Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of MA20260001 rev 1
"General Decision Number: MA20260001 05/18/2026
State: Massachusetts
Construction Types: Building
Counties: Massachusetts Counties of
Barnstable, Bristol, Dukes, Essex,
Middlesex, Nantucket, Norfolk and
Suffolk
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
ASBE0006-001 09/01/2024
Rates Fringes
INSULATOR/ASBESTOS WORKER (ZONE B) ZONE B-
BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH,
MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES
EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM,
FRANKLIN, PLAINVILLE)...............................$ 55.45 36.63
INSULATOR/ASBESTOS WORKER (ZONE A) ZONE A-
BARNSTABLE COUNTY (BREWSTER, CHATHAM, DENNIS,
EASTHAM, HARWICH, ORLEANS, PROVINCETOWN, TRURO,
WELLFLEET, YARMOUTH) BRISTOL COUNTY (EASTON),
MIDDLESEX COUNTY, AND NORFOLK COUNTY (AVON,
BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM,
DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY,
MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY,
RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY,
WESTWOOD, WEYMOUTH).................................$ 55.45 36.63
----------------------------------------------------------------
ASBE0006-002 09/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL, SCRAPPING,
VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION
MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY
CONTAIN ASBESTOS OR NOT (BARNSTABLE (BREWSTER,
CHATHAM, DENNIS, EASTHAM, HARWICH, ORLEANS,
PROVINCETOWN, TRURO, WELLFLEET AND YARMOUTH);
BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON,
BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM,
DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY,
MILLIS, MILTON, NEEDHA..............................$ 55.45 36.63
----------------------------------------------------------------
ASBE0006-010 09/01/2024
Rates Fringes
INSULATOR/ASBESTOS WORKER: INCLUDES THE APPLICATION
OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS.............................................$ 55.45 36.63
----------------------------------------------------------------
BOIL0029-001 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 50.62 28.82
----------------------------------------------------------------
BRMA0001-008 08/01/2023
Rates Fringes
BRICKLAYER, CEMENT MASON, PLASTERER (FOXBORO
CHAPTER BRISTOL (ATTLEBORO, BERKLEY, DIGHTON,
MANSFIELD, NORTH ATTLEBORO, NORTON, RAYNHAM,
REHOBOTH, SEEKONK, TAUNTON) AND NORFOLK
(BELLINGHAM, CANTON, DEDHAM, FOXBORO, FRANKLIN,
NORFOLK, NORWOOD, PLAINVILLE, SHARON, WALPOLE,
WESTRWOOD, WRENTHAM) COUNTIES)....................$ 60.26 33.71
----------------------------------------------------------------
BRMA0001-009 08/01/2023
Rates Fringes
BRICKLAYER AND PLASTERER (LOWELL CHAPTER
MIDDLESEX (ACTON, ASBY, AYER, BEDFORD, BILLERICA,
BOXBORO, CARLISLE, CHEMSFORD, DRACUT, DUNSTBLE, FT.
DENVENS, GROTON, LITTLETON, LOWELL, NORTH ACTON,
PEPPERELL, SHIRLEY, SOUTH ACTON, TEWKSBURY,
TOWNSEND, TYNGSBORO, WEST ACTON, WESTFORD,
WILMINGTON))........................................$ 60.26 33.71
----------------------------------------------------------------
BRMA0001-010 08/01/2023
Rates Fringes
BRICKLAYER (LOWELL CHAPTER MIDDLESEX (ASHLAND,
FRAMINGHAM, HOLLISTON, HOPKINTON, HUDSON, MAYNARD,
NATICK, SHERBVORN, STOW); AND NORFOLK (MEDFIELD,
MEDWAY,MILLIS)).....................................$ 60.26 33.71
----------------------------------------------------------------
BRMA0003-001 08/01/2024
Rates Fringes
TERRAZZO FINISHER...................................$ 63.44 37.33
MARBLE, TILE & TERRAZZO WORKERS.....................$ 64.52 37.51
MARBLE & TILE FINISHER..............................$ 49.32 35.26
----------------------------------------------------------------
BRMA0003-003 08/01/2024
Rates Fringes
BRICKLAYER (BOSTON CHAPTER MIDDLESEX (ARLINGTON,
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE,
SOMERVILLE); NORFOLK (BROOKLINE, MILTON); AND
SUFFOLK)............................................$ 64.50 37.54
----------------------------------------------------------------
BRMA0003-006 08/01/2024
Rates Fringes
BRICKLAYER, CEMENT MASON AND PLASTERER (LYNN
CHAPTER ESSEX (AMESBURY, ANDOVER, BEVERLY,
BOXFORD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER,
GROVELAND, HAMILTON, HAVERHILL, IPSEWICH,
LAWRENCE, LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD,
MERRIMAC, METHUEN, MIDDLETON, NAHANT, NEWBURY,
NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT,
ROWLEY, SALISBURY, SALEM, SAUGUS, SWAMPSCOTT,
TOPSFIELD WAKEFIELD, WENHAM, WEST NEWBURY); AND
MIDDLESEX (READING, NORTH READING, WAKEFIELD))......$ 64.50 37.54
----------------------------------------------------------------
BRMA0003-007 08/01/2024
Rates Fringes
BRICKLAYER AND PLASTERER (WALTHAM CHAPTER
MIDDLESEX (BELMONT, BURLINGTON, CONCORD, LEXINGTON,
LINCOLN, STONEHAM, SUDBURY, WALTHAM, WATERTOWN,
WAYLAND, WESTON, WINCHESTER, WOBURN))...............$ 64.50 37.54
----------------------------------------------------------------
BRMA0003-008 08/01/2024
Rates Fringes
BRICKLAYER, CEMENT MASON AND PLASTERER (NEWTON
CHAPTER MIDDLESEX (NEWTON) AND NORFOLK (DOVER,
NEEDHAM, WELLESLEY))................................$ 64.50 37.54
----------------------------------------------------------------
BRMA0003-009 08/01/2024
Rates Fringes
BRICKLAYER, CEMENT MASON AND PLASTERER (NEW BEDFORD
BARNSTABLE; BRISTOL (ACUSHNET, DARMOUTH,
FARHAVEN, FALL RIVER, FREETOWN, NEW BEDFORD,
SOMERSET, SWANSEA, WESTPORT); DUKES; AND NANTUCKET
COUNTIES)...........................................$ 64.50 37.54
----------------------------------------------------------------
BRMA0003-010 08/01/2024
Rates Fringes
BRICKLAYER, CEMENT MASON AND PLASTERER (QUINCY
CHAPTER NORFOLK COUNTY (AVON, BRAINTREE, COHASSET,
HOLBROOK, QUINCY, RANDOLPH, SOUGHTON, WEYMOUTH))...$ 64.50 37.54
----------------------------------------------------------------
CARP0056-011 08/01/2024
Rates Fringes
PILEDRIVERMAN (SUFFOLK (ALL OF COUNTY); AND THOSE
AREAS OF BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX &
NORFOLK COUNTIES SITUATED INSIDE BOSTON BELTWAY
(I-495) AND NORTH OF CAPE COD CANAL. ALL OF DUKES
AND NANTUCKET COUNTIES).............................$ 55.79 35.47
----------------------------------------------------------------
CARP0056-012 08/01/2024
Rates Fringes
PILEDRIVERMAN (THE AREAS OF BARNSTABLE, BRISTOL,
AND NORFOLK COUNTIES SITUATED OUTSIDE BOSTON
BELTWAY (I-495) AND SOUTH OF CAPE COD CANAL)........$ 55.79 35.47
----------------------------------------------------------------
CARP0056-013 08/01/2024
Rates Fringes
PILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX
COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495))...$ 49.19 35.47
----------------------------------------------------------------
CARP0327-001 09/01/2025
Rates Fringes
CARPENTER (MIDDLESEX (BELMONT, CAMBRIDGE, EVERETT,
MALDEN, MEDFORD, SOMERVILLE); NORFOLK (BROOKLINE,
DEDHAM, MILTON); AND SUFFOLK).......................$ 61.19 31.55
----------------------------------------------------------------
CARP0339-001 09/01/2025
Rates Fringes
CARPENTER (BRISTOL (ATTLEBOROUGH, NORTH
ATTLEBOROUGH); ESSEX; MIDDLESEX (EXCEPT BELMONT,
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE);
AND NORFOLK (BELLINGHAM, CANTON, FOXBORO, FRANKLIN,
MEDFIELD, MEDWAY, MILLIS, NEEDHAM, NORFOLK,
NORWOOD, PLAINVILLE, SHARON, WALPOLE, WELLESLEY,
WESTWOOD, WRENTHAM))................................$ 50.10 31.45
----------------------------------------------------------------
CARP0346-003 09/01/2025
Rates Fringes
CARPENTER (NORFOLK COUNTY (BRAINTREE, COHASSETT,
SCITUATE, WEYMOUTH, QUINCY))........................$ 50.10 31.45
----------------------------------------------------------------
CARP0624-005 09/01/2017
Rates Fringes
CARPENTER (DUKES; NANTUCKET)........................$ 46.43 28.35
----------------------------------------------------------------
CARP0624-007 09/01/2017
Rates Fringes
CARPENTER (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO &
NORTH ATTLEBORO); AND NORFOLK (AVON, HOLBROOK,
RANDOLPH, STOUGHTON) COUNTIES)......................$ 39.28 27.90
----------------------------------------------------------------
CARP1121-001 04/21/2025
Rates Fringes
MILLWRIGHT (SUFFOLK COUNTY).........................$ 50.47 33.50
----------------------------------------------------------------
CARP1121-003 04/21/2025
Rates Fringes
MILLWRIGHT (BARNSTABLE, BRISTOL, DUKES, ESSEX,
MIDDLESEX, NANTUCKET AND NORFOLK COUNTIES).........$ 45.03 33.25
----------------------------------------------------------------
CARP2168-001 09/01/2025
Rates Fringes
FLOOR LAYER: CARPET (MIDDLESEX (BELMONT,
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE);
NORFOLK (BROOKLINE, DEDHAM, MILTON); AND SUFFOLK)...$ 57.49 31.75
----------------------------------------------------------------
CARP2168-004 09/01/2025
Rates Fringes
FLOOR LAYER: CARPET (BRISTOL; ESSEX; MIDDLESEX
(EXCEPT BELMONT, CAMBRIDGE, EVERETT, MALDEN,
MEDFORD, SOMERVILLE); REMAINDER OF NORFOLK COUNTY)..$ 57.49 31.75
----------------------------------------------------------------
CARP2168-005 09/01/2025
Rates Fringes
FLOOR LAYER: CARPET (BARNSTABALE; DUKES; AND
NANTUCKET)..........................................$ 49.18 31.75
----------------------------------------------------------------
ELEC0096-001 09/07/2025
Rates Fringes
TELEDATA SYSTEM INSTALLER (MIDDLESEX (ASHBY,
ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON,
HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW,
TOWNSEND))..........................................$ 36.12 34.51
ELECTRICIAN (MIDDLESEX (ASHBY, ASHLAND, AYER, FT.
DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO,
PEPPERELL, SHIRLEY, STOW, TOWNSEND))................$ 48.16 36.20
----------------------------------------------------------------
ELEC0099-001 06/01/2025
Rates Fringes
TELEDATA SYSTEM INSTALLER (BRISTOL (ATTLEBORO,
NORTH ATTLEBORO, SEEKONK))..........................$ 42.09 19.71
ELECTRICIAN (BRISTOL (ATTLEBORO, NORTH ATTLEBORO,
SEEKONK))...........................................$ 56.11 24.74
----------------------------------------------------------------
ELEC0103-001 09/01/2025
Rates Fringes
TELEDATA SYSTEM INSTALLER (ESSEX; MIDDLESEX
(EXCLUDING ASHBY, ASHLAND, AYER, FT. DEVENS,
GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL,
SHIRLEY, STOW, TOWNSEND); NORFOLK (EXCLUDING AVON,
HOLBROOK, PLAINVILLE, RANDOLPH, STOUGHTON) SUFFOLK).$ 52.94 34.74
----------------------------------------------------------------
ELEC0103-002 09/01/2025
Rates Fringes
ELECTRICIAN (ESSEX (AMESBURY, ANDOVER, BOXFORD,
GEORGETOWN, GROVELAND, HAVERHILL, LAWRENCE,
MERRIMAC, METHUEN, NEWBURY, NEWBURYPORT, NORTH
ANDOVER, ROWLEY, SALISBURY, WEST NEWBURY);
MIDDLESEX (BEDFORD, BILLERICA, BOXBORO, BURLINGTON,
CARLISLE, CHELMSFORD, DRACUT, DUNSTABLE LITTLETON,
LOWELL, NORTH READING, TEWKSBURY, TYNGSBORO,
WESTFORD, WILMINGTON))..............................$ 66.17 37.08
----------------------------------------------------------------
ELEC0103-004 09/01/2025
Rates Fringes
ELECTRICIAN (ESSEX (BEVERLY, DANVERS, ESSEX,
GLOUCESTER, HAMILTON, IPSWICH, MANCHESTER,
MARBLEHEAD, MIDDLETON, PEABODY, ROCKPORT, SALEM,
TOPSFIELD, WENHAM)).................................$ 66.17 37.08
----------------------------------------------------------------
ELEC0103-005 09/01/2025
Rates Fringes
ELECTRICIAN (ESSEX (LYNN, LYNNFIELD, NAHANT,
SAUGUS, SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON,
BELMONT, CAMBRIDGE, CONCORD, EVERETT, FRAMINGHAM,
HOLLISTON, LEXINGTON, LINCOLN, MALDEN, MAYNARD,
MEDFORD, MELROSE, NATICK, NEWTON, READING,
SHERBORN, SOMERVILLE, STONEHAM, SUDBURY, WAKEFIELD,
WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER,
WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE,
CANTON, COHASSET, DEDHAM, DOVER, FOXBORO,
FRANKLOIN, MEDFIELD, MEDWAY, MILLIS, MILTON,
NEEDHAM, NORFOLK, NORWO.............................$ 66.17 37.08
----------------------------------------------------------------
ELEC0104-001 09/01/2024
Rates Fringes
LINE CONSTRUCTION: LINEMAN A. PAID HOLIDAYS:
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND
COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN
EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE
LISTED HOLIDAYS.....................................$ 58.41 30.19
LINE CONSTRUCTION: GROUNDMAN A. PAID HOLIDAYS:
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND
COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN
EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE
LISTED HOLIDAYS.....................................$ 32.13 12.70
LINE CONSTRUCTION: EQUIPMENT OPERATOR A. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE
EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO
ANY ONE OF THE LISTED HOLIDAYS......................$ 49.65 26.72
LINE CONSTRUCTION: CABLEMAN A. PAID HOLIDAYS:
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND
COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN
EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE
LISTED HOLIDAYS.....................................$ 58.41 30.19
----------------------------------------------------------------
ELEC0223-005 09/01/2024
Rates Fringes
ELECTRICIAN (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO,
NORTH ATTLEBORO, SEEKONK); DUKES; NANTUCKET AND
NORFOLK (AVON, HALBROOK, PLAINVILLE, RANDOLPH,
STOUGHTON)).........................................$ 50.02 31.05
----------------------------------------------------------------
ELEC0223-006 09/01/2024
Rates Fringes
TELEDATA SYSTEM INSTALLER (BARNSTABLE; BRISTOL
(EXCEPT ATTLEBORO, NORTH ATTLEBORO, SEEKONK);
DUKES; NANTUCKET AND NORFOLK (AVON, HALBROOK,
PLAINVILLE, RANDOLPH, STOUGHTON))...................$ 42.52 28.47
----------------------------------------------------------------
ELEV0004-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTE FOR ELEVATOR
MECHANICS: A.VACATION: 6%/UNDER 5 YEARS BASED ON
REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER
5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS
WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 74.17 38.44
----------------------------------------------------------------
ENGI0004-001 06/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK
CRANES AND GRADALLS) STANT ENGINEER (ON TRUCK CRANE
AND GRADALL) FOOTNOTE FOR POWER EQUIPMENT
OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY,
INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY,
VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB):
OVER 150 FT. +2.28 OVER 185 FT. +4.05
OVER 210 FT. +5.67 OVER 250 FT. +8.59
OVER 295 FT. +11.86 OVER 350 FT. +13.82..........$ 30.85 33.70
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER
THAN TRUCK CRANES AND GRADALLS) FOOTNOTE FOR POWER
EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW
YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY,
MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY,
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY,
CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS
(INCLUDING JIB): OVER 150 FT. +2.28 OVER
185 FT. +4.05 OVER 210 FT. +5.67 OVER 250
FT. +8.59 OVER 295 FT. +11.86 OVER 350 FT.
+13.82..............................................$ 25.02 33.70
POWER EQUIPMENT OPERATORS: GROUP 4 ASSISTANT
ENGINEER (FIREMAN) FOOTNOTE FOR POWER EQUIPMENT
OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY,
INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY,
VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB):
OVER 150 FT. +2.28 OVER 185 FT. +4.05
OVER 210 FT. +5.67 OVER 250 FT. +8.59
OVER 295 FT. +11.86 OVER 350 FT. +13.82..........$ 46.52 33.70
POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3
GROUPED); COMPRESSOR; WELDING MACHINE (1-3
GROUPED); GENERATOR; CONCRETE VIBRATOR; HEATER
(POWER DRIVEN 1- 5); WELL POINT SYSTEM (OPERATING);
SYPHON-PULSOMETER; CONCRETE MIXER; VALVES
CONTROLLING PERMANENT PLANT AIR OR STEAM; CONVEYOR;
JACKSON TYPE TAMPER; SINGLE DIAPHRAGM PUMP;
LIGHTING PLANT FOOTNOTE FOR POWER EQUIPMENT
OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY,
INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY,
VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB):
OVER 150 FT. +2.28 OVER 185 FT. +4.05
OVER 210 FT. +5.67 OVER 250 FT. +8.59
OVER 295 FT. +11.86 OVER 350 FT. +13.82..........$ 37.02 33.70
POWER EQUIPMENT OPERATORS: GROUP 2 SONIC OR
VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER;
CONCRETE PUMP; BULLDOZER; TRACTOR; YORK RAKE;
MULCHING MACHINE; PORTABLE STEAM BOILER; PORTABLE
STEAM GENERATOR; ROLLER; SPREADER; TAMPER (SELF
PROPELLED OR TRACTOR DRAWN); ASPHALT PAVER;
MECHANIC - MAINTENANCE; PAVING SCREED MACHINE;
STATIONARY STEAM BOILER; PAVING CONCRETE FINISHING
MACHINE; CAL TRUCK; BALLAST REGULATOR; SWITCH
TAMPER; RAIL ANCHOR MACHINE; TIRE TRUCK FOOTNOTE
FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS:
NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY,
MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY,
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY,
CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS
(INCLUDING JIB): OVER 150 FT. +2.28 OVER
185 FT. +4.05 OVER 210 FT. +5.67 OVER 250
FT. +8.59 OVER 295 FT. +11.86 OVER 350 FT.
+13.82..............................................$ 57.18 33.70
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE; SHOVEL;
TRUCK CRANE; CHERRY PICKER; DRAGLINE; TRENCH HOE;
BACKHOE; THREE DRUM MACHINE; DERRICK; PILE DRIVER;
ELEVATOR TOWER; HOIST; GRADALL; SHOVEL DOZER; FRONT
END LOADER; FORK LIFT; SUGER; BORING MACHINE;
ROTARYU DRILL; POST HOLE HAMMER; POST HOLE DIGGER;
PUMPCRETE MACHINE; ASPHALT PLANT (ON SITE);
CONCRETE BATCHING AND/OR MIXING PLANT (ON SITE);
CRUSHER PLANT (ON SITE); PAVING CONCRETE MIXER;
TIMBER JACK FOOTNOTE FOR POWER EQUIPMENT
OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY,
INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY,
VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB):
OVER 150 FT. +2.28 OVER 185 FT. +4.05
OVER 210 FT. +5.67 OVER 250 FT. +8.59
OVER 295 FT. +11.86 OVER 350 FT. +13.82..........$ 57.83 33.70
----------------------------------------------------------------
IRON0007-006 09/16/2025
Rates Fringes
IRONWORKERS:: (AREA 2).............................$ 53.46 37.67
IRONWORKERS:: (AREA 1).............................$ 57.87 37.67
----------------------------------------------------------------
IRON0007-010 09/16/2025
Rates Fringes
IRONWORKER (MIDDLESEX (ASHBY, ASHLAND, AYER,
BOXBORO, HOLLISTON, HOPKINTON, HUDSON, MARLBORO,
SHIRLEY, STOW, TOWNSEND); NORFOLK (MEDWAY)).........$ 57.57 37.67
----------------------------------------------------------------
IRON0037-005 09/16/2025
Rates Fringes
IRONWORKER (BARNSTABLE; BRISTOL (ACUSHNET,
ATTLEBORO, BERKLEY, DARTMOUTH, DIGHTON, FAIRHAVEN,
FALL RIVER, FREETOWN, MANSFIELD, NEW BEDFORD, NORTH
ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK,
SOMERSET, SWANSEA, TAUNTON, WESTPORT); DUKES;
NANTUCKET; NORFOLK (BILLINGHAM, FRANKLIN,
PLAINVILLE, WRENTHAM))..............................$ 43.03 33.53
----------------------------------------------------------------
LABO0022-001 12/02/2024
Rates Fringes
LABORERS:, HEAVY CONSTRUCTION: GROUP 6 ASBESTOS
ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS.......$ 40.95 29.70
LABORERS:, HEAVY CONSTRUCTION: GROUP 5 FLAGGER......$ 39.70 29.70
LABORERS:, HEAVY CONSTRUCTION: GROUP 4 BLASTER;
POWDERMAN...........................................$ 39.95 29.70
LABORERS:, HEAVY CONSTRUCTION: GROUP 3 AIR TRACK
OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER,
HYDRAULIC AND SIMILAR SELF POWERED DRILLS...........$ 39.70 29.70
LABORERS:, HEAVY CONSTRUCTION: GROUP 2 ASPHALT
RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM
OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL
OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL
OPERATOR, JACK HAMMER OPERATOR, PAVEMENT BREAKER,
CARBIDE CORE DRILLING MACHINE, CHAIN SAW OPERATOR,
BARCO TYPE JUMPING TAMPERS, CONCRETE PUMP,
MOTORIZED MORTAR MIXER, RIDE-ON-MOTORIZED BUGGY.....$ 39.20 29.70
LABORERS:, HEAVY CONSTRUCTION: GROUP 1 LABORERS;
CARPENTER TENDERS; CEMENT FINISHER TENDERS,
PLASTERER TENDERS...................................$ 38.95 29.70
----------------------------------------------------------------
LABO0022-004 12/01/2024
Rates Fringes
PLASTERER TENDER....................................$ 38.95 29.70
----------------------------------------------------------------
LABO0022-005 12/01/2024
Rates Fringes
PLASTERER TENDER (SUFFOLK COUNTY (BOSTON, CHELSEA,
REVERE, WINTHROP, DEER ISLAND, NUT ISLAND);
MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON,
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE,
READING, SOMERVILLE, STONEHAM, WAKEFIELD,
WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.10 29.70
PLASTERER TENDER (BARNSTABLE, BRISTOL, DUKES,
ESSEX, NANTUCKET, MIDDLESEX (WITH THE EXCEPTION OF
ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT,
MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE,
STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND
WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE
DEDHAM AND MILTON) COUNTIES)........................$ 38.95 29.70
----------------------------------------------------------------
LABO0022-009 12/01/2024
Rates Fringes
LABORERS: GROUP 7 - FLAGGERS (SUFFOLK COUNTY
(BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT
ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT,
BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD,
MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD,
WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 27.01 29.70
LABORERS: GROUP 6- ASBESTOS REMOVAL
LABORERS/HAZ-MAT LABORERS (SUFFOLK COUNTY (BOSTON,
CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS);
MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON,
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE,
READING, SOMERVILLE, STONEHAM, WAKEFIELD,
WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.10 29.70
LABORERS: GROUP 5- PRE-CAST FLOOR AND ROOF PLANK
ERECTOR (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE,
WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY
(ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE,
EVERETT, MALDEN, MEDFORD, MELROSE, READING,
SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER,
WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY
(BROOKLINE, DEDHAM, AND MILTON ONLY))...............$ 46.10 29.70
LABORERS: GROUP 4- BLASTER; POWDERMAN (SUFFOLK
COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER &
NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT,
BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD,
MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD,
WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.10 29.70
LABORERS: GROUP 3- AIR TRACK, BLOCK PAVER; RAMMER;
CURB SETTER, HYDRAULIC AND SIMILAR SELF-POWERED
DRILLS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE,
WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY
(ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE,
EVERETT, MALDEN, MEDFORD, MELROSE, READING,
SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER,
WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY
(BROOKLINE, DEDHAM, AND MILTON ONLY))...............$ 46.10 29.70
LABORERS: GROUP 2 - JACKHAMMER OPERATOR; PAVEMENT
BREAKER; ASPHALT RAKER CARBIDE CORE DRILLING
MACHINE; CHAIN SAW OPERATOR; PIPELAYER; BARCO TYPE
JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON
TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED
BUGGY; FENCE AND BEAM RAIL ERECTOR2 (SUFFOLK
COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER &
NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT,
BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD,
MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD,
WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.10 29.70
LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS
(SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP,
DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON,
BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN,
MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM,
WAKEFIELD, WINCHESTER, WINTHROP, AND WOBURN ONLY);
NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON
ONLY))..............................................$ 46.10 29.70
----------------------------------------------------------------
LABO0022-010 12/01/2024
Rates Fringes
LABORERS: GROUP 6- ASBESTOS REMOVAL
LABORERS/HAZ-MAT LABORERS (COUNTIES OF
BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET;
MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON,
BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN,
MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM,
WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK
(WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND
MILTON))............................................$ 46.10 29.70
LABORERS: GROUP 5- PRE-CAST FLOOR AND ROOF PLANK
ERECTOR (COUNTIES OF BARNSTABLE; BRISTOL; DUKES;
ESSEX; NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF
ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT,
MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE,
STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND
WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE,
DEDHAM AND MILTON)).................................$ 38.95 29.70
LABORERS: GROUP 4- BLASTER; POWDERMAN (COUNTIES
OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET;
MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON,
BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN,
MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM,
WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK
(WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND
MILTON))............................................$ 38.95 29.70
LABORERS: GROUP 3- AIR TRACK, BLOCK PAVER; HAMMER;
CURB SETTER, HYDRAULIC AND SIMILAR SELF-POWERED
DRILLS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES;
ESSEX; NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF
ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT,
MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE,
STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND
WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE,
DEDHAM AND MILTON)).................................$ 38.95 29.70
LABORERS: GROUP 2- JACKHAMMER OPERATOR; PAVEMENT
BREAKER; ASPHALT RAKER CARBIDE CORE DRILLING
MACHINE; CHAIN SAW OPERATOR; PIPELAYER; BARCO TYPE
JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON
TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED
BUGGY; FENCE AND BEAM RAIL ERECTOR (COUNTIES OF
BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET;
MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON,
BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN,
MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM,
WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK
(WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND
MILTON))............................................$ 38.95 29.70
LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS
(COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX;
NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF
ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT,
MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE,
STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND
WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE,
DEDHAM AND MILTON)).................................$ 38.95 29.70
----------------------------------------------------------------
LABO1421-004 12/02/2024
Rates Fringes
LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT,
TOXIC AND HAZARDOUS WASTE. (BARNSTABLE, BRISTOL,
DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND
SUFFOLK COUNTIES)...................................$ 46.25 29.70
LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS,
SAWYERS. (BARNSTABLE, BRISTOL, DUKES, ESSEX,
MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES)..$ 45.35 29.70
LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD
ONLY). (BARNSTABLE, BRISTOL, DUKES, ESSEX,
MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES)..$ 42.25 29.70
LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES,
LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC
""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING
SAWS. (BARNSTABLE, BRISTOL, DUKES, ESSEX,
MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES)..$ 47.25 29.70
LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS.
(BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX,
NANTUCKET NORFOLK AND SUFFOLK COUNTIES).............$ 47.00 29.70
LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING
LABORER. (BARNSTABLE, BRISTOL, DUKES, ESSEX,
MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES)..$ 46.25 29.70
----------------------------------------------------------------
PAIN0011-007 06/01/2025
Rates Fringes
GLAZIER (BARNSTABLE, BRISTOL, DUKES, AND NANTUCKET
COUNTIES) FOOTNOTE: A. PAID HOLIDAY: LABOR
DAY (PROVIDED EMPLOYEE HAS WORKED ANY PART OF THE
WEEK PRIOR TO LABOR DAY AND ANY PART OF THE WEEK
AFTER LABOR DAY)....................................$ 43.13 21.00
----------------------------------------------------------------
PAIN0035-004 07/01/2024
Rates Fringes
PAINTER SPRAY, SANDBLAST (REPAINT:).................$ 45.72 36.00
PAINTER SPRAY, SANDBLAST (NEW CONSTRUCTION:)........$ 47.66 36.00
PAINTER BRUSH, TAPER (REPAINT:).....................$ 44.32 36.00
PAINTER BRUSH, TAPER (NEW CONSTRUCTION:)............$ 46.26 36.00
----------------------------------------------------------------
PAIN0035-013 07/01/2024
Rates Fringes
PAINTER SPRAY, SANDBLAST (REPAINT:).................$ 45.72 36.00
PAINTER SPRAY, SANDBLAST (NEW CONSTRUCTION:)........$ 47.66 36.00
PAINTER BRUSH, TAPER (REPAINT:).....................$ 44.32 36.00
PAINTER BRUSH, TAPER (NEW CONSTRUCTION:)............$ 46.26 36.00
----------------------------------------------------------------
PAIN0035-020 07/01/2024
Rates Fringes
GLAZIER (ESSEX; MIDDLESEX; NORFOLK; SUFFOLK)........$ 46.26 36.00
----------------------------------------------------------------
PLAS0534-001 07/01/2024
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (ESSEX; MIDDLESEX;
NORFOLK AND SUFFOLK COUNTY).........................$ 49.19 40.86
----------------------------------------------------------------
PLAS0534-004 07/01/2024
Rates Fringes
PLASTERER (MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES).$ 49.19 40.86
----------------------------------------------------------------
PLUM0004-001 09/01/2025
Rates Fringes
PLUMBERS AND PIPEFITTERS (MIDDLESEX (ASHBY,
AYER-WEST OF GREENVILLE BRANCH OF BOSTON AND MAINE
RAILROAD, FT. DEVENS, GROTON, SHIRLEY, TOWNSEND))...$ 55.00 31.57
----------------------------------------------------------------
PLUM0012-005 03/02/2025
Rates Fringes
PLUMBER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD,
BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER,
GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE,
MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEM,
MIDDLETON, NEWBURY, NEWBURYPORT, NORTH ANDOVER,
PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY,
TOPSFIELD, WENHAM, WEST NEWBURY))...................$ 69.84 36.43
----------------------------------------------------------------
PLUM0012-007 03/02/2025
Rates Fringes
PLUMBER (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS,
AND SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON,
ASHFORD, AYER-EXCEPT WEST OF GREENVILLE BRANCH OF
BOSTON & MAINE RAIL ROAD, BEDFORD, BELMONT,
BILLERICA, BOXBORO, BURLINGTON, CAMBRIDGE,
CARLISE, CHELMSFORD, CONCORD, DRACUT, DUNSTABLE,
EVERETT, FRAMINGHAM, HUDSON, HOLLIISTON, HOPKINTON,
LEXINGTON, LINCOLN, LITTLETON, LOWELL, MALDEN,
MARLBORO, MAYNARD, MEDFORD, MELROSE, NATICK,
NEWTON, NORTH READING, PEPPERELL, READING,
SHERBORN, SOMERVILLE, STON..........................$ 69.84 36.43
----------------------------------------------------------------
PLUM0051-004 08/26/2024
Rates Fringes
PLUMBERS AND PIPEFITTERS (BARNSTABLE; BRISTOL;
DUKES; NANTUCKET; AND NORFOLK (AVON, HOLBROOK,
RANDOLPH, STOUGHTON) COUNTIES)......................$ 52.49 33.60
----------------------------------------------------------------
PLUM0537-005 03/01/2025
Rates Fringes
PIPEFITTER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD,
BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER,
GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE,
LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD, MERRIMAC,
METHUEM, MIDDLETON, NAHANT, NEWBURY, NEWBURYPORT,
NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM,
SALISBURY, SAUGUS, SWAMPSCOTT,TOPSFIELD, WENHAM,
WEST NEWBURY); MIDDLESEX (ACTON, ARLINGTON,
ASHFORD, AYER-EXCEPT WEST OF GREENVILLE BRANCH OF
BOSTON & MAINE RAIL ROAD, BEDFORD, BELMONT,
BILLER..............................................$ 66.58 39.22
----------------------------------------------------------------
ROOF0033-001 08/01/2025
Rates Fringes
ROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES
OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING
AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE
WHERE A ROOF IS TO BE RELAID).......................$ 53.53 35.69
----------------------------------------------------------------
SFMA0550-001 10/01/2025
Rates Fringes
SPRINKLER FITTER (BRISTOL (PORTION WITHIN 35 MILE
RADIUS FROM BOSTON CITY HALL; MIDDLESEX (EXCEPT
ASHBY, TOWNSEND, AND PORTIONS OF PEPPERELL AND
SHIRLEY BEYOND 35 MILE RADIUS FROM BOSTON CITY
HALL); NORFOLK; PLYMOUTH (PORTION WITHIN 35 MILE
RADIUS OF BOSTON CITY HALL); SUFFOLK) A. PAID
HOLIDAYS: MEMORIAL DAY, JULY 4TH, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS BEEN IN THE EMPLOYMENT OF A CONTRACTOR
20 WORKING DAYS PRIOR TO ANY SUCH PAID HOLIDAY......$ 72.05 40.76
----------------------------------------------------------------
SFMA0550-002 10/01/2025
Rates Fringes
SPRINKLER FITTER (BRISTOL (SEEKONK, SWANSEA, AND
SOMERSET)) A. PAID HOLIDAYS: MEMORIAL DAY, JULY
4TH, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE HAS BEEN IN THE EMPLOYMENT OF
A CONTRACTOR 20 WORKING DAYS PRIOR TO ANY SUCH PAID
HOLIDAY.............................................$ 64.85 40.76
----------------------------------------------------------------
SFMA0669-001 04/01/2025
Rates Fringes
SPRINKLER FITTER (BARNSTABLE; BRISTOL (BEYOND 35
MILE RADIUS OF BOSTON CITY HALL); DUKES; MIDDLESEX
(ASHBY, TOWNSEND, PORTIONS OF PEPPERELL AND SHIRLEY
BEYOND 35 MILE RADIUS OF BOSTON CITY HALL);
NANTUCKET; PLYMOUTH (BEYOND 35 MILE RADIUS OF
BOSTON CITY HALL))..................................$ 53.25 29.75
----------------------------------------------------------------
SHEE0017-003 04/01/2025
Rates Fringes
SHEET METAL WORKER (ESSEX; MIDDLESEX; NORFOLK;
PLYMOUTH (EXCEPT EXCEPT MARION, MATTAPOISETT,
ROCHESTER, WAREHAM); SUFFOLK).......................$ 60.00 48.78
----------------------------------------------------------------
SHEE0017-007 10/01/2025
Rates Fringes
SHEET METAL WORKER (BARNSTABLE; BRISTOL (ACUSHNET,
ASSONET, DARTMOUTH, DIGHTON, FAIRHAVEN, FALL RIVER,
FREETOWN, NEW BEDFORD, REHOBOTH, SEEEKONK,
SOMERSET, SWANSEA, WESTPORT); DUKES; AND NANTUCKET).$ 43.60 38.49
----------------------------------------------------------------
TEAM0379-001 06/01/2025
Rates Fringes
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING
EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25
DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND
ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS
MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY,
VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY
B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1
YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1
WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.82 37.35
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING
EQUIPMENT OVER 35 TONS POWER TRUCKS $.25
DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND
ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS
MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY,
VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY
B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1
YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1
WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.53 37.35
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING
EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL
TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING
RESTORATION EQUIPMENT POWER TRUCKS $.25
DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND
ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS
MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY,
VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY
B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1
YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1
WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.24 37.35
TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT
POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL
WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE
HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00
PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY,
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND
CHRISTMAS DAY B. PAID VACATION: EMPLOYEES
WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5
YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS
OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10
YEARS OF SERVICE....................................$ 41.14 37.35
TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND
TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE
TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY
AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00
PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY,
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND
CHRISTMAS DAY B. PAID VACATION: EMPLOYEES
WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5
YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS
OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10
YEARS OF SERVICE....................................$ 41.02 37.35
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; &
FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL
BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40
DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT
ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY,
THANKSGIVING DAY AND CHRISTMAS DAY B. PAID
VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF
SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK
VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 40.95 37.35
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL
TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25
DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND
ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS
MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY,
VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY
B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1
YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1
WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 40.78 37.35
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
"