Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of IL20260012 rev 2
"General Decision Number: IL20260012 07/30/2026
State: Illinois
Construction Types: Heavy and Highway
Counties: Illinois Counties of
Bureau, Carroll, Henry, Jo Daviess, Lee,
Ogle, Rock Island, Stephenson, Whiteside
and Winnebago
Heavy Construction
Highway Construction
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
2 07/30/2026
CARP0004-010 05/01/2025
Rates Fringes
CARPENTER (HENRY AND ROCK ISLAND COUNTIES)..........$ 38.00 35.16
----------------------------------------------------------------
CARP0174-002 05/01/2025
Rates Fringes
CARPENTER (BUREAU COUNTY)...........................$ 40.28 38.95
----------------------------------------------------------------
CARP0790-004 05/01/2025
Rates Fringes
CARPENTER (CARROLL, JO DAVIESS, LEE, OGLE (OREGON
AND SOUTH THEREOF), STEPHENSON, AND WHITESIDE
COUNTIES)...........................................$ 48.60 38.53
----------------------------------------------------------------
CARP0792-002 05/01/2025
Rates Fringes
CARPENTER (OGLE (NORTHERN ONE-HALF), AND WINNEBAGO
COUNTIES)...........................................$ 51.00 36.13
----------------------------------------------------------------
ELEC0051-005 01/01/2024
Rates Fringes
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR
(ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON
CRANE OR LARGER) (BUREAU & HENRY (ANNAWAN, BURNS,
CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD
TWPS))..............................................$ 52.63 24.35
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (BUREAU &
HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE,
WELLER, AND WESTERFIELD TWPS))......................$ 39.92 20.22
LINE CONSTRUCTION: LINEMAN AND SUBSTATION
TECHNICIAN (BUREAU & HENRY (ANNAWAN, BURNS,
CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD
TWPS))..............................................$ 58.58 26.29
----------------------------------------------------------------
ELEC0145-003 12/04/2023
Rates Fringes
LINE CONSTRUCTION, CABLE SPLICER (CARROLL
(TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL,
SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK),
JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA,
DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD,
HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND,
VINEGAR HILL & WEST GALENA), HENRY (EXCEPT
ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER,
AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE
(TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON,
GARDEN PLAIN, LYN...................................$ 53.12 24.53
LINE CONSTRUCTION, DYNAMITER (CARROLL (TOWNSHIPS OF
FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA,
WASHINGTON, WOODLAND & YORK), JO DAVIESS
(TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST
GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE,
RAWLINS, RICE, SCALES MOUND, VINEGAR HILL &
WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS,
CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD
TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF
ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN,
LYNDON,.............................................$ 43.92 21.49
LINE CONSTRUCTION, GROUNDMAN (CARROLL (TOWNSHIPS OF
FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA,
WASHINGTON, WOODLAND & YORK), JO DAVIESS
(TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST
GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE,
RAWLINS, RICE, SCALES MOUND, VINEGAR HILL &
WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS,
CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD
TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF
ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN,
LYNDON,.............................................$ 34.64 18.43
LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR
(CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT
CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND &
YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL,
DERINDA, DUNLEITH, EAST GALENA, ELIZABETH,
GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES
MOUND, VINEGAR HILL & WEST GALENA), HENRY
(EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE,
WELLER, AND WESTERFIELD TWPS) ROCK ISLAND &
WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE,
FENTON, FULTON, GA..................................$ 41.61 20.73
LINE CONSTRUCTION, GROUNDMAN TRUCK DRIVER (CARROLL
(TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL,
SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK),
JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA,
DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD,
HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND,
VINEGAR HILL & WEST GALENA), HENRY (EXCEPT
ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER,
AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE
(TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON,
GARDEN P............................................$ 36.15 18.93
LINE CONSTRUCTION, LINEMAN, TECHNICIAN, HEAVY
EQUIPMENT OPERATOR (CARROLL (TOWNSHIPS OF FAIR
HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA,
WASHINGTON, WOODLAND & YORK), JO DAVIESS
(TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST
GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE,
RAWLINS, RICE, SCALES MOUND, VINEGAR HILL &
WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS,
CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD
TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF
ALBANY, CLYDE, ERIE, F..............................$ 52.67 24.38
----------------------------------------------------------------
ELEC0145-005 06/02/2025
Rates Fringes
CABLE SPLICER (CARROLL (CHADWICK, MT. CARROLL,
SAVANNA AND THOMPSON TWPS), HENRY (EXCLUDING
ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER,
AND WESTERFIELD TWPS), JO DAVIESS (SAVANNA ORDNANCE
DEPOT), WHITESIDE (REMAINDER OF COUNTY), AND ROCK
ISLAND COUNTIES)....................................$ 47.00 28.64
ELECTRICIAN (CARROLL (CHADWICK, MT. CARROLL,
SAVANNA AND THOMPSON TWPS), HENRY (EXCLUDING
ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER,
AND WESTERFIELD TWPS), JO DAVIESS (SAVANNA ORDNANCE
DEPOT), WHITESIDE (REMAINDER OF COUNTY), AND ROCK
ISLAND COUNTIES)....................................$ 46.00 28.56
----------------------------------------------------------------
ELEC0176-005 06/01/2023
Rates Fringes
ELECTRICIAN (BUREAU AND HENRY (ANNAWAN, BURNS,
CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WETHERSFIELD
TWPS) COUNTIES).....................................$ 50.45 44.96
----------------------------------------------------------------
ELEC0196-002 03/06/2023
Rates Fringes
LINE CONSTRUCTION, LINEMAN, SUBSTATION TECHNICIAN,
CABLE SPLICING TECHNICIAN, DIGGER OPERATOR, CRANE
OPERATOR 20 TONS AND ABOVE, AND SIGNAL TECHNICIAN
(CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE,
LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS
(TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT
VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS
GROVE, WARREN & WOODBINE), LEE, OGLE,
STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE,
HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY,
STERLING & TAPI.................................$ 59.17 27.12
LINE CONSTRUCTION: EQUIPMENT OPERATOR (CARROLL
(TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA,
ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS
OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA,
RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN &
WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE
(TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME,
JORDAN, MONTMORENCY, STERLING & TAPICO) & WINNEBAGO
COUNTIES) FOOTNOTE: A. PAID HOLIDAYS:
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND
THANKSGIVING DAY....................................$ 49.22 23.73
LINE CONSTRUCTION: GROUNDMAN (CARROLL (TOWNSHIPS
OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK,
SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE
RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH,
STOCKTON, THOMPSON, WARDS GROVE, WARREN &
WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE
(TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME,
JORDAN, MONTMORENCY, STERLING & TAPICO) & WINNEBAGO
COUNTIES) FOOTNOTE: A. PAID HOLIDAYS:
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND
THANKSGIVING DAY....................................$ 37.81 19.86
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER
(CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE,
LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS
(TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT
VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS
GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON,
WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS,
HUME, JORDAN, MONTMORENCY, STERLING & TAPICO) &
WINNEBAGO COUNTIES) FOOTNOTE: A. PAID
HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, AND THANKSGIVING DAY...........................$ 39.19 20.32
----------------------------------------------------------------
ELEC0364-002 06/02/2025
Rates Fringes
ELECTRICIAN (CARROLL (CHERRY GROVE, SHANNON, ROCK
CREEK, LIMA, WYSOX, ELKHORN GROVE TWPS), JO DAVIESS
(WARREN, RUSH, NORA, STOCKTON, WARDS GROVE,
PLEASANT VALLEY, AND BERRENMAN TWPS), LEE, OGLE,
STEPHENSON, WHITESIDE (GENESEE, JORDAN, HOPKINS,
STERLING, HUME, MONTGOMERY, TAMPICO, AND HAHNAMAN
TWPS) AND WINNEBAGO COUNTIES).......................$ 62.61 43.96
----------------------------------------------------------------
ENGI0150-004 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT;
ASPHALT HEATER AND PLANER COMBINATION; ASPHALT
SPREADER; ASPHALT SILO TENDER; AUTOGRADER, GOMACO
OR SIMILAR; BELT LOADER; CAISSON RIGS; CAR DUMPER,
CENTRAL REDI-MIX PLANT; COMBINATION BACKHOE FRONT
END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET
WITH ATTACHMENTS); BACKHOE WITH SHEAR ATTACHMENT;
CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE
CONVEYOR; CONCRETE PAVER OVER 27E CU FT; CONCRETE
PLACER; CONCRETE TUBE FLOAT; CRANES, ALL
ATTACHMENTS; CRANES, HAMMERHEAD, LINDEN, PECO AND
MACHINES OF A LIKE NATURE; CRETER CRANE; CRUSHER,
STONE; DERRICKS; DERRICK BOATS; DERRICKS,
TRAVELING; DREDGES; FIELD MECHANIC WELDER; FORMLESS
CURB AND GUTTER MACHINE; GRADALL AND MACHINES OF A
LIKE NATURE; GRADER, ELEVATING; GRADER, MOTOR
GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER,
PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER
MOUNTED; HOISTS, ONE, TWO, AND THREE DRUM;
HYDRAULIC BACKHOES; LOCOMOTIVE, ALL MUCKING
MACHINE; PILE DRIVERS AND SKID RIG; PRE-STRESS
MACHINE; PUMP CRETES DUAL RAM; ROCK DRILL-CRAWLER
OR SKID RIG; ROCK DRILL TRUCK MOUNTED; ROTO MILL
GRINDER, 36"" AND OVER; ROTO MILL GRINDER, LESS THAN
36""; SLIP- FORM PAVER; SOIL TEST DRILL RIG, TRUCK
MOUNTED; STRADDLE BUGGIES; GCI CRANE AND SIMILAR;
HYDRAULIC TELESCOPING FORM (TUNNEL); TIE BACK
MACHINE; TRACTOR DRAWN BELT LOADER: TRACTOR DRAWN
BELT LOADER WITH ATTACHED PUSHER; TRACTOR WITH
BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER
CONVEYOR MACHINE; RAISED OR BLIND HOE DRILL (TUNNEL
& SHAFT); TRENCHING MACHINE; TRUCK MOUNTED CONCRETE
PUMP WITH BOOM; TRUCK MOUNTED CONCRETE CONVEYOR;
UNDERGROUND BORING AND/OR MINING MACHINES UNDER 5
FT; WHEEL EXCAVATOR & WIDENER (APSCO) (CARROLL, JO
DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN
HALF) AND WINNEBAGO COUNTIES) PREMIMUM PAY:
LONG BOOM : CRANES & DERRICKS 90' TO 150'
INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR.
CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE
AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR
EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY
PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY
EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB
SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF
THE RATED CAPACITY IN EXCESS OF 50 TON. LONG
BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED.
CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE
DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN
EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE
CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM
CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK
MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED
CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS
CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK
MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR.
UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS,
SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50
PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF
7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE.
MINING MACHINES- BORING MACHINES: THE CREW
OPERATING AND MAINTAINING THE MINING MACHINES SHALL
BE COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 56.60 51.05
OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT;
BITUMINOUS MIXER; BOBCATS OVER .75 CU YD; BOILER
AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING
CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER
MACHINE, LESS THAN 1 CU YD BACKHOE BUCKET WITH
ATTACHMENTS; COMPRESSOR AND THROTTLE VALVE;
COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER
OR HYDRO HAMMER; CONCRETE GRINDING MACHINE;
CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING
27 CU FT; CONCRETE SPREADER; CONCRETE CURING
MACHINE, BURLAP MACHINE; BELTING MACHINE AND
SEALING MACHINE; CONVEYOR MUCK CARS (HAGLUND OR
SIMILAR TYPE); FINISHING MACHINE-CONCRETE; GREASER
ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER;
HOIST-SEWER DRAGGING MACHINE; HYDRAULIC BOOM
TRUCKS, ALL ATTACHMENTS; LOCOMOTIVES, DINKY; PUMP
CRETES, SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM
BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS;
ROTOTILLER, SEAMAN, ETC SELF-PROPELLED;
SCOOPS-TRACTOR DRAWN; SELF-PROPELLED COMPACTOR;
SPREADER-CHIP- STONE ETC; SCRAPER; SCRAPER-PRIME
MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO TO
GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH
MACHINE ATTACHED THERETO); TANK CAR HEATER;
TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR
COMPACTOR, ETC; TUG BOATS PREMIMUM PAY: LONG
BOOM : CRANES & DERRICKS 90' TO 150' INCLUDING
JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES &
DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA
$.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH
ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY:
CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING
50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE
COMPENSATED $.01 PER HOUR FOR EACH TON OF THE
RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM
PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE
MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS,
AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50
PER HOUR. CRETER CRANES: WHEN THE CRETER
CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE
OF EXTENDING 70' OR MORE, THE ENGINEER SHALL
RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED
CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE
PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF
EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE
$.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE
CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS
EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF
EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE
AN EXTRA $.50 PER HOUR. UNDERGROUND WORK:
EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE
PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES
WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS
SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR.
EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR
OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING
MACHINES- BORING MACHINES: THE CREW OPERATING
AND MAINTAINING THE MINING MACHINES SHALL BE
COMPENSATED AN ADDITIONAL $.50 PER HOUR.
(CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON,
WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES)....$ 56.05 51.05
OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS;
BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER;
COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER,
TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE
TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON
BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES;
HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS,
TUGGER SINGLE DRUM; JEEP DIGGERS; PIPE JACKING
MACHINES; POST- HOLE DIGGER; POWER SAW, CONCRETE,
POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN
ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS;
STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK
BOATS; TAMPER-FORM MOTOR DRIVEN (CARROLL, JO
DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN
HALF) AND WINNEBAGO COUNTIES) PREMIMUM PAY:
LONG BOOM : CRANES & DERRICKS 90' TO 150'
INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR.
CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE
AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR
EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY
PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY
EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB
SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF
THE RATED CAPACITY IN EXCESS OF 50 TON. LONG
BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED.
CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE
DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN
EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE
CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM
CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK
MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED
CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS
CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK
MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR.
UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS,
SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50
PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF
7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE.
MINING MACHINES- BORING MACHINES: THE CREW
OPERATING AND MAINTAINING THE MINING MACHINES SHALL
BE COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 54.75 51.05
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR
- SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL
OF 300 FT); AIR COMPRESSOR - LARGE OVER 185;
ASPHALT SPREADER BACKEND MAN; COMBINATION - SMALL
EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND
UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS,
MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING,
EXTRACTING OR DRILLING); LIGHT PLANTS ALL (1 TO 5);
PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF
300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING
MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC
DRILL WINCHES; BOBCATS UP TO AND INCLUDING .75 CU
YD (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON,
WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES)
PREMIMUM PAY: LONG BOOM : CRANES & DERRICKS
90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50
PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING
JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN
ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR
JIB. CAPACITY PAY: CRANES & DERRICKS WITH
MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN
90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER
HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS
OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT
BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED
AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL
RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER
CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A
CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE,
THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR.
TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK
MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM,
WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE
ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA.
TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED
CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT
ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER
SHALL RECEIVE AN EXTRA $.50 PER HOUR.
UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS,
SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER
HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2
POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50
PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF
7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE.
MINING MACHINES- BORING MACHINES: THE CREW
OPERATING AND MAINTAINING THE MINING MACHINES SHALL
BE COMPENSATED AN ADDITIONAL $.50 PER HOUR.........$ 53.30 51.05
OPERATOR: POWER EQUIPMENT, GROUP 5 OILERS
(CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON,
WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES) ..$ 50.85 51.05
----------------------------------------------------------------
ENGI0150-016 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*;
ASPHALT HEATER AND PLANER COMBINATION; ASPHALT
HEATER SCARFIRE*; ASPHALT SPREADER; AUTOGRADER; ABG
PAVER*; BACKHOES WITH CAISSON ATTACHMENT*;BELT
LOADER*;CAISSON RIGS*; CAR DUMPER, CENTRAL REDI-MIX
PLANT*; COMBINATION BACKHOE FRONT END LOADER
MACHINE (1 CU YD OR OVER BACKHOE BUCKET WITH
ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED)*;
CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*;
CONCRETE PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL
ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND
MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER,
STONE ETC.; ALL DERRICKS; DERRICK BOATS; DERRICKS,
TRAVELING*; DREDGES*; FIELD MECHANIC WELDER;
FORMLESS CURB AND GUTTER MACHINE; GRADALL AND
MACHINES OF A LIKE NATURE; GRADER, ELEVATING;
GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL,
FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL
POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE
DRUM; HYDRAULIC BACKHOES; LOCOMOTIVE, ALL MUCKING
MACHINE; PILE DRIVERS AND SKID RIG*; PRE- STRESS
MACHINE; PUMP CRETES DUAL RAM (REQUIRES FREQUENT
LUBRICATION AND WATER)*; ROCK/TRACK TAMPER; ROCK
DRILL TRUCK MOUNTED; ROTO MILL GRINDER, 36"" AND
OVER*; ROTO MILL GRINDER, LESS THAN 36""; SLIP- FORM
PAVER*; SOIL TEST DRILL RIG, TRUCK MOUNTED*;
STRADDLE BUGGIES; HYDRAULIC TELESCOPING FORM
(TUNNEL); TRACTOR DRAWN BELT LOADER*; TRACTOR DRAWN
BELT LOADER WITH ATTACHED PUSHER (TWO ENGINEERS);
TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENTS;
RAISED OR BLIND HOE DRILL (TUNNEL & SHAFT)*;
TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH
BOOM; UNDERGROUND BORING AND/OR MINING MACHINES 5
FT IN DIAMETER AND OVER TUNNEL, ETC.*; UNDERGROUND
BORING AND/OR MINING MACHINES UNDER 5 FT; WHEEL
EXCAVATOR* & WIDENER (APSCO) (BUREAU COUNTY (THE
PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE
TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU
COUNTY LINE.)) *EQUIPMENT REQUIRES AN OILER........$ 63.00 51.00
OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT;
BITUMINOUS MIXER; BOILER AND THROTTLE VALVE;
BULLDOZER; CAR LOADER TRAILING CONVEYORS;
COMBINATION BACKKHOE FRONT END LOADER MACHINE, LESS
THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS;
COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON
RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER;
CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER
7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE
SPREADER; CONCRETE CURING MACHINE, BURLAP MACHINE;
BELTING MACHINE AND SEALING MACHINE; CONCRETE WHEEL
SAW; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE);
ALL DRILLS; FINISHING MACHINE-CONCRETE; GREASER
ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER;
HOIST-SEWER DRAGGING MACHINE; HYDRAULIC BOOM
TRUCKS, ALL ATTACHMENTS; HYDRO- BLASTER REQUIRES
TWO OPERATORS (ONE GROUP 4); HYDRAULIC BOOM TRUCKS
(ALL ATTACHMENTS);LOCOMOTIVES, DINKY; OFF-ROAD
HAULING UNITS (INCLUDING ARTICULATING); LASER
SCREED; PUMP CRETES, SQUEEZE CRETES-SCREW TYPE
PUMPS, GYPSUM BULKER AND PUMP; ROCK DRILL-CRAWLER
OR SKID*; ROCK DRILL-TRUCK MOUNTED*; ROLLER
ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN,
ETC. SELF- PROPELLED; SCOOPS-TRACTOR DRAWN;
SELF-PROPELLED COMPACTOR; SPREADER-CHIP-STONE ETC;
SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS
OF SIZE (ADD $1.00 TO TO GROUP 2 HOURLY RATE FOR
EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO);
TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS
FOOT, DISC, COMPACTOR, ETC; TUG BOATS (BUREAU
COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY
26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE
NORTHERN BUREAU COUNTY LINE.)) *EQUIPMENT REQUIRES
AN OILER............................................$ 62.45 51.00
OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS;
BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER;
COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER,
TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE
TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON
BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES;
HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS,
TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE
JACKING MACHINES; POST-HOLE DIGGER; POWER SAW,
CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER
THAN ASPHALT; SEED AND STRAW BLOWER; STEAM
GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH
A-FRAME; WORK BOATS;TAMPER-FORM MOTOR DRIVEN
(BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF
HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO
THE NORTHERN BUREAU COUNTY LINE.))..................$ 60.40 51.00
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR
- SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL
OF 300 FT); AIR COMPRESSOR - LARGE OVER 250;
COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS
- SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER
50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT
(PILE DRIVING, EXTRACTING OR DRILLING);
HYDRO-BLASTER REQUIRES TWO OPERATORS (ONE GROUP 2);
LIGHT PLANTS ALL (1 TO 5); PUMPS, OVER 3"" (1 TO 3,
NOT TO EXCEED A TOTAL OF 300 FT); TRACTAIRE;
WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL
ELECTRIC DRILL WINCHES (BUREAU COUNTY (THE PORTION
LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR
VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY
LINE.)).............................................$ 59.00 51.00
OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS (ALL);
BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE
LOCATOR; OILERS (BUREAU COUNTY (THE PORTION
LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR
VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY
LINE.)) ..........................................$ 57.80 51.00
----------------------------------------------------------------
ENGI0150-020 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION
OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS);
TOW OR PUSH BOAT (HENRY (WESTERN HALF), ROCK
ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES)......$ 43.50 41.25
OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT
HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER
SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE;
BACKFILLER (THROW BUCKET); BLASTHOLER
SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES;
BOOM TRACTOR OR SIDE BOOM; BORING MACHINE
(DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING
HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES;
CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING &
PRIMING MACHINE; COMBINATION BACKHOE FRONT END
LOADER; COMBINATION CONCRETE FINISHING MACHINE AND
FLOAT; CONCRETE BREAKER OR HYDRO-HAMMER; CONCRETE
CONVEYOR OR PUMP; CONCRETE PAVER; CONCRETE
SPREADER; CONCRETE WHEEL SAW (LARGE
SELF-PROPELLED); CRUSHER (STONE, CONCRETE, ASPHALT,
ETC.); CURING-TINNING MACHINE; DIPPER DREDGE CRANE
MAN; DIPPER DREDGE OPERATOR; DUAL PURPOSE TRUCK
(BOOM, WINCH, ETC.); EXCAVATOR; FARM-TYPE TRACTOR
OPERATING SCOOP OR SCRAPER OR WITH POWER
ATTACHMENT; FORKLIFT (6000 LB. CAPACITY); GRADER,
MOTOR GRADER, MOTOR PATROL, AUTO GRADER, FORM
GRADER, PULL GRADER, SUB GRADER, ELEVATING GRADER;
GROUP EQUIPMENT GREASER; GUARD RAIL POST DRIVER;
HOISTS; HYDRAULIC DREDGE LEVERMAN OR ENGINEER;
HYDRO-VAC TRUCK MOUNTED OR PULL TYPE, AND SIMILAR
EQUIPMENT; LASER SCREED; LOADER (TRACK, RUBBER TIRE
OR ARTICULATED); LOCOMOTIVE ENGINEER;
MECHANIC-WELDER; MECHANICAL LOADED LOG CHIPPERS OR
SIMILAR MACHINES; MILLING MACHINE; MUCKING MACHINE;
PILE DRIVER; PIPE BENDING; PUG MILL; ROAD
WIDENER-SHOULDER SPREADER; SCRAPER
(SELF-PROPELLED); SELF-PROPELLED ROLLER OR TIRE
ROLLER (ON ASPHALT OR BLACKTOP), SHEEP FOOT OR PAD
FOOT COMPACTOR; SHOVEL; SLIP FORM PAVER; STEEL
TRACK-TYPE TRACTOR (DOZER, PUSH CAT, ETC.);
TRANSFER OR SHUTTLE BUGGY; TRENCHING MACHINE (40
H.P. & OVER); WORK BOAT. (HENRY (WESTERN HALF),
ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES).$ 41.50 41.25
OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED
OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER
(ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.;
DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR
MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT
POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT
ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB.
CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL
BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN
LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH
MACHINE (UNDER 40 H.P.). (HENRY (WESTERN HALF),
ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES).$ 38.85 41.25
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR
(400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE,
TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE;
MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL
OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT);
WATER PUMP (MORE THAN ONE WELL POINT PUMP). (HENRY
(WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN
HALF) COUNTIES).....................................$ 37.80 41.25
----------------------------------------------------------------
ENGI0649-005 04/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES:
OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE
BACKFILLER; TOWER CRANES-MOBILE, CRAWLER,
STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLINES;
DROTT YUMBO & SIMILAR TYPES CONSIDERED AS CRANES;
360 DEGREES SWING EXCAVATOR, BACKHOE; DERRICK
BOATS; PILE DRIVER AND SKID RIGS; CLAM SHELL;
LOCOMOTIVE CRANES; ROAD PAVERS (SINGLE DRUM, DUAL
DRUM, TRI BATCHER); MOTOR PATROL & POWER BLADES
(DUNMORE, ELEVATING & SIMILAR TYPES); MECHANICS;
CENTRAL CONCRETE MIXING PLANT OPERATOR; ASPHALT
BATCH PLANT OPERATOR AND PLANT ENGINEER; GRADALL;
CAISSON RIGS; SKIMMER SCOOP, KOEHRING SCOOPER;
DREDGES (ALL TYPES); HOPTOE; ALL CHERRY PICKERS;
WORK BOAT; ROSS CARRIER; HELICOPTER; DOZER;
TOURNADOZER; TOURNAPULLS (ALL & SIMILAR TYPES);
CONCRETE AND ALL RECYCLE MACHINES, MULTIPLE UNIT
EARTH MOVERS; 75 CENTS PER HOUR FOR EACH SCOOP OVER
ONE; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL
TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER;
ROCK CRUSHER; MATERIAL CRUSHER (OUTSIDE PITS AND
QUARRIES); SCREENING PLANTS (OUTSIDE PITS AND
QUARRIES); TUNNEL BORING MACHINE; HEAVY EQUIPMENT
GREASER (TOP GREASER ON SPREAD); CMI, AUTO GRADE,
CMI BELT PLACER (3 TRACK & SIMILAR TYPES); SIDE
BOOMS; STARTING ENGINEER ON PIPELINE OR
CONSTRUCTION (ELEVEN 11 PIECES OR MORE); ASPHALT
HEATER & PLANER COMBINATION; WHEEL TRACTORS WITH
DOZER, HOE OR END LOADER ATTACHEMENTS; CAT
EARTHWORK COMPACTORS AND SIMILAR TYPES; BLAW KNOX
SPREADER & SIMILAR TYPES; TRENCH MACHINES; PUMP
CRETE, BELT CRETE, SQUEEZE CRETE, SCREW TYPE PUMPS
& GYPSUM; CRETER CRANE; CONCRETE PUMP TRUCK;
FORMLESS FINISHING MACHINES; FLAHERTY SPREADER OR
SIMILAR TYPES; SCREEDMAN ON LAYDOWN MACHINE;
VERMEER CONCRETE SAW; LASER SCREED; SPAN SAW;
DREDGE LEVERMAN; DREDGE ENGINEER; LULL OR SIMILAR
TYPE; HYDRO-BOOM TRUCK; GUARD RAIL MACHINE. (HENRY
(EASTERN HALF) AND BUREAU (WESTERN HALF) COUNTIES)
- ESCALATED RATE ON CRANE, DERRICK BOOMS, AND
TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE
WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE
ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05
PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB.
$0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. -
OPERATING ENGINEERS WHO OPERATE LATTICE BOOM
CRAWLER CRANES, LATTICE BOOM TRUCK CRANES,
TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER
CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY
HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF
CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL
RECEIVE $1.60 PER HOUR OVER SCALE. A. ON
DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL
RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE
GROUP RATE; LEVELS B AND C ADD $3.00 TO THE
APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO
THE APPROPRIATE GROUP RATE..........................$ 47.79 43.42
OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP;
POWER LAUNCHES; BORING MACHINE & PIPE JACKING
MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A
BORING MACHINE; P-H ONE PASS SOIL CEMENT MACHINES
AND SIMILAR TYPES: WHEEL TRACTOR; BACK FILLERS;
EUCLID LOADER; FORK LIFTS; JEEP WITH DITCHING
MACHINES OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC
CEMENT & GRAVEL BATCHING PLANTS; MOBILE DRILLS SOIL
TESTING AND SIMILAR TYPES); PUGMILL WITH PUMP; ALL
1 AND 2 DRUM HOISTS; DE-WATERING SYSTEMS; STRAW
BLOWER; HYDRO SEEDER; BUMP GRINDERS, SELF
PROPELLED; ASSISTANT HEAVY EQUIPMENT GREASER; APSCO
SPREADER TRACTORS (TRACK-TYPE W/O POWER UNITS
PULLING ROLLERS); ROLLERS ON ASPHALT, BRICK, OR
MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS;
CEMENT STRIPPERS; CEMENT FINISHING MACHINES & CMI
TEXTURE & REEL CURING MACHINES; VIBRO-TAMPERS &
SIMILAR TYPES SELF-PROPELLED; MECHANICAL
BULL-FLOATS; SELF-PROPELLED CONCRETE SAW; TRUCK
MOUNTED POWER SAWS; CURB CUTTERS; MIXERS OVER 3
BAGS TO 27E; WINCH & BOOM TRUCKS; TRACTOR PULLING
POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL;
CLARY SCREED; MULE PULLING ROLLERS; PUGMILL W/O
PUMP; BARBER GREENE OR SIMILAR LOADERS; TRACK TYPE
TRACTOR WITH POWER UNIT ATTACHED; FIREMAN; SPRAY
MACHINE ON PAVING; CURB MACHINE; PAVED DITCH
MACHINE; POWER BROOM; SELF-PROPELLED SWEEPERS;
SELF- PROPELLED CONVEYORS; POWER SUBGRADER; OIL
DISTRIBUTOR; STRAIGHT TRACTOR; TRUCK CRANE OILER;
TRUCK TYPE OILERS; DIRECTIONAL BORING MACHINE;
HORIZONTAL DIRECTIONAL DRILL; ARTICULATING END DUMP
VEHICLES; STARTING ENGINEER (6 TO 10 PIECES).
(HENRY (EASTERN HALF) AND BUREAU (WESTERN HALF)
COUNTIES) - ESCALATED RATE ON CRANE, DERRICK
BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR
OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50
FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER
LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET
INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER
50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE
LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK
CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS,
TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN
CERTIFIED BY HTE NATIONAL COMMISSION FOR THE
CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT
THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER
SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS,
OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE
APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO
THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00
TO THE APPROPRIATE GROUP RATE.......................$ 44.09 43.42
OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED
TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER
(3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS;
ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM
GRADER; BULK CEMENT PLANT; OILERS. (HENRY (EASTERN
HALF) AND BUREAU (WESTERN HALF) COUNTIES) -
ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER
CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN
CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE
ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER
HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02
PER HOUR, PER TON - OVER 50-TON CAPACITY. -
OPERATING ENGINEERS WHO OPERATE LATTICE BOOM
CRAWLER CRANES, LATTICE BOOM TRUCK CRANES,
TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER
CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY
HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF
CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL
RECEIVE $1.60 PER HOUR OVER SCALE. A. ON
DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL
RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE
GROUP RATE; LEVELS B AND C ADD $3.00 TO THE
APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO
THE APPROPRIATE GROUP RATE..........................$ 38.03 43.42
----------------------------------------------------------------
IRON0111-003 07/01/2025
Rates Fringes
IRONWORKER (CARROLL (THOMPSON, SAVANNA & VICINITY),
HENRY, JO DAVIESS (EAST DUBUQUE, GALENA, HANOVER, &
VICINITY), KNOX (GALESBURG AND AREA NORTH OF THE
CITY), MERCER (EXCEPT SOUTHWEST PART), ROCK ISLAND,
WARREN (INCLUDES NORTHWEST PART), AND WHITESIDE
(WESTERN HALF) COUNTIES)............................$ 38.25 32.28
----------------------------------------------------------------
IRON0444-004 06/01/2022
Rates Fringes
IRONWORKER (BUREAU COUNTY)..........................$ 45.50 38.90
----------------------------------------------------------------
IRON0498-002 06/01/2021
Rates Fringes
IRONWORKER (CARROLL (REMAINDER), JO DAVIESS
(REMAINDER), LEE, OGLE, STEPHENS, WHITESIDE
(EASTERN HALF), AND WINNEBAGO COUNTIES).............$ 41.37 44.41
----------------------------------------------------------------
LABO0032-002 05/01/2025
Rates Fringes
LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL
CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN,
GRAVEL BOX MAN, BUMPMAN & SPOTTER, FORM HANDLER,
MATERIAL HANDLER, FENCING LABORER, CLEANING LUMBER,
PIT MAN, MATERIAL CHECKER, LANDSCAPER, UNLOADING
EXPLOSIVES, LAYING OF SOD, PLANTING OF TREES,
ASPHALT WORKERS WITH MACHINE & LAYERS, ASPHALT
PLANT LABORER, WRECKING, FIRE-PROOFING, DRIVING
STAKES, STRINGLINES FOR ALL MACHINERY, WINDOW
CLEANING, DEMOLITION WORKER, EXPLOSIVE HANDLING,
TRIMMING & REMOVAL OF TREES, MULTI-PLATE PIPE,
PILOT CARS FOR TRAFFIC CONTROL, POWER RIGGING
(WINNEBAGO COUNTY)..................................$ 47.04 36.31
LABORER: SKILLED LABORER: ASBESTOS ABATEMENT
WORKER, HAZARDOUS WASTE WORKER, HANDLING ANY
MATERIALS WITH ANY FOREIGN MATTER HARMFUL TO SKIN
OR CLOTHING, TRACK LABOR, CEMENT HANDLER, CHLORIDE
HANDLER, UNLOADING & LABORERS WITH STEEL WORKERS &
RE-BARS, WET CONCRETE WORKERS, TUNNEL TENDERS IN
FREE AIR, BATCH DUMPER, MASON TENDER, KETTLE & TAR
MAN, TANK CLEANER, PLATSIC INSTALLER, SCAFFOLD
WORKER, MOTORIZED BUGGIES OR MOTORIZED UNIT USED
FOR WET CONCRETE OR HANDLING OF BUILDING MATERIALS,
LABORERS WITH DE-WATERING SYSTEMS, SEWER WORKERS
PLUS DEPTH, VIBRATOR OPERATOR, CEMENT SILICA, CLAY,
FLY ASH, LIME & PLASTERS HANDLERS (BULK OR BAG);
COFFERDAM WORKER PLUS DEPTH, CONCRETE PAVING,
PLACING CUTTING & TYING OF REINFORCING, DECK HAND,
DREDGE HAND AND SHORE LABORER, BANKMAN ON FLOATING
PLANT, GRADE CHECKER, POWER TOOLS, FRONT END MAN ON
CHIP SPREADER, CAISSON WORKER PLUS DEPTH, GUNNITE
NOZZLEMAN, LEADMAN ON SEWER WORK, WELDER, CUTTER,
BURNER & TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER &
DRILL OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL
FORM SETTER - STREET & HIGHWAY, AIR TAMPING
HAMMERMAN, SIGNAL MAN ON CRANE, CONCRETE SAW
OPERATOR, SCREENMAN ON ASPHALT PAVER, TENDING
MASONS WITH HOT MATERIAL OR WHERE FOREIGN MATERIALS
ARE USED, MORTAR MIXER OPERATOR, MULTIPLE CONCRETE
DUCT - LEADMAN, LUTEMAN, ASPHALT RAKER, CURB
ASPHALT MACHINE OPERATOR, READY MIX SCALEMAN
PERMANENT PORTABLE OR TEMPORARY PLANT, LABORER
HANDLING MASTERPLATE OR SIMILAR MATERIALS, LASER
BEAM OPERATOR, CONCRETE BURNING MACHINE OPERATOR,
CORING MACHINE OPERATOR, PLASTER TENDER,
UNDERPINNING & SHORING OF BUILDINGS, PUMP MAN,
MANHOLE & CATCH BASIN, DIRT & STONE TAMPER, HOSEMAN
ON CONCRETE PUMP. (WINNEBAGO COUNTY)............$ 50.39 36.31
----------------------------------------------------------------
LABO0309-001 01/01/2024
Rates Fringes
LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM
MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING
OF FORMS OR LUMBER (IN BONE YARD), MOVING AND/OR
MAINTENANCE OF FLARES AND BARRICADES, OPERATION OF
ALL HAND, ELECTRIC, AIR, HYDRAULIC, OR MECHANICALLY
POWERED TOOLS UNDER THE THE LABORERS' INCLUDING
JACKHAMMERS, TAMPERS, AIR SPADES, AUGERS, CONCRETE
SAWS, CHAIN SAWS, UTILITY SAWS, ROCK DRILLS,
VIBRATORS, MORTAR MIXER, POWER AND HAND SAW (WHEN
CLEARING TIMBER), GENERAL LABORER (NOT ELSEWHERE
COVERED), CRAFT- TENDER, MATERIAL CHECKER, MATERIAL
HANDLER, FORM HANDLER, CONCRETE DUMPER, PUDDLER,
EXPLOSIVES HANDLER, CENTER STRIP, REINFORCING IN
CONCRETE, WIRE MESH HANDLER AND INSTALLER, PRIME
MOVER OR ANY MECHANICAL DEVICE TAKING THE PLACE OF
CONCRETE BUGGY OR WHEEL-BARROW, SANDPOINT SETTER,
ASPHALT KETTLEMAN, SHEETING HAMMER DRIVERS, LAYING
AND JOINING OF TELEPHONE CONDUIT, GAS DISTRIBUTION
MEN, PIPE SETTER ON LATERALS, DRAIN TILES, CULVERT
PIPE, AND STORM SEWER CATCH BASIN LEADS, CATCH
BASINS, MANHOLES, BATCH DUMPERS, TANK CLEANERS,
COFFERDAM WORKER, BANKMAN ON FLOATING PLANT,
JOINTMAN WITH PIPELAYERS BACK-UP MAN (CORKER, JOINT
MAKER) WITH PIPE SETTER ON SEWER AND WATER MAINS,
BATTERBOARD MAN OR LASER OPERATOR ON SEWER AND
WATER MAIN, LABORER IN DITCH, OR TUNNEL, ON SEWER
OR WATER MAINS AND TELEPHONE CONDUIT, CUTTERS,
BURNERS, TORCHMAN, GRAVEL BOX MAN, ASPHALT PLANT
LABORER, CONCRETE PLANT LABORER, DECK HAND,
UNLOADING OF STEEL AND REBAR, LASER BEAM OPERATOR,
WRECKING LABORERS. (ROCK ISLAND COUNTY)............$ 33.77 23.60
LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM
SETTER, HEAD DYNAMITE MAN (POWDERMAN) HEAD STRING
OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER
OR WATER MAIN, GUNNITE NOZZLE MAN, ASPHALT OR
CONCRETE CURB MACHINE OPERATOR, HEAD GRADE MAN,
HEAD TUNNEL MINER, CONCRETE BURNING MACHINE
OPERATOR, CORING MACHINE OPERATOR, WELDER,
HAZARDOUS WASTE WORKER, ASBESTOS ABATEMENT WORKER.
(ROCK ISLAND COUNTY)................................$ 34.27 23.60
LABORER GROUP 3 CONCRETE SPECIALIST (ROCK ISLAND
COUNTY).............................................$ 34.90 23.60
----------------------------------------------------------------
LABO0393-002 05/01/2025
Rates Fringes
LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT
LISTED (BUREAU COUNTY)..............................$ 40.54 32.42
LABORER GROUP 2 SEMI-SKILLED - HANDLING OF
MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT
AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR
CLOTHING; TRACK LABORERS; CEMENT HANDLERS; CHLORIDE
HANDLERS; UNLOADING AND LABORERS WITH STEEL WORKERS
AND RE-BARS; CONCRETE WORKERS )WET); BATCH DUMPERS;
MASON TENDERS; KETTLE AND TAR MEN; TANK CLEANERS;
PLASTIC INSTALLERS; SCAFFOLD WORKERS; MOTORIZED
BUGGIES OR MOTORIZED UBIT USED FOR WET CONCRETE OR
HANDLING OF BUILDING MATERIALS; LABORERS WITH
DE-WATERING SYSTEMS; SEWER WORKERS PLUS DEPTH;
VIBRATOR OPERATORS; MOTOR MIXER OPERATORS; CEMENT
SILICA, CLAY, FLY ASH, LIME AND PLASTERS, HANDLERS
(BULK OR BAG); COFFERDAM WORKERS PLUS DEPTH;
CONCRETE PAVING, PLACING, CUTTING AND TYING OF
REINFORCING; DECK HAND, DREDGE HAND AND SHORE
LABORERS; BACKMEN ON FLOATING PLANT; ASPHALT
WORKERS WITH MACHINE AND LAYERS; GRADE CHECKER;
POWER TOOLS; DRIVING ALL STAKES, STRINGLINES FOR
ALL MACHINERY; SETTING AND BUILDING OF MANHOLES AND
CATCH BASINS; STRIPPING OF ALL CONCRETE FORMS
EXCEPT PAVING FORMS; ALL CONCRETE PAVING AND SLOPE
WALLS, PLACING, CUTTING AND TYING OF REINFORCING
(RE-BARS AND WIRE MESH) (BUREAU COUNTY)............$ 40.54 32.42
LABORER GROUP 3 SKILLED - MASON TENDERS; CAISSON
WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; LEAD MAN ON
SEWER WORK; WELDERS, CUTTERS, BURNERS & TORCHMEN;
CHAIN SAW OPERATORS; PAVING BREAKER, JACKHAMMER &
DRILL OPERATORS; LAYOUT MAN AND/OR TILE LAYER;
STEEL FORM SETTERS (STREET & HWY); AIR TAMPING
HAMMERMAN; SIGNAL MAN ON CRANE; CONCRETE SAW
OPERATOR; SCREENMAN ON ASPHALT PAVERS; FRONT END
MAN ON CHIP SPREADER; LABORERS TENDING MASONS WITH
HOT MATERIALS OR WHERE FOREIGN MATERIALS ARE USED;
MULTIPLE CONCRETE DUCT-LEADMAN; LUTEMAN; ASPHALT
RAKER; CURB ASPHALT MACHINE OPERATOR; READY MIX
SCALEMEN, PERMANENT, PORTABLE OR TEMPORARY PLANT;
LABORERS HANDLING MASTERPLATE OR SIMILAR MATERIALS;
LASER BEAM OPERATOR; CORING MACHINE OPERATOR;
PLASTERER TENDERS; UNDERPINNING AND SHORING OF
BUILDING; MATERIAL SELECTOR WHEN WORKING WITH
FIREBRICK OR CASTABLE MATERIALS; FIRE WATCH;
SIGNALLING OF ALL POWER EQUIPMENT; TREE TOPPER OR
TRIMMER (BUREAU COUNTY)............................$ 40.54 32.42
LABORER GROUP 4 DYNAMITE MAN (BUREAU COUNTY)........$ 41.54 32.42
LABORER GROUP 5 ASBESTOS ABATEMENT WORKER AND
HAZARDOUS WASTE WORKER (BUREAU COUNTY)..............$ 42.54 32.42
----------------------------------------------------------------
LABO0538-005 05/01/2024
Rates Fringes
LABORER: GENERAL LABORER: ALL CLASSIFICATIONS NOT
LISTED BELOW. (HENRY COUNTY).....................$ 35.23 28.10
LABORER: SKILLED LABORER: FLAGGERS; TRAFFIC CONTROL
AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS
TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN
MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK
LABORERS; CHLORIDE HANDLERS; UNLOADING AND LABORERS
WITH STEEL WORKERS AND RE-BARS; CONCRETE WORKERS
(WET); BATCH DUMPERS; MASON TENDERS; KETTLE AND TAR
MEN; PLASTIC INSTALLERS; SCAFFOLD WORKERS;
MOTORIZED BUGGIES OR MOTORIZED UNIT USED FOR WET
CONCRETE OR HANDLING OF BUILDING MATERIALS;
LABORERS WITH DE-WATERING SYSTEMS; SEWER WORKERS
PLUS DEPTH; VIBRATOR OPERATORS; MOTOR MIXER
OPERATORS; CEMENT SILICA, CLAY, FLY ASH, LIME AND
PLASTERS, HANDLERS (BULK OR BAG); COFFERDAM WORKERS
PLUS DEPTH; CONCRETE PAVING, PLACING, CUTTING AND
TYING OF REINFORCING; DECKHAND, DREDGE HAND AND
SHORE LABORERS; BACKMEN ON FLOATING PLANT; ASPHALT
WORKERS WITH MACHINE AND LAYERS; GRADE CHECKER;
POWER TOOLS; STRIPPING OF ALL CONCRETE FORMS EXCEPT
PAVING FORMS, DUMPMEN AND SPOTTERS, WHEN NECESSARY;
CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN;
TUNNEL HELPERS IN FREE AIR; ROD AND CHAINMEN;
WELDERS, CUTTERS, BURNERS, AND TORCHMEN; CHAINSAW
OPERATOR; PAVING BREAKER, JACKHAMMER AND DRILL
OPERATOR, LAYOUT MAN AND /OR TILE LAYER; STEEL FORM
SETTERS - STREET AND HIGHWAY, AIR TAMPING
HAMMERMAN; SIGNALMAN ON CRANE CONCRETE SAW
OPERATOR; SCREEDMAN ON ASPHALT PAVERS; FRONT END
MAN ON CHIP SPREADER; MULTIPLE CONCRETE DUCT;
LUTEMAN, ASPHALT RAKER; CURB ASPHALT MACHINE
OPERATOR. (HENRY COUNTY)........................$ 36.23 28.10
----------------------------------------------------------------
LABO0727-002 05/01/2025
Rates Fringes
LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL
CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN,
GRAVEL BOX MAN, DUMPMAN & SPOTTER, FORM HANDLER,
MATERIAL HANDLER, FENCING LABORER, CLEANING LUMBER,
PIT MAN, UNLOADING EXPLOSIVES, REMOVAL OF TREES,
ASPHALT WORKERS WITH MACHINE & LAYERS, ASPHALT
PLANT LABORER, WRECKING, FIREPROOFING, DRIVING
STAKES, STRINGLINES FOR ALL MACHINERY, WINDOW
CLEANING. (CARROLL, JO DAVIESS, LEE, OGLE,
STEPHENSON, AND WHITESIDE COUNTIES).................$ 49.17 34.25
LABORER: SKILLED LABORER: HANDLING ANY MATERIALS
WITH ANY FOREIGN MATTER HARMFUL TO SKIN OR
CLOTHING, TRACK LABOR, CEMENT HANDLER, CHLORIDE
HANDLER, UNLOADING & LABORERS WITH STEEL WORKERS &
RE-BARS, WET CONCRETE WORKERS, TUNNEL TENDERS IN
FREE AIR, BATCH DUMPER, MASON TENDER, KETTLE & TAR
MAN, TANK CLEANER, PLASTIC INSTALLER, SCAFFOLD
WORKER, MOTORIZED BUGGIES OR MOTORIZED UNIT USED
FOR WET CONCRETE OR SO HANDLING OF BUILDING
MATERIALS, LABORERS WITH DE- WATERING SYSTEMS,
SEWER WORKERS PLUS DEPTH, VIBRATOR OPERATOR; CEMENT
SILICA, CLAY, FLY ASH, LIME & PLASTERS HANDLERS
(BULK OR BAG); COFFERDAM WORKER PLUS DEPTH,
CONCRETE PAVING, PLACING CUTTING & TYING OF
REINFORCING, DECK HAND, DREDGE HAND AND SHORE
LABORER, BANKMAN ON FLOATING PLANT, GRADE CHECKER,
POWER TOOLS, FRONT END MAN ON CHIP SPREADER,
CAISSON WORKER PLUS DEPTH, GUNNITER NOZZLEMAN,
LEADMAN ON SEWER WORK, WELDER, CUTTER, BURNER &
TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER & DRILL
OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL FORM
SETTER - STREET & HIGHWAY, AIR TAMPING HAMMERMAN,
SIGNAL MAN ON CRANE, CONCRETE SAW OPERATOR,
SCREENMAN ON ASPHALT PAVER, TENDING MASONS WITH HOT
MATERIAL OR WHERE FOREIGN MATERIALS ARE USED,
MORTAR MIXER OPERATOR, MULTIPLE CONCRETE DUCT -
LEADMAN, LUTEMAN, ASPHALT RAKER CURB ASPHALT
MACHINE OPERATOR, READY MIX SCALEMAN PERMANENT
PORTABLE OR TEMPORARY PLANT, LABORER HANDLING
MASTERPLATE OR SIMILAR MATERIALS, LASER BEAM
OPERATOR, CONCRETE BURNING MACHINE OPERATOR, CORING
MACHINE OPERATOR, PLASTER TENDER, UNDERPINNING &
SHORING OF BUILDINGS, PUMP MAN, MANHOLE & CATCH
BASIN, DIRT & STONE TAMPER, HOSEMAN ON CONCRETE
PUMP. (CARROLL, JO DAVIESS, LEE, OGLE,
STEPHENSON, AND WHITESIDE COUNTIES).................$ 52.52 34.25
----------------------------------------------------------------
PAIN0030-004 06/01/2024
Rates Fringes
PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING,
PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY
STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE,
STEPHENSON AND WINNEBAGO COUNTIES)..................$ 45.15 29.41
----------------------------------------------------------------
PAIN0030-010 06/01/2023
Rates Fringes
PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY,
AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL
TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES
(BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON,
MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES).......$ 40.00 26.90
----------------------------------------------------------------
PAIN1178-001 06/01/2022
Rates Fringes
PAINTER: BRIDGES (CARROLL, HENRY, ROCK ISLAND, AND
WHITESIDE COUNTIES).................................$ 32.00 17.37
PAINTER: BRUSH AND ROLLER (CARROLL, HENRY, ROCK
ISLAND, AND WHITESIDE COUNTIES).....................$ 30.00 17.37
PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING
(CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE
COUNTIES)...........................................$ 30.50 17.37
----------------------------------------------------------------
PLAS0011-004 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (CARROLL, JO
DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE
(EXCEPT ERIE AND AREA SOUTHWEST THEREOF) COUNTIES)..$ 38.48 38.77
PLASTERER (CARROLL, JO DAVIESS, LEE, OGLE,
STEPHENSON, AND WHITESIDE (EXCEPT ERIE AND AREA
SOUTHWEST THEREOF) COUNTIES)........................$ 38.98 36.58
----------------------------------------------------------------
PLAS0011-005 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (BUREAU COUNTY)......$ 40.50 33.54
----------------------------------------------------------------
PLAS0011-017 06/01/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (WINNEBAGO COUNTY)...$ 41.03 36.39
----------------------------------------------------------------
PLAS0018-007 06/01/2015
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (HENRY COUNTY).......$ 36.70 22.08
----------------------------------------------------------------
PLAS0018-036 01/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (ROCK ISLAND COUNTY).$ 28.52 24.04
----------------------------------------------------------------
TEAM0325-002 06/01/2025
Rates Fringes
TRUCK DRIVER: 2 OR 3 AXLES (CARROLL (NORTH OF
ROUTE. #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF
ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND
WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS
ADDITIONAL PER AXLE OVER 6 AXLES....................$ 48.47 26.70
TRUCK DRIVER: 4 AXLES (CARROLL (NORTH OF ROUTE.
#72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE
#78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO
COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER
AXLE OVER 6 AXLES...................................$ 48.62 26.70
TRUCK DRIVER: 5 AXLES (CARROLL (NORTH OF ROUTE.
#72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE
#78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO
COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER
AXLE OVER 6 AXLES...................................$ 48.82 26.70
TRUCK DRIVER: 6 AXLES (CARROLL (NORTH OF ROUTE.
#72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE
#78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO
COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER
AXLE OVER 6 AXLES...................................$ 48.93 26.70
----------------------------------------------------------------
TEAM0330-003 06/01/2025
Rates Fringes
TRUCK DRIVER: 2-3 AXLES (LEE (EAST OF ROUTE 251,
COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND
OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE,
BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE
72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE,
MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE:
A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION
$644.34 PER WEEK LOW BOY CLASSIFICATION IS AN
ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER
AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN
SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 44.83 0.30
TRUCK DRIVER: 4 AXLES (LEE (EAST OF ROUTE 251,
COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND
OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE,
BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE
72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE,
MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE:
A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION
$644.34 PER WEEK LOW BOY CLASSIFICATION IS AN
ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER
AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN
SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 44.98 0.30
TRUCK DRIVER: 5 AXLES (LEE (EAST OF ROUTE 251,
COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND
OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE,
BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE
72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE,
MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE:
A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION
$644.34 PER WEEK LOW BOY CLASSIFICATION IS AN
ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER
AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN
SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.18 0.30
TRUCK DRIVER: 6 AXLES (LEE (EAST OF ROUTE 251,
COMPTON, LEE, PAW PAW, SCARBORO, & STEWARD), AND
OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE,
BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE
72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE,
MONROE, ROCHELLE, & SCOTT) COUNTIES) FOOTNOTE:
A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION
$644.34 PER WEEK LOW BOY CLASSIFICATION IS AN
ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER
AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN
SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY. 900
STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR
THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID
VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS
- 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID
VACATION............................................$ 45.38 0.30
----------------------------------------------------------------
TEAM0371-004 05/01/2025
Rates Fringes
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING
LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES
AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE
UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES;
MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP
TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO
AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO
6,000 LB CAPACITY. (HENRY AND ROCK ISLAND
COUNTIES)...........................................$ 45.35 25.72
TRUCK DRIVER, GROUP 2 (HENRY AND ROCK ISLAND
COUNTIES)...........................................$ 45.93 25.72
TRUCK DRIVER, GROUP 3 (HENRY AND ROCK ISLAND
COUNTIES)...........................................$ 46.25 25.72
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.
(HENRY AND ROCK ISLAND COUNTIES)....................$ 46.60 25.72
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL
PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS
WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES)........$ 47.71 25.72
----------------------------------------------------------------
TEAM0722-001 05/01/2025
Rates Fringes
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING
LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES
AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE
UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES;
MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP
TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO
AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO
6,000 LB CAPACITY. (BUREAU, CARROLL (WEST OF
ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF
ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF
ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE
COUNTIES)...........................................$ 45.29 25.42
TRUCK DRIVER, GROUP 2 (BUREAU, CARROLL (WEST OF
ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF
ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF
ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE
COUNTIES)...........................................$ 45.88 25.42
TRUCK DRIVER, GROUP 3 (BUREAU, CARROLL (WEST OF
ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF
ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF
ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE
COUNTIES)...........................................$ 46.15 25.42
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.
(BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE
72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF
ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE
251), AND WHITESIDE COUNTIES).......................$ 46.54 25.42
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL
PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS
WASTE WORK. (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH
OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE
(WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST
OF ROUTE 251), AND WHITESIDE COUNTIES)..............$ 47.64 25.42
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to
the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at
least $13.65 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the
contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"