Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0017-002 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
ASBESTOS WORKER/HEAT & FROST INSULATOR (LAKE AND PORTER COUNTIES)$56.0237.24
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS O$44.8234.00

ASBE0017-002 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ASBESTOS WORKER/HEAT & FROST INSULATOR (LAKE AND PORTER COUNTIES)$56.0237.24
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS O$44.8234.00

ASBE0075-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTO$41.2030.93
ASBESTOS WORKER/HEAT & FROST INSULATOR (REMAINING COUNTIES)$41.2030.93

BOIL0001-005 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
BOILERMAKER (LAKE COUNTY, CITY OF HAMMOND; NORTH OF 114TH STREET)$58.9139.75

BOIL0374-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
BOILERMAKER$43.2438.17

BRIN0004-011 (collectively bargained (union) rate, 09/21/2024)

ClassificationBase rateFringes
BRICKLAYER: TERRAZZO FINISHER (LAKE, LAPORTE AND PORTER COUNTIES)$33.0021.84
BRICKLAYER: MARBLE FINISHER; TILE FINISHER (LAKE, LAPORTE AND PORTER COUNTIES)$34.0021.84

BRIN0004-018 (collectively bargained (union) rate, 09/21/2024)

ClassificationBase rateFringes
BRICKLAYER: TERRAZZO FINISHER (SOUTH BEND: ST. JOSEPH COUNTY)$33.0021.84
BRICKLAYER: MARBLE AND TILE FINISHER (SOUTH BEND: ST. JOSEPH COUNTY)$33.0021.84

CARP0413-002 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
CARPENTER (ST. JOSEPH COUNTY)$34.7025.98

CARP0765-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
MILLWRIGHT (LAKE, LAPORTE AND PORTER COUNTIES)$47.9237.23
CARPENTER (LAKE, LAPORTE AND PORTER COUNTIES)$45.9135.90

CARP1029-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
MILLWRIGHT (ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD, HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST. JOSEPH, STEUBEN, TIPTON, WABASH, WELLS AND WHIT$35.8930.52

ELEC0153-001 (collectively bargained (union) rate, 06/03/2019)

ClassificationBase rateFringes
COMMUNICATION TECHNICIAN- INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF SIGNALS OF AN$26.5018.33
ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF SIGNALS OF ANY NATURE, FOR$46.0029.23

ELEC0153-001 (collectively bargained (union) rate, 06/03/2025)

ClassificationBase rateFringes
COMMUNICATION TECHNICIAN- INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF SIGNALS OF AN$26.5018.33
ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF SIGNALS OF ANY NATURE, FOR$46.0029.23

ELEC0531-001 (collectively bargained (union) rate, 05/31/2025)

ClassificationBase rateFringes
ELECTRICIAN (LAPORTE AND PORTER COUNTIES)$49.0032.89

ELEC0697-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (LAKE COUNTY)$52.0032.85

ELEC0697-004 (collectively bargained (union) rate, 08/31/2025)

ClassificationBase rateFringes
TELECOMMUNICATION TECHNICIAN - WORK COVERS LOW VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA AND VIDEO) INCLUDING, TELEPHONE AND$41.5031.23

ELEC1393-003 (collectively bargained (union) rate, 01/02/2025)

ClassificationBase rateFringes
LINE CONSTRUCTION:: LINEMAN (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30))$50.2822.16
LINE CONSTRUCTION:: GROUNDMAN-TRUCK DRIVER (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30))$31.4916.71
LINE CONSTRUCTION:: GROUNDMAN (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30))$31.4916.71
LINE CONSTRUCTION:: EQUIPMENT OPERATOR 3 (BACKHOE OVER 1/2 YARD BUCKET CAPACITY, CRANES RATED AT 15 TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & PORTER COUNTIES (CALUMET AREA$47.3521.53
LINE CONSTRUCTION:: EQUIPMENT OPERATOR 1: (DIGGERS 5TH WHEEL TYPE TRUCKS, CRAWLER TYPE, D-4 AND SMALLER, BUCKET TRUCKS AND LIVE BOOM TYPE LINE TRUCKS) (LAKE & PORTER COUNTIES ($38.3318.92

ELEV0002-005 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC: (LAKE AND PORTER COUNTIES) FOOTNOTES: A) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; VETERANS DAY, MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY A$70.6838.44

ELEV0044-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC (LA PORTE AND ST. JOSEPH COUNTIES) A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER $62.2738.44

ENGI0150-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS (HOUSING AND COMMERCIAL ONLY) (LAKE, LAPORTE, AND PORTER COUNTIES)$35.9545.93
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 4 BULL GANG (CRANE ERECTION CREW); HEATERS, MECHANICAL (1 TO 5); OILERS; SWITCHMEN (LAKE, LAPORTE, AND PORTER COUNTIES)$41.4045.93
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 3 AIR COMPRESSOR - SMALL 210 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FEET); AIR COMPRESSOR - LARGE OVER 210; AIR COMPRE$43.6045.93
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 2 AIR COMPORESSOR (3) (FEEDING A COMMON RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; COMBINATION BACKHOE END LOADER WITH $47.9045.93
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 1 ASPHALT PLANT; AUTOGRADE; BATCH PLANT); BENOTO (REQUIRES 2 ENGINEERS; BOILER & THROTTLE VALVE; BORING MACHINE (MINING MACHIN$48.7045.93

ENGI0150-012 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 BOBCATS AND FORKLIFTS (COMMERCIAL OR RESIDENTIAL). (ST. JOSEPH COUNTY)$30.6038.65
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 4 BOBCAT (UP TO AND INCLUDING 3/4 CU. YD.). COMPRESSOR (OVER 210 CU. FT. AND LESS THAN 600 CU. FT.), GENERATOR (OVER 50 KW.), $33.2038.65
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 3 BUCK HOIST, COMBINATION (SMALL EQUIPMENT OPERATOR), .CONVEYOR (PORTABLE), GROUTING MACHINE, HOIST ELEVATORS (MATERIAL AND PE$34.0038.65
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 2 AIR COMPRESSOR (600 CU. FT. AND OVER), BOB CAT (OVER 3/4 CU. YD.), BOILERS, BROOM (ALL POWERED PROPELLED), BULL DOZERS WITH $34.8038.65
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 1 MECHANIC, ASPHALT PLANT, ASPHALT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALV$36.1538.65

ENGI0150-014 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER (1 TO 5), OUTBOARD OR INBOARD MOTOR BOAT, OILER, POWER SAW (CONCRETE POWER DRIVEN)$45.9043.40
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 4 AIR COMPRESSORS, CONVEYOR (ALL), FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CURING SPRAYING MACHINE (SELF-PROPELLED), BROOM $46.9543.40
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRESSOR (COMMON RECEIVER 2), CONCRETE CUTTER WHEEL TYPE $48.1543.40
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 2 COMBINATION BACKHOE FRONT END LOADER MACHINE WITH LESS THAN 1/2 CU. YD., BACKHOE BUCKET OR WITH ATTACHMENTS, BITUMINOUS MIXER, BITUM$48.6043.40
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 1 ASPHALT PLANTS (CONSTRUCTION), ASPHALT PLANT (PERMANENT), AUTO PATROL (MAINTAINER), AUTOMATIC DRY BATCH PLANT, AUTOMATED CONCRETE PL$49.0543.40

IRON0292-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
IRONWORKER (ST. JOSEPH AND LAPORTE (REMAINDER OF COUNTY) COUNTIES)$39.7625.00

IRON0395-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
IRONWORKER: STRUCTURAL & ORNAMENTAL (LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50 MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE ON W. TO 3 MILES E. O$47.7541.28
IRONWORKER: SHEETER (LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50 MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE ON W. TO 3 MILES E. OF IN. COUNTIES)$48.0041.28

LABO0041-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
LABORERS: CAISSON AND TUNNEL WORK (COMPRESSED & FREE AIR) (BUILDING CONSTRUCTION) (LAKE COUNTY (WESTERN HALF)) Premium for all employees working in compressed air shall be as follo$40.3028.90
LABORERS: BUILDING CONSTRUCTION: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES. (LAKE COUNTY (WESTERN HALF))$40.2628.90
LABORERS: BUILDING CONSTRUCTION: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GU$40.0128.90
LABORERS: BUILDING CONSTRUCTION: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON OR PLASTERERS); RAILROAD WORKERS, MASONRY WALL WORKERS, (INTERI$39.2628.90

LABO0041-004 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW JOINT CONTROL CUTTING (LAKE COUNTY)$34.4527.50
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEMPORARY OR PERMANENT WELDERS (ELECTRIC $33.7527.50
LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS STEEL ROD OR MAT INSTALLER, WIRE MESH L$33.4527.50

LABO0081-001 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; DYNAMITE AND POWDER MAN; CONCRETE BARRIER RAIL FORM SETTER; GENERAL LABORER; CONCRETE SAW, JOINT CON$34.4527.50
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER: LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDERS$33.7527.50
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; CARPENTER TENDER; FENCE ERECTOR; GRADE CHECKER; GUARD RAIL ERECTOR; CONTINUOUS STEEL ROD OR MAT INSTALLER; W$33.4527.50

LABO0081-002 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
LABORERS:: GROUP 1 (LA PORTE & PORTER COUNTIES).$ 33.45 27.50 LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE $34.4527.50
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER (ELECTRIC $33.7527.50

LABO0081-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST (LAKE (EASTERN HALF), LA PORTE, AND PORTER COUNTIES)$40.8930.30
LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; SCAFFOLD BUILDERS WHEN WORKIN$40.6430.30
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON OR PLASTERERS); MECHANIC TENDERS; RODMEN AND CHAINMEN, RAILROAD WORKERS, MASONRY WALL $39.8930.30

LABO0645-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
LABORERS:: GROUP 3 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION)$31.8818.70
LABORERS:: GROUP 2 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION)$30.3818.70
LABORERS:: GROUP 1 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION)$29.8818.70

LABO0645-002 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
LABORERS:: GROUP 3 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION)$31.6518.00
LABORERS:: GROUP 2 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION)$31.1518.00
LABORERS:: GROUP 1 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION)$30.6518.00

LABO0645-004 (collectively bargained (union) rate, 04/01/2022)

ClassificationBase rateFringes
LABORERS: GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CUTT$28.4017.22
LABORERS: GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDER$27.9017.22
LABORERS: (HEAVY AND HIGHWAY CONSTRUCTION) GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN (MORTAR, MASTIC AND A$27.4017.22

PAIN0027-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
GLAZIER (LAKE COUNTY, WEST OF HIGHWAY #41, INCLUDING HAMMOND AREA)$53.5544.88

PAIN0091-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
PAINTER: SPRAY (LA PORTE (EVERYTHING EAST OF HWY 39 AND NORTH OF HWY 20, INCLUDING THE CITIES OF LAPORTE AND MICHIGAN CITY); ST. JOSEPH COUNTIES)$33.0019.86
PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING (LA PORTE (EVERYTHING EAST OF HWY 39 AND NORTH OF HWY 20, INCLUDING THE CITIES OF LAPORTE AND MICHIGAN CITY$32.5019.86

PAIN0460-003 (collectively bargained (union) rate, 06/24/2025)

ClassificationBase rateFringes
PAINTERS: PAINTER (PORTER, LAKE AND THE REMAINDER OF LA PORTE COUNTY))$41.0031.26
PAINTERS: DRYWALL FINISHING (PORTER, LAKE AND THE REMAINDER OF LA PORTE COUNTY))$41.0031.26

PAIN1165-005 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
GLAZIER (LAKE (EAST OF HIGHWAY #41 EXCLUDING HAMMOND AREA), LAPORTE AND PORTER COUNTIES)$44.0930.63

PAIN1165-009 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
GLAZIER (ST. JOSEPH COUNTY)$34.2224.67

PLAS0101-006 (collectively bargained (union) rate, 06/01/2018)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER: HEAVY/HIGHWAY (ST. JOSEPH COUNTY)$31.5014.30

PLAS0101-007 (collectively bargained (union) rate, 06/01/2014)

ClassificationBase rateFringes
PLASTERER: BUILDING CONSTRUCTION (ST. JOSEPH COUNTY)$26.8112.40
CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (ST. JOSEPH COUNTY)$28.8414.48

PLAS0101-007 (collectively bargained (union) rate, 06/01/2018)

ClassificationBase rateFringes
PLASTERER: BUILDING CONSTRUCTION (ST. JOSEPH COUNTY)$26.8112.40
CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (ST. JOSEPH COUNTY)$28.8414.48

PLAS0165-001 (collectively bargained (union) rate, 06/01/2012)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH))$33.9413.80
PLASTERER (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH))$32.7017.70

PLAS0165-001 (collectively bargained (union) rate, 07/01/2018)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH))$33.9413.80
PLASTERER (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH))$32.7017.70

PLAS0406-001 (collectively bargained (union) rate, 06/01/2012)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN$32.0015.74
CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT)$35.4821.68
PLASTERER (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES)$33.2817.32

PLAS0406-001 (collectively bargained (union) rate, 07/01/2018)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN$32.0015.74
CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT)$35.4821.68
PLASTERER (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES)$33.2817.32

PLAS0438-001 (collectively bargained (union) rate, 06/01/2018)

ClassificationBase rateFringes
CEMENT MASON: BUILDING CONSTRUCTION (LAPORTE COUNTY, EASTERN PORTION OF PORTER COUNTY WEST TO BUT NOT INCLUDING CHESTERTON IN THE NORTH AND WEST TO AND INCLUDING KOUTS IN THE SOUTH$36.0125.40

PLUM0172-006 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
PLUMBER, PIPEFITTER, STEAMFITTER (LA PORTE COUNTY (CITY OF LAPORTE) AND ST. JOSEPH COUNTIES)$44.930.00

PLUM0210-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
PLUMBER (LAKE, LAPORTE (EXCLUDING THE CITY OF LAPORTE) AND PORTER COUNTIES)$49.7728.56

PLUM0597-003 (collectively bargained (union) rate, 06/01/2018)

ClassificationBase rateFringes
PIPEFITTER (LAKE (ENTIRE COUNTY), LA PORTE (EXCLUDING THE CITY OF LA PORTE), PORTER (ENTIRE COUNTY))$48.5031.12

ROOF0023-006 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
ROOFER: SLATE & TILE (LA PORTE AND ST. JOSEPH COUNTIES)$36.0521.04
ROOFER: COMPOSITION (LA PORTE AND ST. JOSEPH COUNTIES)$34.5521.04

ROOF0026-003 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ROOFER (LAKE AND PORTER COUNTIES)$47.4727.81

SFIN0281-001 (collectively bargained (union) rate, 01/01/2018)

ClassificationBase rateFringes
SPRINKLER FITTERS (PORTER COUNTY (NORTH OF U.S. ROUTE 30))$48.1027.05

SFIN0669-002 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
SPRINKLER FITTER$44.2027.88

SHEE0020-013 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER (ST. JOSEPH COUNTY)$44.4530.43

SHEE0020-015 (collectively bargained (union) rate, 10/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER (LAKE, LAPORTE, AND PORTER COUNTIES)$52.9631.41

TEAM0135-004 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. (LA PORTE COUNTY) A: $37.90 PER DAY & 460.00 PER WEEK$34.020.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN (16) CU.YDS. OR TWENTY-FOUR (24) TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS,$33.520.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI- TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, T$33.370.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN (18) CU.YDS. OR TWENTY- FOUR (24) TONS GROSS, SIX (6) WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS,$33.170.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 1 SINGLE AXLE TRUCKS, SEVEN (7) CU. YDS. OR LESS THAN TEN AND ONE-HALF (10 1/2) TONS, DUPSTERS, SCOOP-MOBILES FIVE (5) CU.YDS. AND U$32.670.00

TEAM0135-011 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER:GROUP 10 PICK-UP TRUCKS LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION$34.5420.51
TRUCK DRIVER: GROUP12 ACEY WAGON (OVER 3 BUCKETS); QUAD AXLE TRUCKS; ARTICULATING DUMP LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION$35.1920.51
TRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN; BATCH BOARD TENDERS; WAREHOUSEMAN LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION$35.0920.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 9 LOW-BOYS, TANDEM TRI-AXLE; ACEY WAGONS UP TO AND INCLUDING 3 BUCKETS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS$35.0920.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 8 TANDEM-TANDEM SEMI TRUCKS; TRUCK MECHANICS AND WELDERS; HEAVY EQUIPMENT-TYPE WATER WAGON OVER 5,000 GALLONS; TRI-AXLE TRUCKS P$35.0420.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 TRI-AXLE TRUCKS; TANDEM AXLE SEMI TRUCKS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTE$34.9920.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 TANDEM TRUCKS OR ""DOG-LEGS""; SEMI-WATER TRUCK; SPRINKLER TRUCK; HEAVY EQUIPMENT-TYPE WATER WAGONS, 5,000 GALLONS AND UNDER; $34.9420.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 TANDEM TRUCKS OVER 15 TONS PAYLOAD; SINGLE AXLE SEMI TRUCKS; FARM TRACTORS HAULING MATERIAL; MIXER TRUCKS (ALL TYPES); TRUCKS $34.8920.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER TRUCKS; BUTUMINOUS DISTRIBUTORS (TWO-MAN) (LAPORTE & ST. JOSEPH COUNTIES)$34.8420.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 SINGLE AXLE ""DOG-LEGS"", AND TANDEM TRUCK OR DOG- LEGS; WINCH TRUCKS OR A-FRAMES WHEN USED FOR TRANSPORTATION PURPOSES; DRIVE$34.7920.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 SINGLE AXLE FUEL AND WATER TRUCKS (LAPORTE & ST. JOSEPH COUNTIES)$34.7420.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH TRUCKS, WET OR DRY 3 (34E) AXLE OR LESS; SINGLE AXLE GREASE AND MAINTENANCE TRUCK ($34.6920.51

TEAM0142-002 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 6)$36.6035.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 5)$36.1535.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 4)$38.2035.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 3)$38.0035.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 2)$37.8035.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 1)$37.6035.48

TEAM0364-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER GROUP 4 (BUILDING CONSTRUCTION) SEMI TRAILER TRUCKS (ST. JOSEPH COUNTY) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURT$34.750.00
TRUCK DRIVER GROUP 3 (BUILDING CONSTRUCTION) TANDEM, TRIAXLE AND FUEL TRUCKS (ST. JOSEPH COUNTY) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIA$34.250.00
TRUCK DRIVER GROUP 2 (BUILDING CONSTRUCTION ) SINGLE AXLE TRUCKS (ST. JOSEPH COUNTY) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURT$33.950.00
TRUCK DRIVER GROUP 1 (BUILDING CONSTRUCTION) PICKUP TRUCKS (ST. JOSEPH COUNTY) FOOTNOTE: A. FRINGE BENEFITS: $422.50 PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF J$33.750.00
Full official text of IN20260001 rev 3
"General Decision Number: IN20260001 05/18/2026


State: Indiana


Construction Types: Building, Heavy and Highway


Counties: Indiana Counties of 
La Porte, Lake, Porter and St Joseph




Building Construction Projects

Heavy Construction Projects

Highway Construction Projects


Modification Number     Publication Date
          2                01/30/2026
          3                05/18/2026


 ASBE0017-002 06/01/2024
                                                     Rates                  Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR (LAKE AND 
PORTER COUNTIES)....................................$ 56.02                  37.24
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, 
WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, 
BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM 
MECHANICAL SYSTEMS (LAKE AND PORTER COUNTIES).......$ 44.82                  34.00
----------------------------------------------------------------

 ASBE0017-002 06/01/2025
                                                     Rates                  Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR (LAKE AND 
PORTER COUNTIES)....................................$ 56.02                  37.24
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, 
WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, 
BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM 
MECHANICAL SYSTEMS (LAKE AND PORTER COUNTIES).......$ 44.82                  34.00
----------------------------------------------------------------

 ASBE0075-001 06/01/2025
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, 
WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, 
BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM 
MECHANICAL SYSTEMS (REMAINING COUNTIES).............$ 41.20                  30.93
ASBESTOS WORKER/HEAT & FROST INSULATOR (REMAINING 
COUNTIES)...........................................$ 41.20                  30.93
----------------------------------------------------------------

 BOIL0001-005 05/01/2025
                                                     Rates                  Fringes
BOILERMAKER (LAKE COUNTY, CITY OF HAMMOND;  NORTH 
OF 114TH STREET)....................................$ 58.91                  39.75
----------------------------------------------------------------

 BOIL0374-003 05/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 43.24                  38.17
----------------------------------------------------------------

 BRIN0004-011 09/21/2024
                                                     Rates                  Fringes
BRICKLAYER: TERRAZZO FINISHER (LAKE, LAPORTE AND 
PORTER COUNTIES)....................................$ 33.00                  21.84
BRICKLAYER: MARBLE FINISHER; TILE FINISHER (LAKE, 
LAPORTE AND PORTER COUNTIES)........................$ 34.00                  21.84
----------------------------------------------------------------

 BRIN0004-018 09/21/2024
                                                     Rates                  Fringes
BRICKLAYER: TERRAZZO FINISHER (SOUTH BEND: ST. 
JOSEPH COUNTY)......................................$ 33.00                  21.84
BRICKLAYER: MARBLE AND TILE FINISHER (SOUTH BEND: 
ST. JOSEPH COUNTY)..................................$ 33.00                  21.84
----------------------------------------------------------------

 CARP0413-002 06/01/2025
                                                     Rates                  Fringes
CARPENTER (ST. JOSEPH COUNTY).......................$ 34.70                  25.98
----------------------------------------------------------------

 CARP0765-001 06/01/2025
                                                     Rates                  Fringes
MILLWRIGHT (LAKE, LAPORTE AND PORTER COUNTIES)......$ 47.92                  37.23
CARPENTER (LAKE, LAPORTE AND PORTER COUNTIES).......$ 45.91                  35.90
----------------------------------------------------------------

 CARP1029-001 06/01/2025
                                                     Rates                  Fringes
MILLWRIGHT (ADAMS, ALLEN, CASS, DEKALB, ELKHART, 
FULTON, GRANT, HOWARD, HUNTINGTON, KOSCIUSKO, 
LAGRANGE, MARSHALL, MIAMI, NOBLE, ST. JOSEPH, 
STEUBEN, TIPTON, WABASH, WELLS AND WHITLEY  
COUNTIES)...........................................$ 35.89                  30.52
----------------------------------------------------------------

 ELEC0153-001 06/03/2019
                                                     Rates                  Fringes
COMMUNICATION TECHNICIAN- INCLUDES THE 
INSTALLATION, OPERATION, INSPECTION, MODIFICATION, 
MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE 
TRANSMISSION AND RECEPTION OF SIGNALS OF ANY 
NATURE, FOR ANY PURPOSE, INCLUDING BUT NOT LIMITED 
TO, SOUND AND VOICE TRANSMISSION/TRANSFERENCE 
SYSTEMS, COMMUNICATION SYSTEMS THAT TRANSMIT OR 
RECEIVE INFORMATION AND/OR CONTROL SYSTEMS, 
TELEVISION AND VIDEO SYSTEMS, MICRO-PROCESSOR 
CONTROLLED FIRE ALARM SYSTEMS, AND SECURITY SYSTEMS 
AND THE PERFORMANCE OF ANY TASK DIRECTLY RELATED TO 
SUCH INSTALLATION OR SERVICE.  THE SCOPE OF WORK 
SHALL EXCLUDE THE INSTALLATION OF ELECTRICAL POWER 
WIRING AND THE INSTALLATION OF CONDUIT RACEWAYS 
EXCEEDING FIFTEEN (15) FEET IN LENGTH.  (ST JOSEPH 
COUNTY).............................................$ 26.50                  18.33
ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, 
INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF 
SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF 
SIGNALS OF ANY NATURE, FOR ANY PURPOSE, INCLUDING 
BUT NOT LIMITED TO, SOUND AND VOICE 
TRANSMISSION/TRANSFERENCE SYSTEMS, COMMUNICATION 
SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR 
CONTROL SYSTEMS, TELEVISION AND VIDEO SYSTEMS, 
MICRO-PROCESSOR CONTROLLED FIRE ALARM SYSTEMS, AND 
SECURITY SYSTEMS AND THE PERFORMANCE OF ANY TASK 
DIRECTLY RELATED TO SUCH INSTALLATION OR SERVICE.  
THE SCOPE OF WORK SHALL EXCLUDE THE INSTALLATION OF 
ELECTRICAL POWER WIRING AND THE INSTALLATION OF 
CONDUIT RACEWAYS EXCEEDING FIFTEEN (15) FEET IN 
LENGTH.  (ST JOSEPH COUNTY).........................$ 46.00                  29.23
----------------------------------------------------------------

 ELEC0153-001 06/03/2025
                                                     Rates                  Fringes
COMMUNICATION TECHNICIAN- INCLUDES THE 
INSTALLATION, OPERATION, INSPECTION, MODIFICATION, 
MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE 
TRANSMISSION AND RECEPTION OF SIGNALS OF ANY 
NATURE, FOR ANY PURPOSE, INCLUDING BUT NOT LIMITED 
TO, SOUND AND VOICE TRANSMISSION/TRANSFERENCE 
SYSTEMS, COMMUNICATION SYSTEMS THAT TRANSMIT OR 
RECEIVE INFORMATION AND/OR CONTROL SYSTEMS, 
TELEVISION AND VIDEO SYSTEMS, MICRO-PROCESSOR 
CONTROLLED FIRE ALARM SYSTEMS, AND SECURITY SYSTEMS 
AND THE PERFORMANCE OF ANY TASK DIRECTLY RELATED TO 
SUCH INSTALLATION OR SERVICE.  THE SCOPE OF WORK 
SHALL EXCLUDE THE INSTALLATION OF ELECTRICAL POWER 
WIRING AND THE INSTALLATION OF CONDUIT RACEWAYS 
EXCEEDING FIFTEEN (15) FEET IN LENGTH.  (ST JOSEPH 
COUNTY).............................................$ 26.50                  18.33
ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, 
INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF 
SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF 
SIGNALS OF ANY NATURE, FOR ANY PURPOSE, INCLUDING 
BUT NOT LIMITED TO, SOUND AND VOICE 
TRANSMISSION/TRANSFERENCE SYSTEMS, COMMUNICATION 
SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR 
CONTROL SYSTEMS, TELEVISION AND VIDEO SYSTEMS, 
MICRO-PROCESSOR CONTROLLED FIRE ALARM SYSTEMS, AND 
SECURITY SYSTEMS AND THE PERFORMANCE OF ANY TASK 
DIRECTLY RELATED TO SUCH INSTALLATION OR SERVICE.  
THE SCOPE OF WORK SHALL EXCLUDE THE INSTALLATION OF 
ELECTRICAL POWER WIRING AND THE INSTALLATION OF 
CONDUIT RACEWAYS EXCEEDING FIFTEEN (15) FEET IN 
LENGTH.  (ST JOSEPH COUNTY).........................$ 46.00                  29.23
----------------------------------------------------------------

 ELEC0531-001 05/31/2025
                                                     Rates                  Fringes
ELECTRICIAN (LAPORTE AND PORTER COUNTIES)...........$ 49.00                  32.89
----------------------------------------------------------------

 ELEC0697-001 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (LAKE COUNTY)...........................$ 52.00                  32.85
----------------------------------------------------------------

 ELEC0697-004 08/31/2025
                                                     Rates                  Fringes
TELECOMMUNICATION TECHNICIAN - WORK COVERS LOW 
VOLTAGE INSTALLATION, MAINTENANCE AND REMOVAL OF 
TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA 
AND VIDEO) INCLUDING, TELEPHONE AND DATA INSIDE 
WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL 
OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, 
MICRO WAVES, V/SAT, BYPASS, CATV, WAN (WIDE AREA 
NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN 
(INTEGRATED SYSTEM DIGITAL NETWORK).  DOES NOT 
COVER ANY WORK WHICH PROPERLY COMES UNDER THE WORK 
DESCRIPTION OF INSIDE JW (JOURNEYMAN WIREMAN), BUT 
SHALL COVER THE PULLING OF WIRE IN RACEWAYS, BUT 
NOT THE INSTALLATION OF RACEWAYS.  (LAKE COUNTY)....$ 41.50                  31.23
----------------------------------------------------------------

 ELEC1393-003 01/02/2025
                                                     Rates                  Fringes
LINE CONSTRUCTION:: LINEMAN (LAKE & PORTER 
COUNTIES   (CALUMET AREA, NORTH OF U.S. HWY 30))....$ 50.28                  22.16
LINE CONSTRUCTION:: GROUNDMAN-TRUCK DRIVER (LAKE 
& PORTER COUNTIES   (CALUMET AREA, NORTH OF 
U.S. HWY 30)).......................................$ 31.49                  16.71
LINE CONSTRUCTION:: GROUNDMAN (LAKE & PORTER 
COUNTIES   (CALUMET AREA, NORTH OF U.S. HWY 30))....$ 31.49                  16.71
LINE CONSTRUCTION:: EQUIPMENT OPERATOR 3 (BACKHOE 
OVER 1/2 YARD BUCKET CAPACITY, CRANES RATED AT 15 
TON OR MORE CAPACITY) 95% OF J.L. RATE (LAKE & 
PORTER COUNTIES   (CALUMET AREA, NORTH OF U.S. HWY 
30))................................................$ 47.35                  21.53
LINE CONSTRUCTION:: EQUIPMENT OPERATOR 1:  (DIGGERS 
5TH WHEEL TYPE TRUCKS, CRAWLER TYPE, D-4 AND 
SMALLER, BUCKET TRUCKS AND LIVE BOOM TYPE LINE 
TRUCKS) (LAKE & PORTER COUNTIES   (CALUMET 
AREA, NORTH OF U.S. HWY 30))........................$ 38.33                  18.92
----------------------------------------------------------------

 ELEV0002-005 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC:  (LAKE AND PORTER COUNTIES)    
FOOTNOTES:   A) EIGHT PAID HOLIDAYS: NEW YEAR'S 
DAY; VETERANS DAY, MEMORIAL DAY; INDEPENDENCE DAY; 
LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER 
THANKSGIVING AND CHRISTMAS DAY.  B) EMPLOYER 
CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION 
PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF 
SERVICE, AND 6% OF REGULAR HOURLY RATE FOR LESS 
THAN 5 YEARS OF SERVICE.............................$ 70.68                  38.44
----------------------------------------------------------------

 ELEV0044-001 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC (LA PORTE AND ST. JOSEPH 
COUNTIES)    A) PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER 
THANKSGIVING, AND CHRISTMAS DAY.  B) EMPLOYER 
CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION 
PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF 
SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE..........$ 62.27                  38.44
----------------------------------------------------------------

 ENGI0150-001 06/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 5 FORK LIFTS (HOUSING AND COMMERCIAL ONLY)   
(LAKE, LAPORTE, AND PORTER COUNTIES)................$ 35.95                  45.93
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 4 BULL GANG (CRANE ERECTION CREW); HEATERS, 
MECHANICAL (1 TO 5); OILERS; SWITCHMEN  (LAKE, 
LAPORTE, AND PORTER COUNTIES).......................$ 41.40                  45.93
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 3 AIR COMPRESSOR - SMALL 210 AND UNDER (1 TO 
5 NOT TO EXCEED A TOTAL OF 300 FEET); AIR 
COMPRESSOR - LARGE OVER 210; AIR COMPRESSOR (2) 
FEEDING A COMMON RECEIVER; COMBINATION - SMALL 
EQUIPMENT OPERATOR; CONCRETE MIXER (TWO BAG & 
OVER); CONVEYOR, PORTABLE; FORKLIFT-UNDER 10 TON; 
GENERATOR; PUMPS (1 TO 3 NOT TO EXCEED A TOTAL OF 
300 FEET); PUMPS, WELL POINTS; STEAM GENERATORS; 
TRACTORS, FARM & SIMILAR TYPE; WELDING MACHINES (2 
THRU 5); WINCHES, 4 ELECTRIC DRILLO WINCHES  (LAKE, 
LAPORTE, AND PORTER COUNTIES).......................$ 43.60                  45.93
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 2 AIR COMPORESSOR (3) (FEEDING A COMMON 
RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; 
COMBINATION BACKHOE END LOADER WITH BACKHOE BUCKET 
1/2 CU. YD. AND UNDER OR WITH ATTACHMENTS; CORBOY 
DRILLING MACHINE; GRADER, ELEVATING; GROUTING 
MACHINES; GUARD RAIL POST DRIVER; HIGHLIFT SHOVEL 
OR FRONTEND LOADER; HOIST (AUTOMATIC), HOIST (ALL 
ELEVATORS); HOIST (TUGGER AND SINGLE DRUM); POST 
HOLE DIGGER; ROLLERS (ALL); SCOOP (TRACTOR DRAWN); 
STONE CRUSHERS; TOURNAPULL; WINCH TRUCKS  (LAKE, 
LAPORTE, AND PORTER COUNTIES).......................$ 47.90                  45.93
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 1 ASPHALT PLANT; AUTOGRADE; BATCH PLANT); 
BENOTO (REQUIRES 2 ENGINEERS; BOILER & THROTTLE 
VALVE; BORING MACHINE (MINING MACHINE); CAISSON 
RIGS; CENTRAL REDI-MIX PLANT; COMBINATION BACKHOE 
ENDLOADER WITH BACKHOE BUCKET OVER 1/2 CU. YD. OR 
WITH ATTACHMENTS; COMBINATION TUGGER HOIST & AIR 
COMPRESSOR; COMPRESSOR & THROTTLE; CONCRETE BREAKER 
(TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE 
CONVEYOR (TRUCK MOUNTED); CONCRETE PAVER OVER 27E 
CU.FT.; CONCRETE PAVER 27E CU. FT. & UNDER; 
CONCRETE PLACING BOOM; CONCRETE PUMP/GROUT PUMP 
WITH BOOM (TRUCK MOUNTED); CONCRETE PUMP WITH BOOM 
(TRUCK MOUNTED); CONCRETE TOWER; CRANES AND 
BACKHOES (ALL ATTACHMENTS); CRANES, HAMMERHEAD 
TOWER; CRETER CRANE; DERRICKS (ALL); DERRICKS 
(TRAVELING); FORKLIFT LULL TYPE; FORKLIFT, 10 TON & 
OVER; GRADALL, HOIST 1, 2, AND 3 DRUMS; HOIST (2 
TUGGER L FLOOR), HYDRAULIC BOOM TRUCK, LASER 
SCREED, LOCOMOTIVE (ALL), MOTOR PATROL, MUCKING 
MACHINE; PILE DRIVING AND SKID RIG, PIT MACHINE, 
PRESTRESS MACHINES, PUMP CRETES (AND SIMILAR 
TYPES), ROCK DRILL (SELF-PROPELLED), ROCK DRILL 
TRUCK MOUNTED; SLIP FORM PAVER, STRADDLE BUGGIES, 
TRACTOR WITH BOOM AND SIDE BOOM, TRENCHING MECHINE; 
WINCH TRACTORS, WELDING MACHINES (6-9),  (LAKE, 
LAPORTE, AND PORTER COUNTIES).......................$ 48.70                  45.93
----------------------------------------------------------------

 ENGI0150-012 06/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 5 BOBCATS AND FORKLIFTS (COMMERCIAL OR 
RESIDENTIAL).   (ST. JOSEPH COUNTY).................$ 30.60                  38.65
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 4 BOBCAT (UP TO AND INCLUDING 3/4 CU. YD.). 
COMPRESSOR (OVER 210 CU. FT. AND LESS THAN 600 CU. 
FT.), GENERATOR (OVER 50 KW.), HEATERS, MECHANICAL, 
HOISTS (ALL ELEVATOR, PERMANENT INSTALLATION), 
HOIST (AUTOMATIC), HOIST (TUGGER SINGLE DRUM), 
OILERS, PUMPS, WELL POINTS AND ELECTRIC 
SUBMERSIBLE, SMALL RUBBER TIRED END LOADERS (1/4 
CU. YD. AND UNDER), TRACTORS (FARM TYPE) WELDING 
MACHINES (2 THROUGH 8).  (ST. JOSEPH COUNTY)........$ 33.20                  38.65
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 3 BUCK HOIST, COMBINATION (SMALL EQUIPMENT 
OPERATOR), .CONVEYOR (PORTABLE), GROUTING MACHINE, 
HOIST ELEVATORS (MATERIAL AND PERSONNEL), HYDRAULIC 
POWER UNITS, GROUTING AND PILE DRIVING, STUD 
WELDER, TRENCHING MACHINES LESS THAN  12 INCHES IN 
WIDTH, WELDING MACHINES (8 THROUGH 15).   (ST. 
JOSEPH COUNTY)......................................$ 34.00                  38.65
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 2 AIR COMPRESSOR (600 CU. FT. AND OVER), BOB 
CAT (OVER 3/4 CU. YD.), BOILERS, BROOM (ALL POWERED 
PROPELLED), BULL DOZERS WITH ENGINES OF LESS THAN 
140 NET HORSEPOWER, COMBINATION BACKHOE FRONT END 
LOADER 1/2 YF BSKHHOE OR UNDER, COMPRESSOR AND 
THROTTLE VALVE, CONCRETE BREAKER (TRUCK MOUNTED), 
CONCRETE MIXER (OF MOORE THAN 21 CU. FT. CAPACITY), 
FORKLIFT (WITH FIXED OR TILT MAST), GREASER 
ENGINEER, HIGHLIFT SHOVEL OR FRONT ENDLOADER 3 YD 
BUCKET AND UNDER, HOISTS (1 DRUM), HYDRULIC BOOM 
TRUCK, POST HOLE DIGGER (VEHICLE MOUNTED), PUMP 
CRETES (SQUEZE CRETE TYPE PUMPS, GYPSUM, BULKER , 
ROLLERS(ALL), STEAM GENERATORS, STONE CRUSHERS, 
STRADDDLE BUGGIES, TRACTORS, WINCH TRUCKS (WITH ""A"" 
FRAME.   (ST. JOSEPH COUNTY)........................$ 34.80                  38.65
POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION 
GROUP 1 MECHANIC, ASPHALT PLANT, ASPHALT SPREADER, 
AUTO GRADER; BATCH PLANT, BENOTO (REQUIRES 2 
ENGINEERS), BOILER AND THROTTLE VALVE, BORING 
MACHINE (ROAD), BULLDOZERS (WITH ENGINES OF 140 NET 
HORSE POWER OR MORE) CAISSON RIGS, CENTRAL REDI-MIX 
PLANT, CONCRETE CONVEYOR SYSTEMS, CONCRETE POWER 
(OVER 27E CU. FT.), CONCRETE PAVER (27E CU. FT. AND 
UNDER), CONCRETE PUMPS/GROUT CNCRETE PLACER (TRUCK 
MOUNTED), CONCRETE TOWER, CRANES AND BACKHOES 
(ALL), CRANES, HAMMERHEAD TOWER, CRETER CRANE, 
DERRICKS (ALL),  FORKLIFT (CAPBLE OF HOISTING AND 
MECHANICALLY MOVING FORKS HORIZONTALLY), GRADER, 
ELEVATING, HIGHLIFT SHOVELS OR FRONT END LOADERS 
(OVER 3 YD BUCKET), HOISTS (2 OR MORE DRUMS), 
LOCOMOTIVES (ALL), LASER SCREED, MOTOR PATROL, PILE 
DRIVERS AND SKID RIG, PRE-STRESS MACHINES, PUMP 
CRETES & SIMILAR TYPES, ROCK DRILL 
(SELF-PROPELLED), ROCK DRILL (SELF PROPELLED TRUCK 
MOUNTED), SCOOPS (TRACTOR DRAWN), SLIP-FORM PAVER, 
TOURNAPULL, TRACTOR WITH BOOM & SIDE BOOM, 
TRENCHING MACHINE (12 OR MORE INCHES IN WIDTH), 
COMBINATION BACKHOE FRONT END LOADER MACHINE WITH 
BACKHOE 1/2 YD BUCKET OR ATTACHMENTS.  (ST. JOSEPH 
COUNTY).............................................$ 36.15                  38.65
----------------------------------------------------------------

 ENGI0150-014 05/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 5 
DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER 
(1 TO 5), OUTBOARD OR INBOARD MOTOR BOAT, OILER, 
POWER SAW (CONCRETE POWER DRIVEN), WATER PUMP, 
GRASSCUTTER.  (LAKE, LAPORTE, PORTER AND ST. JOSEPH 
COUNTIES)...........................................$ 45.90                  43.40
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 4 AIR 
COMPRESSORS, CONVEYOR (ALL), FIREMAN ON BOILER, 
GENERATOR, GROUT MACHINE, POWER CURING SPRAYING 
MACHINE (SELF-PROPELLED), BROOM (SELF-PROPELLED), 
SEAMAN TILLER, SKID STEER LOADERS, SPIKE MACHINE 
(RR), STRIPPING MACHINE (PAINT, SELF-PROPELLED), 
THROTTLE VALVE, WELDING MACHINE, WELL POINTS 
SYSTEM.  (LAKE, LAPORTE, PORTER AND ST. JOSEPH 
COUNTIES)...........................................$ 46.95                  43.40
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 3 
BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT 
MACHINE, BULL FLOAT, COMPRESSOR (COMMON RECEIVER 
2), CONCRETE CUTTER WHEEL TYPE (ROCKWELL), CONCRETE 
FINISHING MACHINE, CONCRETE SPREADER (POWER 
DRIVEN), DIGGER, POST HOLE (POWER DRIVEN), 
FINISHING MACHINE AND BULL FLOAT, FORKLIFT, FORM 
GRADER, FORM TAMPER (MOTOR DRIVEN), HYDRAULIC (BOOM 
TRUCK) WHEN USED FOR HAULING MATERIALS, LASER 
SCREED, MUTIPLE TAMPING MACHINE, PAVING  BREAKER, 
ROLLER (EARTH AND SUBBASE MATERIAL), ROLLER 
SHEEPFOOT (SELF-PROPELLED), SUB-GRADER, TAMPER, 
MUTIPILE VIBRATING (EARTH AND SUBBASE MATERIAL), 
TRACTAIRE WITH DRILL, TRACTOR (WITH ALL DRAWN 
ATTACHEMENTS EXCEPT BACKHOE AND INCLUDING HIGHLIFT, 
ENDLOADER OF 1 CU. YD. CAPACITY AND LESS.  (LAKE, 
LAPORTE, PORTER AND ST. JOSEPH COUNTIES)............$ 48.15                  43.40
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 2 
COMBINATION BACKHOE FRONT END LOADER MACHINE WITH 
LESS THAN 1/2 CU. YD., BACKHOE BUCKET OR WITH 
ATTACHMENTS, BITUMINOUS MIXER, BITUMINOUS PAVER, 
BRIDGE DECK FINISHER, CONCRETE MIXER (LESS THAN 27 
CU. FT.), COMPRESSOR AND THROTTLE VALVE, COMPRESSOR 
(COMMON RECEIVER 3),  GREASER, HIGHLIFT SHOVELS 
(UNDER 3 CU. YDS.), JERSEY SPREADER OR BASE PAVER, 
PAVEMENT BUMP GRINDER (SELF-PROPELLED), ROLLER 
(ASPHALT, WATERBOUND, MACADAM, BITUMINOUS MACADAM, 
BRICK SURFACE, SHEEPFOOT ROLLER (SELF- PROPELLED 
WITH BLADE), SURFACE HEATER AND PLANER, TAMPER 
(MUTIPLE VIBRATING, ASPHALT WATERBOUND MACADAM, 
BITUMINOUUS MACADAM, BRICK SURFACE), TRACTOR 
(PUSH), TRACTOR WITH SCOOP, WIDENER, APSCO OR 
SIMILAR TYPE.   (LAKE, LAPORTE, PORTER AND ST. 
JOSEPH COUNTIES)....................................$ 48.60                  43.40
POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 1 
ASPHALT PLANTS (CONSTRUCTION), ASPHALT PLANT 
(PERMANENT), AUTO PATROL  (MAINTAINER),  AUTOMATIC 
DRY BATCH PLANT, AUTOMATED CONCRETE PLACER, 
AUTOMATED SUB-GRADER, AUTOMATED SLIP FORM PAVER,  
AUTOMATED FINISH MACHINE, COMBINATION BACKHOE 
FRONT,  END LOADER MACHINE (1/2 CU. YD.), BACKHOE 
BUCKET OR OVER OR WITH ATTACHMENTS), COMBINATION 
BACKHOE 1 CU YD, BACKHOE BUCKET OR OVER OR WITH 
ATTACHMENTS, BALLAST REGULATOR (RR), BELT LOADER 
(STATIONARY), BORING MACHINE (ROAD), BULLDOZER, 
CONCRETE MIXER(27 CU. FT. OR OVER), CONCRETE PUMP 
(TRUCK MOUNTED), CONCRETE BREAKER (TRUCK MOUNTED 
AND SELF-PROPELLED), CORE DRILLING MACHINE, CRANES 
AND BACKHOES (ALL ATTACHMENTS), CRANES, HAMMERHEAD, 
CRETER CRANE, CRUSHERS (CONCRETE, ROCK, RECYCLING, 
ETC.), DERRICKS , DERRICKS (TRAVELING), DREDGE 
OPERATOR, FORMLESS CURB AND GUTTER MACHINE (36 
INCHES AND OVER), FORMLESS CURB AND GUTTER MACHINE 
UNDER 36 INCHES, GRADALL AND MACHINES (OF A LIKE 
NATURE), GUARDRAIL POST DRIVER (TRUCK MOUNTED), 
LEAD GREASER, HELICOPTER, HIGHLIFT SHOVEL (3 YD. 
AND OVER), HOIST (1 DRUM), HOIST (2, AND 3 DRUMS), 
HYDRAULIC POWER UNITS (GROUTING, PILEDRIVING AND 
EXTRACTING) HYDRO OR WATER BLASTER 
(SELF-PROPELLED), LOCOMOTIVE OPERATORS, MECHANIC, 
WELDER, MUCKING MACHINE, PANELBOARD CONCRETE PLANT 
(CENTRAL MIX TYPE), PAVER (HETHERINGTON), PILE 
DRIVER (SKID OR CRAWLER), ROAD  PAVING MIXER, ROCK 
DRILL CRAWLER OR SKID RIG, ROCK DRILL (TRUCK 
MOUNTED), ROSS CARRIER, ROTO MILL GRINDER (36"" AND 
OVER), ROTO MILL GRINDER (LESS THAN 36""), THROTTLE 
VALVE AND COMPRESSOR OR CLEVER BROOKS TYPE 
COMBINATION, THROTTLE VALVE AND FIREMAN COMBINATION 
OR HORIZONTAL OR UPRIGHT BOILER, TOURNAPULL OR 
SIMILAR TYPE EQUIPMENT, TRACTOR (BOOM), TRACTOR 
DRAWN BELT LOADER WITH ATTACHED PUSHER (REQUIRES 
TWO ENGINEERS), TRENCH MACHINE, TUG BOAT OPERATOR, 
WHEEL EXCAVATOR, WINCH TRACTOR WITH ""A"" FRAME, 
SCOOPS, TURNAPULL OR SIMILAR TYPES MACHINE USED IN 
TANDEM (ADD $1.00 TO CLASS L HOURLY RATE FOR EACH 
MACHINE ATTACHED THERE TO).  (LAKE, LAPORTE, PORTER 
AND ST. JOSEPH COUNTIES)............................$ 49.05                  43.40
----------------------------------------------------------------

 IRON0292-001 06/01/2025
                                                     Rates                  Fringes
IRONWORKER (ST. JOSEPH AND  LAPORTE (REMAINDER OF 
COUNTY) COUNTIES)...................................$ 39.76                  25.00
----------------------------------------------------------------

 IRON0395-001 06/01/2025
                                                     Rates                  Fringes
IRONWORKER: STRUCTURAL & ORNAMENTAL (LAKE, PORTER 
AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50 
MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL 
STATE LINE ON W. TO 3 MILES E. OF IN. COUNTIES).....$ 47.75                  41.28
IRONWORKER: SHEETER (LAKE, PORTER AND LAPORTE (FROM 
LAKE MICHIGAN ON NORTH TO 50 MILES S. OF LAKE 
MICHIGAN ON THE S. AND FROM IN/IL STATE LINE ON W. 
TO 3 MILES E. OF IN. COUNTIES)......................$ 48.00                  41.28
----------------------------------------------------------------

 LABO0041-001 06/01/2025
                                                     Rates                  Fringes
LABORERS: CAISSON AND TUNNEL WORK (COMPRESSED & 
FREE AIR) (BUILDING CONSTRUCTION)  (LAKE COUNTY 
(WESTERN HALF))    Premium for all employees 
working in compressed air shall be as follows:  0  
-  15 lbs.    $1.00 per hour  16 -  20 lbs.      
1.50 per hour  21 -  26 lbs.      2.00 per hour  27 
-  33 lbs.      3.00 per hour  34 & over         
4.00 per hour.......................................$ 40.30                  28.90
LABORERS: BUILDING CONSTRUCTION: GROUP 3 DYNAMITE 
MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR 
EXPLOSIVES.   (LAKE COUNTY (WESTERN HALF))   .......$ 40.26                  28.90
LABORERS: BUILDING CONSTRUCTION: GROUP 2 PLASTER 
TENDERS, MASONS TENDERS; MORTAR MIXERS; WELDERS 
(ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; 
CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; 
SCAFFOLD BUILDERS FOR PLASTERERS; SCAFFOLD BUILDERS 
FOR MASONS; WATER BLAST MACHINE OPERATORS; AIR TOOL 
OPERATORS AND ALL PNEUMATIC TOOL OPERATORS, AIR AND 
ELECTRIC VIBRATORS AND CHPPING HAMMER OPERATORS; 
ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL; ALL 
BOILER SETTERS LABORERS, INCLUDING EXPEDITERS, 
BOTTOM MEN, BELL MEN, AND MASON TENDERS  (LAKE 
COUNTY (WESTERN HALF))..............................$ 40.01                  28.90
LABORERS: BUILDING CONSTRUCTION: GROUP 1 BUILDING 
AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER 
THAN FOR MASON OR PLASTERERS); RAILROAD WORKERS, 
MASONRY WALL WORKERS, (INTERIOR & EXTERIOR); 
PORTABLE WATER, PUMPS WITH DISCHARGE UP TO 3 
INDCHES; HANDLING OF CREOSOTE LUMBER OR LIKE 
TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); 
ASPHALT RAKERS AND LUTEMEN; EARTH COMPACTORS; 
JACKMEN AND SHEETMEN WORKING DITCHES DEEPER THAN 
SIX (6) FEET IN DEPTH; LABORERS WORKING DITCHES SIX 
(6) FEET IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE 
PUMP; TILE LAYERS (SEWER OR FIELD) AND SEWER PIPE 
LAYERS (METALLIC OR NON-METALLIC); MOTOR DRIVEN 
WHEELBARROWS AND CONCRETE BUGGIES; HYSTER 
OPERATORS; PUMP CRETE ASSEMBLERS; CORE DRILL 
OPERATORS; CEMENT, LIME OR SILICA CLAY HANDLER 
(BULK OR BAG); HANDLING OF TOXIC MATERAIL DAMAGING 
TO CLOTHING; PNEUMATIC SPIKERS; DECK ENGINE AND 
WINCH OPERATORS; WATER MAIN AND CABLE DUCKING 
(METALLIC AND NON-METALLIC); SCREED MAN OR SCREW 
OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION 
SAW OPERATORS; CONCRETE SAW; CONCRETE CONVEYOR 
ASSEMBLERS; APPLYING OF CURING COMPOUND; SINKING OF 
WELLPOINTS; DEWATERING HEADER SYSTEMS  (LAKE COUNTY 
(WESTERN HALF)).....................................$ 39.26                  28.90
----------------------------------------------------------------

 LABO0041-004 04/01/2025
                                                     Rates                  Fringes
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK 
AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, 
CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW 
JOINT CONTROL CUTTING (LAKE COUNTY).................$ 34.45                  27.50
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING 
TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, 
SEWER PIPE LAYER, WATER LINE INSTALLER, TEMPORARY 
OR PERMANENT WELDERS (ELECTRIC OR OXY ACETYLENE) 
(LAKE COUNTY).......................................$ 33.75                  27.50
LABORERS: UTILITY CONSTRUCTION: GROUP 1 
CONSTRUCTION LABORER, CARPENTER TENDER, FENCE 
ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, 
CONTINUOUS STEEL ROD OR MAT INSTALLER, WIRE MESH 
LAYER, JOINT MAN (MORTAR, MASTIC, AND ALL OTHER 
TYPES), LIGHTING INSTALLER (PERMANENT OR 
TEMPORARY), LINEMAN FOR AUTOMATIC GRADE MAKER ON 
PAVING MACHINES, MORTAR MAN, MULTI-PLANT ERECTOR, 
RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS), 
ROAD MARKING AND DELINEATION LABORER, SETTING AND 
PLACING OF ALL PRECAST CONCRETE PRODUCTS, SING 
INSTALLATION INCLUDING SUPPORTING STRUCTURE, 
SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE 
MATERIAL, FLAGPERSON, AIR TOOL, POWER TOOL 
OPERATOR, ASPHALT RAKER MAN, BATCH TRUCK DUMPER, 
BRIDGE HAND RAIL ERECTOR, HANDLER (BULK OR BAG 
CEMENT), CHAIN SAW MAN, CONCRETE PUDDLER, CONCRETE 
RUBBER, CONCRETE SAW OPERATOR, CORE DRILL OPERATOR, 
EYE LEVEL, HAND BLADE OPERATOR HYDRO SEEDER MAN, 
MOTOR DRIVEN GEORGIA BUGGY OPERATOR, POWER DRIVEN 
COMPACTOR OR TAPER OPERATOR, POWER SAW OPERATOR, 
PUMP CRETE ASSEMBLY MAN, SREED MAN OR SCREW MAN ON 
ASPHALT PAVER, REGAR INSTALLER, SANDBLASTER MAN, 
SEALER APPLICATOR FOR ASPHALT (TOXIC), SETTING AND 
PLACING PRE-STRESSED ON PRE-CAST CONCRETE 
STRUCTURAL MEMBERS, SIDE RAIL SETTERS (FOR 
SIDEWALK, SIDE DITCHES, RADII, AND PAVEMENT), 
SPREADER BOX TENDER (MANUA OR POWER DRIVEN), STRAW 
BLOWER MAN, SUBSUREFACE DRAIN AND CULVERT PIPE 
LAYER, CONCRETE CONVEYOR, HORIZONAL BORING AND 
JACKMAN AND SHEETMAN, PIPE GREADE MAN, WINCH AND 
WINDLESS OPERATOR CONDUIT INSTALLER, SOD LAYER   
(LAKE COUNTY).......................................$ 33.45                  27.50
----------------------------------------------------------------

 LABO0081-001 04/01/2025
                                                     Rates                  Fringes
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 
AIR TRACK AND WAGON DRILLMAN; DYNAMITE AND POWDER 
MAN; CONCRETE BARRIER RAIL FORM SETTER; GENERAL 
LABORER; CONCRETE SAW, JOINT CONTROL CUTTING (LAKE, 
LA PORTE, AND PORTER COUNTIES)......................$ 34.45                  27.50
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 
CUTTING TORCH BURNER: LASER BEAM ALIGNER; MANHOLE 
ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, 
TEMPORARY OR PERMANENT; WELDERS (ELECTRIC OR 
OXY-ACETYLENE). (LAKE, LA PORTE, AND PORTER 
COUNTIES)...........................................$ 33.75                  27.50
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 
CONSTRUCTION LABORER; CARPENTER TENDER; FENCE 
ERECTOR; GRADE CHECKER; GUARD RAIL ERECTOR; 
CONTINUOUS STEEL ROD OR MAT INSTALLER; WIRE MESH 
LAYER; JOINT MAN (MORTAR, MASTIC, AND ALL OTHER 
TYPES); LIGHTING INSTALLER (PERMANENT OR 
TEMPORARY); LINEMAN FOR AUTOMATIC GRADE MAKER ON 
PAVING MACHINES; MORTAR MAN; MULTI-PLANT ERECTOR; 
RIP-RAP INSTALLER (ALL PRODUCTS AND MATERIALS); 
ROAD MARKING AND DELINEATION LABORER; SETTING AND 
PLACEING OF ALL PRECAST CONCRETE PRODUCTS; SING 
INSTALLATION INCLUDING SUPPORTING STRUCTURE; 
SPRAYING OF ALL EPOXY, CURING COMPOUND, OR LIKE 
MATERIAL; FLAGPERSON; AIR TOOL, POWER TOOL 
OPERATOR; ASPHALT RAKER MAN; BATCH TRUCK DUMPER; 
BRIDGE HAND RAIL ERECTOR; HANDLER (BULK OR BAG 
CEMENT); CHAIN SAW MAN; CONCRETE PUDDLER; CONCRETE 
RUBBER; CONCRETE SAW OPERATOR; CORE DRILL OPERATOR, 
EYE LEVEL; HAND BLADE OPERATOR HYDRO SEEDER MAN; 
MOTOR DRIVEN GEORGIA BUGGY OPERATOR; POWER DRIVEN 
COMPACTOR OR TAMPER OPERATOR; POWER SAW OPERATOR; 
PUMP CRETE ASSEMBLY MAN; SCREED MAN OR SCREW MAN ON 
ASPHALT PAVER; REBAR INSTALLER; SANDBLASTER MAN; 
SEALER APPLICATOR FOR ASPHALT (TOXIC); SETTING AND 
PLACEING PRESTRESSED ON PRECAST CONCRETE STRUCTURAL 
MEMBERS; SIDE RAIL SETTERS (FOR SIDEWALK, SIDE 
DITCHES, RADII, AND PAVEMENT); SPREADER BOX TENDER 
(MANUAL OR POWER DRIVEN); STRAW BLOWER MAN; 
SUBSURFACE DRAIN AND CULVERT PIPE LAYER; CONCRETE 
CONVEYOR; HORIZONIAL BORING AND JACKMAN AND 
SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS 
OPERATOR CONDUIT INSTALLER, SOD LAYER.  (LAKE, LA 
PORTE, AND PORTER COUNTIES).........................$ 33.45                  27.50
----------------------------------------------------------------

 LABO0081-002 04/01/2025
                                                     Rates                  Fringes
LABORERS:: GROUP 1 (LA PORTE & PORTER COUNTIES).$ 33.45                  27.50
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK 
AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM 
SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN;  
CONCRETE SAW JOINT CONTROL CUTTING  (LA PORTE & 
PORTER COUNTIES)....................................$ 34.45                  27.50
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING 
TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; 
SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY 
OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN 
CONNECTION WITH WATERLINE AND SEWER WORK, HOD 
CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED 
GROUTING OF UTILITY LINES  (LA PORTE & PORTER 
COUNTIES)...........................................$ 33.75                  27.50
----------------------------------------------------------------

 LABO0081-004 06/01/2025
                                                     Rates                  Fringes
LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK 
OR WAGON DRILLING FOR EXPLOSIVES; LABORER 
SPECIALIST   (LAKE (EASTERN HALF), LA PORTE, AND 
PORTER COUNTIES)....................................$ 40.89                  30.30
LABORERS: GROUP 2 PLASTER TENDERS, MASONS TENDERS; 
MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); 
CUTTING TORCH OR BURNER; CEMENT NOZZLE; CEMENT GUN; 
SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS, AND 
MASON; WATER BLAST MACHINE OPERATOR; AIR TOOL 
OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND 
ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; 
ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL  (LAKE 
(EASTERN HALF), LA PORTE, AND PORTER COUNTIES)......$ 40.64                  30.30
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION 
LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASON 
OR PLASTERERS); MECHANIC TENDERS; RODMEN AND 
CHAINMEN, RAILROAD WORKERS, MASONRY WALL WORKERS, 
(INTERIOR & EXTERIOR); ROOFER TENDERS, CEMENT 
FINISHER TENDERS, CARPENTER TENDERS, PORTABLE 
WATER, PUMPS WITH DISCHARGE UP TO 3 INCHES; 
WATERPROOFING; HAULING OF CREOSOTE LUMBER OR 
LUTEMEN; ASPHALT RAKERS; KETTLEM, EARTH COMPACTORS; 
JACKMAN AND SHEETMEN IN DITCHES MORE THAN 6 FT. 
DEEP; LABORERS IN DITCHES 6' DEEP OR DEEPER; 
ASSEMBLY OF UNCRETE PUMP; TILE LAYERS (SEWER OR 
FIELD); SEWER PIPE LAYERS; MOTOR DRIVEN 
WHEELBARROWS AND CONCRETE BUGGIES; HYSTER OPERATOR; 
PUMP CRETE ASSEMBLERS; CORE DRILL OPERATOR; CEMENT, 
LINE OR SILICA CLAY HANDERS; HANDLING OF TOXIC 
MATERIALS DAMAGING TO CLOTHING; PNEUMATIC SPIKERS; 
DECK ENGINE AND WINCH OPERATOR; WATER MAIN AND 
CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON 
ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW 
OPERATOR; CONCRETE CONVEYOR ASSEMBLER   (LAKE 
(EASTERN HALF), LA PORTE, AND PORTER COUNTIES)......$ 39.89                  30.30
----------------------------------------------------------------

 LABO0645-001 06/01/2025
                                                     Rates                  Fringes
LABORERS:: GROUP 3 (ST JOSEPH COUNTY) (BUILDING 
CONSTRUCTION).......................................$ 31.88                  18.70
LABORERS:: GROUP 2 (ST JOSEPH COUNTY) (BUILDING 
CONSTRUCTION).......................................$ 30.38                  18.70
LABORERS:: GROUP 1 (ST JOSEPH COUNTY) (BUILDING 
CONSTRUCTION).......................................$ 29.88                  18.70
----------------------------------------------------------------

 LABO0645-002 04/01/2025
                                                     Rates                  Fringes
LABORERS:: GROUP 3 (ST JOSEPH COUNTY) (UTILITY 
CONSTRUCTION).......................................$ 31.65                  18.00
LABORERS:: GROUP 2 (ST JOSEPH COUNTY) (UTILITY 
CONSTRUCTION).......................................$ 31.15                  18.00
LABORERS:: GROUP 1 (ST JOSEPH COUNTY) (UTILITY 
CONSTRUCTION).......................................$ 30.65                  18.00
----------------------------------------------------------------

 LABO0645-004 04/01/2022
                                                     Rates                  Fringes
LABORERS: GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) 
AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL 
FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL 
LEADMAN; CONCRETE SAW JOINT CUTTING  (ST. JOSEPH 
COUNTY).............................................$ 28.40                  17.22
LABORERS: GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) 
CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE 
ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, 
TEMPORARY OR PERMANENT; WELDER (ELECTRIC OR 
EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND 
SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); 
TVING AND ASSOCIATED GROUTING OF UTILITY LINES.   
(ST. JOSEPH COUNTY).................................$ 27.90                  17.22
LABORERS: (HEAVY AND HIGHWAY CONSTRUCTION) GROUP 1 
CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE 
CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT 
MAN (MORTAR, MASTIC AND ALL OTHER TYPES); LIGHTING 
INSTALLER (PERMANENT OR TEMPORARY); LINEMAN FOR 
AUTOMATIC GRADE MAKER ON PAVING MACHINES; MORTAR 
MAN; MULTI-PLATEERECTOR; RIP-RAP INSTALLER (ALL 
PRODUCTS AND MATERIALS); ROAD MARKIN AND 
DELINEATION LABORER; SETTING AND PLACING OF ALL 
PRECAST CONCRETE PRODUCTS; SIGN INSTALLATION 
INCLUDING SUPPORTING STRUCTURE; SPRAYING OF ALL 
EPOXY, CURING COMPOUND, OR LIKE MATERIAL; SOD 
LAYER; AIR TOOL, POWER TOOL, AND POWER EQUIPMENT 
OPERATOR; ASPHALT LUTE MAN; ASPHALT RAKER MAN; 
BATCH TRUCK DUMPER; BRIDGE HANDRAIL ERECTOR; 
HANDLER (BULK OR BAG CEMENT); CHAIN SAW MAN; 
CONCRETE PUDDLER; CONCRETE RUBBER; CONCRETE SAW 
OPERATOR; CORE DRILL OPERATOR, EYE LEVEL; HAND 
BLADE OPERATOR; HYDRO SEEDER MAN; MOTOR-DRIVEN 
GEORGIA BUGGY OPERATOR; POWER-DRIVEN CMPACTOR OR 
TAMPER OPERATOR; POWER SAW OPERATOR; PUMPCRETE 
ASSEMBLY MAN; SCREED MAN OR SCREW MAN OR ASPHALT 
PAVER; REBAR INSTALLER; SANDBLASTER MAN; SEALER 
APPLICATOR FOR ASPHALT (TOXIC); SETTING AND PLACING 
PRESTRESSED OR PRECAST CONCRETE STRUCTURAL MEMBERS; 
SIDE RAIL SETTER (FOR SIDEWALKS, SIDE DITCHES, 
RADII, AND PAVEMENTS); SPREADER BOX TENDER (MANUAL 
OR POWER-DRIVEN); STRAW BLOWER MAN; SUBSURFACE 
DRAIN AND CULVERT PIPE LAYER; CONCRETE CONVEYOR 
ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; 
JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND 
WINDLASS OPERATOR  (ST. JOSEPH COUNTY)..............$ 27.40                  17.22
----------------------------------------------------------------

 PAIN0027-004 06/01/2025
                                                     Rates                  Fringes
GLAZIER (LAKE COUNTY, WEST OF HIGHWAY #41, 
INCLUDING HAMMOND AREA).............................$ 53.55                  44.88
----------------------------------------------------------------

 PAIN0091-004 06/01/2025
                                                     Rates                  Fringes
PAINTER: SPRAY (LA PORTE (EVERYTHING EAST OF HWY 39 
AND NORTH OF HWY 20, INCLUDING THE CITIES OF 
LAPORTE AND MICHIGAN CITY); ST. JOSEPH COUNTIES)....$ 33.00                  19.86
PAINTER: BRUSH & ROLLER, DRYWALL TAPING & 
FINISHING, VINYL/PAPER HANGING (LA PORTE 
(EVERYTHING EAST OF HWY 39 AND NORTH OF HWY 20, 
INCLUDING THE CITIES OF LAPORTE AND MICHIGAN CITY); 
ST. JOSEPH COUNTIES)................................$ 32.50                  19.86
----------------------------------------------------------------

 PAIN0460-003 06/24/2025
                                                     Rates                  Fringes
PAINTERS: PAINTER (PORTER, LAKE AND THE REMAINDER 
OF  LA PORTE COUNTY))...............................$ 41.00                  31.26
PAINTERS: DRYWALL  FINISHING (PORTER, LAKE AND THE 
REMAINDER OF  LA PORTE COUNTY)).....................$ 41.00                  31.26
----------------------------------------------------------------

 PAIN1165-005 07/01/2025
                                                     Rates                  Fringes
GLAZIER (LAKE (EAST OF HIGHWAY #41 EXCLUDING 
HAMMOND AREA), LAPORTE AND PORTER COUNTIES).........$ 44.09                  30.63
----------------------------------------------------------------

 PAIN1165-009 07/01/2025
                                                     Rates                  Fringes
GLAZIER (ST. JOSEPH COUNTY).........................$ 34.22                  24.67
----------------------------------------------------------------

 PLAS0101-006 06/01/2018
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER: HEAVY/HIGHWAY (ST. 
JOSEPH COUNTY)......................................$ 31.50                  14.30
----------------------------------------------------------------

 PLAS0101-007 06/01/2014
                                                     Rates                  Fringes
PLASTERER: BUILDING CONSTRUCTION (ST. JOSEPH 
COUNTY).............................................$ 26.81                  12.40
CEMENT MASON/CONCRETE FINISHER: BUILDING 
CONSTRUCTION (ST. JOSEPH COUNTY)....................$ 28.84                  14.48
----------------------------------------------------------------

 PLAS0101-007 06/01/2018
                                                     Rates                  Fringes
PLASTERER: BUILDING CONSTRUCTION (ST. JOSEPH 
COUNTY).............................................$ 26.81                  12.40
CEMENT MASON/CONCRETE FINISHER: BUILDING 
CONSTRUCTION (ST. JOSEPH COUNTY)....................$ 28.84                  14.48
----------------------------------------------------------------

 PLAS0165-001 06/01/2012
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY 
CONSTRUCTION (LAKE COUNTY (EXCEPT BY THE NORTHEAST 
SECTION LYING NORTH OF CROWN POINT AND EAST OF 
GRIFFITH))..........................................$ 33.94                  13.80
PLASTERER (LAKE COUNTY (EXCEPT BY THE NORTHEAST 
SECTION LYING NORTH OF CROWN POINT AND EAST OF 
GRIFFITH))..........................................$ 32.70                  17.70
----------------------------------------------------------------

 PLAS0165-001 07/01/2018
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY 
CONSTRUCTION (LAKE COUNTY (EXCEPT BY THE NORTHEAST 
SECTION LYING NORTH OF CROWN POINT AND EAST OF 
GRIFFITH))..........................................$ 33.94                  13.80
PLASTERER (LAKE COUNTY (EXCEPT BY THE NORTHEAST 
SECTION LYING NORTH OF CROWN POINT AND EAST OF 
GRIFFITH))..........................................$ 32.70                  17.70
----------------------------------------------------------------

 PLAS0406-001 06/01/2012
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY 
CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY 
LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT 
NOT THE CITY LIMITS OF CROWN POINT) AND PORTER 
COUNTIES)...........................................$ 32.00                  15.74
CEMENT MASON/CONCRETE FINISHER: BUILDING 
CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY 
LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT 
NOT THE CITY LIMITS OF CROWN POINT) AND PORTER 
COUNTIES)...........................................$ 35.48                  21.68
PLASTERER (LAKE COUNTY (NORTHWARD ON LAKE COUNTY 
LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT 
NOT THE CITY LIMITS OF CROWN POINT) AND PORTER 
COUNTIES)...........................................$ 33.28                  17.32
----------------------------------------------------------------

 PLAS0406-001 07/01/2018
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY 
CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY 
LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT 
NOT THE CITY LIMITS OF CROWN POINT) AND PORTER 
COUNTIES)...........................................$ 32.00                  15.74
CEMENT MASON/CONCRETE FINISHER: BUILDING 
CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY 
LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT 
NOT THE CITY LIMITS OF CROWN POINT) AND PORTER 
COUNTIES)...........................................$ 35.48                  21.68
PLASTERER (LAKE COUNTY (NORTHWARD ON LAKE COUNTY 
LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT 
NOT THE CITY LIMITS OF CROWN POINT) AND PORTER 
COUNTIES)...........................................$ 33.28                  17.32
----------------------------------------------------------------

 PLAS0438-001 06/01/2018
                                                     Rates                  Fringes
CEMENT MASON: BUILDING CONSTRUCTION (LAPORTE 
COUNTY, EASTERN PORTION OF PORTER COUNTY WEST TO 
BUT NOT INCLUDING CHESTERTON IN THE NORTH AND WEST 
TO AND INCLUDING KOUTS IN THE SOUTH)................$ 36.01                  25.40
----------------------------------------------------------------

 PLUM0172-006 06/01/2025
                                                     Rates                  Fringes
PLUMBER, PIPEFITTER, STEAMFITTER (LA PORTE COUNTY 
(CITY OF LAPORTE) AND ST. JOSEPH COUNTIES)..........$ 44.93                  0.00
----------------------------------------------------------------

 PLUM0210-001 06/01/2025
                                                     Rates                  Fringes
PLUMBER (LAKE, LAPORTE (EXCLUDING THE CITY OF 
LAPORTE) AND PORTER COUNTIES).......................$ 49.77                  28.56
----------------------------------------------------------------

 PLUM0597-003 06/01/2018
                                                     Rates                  Fringes
PIPEFITTER (LAKE (ENTIRE COUNTY), LA PORTE 
(EXCLUDING THE CITY OF LA PORTE), PORTER (ENTIRE 
COUNTY))............................................$ 48.50                  31.12
----------------------------------------------------------------

 ROOF0023-006 06/01/2024
                                                     Rates                  Fringes
ROOFER: SLATE & TILE (LA PORTE AND ST. JOSEPH 
COUNTIES)...........................................$ 36.05                  21.04
ROOFER: COMPOSITION (LA PORTE AND ST. JOSEPH 
COUNTIES)...........................................$ 34.55                  21.04
----------------------------------------------------------------

 ROOF0026-003 06/01/2025
                                                     Rates                  Fringes
ROOFER (LAKE AND PORTER COUNTIES)...................$ 47.47                  27.81
----------------------------------------------------------------

 SFIN0281-001 01/01/2018
                                                     Rates                  Fringes
SPRINKLER FITTERS (PORTER COUNTY (NORTH OF U.S. 
ROUTE 30))..........................................$ 48.10                  27.05
----------------------------------------------------------------

 SFIN0669-002 04/01/2025
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 44.20                  27.88
----------------------------------------------------------------

 SHEE0020-013 07/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER (ST. JOSEPH COUNTY)..............$ 44.45                  30.43
----------------------------------------------------------------

 SHEE0020-015 10/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER (LAKE, LAPORTE, AND PORTER 
COUNTIES)...........................................$ 52.96                  31.41
----------------------------------------------------------------

 TEAM0135-004 04/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 5 
MECHANIC FURNISHING HIS OWN TOOLS.   (LA PORTE 
COUNTY)   A: $37.90 PER DAY & 460.00 PER WEEK.......$ 34.02                  0.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 4 
DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN (16) 
CU.YDS. OR TWENTY-FOUR (24) TON, SUCH AS KOEHRING 
OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG 
BOTTOM DUMPS, TOURNAPULLS, TOURNAROCKERS OR SIMILAR 
EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, 
POLE TRAILERS OVER SIX (6) WHEELS, WATER PULLS, 
LOW-BOY TRAILERS TANDEM AXLES, QUAD AXLE OR MORE 
NO-WEIGHT LIMITATION, DIESEL AND/OR HEAVY EQUIPMENT 
MECHANICS.  (LA PORTE COUNTY)   A: $37.90 PER DAY & 
460.00 PER WEEK.....................................$ 33.52                  0.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 3 
KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI- 
TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, 
TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, TRACTOR 
TRAILERS, TANDEMS,  Q- FRAME WINCH TRUCKS, 
HYDROLIFT TURCKS OR SIMILAR EQUIPMENT WHEN USED FOR 
TRANSPORTATION PURPOSES, MIXER TRUCKS OVER SIX AND 
ONE- HALF (6 1/2) CU.YDS, BATCH TRUCKS WET OR DRY 
OVER 4 - ""34-E"" BATCHES SINGLE EQUIPMENT OPERATED 
BY EMPLOYEES WITHING THIS BARGAINING UNIT.  SIX (6) 
WHEEL POLE TRAILERS AND ONE (1) MAN OIL 
DISTRIBUTORS, FORK-LIFT OVER FOUR (4) TON AND 
MOBILE MIXERS.  (LA PORTE COUNTY)   A: $37.90 PER 
DAY & 460.00 PER WEEK...............................$ 33.37                  0.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 2 
DRIVERS ON TANDEM AXLE EIGHTEEN (18) CU.YDS. OR 
TWENTY- FOUR (24) TONS GROSS, SIX (6) WHEEL TRUCKS, 
KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, 
EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, 
TROUNATRAILERS, TOURNAROCKERS, OR SIMILAR EQUIPMENT 
WHEN USED FOR TRANSPORTATION PURPOSES UNDER NINE 
(9) CU.YDS. OR LESS THAN THIRTEEN AND ONE-HALF (13 
1/2) TONS, TANDEMS AND SEMI-TRAILER SERVICE TRUCKS, 
MIXER TRUCKS OVER THREE (3) CU.YDS. AND INCLUDING 
SIX AND ONE-HALF (6 1/2) CU.YDS., FORK LIFT, FOUR 
(4) WHEEL A- FRAME TRUCKS WHEN USED FOR 
TRANSPORTATION PURPOSES, FOUR (4) WHEEL WINCH 
TRUCKS, PAVEMENT BREAKERS, BATCH TRUCKS-WET OR DRY- 
OVER 2 UP TO AND INCLUDING 4-""34-E"" BATCHES TWO (2) 
MEN OIL DISTRIBUTORS, FORK-LIFT UNDER FOUR (4) TON 
AND VACUUM TRUCKS.  (LA PORTE COUNTY)   A: $37.90 
PER DAY & 460.00 PER WEEK...........................$ 33.17                  0.00
TRUCK DRIVER, BUILDING CONSTRUCTION ONLY: GROUP 1 
SINGLE AXLE TRUCKS, SEVEN (7) CU. YDS. OR LESS THAN 
TEN AND ONE-HALF (10 1/2) TONS, DUPSTERS, 
SCOOP-MOBILES FIVE (5) CU.YDS. AND UNDER OR LESS 
THAN SEVEN AND ONE-HALF (7 1/2) TONS, MIXER TRUCKS 
THREE (3) CU.YDS. AND UNDER, AIR COMPRESSORS AND 
WELDING MACHINES, INCLUDING THOSE PULLED BY 
SEPARATE UNITS, BATCH TRUCKS-WET OR DRY- 2""34-E"" 
BATCHES OR LESS, TRUCK DRIVER HELPERS, 
WAREHOUSEMEN, MECHANIC'S HELPERS, GREASERS AND 
TIREMEN, ALL PICK-UP TRUCKS AND OTHER VEHICLES.  
DRIVERS ON DUMPSTERS OR SIMILAR DUMPSTERS, MOUNTED 
ON FOUR (4) WHEEL TRUCK RATED TWO (2) CU.YDS. OR 
LESS, AND SMALL PALLET TYPE FORK-LIFT OPERATOR AND 
DRIVERS ON PALLET JACKS OR SIMILAR TYPE EQUIPMENT.  
(LA PORTE COUNTY)   A: $37.90 PER DAY & 460.00 PER 
WEEK................................................$ 32.67                  0.00
----------------------------------------------------------------

 TEAM0135-011 04/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER:GROUP 10  PICK-UP TRUCKS       LAPORTE 
& ST. JOSEPH COUNTIES  HEAVY AND HIGHWAY 
CONSTRUCTION........................................$ 34.54                  20.51
TRUCK DRIVER: GROUP12   ACEY WAGON (OVER 3 
BUCKETS); QUAD AXLE TRUCKS; ARTICULATING DUMP    
LAPORTE & ST. JOSEPH COUNTIES  HEAVY AND HIGHWAY 
CONSTRUCTION........................................$ 35.19                  20.51
TRUCK DRIVER: GROUP11   HELPERS; GREASERS; TIRE 
MEN; BATCH BOARD TENDERS; WAREHOUSEMAN      LAPORTE 
& ST. JOSEPH COUNTIES  HEAVY AND HIGHWAY 
CONSTRUCTION........................................$ 35.09                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
9 LOW-BOYS, TANDEM TRI-AXLE; ACEY WAGONS UP TO AND 
INCLUDING 3 BUCKETS; EQUIPMENT WHEN NOT SELF-LOADED 
OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR 
DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG 
BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS, ACEY 
WAGONS OR FOR SIMILAR EQUIPMENT (OVER 12 CU YDS.) 
(LAPORTE & ST. JOSEPH COUNTIES).....................$ 35.09                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
8 TANDEM-TANDEM SEMI TRUCKS; TRUCK MECHANICS AND 
WELDERS; HEAVY EQUIPMENT-TYPE WATER WAGON OVER 
5,000 GALLONS; TRI-AXLE TRUCKS PULLING TILT-TOP 
TRAILER; LOW-BOYS, TANDEM-TANDEM AXLE  (LAPORTE & 
ST. JOSEPH COUNTIES)................................$ 35.04                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
7 TRI-AXLE TRUCKS; TANDEM AXLE SEMI TRUCKS; 
EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, 
SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACK 
TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, 
TOURNATRAILERS, TOURNAROCKERS, ACEY WAGONS OR FOR 
SIMILAR EQUIPMENT (12 CU YDS OR LESS); MOBILE MIXER 
TRUCK; TANDEM AXLE TRUCKS PULLING TILT-TOP TRAILER; 
TANDEM - AXLE LOWBOY; TRI- AXLE BATCH TRUCK; 
TRI-AXLE GREASE AND MAINTENANCE TRUCK  (LAPORTE & 
ST. JOSEPH COUNTIES)................................$ 34.99                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
6 TANDEM TRUCKS OR ""DOG-LEGS""; SEMI-WATER TRUCK; 
SPRINKLER TRUCK; HEAVY EQUIPMENT-TYPE WATER WAGONS, 
5,000 GALLONS AND UNDER; BUTUMINOUS DISTRIBUTORS 
(ONE-MAN)  (LAPORTE & ST. JOSEPH COUNTIES)..........$ 34.94                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
5 TANDEM TRUCKS OVER 15 TONS PAYLOAD; SINGLE AXLE 
SEMI TRUCKS; FARM TRACTORS HAULING MATERIAL; MIXER 
TRUCKS (ALL TYPES); TRUCKS PULLING TILT-TOP TRAILER 
SINGLE AXLE; SINGLE AXLE LOW- BOYS; TRUCK-MOUNTED 
PAVEMENT BREAKERS (LAPORTE & ST. JOSEPH COUNTIES)...$ 34.89                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER 
TRUCKS; BUTUMINOUS DISTRIBUTORS (TWO-MAN) (LAPORTE 
& ST. JOSEPH COUNTIES)..............................$ 34.84                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
3 SINGLE AXLE ""DOG-LEGS"", AND TANDEM TRUCK OR DOG- 
LEGS; WINCH TRUCKS OR A-FRAMES WHEN USED FOR 
TRANSPORTATION PURPOSES; DRIVERS ON BATCH TRUCKS, 
WET OR DRY OVER 3 (34E) BATCHES AND TANDEM AXLE 
GREASE AND MAINTENANCE TRUCK  (LAPORTE & ST. JOSEPH 
COUNTIES)...........................................$ 34.79                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
2 SINGLE AXLE FUEL AND WATER TRUCKS (LAPORTE & ST. 
JOSEPH COUNTIES)....................................$ 34.74                  20.51
TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH 
TRUCKS, WET OR DRY 3 (34E) AXLE OR LESS; SINGLE 
AXLE GREASE AND MAINTENANCE TRUCK (LAPORTE & ST. 
JOSEPH COUNTIES)....................................$ 34.69                  20.51
----------------------------------------------------------------

 TEAM0142-002 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY 
CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE 
AND PORTER COUNTIES) (GROUP 6)......................$ 36.60                  35.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY 
CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE 
AND PORTER COUNTIES) (GROUP 5)......................$ 36.15                  35.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY 
CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE 
AND PORTER COUNTIES) (GROUP 4)......................$ 38.20                  35.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY 
CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE 
AND PORTER COUNTIES) (GROUP 3)......................$ 38.00                  35.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY 
CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE 
AND PORTER COUNTIES) (GROUP 2)......................$ 37.80                  35.48
TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY 
CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE 
AND PORTER COUNTIES) (GROUP 1)......................$ 37.60                  35.48
----------------------------------------------------------------

 TEAM0364-004 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER GROUP 4 (BUILDING CONSTRUCTION) SEMI 
TRAILER TRUCKS (ST. JOSEPH COUNTY)   FOOTNOTE:  A. 
FRINGE BENEFITS: $422.50 PER WEEK  B.  HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 34.75                  0.00
TRUCK DRIVER GROUP 3 (BUILDING CONSTRUCTION) 
TANDEM, TRIAXLE AND FUEL TRUCKS  (ST. JOSEPH 
COUNTY)  FOOTNOTE:  A. FRINGE BENEFITS: $422.50 PER 
WEEK  B.  HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 34.25                  0.00
TRUCK DRIVER GROUP 2 (BUILDING CONSTRUCTION ) 
SINGLE AXLE TRUCKS (ST. JOSEPH COUNTY)  FOOTNOTE:  
A. FRINGE BENEFITS: $422.50 PER WEEK  B.  HOLIDAYS: 
 NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, 
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.......$ 33.95                  0.00
TRUCK DRIVER GROUP 1 (BUILDING CONSTRUCTION) PICKUP 
TRUCKS  (ST. JOSEPH COUNTY)  FOOTNOTE:  A. FRINGE 
BENEFITS: $422.50 PER WEEK  B.  HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 33.75                  0.00
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).


----------------------------------------------------------------

The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
""""SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The """"SU"""" identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The """"SA"""" identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the ?SA? identifier took
effect under state law in the state from which the rates were
adopted.

-----------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can
be:

           a) a survey underlying a wage determination
           b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination

On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:

            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:

            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:

            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.



================================================================

          END OF GENERAL DECISION"