Building, Heavy, Highway, Residential construction - Illinois, revision 2, modified 2026-05-18
Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of IL20260009 rev 2
"General Decision Number: IL20260009 05/18/2026
State: Illinois
Construction Types: Building, Heavy, Highway and Residential
Counties: Illinois Counties of
Cook
Excludes Landscape Projects
Modification Number Publication Date
1 01/09/2026
2 05/18/2026
ASBE0017-001 06/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING,
BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 41.27 32.76
FIRE STOP TECHNICIAN................................$ 44.02 32.76
ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION
OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS).................................$ 55.02 35.75
----------------------------------------------------------------
BOIL0001-001 05/01/2024
Rates Fringes
BOILERMAKER.........................................$ 53.10 38.54
----------------------------------------------------------------
BRIL0021-001 06/01/2016
Rates Fringes
BRICKLAYER..........................................$ 44.88 26.62
----------------------------------------------------------------
BRIL0021-004 06/01/2017
Rates Fringes
MARBLE MASON........................................$ 44.63 26.83
----------------------------------------------------------------
BRIL0021-006 06/01/2017
Rates Fringes
TILE SETTER.........................................$ 45.49 25.72
TILE FINISHER.......................................$ 38.56 22.10
TERRAZZO WORKER/SETTER..............................$ 44.38 25.84
----------------------------------------------------------------
BRIL0021-009 06/01/2017
Rates Fringes
MARBLE FINISHER.....................................$ 33.95 26.03
----------------------------------------------------------------
BRIL0021-012 06/01/2017
Rates Fringes
POINTER, CLEANER AND CAULKER........................$ 45.42 24.06
----------------------------------------------------------------
CARP0555-001 06/01/2022
Rates Fringes
CARPENTER: CARPENTER, LATHER, MILLWRIGHT,
PILEDRIVER, AND SOFT FLOOR LAYER (Heavy & Highway)..$ 52.01 38.85
CARPENTER: CARPENTER, LATHER, MILLWRIGHT,
PILEDRIVER, AND SOFT FLOOR LAYER (Building).........$ 52.01 38.85
----------------------------------------------------------------
CARP0555-002 10/01/2023
Rates Fringes
CARPENTER (RESIDENTIAL CONSTRUCTION)................$ 45.61 35.31
----------------------------------------------------------------
ELEC0009-003 05/26/2024
Rates Fringes
LINE CONSTRUCTION: GROUNDMAN........................$ 48.44 29.09
LINE CONSTRUCTION (LINEMAN AND EQUIPMENT OPERATOR)..$ 62.10 37.29
----------------------------------------------------------------
ELEC0134-001 06/02/2025
Rates Fringes
ELECTRICIAN.........................................$ 57.75 42.89
----------------------------------------------------------------
ELEC0134-003 06/02/2025
Rates Fringes
ELECTRICIAN:ELECTRICAL TECHNICIAN: THE WORK SHALL
CONSIST OF THE INSTALLATION, OPERATION, INSPECTION,
MAINTENANCE, REPAIR AND SERVICE OF RADIO,
TELEVISION, RECORDING, VOICE SOUND VISION
PRODUCTION AND REPRODUCTION, TELEPHONE AND
TELEPHONE INTERCONNECT, FACSIMILE, DATA APPATATUS,
COAXIAL, FIBRE OPTIC AND WIRELESS EQUIPMENT,
APPLIANCES AND SYSTEMS USED FOR THE TRANSMISSION
AND RECEPTION OF SIGNALS OF ANY NATURE, BUSINESS,
DOMESTIC, COMMERCIAL, EDUCATION, ENTERTAINMENT AND
RESIDENTIAL PURPOSES, INCLUDING BUT NOT LIMITED TO
COMMUNICATION AND TELEPHONE, ELECTRONIC AND SOUND
EQUIPMENT, FIBRE OPTIC AND DATA COMMUNICATION
SYSTEMS, AND THE PERFORMANCE OF ANY TASK DIRECTLY
RELATED TO SUCH INSTALLATION OR SERVICE WHETHER AT
NEW OR EXISTING SITES, SUCH TASKS TO INCLUDE THE
PLACING OF WIRE AND CABLE AND ELECTRICAL POWER
CONDUIT OR OTHER RACEWAY WORK WITHIN THE EQUIPMENT
ROOM AND PULLING WIRE AND/OR CABLE THROUGH CONDUIT
AND THE INSTALLATION OF ANY INCIDENTIAL CONDUIT. ..$ 51.14 30.55
----------------------------------------------------------------
ELEV0002-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTES: A) PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY
AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS
DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR
HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEE
WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR
EMPLOYEE WITH LESS THAN 5 YEARS SERVICE.............$ 70.68 38.44
----------------------------------------------------------------
ENGI0150-006 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND
RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID
STEER LOADERS; BRICK FORKLIFTS; OILERS ..........$ 59.20 51.00
OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND
RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250
AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT);
AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL
EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND
UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS,
MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR
RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE
DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS
OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT);
PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5);
WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP
TO AND INCLUDING 3/4 CU YD).........................$ 60.95 51.00
OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND
RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD);
BOILERS; BROOM, POWER PROPELLED; BULLDOZERS;
CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR,
PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER;
HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4
CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS;
HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER
SINGLE DRUM; LASER SCREED; ROCK DRILL
(SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*;
ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN
VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER
HOUR); WINCH TRUCKS WITH ""A"" FRAME. *-REQUIRES
OILER...............................................$ 63.50 51.00
OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND
RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT*;
ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON
ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO
ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON
RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE
FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE
VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE
CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED;
CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER
27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE
PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED);
CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*;
CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO
OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC;
DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND
GUTTER MACHINE*; GRADER, ELEVATING; GROUTING
MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4
YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK
AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO,
AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR;
HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS;
HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES;
MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST
HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL
RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP
CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM
BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO
MILL GRINDER (36"" AND OVER)*; ROTO MILL GRINDER
(LESS THAN 36"")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM
PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH
BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*.
*-REQUIRES OILER....................................$ 64.80 51.00
----------------------------------------------------------------
ENGI0150-025 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 5 (HEAVY AND
HIGHWAY CONSTRUCTION) BOBCATS (ALL); BRICK
FORKLIFTS; OILERS; DIRECTIONAL BORING ...........$ 57.80 51.00
OPERATOR: POWER EQUIPMENT, GROUP 4 (HEAVY AND
HIGHWAY CONSTRUCTION) AIR COMPRESSOR - SMALL 250
AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT);
AIR COMPRESSOR - LARGE OVER 250; COMBINATION -
SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING
MACHINE; GENERATORS - SMALL 50 KW AND UNDER;
GENERATORS - LARGE , OVER 50 KW; HEATERS,
MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING,
EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5);
PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF
300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING
MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC
DRILL WINCHES;......................................$ 59.00 51.00
OPERATOR: POWER EQUIPMENT, GROUP 3 (HEAVY AND
HIGHWAY CONSTRUCTION) BOILERS; BROOMS, ALL POWER
PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON
RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER;
CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR
MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT
TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC;
HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM;
JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES;
POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER
DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT;
SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP
MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS;
TAMPER-FORM MOTOR DRIVEN............................$ 60.40 51.00
OPERATOR: POWER EQUIPMENT, GROUP 2 (HEAVY AND
HIGHWAY CONSTRUCTION) BATCH PLANT*; BITUMINOUS
MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR
LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE
FRONT END LOADER MACHINE, (LESS THAN 1 CU YD
BACKHOE BUCKET WITH ATTACHMENTS); COMPRESSOR AND
THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3);
CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING
MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND
INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE
CURING MACHINE; BURLAP MACHINE; BELTING MACHINE AND
SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR MUCK
CARS (HAGLUND OR SIMILAR TYPE); DRILLS (ALL);
FINISHING MACHINE-CONCRETE; GREASER ENGINEER;
HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST- SEWER
DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL
ATTACHMENTS; HYDRO-BLASTER (REQUIRES TWO
OPERATORS); LASER SCREED*; LOCOMOTIVES, DINKY;
OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING);
PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS,
GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW
PLOWS; ROTOTILLER, SEAMAN, SELF-PROPELLED;
SCOOPS-TRACTOR DRAWN; SELF- PROPELLED COMPACTOR;
SPREADER-CHIP-STONE; SCRAPER; SCRAPER-PRIME MOVER
IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO GROUP 2
HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE
ATTACHED THERETO ADD $1.00 TO GROUP 2 HOURLY RATE
FOR EACH HOUR); TANK CAR HEATER; TRACTORS, PUSH,
PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG
BOATS *REQUIRES OILER..............................$ 62.45 51.00
OPERATOR: POWER EQUIPMENT, GROUP 1 (HEAVY AND
HIGHWAY CONSTRUCTION) ASPHALT PLANT*; ASPHALT
HEATER AND PLANER COMBINATION; ASPHALT HEATER
SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR
SIMILAR; ABG PAVER*, BACKHOES WITH CAISSON
ATTACHMENT*, BALLAST REGULATOR, BELT LOADER*;
CAISSON RIGS*CAR DUMPER, CENTRAL REDI-MIX PLANT*,
COMBINATION BACKHOE; FRONT END LOADER MACHINE (1 CU
YD OR OVER BACKHOE BUCKET OR WITH ATTACHMENTS);
CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE
CONVEYOR; CONCRETE PAVER OVER 27E CU FT*; CONCRETE
PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL
ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND
MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER,
STONE; ALL DERRICKS; DERRICK BOATS; DERRICKS,
TRAVELING*; DOWELL MACHINE WITH AIR COMPRESSOR
($1.00 ABOVE CLASS 1); DREDGES*; FIELD MECHANIC
WELDER; FORMLESS CURB AND GUTTER MACHINE*; GRADALL
AND MACHINES OF A LIKE NATURE*; GRADER, ELEVATING;
GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL,
FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL
POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE
DRUM; HYDRAULIC BACKHOES*; BACKHOES WITH SHEAR
ATTACHMENTS*; MUCKING MACHINE; PILE DRIVERS AND
SKID RIG*; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM
(REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK
DRILL- CRAWLER OR SKID RIG*; ROCK DRILL TRUCK
MOUNTED*; ROCK/ TRACK TAMPER; ROTO MILL GRINDER,
(36"" AND OVER)*; SLIP-FORM PAVER*; SOIL TEST DRILL
RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC
TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT
LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED
PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM;
TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER TRANSFER
MACHINE*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE
PUMP WITH BOOM*; UNDERGROUND BORING AND/OR MINING
MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*;
WHEEL EXCAVATOR* & WIDENER (APSCO); RAISED OR BLIND
HOE DRILL, TUNNEL & SHAFT* *REQUIRES OILER.........$ 63.00 51.00
----------------------------------------------------------------
IRON0001-026 06/01/2025
Rates Fringes
IRONWORKER: STRUCTURAL AND REINFORCING..............$ 62.46 46.58
IRONWORKER: SHEETER.................................$ 62.71 46.58
----------------------------------------------------------------
IRON0063-001 06/01/2025
Rates Fringes
IRONWORKER: ORNAMENTAL..............................$ 59.26 44.81
----------------------------------------------------------------
IRON0063-002 06/01/2025
Rates Fringes
IRONWORKER (FENCE ERECTOR)..........................$ 52.25 34.31
----------------------------------------------------------------
IRON0136-001 07/01/2025
Rates Fringes
IRONWORKER: MASTER RIGGERS..........................$ 56.75 47.38
IRONWORKER (MACHINERY MOVERS; RIGGERS; MACHINERY
ERECTORS)...........................................$ 54.25 47.38
----------------------------------------------------------------
LABO0002-006 06/01/2025
Rates Fringes
LABORER, BUILDING & RESIDENTIAL: GROUP 12 DOSIMETER
USE (ANY DEVICE) MONITORING NUCLEAR EXPOSURE);
ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS
WASTE REMOVAL LABORERS..............................$ 52.40 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 11
JACKHAMMERMEN ON FIRE BRICK WORK ONLY...............$ 51.68 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 10 BOILER
SETTER PLASTIC LABORERS.............................$ 51.85 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 9 CHIMNEY
ON FIRE BRICK; CAISSON DIGGERS; & WELL POINT SYSTEM
MEN.................................................$ 51.75 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 8 FIREBRICK
& BOILER LABORERS...................................$ 51.73 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 7
JACKHAMMERMEN; POWER DRIVEN CONCRETE SAWS; AND
OTHER POWER TOOLS...................................$ 51.63 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 6 STONE
DERRICKMEN & HANDLERS...............................$ 51.60 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 5 CEMENT
GUN NOZZLE LABORERS (GUNITE); WINDLASS AND CAPSTAN
PERSON..............................................$ 51.55 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 4 CHIMNEY
OVER 40 FT.; SCAFFOLD LABORERS......................$ 51.50 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 3 CEMENT
GUN.................................................$ 51.48 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 2
FIREPROOFING AND FIRE SHOP LABORERS.................$ 51.40 36.94
LABORER, BUILDING & RESIDENTIAL: GROUP 1 BUILDING
LABORERS; PLASTERER TENDERS; PUMPS FOR DEWATERING;
AND OTHER UNCLASSIFIED LABORERS.....................$ 51.40 36.94
----------------------------------------------------------------
LABO0002-007 06/01/2025
Rates Fringes
LABORER, HEAVY & HIGHWAY: GROUP 5 ASBESTOS
ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE
REMOVAL LABORERS, DOSIMETER (ANY DEVICE) MONITORING
NUCLEAR EXPOSURE....................................$ 51.40 36.94
LABORER, HEAVY & HIGHWAY: GROUP 4 RAKERS, LUTEMEN;
MACHINE-SCREWMEN; KETTLEMEN; MIXERMEN; DRUN-MEN;
JACKHAMMERMEN (ASPHALT); PAINTMEN; MITRE BOX
SPREADERS; LABORERS ON BIRCH, OVERMAN AND SIMILAR
SPREADER EQUIPMENT; LABORERS ON APSCO; LABORERS ON
AIR COMPRESSOR; PAVING FORM SETTER; JACKHAMMERMEN
(CONCRETE); POWER DRIVE CONCRETE SAWS; OTHER POWER
TOOLS...............................................$ 51.68 36.94
LABORER, HEAVY & HIGHWAY: GROUP 3 CEMENT GUN NOZZLE
(LABORERS), GUNITE..................................$ 51.55 36.94
LABORER, HEAVY & HIGHWAY: GROUP 2 ASPHALT TAMPERS &
SMOOTHERS; CEMENT GUN LABORERS......................$ 51.48 36.94
LABORER, HEAVY & HIGHWAY: GROUP 1 COMMON LABORER;
TENDERS; MATERIAL EXPEDITOR (ASPHALT PLANT); STREET
PAVING, GRADE SEPARATION, SIDEWALK, CURB & GUTTER,
STRIPPERS & ALL LABORERS NOT OTHERWISE MENTIONED....$ 51.40 36.94
----------------------------------------------------------------
LABO0002-008 06/01/2025
Rates Fringes
LABORER, TUNNEL AND SEWER: GROUP 5 ASBESTOS
ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE
REMOVAL LABORER; DOSIMETER (ANY DEVICE) MONITORING
NUCLEAR EXPOSURE LABORER CLASSIFICATIONS (SEWER)...$ 51.40 36.94
LABORER, TUNNEL AND SEWER: GROUP 4 AIR TRAC DRILL
OPERATOR; MINER; BRICKLAYER TENDERS; CONCRETE
BLOWER OPERATOR; DRILLERS; DYNAMITERS; ERECTOR
OPERATOR; FORM MEN; JACKHAMMERMEN; POWERPAC; MINING
MACHINE OPERATORS; MUCKING MACHINE OPERATOR; LASER
BEAM OPERATOR; LINER PLATE AND RING SETTERS; SHIELD
DRIVERS; POWER KNIFE OPERATOR; WELDER- BURNERS;
PIPE JACKING MACHINE OPERATOR; SKINNERS;
MAINTENANCE TECHNICIAN..............................$ 51.75 36.94
LABORER, TUNNEL AND SEWER: GROUP 3 CONCRETE
REPAIRMEN; LOCK TENDERS (PRESSURE SIDE); MORTAR
MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS.$ 51.63 36.94
LABORER, TUNNEL AND SEWER: GROUP 2 AIR HOIST
OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER;
GROUT; LOCK TENDERS (FREE AIR SIDE); STEEL SETTERS;
TUGGERS; SWITCHMEN; CAR PUSHER......................$ 51.53 36.94
LABORER, TUNNEL AND SEWER: GROUP 1 CAGE TENDERS;
DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS...........$ 51.40 36.94
LABORER, COMPRESSED AIR: 34 - AND OVER..............$ 55.40 36.94
LABORER, COMPRESSED AIR: 27 - 33 POUNDS.............$ 54.40 36.94
LABORER, COMPRESSED AIR: 21 - 26 POUNDS.............$ 53.40 36.94
LABORER, COMPRESSED AIR: 16 - 20 POUNDS.............$ 52.90 36.94
LABORER, COMPRESSED AIR: 0 - 15 POUNDS..............$ 52.40 36.94
----------------------------------------------------------------
LABO0225-001 06/01/2025
Rates Fringes
LABORER, DEMOLITION/WRECKING: GROUP 3 ASBESTOS WORK
WITH COMPLETE DEMOLITION/WRECKING OR STRIP OUT WORK.$ 51.40 36.94
LABORER, DEMOLITION/WRECKING: GROUP 2 INTERIOR
WRECKING AND STRIP OUT WORK.........................$ 51.40 36.94
LABORER, DEMOLITION/WRECKING: GROUP 1 COMPLETE
DEMOLITION..........................................$ 46.40 36.94
----------------------------------------------------------------
PAIN0014-001 06/01/2024
Rates Fringes
PAINTER (INCLUDING TAPER)...........................$ 53.05 33.91
----------------------------------------------------------------
PAIN0027-001 06/01/2024
Rates Fringes
GLAZIER.............................................$ 51.55 44.09
----------------------------------------------------------------
PLAS0005-002 07/01/2015
Rates Fringes
PLASTERER...........................................$ 42.25 26.65
----------------------------------------------------------------
PLAS0502-001 06/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 53.10 43.80
----------------------------------------------------------------
PLUM0130-001 06/01/2025
Rates Fringes
PLUMBER.............................................$ 60.50 39.02
----------------------------------------------------------------
PLUM0597-002 06/01/2023
Rates Fringes
PIPEFITTER..........................................$ 55.00 38.62
----------------------------------------------------------------
ROOF0011-001 12/01/2024
Rates Fringes
ROOFER..............................................$ 50.25 30.43
----------------------------------------------------------------
SFIL0281-001 07/01/2025
Rates Fringes
SPRINKLER FITTER....................................$ 63.25 36.50
----------------------------------------------------------------
SHEE0073-001 06/01/2022
Rates Fringes
SHEET METAL WORKER..................................$ 49.10 42.91
----------------------------------------------------------------
SHEE0073-002 06/08/2018
Rates Fringes
SHEET METAL WORKER (ALUMINUM GUTTER WORK)...........$ 31.32 37.02
----------------------------------------------------------------
TEAM0731-001 06/01/2025
Rates Fringes
TRUCK DRIVER: 6 AXLES (COOK COUNTY - HEAVY AND
HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B.
900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR
FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE
PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $448.80 PER WEEK PENSION:
$562.80 PER WEEK....................................$ 46.20 30.27
TRUCK DRIVER: 5 AXLES (COOK COUNTY - HEAVY AND
HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B.
900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR
FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE
PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $448.80 PER WEEK PENSION:
$562.80 PER WEEK....................................$ 46.00 30.27
TRUCK DRIVER: 4 AXLES (COOK COUNTY - HEAVY AND
HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B.
900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR
FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE
PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $448.80 PER WEEK PENSION:
$562.80 PER WEEK....................................$ 45.80 30.27
TRUCK DRIVER: 2 OR 3 AXLES (COOK COUNTY - HEAVY AND
HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B.
900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR
FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE
PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES.
LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $448.80 PER WEEK PENSION:
$562.80 PER WEEK....................................$ 45.55 30.27
----------------------------------------------------------------
TEAM0731-002 04/01/2025
Rates Fringes
TRAFFIC CONTROL DEVICE MONITOR (TRAFFIC SAFETY
WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED
TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC
CONTROL DEVICES, THE SET-UP AND INSTALLATION OF
TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH
BARRELS AND GLARE SCREENS, TRAFFIC CONTROL
SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS,
CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND
SIGN FABRICATION EQUIPMENT).........................$ 43.40 22.71
----------------------------------------------------------------
TEAM0786-001 06/01/2025
Rates Fringes
TRUCK DRIVER: 6 AXLES (COOK COUNTY - BUILDING AND
RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20
PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE
THAN SIX (6) AXLES. LOW-BOY WORK
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR.
HEALTH AND WELFARE: $445.00 PER WEEK
PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME
HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME
EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3
YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS
PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY.......................................$ 54.64 0.30
TRUCK DRIVER: 5 AXLES (COOK COUNTY - BUILDING AND
RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20
PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE
THAN SIX (6) AXLES. LOW-BOY WORK
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR.
HEALTH AND WELFARE: $445.00 PER WEEK
PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME
HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME
EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3
YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS
PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY.......................................$ 54.43 0.30
TRUCK DRIVER: 4 AXLES (COOK COUNTY - BUILDING AND
RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20
PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE
THAN SIX (6) AXLES. LOW-BOY WORK
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR.
HEALTH AND WELFARE: $445.00 PER WEEK
PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME
HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME
EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3
YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS
PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY.......................................$ 54.21 0.30
TRUCK DRIVER: 2 & 3 AXLES (COOK COUNTY - BUILDING
AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL
$.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH
MORE THAN SIX (6) AXLES. LOW-BOY WORK
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR.
HEALTH AND WELFARE: $445.00 PER WEEK
PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME
HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME
EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3
YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS
PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY.......................................$ 53.95 0.30
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
"