Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of IL20260008 rev 2
"General Decision Number: IL20260008 05/18/2026
State: Illinois
Construction Types: Building and Residential
Counties: Illinois Counties of
Du Page, Grundy, Kane, Kendall, Lake,
McHenry and Will
Excludes Landscape Projects
Modification Number Publication Date
1 01/09/2026
2 05/18/2026
ASBE0017-005 06/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL, SCRAPPING VACUUMING,
BAGGING AND DISPOSING OF ALL INSULATION MATERIALS
FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN
ASBESTOS OR NOT)....................................$ 41.27 32.76
FIRE STOP TECHNICIAN................................$ 44.02 32.76
ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION
OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS)............................................$ 55.02 35.75
----------------------------------------------------------------
BOIL0001-003 05/01/2024
Rates Fringes
BOILERMAKER (DU PAGE, GRUNDY, KANE, KENDALL, LAKE,
MCHENRY, AND WILL COUNTIES).........................$ 53.10 38.54
----------------------------------------------------------------
BRIL0014-001 06/01/2021
Rates Fringes
BRICKLAYER (DU PAGE, GRUNDY, LAKE, AND WILL
COUNTIES)...........................................$ 48.56 34.05
----------------------------------------------------------------
BRIL0021-002 06/01/2021
Rates Fringes
MARBLE SETTER.......................................$ 47.71 33.20
----------------------------------------------------------------
BRIL0021-008 06/01/2021
Rates Fringes
TILE SETTER.........................................$ 49.75 30.79
TILE FINISHER.......................................$ 42.80 26.97
TERRAZZO WORKER/SETTER..............................$ 48.38 30.79
----------------------------------------------------------------
BRIL0021-010 06/01/2017
Rates Fringes
MARBLE FINISHER.....................................$ 33.95 26.03
----------------------------------------------------------------
BRIL0027-002 06/01/2016
Rates Fringes
BRICKLAYER (KANE, KENDALL, AND MCHENRY COUNTIES)....$ 44.88 26.62
----------------------------------------------------------------
CARP0555-003 06/01/2022
Rates Fringes
CARPENTER: HEAVY & HIGHWAY (DUPAGE ANE LAKE
COUNTIES)...........................................$ 52.01 38.85
CARPENTER: BUILDING (DUPAGE ANE LAKE COUNTIES)......$ 52.01 38.85
----------------------------------------------------------------
CARP0555-004 10/01/2023
Rates Fringes
CARPENTER: RESIDENTIAL (DU PAGE AND LAKE COUNTIES)..$ 45.61 35.31
----------------------------------------------------------------
CARP0555-006 06/01/2022
Rates Fringes
CARPENTER; MILLWRIGHT; PILEDRIVERMEN (WILL COUNTY
BUILDING)...........................................$ 52.01 41.41
----------------------------------------------------------------
CARP0555-007 10/01/2023
Rates Fringes
CARPENTER (WILL COUNTY RESIDENTIAL)................$ 45.61 35.31
----------------------------------------------------------------
CARP0555-009 06/01/2022
Rates Fringes
CARPENTER: CARPENTER, FLOOR LAYER, LATHER,
MILLWRIGHT, AND PILEDRIVER (KANE, KENDALL, AND
MCHENRY COUNTIES BUILDING).........................$ 52.01 38.86
----------------------------------------------------------------
CARP0555-010 10/01/2023
Rates Fringes
CARPENTER (KANE, KENDALL, AND MCHENRY COUNTIES
RESIDENTIAL)........................................$ 45.61 35.31
----------------------------------------------------------------
CARP0555-012 10/01/2023
Rates Fringes
CARPENTER, CARPENTER, MILLWRIGHT, PILEDRIVER, AND
SOFT FLOOR LAYER (GRUNDY COUNTY)....................$ 45.61 35.31
----------------------------------------------------------------
ELEC0009-002 05/26/2024
Rates Fringes
LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR
(WILL COUNTY).......................................$ 62.10 37.29
LINE CONSTRUCTION: GROUNDMAN (WILL COUNTY)..........$ 48.44 29.09
----------------------------------------------------------------
ELEC0117-002 06/02/2025
Rates Fringes
ELECTRICIAN: BUILDING (KANE (NORTHERN HALF) AND
MCHENRY COUNTIES)...................................$ 59.11 42.23
----------------------------------------------------------------
ELEC0117-003 11/03/2025
Rates Fringes
ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES
THE INSTALLATION, MAINTENANCE AND REMOVAL OF
TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA
AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS
THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND
SHARE A COMMON CABLE, AND DATA INSIDE WIRE,
INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE,
PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS,
CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA
NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL
NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE
IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS.
KANE (NORTHERN HALF), AND MCHENRY COUNTIES)......$ 48.71 35.87
----------------------------------------------------------------
ELEC0117-004 11/04/2024
Rates Fringes
ELECTRICIAN: RESIDENTIAL (KANE (NORTHERN HALF) AND
MCHENRY COUNTIES)...................................$ 44.40 34.59
----------------------------------------------------------------
ELEC0150-002 06/02/2025
Rates Fringes
ELECTRICIAN: BUILDING (LAKE COUNTY).................$ 51.87 51.77
----------------------------------------------------------------
ELEC0150-003 12/01/2025
Rates Fringes
ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES
THE INSTALLATION, MAINTENANCE AND REMOVAL OF
TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA
AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS
THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND
SHARE A COMMON CABLE, AND DATA INSIDE WIRE,
INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE,
PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS,
CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA
NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL
NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE
IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS.
(LAKE COUNTY)......................................$ 48.00 39.85
----------------------------------------------------------------
ELEC0176-003 06/01/2023
Rates Fringes
ELECTRICIAN: RESIDENTIAL (GRUNDY AND WILL COUNTIES).$ 46.87 33.38
----------------------------------------------------------------
ELEC0176-008 06/01/2023
Rates Fringes
ELECTRICIAN: BUILDING (GRUNDY AND WILL COUNTIES)....$ 52.00 45.01
----------------------------------------------------------------
ELEC0176-015 06/01/2024
Rates Fringes
ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES
THE INSTALLATION, MAINTENANCE AND REMOVAL OF
TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA
AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS
THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND
SHARE A COMMON CABLE, AND DATA INSIDE WIRE,
INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE,
PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS,
CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA
NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL
NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE
IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS.
(GRUNDY AND WILL COUNTIES)..........................$ 44.00 37.91
----------------------------------------------------------------
ELEC0461-002 06/02/2025
Rates Fringes
ELECTRICIAN: BUILDING (KANE (SOUTHERN HALF) AND
KENDALL COUNTIES)...................................$ 60.17 43.50
----------------------------------------------------------------
ELEC0461-005 11/03/2025
Rates Fringes
ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES
THE INSTALLATION, MAINTENANCE AND REMOVAL OF
TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA
AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS
THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND
SHARE A COMMON CABLE, AND DATA INSIDE WIRE,
INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE,
PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS,
CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA
NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL
NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE
IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS.
(KANE (SOUTHERN HALF), AND KENDALL COUNTIES)......$ 49.70 38.45
----------------------------------------------------------------
ELEC0701-002 11/04/2019
Rates Fringes
ELECTRICIAN: RESIDENTIAL (DUPAGE COUNTY)............$ 39.60 32.25
----------------------------------------------------------------
ELEC0701-003 09/01/2025
Rates Fringes
ELECTRICIAN: ELECTRICAL TECHNICIAN: WORK INCLUDES
THE INSTALLATION, MAINTENANCE AND REMOVAL OF
TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA
AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS
THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND
SHARE A COMMON CABLE, AND DATA INSIDE WIRE,
INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE,
PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS,
CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA
NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL
NETWORK).THE WORK SHALL COVER THE PULLING OF WIRE
IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS.
(DU PAGE COUNTY)....................................$ 40.90 44.32
----------------------------------------------------------------
ELEV0002-002 01/01/2025
Rates Fringes
ELEVATOR MECHANIC (DU PAGE, KANE, KENDALL, LAKE,
& WILL COUNTIES) FOOTNOTES: A) PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY
AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS
DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR
HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEE
WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR
EMPLOYEE WITH LESS THAN 5 YEARS SERVICE.............$ 70.68 38.44
----------------------------------------------------------------
ELEV0015-002 01/01/2025
Rates Fringes
ELEVATOR MECHANIC MCHENRY COUNTY) FOOTNOTES:
A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC
HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES
WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER
5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY,
VETERANS' DAY AND CHRISTMAS DAY.....................$ 61.96 38.44
----------------------------------------------------------------
ELEV0055-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC (GRUNDY COUNTY) FOOTNOTES:
A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC
HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES
WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER
5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S
DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
THANKSGIVING DAY; DAY AFTER THANKSGIVING; VETERANS'
DAY & CHRISTMAS DAY.................................$ 57.99 38.44
----------------------------------------------------------------
ENGI0150-026 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND
RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER
LOADERS; BRICK FORKLIFTS; OILERS....................$ 59.20 51.00
OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND
RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1
TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR
COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL
EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND
UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS,
MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR
RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE
DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS
OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT);
PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5);
WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP
TO AND INCLUDING 3/4 CU YD).........................$ 60.95 51.00
OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND
RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS;
BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS;
CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR,
PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER;
HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4
CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS;
HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER
SINGLE DRUM; LASER SCREED; ROCK DRILL
(SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*;
ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN
VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER
HOUR); WINCH TRUCKS WITH ""A"" FRAME. *-REQUIRES
OILER...............................................$ 63.50 51.00
OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND
RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT
SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON
ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO
ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON
RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE
FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE
VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE
CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED;
CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER
27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE
PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED);
CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*;
CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO
OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC;
DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND
GUTTER MACHINE*; GRADER, ELEVATING; GROUTING
MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4
YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK
AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO,
AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR;
HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS;
HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES;
MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST
HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL
RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP
CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM
BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO
MILL GRINDER (36"" AND OVER)*; ROTO MILL GRINDER
(LESS THAN 36"")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM
PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH
BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*.
*-REQUIRES OILER....................................$ 64.80 51.00
----------------------------------------------------------------
IRON0001-014 06/01/2025
Rates Fringes
IRONWORKER: STRUCTURAL AND REINFORCING (DU PAGE
(EASTERN 1/4), LAKE, AND MCHENRY (HEBRON,
WOODSTOCK, AND EAST THEREOF) COUNTIES)..............$ 62.46 46.58
IRONWORKER: SHEETER (DU PAGE (EASTERN 1/4), LAKE,
AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF)
COUNTIES)...........................................$ 62.71 46.58
----------------------------------------------------------------
IRON0063-003 06/01/2025
Rates Fringes
IRONWORKER, ORNAMENTAL (LAKE, DUPAGE (EASTERN 1/4)
AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF)
COUNTIES)...........................................$ 59.26 44.81
----------------------------------------------------------------
IRON0063-004 06/01/2025
Rates Fringes
IRONWORKER: FENCE ERECTOR (LAKE, DUPAGE (EASTERN
1/4), AND MCHENRY (HEBRON, WOODSTOCK & EAST
THEREOF) COUNTIES)..................................$ 52.25 34.31
----------------------------------------------------------------
IRON0136-002 07/01/2025
Rates Fringes
IRONWORKER: MASTER RIGGERS (LAKE, DUPAGE (EASTERN
1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF)
COUNTIES)...........................................$ 56.75 47.38
IRONWORKER: MACHINERY MOVERS; RIGGERS; MACHINERY
ERECTORS (LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY
(HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES)........$ 54.25 47.38
----------------------------------------------------------------
IRON0393-002 06/01/2021
Rates Fringes
IRONWORKER (DUPAGE (REMAINDER), KANE, KENDALL
(NORTHERN PART), AND MCHENRY (SOUTHEAST 1/4)
COUNTIES)...........................................$ 48.83 39.84
----------------------------------------------------------------
IRON0444-002 06/01/2022
Rates Fringes
IRONWORKER (DUPAGE (ARGONNE & VIC), GRUNDY, KENDALL
(SOUTHERN PART), AND WILL COUNTIES).................$ 47.80 42.50
----------------------------------------------------------------
IRON0498-006 06/01/2021
Rates Fringes
IRONWORKER (MCHENRY COUNTY (NORTHWEST PART))........$ 41.37 44.41
----------------------------------------------------------------
LABO0002-003 06/01/2025
Rates Fringes
LABORER GROUP 12 DOSIMETER (ANY DEVICE) MONITORING
NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORERS;
TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (DU PAGE
COUNTY).............................................$ 52.40 36.94
LABORER GROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK
ONLY (DU PAGE COUNTY)...............................$ 51.68 36.94
LABORER GROUP 10 BOILER SETTER PLASTIC LABORERS (DU
PAGE COUNTY)........................................$ 51.85 36.94
LABORER GROUP 9 CHIMNEY ON FIRE BRICK; CAISSON
DIGGERS; WELL POINT SYSTEM MEN (DU PAGE COUNTY).....$ 51.75 36.94
LABORER GROUP 8 FIREBRICK & BOILER LABORERS (DU
PAGE COUNTY)........................................$ 51.73 36.94
LABORER GROUP 7 JACKHAMMERMEN, POWER DRIVEN
CONCRETE SAWS AND OTHER POWER EQUIPMENT (DU PAGE
COUNTY).............................................$ 51.63 36.94
LABORER GROUP 6 STONE DERRICKMEN AND HANDLERS (DU
PAGE COUNTY)........................................$ 51.60 36.94
LABORER GROUP 5 CEMENT GUN NOZZLE (GUNITE)
LABORERS; WINDLASS AND CAPSTAN PERSON (DU PAGE
COUNTY).............................................$ 51.55 36.94
LABORER GROUP 4 CHIMNEY OVER 40 FEET; SCAFFOLD
LABORERS; WELDMAN-WRECKERS BURNERS (DU PAGE
COUNTY).............................................$ 51.50 36.94
LABORER GROUP 3 CEMENT GUN LABORERS AND HOSE (DU
PAGE COUNTY)........................................$ 51.48 36.94
LABORER GROUP 2 FIREPROOFING AND FIRE SHOP
LABORERS (DU PAGE COUNTY)...........................$ 51.40 36.94
LABORER GROUP 1 BUILDING LABORERS, PLASTERER
TENDERS, PUMPS FOR DEWATERING & OTHER UNCLASSIFIED
LABORERS (DU PAGE COUNTY)...........................$ 51.40 36.94
----------------------------------------------------------------
LABO0075-001 06/01/2022
Rates Fringes
LABORER GROUP 7 DOSIMETER (ANY DEVICE) USED FOR
MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT
WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER;
AND CHIMNEY AND SILO LABORERS FOR EVERY ADDITIONAL
50 FEET OR ANY PART THEREOF ABOVE 100 FEET HIGH
(GRUNDY AND WILL COUNTIES)..........................$ 47.60 33.16
LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS;
CAISSON LABORERS 50 FEET OR MORE BELOW GROUND
LEVEL; LABORERS WORKING UNDER RADIO ACTIVE
CONDITIONS (SUITING UP); BLASTING MEN (POWDERMEN)
(GRUNDY AND WILL COUNTIES)..........................$ 47.75 33.16
LABORER GROUP 5 GUNNITE NOZZLE MEN; CAISSON
LABORERS AND ALL TAMPING HAMMERS FROM 150 LBS AND
OVER; FROM 15 FEET BELOW GROUND LEVEL DOWN TO 50
FEET; AND ALL LABORERS WORKING INSIDE OF A SPHERE
OR ANY TYPE OF TANK FOR EVERY ADDITIONAL 50 FEET OR
PART THEREOF ABOVE 100 FEET IN HEIGHT (GRUNDY AND
WILL COUNTIES)......................................$ 47.60 33.16
LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS
INSIDE TUNNEL; AIR BLOW PIPEMEN; TORCHMEN
(BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE
(THE APPLYING OF MORTAR AND COMPOSITION MIXES); ALL
BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN
PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE
OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE
BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH
LABORERS 8 FEET OR MORE BELOW GROUND LEVEL
REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK
INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL
STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND
LEVEL DOWN 15 FEET; ALL AIR TOOLS 8 FEET OR MORE
BELOW GROUND LEVEL; ALL LABORERS WORKING ON
SWINGING-SUSPENDED OR ANY TYPE OR MAKE OF
SCAFFOLDS, 48 FEET TO 100 FEET; ALL CHIMNEY AND
SILO LABORERS WORKING AT A HEIGHT OF 48 TO 100
FEET; ALL TAMPING HAMMERS OVER 150 LBS.; ALL
LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OR
MAKE OF TANK AT A HEIGHT OF 48 FEET TO 100 FEET;
ALL HYDRAULIC, ELECTRIC AND AIR TOOLS OR ANY OTHER
TYPE 8 FEET OR MORE BELOW GROUND LEVEL;
VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND
LEVEL (GRUNDY AND WILL COUNTIES)...................$ 47.60 33.16
LABORER GROUP 3 ASPHALT RAKERS; HOD CARRIERS;
PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR
SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORT
RUNAWAYS, AND RADII (ANY TYPE OF FORM) STRINGLINE
MEN FOR ALL AFOREMENTIONED WORK; WAGON AND TOWER
DRILLERS ON LAND AND FLOATING PLANT USED ON
DREDGING; ASPHALT GUNNERS AND PLUG MEN
(UNDERCOATING ON ROAD WORK); MORTAR PUMP LABORERS;
PLASTER PUMP LABORERS (GRUNDY AND WILL COUNTIES)...$ 47.48 33.16
LABORER GROUP 2 SEWER AND DRAIN PIPE LAYERS AND
MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE
USED, ON PUBLIC UTILITY WORK (GROUND LEVEL TO 8
FEET); PUMPCRETE PIPE HANDLERS (GRUNDY AND WILL
COUNTIES)...........................................$ 47.40 33.16
LABORER GROUP 1 MORTAR MIXERS, HANDLING ASPHALT
SHINGLES; SCAFFOLDS; SEWER AND TRENCH WORK (GROUND
LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE
DIGGERS, MESH HANDLING ON ROAD WORK; CEMENT AND
MINERAL FILLER HANDLER; CONCRETE PUDDLERS; BATCH
DUMPERS (CEMENT & ASPHALT); VIBRATOR OPERATORS;
SAND AND STONE WHEELERS TO MIXER HANDLERS);
CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE &
PAVING BREAKERS; ROCK DRILLERS/JACKHAMMERMEN;
CHIPPING HAMMERMEN 1-BAG MIXER; ASPHALT LABORER;
CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS;
MASON TENDERS (MORTAR AND BRICK WHEELER); KETTLEMEN
& TARMEN, TANK CLEANERS; SCAFFOLD AND STAGING
LABORERS; POT FIREMEN (TARMEN); HEATERS TENDER FOR
ANY PURPOSE; WATER PUMPS (PORTABLE WATER PUMPS
SHALL BE TENDED BY LABORERS IF THE EMPLOYER
DETERMINES TENDING IS REQUIRED); RIP RAP; HANDLING
OF SLAB STEEL ROAD FORMS IN ANY MANNER, EXCEPT ROAD
FORM SETTING, SETTING CENTER STRIPS, CONTRACTION
AND EXPANSION JOINTS (ROAD WORK); UNLOADING AND
HANDLING OF LUMBER, BRICK, TRANSITE MATERIALS, CAST
IRON WATER PIPE, REINFORCED CONCRETE RODS, SEWER
AND DRAIN TILE, RAILROAD TILES AND ALL OTHER
CREOSOTED MATERIALS; PAVING BLOCKS AND CONCRETE
FORMS; HANDLING OF INSULATION OF ANY TYPE; ALL WORK
INVOLVING THE UNLOADING OF MATERIALS, FIXTURES, OR
FURNISHING, WHETHER CRATED OR UNCRATED; ALL MORTAR
AND COMPOSITION MIXERS OF SEWER WORK; TRACK
LABORERS; CHIMNEY AND SILO LABORERS WORKING AT A
HEIGHT OF 1 TO 48 FEET; ALL LABORERS WORKING ON
SWINGING SUSPENDED, OR ANY TYPE OR MAKE OF
SCAFFOLDING 1 TO 48 FEET; ALL LABORERS WORKING
INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK;
WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK
FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS
(ANY TYPE); MECHANICAL OR MOTORIZED BUGGIES, FOR
CONCRETE OR MASONS EMPLOYERS; USE OF SKID STEER
LOADS OR ANY OTHER MACHINERY WHICH REPLACES THE
WHEELBARROW OR BUGGY; HANDLING MULTIPLE CONCRETE
DUCT OR ANY OTHER TYPE OF PIPE USED IN PUBLIC
UTILITY WORK UNLESS OTHERWISE SPECIFIED HEREIN;
SNAPPING OF WALL TIES AND REMOVAL OF RODS; DRILLING
OF ANCHOR BOLT HOLES; CONCRETE OR ASPHALT CLIPPER
TYPE SAWS AND SELF-PROPELLED SAWS; SHOULDER AND
GRADE LABORERS; ALL HYDRAULIC ELECTRIC AND AIR OR
ANY OTHER TYPE OF TOOLS; GROUTING AND CAULKING;
CLEANING LUMBER, NAIL PULLING, DECK HAND;
DREDGEHAND; SHORE LABORER; BANKMEN ON FLOATING
PLANT; TOOL AND MATERIAL CHECKERS; SIGNALMEN AND
FLAGMEN ON ALL CONSTRUCTION WORK; CLEANING OF
DEBRIS; REMOVAL OF TREES; CONCRETE CURING,
TEMPORARY CONCRETE PROTECTION REGARDLESS OF MANNER
OR MATERIALS USED; LABORERS ON APSCO; JANITORIAL;
WRECKING AND DEMOLITION LABORERS (GRUNDY AND WILL
COUNTIES)...........................................$ 47.40 33.16
----------------------------------------------------------------
LABO0149-001 06/01/2025
Rates Fringes
LABORER: GROUP 2 POWER VIBRATOR KANE,
KENDALL, AND MCHENRY COUNTIES.......................$ 51.65 36.94
LABORER: GROUP 1 COMMON LABORER KANE,
KENDALL, AND MCHENRY COUNTIES.......................$ 51.40 36.94
LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS,
TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS,
DOSIMETER (ANY DEVICE) MONITORING NUCLEAR
EXPOSUREANE KENDALL, AND MCHENRY COUNTIES........$ 51.80 36.94
LABORER GROUP 7 CAISSON LABORERS; DYNAMITERS
KANE, KENDALL, AND MCHENRY COUNTIES.................$ 52.10 36.94
LABORER GROUP 6 TILE LAYERS; BOTTOM MEN
KANE, KENDALL, AND MCHENRY COUNTIES.................$ 52.10 36.94
LABORER GROUP 5 JACKHAMMER & AIRSPADE; CHAINSAW,
SWINGING STAGE AND BOATSWAIN CHAIR; CEMENT GUN
NOZZLEMAN; HOD CARRIER; PLASTERER TENDER, AND
TUNNEL MAN KANE, KENDALL, AND MCHENRY COUNTIES.$ 51.65 36.94
LABORER GROUP 4 POWER TAMPER KANE, KENDALL,
AND MCHENRY COUNTIES................................$ 51.65 36.94
LABORER GROUP 3 TORCHMAN (DEMOLITION ONLY),
MORTARMEN KANE, KENDALL, AND MCHENRY COUNTIES..$ 51.40 36.94
----------------------------------------------------------------
LABO0152-001 06/01/2025
Rates Fringes
LABORER GROUP 11 DOSIMETER (ANY DEVICE) MONITORING
NUCLEAR EXPOSURE; ASBESTOS ABATEMENT LABORERS;
TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (LAKE
COUNTY).............................................$ 51.60 36.94
LABORER GROUP 10 BOILER SETTER PLASTIC LABORERS
(LAKE COUNTY).......................................$ 51.95 36.94
LABORER GROUP 9 WINDLASS AND CAPSTAN PERSONS (LAKE
COUNTY).............................................$ 51.60 36.94
LABORER GROUP 8 CHIMNEY LABORERS (ON FIRE BRICK);
CAISSON DIGGERS; WELL POINT SYSTEM MEN (LAKE
COUNTY).............................................$ 51.75 36.94
LABORER GROUP 7 FIREBRICK & BOILER LABORER SETTERS
(LAKE COUNTY).......................................$ 51.73 36.94
LABORER GROUP 6 JACKHAMMERMEN (TAMPERS &
VIBRATORS); POWER DRIVEN CONCRETE SAWS (LAKE
COUNTY).............................................$ 51.63 36.94
LABORER GROUP 5 STONE DERRICKMEN AND HANDLERS
(LAKE COUNTY).......................................$ 51.60 36.94
LABORER GROUP 4 CEMENT GUN NOZZLE (GUNITE)
LABORERS (LAKE COUNTY)..............................$ 51.60 36.94
LABORER GROUP 3 CHIMNEY OVER 40 FEET; SCAFFOLD
LABORERS; WALL MEN OR WRECKERS (LAKE COUNTY).......$ 51.50 36.94
LABORER GROUP 2 CEMENT GUN LABORERS AND HOSE (LAKE
COUNTY).............................................$ 51.48 36.94
LABORER GROUP 1 BUILDING LABORERS; PLASTERER
TENDERS, GENERAL LABORERS (WRECKING AND
DEMOLITION); FIREPROOFING AND FIRE SHOP LABORERS
(LAKE COUNTY).......................................$ 51.40 36.94
----------------------------------------------------------------
PAIN0014-002 06/01/2024
Rates Fringes
PAINTER: BRUSH, DECORATOR, AND PAPERHANGER (GRUNDY,
LAKE, AND WILL COUNTIES)............................$ 53.05 33.91
----------------------------------------------------------------
PAIN0027-003 06/01/2024
Rates Fringes
GLAZIER.............................................$ 51.55 44.09
----------------------------------------------------------------
PAIN0030-001 06/01/2024
Rates Fringes
PAINTER: BRUSH, DRYWALL TAPER/FINISHER,
SANDBLASTER, AND SPRAY (DE KALB, DU PAGE, KANE,
KENDALL AND MCHENRY COUNTIES).......................$ 53.05 27.63
----------------------------------------------------------------
PLAS0005-003 07/01/2015
Rates Fringes
PLASTERER (GRUNDY AND WILL COUNTIES)................$ 42.25 26.65
----------------------------------------------------------------
PLAS0005-006 07/01/2015
Rates Fringes
PLASTERER (DU PAGE COUNTY)..........................$ 42.25 26.65
----------------------------------------------------------------
PLAS0011-008 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (DE KALB, KANE,
KENDALL, AND MCHENRY COUNTIES)......................$ 50.70 40.60
----------------------------------------------------------------
PLAS0011-012 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (GRUNDY AND WILL
COUNTIES)...........................................$ 46.25 45.10
----------------------------------------------------------------
PLAS0011-014 06/01/2023
Rates Fringes
PLASTERER (LAKE COUNTY).............................$ 49.65 42.17
CEMENT MASON/CONCRETE FINISHER (LAKE COUNTY)........$ 48.50 42.82
----------------------------------------------------------------
PLAS0803-002 08/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (DUPAGE COUNTY)......$ 38.00 24.03
----------------------------------------------------------------
PLUM0093-001 06/01/2015
Rates Fringes
PLUMBER (LAKE AND MCHENRY COUNTIES).................$ 45.76 26.92
----------------------------------------------------------------
PLUM0130-002 06/01/2025
Rates Fringes
PLUMBER (DUPAGE (ARGONNE NATIONAL LABORATORIES AND
FERMI NATIONAL LABORATORY), GRUNDY & WILL COUNTIES).$ 60.50 39.02
----------------------------------------------------------------
PLUM0501-001 12/01/2013
Rates Fringes
PLUMBER/PIPEFITTER (DUPAGE (EXCLUDING ARGONNE
NATIONAL LABORATORY AND FERMI NATIONAL LABORATORY),
KANE, AND KENDALL (EXCEPT THE MICH-WIS PUMPING
STATION IN MILBROOK, SILICAS AND PLANT AND VILLAGE
OF NEWARK, EXCLUDES YORKVILLE) COUNTIES)............$ 41.20 29.15
----------------------------------------------------------------
PLUM0597-001 06/01/2023
Rates Fringes
PIPEFITTER (DUPAGE (ARGONNE NATIONAL LABORATORIES,
AND FERMI NATIONAL LABORATORY), GRUNDY, LAKE,
MCHENRY & WILL COUNTIES)............................$ 55.00 38.62
----------------------------------------------------------------
ROOF0011-004 12/01/2024
Rates Fringes
ROOFER (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND
WILL COUNTIES)......................................$ 50.25 30.43
----------------------------------------------------------------
ROOF0011-009 12/01/2024
Rates Fringes
ROOFER..............................................$ 38.50 27.23
----------------------------------------------------------------
SFIL0281-002 07/01/2025
Rates Fringes
SPRINKLER FITTER (DUPAGE, KANE, KENDALL, LAKE,
MCHENRY, AND WILL COUNTIES).........................$ 63.25 36.50
----------------------------------------------------------------
SHEE0073-003 06/01/2022
Rates Fringes
SHEET METAL WORKER (LAKE COUNTY)....................$ 49.10 42.91
----------------------------------------------------------------
SHEE0073-004 06/08/2018
Rates Fringes
SHEET METAL WORKER: ALUMINUM GUTTER WORK (LAKE
COUNTY).............................................$ 31.32 37.02
----------------------------------------------------------------
SHEE0265-001 06/01/2024
Rates Fringes
SHEET METAL WORKER (DU PAGE, GRUNDY, KANE, KENDALL,
MCHENRY, AND WILL COUNTIES).........................$ 56.35 38.65
----------------------------------------------------------------
TEAM0179-001 06/01/2025
Rates Fringes
TRUCK DRIVER: 6 AXLE TRUCKS (GRUNDY, KENDALL, AND
WILL COUNTIES) FOOTNOTES: A. $448.80 HEALTH &
WELFARE PER WEEK, $562.80 PENSION PER WEEK. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.67 0.30
TRUCK DRIVER: 5 AXLE TRUCKS (GRUNDY, KENDALL, AND
WILL COUNTIES) FOOTNOTES: A. $448.80 HEALTH &
WELFARE PER WEEK, $562.80 PENSION PER WEEK. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.47 0.30
TRUCK DRIVER: 4 AXLE TRUCKS (GRUNDY, KENDALL, AND
WILL COUNTIES) FOOTNOTES: A. $448.80 HEALTH &
WELFARE PER WEEK, $562.80 PENSION PER WEEK. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.27 0.30
TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (GRUNDY,
KENDALL, AND WILL COUNTIES) FOOTNOTES: A.
$448.80 HEALTH & WELFARE PER WEEK, $562.80 PENSION
PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50 PER
HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR
ALL VEHICLES WITH MORE THAN SIX (6) AXLES...........$ 46.12 0.30
----------------------------------------------------------------
TEAM0301-001 06/01/2024
Rates Fringes
TRUCK DRIVER: 6 AXLES (LAKE AND MCHENRY COUNTIES)
FOOTNOTES: A.$500.00 PER WEEK PENSION. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 45.09 13.40
TRUCK DRIVER: 5 AXLES (LAKE AND MCHENRY COUNTIES)
FOOTNOTES: A.$500.00 PER WEEK PENSION. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 44.89 13.40
TRUCK DRIVER: 4 AXLES (LAKE AND MCHENRY COUNTIES)
FOOTNOTES: A.$500.00 PER WEEK PENSION. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 44.69 13.40
TRUCK DRIVER: 2-3 AXLES (LAKE AND MCHENRY COUNTIES)
FOOTNOTES: A.$500.00 PER WEEK PENSION. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 44.54 13.40
----------------------------------------------------------------
TEAM0673-003 06/01/2025
Rates Fringes
TRUCK DRIVER: 6 AXLES (DU PAGE AND KANE COUNTIES)
FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6)
AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $453.20 PER WEEK PENSON:
$589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.86 0.30
TRUCK DRIVER: 5 AXLES (DU PAGE AND KANE COUNTIES)
FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6)
AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $453.20 PER WEEK PENSON:
$589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.66 0.30
TRUCK DRIVER: 4 AXLES (DU PAGE AND KANE COUNTIES)
FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6)
AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $453.20 PER WEEK PENSON:
$589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.46 0.30
TRUCK DRIVER: 2-3 AXLES (DU PAGE AND KANE COUNTIES)
FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX
(6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $453.20 PER WEEK PENSON:
$589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.31 0.30
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
"