"General Decision Number: IL20260011 05/21/2026
State: Illinois
Construction Types: Heavy and Highway
Counties: Illinois Counties of
Boone, De Kalb, Du Page, Kane, Kendall,
Lake, McHenry and Will
Excludes Landscape Projects
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
2 05/21/2026
CARP0555-003 06/01/2022
Rates Fringes
CARPENTER: HEAVY & HIGHWAY (DUPAGE ANE LAKE
COUNTIES)...........................................$ 52.01 38.85
CARPENTER: BUILDING (DUPAGE ANE LAKE COUNTIES)......$ 52.01 38.85
----------------------------------------------------------------
CARP0555-008 06/01/2020
Rates Fringes
CARPENTER AND PILEDRIVER (WILL COUNTY)..............$ 49.76 38.26
----------------------------------------------------------------
CARP0555-011 06/01/2022
Rates Fringes
CARPENTER AND PILEDRIVER (KANE, MCHENRY (NORTH OF
HWY 52), AND KENDALL COUNTIES)......................$ 52.01 38.86
----------------------------------------------------------------
CARP0790-003 05/01/2025
Rates Fringes
CARPENTER (DE KALB COUNTY)..........................$ 48.60 38.53
----------------------------------------------------------------
CARP0790-004 05/01/2025
Rates Fringes
CARPENTER (CARROLL, JO DAVIESS, LEE, OGLE (OREGON
AND SOUTH THEREOF), STEPHENSON, AND WHITESIDE
COUNTIES)...........................................$ 48.60 38.53
----------------------------------------------------------------
CARP0792-003 05/01/2025
Rates Fringes
CARPENTER (BOONE COUNTY)............................$ 51.00 36.13
----------------------------------------------------------------
ELEC0009-002 05/26/2024
Rates Fringes
LINE CONSTRUCTION: LINEMAN AND EQUIPMENT OPERATOR
(WILL COUNTY).......................................$ 62.10 37.29
LINE CONSTRUCTION: GROUNDMAN (WILL COUNTY)..........$ 48.44 29.09
----------------------------------------------------------------
ELEC0117-001 06/02/2025
Rates Fringes
ELECTRICIAN (KANE (NORTHERN HALF) AND MCHENRY (ALL)
COUNTIES)...........................................$ 59.11 42.23
----------------------------------------------------------------
ELEC0150-001 06/03/2024
Rates Fringes
ELECTRICIAN (LAKE COUNTY)...........................$ 48.28 50.46
----------------------------------------------------------------
ELEC0176-011 06/01/2023
Rates Fringes
ELECTRICIAN (WILL COUNTY)...........................$ 52.00 45.01
----------------------------------------------------------------
ELEC0196-001 03/06/2023
Rates Fringes
LINE CONSTRUCTION: LINEMAN, SUBSTATION TECHNICIAN,
CABLE SPLICING TECHNICIAN, DIGGER OPERATOR, CRANE
OPERATOR 20 TONS AND ABOVE, AND SIGNAL TECHNICIAN
(BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND
MCHENRY COUNTIES) FOOTNOTE: A. PAID HOLIDAYS:
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND
THANKSGIVING DAY....................................$ 59.17 27.12
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (BOONE,
DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY
COUNTIES) FOOTNOTE: A. PAID HOLIDAYS:
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND
THANKSGIVING DAY....................................$ 39.19 20.32
LINE CONSTRUCTION: GROUNDMAN (BOONE, DEKALB,
DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY COUNTIES)
FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY...$ 37.81 19.86
LINE CONSTRUCTION: EQUIPMENT OPERATOR (BOONE,
DEKALB, DUPAGE, KANE, KENDALL, LAKE, AND MCHENRY
COUNTIES) FOOTNOTE: A. PAID HOLIDAYS:
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND
THANKSGIVING DAY....................................$ 49.22 23.73
----------------------------------------------------------------
ELEC0364-003 06/02/2025
Rates Fringes
ELECTRICIAN (BOONE (ALL) & DEKALB (REMAINDER)
COUNTIES)...........................................$ 62.61 43.96
----------------------------------------------------------------
ELEC0461-006 06/02/2025
Rates Fringes
ELECTRICIAN (DEKALB (SANDWICH TWP), KANE (SOUTHERN
HALF) & KENDALL (ALL) COUNTIES).....................$ 60.17 43.50
----------------------------------------------------------------
ELEC0701-001 06/03/2019
Rates Fringes
ELECTRICIAN (DUPAGE COUNTY).........................$ 41.00 43.40
----------------------------------------------------------------
ENGI0150-015 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 5 OILERS (BOONE
AND DE KALB COUNTIES) PREMIUM PAY: LONG BOOM :
CRANES & DERRICKS 90' TO 150' INCLUDING JIB
RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS
OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER
HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL
10' OF BOOM OR JIB. CAPACITY PAY: CRANES &
DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON
WITH LESS THAN 90' OF BOOM OR JIB SHALL BE
COMPENSATED $.01 PER HOUR FOR EACH TON OF THE
RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM
PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE
MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS,
AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50
PER HOUR. CRETER CRANES: WHEN THE CRETER
CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE
OF EXTENDING 70' OR MORE, THE ENGINEER SHALL
RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED
CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE
PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF
EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE
$.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE
CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS
EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF
EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE
AN EXTRA $.50 PER HOUR. UNDERGROUND WORK:
EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE
PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES
WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS
SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR.
EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR
OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING
MACHINES- BORING MACHINES: THE CREW OPERATING
AND MAINTAINING THE MINING MACHINES SHALL BE
COMPENSATED AN ADDITIONAL $.50 PER HOUR.............$ 50.85 51.05
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR
- SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL
OF 300 FT); AIR COMPRESSOR - LARGE OVER 185;
ASPHALT SPREADER BACKEND MAN; COMBINATION - SMALL
EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND
UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS,
MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING,
EXTRACTING OR DRILLING); LIGHT PLANTS ALL (1 TO 5);
PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF
300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING
MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC
DRILL WINCHES; BOBCATS UP TO AND INCLUDING .75 CU
YD (BOONE AND DE KALB COUNTIES) PREMIUM PAY:
LONG BOOM : CRANES & DERRICKS 90' TO 150'
INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR.
CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE
AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR
EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY
PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY
EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB
SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF
THE RATED CAPACITY IN EXCESS OF 50 TON. LONG
BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED.
CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE
DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN
EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE
CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM
CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK
MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED
CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS
CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK
MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR.
UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS,
SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50
PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF
7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE.
MINING MACHINES- BORING MACHINES: THE CREW
OPERATING AND MAINTAINING THE MINING MACHINES SHALL
BE COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 53.30 51.05
OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS;
BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER;
COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER,
TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE
TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON
BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES;
HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS,
TUGGER SINGLE DRUM; JEEP DIGGERS; PIPE JACKING
MACHINES; POST- HOLE DIGGER; POWER SAW, CONCRETE,
POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN
ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS;
STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK
BOATS; TAMPER-FORM MOTOR DRIVEN (BOONE AND DE KALB
COUNTIES) PREMIUM PAY: LONG BOOM : CRANES &
DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA
$.50 PER HOUR. CRANES & DERRICKS OVER 150'
INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS
AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM
OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH
MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN
90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER
HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS
OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT
BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED
AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL
RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER
CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A
CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE,
THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR.
TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK
MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM,
WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE
ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA.
TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR.
UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS,
SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50
PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF
7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE.
MINING MACHINES- BORING MACHINES: THE CREW
OPERATING AND MAINTAINING THE MINING MACHINES SHALL
BE COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 54.75 51.05
OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT;
BITUMINOUS MIXER; BOBCATS OVER .75 CU YD; BOILER
AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING
CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER
MACHINE, LESS THAN 1 CU YD BACKHOE BUCKET WITH
ATTACHMENTS; COMPRESSOR AND THROTTLE VALVE;
COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER
OR HYDRO HAMMER; CONCRETE GRINDING MACHINE;
CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING
27 CU FT; CONCRETE SPREADER; CONCRETE CURING
MACHINE, BURLAP MACHINE; BELTING MACHINE AND
SEALING MACHINE; CONVEYOR MUCK CARS (HAGLUND OR
SIMILAR TYPE); FINISHING MACHINE-CONCRETE; GREASER
ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER;
HOIST-SEWER DRAGGING MACHINE; HYDRAULIC BOOM
TRUCKS, ALL ATTACHMENTS; LOCOMOTIVES, DINKY; PUMP
CRETES, SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM
BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS;
ROTOTILLER, SEAMAN, ETC SELF-PROPELLED;
SCOOPS-TRACTOR DRAWN; SELF-PROPELLED COMPACTOR;
SPREADER-CHIP- STONE ETC; SCRAPER; SCRAPER-PRIME
MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO TO
GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH
MACHINE ATTACHED THERETO); TANK CAR HEATER;
TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR
COMPACTOR, ETC; TUG BOATS PREMIUM PAY: LONG
BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING
JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES &
DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA
$.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH
ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY:
CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING
50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE
COMPENSATED $.01 PER HOUR FOR EACH TON OF THE
RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM
PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE
MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS,
AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50
PER HOUR. CRETER CRANES: WHEN THE CRETER
CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE
OF EXTENDING 70' OR MORE, THE ENGINEER SHALL
RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED
CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE
PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF
EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE
$.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE
CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS
EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF
EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE
AN EXTRA $.50 PER HOUR. UNDERGROUND WORK:
EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE
PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES
WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS
SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR.
EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR
OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING
MACHINES- BORING MACHINES: THE CREW OPERATING
AND MAINTAINING THE MINING MACHINES SHALL BE
COMPENSATED AN ADDITIONAL $.50 PER HOUR. (BOONE
AND DE KALB COUNTIES)...............................$ 56.05 51.05
OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT;
ASPHALT HEATER AND PLANER COMBINATION; ASPHALT
SPREADER; ASPHALT SILO TENDER; AUTOGRADER, GOMACO
OR SIMILAR; BELT LOADER; CAISSON RIGS; CAR DUMPER,
CENTRAL REDI-MIX PLANT; COMBINATION BACKHOE FRONT
END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET
WITH ATTACHMENTS); BACKHOE WITH SHEAR ATTACHMENT;
CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE
CONVEYOR; CONCRETE PAVER OVER 27E CU FT; CONCRETE
PLACER; CONCRETE TUBE FLOAT; CRANES, ALL
ATTACHMENTS; CRANES, HAMMERHEAD, LINDEN, PECO AND
MACHINES OF A LIKE NATURE; CRETER CRANE; CRUSHER,
STONE; DERRICKS; DERRICK BOATS; DERRICKS,
TRAVELING; DREDGES; FIELD MECHANIC WELDER; FORMLESS
CURB AND GUTTER MACHINE; GRADALL AND MACHINES OF A
LIKE NATURE; GRADER, ELEVATING; GRADER, MOTOR
GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER,
PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER
MOUNTED; HOISTS, ONE, TWO, AND THREE DRUM;
HYDRAULIC BACKHOES; LOCOMOTIVE, ALL MUCKING
MACHINE; PILE DRIVERS AND SKID RIG; PRE-STRESS
MACHINE; PUMP CRETES DUAL RAM; ROCK DRILL-CRAWLER
OR SKID RIG; ROCK DRILL TRUCK MOUNTED; ROTO MILL
GRINDER, 36"" AND OVER; ROTO MILL GRINDER, LESS THAN
36""; SLIP- FORM PAVER; SOIL TEST DRILL RIG, TRUCK
MOUNTED; STRADDLE BUGGIES; GCI CRANE AND SIMILAR;
HYDRAULIC TELESCOPING FORM (TUNNEL); TIE BACK
MACHINE; TRACTOR DRAWN BELT LOADER: TRACTOR DRAWN
BELT LOADER WITH ATTACHED PUSHER; TRACTOR WITH
BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER
CONVEYOR MACHINE; RAISED OR BLIND HOE DRILL (TUNNEL
& SHAFT); TRENCHING MACHINE; TRUCK MOUNTED CONCRETE
PUMP WITH BOOM; TRUCK MOUNTED CONCRETE CONVEYOR;
UNDERGROUND BORING AND/OR MINING MACHINES UNDER 5
FT; WHEEL EXCAVATOR & WIDENER (APSCO) (BOONE AND
DE KALB COUNTIES) PREMIUM PAY: LONG BOOM :
CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE
AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER
150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR
PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF
BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS
WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS
THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01
PER HOUR FOR EACH TON OF THE RATED CAPACITY IN
EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY
CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER,
RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED
DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR.
CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED
WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR
MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER
HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE
TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A
BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE,
THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA.
TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR.
UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS,
SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50
PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF
7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE.
MINING MACHINES- BORING MACHINES: THE CREW
OPERATING AND MAINTAINING THE MINING MACHINES SHALL
BE COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 56.60 51.05
----------------------------------------------------------------
ENGI0150-024 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS (ALL);
BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING
(DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL
COUNTIES) ........................................$ 57.80 51.00
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR
- SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL
OF 300 FT); AIR COMPRESSOR - LARGE OVER 250;
COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL
BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER;
GENERATORS - LARGE , OVER 50 KW; HEATERS,
MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING,
EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5);
PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF
300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING
MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC
DRILL WINCHES; (DUPAGE, KANE, KENDALL, LAKE,
MCHENRY, AND WILL COUNTIES).........................$ 59.00 51.00
OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS;
BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER;
COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER,
TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE
TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON
BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES;
HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS,
TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE
JACKING MACHINES; POST-HOLE DIGGER; POWER SAW,
CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER
THAN ASPHALT; SEED AND STRAW BLOWER; STEAM
GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH
A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN
(DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL
COUNTIES)...........................................$ 60.40 51.00
OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT*;
BITUMINOUS MIXER; BOILER AND THROTTLE VALVE;
BULLDOZER; CAR LOADER TRAILING CONVEYORS;
COMBINATION BACKKHOE FRONT END LOADER MACHINE,
(LESS THAN 1 CU YD BACKHOE BUCKET WITH
ATTACHMENTS); COMPRESSOR AND THROTTLE VALVE;
COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER
OR HYDRO HAMMER; CONCRETE GRINDING MACHINE;
CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING
27 CU FT; CONCRETE SPREADER; CONCRETE CURING
MACHINE; BURLAP MACHINE; BELTING MACHINE AND
SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR MUCK
CARS (HAGLUND OR SIMILAR TYPE); DRILLS (ALL);
FINISHING MACHINE-CONCRETE; GREASER ENGINEER;
HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST- SEWER
DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL
ATTACHMENTS; HYDRO-BLASTER (REQUIRES TWO
OPERATORS); LASER SCREED*; LOCOMOTIVES, DINKY;
OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING);
PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS,
GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW
PLOWS; ROTOTILLER, SEAMAN, SELF-PROPELLED;
SCOOPS-TRACTOR DRAWN; SELF- PROPELLED COMPACTOR;
SPREADER-CHIP-STONE; SCRAPER; SCRAPER-PRIME MOVER
IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO GROUP 2
HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE
ATTACHED THERETO ADD $1.00 TO GROUP 2 HOURLY RATE
FOR EACH HOUR); TANK CAR HEATER; TRACTORS, PUSH,
PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG
BOATS (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND
WILL COUNTIES) *REQUIRES OILER....................$ 62.45 51.00
OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*;
ASPHALT HEATER AND PLANER COMBINATION; ASPHALT
HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/
GOMACO OR SIMILAR; ABG PAVER*, BACKHOES WITH
CAISSON ATTACHMENT*, BALLAST REGULATOR, BELT
LOADER*; CAISSON RIGS*CAR DUMPER, CENTRAL REDI-MIX
PLANT*, COMBINATION BACKHOE; FRONT END LOADER
MACHINE (1 CU YD OR OVER BACKHOE BUCKET OR WITH
ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED);
CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*;
CONCRETE PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL
ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND
MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER,
STONE; ALL DERRICKS; DERRICK BOATS; DERRICKS,
TRAVELING*; DOWELL MACHINE WITH AIR COMPRESSOR
($1.00 ABOVE CLASS 1); DREDGES*; FIELD MECHANIC
WELDER; FORMLESS CURB AND GUTTER MACHINE*; GRADALL
AND MACHINES OF A LIKE NATURE*; GRADER, ELEVATING;
GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL,
FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL
POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE
DRUM; HYDRAULIC BACKHOES*; BACKHOES WITH SHEAR
ATTACHMENTS*; MUCKING MACHINE; PILE DRIVERS AND
SKID RIG*; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM
(REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK
DRILL- CRAWLER OR SKID RIG*; ROCK DRILL TRUCK
MOUNTED*; ROCK/ TRACK TAMPER; ROTO MILL GRINDER,
(36"" AND OVER)*; SLIP-FORM PAVER*; SOIL TEST DRILL
RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC
TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT
LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED
PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM;
TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER TRANSFER
MACHINE*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE
PUMP WITH BOOM*; UNDERGROUND BORING AND/OR MINING
MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*;
WHEEL EXCAVATOR* & WIDENER (APSCO); RAISED OR BLIND
HOE DRILL, TUNNEL & SHAFT* (DUPAGE, KANE, KENDALL,
LAKE, MCHENRY, AND WILL COUNTIES) ................$ 63.00 51.00
----------------------------------------------------------------
IRON0001-014 06/01/2025
Rates Fringes
IRONWORKER: STRUCTURAL AND REINFORCING (DU PAGE
(EASTERN 1/4), LAKE, AND MCHENRY (HEBRON,
WOODSTOCK, AND EAST THEREOF) COUNTIES)..............$ 62.46 46.58
IRONWORKER: SHEETER (DU PAGE (EASTERN 1/4), LAKE,
AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF)
COUNTIES)...........................................$ 62.71 46.58
----------------------------------------------------------------
IRON0063-003 06/01/2025
Rates Fringes
IRONWORKER, ORNAMENTAL (LAKE, DUPAGE (EASTERN 1/4)
AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF)
COUNTIES)...........................................$ 59.26 44.81
----------------------------------------------------------------
IRON0393-003 06/01/2021
Rates Fringes
IRONWORKER (DEKALB (SOUTHEASTERN 2/3 INCLUDING
SYCAMORE AND DEKALB), DUPAGE (REMAINDER), KANE,
KENDALL (NORTHERN PART), AND MCHENRY (SOUTHEAST
1/4) COUNTIES)......................................$ 48.83 39.84
----------------------------------------------------------------
IRON0444-006 06/01/2022
Rates Fringes
IRONWORKER (KENDALL (SOUTHERN PART) AND WILL
COUNTIES)...........................................$ 47.80 42.50
----------------------------------------------------------------
IRON0498-003 06/01/2021
Rates Fringes
IRONWORKER (BOONE, DEKALB (EXCEPT SOUTHEAST), AND
MCHENRY (NORTHWEST) COUNTIES).......................$ 41.37 44.41
----------------------------------------------------------------
LABO0002-004 06/01/2025
Rates Fringes
LABORER, SEWER CONSTRUCTION: GROUP 5 ASBESTOS
ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE
REMOVAL LABORERS & DOSIMETER USE (ANY DEVICE)
MONITORING NUCLEAR EXPOSURE. (DUPAGE COUNTY)........$ 51.40 36.94
LABORER, SEWER CONSTRUCTION: GROUP 4 BOTTOM MEN;
BRACERS-BRACING; BRICKLAYER'S TENDER; CATCH BASIN
DIGGER; DRAINLAYER; DYNAMITER; FORM MEN;
JACKHAMMERMEN; POWERPAC; PIPELAYERS; RODDERS;
WELDERS & BURNERS; WELL POINT SYSTEM MEN. (DUPAGE
COUNTY).............................................$ 51.75 36.94
LABORER, SEWER CONSTRUCTION: GROUP 3 CEMENT
CARRIERS; CEMENT MIXERS; CONCRETE REPAIRMEN; MORTAR
MEN; SCAFFOLD MEN; AND SECOND BOTTOM MEN. (DUPAGE
COUNTY).............................................$ 51.63 36.94
LABORER, SEWER CONSTRUCTION: GROUP 2 CONCRETE
LABORERS; STEEL SETTERS. (DUPAGE COUNTY)............$ 51.53 36.94
LABORER, SEWER CONSTRUCTION: GROUP 1 SIGNALMEN TOP
LABORERS, AND ALL OTHER LABORERS NOT MENTIONED.
(DUPAGE COUNTY).....................................$ 51.40 36.94
----------------------------------------------------------------
LABO0002-009 06/01/2025
Rates Fringes
LABORER, TUNNEL: GROUP 5 ASBESTOS ABATEMENT
LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER;
DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE
(DUPAGE COUNTY) ..................................$ 51.40 36.94
LABORER, TUNNEL: GROUP 4 AIR TRAC DRILL OPERATOR;
MINER; BRICKLAYER TENDERS; CONCRETE BLOWER
OPERATOR; DRILLERS; DYNAMITERS; ERECTOR OPERATOR;
FORM MEN; JACKHAMMERMEN; POWERPAC; MINING MACHINE
OPERATORS; MUCKING MACHINE OPERATOR; LASER BEAM
OPERATOR; LINER PLATE AND RING SETTERS; SHIELD
DRIVERS; POWER KNIFE OPERATOR; WELDER- BURNERS;
PIPE JACKING MACHINE OPERATOR; SKINNERS;
MAINTENANCE TECHNICIAN (DUPAGE COUNTY)..............$ 51.75 36.94
LABORER, TUNNEL: GROUP 3 CONCRETE REPAIRMEN; LOCK
TENDERS (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT
MACHINE OPERATORS; TRACK LAYERS (DUPAGE COUNTY).....$ 51.63 36.94
LABORER, TUNNEL: GROUP 2 AIR HOIST OPERATOR; KEY
BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK
TENDERS (FREE AIR SIDE); STEEL SETTERS; TUGGERS;
SWITCHMEN; CAR PUSHER (DUPAGE COUNTY)...............$ 51.53 36.94
LABORER, TUNNEL: GROUP 1 CAGE TENDERS; DUMPMEN;
FLAGMEN; SIGNALMEN; TOP LABORERS (DUPAGE COUNTY)....$ 51.40 36.94
LABORER, COMPRESSED AIR: 34 LBS AND OVER (DU PAGE
COUNTY).............................................$ 55.40 36.94
LABORER, COMPRESSED AIR, 27-33 lbs (DU PAGE COUNTY).$ 54.40 36.94
LABORER, COMPRESSED AIR, 21-26 lbs (DU PAGE COUNTY).$ 53.40 36.94
LABORER, COMPRESSED AIR, 16-20 lbs (DU PAGE COUNTY).$ 52.90 36.94
LABORER, COMPRESSED AIR, 0-15 lbs (DU PAGE COUNTY)..$ 52.40 36.94
----------------------------------------------------------------
LABO0032-007 05/01/2025
Rates Fringes
LABORER: SKILLED LABORER SKILLED LABORER:
ASBESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER
HANDLING ANY MATERIALS WITH ANY FOREIGN MATTER
HARMFUL TO SKIN OR CLOTHING, TRACK LABOR, CEMENT
HANDLER, CHLORIDE HANDLER, UNLOADING & LABORERS
WITH STEEL WORKERS & RE-BARS, WET CONCRETE WORKERS,
TUNNEL TENDERS IN FREE AIR, BATCH DUMPER, MASON
TENDER, KETTLE & TAR MAN, TANK CLEANER, PLASTIC
INSTALLER, SCAFFOLD WORKER, MOTORIZED BUGGIES OR
MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF
BUILDING MATERIALS, LABORERS WITH DE-WATERING
SYSTEMS, SEWER WORKERS PLUS DEPTH, VIBRATOR
OPERATOR; CEMENT SILICA, CLAY, FLY ASH, LIME &
PLASTERS HANDLERS (BULK OR BAG); COFFERDAM WORKER
PLUS DEPTH, CONCRETE PAVING, PLACING, CUTTING &
TYING OF REINFORCING, DECK HAND, DREDGE HAND AND
SHORE LABORER, BANKMAN ON FLOATING PLANT, GRADE
CHECKER, POWER TOOLS, FRONT END MAN ON CHIP
SPREADER, CAISSON WORKER PLUS DEPTH, GUNNITE
NOZZLEMAN, LEADMAN ON SEWER WORK, WELDER, CUTTER,
BURNER & TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER &
DRILL OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL
FORM SETTER - STREET & HIGHWAY, AIR TAMPING
HAMMERMAN, SIGNAL MAN ON CRANE, CONCRETE SAW
OPERATOR, SCREENMAN ON ASPHALT PAVER, TENDING
MASONS WITH HOT MATERIAL OR WHERE FOREIGN MATERIALS
ARE USED, MORTAR MIXER OPERATOR, MULTIPLE CONCRETE
DUCT - LEADMAN, LUTEMAN, ASPHALT RAKER CURB ASPHALT
MACHINE OPERATOR, READY MIX SCALEMAN PERMANENT
PORTABLE OR TEMPORART PLANT, LABORER HANDLING
MASTERPLATE OR SIMILAR MATERIALS, LASER BEAM
OPERATOR, CONCRETE BURNING MACHINE OPERATOR, CORING
MACHINE OPERATOR, PLASTER TENDER, UNDERPINNING &
SHORING OF BUILDINGS, PUMP MAN, MANHOLE & CATCH
BASIN, DIRT & STONE TAMPER, HOSEMAN ON CONCRETE
PUMP. (DE KALB COUNTY).............................$ 50.39 36.31
LABORER: GENERAL LABORER GENERAL LABORER:
CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR
SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN
& SPOTTER, FORM HANDLER, MATERIAL HANDLER, FENCING
LABORER, CLEANING LUMBER, PIT MAN, MATERIAL
CHECKER, LANDSCAPER, UNLOADING EXPLOSIVES, LAYING
OF SOD, PLANTING OF TREES, ASPHALT WORKERS WITH
MACHINE & LAYERS, ASPHALT PLANT LABORER, WRECKING,
FIRE-PROOFING, DRIVING STAKES, STRINGLINES FOR ALL
MACHINERY, WINDOW CLEANING, DEMOLITION WORKER,
EXPLOSIVE HANDLING, TRIMMING & REMOVAL OF TREES,
MULTI-PLATE PIPE, PILOT CARS FOR TRAFFIC CONTROL,
POWER RIGGING (DE KALB COUNTY)..................$ 47.04 36.31
----------------------------------------------------------------
LABO0075-002 06/01/2025
Rates Fringes
LABORER GROUP 7 DOSIMETER (ANY DEVICE) USED FOR
MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT
WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER;
AND CHIMNEY AND SILO LABORERS FOR EVERY ADDITIONAL
50 FEET OR ANY PART THEREOF ABOVE 100 FEET HIGH
(WILL COUNTY).......................................$ 51.60 36.94
LABORER GROUP 6 ALL UNDERGROUND CAVERN LABORERS;
CAISSON LABORERS 50 FEET OR MORE BELOW GROUND
LEVEL; LABORERS WORKING UNDER RADIO ACTIVE
CONDITIONS (SUITING UP); BLASTING MEN (POWDERMEN)
(WILL COUNTY).......................................$ 51.75 36.94
LABORER GROUP 5 GUNNITE NOZZLE MEN; CAISSON
LABORERS AND ALL TAMPING HAMMERS FROM 150 LBS AND
OVER; FROM 15 FEET BELOW GROUND LEVEL DOWN TO 50
FEET; AND ALL LABORERS WORKING INSIDE OF A SPHERE
OR ANY TYPE OF TANK FOR EVERY ADDITIONAL 50 FEET OR
PART THEREOF ABOVE 100 FEET IN HEIGHT (WILL COUNTY).$ 51.60 36.94
LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS
INSIDE TUNNEL; AIR BLOW PIPEMEN; TORCHMEN
(BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE
(THE APPLYING OF MORTAR AND COMPOSITION MIXES); ALL
BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN
PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE
OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE
BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH
LABORERS 8 FEET OR MORE BELOW GROUND LEVEL
REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK
INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL
STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND
LEVEL DOWN 15 FEET; ALL AIR TOOLS 8 FEET OR MORE
BELOW GROUND LEVEL; ALL LABORERS WORKING ON
SWINGING-SUSPENDED OR ANY TYPE OR MAKE OF
SCAFFOLDS, 48 FEET TO 100 FEET; ALL CHIMNEY AND
SILO LABORERS WORKING AT A HEIGHT OF 48 TO 100
FEET; ALL TAMPING HAMMERS OVER 150 LBS.; ALL
LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OR
MAKE OF TANK AT A HEIGHT OF 48 FEET TO 100 FEET;
ALL HYDRAULIC, ELECTRIC AND AIR TOOLS OR ANY OTHER
TYPE 8 FEET OR MORE BELOW GROUND LEVEL;
VIBRATORS-ANY TYPE-8 FEET OR MORE BELOW GROUND
LEVEL (WILL COUNTY)..............................$ 51.75 36.94
LABORER GROUP 3 ASPHALT RAKERS; HOD CARRIERS;
PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR
SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORT
RUNAWAYS, AND RADII (ANY TYPE OF FORM) STRINGLINE
MEN FOR ALL AFOREMENTIONED WORK; WAGON AND TOWER
DRILLERS ON LAND AND FLOATING PLANT USED ON
DREDGING; ASPHALT GUNNERS AND PLUG MEN
(UNDERCOATING ON ROAD WORK); MORTAR PUMP LABORERS;
PLASTER PUMP LABORERS (WILL COUNTY).................$ 51.40 36.94
LABORER GROUP 2 SEWER AND DRAIN PIPE LAYERS AND
MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE
USED, ON PUBLIC UTILITY WORK (GROUND LEVEL TO 8
FEET); PUMPCRETE PIPE HANDLERS (WILL COUNTY).......$ 51.75 36.94
LABORER GROUP 1 MORTAR MIXERS, HANDLING ASPHALT
SHINGLES; SCAFFOLDS; SEWER AND TRENCH WORK (GROUND
LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE
DIGGERS, MESH HANDLING ON ROAD WORK; CEMENT AND
MINERAL FILLER HANDLER; CONCRETE PUDDLERS; BATCH
DUMPERS (CEMENT & ASPHALT); VIBRATOR OPERATORS;
SAND AND STONE WHEELERS TO MIXER HANDLERS);
CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE &
PAVING BREAKERS; ROCK DRILLERS/JACKHAMMERMEN;
CHIPPING HAMMERMEN 1-BAG MIXER; ASPHALT LABORER;
CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS;
MASON TENDERS (MORTAR AND BRICK WHEELER); KETTLEMEN
& TARMEN, TANK CLEANERS; SCAFFOLD AND STAGING
LABORERS; POT FIREMEN (TARMEN); HEATERS TENDER FOR
ANY PURPOSE; WATER PUMPS (PORTABLE WATER PUMPS
SHALL BE TENDED BY LABORERS IF THE EMPLOYER
DETERMINES TENDING IS REQUIRED); RIP RAP; HANDLING
OF SLAB STEEL ROAD FORMS IN ANY MANNER, EXCEPT ROAD
FORM SETTING, SETTING CENTER STRIPS, CONTRACTION
AND EXPANSION JOINTS (ROAD WORK); UNLOADING AND
HANDLING OF LUMBER, BRICK, TRANSITE MATERIALS, CAST
IRON WATER PIPE, REINFORCED CONCRETE RODS, SEWER
AND DRAIN TILE, RAILROAD TILES AND ALL OTHER
CREOSOTED MATERIALS; PAVING BLOCKS AND CONCRETE
FORMS; HANDLING OF INSULATION OF ANY TYPE; ALL WORK
INVOLVING THE UNLOADING OF MATERIALS, FIXTURES, OR
FURNISHING, WHETHER CRATED OR UNCRATED; ALL MORTAR
AND COMPOSITION MIXERS OF SEWER WORK; TRACK
LABORERS; CHIMNEY AND SILO LABORERS WORKING AT A
HEIGHT OF 1 TO 48 FEET; ALL LABORERS WORKING ON
SWINGING SUSPENDED, OR ANY TYPE OR MAKE OF
SCAFFOLDING 1 TO 48 FEET; ALL LABORERS WORKING
INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK;
WORKING INSIDE A SPHERE OR ANY TYPE OR MAKE OF TANK
FROM BOTTOM TO A HEIGHT OF 48 FEET; FORM STRIPPERS
(ANY TYPE); MECHANICAL OR MOTORIZED BUGGIES, FOR
CONCRETE OR MASONS EMPLOYERS; USE OF SKID STEER
LOADS OR ANY OTHER MACHINERY WHICH REPLACES THE
WHEELBARROW OR BUGGY; HANDLING MULTIPLE CONCRETE
DUCT OR ANY OTHER TYPE OF PIPE USED IN PUBLIC
UTILITY WORK UNLESS OTHERWISE SPECIFIED HEREIN;
SNAPPING OF WALL TIES AND REMOVAL OF RODS; DRILLING
OF ANCHOR BOLT HOLES; CONCRETE OR ASPHALT CLIPPER
TYPE SAWS AND SELF-PROPELLED SAWS; SHOULDER AND
GRADE LABORERS; ALL HYDRAULIC ELECTRIC AND AIR OR
ANY OTHER TYPE OF TOOLS; GROUTING AND CAULKING;
CLEANING LUMBER, NAIL PULLING, DECK HAND;
DREDGEHAND; SHORE LABORER; BANKMEN ON FLOATING
PLANT; TOOL AND MATERIAL CHECKERS; SIGNALMEN AND
FLAGMEN ON ALL CONSTRUCTION WORK; CLEANING OF
DEBRIS; REMOVAL OF TREES; CONCRETE CURING,
TEMPORARY CONCRETE PROTECTION REGARDLESS OF MANNER
OR MATERIALS USED; LABORERS ON APSCO; JANITORIAL;
WRECKING AND DEMOLITION LABORERS (WILL COUNTY).....$ 51.40 36.94
----------------------------------------------------------------
LABO0149-002 06/01/2025
Rates Fringes
LABORER GROUP 9 ASBESTOS APATEMENT LABORERS, TOXIC
& HAZARDOUS WASTE REMOVAL LABORERS & DOSIMETER (ANY
DEVICE) MONITORING NUCLEAR EXPOSURE (BOONE, KANE,
KENDALL, AND MCHENRY COUNTIES)......................$ 52.40 36.94
LABORER GROUP 8 FLAGMAN (BOONE, KANE, KENDALL, AND
MCHENRY COUNTIES)...................................$ 51.40 36.94
LABORER GROUP 7 CAISSON DIGGERS, DYNAMITERS (BOONE,
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.75 36.94
LABORER GROUP 6 TUNNEL LABORERS, TILE LAYERS &
BOTTOM MEN (BOONE, KANE, KENDALL, AND MCHENRY
COUNTIES)...........................................$ 51.75 36.94
LABORER GROUP 5 CHAIN SAW MAN, JACKHAMMER MAN,
DRILLMAN, CONCRETE BREADERS & AIR SPADE (BOONE,
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.63 36.94
LABORER GROUP 4 STRINGLINE & FORM SETTER; TORCHMAN
(DEMOLITION), SHEETING & CRIBBING, BLACK TOP RAKERS
& LUTEMEN, MACHINE SCREWMEN (BOONE, KANE, KENDALL,
AND MCHENRY COUNTIES)...............................$ 51.68 36.94
LABORER GROUP 3 MORTAR & CONCRETE MIXERS (BOONE,
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.68 36.94
LABORER GROUP 2 AIR TAMPERS & VIBRATORS (BOONE,
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.68 36.94
LABORER GROUP 1 COMMON LABORER, ASPHALT LABORER,
ASPHALT PLANT LABORER, STRIPING LABORER, CLIPPER
TYPE CONCRETE SAW, SELF-PROPELLED SAWS (BOONE,
KANE, KENDALL, AND MCHENRY COUNTIES)................$ 51.40 36.94
----------------------------------------------------------------
LABO0152-003 06/01/2025
Rates Fringes
LABORER GROUP 6 ASBESTOS ABATEMENT LABORERS; TOXIC
AND HAZARDOUS WASTE REMOVAL LABORERS; DOSIMETER
(ANY DEVICE MONITORING NUCLEAR EXPOSURE) (LAKE
COUNTY).............................................$ 51.60 36.94
LABORER GROUP 5 CEMENT GUN NOZZLE (GUNITE) (LAKE
COUNTY).............................................$ 51.60 36.94
LABORER GROUP 4 RAKERS AND LUTEMEN; MACHINE
SCREWMAN; KETTLEMEN; MIXERMEN, DRUM-MEN;
JACKHAMMERMEN (ASPHALT); MITE BOX SPREADERS;
LABORERS ON BIRCH OVERMAN AND SIMILAR SPREADER
EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR
COMPRESSORS; PAVING FORM SETTERS; JACKHAMMERMAN
(CONCRETE); POWER DRIVE CONCRETE SAWS (LAKE COUNTY).$ 51.63 36.94
LABORER GROUP 3 ASPHALT TAMPERS AND SMOOTHERS (LAKE
COUNTY).............................................$ 51.40 36.94
LABORER GROUP 2 CEMENT GUN LABORERS (LAKE COUNTY)...$ 51.48 36.94
LABORER GROUP 1 GENERAL LABORERS; ASPHALT (LAKE
COUNTY).............................................$ 51.40 36.94
----------------------------------------------------------------
PAIN0014-003 06/01/2024
Rates Fringes
PAINTER: BRUSH ONLY (LAKE AND WILL COUNTIES).......$ 53.05 33.91
----------------------------------------------------------------
PAIN0030-001 06/01/2024
Rates Fringes
PAINTER: BRUSH, DRYWALL TAPER/FINISHER,
SANDBLASTER, AND SPRAY (DE KALB, DU PAGE, KANE,
KENDALL AND MCHENRY COUNTIES).......................$ 53.05 27.63
----------------------------------------------------------------
PAIN0030-004 06/01/2024
Rates Fringes
PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING,
PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY
STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE,
STEPHENSON AND WINNEBAGO COUNTIES)..................$ 45.15 29.41
----------------------------------------------------------------
PLAS0011-002 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (WILL COUNTY)........$ 46.25 45.10
----------------------------------------------------------------
PLAS0011-008 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (DE KALB, KANE,
KENDALL, AND MCHENRY COUNTIES)......................$ 50.70 40.60
----------------------------------------------------------------
PLAS0011-013 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (LAKE COUNTY)........$ 48.50 42.82
----------------------------------------------------------------
PLAS0011-015 06/01/2023
Rates Fringes
PLASTERER (BOONE COUNTY)............................$ 37.90 37.66
CEMENT MASON/CONCRETE FINISHER (BOONE COUNTY).......$ 41.03 36.39
----------------------------------------------------------------
PLAS0803-001 08/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (DUPAGE COUNTY)......$ 38.00 24.03
----------------------------------------------------------------
TEAM0179-002 06/01/2025
Rates Fringes
TRUCK DRIVER: 6 AXLE TRUCKS (KENDALL AND WILL
COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE
$448.80 PER WEEK; PENSION $562.80 PER WEEK. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.67 0.30
TRUCK DRIVER: 5 AXLE TRUCKS (KENDALL AND WILL
COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE
$448.80 PER WEEK; PENSION $562.80 PER WEEK. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.47 0.30
TRUCK DRIVER: 4 AXLE TRUCKS (KENDALL AND WILL
COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE
$448.80 PER WEEK; PENSION $562.80 PER WEEK. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.27 0.30
TRUCK DRIVER: 2 OR 3 AXLE TRUCKS (KENDALL AND WILL
COUNTIES) FOOTNOTES: A.HEALTH AND WELFARE
$448.80 PER WEEK; PENSION $562.80 PER WEEK. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES...............$ 46.12 0.30
----------------------------------------------------------------
TEAM0301-001 06/01/2024
Rates Fringes
TRUCK DRIVER: 6 AXLES (LAKE AND MCHENRY COUNTIES)
FOOTNOTES: A.$500.00 PER WEEK PENSION. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 45.09 13.40
TRUCK DRIVER: 5 AXLES (LAKE AND MCHENRY COUNTIES)
FOOTNOTES: A.$500.00 PER WEEK PENSION. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 44.89 13.40
TRUCK DRIVER: 4 AXLES (LAKE AND MCHENRY COUNTIES)
FOOTNOTES: A.$500.00 PER WEEK PENSION. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 44.69 13.40
TRUCK DRIVER: 2-3 AXLES (LAKE AND MCHENRY COUNTIES)
FOOTNOTES: A.$500.00 PER WEEK PENSION. B.
LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 44.54 13.40
----------------------------------------------------------------
TEAM0325-004 06/01/2025
Rates Fringes
TRUCK DRIVER: 6 AXLES (BOONE AND WINNEBAGO
COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX
(6) AXLES...........................................$ 48.93 26.70
TRUCK DRIVER: 5 AXLES (BOONE AND WINNEBAGO
COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX
(6) AXLES...........................................$ 48.82 26.70
TRUCK DRIVER: 4 AXLES (BOONE AND WINNEBAGO
COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX
(6) AXLES...........................................$ 48.62 26.70
TRUCK DRIVER: 2 - 3 AXLES (BOONE AND WINNEBAGO
COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX
(6) AXLES...........................................$ 48.47 26.70
----------------------------------------------------------------
TEAM0330-002 06/01/2025
Rates Fringes
TRUCK DRIVER: 6 AXLES (DEKALB COUNTY)
FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER
WEEK;PENSION $644.34 PER WEEK LOW BOY
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 45.38 0.30
TRUCK DRIVER: 5 AXLES (DEKALB COUNTY)
FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER
WEEK;PENSION $644.34 PER WEEK LOW BOY
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 45.18 0.30
TRUCK DRIVER: 4 AXLES (DEKALB COUNTY)
FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER
WEEK;PENSION $644.34 PER WEEK LOW BOY
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 44.98 0.30
TRUCK DRIVER: 2-3 AXLES (DEKALB COUNTY)
FOOTNOTE: A.HEALTH AND WELFARE $468.00 PER
WEEK;PENSION $644.34 PER WEEK LOW BOY
CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN
ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL
VEHICLES WITH MORE THAN SIX (6) AXLES. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE
IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL
RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS
PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20
YEARS - 4 WEEKS PAID VACATION.......................$ 44.83 0.30
----------------------------------------------------------------
TEAM0673-003 06/01/2025
Rates Fringes
TRUCK DRIVER: 6 AXLES (DU PAGE AND KANE COUNTIES)
FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6)
AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $453.20 PER WEEK PENSON:
$589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.86 0.30
TRUCK DRIVER: 5 AXLES (DU PAGE AND KANE COUNTIES)
FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6)
AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $453.20 PER WEEK PENSON:
$589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.66 0.30
TRUCK DRIVER: 4 AXLES (DU PAGE AND KANE COUNTIES)
FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL
BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6)
AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $453.20 PER WEEK PENSON:
$589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.46 0.30
TRUCK DRIVER: 2-3 AXLES (DU PAGE AND KANE COUNTIES)
FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE
SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX
(6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR
HEALTH AND WELFARE: $453.20 PER WEEK PENSON:
$589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.31 0.30
----------------------------------------------------------------
TEAM0731-002 04/01/2025
Rates Fringes
TRAFFIC CONTROL DEVICE MONITOR (TRAFFIC SAFETY
WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED
TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC
CONTROL DEVICES, THE SET-UP AND INSTALLATION OF
TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH
BARRELS AND GLARE SCREENS, TRAFFIC CONTROL
SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS,
CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND
SIGN FABRICATION EQUIPMENT).........................$ 43.40 22.71
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
"