"General Decision Number: IL20260014 07/30/2026
State: Illinois
Construction Types: Heavy and Highway
Counties: Illinois Counties of
Fulton, Hancock, Henderson, Knox,
McDonough, Mercer, Peoria, Stark,
Tazewell and Warren
Heavy Construction
Highway Construction
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
2 07/30/2026
CARP0004-009 05/01/2025
Rates Fringes
CARPENTER (HENDERSON AND MERCER COUNTIES)...........$ 38.00 35.16
----------------------------------------------------------------
CARP0174-003 05/01/2025
Rates Fringes
CARPENTER (STARK COUNTY)............................$ 40.28 38.95
----------------------------------------------------------------
CARP0237-003 05/15/2020
Rates Fringes
CARPENTER (FULTON AND TAZEWELL (SOUTHERN 2/3)
COUNTIES)...........................................$ 36.16 30.07
----------------------------------------------------------------
CARP0237-013 05/15/2020
Rates Fringes
CARPENTER (FULTON, KNOX, PEORIA, AND TAZEWELL
(NORTHERN 1/3) COUNTIES)............................$ 36.16 30.07
PILEDRIVERMAN (FULTON, KNOX, PEORIA, AND TAZEWELL
(NORTHERN 1/3) COUNTIES)............................$ 36.16 30.07
----------------------------------------------------------------
CARP0270-010 05/15/2020
Rates Fringes
CARPENTER (MCDONOUGH AND WARREN COUNTIES)...........$ 37.66 28.57
PILEDRIVERMAN (MCDONOUGH AND WARREN COUNTIES).......$ 37.66 28.57
----------------------------------------------------------------
CARP0270-011 05/15/2020
Rates Fringes
CARPENTER (HANCOCK COUNTY)..........................$ 35.05 28.57
PILEDRIVERMAN (HANCOCK COUNTY)......................$ 35.05 28.57
----------------------------------------------------------------
ELEC0034-006 03/01/2018
Rates Fringes
ELECTRICIAN (FULTON (FAIRVIEW, FARMINGTON, JOSHUA,
CANTON, ORION, PUTNAM, BUCKHEART, BANNER, FARMERS,
BERNADOTTE, LEWISTOWN, LIVERPOOL, VERMONT,
PLEASANT, ISABEL, WATERFORD, ASTORIA, WOODLAND, AND
KERTON TWPS), PEORIA, STARK (WEST JERSEY, ESSEX,
AND VALLEY TWPS), & TAZEWELL COUNTIES)..............$ 36.51 21.19
----------------------------------------------------------------
ELEC0034-007 06/01/2022
Rates Fringes
ELECTRICIAN (FULTON (CASS, DEERFIELD, ELLISVILLE,
HARRIS, LEE, UNION, YOUNG, & HICKORY TWPS),
HENDERSON, KNOX, MCDONOUGH (BLANDINSVILLE, PRAIRIE
CITY, EMMET, TENNESEE, SCOTLAND, SCIOTA, BUSHNELL,
CHALMERS TWPS), MERCER (OHIO GROVE, NORTH
HENDERSON, AND SUEZ TWPS), AND WARREN COUNTIES).....$ 38.32 24.24
----------------------------------------------------------------
ELEC0051-002 01/01/2024
Rates Fringes
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR
(ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON
CRANE OR LARGER) (FULTON, HANCOCK, HENDERSON, KNOX,
MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS),
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 52.63 24.35
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (FULTON,
HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N.
HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL,
AND WARREN COUNTIES)................................$ 39.92 20.22
LINE CONSTRUCTION: LINEMAN AND SUBSTATION
TECHNICIAN (FULTON, HANCOCK, HENDERSON, KNOX,
MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS),
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 58.58 26.29
----------------------------------------------------------------
ELEC0145-006 06/02/2025
Rates Fringes
CABLE SPLICER (MERCER COUNTY (EXCEPT OHIO GROVE,
NORTH HENDERSON, AND SUEZ TWPS))....................$ 47.00 28.64
ELECTRICIAN (MERCER COUNTY (EXCEPT OHIO GROVE,
NORTH HENDERSON, AND SUEZ TWPS))....................$ 46.00 28.56
----------------------------------------------------------------
ELEC0145-007 12/04/2023
Rates Fringes
LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR
(MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ
TWPS)) ............................................$ 41.61 20.73
LINE CONSTRUCTION: CABLE SPLICER (MERCER COUNTY
(EXCEPT NORTH HENDERSON AND SUEZ TWPS))
FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY...$ 53.12 24.53
LINE CONSTRUCTION: DYNAMITER (MERCER COUNTY (EXCEPT
NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE:
A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, AND THANKSGIVING DAY.....................$ 43.92 21.49
LINE CONSTRUCTION: GROUNDMAN (MERCER COUNTY (EXCEPT
NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE:
A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, AND THANKSGIVING DAY.....................$ 34.64 18.43
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (MERCER
COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS))
FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY...$ 36.15 18.93
LINE CONSTRUCTION: LINEMAN, TECHNICIAN, HEAVY
EQUIPMENT OPERATOR (MERCER COUNTY (EXCEPT NORTH
HENDERSON AND SUEZ TWPS)) FOOTNOTE: A.
PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, AND THANKSGIVING DAY.....................$ 52.67 24.38
----------------------------------------------------------------
ENGI0150-021 06/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION
OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS);
TOW OR PUSH BOAT (MERCER COUNTY)....................$ 43.50 41.25
OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT
HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER
SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE;
BACKFILLER (THROW BUCKET); BLASTHOLER
SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES;
BOOM TRACTOR OR SIDE BOOM; BORING MACHINE
(DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING
HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES;
CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING &
PRIMING MACHINE; COMBINATION BACKHOE FRONT END
LOADER; COMBINATION CONCRETE FINISHING MACHINE AND
FLOAT; CONCRETE BREAKER OR HYDRO-HAMMER; CONCRETE
CONVEYOR OR PUMP; CONCRETE PAVER; CONCRETE
SPREADER; CONCRETE WHEEL SAW (LARGE
SELF-PROPELLED); CRUSHER (STONE, CONCRETE, ASPHALT,
ETC.); CURING-TINNING MACHINE; DIPPER DREDGE CRANE
MAN; DIPPER DREDGE OPERATOR; DUAL PURPOSE TRUCK
(BOOM, WINCH, ETC.); EXCAVATOR; FARM-TYPE TRACTOR
OPERATING SCOOP OR SCRAPER OR WITH POWER
ATTACHMENT; FORKLIFT (6000 LB. CAPACITY); GRADER,
MOTOR GRADER, MOTOR PATROL, AUTO GRADER, FORM
GRADER, PULL GRADER, SUB GRADER, ELEVATING GRADER;
GROUP EQUIPMENT GREASER; GUARD RAIL POST DRIVER;
HOISTS; HYDRAULIC DREDGE LEVERMAN OR ENGINEER;
HYDRO-VAC TRUCK MOUNTED OR PULL TYPE, AND SIMILAR
EQUIPMENT; LASER SCREED; LOADER (TRACK, RUBBER TIRE
OR ARTICULATED); LOCOMOTIVE ENGINEER;
MECHANIC-WELDER; MECHANICAL LOADED LOG CHIPPERS OR
SIMILAR MACHINES; MILLING MACHINE; MUCKING MACHINE;
PILE DRIVER; PIPE BENDING; PUG MILL; ROAD
WIDENER-SHOULDER SPREADER; SCRAPER
(SELF-PROPELLED); SELF-PROPELLED ROLLER OR TIRE
ROLLER (ON ASPHALT OR BLACKTOP), SHEEP FOOT OR PAD
FOOT COMPACTOR; SHOVEL; SLIP FORM PAVER; STEEL
TRACK-TYPE TRACTOR (DOZER, PUSH CAT, ETC.);
TRANSFER OR SHUTTLE BUGGY; TRENCHING MACHINE (40
H.P. & OVER); WORK BOAT. (MERCER COUNTY)..........$ 41.50 41.25
OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED
OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER
(ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.;
DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR
MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT
POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT
ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB.
CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL
BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN
LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH
MACHINE (UNDER 40 H.P.). (MERCER COUNTY)...........$ 38.85 41.25
OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR
(400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE,
TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE;
MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL
OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT);
WATER PUMP (MORE THAN ONE WELL POINT PUMP).
(MERCER COUNTY).....................................$ 37.80 41.25
----------------------------------------------------------------
ENGI0649-002 04/01/2025
Rates Fringes
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES:
OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE
BACKFILLER; TOWER CRANES-MOBILE, CRAWLER,
STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLINES;
DROTT YUMBO & SIMILAR TYPES CONSIDERED AS CRANES;
360 DEGREES SWING EXCAVATOR, BACKHOE; DERRICK
BOATS; PILE DRIVER AND SKID RIGS; CLAM SHELL;
LOCOMOTIVE CRANES; ROAD PAVERS (SINGLE DRUM, DUAL
DRUM, TRI BATCHER); MOTOR PATROL & POWER BLADES
(DUNMORE, ELEVATING & SIMILAR TYPES); MECHANICS;
CENTRAL CONCRETE MIXING PLANT OPERATOR; ASPHALT
BATCH PLANT OPERATOR AND PLANT ENGINEER; GRADALL;
CAISSON RIGS; SKIMMER SCOOP, KOEHRING SCOOPER;
DREDGES (ALL TYPES); HOPTOE; ALL CHERRY PICKERS;
WORK BOAT; ROSS CARRIER; HELICOPTER; DOZER;
TOURNADOZER; TOURNAPULLS (ALL & SIMILAR TYPES);
CONCRETE AND ALL RECYCLE MACHINES, MULTIPLE UNIT
EARTH MOVERS; 75 CENTS PER HOUR FOR EACH SCOOP OVER
ONE; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL
TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER;
ROCK CRUSHER; MATERIAL CRUSHER (OUTSIDE PITS AND
QUARRIES); SCREENING PLANTS (OUTSIDE PITS AND
QUARRIES); TUNNEL BORING MACHINE; HEAVY EQUIPMENT
GREASER (TOP GREASER ON SPREAD); CMI, AUTO GRADE,
CMI BELT PLACER (3 TRACK & SIMILAR TYPES); SIDE
BOOMS; STARTING ENGINEER ON PIPELINE OR
CONSTRUCTION (ELEVEN 11 PIECES OR MORE); ASPHALT
HEATER & PLANER COMBINATION; WHEEL TRACTORS WITH
DOZER, HOE OR END LOADER ATTACHEMENTS; CAT
EARTHWORK COMPACTORS AND SIMILAR TYPES; BLAW KNOX
SPREADER & SIMILAR TYPES; TRENCH MACHINES; PUMP
CRETE, BELT CRETE, SQUEEZE CRETE, SCREW TYPE PUMPS
& GYPSUM; CRETER CRANE; CONCRETE PUMP TRUCK;
FORMLESS FINISHING MACHINES; FLAHERTY SPREADER OR
SIMILAR TYPES; SCREEDMAN ON LAYDOWN MACHINE;
VERMEER CONCRETE SAW; LASER SCREED; SPAN SAW;
DREDGE LEVERMAN; DREDGE ENGINEER; LULL OR SIMILAR
TYPE; HYDRO-BOOM TRUCK; GUARD RAIL MACHINE.
(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH,
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) -
ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER
CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN
CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE
ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER
HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02
PER HOUR, PER TON - OVER 50-TON CAPACITY. -
OPERATING ENGINEERS WHO OPERATE LATTICE BOOM
CRAWLER CRANES, LATTICE BOOM TRUCK CRANES,
TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER
CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY
HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF
CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL
RECEIVE $1.60 PER HOUR OVER SCALE. A. ON
DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL
RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE
GROUP RATE; LEVELS B AND C ADD $3.00 TO THE
APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO
THE APPROPRIATE GROUP RATE..........................$ 47.79 43.42
OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP;
POWER LAUNCHES; BORING MACHINE & PIPE JACKING
MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A
BORING MACHINE; P-H ONE PASS SOIL CEMENT MACHINES
AND SIMILAR TYPES: WHEEL TRACTOR; BACK FILLERS;
EUCLID LOADER; FORK LIFTS; JEEP WITH DITCHING
MACHINES OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC
CEMENT & GRAVEL BATCHING PLANTS; MOBILE DRILLS SOIL
TESTING AND SIMILAR TYPES); PUGMILL WITH PUMP; ALL
1 AND 2 DRUM HOISTS; DE-WATERING SYSTEMS; STRAW
BLOWER; HYDRO SEEDER; BUMP GRINDERS, SELF
PROPELLED; ASSISTANT HEAVY EQUIPMENT GREASER; APSCO
SPREADER TRACTORS (TRACK-TYPE W/O POWER UNITS
PULLING ROLLERS); ROLLERS ON ASPHALT, BRICK, OR
MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS;
CEMENT STRIPPERS; CEMENT FINISHING MACHINES & CMI
TEXTURE & REEL CURING MACHINES; VIBRO-TAMPERS &
SIMILAR TYPES SELF-PROPELLED; MECHANICAL
BULL-FLOATS; SELF-PROPELLED CONCRETE SAW; TRUCK
MOUNTED POWER SAWS; CURB CUTTERS; MIXERS OVER 3
BAGS TO 27E; WINCH & BOOM TRUCKS; TRACTOR PULLING
POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL;
CLARY SCREED; MULE PULLING ROLLERS; PUGMILL W/O
PUMP; BARBER GREENE OR SIMILAR LOADERS; TRACK TYPE
TRACTOR WITH POWER UNIT ATTACHED; FIREMAN; SPRAY
MACHINE ON PAVING; CURB MACHINE; PAVED DITCH
MACHINE; POWER BROOM; SELF-PROPELLED SWEEPERS;
SELF- PROPELLED CONVEYORS; POWER SUBGRADER; OIL
DISTRIBUTOR; STRAIGHT TRACTOR; TRUCK CRANE OILER;
TRUCK TYPE OILERS; DIRECTIONAL BORING MACHINE;
HORIZONTAL DIRECTIONAL DRILL; ARTICULATING END DUMP
VEHICLES; STARTING ENGINEER (6 TO 10 PIECES).
(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH,
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) -
ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER
CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN
CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE
ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER
HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02
PER HOUR, PER TON - OVER 50-TON CAPACITY. -
OPERATING ENGINEERS WHO OPERATE LATTICE BOOM
CRAWLER CRANES, LATTICE BOOM TRUCK CRANES,
TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER
CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY
HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF
CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL
RECEIVE $1.60 PER HOUR OVER SCALE. A. ON
DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL
RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE
GROUP RATE; LEVELS B AND C ADD $3.00 TO THE
APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO
THE APPROPRIATE GROUP RATE..........................$ 44.09 43.42
OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED
TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER
(3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS;
ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM
GRADER; BULK CEMENT PLANT; OILERS. (FULTON,
HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK,
TAZEWELL, AND WARREN COUNTIES) - ESCALATED RATE
ON CRANE, DERRICK BOOMS, AND TOWER CRANES:
ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR
DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT
GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER
FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR,
PER TON - OVER 50-TON CAPACITY. - OPERATING
ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES,
LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES
LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES
AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION
FOR THE CERTIFICATION OF CRANE OPERATORS ON THE
EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR
OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE
JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00
TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD
$3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D
ADD $2.00 TO THE APPROPRIATE GROUP RATE.............$ 38.03 43.42
----------------------------------------------------------------
IRON0046-005 05/01/2024
Rates Fringes
IRONWORKER (FULTON COUNTY (SOUTHERN TIP INCLUDING
MARBLETOWN ASTORIA, & SUMMUM TWPS)).................$ 37.60 32.94
----------------------------------------------------------------
IRON0111-004 07/01/2025
Rates Fringes
IRONWORKER (KNOX (GALESBURG AND AREA NORTH
THEREOF), MERCER (EXCEPT SOUTHWEST PART), AND
WARREN (NORTHWEST PART) COUNTIES)...................$ 38.25 32.28
----------------------------------------------------------------
IRON0112-004 05/01/2025
Rates Fringes
IRONWORKER (FULTON (EASTERN 2/3), KNOX (SOUTH AND
EAST OF GALESBURG), PEORIA, STARK, AND TAZEWELL
COUNTIES)...........................................$ 45.48 34.13
----------------------------------------------------------------
IRON0577-006 06/01/2025
Rates Fringes
IRONWORKER (FULTON (NORTH OF SUMMUM & MARBLETOWN
TWPS, WEST 1/3), HANCOCK, HENDERSON, KNOX (WEST AND
SOUTHWEST OF GALESBURG), MCDONOUGH, MERCER, AND
WARREN (EXCEPT NORTHWEST PART) COUNTIES)............$ 36.30 25.80
----------------------------------------------------------------
LABO0165-002 05/01/2025
Rates Fringes
LABORER GROUP 1 GENERAL LABORER - LAYING OF
TEMPORARY GAS, OIL, AIR, AND WATER LINES; ALL
LABORER WORK PERTAINING TO ASPHALT AND ASPHALT
PLANTS IF NEEDED; WATERPROOFING MEMBRANE SYSTEMS
FOR BRIDGE DECKS AND WATERPROOFING FOR BOX CULVERTS
ON SITE; LAYING, PLACING, AND INSTALLATION OF ALL
STEEL CASING, CORRUGATED CASINGS, MULTIPLE PLATE
AND PRECAST CONCRETE AND ALL OTHER MATERIAL USED
FOR CASING, TUNNELS AND TUNNEL LINING; REMOVAL OF
SNAP TIES, THE PLACING AND REMOVING AND TENDING OF
BARRICADES, CONCRETE BARRICADE WALL, FLARES AND
SIGNAL LIGHTS; MAINTENANCE OF NELSON HEATERS; DIRT
FILL JOBS, SPOTTER AND GRADE EMPLOYEE AND SIGNAL
EMPLOYEE; SCAFFOLDING; TEMPORARY FENCING; PLACING
OF CONCRETE TO GRADE BY ANY MODE OR METHOD;
CARPENTER TENDERS, THE CONVEYING, HANDLING,
UNLOADING AND LOADING, HOISTING, ASSORTING OF ALL
LUMBER, ALL LABORER WORK REQUIRED AROUND CARPENTERS
INCLUDING THE CLEAN UP AFTER CARPENTERS; HORIZONTAL
DIRECTIONAL DRILL LOCATOR; WATERPROOFING WITH COLD
STUFF; BRICKLAYER TENDERS; CEMENT MASON TENDER;
CURING ALL CONCRETE BY HAND METHOD; DRIVE STAKES
AND STRING LINES FOR ALL MACHINERY; CONCRETE FORM
DISMANTLERS; HANDLING AND MAINTAINING ALL LIGHTS;
FLARES AND FLASHER FLARES; FLAGMAN; LANDSCAPING ON
ALL JOBS, THE LOADING, UNLOADING, DISTRIBUTION,
PLANTING, AND PLACING OF TREES, SHRUB, SOD, AND
SEEDING ON WORK COVERED BY THE AGREEMENT; COVERING
OF CONCRETE IN ANY MANNER; HIGH PRESSURE NOZZLE
(WATER BLAST); PILE DRIVER TENDERS; SURVEYOR
HELPER; TOOL CRIB MAN; WATER CARRIER; EXPANSION
JOINT ASSEMBLER; ALL OTHER EXCAVATING; DECK HAND,
DREDGE HAND, AND SHORE LABORER; UNLOADING AND
DISTRIBUTING OF REBARS; ALL POWER OPERATED TOOLS
AND CHAIN SAWS; CURB ASPHALT MACHING OPERATOR;
ASPHALT KETTLEMEN AND CARRIERS; WATERPROOFING WITH
HOT STUFF; CEMENT MEN AND SACK SHAKERS; CHIPPING
HAMMER MAN; KETTLEMEN AND CARRIERS OR MEN HANDLING
HOT STUFF; POWDER MAN HELPER; POWER CONCRETE SAW;
POWER FORM TAMPERS; RIG MEN; SIGNALING AND SPOTTING
OF RIGS AND EQUIPMENT; WALK BEHIND CONCRETE
BREAKER; STRIPPING CONCRETE FORMS WITH COMPOSITE
CREW OF LABORERS AND CARPENTERS; ALL OTHER WORK NOT
LISTED BELOW (PEORIA AND TAZEWELL (NORTHWEST)
COUNTIES)...........................................$ 37.32 38.14
LABORER GROUP 2 SKILLED LABORER - JACKHAMMER &
DRILL OPERATOR; GUNITE PUMP AND POT MAN; PUDDLERS,
VIBRATOR MEN; WIRE FABRIC PLACER; SANDBLAST PUMP
AND POT MAN; STRIKE OFF CONCRETE; UNLOADING,
HANDLING AND CARRYING OF ALL CREOSOTED PILES, TIES,
OR TIMER; CONCRETE BURNING BARS; POWER WHEELBARROWS
OR BUGGIES; ASPHALT RAKER; BRICKSETTERS; CUTTING
TORCHMEN (ELEC. AND ACETYLENE); MEN SETTING LINES
TO LEVEL FORMS; FORM SETTERS; GUNITE NOZZLE MAN AND
SANDBLASTING NOZZLE MAN; POWDER MAN; RIP-RAPPING
(BY HAND) (PEORIA AND TAZEWELL (NORTHWEST)
COUNTIES)...........................................$ 37.62 38.14
LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS
WASTE WORKER (INCLUDING MAINTAINING OF MANIFEST
SHEET); LEAD BASE PAINT ABATEMENT WORKER (PEORIA
AND TAZEWELL (NORTHWEST) COUNTIES)..................$ 38.07 38.14
----------------------------------------------------------------
LABO0231-002 05/01/2024
Rates Fringes
LABORER (FULTON AND TAZEWELL (SOUTHEAST) COUNTIES)..$ 38.50 33.45
----------------------------------------------------------------
LABO0231-005 05/01/2024
Rates Fringes
LABORER (HANCOCK AND MCDONOUGH COUNTIES)............$ 33.50 30.13
----------------------------------------------------------------
LABO0309-003 01/01/2024
Rates Fringes
LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM
MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING
OF FORMS OR LUMBER (IN BONE YARD), MOVING AND/OR
MAINTENANCE OF FLARES AND BARRICADES, OPERATION OF
ALL HAND, ELECTRIC, AIR, HYDRAULIC, OR MECHANICALLY
POWERED TOOLS UNDER THE JURISDICTION OF THE
LABORERS; INCLUDING JACKHAMMERS, TAMPERS; AIR
SPADES, AUGERS, CONCRETE SAWS, CHAINS SAWS, UTILITY
SAWS, ROCK DRILLS, VIBRATORS, MORTAR MIXER, POWER
AND HAND SAW (WHEN CLEANING TIMBER), GENERAL
LABORERS (NOT ELSEWHERE COVERED), CRAFT-TENDER,
MATERIAL CHECKER, MATERIAL HANDLER, FORM HANDLER,
CONCRETE DUMPER, PUDDLER, EXPLOSIVES HANDLER,
CENTER STRIP, REINFORCING IN CONCRETE, WIRE MESH
HANDLER AND INSTALLER, PRIME MOVER OR ANY
MECHANICAL DEVICE TAKING THE PLACE OF CONCRETE
BUGGY OR WHEEL-BARROW, SANDPOINT SETTER, ASPHALT
KETTLEMAN, SHEETING HAMMER DRIVERS, LAYING AND
JOINING OF TELEPHONE CONDUIT, GAS DISTRIBUTION MEN,
PIPE SETTER ON LATERALS, DRAIN TILES, CULVERT PIPE,
AND STORM SEWER CATCH BASIN LEADS, CATCH BASINS,
MANHOLES, BATCH DUMPERS, TANK CLEANERS, COFFERDAM
WORKER, BANKMAN ON FLOATING PLANT, JOINTMAN WITH
PIPELAYERS. BACK-UP MAN (CORKER, JOINT MAKER) WITH
PIPE SETTER ON SEWER AND WATER MAINS, BATTERBOARD
MAN OR LASER OPERATOR ON SEWER AND WATER MAIN,
LABORER IN DITCH, OR TUNNEL, ON SEWER OR WATER
MAINS AND TELEPHONE CONDUIT, CUTTERS, BURNERS,
TORCHMAN, GRAVEL BOX MAN, ASPHALT PLANT LABORER,
CONCRETE PLANT LABORER, DECK HAND, UNLOADING OF
STEEL AND REBAR, LASER BEAM OPERATOR, WRECKING
LABORERS (MERCER COUNTY)..........................$ 33.77 23.60
LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM
SETTER, HEAD DYNAMITE MAN (POWDERMAN) HEAD STRING
OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER
OR WATER MAIN, GUNNITE NOZZIE MAN, ASPHALT OR
CONCRETE CURB MACHINE OPERATOR, HEAD GRADE MAN,
HEAD TUNNEL MINER, CONCRETE BURNING MACHINE
OPERATOR, CORING MACHINE OPERATOR, WELDER, ASBESTOS
ABATEMENT AND HAZARDOUS WASTE WORKERS (MERCER
COUNTY).............................................$ 34.27 23.60
LABORER GROUP 3 CONCRETE SPECIALIST (MERCER
COUNTY).............................................$ 34.90 23.60
----------------------------------------------------------------
LABO0538-001 05/01/2024
Rates Fringes
LABORERS: GENERAL LABORER: ALL CLASSIFICATIONS NOT
LISTED BELOW. (HENDERSON, KNOX, WARREN, AND STARK
(WEST) COUNTIES)....................................$ 35.23 28.10
LABORERS: SKILLED LABORER: FLAGGERS; TRAFFIC
CONTROL AND ALL ASSOCIATED WORK; HANDLING OF
MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT
AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR
CLOTHING; TRACK LABORERS; CHLORIDE HANDLERS;
UNLOADING AND LABORERS WITH STEEL WORKERS AND
RE-BARS; CONCRETE WORKERS (WET); BATCH DUMPERS;
MASON TENDERS; KETTLE AND TAR MEN; PLASTIC
INSTALLERS; SCAFFOLD WORKERS; MOTORIZED BUGGIES OR
MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF
BUILDING MATERIALS; LABORERS WITH DE-WATERING
SYSTEMS; SEWER WORKERS PLUS DEPTH; VIBRATOR
OPERATORS; MOTOR MIXER OPERATORS; CEMENT SILICA,
CLAY, FLY ASH, LIME AND PLASTERS, HANDLERS (BULK OR
BAG); COFFERDAM WORKERS PLUS DEPTH; CONCRETE
PAVING, PLACING, CUTTING AND TYING OF REINFORCING;
DECKHAND, DREDGE HAND AND SHORE LABORERS; BACKMEN
ON FLOATING PLANT; ASPHALT WORKERS WITH MACHINE AND
LAYERS; GRADE CHECKER; POWER TOOLS; STRIPPING OF
ALL CONCRETE FORMS EXCEPT PAVING FORMS, DUMPMEN AND
SPOTTERS, WHEN NECESSARY; CAISSON WORKERS PLUS
DEPTH; GUNNITE NOZZLE MEN; TUNNEL HELPERS IN FREE
AIR; ROD AND CHAINMEN; WELDERS, CUTTERS, BURNERS,
AND TORCHMEN; CHAINSAW OPERATOR; PAVING BREAKER,
JACKHAMMER AND DRILL OPERATOR, LAYOUT MAN AND /OR
TILE LAYER; STEEL FORM SETTERS - STREET AND
HIGHWAY, AIR TAMPING HAMMERMAN; SIGNALMAN ON CRANE
CONCRETE SAW OPERATOR; SCREEDMAN ON ASPHALT PAVERS;
FRONT END MAN ON CHIP SPREADER; MULTIPLE CONCRETE
DUCT; LUTEMAN, ASPHALT RAKER; CURB ASPHALT MACHINE
OPERATOR. (HENDERSON, KNOX, WARREN, AND STARK
(WEST) COUNTIES)....................................$ 36.23 28.10
----------------------------------------------------------------
LABO0996-003 05/01/2024
Rates Fringes
LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED
BELOW (STARK COUNTY (EAST)).........................$ 39.17 28.01
LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT
WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE
PAINT WORKER (STARK COUNTY (EAST))..................$ 40.17 28.01
----------------------------------------------------------------
PAIN0030-010 06/01/2023
Rates Fringes
PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY,
AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL
TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES
(BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON,
MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES).......$ 40.00 26.90
----------------------------------------------------------------
PAIN0157-001 06/01/2023
Rates Fringes
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER,
SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK
(FULTON, MARSHALL, MASON, PEORIA, SCHUYLER,
TAZEWELL AND WOODFORD COUNTIES).....................$ 40.00 26.90
----------------------------------------------------------------
PAIN1178-003 06/01/2022
Rates Fringes
PAINTER: BRIDGES (HENDERSON, KNOX, MERCER, AND
WARREN COUNTIES)....................................$ 32.00 17.37
PAINTER: BRUSH AND ROLLER (HENDERSON, KNOX, MERCER,
AND WARREN COUNTIES)................................$ 30.00 17.37
PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING
(HENDERSON, KNOX, MERCER, AND WARREN COUNTIES)......$ 30.50 17.37
----------------------------------------------------------------
PLAS0018-011 05/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (FULTON
(NORTHWESTERN PART), KNOX, MERCER (SOUTHEASTERN
CORNER), AND WARREN COUNTIES).......................$ 35.38 27.31
----------------------------------------------------------------
PLAS0018-012 06/01/2015
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (STARK COUNTY).......$ 36.70 22.08
----------------------------------------------------------------
PLAS0018-013 05/01/2021
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (FULTON (EXCEPT
NORTHWEST PART), PEORIA, AND TAZEWELL COUNTIES).....$ 32.98 30.70
----------------------------------------------------------------
PLAS0018-028 05/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (HANCOCK, HENDERSON
(SOUTHERN HALF), AND MCDONOUGH COUNTIES)............$ 28.64 24.57
----------------------------------------------------------------
PLAS0018-037 01/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (HENDERSON (NORTHERN
HALF) AND MERCER (EXCEPT SOUTHEASTERN CORNER)
COUNTIES)...........................................$ 28.52 24.04
----------------------------------------------------------------
TEAM0371-003 05/01/2025
Rates Fringes
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING
LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES
AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE
UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES;
MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP
TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO
AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO
6,000 LB CAPACITY. (MERCER COUNTY).................$ 45.35 25.72
TRUCK DRIVER, GROUP 2 (MERCER COUNTY)...............$ 45.93 25.72
TRUCK DRIVER, GROUP 3 (MERCER COUNTY)...............$ 46.25 25.72
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.
(MERCER COUNTY).....................................$ 46.60 25.72
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL
PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS
WASTE WORK. (MERCER COUNTY).........................$ 47.71 25.72
----------------------------------------------------------------
TEAM0627-002 05/01/2024
Rates Fringes
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING
LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES
AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE
UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES;
MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP
TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO
AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO
6,000 LB CAPACITY. (FULTON, HANCOCK, HENDERSON,
KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND
WARREN COUNTIES)....................................$ 43.24 24.27
TRUCK DRIVER, GROUP 2 (FULTON, HANCOCK, HENDERSON,
KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND
WARREN COUNTIES)....................................$ 43.83 24.27
TRUCK DRIVER, GROUP 3 (FULTON, HANCOCK, HENDERSON,
KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND
WARREN COUNTIES)....................................$ 44.10 24.27
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.
(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH,
PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 44.49 24.27
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL
PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS
WASTE WORK. (FULTON, HANCOCK, HENDERSON, KNOX,
MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN
COUNTIES)...........................................$ 45.59 24.27
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to
the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at
least $13.65 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the
contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"