Prevailing Wage Index
HomePrevailing wage by stateIllinoisDeterminations › IL20260014

Wage determination IL20260014

Heavy, Highway construction - Illinois, revision 2, modified 2026-07-30

Verify against the official document: this page mirrors WD IL20260014 revision 2 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

CARP0004-009 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
CARPENTER (HENDERSON AND MERCER COUNTIES)$38.0035.16

CARP0174-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
CARPENTER (STARK COUNTY)$40.2838.95

CARP0237-003 (collectively bargained (union) rate, 05/15/2020)

ClassificationBase rateFringes
CARPENTER (FULTON AND TAZEWELL (SOUTHERN 2/3) COUNTIES)$36.1630.07

CARP0237-013 (collectively bargained (union) rate, 05/15/2020)

ClassificationBase rateFringes
CARPENTER (FULTON, KNOX, PEORIA, AND TAZEWELL (NORTHERN 1/3) COUNTIES)$36.1630.07
PILEDRIVERMAN (FULTON, KNOX, PEORIA, AND TAZEWELL (NORTHERN 1/3) COUNTIES)$36.1630.07

CARP0270-010 (collectively bargained (union) rate, 05/15/2020)

ClassificationBase rateFringes
CARPENTER (MCDONOUGH AND WARREN COUNTIES)$37.6628.57
PILEDRIVERMAN (MCDONOUGH AND WARREN COUNTIES)$37.6628.57

CARP0270-011 (collectively bargained (union) rate, 05/15/2020)

ClassificationBase rateFringes
CARPENTER (HANCOCK COUNTY)$35.0528.57
PILEDRIVERMAN (HANCOCK COUNTY)$35.0528.57

ELEC0034-006 (collectively bargained (union) rate, 03/01/2018)

ClassificationBase rateFringes
ELECTRICIAN (FULTON (FAIRVIEW, FARMINGTON, JOSHUA, CANTON, ORION, PUTNAM, BUCKHEART, BANNER, FARMERS, BERNADOTTE, LEWISTOWN, LIVERPOOL, VERMONT, PLEASANT, ISABEL, WATERFORD, ASTORI$36.5121.19

ELEC0034-007 (collectively bargained (union) rate, 06/01/2022)

ClassificationBase rateFringes
ELECTRICIAN (FULTON (CASS, DEERFIELD, ELLISVILLE, HARRIS, LEE, UNION, YOUNG, & HICKORY TWPS), HENDERSON, KNOX, MCDONOUGH (BLANDINSVILLE, PRAIRIE CITY, EMMET, TENNESEE, SCOTLAND, SC$38.3224.24

ELEC0051-002 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDER$52.6324.35
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES)$39.9220.22
LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES)$58.5826.29

ELEC0145-006 (collectively bargained (union) rate, 06/02/2025)

ClassificationBase rateFringes
CABLE SPLICER (MERCER COUNTY (EXCEPT OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS))$47.0028.64
ELECTRICIAN (MERCER COUNTY (EXCEPT OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS))$46.0028.56

ELEC0145-007 (collectively bargained (union) rate, 12/04/2023)

ClassificationBase rateFringes
LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS))$41.6120.73
LINE CONSTRUCTION: CABLE SPLICER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY$53.1224.53
LINE CONSTRUCTION: DYNAMITER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY$43.9221.49
LINE CONSTRUCTION: GROUNDMAN (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY$34.6418.43
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGI$36.1518.93
LINE CONSTRUCTION: LINEMAN, TECHNICIAN, HEAVY EQUIPMENT OPERATOR (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, $52.6724.38

ENGI0150-021 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (MERCER COUNTY)$43.5041.25
OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER $41.5041.25
OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMIL$38.8541.25
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN $37.8041.25

ENGI0649-002 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLIN$47.7943.42
OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORING MACHINE; P-H ONE PASS SOIL C$44.0943.42
OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON$38.0343.42

IRON0046-005 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
IRONWORKER (FULTON COUNTY (SOUTHERN TIP INCLUDING MARBLETOWN ASTORIA, & SUMMUM TWPS))$37.6032.94

IRON0111-004 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER (KNOX (GALESBURG AND AREA NORTH THEREOF), MERCER (EXCEPT SOUTHWEST PART), AND WARREN (NORTHWEST PART) COUNTIES)$38.2532.28

IRON0112-004 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
IRONWORKER (FULTON (EASTERN 2/3), KNOX (SOUTH AND EAST OF GALESBURG), PEORIA, STARK, AND TAZEWELL COUNTIES)$45.4834.13

IRON0577-006 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
IRONWORKER (FULTON (NORTH OF SUMMUM & MARBLETOWN TWPS, WEST 1/3), HANCOCK, HENDERSON, KNOX (WEST AND SOUTHWEST OF GALESBURG), MCDONOUGH, MERCER, AND WARREN (EXCEPT NORTHWEST PART) $36.3025.80

LABO0165-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
LABORER GROUP 1 GENERAL LABORER - LAYING OF TEMPORARY GAS, OIL, AIR, AND WATER LINES; ALL LABORER WORK PERTAINING TO ASPHALT AND ASPHALT PLANTS IF NEEDED; WATERPROOFING MEMBRANE SY$37.3238.14
LABORER GROUP 2 SKILLED LABORER - JACKHAMMER & DRILL OPERATOR; GUNITE PUMP AND POT MAN; PUDDLERS, VIBRATOR MEN; WIRE FABRIC PLACER; SANDBLAST PUMP AND POT MAN; STRIKE OFF CONCRETE;$37.6238.14
LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER (INCLUDING MAINTAINING OF MANIFEST SHEET); LEAD BASE PAINT ABATEMENT WORKER (PEORIA AND TAZEWELL (NORTHWEST) COUNTI$38.0738.14

LABO0231-002 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
LABORER (FULTON AND TAZEWELL (SOUTHEAST) COUNTIES)$38.5033.45

LABO0231-005 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
LABORER (HANCOCK AND MCDONOUGH COUNTIES)$33.5030.13

LABO0309-003 (collectively bargained (union) rate, 01/01/2024)

ClassificationBase rateFringes
LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING OF FORMS OR LUMBER (IN BONE YARD), MOVING AND/OR MAINTENANCE OF FLARES AND BARRIC$33.7723.60
LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN (POWDERMAN) HEAD STRING OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE NOZZI$34.2723.60
LABORER GROUP 3 CONCRETE SPECIALIST (MERCER COUNTY)$34.9023.60

LABO0538-001 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
LABORERS: GENERAL LABORER: ALL CLASSIFICATIONS NOT LISTED BELOW. (HENDERSON, KNOX, WARREN, AND STARK (WEST) COUNTIES)$35.2328.10
LABORERS: SKILLED LABORER: FLAGGERS; TRAFFIC CONTROL AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR C$36.2328.10

LABO0996-003 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED BELOW (STARK COUNTY (EAST))$39.1728.01
LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE PAINT WORKER (STARK COUNTY (EAST))$40.1728.01

PAIN0030-010 (collectively bargained (union) rate, 06/01/2023)

ClassificationBase rateFringes
PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGST$40.0026.90

PAIN0157-001 (collectively bargained (union) rate, 06/01/2023)

ClassificationBase rateFringes
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES)$40.0026.90

PAIN1178-003 (collectively bargained (union) rate, 06/01/2022)

ClassificationBase rateFringes
PAINTER: BRIDGES (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES)$32.0017.37
PAINTER: BRUSH AND ROLLER (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES)$30.0017.37
PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES)$30.5017.37

PLAS0018-011 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (FULTON (NORTHWESTERN PART), KNOX, MERCER (SOUTHEASTERN CORNER), AND WARREN COUNTIES)$35.3827.31

PLAS0018-012 (collectively bargained (union) rate, 06/01/2015)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (STARK COUNTY)$36.7022.08

PLAS0018-013 (collectively bargained (union) rate, 05/01/2021)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (FULTON (EXCEPT NORTHWEST PART), PEORIA, AND TAZEWELL COUNTIES)$32.9830.70

PLAS0018-028 (collectively bargained (union) rate, 05/01/2016)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (HANCOCK, HENDERSON (SOUTHERN HALF), AND MCDONOUGH COUNTIES)$28.6424.57

PLAS0018-037 (collectively bargained (union) rate, 01/01/2020)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (HENDERSON (NORTHERN HALF) AND MERCER (EXCEPT SOUTHEASTERN CORNER) COUNTIES)$28.5224.04

TEAM0371-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WARE$45.3525.72
TRUCK DRIVER, GROUP 2 (MERCER COUNTY)$45.9325.72
TRUCK DRIVER, GROUP 3 (MERCER COUNTY)$46.2525.72
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (MERCER COUNTY)$46.6025.72
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MERCER COUNTY)$47.7125.72

TEAM0627-002 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WARE$43.2424.27
TRUCK DRIVER, GROUP 2 (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES)$43.8324.27
TRUCK DRIVER, GROUP 3 (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES)$44.1024.27
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES)$44.4924.27
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL,$45.5924.27
Full official text of IL20260014 rev 2
"General Decision Number: IL20260014 07/30/2026


State: Illinois


Construction Types: Heavy and Highway


Counties: Illinois Counties of 
Fulton, Hancock, Henderson, Knox, 
McDonough, Mercer, Peoria, Stark, 
Tazewell and Warren




Heavy Construction

Highway Construction


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026
          2                07/30/2026


 CARP0004-009 05/01/2025
                                                     Rates                  Fringes
CARPENTER (HENDERSON AND MERCER COUNTIES)...........$ 38.00                  35.16
----------------------------------------------------------------

 CARP0174-003 05/01/2025
                                                     Rates                  Fringes
CARPENTER (STARK COUNTY)............................$ 40.28                  38.95
----------------------------------------------------------------

 CARP0237-003 05/15/2020
                                                     Rates                  Fringes
CARPENTER (FULTON AND TAZEWELL (SOUTHERN 2/3) 
COUNTIES)...........................................$ 36.16                  30.07
----------------------------------------------------------------

 CARP0237-013 05/15/2020
                                                     Rates                  Fringes
CARPENTER (FULTON, KNOX, PEORIA, AND TAZEWELL 
(NORTHERN 1/3) COUNTIES)............................$ 36.16                  30.07
PILEDRIVERMAN (FULTON, KNOX, PEORIA, AND TAZEWELL 
(NORTHERN 1/3) COUNTIES)............................$ 36.16                  30.07
----------------------------------------------------------------

 CARP0270-010 05/15/2020
                                                     Rates                  Fringes
CARPENTER (MCDONOUGH AND WARREN COUNTIES)...........$ 37.66                  28.57
PILEDRIVERMAN (MCDONOUGH AND WARREN COUNTIES).......$ 37.66                  28.57
----------------------------------------------------------------

 CARP0270-011 05/15/2020
                                                     Rates                  Fringes
CARPENTER (HANCOCK COUNTY)..........................$ 35.05                  28.57
PILEDRIVERMAN (HANCOCK COUNTY)......................$ 35.05                  28.57
----------------------------------------------------------------

 ELEC0034-006 03/01/2018
                                                     Rates                  Fringes
ELECTRICIAN (FULTON (FAIRVIEW, FARMINGTON, JOSHUA, 
CANTON, ORION, PUTNAM, BUCKHEART, BANNER, FARMERS, 
BERNADOTTE, LEWISTOWN, LIVERPOOL, VERMONT, 
PLEASANT, ISABEL, WATERFORD, ASTORIA, WOODLAND, AND 
KERTON TWPS), PEORIA, STARK (WEST JERSEY, ESSEX, 
AND VALLEY TWPS), & TAZEWELL COUNTIES)..............$ 36.51                  21.19
----------------------------------------------------------------

 ELEC0034-007 06/01/2022
                                                     Rates                  Fringes
ELECTRICIAN (FULTON (CASS, DEERFIELD, ELLISVILLE, 
HARRIS, LEE, UNION, YOUNG, & HICKORY TWPS), 
HENDERSON, KNOX, MCDONOUGH (BLANDINSVILLE, PRAIRIE 
CITY, EMMET, TENNESEE, SCOTLAND, SCIOTA, BUSHNELL, 
CHALMERS TWPS), MERCER (OHIO GROVE, NORTH 
HENDERSON, AND SUEZ TWPS), AND WARREN COUNTIES).....$ 38.32                  24.24
----------------------------------------------------------------

 ELEC0051-002 01/01/2024
                                                     Rates                  Fringes
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR 
(ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON 
CRANE OR LARGER) (FULTON, HANCOCK, HENDERSON, KNOX, 
MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), 
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 52.63                  24.35
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (FULTON, 
HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. 
HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, 
AND WARREN COUNTIES)................................$ 39.92                  20.22
LINE CONSTRUCTION: LINEMAN AND SUBSTATION 
TECHNICIAN (FULTON, HANCOCK, HENDERSON, KNOX, 
MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), 
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 58.58                  26.29
----------------------------------------------------------------

 ELEC0145-006 06/02/2025
                                                     Rates                  Fringes
CABLE SPLICER (MERCER COUNTY (EXCEPT OHIO GROVE, 
NORTH HENDERSON, AND SUEZ TWPS))....................$ 47.00                  28.64
ELECTRICIAN (MERCER COUNTY (EXCEPT OHIO GROVE, 
NORTH HENDERSON, AND SUEZ TWPS))....................$ 46.00                  28.56
----------------------------------------------------------------

 ELEC0145-007 12/04/2023
                                                     Rates                  Fringes
LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR 
(MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ 
TWPS))  ............................................$ 41.61                  20.73
LINE CONSTRUCTION: CABLE SPLICER (MERCER COUNTY 
(EXCEPT NORTH HENDERSON AND SUEZ TWPS))    
FOOTNOTE:       A.  PAID HOLIDAYS: MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY...$ 53.12                  24.53
LINE CONSTRUCTION: DYNAMITER (MERCER COUNTY (EXCEPT 
NORTH HENDERSON AND SUEZ TWPS))    FOOTNOTE:       
A.  PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, AND THANKSGIVING DAY.....................$ 43.92                  21.49
LINE CONSTRUCTION: GROUNDMAN (MERCER COUNTY (EXCEPT 
NORTH HENDERSON AND SUEZ TWPS))    FOOTNOTE:       
A.  PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, AND THANKSGIVING DAY.....................$ 34.64                  18.43
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (MERCER 
COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS))    
FOOTNOTE:       A.  PAID HOLIDAYS: MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY...$ 36.15                  18.93
LINE CONSTRUCTION: LINEMAN, TECHNICIAN, HEAVY 
EQUIPMENT OPERATOR (MERCER COUNTY (EXCEPT NORTH 
HENDERSON AND SUEZ TWPS))    FOOTNOTE:       A.  
PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, AND THANKSGIVING DAY.....................$ 52.67                  24.38
----------------------------------------------------------------

 ENGI0150-021 06/01/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, GROUP 1 CRANE (FRICTION 
OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); 
TOW OR PUSH BOAT (MERCER COUNTY)....................$ 43.50                  41.25
OPERATOR:  POWER EQUIPMENT, GROUP 2 ASPHALT 
HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER 
SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; 
BACKFILLER (THROW BUCKET); BLASTHOLER 
SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; 
BOOM TRACTOR OR SIDE BOOM; BORING MACHINE 
(DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING 
HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES; 
CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING & 
PRIMING MACHINE; COMBINATION BACKHOE FRONT END 
LOADER; COMBINATION CONCRETE FINISHING MACHINE AND 
FLOAT; CONCRETE BREAKER OR HYDRO-HAMMER; CONCRETE 
CONVEYOR OR PUMP; CONCRETE PAVER; CONCRETE 
SPREADER; CONCRETE WHEEL SAW (LARGE 
SELF-PROPELLED); CRUSHER (STONE, CONCRETE, ASPHALT, 
ETC.); CURING-TINNING MACHINE; DIPPER DREDGE CRANE 
MAN; DIPPER DREDGE OPERATOR; DUAL PURPOSE TRUCK 
(BOOM, WINCH, ETC.); EXCAVATOR; FARM-TYPE TRACTOR 
OPERATING SCOOP OR SCRAPER OR WITH POWER 
ATTACHMENT; FORKLIFT (6000 LB. CAPACITY); GRADER, 
MOTOR GRADER, MOTOR PATROL, AUTO GRADER, FORM 
GRADER, PULL GRADER, SUB GRADER, ELEVATING GRADER; 
GROUP EQUIPMENT GREASER; GUARD RAIL POST DRIVER; 
HOISTS; HYDRAULIC DREDGE LEVERMAN OR ENGINEER; 
HYDRO-VAC TRUCK MOUNTED OR PULL TYPE, AND SIMILAR 
EQUIPMENT; LASER SCREED; LOADER (TRACK, RUBBER TIRE 
OR ARTICULATED); LOCOMOTIVE ENGINEER; 
MECHANIC-WELDER; MECHANICAL LOADED LOG CHIPPERS OR 
SIMILAR MACHINES; MILLING MACHINE; MUCKING MACHINE; 
PILE DRIVER; PIPE BENDING; PUG MILL; ROAD 
WIDENER-SHOULDER SPREADER; SCRAPER 
(SELF-PROPELLED); SELF-PROPELLED ROLLER OR TIRE 
ROLLER (ON ASPHALT OR BLACKTOP), SHEEP FOOT OR PAD 
FOOT COMPACTOR; SHOVEL; SLIP FORM PAVER; STEEL 
TRACK-TYPE TRACTOR (DOZER, PUSH CAT, ETC.); 
TRANSFER OR SHUTTLE BUGGY; TRENCHING MACHINE (40 
H.P. & OVER); WORK BOAT.   (MERCER COUNTY)..........$ 41.50                  41.25
OPERATOR:  POWER EQUIPMENT, GROUP 3 ARTICULATED 
OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER 
(ENGINEER OR FIREMAN);  CONVEYOR OVER 20 H.P.; 
DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR 
MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT 
POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT 
ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB. 
CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL 
BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN 
LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH 
MACHINE (UNDER 40 H.P.).  (MERCER COUNTY)...........$ 38.85                  41.25
OPERATOR:  POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR 
(400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, 
TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; 
MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL 
OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); 
WATER PUMP (MORE THAN ONE WELL POINT PUMP).  
(MERCER COUNTY).....................................$ 37.80                  41.25
----------------------------------------------------------------

 ENGI0649-002 04/01/2025
                                                     Rates                  Fringes
OPERATOR:  POWER EQUIPMENT, GROUP 1 CRANES: 
OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE 
BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, 
STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLINES; 
DROTT YUMBO & SIMILAR TYPES CONSIDERED AS CRANES; 
360 DEGREES SWING EXCAVATOR, BACKHOE; DERRICK 
BOATS; PILE DRIVER AND SKID RIGS; CLAM SHELL; 
LOCOMOTIVE CRANES; ROAD PAVERS (SINGLE DRUM, DUAL 
DRUM, TRI BATCHER); MOTOR PATROL & POWER BLADES 
(DUNMORE, ELEVATING & SIMILAR TYPES); MECHANICS; 
CENTRAL CONCRETE MIXING PLANT OPERATOR; ASPHALT 
BATCH PLANT OPERATOR AND PLANT ENGINEER; GRADALL; 
CAISSON RIGS; SKIMMER SCOOP, KOEHRING SCOOPER; 
DREDGES (ALL TYPES); HOPTOE; ALL CHERRY PICKERS; 
WORK BOAT; ROSS CARRIER; HELICOPTER; DOZER; 
TOURNADOZER; TOURNAPULLS (ALL & SIMILAR TYPES); 
CONCRETE AND ALL RECYCLE MACHINES, MULTIPLE UNIT 
EARTH MOVERS; 75 CENTS PER HOUR FOR EACH SCOOP OVER 
ONE; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL 
TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER; 
ROCK CRUSHER; MATERIAL CRUSHER (OUTSIDE PITS AND 
QUARRIES); SCREENING PLANTS (OUTSIDE PITS AND 
QUARRIES); TUNNEL BORING MACHINE; HEAVY EQUIPMENT 
GREASER (TOP GREASER ON SPREAD); CMI, AUTO GRADE, 
CMI BELT PLACER (3 TRACK & SIMILAR TYPES); SIDE 
BOOMS; STARTING ENGINEER ON PIPELINE OR 
CONSTRUCTION (ELEVEN 11 PIECES OR MORE); ASPHALT 
HEATER & PLANER COMBINATION; WHEEL TRACTORS WITH 
DOZER, HOE OR END LOADER ATTACHEMENTS; CAT 
EARTHWORK COMPACTORS AND SIMILAR TYPES; BLAW KNOX 
SPREADER & SIMILAR TYPES; TRENCH MACHINES; PUMP 
CRETE, BELT CRETE, SQUEEZE CRETE, SCREW TYPE PUMPS 
& GYPSUM; CRETER CRANE; CONCRETE PUMP TRUCK; 
FORMLESS FINISHING MACHINES; FLAHERTY SPREADER OR 
SIMILAR TYPES; SCREEDMAN ON LAYDOWN MACHINE; 
VERMEER CONCRETE SAW; LASER SCREED; SPAN SAW; 
DREDGE LEVERMAN; DREDGE ENGINEER; LULL OR SIMILAR 
TYPE; HYDRO-BOOM TRUCK; GUARD RAIL MACHINE.  
(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, 
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES)   - 
ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER 
CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN 
CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE 
ADJACENT GROUND LEVEL OR WATER LEVEL.  $.05 PER 
HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB.  $0.02 
PER HOUR, PER TON - OVER 50-TON CAPACITY.  - 
OPERATING ENGINEERS WHO OPERATE LATTICE BOOM 
CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, 
TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER 
CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY 
HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF 
CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL 
RECEIVE $1.60 PER HOUR OVER SCALE.  A.  ON 
DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL 
RECEIVE:  LEVEL A ADD $4.00 TO THE APPROPRIATE 
GROUP RATE; LEVELS B AND C ADD $3.00 TO THE 
APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO 
THE APPROPRIATE GROUP RATE..........................$ 47.79                  43.42
OPERATOR:  POWER EQUIPMENT, GROUP 2 BULKER & PUMP; 
POWER LAUNCHES; BORING MACHINE & PIPE JACKING 
MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A 
BORING MACHINE; P-H ONE PASS SOIL CEMENT MACHINES 
AND SIMILAR TYPES: WHEEL TRACTOR; BACK FILLERS; 
EUCLID LOADER; FORK LIFTS; JEEP WITH DITCHING 
MACHINES OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC 
CEMENT & GRAVEL BATCHING PLANTS; MOBILE DRILLS SOIL 
TESTING AND SIMILAR TYPES); PUGMILL WITH PUMP; ALL 
1 AND 2 DRUM HOISTS; DE-WATERING SYSTEMS; STRAW 
BLOWER; HYDRO SEEDER; BUMP GRINDERS, SELF 
PROPELLED; ASSISTANT HEAVY EQUIPMENT GREASER; APSCO 
SPREADER TRACTORS (TRACK-TYPE W/O POWER UNITS 
PULLING ROLLERS); ROLLERS ON ASPHALT, BRICK, OR 
MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS; 
CEMENT STRIPPERS; CEMENT FINISHING MACHINES & CMI 
TEXTURE & REEL CURING MACHINES; VIBRO-TAMPERS & 
SIMILAR TYPES SELF-PROPELLED; MECHANICAL 
BULL-FLOATS; SELF-PROPELLED CONCRETE SAW; TRUCK 
MOUNTED POWER SAWS; CURB CUTTERS; MIXERS OVER 3 
BAGS TO 27E; WINCH & BOOM TRUCKS; TRACTOR PULLING 
POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL; 
CLARY SCREED; MULE PULLING ROLLERS; PUGMILL W/O 
PUMP; BARBER GREENE OR SIMILAR LOADERS; TRACK TYPE 
TRACTOR WITH POWER UNIT ATTACHED; FIREMAN; SPRAY 
MACHINE ON PAVING; CURB MACHINE; PAVED DITCH 
MACHINE; POWER BROOM; SELF-PROPELLED SWEEPERS; 
SELF- PROPELLED CONVEYORS; POWER SUBGRADER; OIL 
DISTRIBUTOR; STRAIGHT TRACTOR; TRUCK CRANE OILER; 
TRUCK TYPE OILERS; DIRECTIONAL BORING MACHINE; 
HORIZONTAL DIRECTIONAL DRILL; ARTICULATING END DUMP 
VEHICLES; STARTING ENGINEER (6 TO 10 PIECES).   
(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, 
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES)   - 
ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER 
CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN 
CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE 
ADJACENT GROUND LEVEL OR WATER LEVEL.  $.05 PER 
HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB.  $0.02 
PER HOUR, PER TON - OVER 50-TON CAPACITY.  - 
OPERATING ENGINEERS WHO OPERATE LATTICE BOOM 
CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, 
TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER 
CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY 
HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF 
CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL 
RECEIVE $1.60 PER HOUR OVER SCALE.  A.  ON 
DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL 
RECEIVE:  LEVEL A ADD $4.00 TO THE APPROPRIATE 
GROUP RATE; LEVELS B AND C ADD $3.00 TO THE 
APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO 
THE APPROPRIATE GROUP RATE..........................$ 44.09                  43.42
OPERATOR:  POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED 
TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER 
(3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; 
ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM 
GRADER; BULK CEMENT PLANT; OILERS.  (FULTON, 
HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, 
TAZEWELL, AND WARREN COUNTIES)   - ESCALATED RATE 
ON CRANE, DERRICK BOOMS, AND TOWER CRANES: 
ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR 
DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT 
GROUND LEVEL OR WATER LEVEL.  $.05 PER HOUR, PER 
FOOT, OVER 90 FEET INCLUDING JIB.  $0.02 PER HOUR, 
PER TON - OVER 50-TON CAPACITY.  - OPERATING 
ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, 
LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES 
LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES 
AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION 
FOR THE CERTIFICATION OF CRANE OPERATORS ON THE 
EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR 
OVER SCALE.  A.  ON DESIGNATED HAZARDOUS WASTE 
JOBS, OPERATORS SHALL RECEIVE:  LEVEL A ADD $4.00 
TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD 
$3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D 
ADD $2.00 TO THE APPROPRIATE GROUP RATE.............$ 38.03                  43.42
----------------------------------------------------------------

 IRON0046-005 05/01/2024
                                                     Rates                  Fringes
IRONWORKER (FULTON COUNTY (SOUTHERN TIP INCLUDING 
MARBLETOWN ASTORIA, & SUMMUM TWPS)).................$ 37.60                  32.94
----------------------------------------------------------------

 IRON0111-004 07/01/2025
                                                     Rates                  Fringes
IRONWORKER (KNOX (GALESBURG AND AREA NORTH 
THEREOF), MERCER (EXCEPT SOUTHWEST PART), AND 
WARREN (NORTHWEST PART) COUNTIES)...................$ 38.25                  32.28
----------------------------------------------------------------

 IRON0112-004 05/01/2025
                                                     Rates                  Fringes
IRONWORKER (FULTON (EASTERN 2/3), KNOX (SOUTH AND 
EAST OF GALESBURG), PEORIA, STARK, AND TAZEWELL 
COUNTIES)...........................................$ 45.48                  34.13
----------------------------------------------------------------

 IRON0577-006 06/01/2025
                                                     Rates                  Fringes
IRONWORKER (FULTON (NORTH OF SUMMUM & MARBLETOWN 
TWPS, WEST 1/3), HANCOCK, HENDERSON, KNOX (WEST AND 
SOUTHWEST OF GALESBURG), MCDONOUGH, MERCER, AND  
WARREN (EXCEPT NORTHWEST PART) COUNTIES)............$ 36.30                  25.80
----------------------------------------------------------------

 LABO0165-002 05/01/2025
                                                     Rates                  Fringes
LABORER GROUP 1 GENERAL LABORER - LAYING OF 
TEMPORARY GAS, OIL, AIR, AND WATER LINES; ALL 
LABORER WORK PERTAINING TO ASPHALT AND ASPHALT 
PLANTS IF NEEDED; WATERPROOFING MEMBRANE SYSTEMS 
FOR BRIDGE DECKS AND WATERPROOFING FOR BOX CULVERTS 
ON SITE; LAYING, PLACING, AND INSTALLATION OF ALL 
STEEL CASING, CORRUGATED CASINGS, MULTIPLE PLATE 
AND PRECAST CONCRETE AND ALL OTHER MATERIAL USED 
FOR CASING, TUNNELS AND TUNNEL LINING; REMOVAL OF 
SNAP TIES, THE PLACING AND REMOVING AND TENDING OF 
BARRICADES, CONCRETE BARRICADE WALL, FLARES AND 
SIGNAL LIGHTS; MAINTENANCE OF NELSON HEATERS; DIRT 
FILL JOBS, SPOTTER AND GRADE EMPLOYEE AND SIGNAL 
EMPLOYEE; SCAFFOLDING; TEMPORARY FENCING; PLACING 
OF CONCRETE TO GRADE BY ANY MODE OR METHOD; 
CARPENTER TENDERS, THE CONVEYING, HANDLING, 
UNLOADING AND LOADING, HOISTING, ASSORTING OF ALL 
LUMBER, ALL LABORER WORK REQUIRED AROUND CARPENTERS 
INCLUDING THE CLEAN UP AFTER CARPENTERS; HORIZONTAL 
DIRECTIONAL DRILL LOCATOR; WATERPROOFING WITH COLD 
STUFF; BRICKLAYER TENDERS; CEMENT MASON TENDER; 
CURING ALL CONCRETE BY HAND METHOD; DRIVE STAKES 
AND STRING LINES FOR ALL MACHINERY; CONCRETE FORM 
DISMANTLERS; HANDLING AND MAINTAINING ALL LIGHTS; 
FLARES AND FLASHER FLARES; FLAGMAN; LANDSCAPING ON 
ALL JOBS, THE LOADING, UNLOADING, DISTRIBUTION, 
PLANTING, AND PLACING OF TREES, SHRUB, SOD, AND 
SEEDING ON WORK COVERED BY THE AGREEMENT; COVERING 
OF CONCRETE IN ANY MANNER; HIGH PRESSURE NOZZLE 
(WATER BLAST); PILE DRIVER TENDERS; SURVEYOR 
HELPER; TOOL CRIB MAN; WATER CARRIER; EXPANSION 
JOINT ASSEMBLER; ALL OTHER EXCAVATING; DECK HAND, 
DREDGE HAND, AND SHORE LABORER; UNLOADING AND 
DISTRIBUTING OF REBARS; ALL POWER OPERATED TOOLS 
AND CHAIN SAWS; CURB ASPHALT MACHING OPERATOR; 
ASPHALT KETTLEMEN AND CARRIERS; WATERPROOFING WITH 
HOT STUFF; CEMENT MEN AND SACK SHAKERS; CHIPPING 
HAMMER MAN; KETTLEMEN AND CARRIERS OR MEN HANDLING 
HOT STUFF; POWDER MAN HELPER; POWER CONCRETE SAW; 
POWER FORM TAMPERS; RIG MEN; SIGNALING AND SPOTTING 
OF RIGS AND EQUIPMENT; WALK BEHIND CONCRETE 
BREAKER; STRIPPING CONCRETE FORMS WITH COMPOSITE 
CREW OF LABORERS AND CARPENTERS; ALL OTHER WORK NOT 
LISTED BELOW  (PEORIA AND TAZEWELL (NORTHWEST) 
COUNTIES)...........................................$ 37.32                  38.14
LABORER GROUP 2 SKILLED LABORER - JACKHAMMER & 
DRILL OPERATOR; GUNITE PUMP AND POT MAN; PUDDLERS, 
VIBRATOR MEN; WIRE FABRIC PLACER; SANDBLAST PUMP 
AND POT MAN; STRIKE OFF CONCRETE; UNLOADING, 
HANDLING AND CARRYING OF ALL CREOSOTED PILES, TIES, 
OR TIMER; CONCRETE BURNING BARS; POWER WHEELBARROWS 
OR BUGGIES; ASPHALT RAKER; BRICKSETTERS; CUTTING 
TORCHMEN (ELEC. AND ACETYLENE); MEN SETTING LINES 
TO LEVEL FORMS; FORM SETTERS; GUNITE NOZZLE MAN AND 
SANDBLASTING NOZZLE MAN; POWDER MAN; RIP-RAPPING 
(BY HAND)  (PEORIA AND TAZEWELL (NORTHWEST) 
COUNTIES)...........................................$ 37.62                  38.14
LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS 
WASTE WORKER (INCLUDING MAINTAINING OF MANIFEST 
SHEET); LEAD BASE PAINT ABATEMENT WORKER  (PEORIA 
AND TAZEWELL (NORTHWEST) COUNTIES)..................$ 38.07                  38.14
----------------------------------------------------------------

 LABO0231-002 05/01/2024
                                                     Rates                  Fringes
LABORER (FULTON AND TAZEWELL (SOUTHEAST) COUNTIES)..$ 38.50                  33.45
----------------------------------------------------------------

 LABO0231-005 05/01/2024
                                                     Rates                  Fringes
LABORER (HANCOCK AND MCDONOUGH COUNTIES)............$ 33.50                  30.13
----------------------------------------------------------------

 LABO0309-003 01/01/2024
                                                     Rates                  Fringes
LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM 
MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING 
OF FORMS OR LUMBER (IN BONE YARD), MOVING AND/OR 
MAINTENANCE OF FLARES AND BARRICADES, OPERATION OF 
ALL HAND, ELECTRIC, AIR, HYDRAULIC, OR MECHANICALLY 
POWERED TOOLS UNDER THE JURISDICTION OF THE 
LABORERS; INCLUDING JACKHAMMERS, TAMPERS; AIR 
SPADES, AUGERS, CONCRETE SAWS, CHAINS SAWS, UTILITY 
SAWS, ROCK DRILLS, VIBRATORS, MORTAR MIXER, POWER 
AND HAND SAW (WHEN CLEANING TIMBER), GENERAL 
LABORERS (NOT ELSEWHERE COVERED), CRAFT-TENDER, 
MATERIAL CHECKER, MATERIAL HANDLER, FORM HANDLER, 
CONCRETE DUMPER, PUDDLER, EXPLOSIVES HANDLER, 
CENTER STRIP, REINFORCING IN CONCRETE, WIRE MESH 
HANDLER AND INSTALLER, PRIME MOVER OR ANY 
MECHANICAL DEVICE TAKING THE PLACE OF CONCRETE 
BUGGY OR WHEEL-BARROW, SANDPOINT SETTER, ASPHALT 
KETTLEMAN, SHEETING HAMMER DRIVERS, LAYING AND 
JOINING OF TELEPHONE CONDUIT, GAS DISTRIBUTION MEN, 
PIPE SETTER ON LATERALS, DRAIN TILES, CULVERT PIPE, 
AND STORM SEWER CATCH BASIN LEADS, CATCH BASINS, 
MANHOLES, BATCH DUMPERS, TANK CLEANERS, COFFERDAM 
WORKER, BANKMAN ON FLOATING PLANT, JOINTMAN WITH 
PIPELAYERS. BACK-UP MAN (CORKER, JOINT MAKER) WITH 
PIPE SETTER ON SEWER AND WATER MAINS, BATTERBOARD 
MAN OR LASER OPERATOR ON SEWER AND WATER MAIN, 
LABORER IN DITCH, OR TUNNEL, ON SEWER OR WATER 
MAINS AND TELEPHONE CONDUIT, CUTTERS, BURNERS, 
TORCHMAN, GRAVEL BOX MAN, ASPHALT PLANT LABORER, 
CONCRETE PLANT LABORER, DECK HAND, UNLOADING OF 
STEEL AND REBAR, LASER BEAM OPERATOR, WRECKING 
LABORERS   (MERCER COUNTY)..........................$ 33.77                  23.60
LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM 
SETTER, HEAD DYNAMITE MAN (POWDERMAN) HEAD STRING 
OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER 
OR WATER MAIN, GUNNITE NOZZIE MAN, ASPHALT OR 
CONCRETE CURB MACHINE OPERATOR, HEAD GRADE MAN, 
HEAD TUNNEL MINER, CONCRETE BURNING MACHINE 
OPERATOR, CORING MACHINE OPERATOR, WELDER, ASBESTOS 
ABATEMENT AND HAZARDOUS WASTE WORKERS   (MERCER 
COUNTY).............................................$ 34.27                  23.60
LABORER GROUP 3  CONCRETE SPECIALIST (MERCER 
COUNTY).............................................$ 34.90                  23.60
----------------------------------------------------------------

 LABO0538-001 05/01/2024
                                                     Rates                  Fringes
LABORERS: GENERAL LABORER:  ALL CLASSIFICATIONS NOT 
LISTED BELOW.   (HENDERSON, KNOX, WARREN, AND STARK 
(WEST) COUNTIES)....................................$ 35.23                  28.10
LABORERS: SKILLED LABORER: FLAGGERS; TRAFFIC 
CONTROL AND ALL ASSOCIATED WORK; HANDLING OF 
MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT 
AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR 
CLOTHING; TRACK LABORERS; CHLORIDE HANDLERS; 
UNLOADING AND LABORERS WITH STEEL WORKERS AND 
RE-BARS; CONCRETE WORKERS (WET); BATCH DUMPERS; 
MASON TENDERS; KETTLE AND TAR MEN; PLASTIC 
INSTALLERS; SCAFFOLD WORKERS; MOTORIZED BUGGIES OR 
MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF 
BUILDING MATERIALS; LABORERS WITH DE-WATERING 
SYSTEMS; SEWER WORKERS PLUS DEPTH; VIBRATOR 
OPERATORS; MOTOR MIXER OPERATORS; CEMENT SILICA, 
CLAY, FLY ASH, LIME AND PLASTERS, HANDLERS (BULK OR 
BAG); COFFERDAM WORKERS PLUS DEPTH; CONCRETE 
PAVING, PLACING, CUTTING AND TYING OF REINFORCING; 
DECKHAND, DREDGE HAND AND SHORE LABORERS; BACKMEN 
ON FLOATING PLANT; ASPHALT WORKERS WITH MACHINE AND 
LAYERS; GRADE CHECKER; POWER TOOLS; STRIPPING OF 
ALL CONCRETE FORMS EXCEPT PAVING FORMS, DUMPMEN AND 
SPOTTERS, WHEN NECESSARY; CAISSON WORKERS PLUS 
DEPTH; GUNNITE NOZZLE MEN; TUNNEL HELPERS IN FREE 
AIR; ROD AND CHAINMEN; WELDERS, CUTTERS, BURNERS, 
AND TORCHMEN; CHAINSAW OPERATOR; PAVING BREAKER, 
JACKHAMMER AND DRILL OPERATOR, LAYOUT MAN AND /OR 
TILE LAYER; STEEL FORM SETTERS - STREET AND 
HIGHWAY, AIR TAMPING HAMMERMAN; SIGNALMAN ON CRANE 
CONCRETE SAW OPERATOR; SCREEDMAN ON ASPHALT PAVERS; 
FRONT END MAN ON CHIP SPREADER; MULTIPLE CONCRETE 
DUCT; LUTEMAN, ASPHALT RAKER; CURB ASPHALT MACHINE 
OPERATOR.  (HENDERSON, KNOX, WARREN, AND STARK 
(WEST) COUNTIES)....................................$ 36.23                  28.10
----------------------------------------------------------------

 LABO0996-003 05/01/2024
                                                     Rates                  Fringes
LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED 
BELOW (STARK COUNTY (EAST)).........................$ 39.17                  28.01
LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT 
WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE 
PAINT WORKER (STARK COUNTY (EAST))..................$ 40.17                  28.01
----------------------------------------------------------------

 PAIN0030-010 06/01/2023
                                                     Rates                  Fringes
PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, 
AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL 
TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES 
(BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, 
MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES).......$ 40.00                  26.90
----------------------------------------------------------------

 PAIN0157-001 06/01/2023
                                                     Rates                  Fringes
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, 
SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK 
(FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, 
TAZEWELL AND WOODFORD COUNTIES).....................$ 40.00                  26.90
----------------------------------------------------------------

 PAIN1178-003 06/01/2022
                                                     Rates                  Fringes
PAINTER: BRIDGES (HENDERSON, KNOX, MERCER, AND 
WARREN COUNTIES)....................................$ 32.00                  17.37
PAINTER: BRUSH AND ROLLER (HENDERSON, KNOX, MERCER, 
AND WARREN COUNTIES)................................$ 30.00                  17.37
PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING 
(HENDERSON, KNOX, MERCER, AND WARREN COUNTIES)......$ 30.50                  17.37
----------------------------------------------------------------

 PLAS0018-011 05/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (FULTON 
(NORTHWESTERN PART), KNOX, MERCER (SOUTHEASTERN 
CORNER), AND WARREN COUNTIES).......................$ 35.38                  27.31
----------------------------------------------------------------

 PLAS0018-012 06/01/2015
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (STARK COUNTY).......$ 36.70                  22.08
----------------------------------------------------------------

 PLAS0018-013 05/01/2021
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (FULTON (EXCEPT 
NORTHWEST PART), PEORIA, AND TAZEWELL COUNTIES).....$ 32.98                  30.70
----------------------------------------------------------------

 PLAS0018-028 05/01/2016
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (HANCOCK, HENDERSON 
(SOUTHERN HALF), AND MCDONOUGH COUNTIES)............$ 28.64                  24.57
----------------------------------------------------------------

 PLAS0018-037 01/01/2020
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (HENDERSON (NORTHERN 
HALF) AND MERCER (EXCEPT SOUTHEASTERN CORNER) 
COUNTIES)...........................................$ 28.52                  24.04
----------------------------------------------------------------

 TEAM0371-003 05/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING 
LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES 
AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE 
UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; 
MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP 
TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO 
AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 
6,000 LB CAPACITY.  (MERCER COUNTY).................$ 45.35                  25.72
TRUCK DRIVER, GROUP 2 (MERCER COUNTY)...............$ 45.93                  25.72
TRUCK DRIVER, GROUP 3 (MERCER COUNTY)...............$ 46.25                  25.72
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. 
(MERCER COUNTY).....................................$ 46.60                  25.72
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL 
PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS 
WASTE WORK. (MERCER COUNTY).........................$ 47.71                  25.72
----------------------------------------------------------------

 TEAM0627-002 05/01/2024
                                                     Rates                  Fringes
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING 
LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES 
AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE 
UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; 
MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP 
TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO 
AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 
6,000 LB CAPACITY.  (FULTON, HANCOCK, HENDERSON, 
KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND 
WARREN COUNTIES)....................................$ 43.24                  24.27
TRUCK DRIVER, GROUP 2 (FULTON, HANCOCK, HENDERSON, 
KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND 
WARREN COUNTIES)....................................$ 43.83                  24.27
TRUCK DRIVER, GROUP 3 (FULTON, HANCOCK, HENDERSON, 
KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND 
WARREN COUNTIES)....................................$ 44.10                  24.27
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. 
(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, 
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 44.49                  24.27
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL 
PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS 
WASTE WORK.  (FULTON, HANCOCK, HENDERSON, KNOX, 
MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN 
COUNTIES)...........................................$ 45.59                  24.27
----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).


----------------------------------------------------------------

The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.

-----------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can
be:

           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
             a wage determination matter
           d) an initial conformance (additional classification
             and rate) determination

On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:

            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:

            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:

            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.



================================================================

          END OF GENERAL DECISION"

All Illinois determinations: county index · Illinois prevailing wage · compute pay with the calculator.