMANCE OF LANDSCAPE AND IRRIGATION WORK 
IN CONNECTION WITH ARCHITECTURAL HORTICULTURE; 
CHOKE-SETTING, SIGNALING, AND RIGGING FOR EQUIPMENT 
OPERATORS ON JOB-SITE IN THE PERFORMANCE OF SUCH 
LANDSCAPING AND IRRIGATION WORK; CONCRETE WORK (WET 
OR DRY) PERFORMED IN CONNECTION WITH SUCH 
LANDSCAPING AND IRRIGATION WORK. THIS WORK SHALL 
ALSO INCLUDE THE SETTING OF ROCK, STONE, OR RIPRAP 
IN CONNECTION WITH SUCH LANDSCAPE, WATERSCAPE, 
ROCKSCAPE, AND IRRIGATION WORK; GRUBBING, PICK AND 
SHOVEL EXCAVATION, AND HAND ROLLING OR TAMPING IN 
CONNECTION WITH THE PERFORMANCE OF SUCH LANDSCAPING 
AND IRRIGATION WORK; SPRIGGING, HANDSEEDING, AND 
PLANTING OF TREES, SHRUBS, GROUND COVERS, AND OTHER 
PLANTINGS AND THE PERFORMANCE OF ALL TYPES OF 
GARDENING AND HORTICULTURAL WORK RELATING TO SAID 
PLANTING; OPERATION OF FLAT BED TRUCKS (UP TO AND 
INCLUDING 2 1/2 TONS).:  ...........................$ 28.40                  17.15
LANDSCAPE & IRRIGATION LABORERS, GROUP 3: 
MAINTENANCE OF TREES, SHRUBS, GROUND COVERS, LAWNS 
AND OTHER PLANTED AREAS, INCLUDING THE REPLANTING 
OF TREES, SHRUBS, GROUND COVERS, AND OTHER 
PLANTINGS THAT DID NOT ""TAKE"" OR WHICH ARE DAMAGED; 
PROVIDED, HOWEVER, THAT RE-PLANTING THAT REQUIRES 
THE USE OF EQUIPMENT, MACHINERY, OR POWER TOOLS 
SHALL BE PAID FOR AT THE RATE OF PAY SPECIFIED 
UNDER LANDSCAPE AND IRRIGATION LABORER, GROUP 1; 
RAKING, MOWING, TRIMMING, AND RUNING, INCLUDING THE 
USE OF ""WEED EATERS"", HEDGE TRIMMERS, VACUUMS, 
BLOWERS, AND OTHER HAND-HELD GAS, AIR, ELECTRIC, OR 
SELF-POWERED TOOLS, AND THE OPERATION OF LAWN 
MOWERS (NOTE: THE OPERATION OF SIT-DOWN TYPE AND 
""GANG"" MOWERS SHALL BE PAID FOR AT THE RATE OF PAY 
SPECIFIED UNDER LANDSCAPE & IRRIGATION LABORER, 
GROUP 2); GUYWIRING, STAKING, PROPPING, AND 
SUPPORTING TREES; FERTILIZING, CHEMICAL SPRAYING 
USING SPRAY EQUIPMENT WITH LESS THAN 200 GALLON 
CAPACITY, MAINTAINING IRRIGATION AND SPRINKLER 
SYSTEMS, INCLUDING THE STAKING, CLAMPING, AND 
ADJUSTMENT OF RISERS, AND THE ADJUSTMENT AND/OR 
REPLACEMENT OF SPRINKLER HEADS, (NOTE: THE CLEANING 
AND GLUING OF PIPE AND FITTINGS SHALL BE PAID FOR 
AT THE RATE OF PAY SPECIFIED UNDER LANDSCAPE & 
IRRIGATION LABORER(GROUP 1); WATERING BY HAND OR 
SPRINKLER SYSTEM AND THE PEFORMANCE OF OTHER TYPES 
OF GARDENING, YARDMAN, AND HORTICULTURAL-RELATED 
WORK................................................$ 23.00                  17.15
LANDSCAPE & IRRIGATION LABORERS,GROUP 2: LAYOUT OF 
IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER 
SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND 
OTHER POTABLE IRRIGATION WATER SYSTEMS IN 
CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION 
WORK. THIS INCLUDES THE LAYOUT OF ALL HEADS, 
RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS, LOW 
VOLTAGE ELECTRICAL LINES, HYDRAULIC AND ELECTRICAL 
CONTROLLERS, AND METALLIC (COPPERS, BRASS, 
GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR 
OTHER PLASTIC PIPE.  THIS WORK ALSO INCLUDES THE 
READING AND INTERPRETATION OF PLANS AND 
SPECIFICATIONS IN CONNECTION WITH THE LAYOUT OF 
LANDSCAPING, ROCKSCAPE, WATERSCAPE, AND IRRIGATION 
WORK; OPERATION OF HYDRO-MULCHING MACHINES 
(SPRAYMAN AND DRIVER), DRILLERS, TRENCHERS (RIDING 
TYPE, DAVIS T-66, AND SIMILAR) AND FORK LIFTS USED 
IN CONNECTION WITH THE PERFORMANCE OF SUCH 
LANDSCAPING AND IRRIGATION WORK; TREE CLIMBERS AND 
CHAIN SAW TREE TRIMMERS, SPORADIC OPERATION (WHEN 
USED IN CONNECTION WITH LANDSCAPING, ROCKSCAPE, 
WATERSCAPE, AND IRRIGATION WORK) OF SKID-STEER 
LOADERS (BOBCAT AND SIMILAR), CRANES (BANTAM, 
GROVE, AND SIMILAR), HOPTOS, BACKHOES, LOADERS, 
ROLLERS, AND DOZERS (CASE, JOHN DEERE, AND 
SIMILAR), WATER TRUCKS, TRUCKS REQUIRING A STATE OF 
HAWAII PUBLIC UTILITIES COMMISSION TYPE 5 AND/OR 
TYPE 7 LICENSE, SIT-DOWN TYPE AND ""GANG"" MOWERS, 
AND OTHER SELF-PROPELLED, SIT-DOWN OPERATED 
MACHINES NOT LISTED UNDER LANDSCAPE & IRRIGATION 
MAINTENANCE LABORER; CHEMICAL SPRAYING USING 
SELF-PROPELLED POWER SPRAYING EQUIPMENT (200 GALLON 
CAPACITY OR MORE)...................................$ 29.40                  17.15
LANDSCAPE & IRRIGATION LABORERS: GROUP 2  LAYOUT OF 
IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER 
SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND 
OTHER POTABLE IRRIGATION WATER SYSTEMS IN 
CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION 
WORK. THIS INCLUDES THE LAYOUT OF ALL HEADS, 
RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS, LOW 
VOLTAGE ELECTRICAL LINES, HYDRAULIC AND ELECTRICAL 
CONTROLLERS, AND METALLIC (COPPERS, BRASS, 
GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR 
OTHER PLASTIC PIPE.  THIS WORK ALSO INCLUDES THE 
READING AND INTERPRETATION OF PLANS AND 
SPECIFICATIONS IN CONNECTION WITH THE LAYOUT OF 
LANDSCAPING, ROCKSCAPE, WATERSCAPE, AND IRRIGATION 
WORK; OPERATION OF HYDRO-MULCHING MACHINES 
(SPRAYMAN AND DRIVER), DRILLERS, TRENCHERS (RIDING 
TYPE, DAVIS T-66, AND SIMILAR) AND FORK LIFTS USED 
IN CONNECTION WITH THE PERFORMANCE OF SUCH 
LANDSCAPING AND IRRIGATION WORK; TREE CLIMBERS AND 
CHAIN SAW TREE TRIMMERS, SPORADIC OPERATION (WHEN 
USED IN CONNECTION WITH LANDSCAPING, ROCKSCAPE, 
WATERSCAPE, AND IRRIGATION WORK) OF SKID-STEER 
LOADERS (BOBCAT AND SIMILAR), CRANES (BANTAM, 
GROVE, AND SIMILAR), HOPTOS, BACKHOES, LOADERS, 
ROLLERS, AND DOZERS (CASE, JOHN DEERE, AND 
SIMILAR), WATER TRUCKS, TRUCKS REQUIRING A STATE OF 
HAWAII PUBLIC UTILITIES COMMISSION TYPE 5 AND/OR 
TYPE 7 LICENSE, SIT-DOWN TYPE AND ""GANG"" MOWERS, 
AND OTHER SELF-PROPELLED, SIT-DOWN OPERATED 
MACHINES NOT LISTED UNDER LANDSCAPE & IRRIGATION 
MAINTENANCE LABORER; CHEMICAL SPRAYING USING 
SELF-PROPELLED POWER SPRAYING EQUIPMENT (200 GALLON 
CAPACITY OR MORE)...................................$ 29.40                  17.15
----------------------------------------------------------------

 LABO0368-003 09/02/2024
                                                     Rates                  Fringes
UNDERGROUND LABORER, GROUP 1: WATCHMEN; CHANGE 
HOUSE ATTENDANT.....................................$ 42.35                  25.91
UNDERGROUND LABORER, GROUP 2: SWAMPER; BRAKEMAN; 
BULL GANG-MUCKERS, TRACKMEN; DUMPMEN (ANY METHOD); 
CONCRETE CREW (INCLUDES RODDING AND SPREADING); 
GROUT CREW; REBOUNDMEN..............................$ 43.85                  25.91
UNDERGROUND LABORER, GROUP 3: CHUCKTENDERS AND 
CABLETENDERS; POWDERMAN (PRIME HOUSE); VIBRATORMAN, 
PAVEMENT BREAKERS...................................$ 44.35                  25.91
UNDERGROUND LABORER, GROUP 4: MINERS - TUNNEL 
(INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE 
WORK); TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR 
SUBSTITUTE MATERIALS THEREOF); BLASTERS, DRILLERS, 
POWDERMAN (IN HEADING); MICROTUNNEL LABORER; 
HEADMAN; CHERRY PICKERMAN (WHERE CAR IS LIFTED); 
NIPPER; GROUT GUNMEN; GROUT PUMPMAN & POTMAN; 
GUNITE, SHOTCRETE GUNMEN & POTMEN; CONCRETE 
FINISHER (IN TUNNEL); CONCRETE SCREED MAN; BIT 
GRINDER; STEEL FORM RAISERS & SETTERS; HIGH 
PRESSURE NOZZLEMAN; NOZZLEMAN (ON SLICK LINE); 
SANDBLASTER-POTMAN (COMBINATION WORK ASSIGNMENT 
INTERCHANGEABLE); TUGGER............................$ 45.35                  25.91
UNDERGROUND LABORER, GROUP 5: SHAFT WORK & RAISE 
(BELOW ACTUAL OR EXCAVATED GROUND LEVEL); DIAMOND 
DRILLER; GUNITE OR SHOTCRETE NOZZLEMAN; RODMAN; 
GROUNDMAN...........................................$ 45.70                  25.91
UNDERGROUND LABORER, GROUP 6: SHIFTER...............$ 45.95                  25.91
UNDERGROUND LABORER, GROUP 7: SHIFTER (SHAFT WORK & 
RAISER).............................................$ 46.40                  25.91
----------------------------------------------------------------

 PAIN1791-001 07/01/2025
                                                     Rates                  Fringes
PAINTERS: BRUSH.....................................$ 44.05                  30.05
PAINTERS: SANDBLASTER; SPRAY........................$ 44.05                  30.05
----------------------------------------------------------------

 PAIN1889-001 07/01/2025
                                                     Rates                  Fringes
GLAZIERS............................................$ 48.50                  40.20
----------------------------------------------------------------

 PAIN1926-001 03/02/2025
                                                     Rates                  Fringes
SOFT FLOOR LAYERS...................................$ 43.27                  35.18
----------------------------------------------------------------

 PAIN1944-001 01/01/2025
                                                     Rates                  Fringes
TAPER...............................................$ 47.36                  32.00
----------------------------------------------------------------

 PLAS0630-001 09/04/2023
                                                     Rates                  Fringes
PLASTERER...........................................$ 46.12                  34.53
----------------------------------------------------------------

 PLAS0630-002 09/04/2023
                                                     Rates                  Fringes
CEMENT MASONS.......................................$ 44.12                  33.63
CEMENT MASONS: TROWEL MACHINE OPERATORS.............$ 44.27                  33.63
----------------------------------------------------------------

 PLUM0675-001 07/06/2025
                                                     Rates                  Fringes
PLUMBER, PIPEFITTER, STEAMFITTER & SPRINKLER FITTER.$ 53.83                  33.19
----------------------------------------------------------------

 ROOF0221-001 11/06/2022
                                                     Rates                  Fringes
ROOFERS (INCLUDING BUILT UP, COMPOSITION AND SINGLE 
PLY)................................................$ 43.15                  21.21
----------------------------------------------------------------

 SHEE0293-001 03/02/2025
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 50.16                  33.32
----------------------------------------------------------------

 SUHI1997-002 09/15/1997
                                                     Rates                  Fringes
DRAPERY INSTALLER...................................$ 13.60                  1.20
FENCE ERECTOR (CHAIN LINK FENCE)....................$ 9.33                  1.65
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
LABORERS: LABORER I: AIR BLASTING RUN BY ELECTRIC OR PNEUMATIC COMPRESSOR; ASPHALT
 LABORER, IRONER, RAKER, LUTEMAN, & HANDROLLER, AND ALL TYPES OF ASPHALT SPREADER
 BOXES; ASPHALT SHOVELER; ASSEMBLY & INSTALLATION OF MULTIPLATES, LINER PLATES, RINGS,
 MESH, MATS; BATCHING PLANT (PORTABLE & TEMPORARY); BORING MACHINE OPERATOR 
(UNDER STREETS & SIDEWALKS); BUGGYMOBILE; BURNING & WELDING; CHAINSAW, FALLER, 
LOGLOADER, & BUCKER; COMPACTORS (JACKSON JUMPING JACK & SIMILAR); CONCRETE BUCKET 
DUMPMAN; CONCRETE CHIPPING; CONCRETE CHUTEMAN/HOSEMAN (POURING CONCRETE) 
(THE HANDLING OF THE CHUTE FROM READY-MIX TRUCKS FOR SUCH JOBS AS WALLS, SLABS, 
DECKS, FLOORS, FOUNDATIONS, FOOTINGS, CURBS, GUTTERS, & SIDEWALKS); CONCRETE CORE 
CUTTER (WALLS, FLOORS, & CEILING); CONCRETE GRINDING OR SANDING; CONCRETE: HOOKING
 ON, SIGNALING, DUMPING OF CONCRETE FOR TREME WORK OVER WATER ON CAISSONS, 
PILINGS, ABUTMENTS, ETC.; CONCRETE: MIXING, HANDLING, CONVEYING, POURING, VIBRATING,
 OTHERWISE PLACING OF CONCRETE OR AGGREGATES OR BY ANY OTHER PROCESS; 
CONCRETE: OPERATION OF MOTORIZED WHEELBARROWS OR BUGGIES OR MACHINES OF 
SIMILAR CHARACTER, WHETHER RUN BY GAS, DIESEL, OR ELECTRIC POWER; CONCRETE 
PLACEMENT MACHINE OPERATOR: OPERATION OF SOMERO HAMMERHEAD, COPPERHEADS, OR
 SIMILAR MACHINES; CONCRETE PUMP MACHINE (LAYING, COUPLING, UNCOUPLING OF ALL 
CONNECTIONS & CLEANING OF EQUIPMENT); CONCRETE SHOVELERS/LABORERS (WET OR DRY); 
CONCRETE SCREEDING FOR ROUGH STRIKE-OFF: RODDING OR STRIKING-OFF, BY HAND OR 
MECHANICAL MEANS PRIOR TO FINISHING; CONCRETE VIBRATOR OPERATOR; 
CORING HOLES: WALLS, FOOTINGS, PIERS OR OTHER OBSTRUCTIONS FOR PASSAGE OF PIPES 
OR CONDUITS FOR ANY PURPOSE & THE POURING OF CONCRETE TO SECURE THE HOLE; 
CRIBBERS, SHORER, LAGGING, SHEETING, & TRENCH JACKING & BRACING, HAND-GUIDED 
LAGGING HAMMER WHALING BRACING;  CURBING (CONCRETE & ASPHALT); CURING OF 
CONCRETE (IMPERVIOUS MEMBRANE & FORM OILER)  MORTAR & OTHER MATERIALS BY ANY 
MODE OR METHOD; CUT GRANITE CURB SETTER (SETTING, LEVELING & GROUTING OF ALL 
PRECAST CONCRETE OR STONE CURBS); CUTTING & BURNING TORCH (DEMOLITION); DRI PAK-IT
 MACHINE; ENVIRONMENTAL ABATEMENT: REMOVAL OF ASBESTOS, LEAD, & BIO HAZARDOUS 
MATERIALS (EPA &/OR OSHA CERTIFIED); FALLING, BUCKING, YARDING, LOADING OR BURNING 
OF ALL TREES OR TIMBER ON CONSTRUCTION SITE; FORKLIFT (9 FT. & UNDER); GAS, PNEUMATIC, 
& ELECTRIC TOOLS; GRATING & GRILL WORK FOR DRAINS OR OTHER PURPOSES; GREEN CUTTER
OF CONCRETE OR AGGREGATE IN ANY FORM, BY HAND, MECHANICAL MEANS, GRINDSTONE OR 
AIR &/OR WATER; GROUT: SPREADING FOR ANY PURPOSE; GUINEA CHASER (GRADE CHECKER) 
FOR GENERAL UTILITY TRENCHES, SITEWORK, & EXCAVATION; HEADERBOARD MAN (ASPHALT OR 
CONCRETE); HEAT WELDER OF PLASTIC (LABORERS' AGC CERTIFIED WORKERS) (WHEN WORK 
INVOLVES WATERPROOFING FOR WATERPONDS, ARTIFICIAL LAKES & RESERVOIR) HEAT WELDING 
FOR SEWER PIPES & FUSION OF HDPE PIPES; HEAVY HIGHWAY LABORER (RIGGING, SIGNALING, 
HANDLING, & INSTALLATION OF PRE-CAST CATCH BASINS, MANHOLES, CURBS & GUTTERS); HIGH 
PRESSURE NOZZLEMAN - HYDRAULIC MONITOR (OVER 100# PRESSURE); JACKHAMMER OPERATOR; 
JACKING OF SLIP FORMS: ALL SEMI & UNSKILLED WORK CONNECTED THEREWITHIN; LAYING OF ALL 
MULTI-CELL CONDUIT OR MULTI-PURPOSE PIPE; MAGNESITE & MASTIC WORKERS (WET OR DRY)
(INCLUDING MIXER OPERATOR);MORTAR MAN; MORTAR MIXER (BLOCK, BRICK, MASONRY, & 
PLASTERING); NOZZLEMAN (SANDBLASTING &/OR WATER BLASTING): HANDLING, PLACING & 
OPERATION OF NOZZLE; OPERATION, MANUAL OR HYDRAULIC JACKING OF SHIELDS & THE USE OF 
SUCH OTHER MECHANICAL EQUIPMENT AS MAY BE NECESSARY; PAVEMENT BREAKERS; PAVING, 
CURBING & SURFACING OF STREETS, WAYS, COURTS, UNDER & OVERPASSES, BRIDGES, APPROACHES, 
SLOPE WALLS, & ALL OTHER LABOR CONNECTED THEREWITH; PILECUTTERS; PIPE ACCESSMENT IN 
PLACE, BOLTING & LINING UP OF SECTIONAL METAL OR OTHER PIPE INCLUDING CORRUGATED PIPE; 
PIPELAYER PERFORMING ALL SERVICES IN THE LAYING & INSTALLATION OF PIPE FROM THE POINT 
OF RECEIVING PIPE IN THE DITCH UNTIL COMPLETION OF OPERATION, INCLUDING ANY & ALL FORMS 
OF TUBULAR MATERIAL, WHETHER PIPE, HDPE, METALLIC OR NON-METALLIC, CONDUIT, & ANY 
OTHER STATIONARY-TYPE OF TUBULAR DEVICE USED FOR CONVEYING OF ANY SUBSTANCE OR 
ELEMENT, WHETHER WATER, SEWAGE, SOLID, GAS, AIR, OR OTHER PRODUCT WHATSOEVER & 
WITHOUT REGARD TO THE NATURE OF MATERIAL FROM WHICH TUBULAR MATERIAL IS FABRICATED; 
NO-JOINT PIPE & STRIPPING OF SAME, PIPEWRAPPER, CAULKER, BANDER, KETTLEMEN, & MEN 
APPLYING ASPHALT, LAYKOLD, TREATING CREOSOTE & SIMILAR-TYPE MATERIALS (6-INCH) PIPE & 
OVER); PIPING: RESURFACING & PAVING OF ALL DITCHES IN PREPARATION FOR LAYING OF ALL PIPES; 
PIPE LAYING OF LATERAL SEWER PIPE FROM MAIN OR SIDE SEWER TO BUILDINGS OR STRUCTURE 
(EXCEPT CONTACTOR MAY DIRECT WORK BE DONE UNDER PROPER SUPERVISION); PIPE LAYING, 
LEVELING & MARKING OF THE JOINT USED FOR MAIN OR SIDE SEWERS & STORM SEWERS; LAYING OF 
ALL CLAY, TERRA COTTA, IRONSTONE, VITRIFIED CONCRETE, HDPE OR OTHER PIPE FOR DRAINAGE; 
PLACING & SETTING OF WATER MAINS, GAS MAINS & ALL PIPE INCLUDING REMOVAL OF SKIDS; 
PLASTER MORTAR MIXER/PUMP; PNEUMATIC IMPACT WRENCH; PORTABLE SAWMILL OPERATION: 
CHOKER SETTERS, OFF BEARERS, & LUMBER HANDLERS CONNECTED WITH CLEARING; POSTHOLE 
DIGGER (HAND HELD, GAS, AIR & ELECTRIC); POWDERMAN'S TENDER; POWER BROOM SWEEPERS 
(SMALL); PREPARATION & COMPACTION OF ROADBEDS FOR RAILROAD TRACK LAYING, HIGHWAY 
CONSTRUCTION, & THE PREPARATION OF TRENCHES, FOOTINGS, ETC., FOR CROSS-COUNTRY 
TRANSMISSION BY PIPELINES, ELECTRICAL TRANSMISSION OR UNDERGROUND LINES OR CABLES 
(BY MECHANICAL MEANS); RAISING OF STRUCTURE BY MANUAL OR HYDRAULIC JACKS OR OTHER 
METHODS & RESETTING OF STRUCTURE IN NEW LOCATIONS, INCLUDING ALL CONCRETE WORK; 
RAMMING OR COMPACTION; RIGGING IN CONNECTION WITH LABORERS' WORK (EXCEPT 
DEMOLITION), SIGNALING (INCLUDING THE USE OF WALKIE TALKIE) CHOKE SETTING, TAG LINE 
USAGE; TAGGING & SIGNALING OF BUILDING MATERIALS INTO HIGH RISE UNITS; RIPRAP, 
STONEPAVER, & ROCK SLINGER (INCLUDES PLACEMENT OF STACKED CONCRETE, WET OR DRY & 
LOADING, UNLOADING, SIGNALING, SLINGING & SETTING OF OTHER SIMILAR MATERIALS); 
ROTARY SCARIFIER (INCLUDING MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER); SALAMANDER 
HEATER, DRYING OF PLASTER, CONCRETE MORTAR OR OTHER AGGREGATE; SCAFFOLD ERECTOR 
LEADMAN; SCAFFOLDS: (SWING & HANGING) INCLUDING MAINTENANCE THEREOF; SCALER; 
SEPTIC TANK/CESSPOOL & DRAIN FIELDS DIGGER & INSTALLER; SHREDDER/CHIPPER (TREE 
BRANCHES, BRUSH, ETC.); STRIPPING & SETTING FORMS; STRIPPING OF FORMS: OTHER THAN 
PANEL FORMS WHICH ARE TO BE RE-USED IN THEIR ORIGINAL FORM, & STRIPPING OF FORMS ON 
ALL FLAT ARCH WORK; TAMPERS (BARKO, WACKER, & SIMILAR TYPE); TANK SCALER & CLEANERS; 
TARMAN; TREE CLIMBERS & TRIMMERS; TRENCHER (INCLUDES HAND-HELD, DAVIS T-66 & SIMILAR 
TYPE); TRUCKS (FLATBED UP TO & INCLUDING 2 1/2 TONS WHEN USED IN CONNECTION WITH 
ON-SITE LABORERS'WORK; TRUCKS (REFUSE & GARBAGE DISPOSAL) (FROM JOB SITE TO DUMP); 
VIBRA-SCREED (BULL FLOAT IN CONNECTION WITH LABORERS' WORK); WELL POINTS, 
INSTALLATION OF OR ANY OTHER DEWATERING SYSTEM.

LABORERS: LABORER II:  ASPHALT PLANT LABORER; BORING MACHINE TENDER; BRIDGE LABORER;
 BURNING OF ALL DEBRIS (CRATES, BOXES, PACKAGING WASTE MATERIALS);  CHAINMAN, 
RODMEN, & GRADE MARKERS; CLEANING, CLEARING, GRADING &/OR REMOVAL FOR STREETS, 
HIGHWAYS, ROADWAYS, APRONS, RUNWAYS, SIDEWALKS, PARKING AREAS, AIRPORTS, 
APPROACHES, & OTHER SIMILAR INSTALLATIONS; CLEANING OR RECONDITIONING OF STREETS, 
WAYS, SEWERS & WATERLINES, ALL MAINTENANCE WORK & WORK OF AN UNSKILLED & 
SEMI-SKILLED NATURE; CONCRETE BUCKET TENDER (GROUNDMAN) HOOKING & UNHOOKING OF 
BUCKET; CONCRETE FORMS; MOVING, CLEANING, OILING & CARRYING TO THE NEXT POINT OF 
ERECTION OF ALL FORMS; CONCRETE PRODUCTS PLANT LABORERS; CONVEYOR TENDER 
(CONVEYING OF BUILDING MATERIALS);  CRUSHED STONE YARDS & GRAVEL & SAND PIT LABORERS 
& ALL OTHER SIMILAR PLANTS; DEMOLITION, WRECKING & SALVAGE LABORERS: WRECKING & 
DISMANTLING OF BUILDINGS & ALL STRUCTURES, WITH USE OF CUTTING OR WRECKING TOOLS, 
BREAKING AWAY, CLEANING & REMOVAL OF ALL FIXTURES, ALL HOOKING, UNHOOKING, 
SIGNALING OF MATERIALS FOR SALVAGE OR SCRAP REMOVED BY CRANE OR DERRICK; DIGGING 
UNDER STREETS, ROADWAYS, APRONS OR OTHER PAVED SURFACES; DRILLER'S TENDER; CHUCK 
TENDER, OUTSIDE 
NIPPER; DRY-PACKING OF CONCRETE (PLUGGING & FILLING OF SHE-BOLT HOLES); FENCE &/OR 
GUARDRAIL ERECTOR: DISMANTLING &/OR RE-INSTALLATION OF ALL FENCE; FINEGRADER; 
FIREWATCHER; FLAGMAN (CONING, PREPARING, STABLISHING & REMOVING PORTABLE ROADWAY 
BARRICADE DEVICES); SIGNAL MEN ON ALL CONSTRUCTION WORK DEFINED HEREIN, INCLUDING 
TRAFFIC CONTROL SIGNAL MEN AT CONSTRUCTION SITE; GENERAL EXCAVATION; BACKFILLING, 
GRADING & ALL OTHER LABOR CONNECTED THEREWITH; DIGGING OF TRENCHES, DITCHES & 
MANHOLES & THE LEVELING, GRADING & OTHER PREPARATION PRIOR TO LAYING PIPE OR 
CONDUIT FOR ANY PURPOSE; EXCAVATIONS & FOUNDATIONS FOR BUILDINGS, PIERS, 
FOUNDATIONS & HOLES, & ALL OTHER CONSTRUCTION. PREPARATION OF STREET WAYS & 
BRIDGES; GENERAL LABORER: CLEANING & CLEARING OF ALL DEBRIS & SURPLUS MATERIAL. 
CLEAN-UP OF RIGHT-OF-WAY. CLEARING & SLASHING OF BRUSH OR TREES BY HAND OR 
MECHANICAL CUTTING. GENERAL CLEAN UP: SWEEPING, CLEANING, WASH-DOWN, WIPING OF 
CONSTRUCTION FACILITY & EQUIPMENT (OTHER THAN ""LIGHT CLEAN UP (JANITORIAL) LABORER. 
GARBAGE & DEBRIS HANDLERS & CLEANERS. APPLIANCE HANDLING (JOB SITE) (AFTER DELIVERY 
UNLADING IN STORAGE AREA); GROUND & SOIL TREATMENT WORK (PEST CONTROL); 
GUNITE/SHOTCRETE OPERATOR TENDER; JUNK YARD LABORERS (SAME AS SALVAGE YARD); 
LASER BEAM ""TARGET MAN"" IN CONNECTION WITH LABORERS' WORK; LAYOUT PERSON FOR 
PLASTIC (WHEN WORK INVOLVES WATERPROOFING FOR WATERPONDS, ARTIFICIAL LAKES & 
RESERVOIRS); LIMBERS, BRUSH LOADERS, & PILERS; LOADING, UNLOADING, CARRYING, 
DISTRIBUTING & HANDLING OF ALL RODS & MATERIAL FOR USE IN REINFORCING CONCRETE 
CONSTRUCTION (EXCEPT WHEN A DERRICK OR OUTRIGGER OPERATED BY OTHER THAN HAND 
POWER IS USED); LOADING, UNLOADING, SORTING, STOCKPILING, HANDLING & DISTRIBUTION 
OF WATER MAINS, GAS MAINS & ALL PIPES; LOADING & UNLOADING OF ALL MATERIALS, FIXTURES, 
FURNISHINGS & APPLIANCES FROM POINT OF DELIVERY TO STOCKPILE TO POINT OF 
INSTALLATION; HOOKING & SIGNALING FROM TRUCK, CONVEYANCE OR STOCKPILE; MATERIAL 
YARD LABORERS; PIPELAYER TENDER; PIPEWRAPPER, CAULKER, BANDER, KETTLEMEN, & MEN 
APPLYING ASPHALT, LAYKOLD, CREOSOTE, & SIMILAR-TYPE MATERIALS (PIPE UNDER 6 INCHES); 
PLASTERER LABORER; PREPARATION, CONSTRUCTION & MAINTENANCE OF ROADBEDS & 
SUB-GRADE FOR ALL PAVING, INCLUDING EXCAVATION, DUMPING, & SPREADING OF SUB-GRADE 
MATERIAL; PRESTRESSED OR PRECAST CONCRETE SLABS, WALLS, OR SECTIONS: ALL LOADING, 
UNLOADING, STOCKPILING, HOOKING ON OF SUCH SLABS, WALLS OR SECTIONS; QUARRY 
LABORERS; RAILROAD, STREETCAR, & RAIL TRANSIT MAINTENANCE & REPAIR; ROUSTABOUT; 
RUBBISH TRUCKS IN CONNECTION WITH BUILDING CONSTRUCTION PROJECTS (EXCLUDING 
CLEARING, GRUBBING, & EXCAVATING); SALVAGE YARD: ALL WORK CONNECTED WITH CUTTING, 
CLEANING, STORING, STOCKPILING OR HANDLING OF MATERIALS, ALL CLEANUP, REMOVAL OF 
DEBRIS, BURNING, BACK-FILLING & LANDSCAPING OF THE SITE; SANDBLASTING TENDER (POT 
TENDER):  HOSES & POTS OR MARKERS; SCAFFOLDS: ERECTION, PLANKING & REMOVAL OF ALL 
SCAFFOLDS USED FOR SUPPORT FOR LATHERS, PLASTERS, BRICK LAYERS, MASONS, & OTHER 
CONSTRUCTION TRADES CRAFTS; SCAFFOLDS: (SPECIALLY DESIGNED BY CARPENTERS) LABORERS 
SHALL TEND SAID CARPENTER ON ERECTION & DISMANTLING THEREOF, PREPARATION FOR 
FOUNDATION OR MUDSILLS, MAINTENANCE; SCRAPING OF FLOORS; SCREEDS: HANDLING OF 
ALL SCREEDS TO BE REUSED; HANDLING, DISMANTLING & CONVEYANCE OF SCREEDS; SETTING, 
LEVELING & SECURING OR BRACING OF METAL OR OTHER ROAD FORMS & EXPANSION JOINTS; 
SHEETING PILING/TRENCH SHORING (HANDLING & PLACING OF SKIP SHEET OR WOOD PLANK 
TRENCH SHORING); SHIP SCALERS; SHIPWRIGHT TENDER; SIGN ERECTOR (SUBDIVISION TRAFFIC, 
REGULATORY, & STREET-NAME SIGNS); SLOPER; SLURRY SEAL CREWS (MIXER OPERATOR, 
APPLICATOR, SQUEEGEE MAN, SHUTTLE MAN, TOP MAN); SNAPPING OF WALL TIES & REMOVAL 
OF TIE RODS; SOIL TEST OPERATIONS OF SEMI & UNSKILLED LABOR SUCH AS FILLING SAND 
BAGS; STRIPER (ASPHALT, CONCRETE OR OTHER PAVED SURFACES); TOOL ROOM ATTENDANT 
(JOB SITE); TRAFFIC DELINEATING DEVICE APPLICATOR; UNDERPINNING, LAGGING, BRACING, 
PROPPING & SHORING, LOADING, SIGNALING, RIGHT-OF-WAY CLEARANCE ALONG THE ROUTE 
OF MOVEMENT, THE CLEARANCE OF NEW SITE, EXCAVATION OF FOUNDATION WHEN MOVING 
A HOUSE OR STRUCTURE FROM OLD SITE TO NEW SITE; UTILITIES EMPLOYEES; WATER MAN; 
WATERSCAPE/HARDSCAPE LABORERS; WIRE MESH PULLING (ALL CONCRETE POURING 
OPERATIONS); WRECKING, STRIPPING, DISMANTLING & HANDLING CONCRETE FORMS AN FALSE 
WORK.
	
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================

  END OF GENERAL DECISION"

All Hawaii determinations: county index · Hawaii prevailing wage · compute pay with the calculator.