Wage determination MA20260008

Heavy construction - Massachusetts, revision 1, modified 2026-05-18

Verify against the official document: this page mirrors WD MA20260008 revision 1 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

BOIL0029-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$50.6228.82

BRMA0001-011 (collectively bargained (union) rate, 02/01/2023)

ClassificationBase rateFringes
BRICKLAYER/CEMENT MASON (FOXBORO CHAPTER BRISTOL (ATTLEBORO, BERKLEY, DIGHTON, MANSFIELD, NORTH ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, TAUNTON); NORFOLK, (BELLINGHAM, CANTO$60.3534.40

BRMA0001-012 (collectively bargained (union) rate, 02/01/2023)

ClassificationBase rateFringes
BRICKLAYER (LOWELL CHAPTER MIDDLESEX (ACTON, ASHBY, AYER, BEDFORD, BILLERICA, BOXBORO, CARLISLE, CHEMSFORD, DRACUT, DUNSTABALE, FT DEVENS, GROTON, LITTLETON, LOWELL, NORTH ACTON, P$58.2133.71

BRMA0001-013 (collectively bargained (union) rate, 08/01/2023)

ClassificationBase rateFringes
BRICKLAYER (LOWELL CHAPTER MIDDLESEX (ASHLAND, FRAMINGHAM, HOLLISTON, HOPKINTON, HUDSON, MAYNARD, NATICK, SHERBVORN, STOW); AND NORFOLK (MEDFIELD, MEDWAY, MILLIS))$62.4034.40

BRMA0003-001 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
TERRAZZO FINISHER$63.4437.33
MARBLE, TILE & TERRAZZO WORKERS$64.5237.51
MARBLE & TILE FINISHER$49.3235.26

BRMA0003-003 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
BRICKLAYER (BOSTON CHAPTER MIDDLESEX (ARLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, SOMERVILLE); NORFOLK (BROOKLINE, MILTON); AND SUFFOLK)$64.5037.54

BRMA0003-011 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
BRICKLAYER/CEMENT MASON (LYNN CHAPTER ESSEX (AMESBURY, ANDOVER, BEVERLY, BOXFORD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, LYNN, L$64.5037.54

BRMA0003-012 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
BRICKLAYER (WALTHAM CHAPTER - MIDDLESEX (BELMONT, BURLINGTON, CONCORD, LEXINGTON, LINCOLN, STONEHAM, SUDBURY, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN))$64.5037.54

BRMA0003-014 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
BRICKLAYER/CEMENT MASON (QUINCY CHAPTER PLYMOUTH COUNTY (ABINGTON, BRIDGEWATER, BROCKTON, CARVER, DUXBURY, EAST BRIDGEWATER, HALIFAX, HANOVER, HANSON, HINGHAM, HULL, KINGSTON, MARS$64.5037.54

BRMA0003-025 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
BRICKLAYER/CEMENT MASON (NEW BEDFORD CHAPTER BARNSTABLE; BRISTOL (ACUSHNET, DARMOUTH, FAIRHAVEN, FALL RIVER, FREETOWN, NEW BEDFORD, SOMERSET, SWANSEA, WESTPORT); DUKES; NANTUCKET; $64.5037.54

BRMA0003-033 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
BRICKLAYER, PLASTERER (NEWTON CHAPTER MIDDLESEX (NEWTON); NORFOLK (DOVER, NEEDHAM, WELLESLEY))$64.5037.54

CARP0056-001 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
PILEDRIVERMAN (ALL OF SUFFOLK COUNTY; AND THOSE AREAS OF BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, AND PLYMOUTH COUNTIES SITUATED INSIDE BOSTON BELTWAY (I-495) AND NORTH OF C$55.7935.47

CARP0056-003 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
PILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495))$49.1935.47

CARP0056-004 (collectively bargained (union) rate, 08/01/2024)

ClassificationBase rateFringes
DIVER TENDER$61.7035.47
DIVER$78.1135.47

CARP0327-002 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
CARPENTER (MIDDLESEX (BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); NORFOLK (BROOKLINE, DEDHAM, MILTON); AND SUFFOLK COUNTIES)$61.1931.55

CARP0339-002 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
CARPENTER (BRISTOL (ATTLEBOROUGH, NORTH ATTLEBOROUGH); ESSEX; MIDDLESEX (EXCEPT BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); AND NORFOLK (BELLINGHAM, BRAINTREE, CANTO$50.1031.45

CARP0346-001 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
CARPENTER (NORFOLK (BRAINTREE, QUINCY, COHASSET, WEYMOUTH, ETC.) PLYMOUTH (DUXBURY, HANOVER, HULL, HINGHAM, MARSHFIELD, NORWELL, PEMBROKE ROCKLAND, SCITUATE))$50.1031.45

CARP0624-002 (collectively bargained (union) rate, 09/01/2017)

ClassificationBase rateFringes
CARPENTER (DUKES; NANTUCKET)$46.4328.35

CARP0624-006 (collectively bargained (union) rate, 09/01/2017)

ClassificationBase rateFringes
CARPENTER (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO & NORTH ATTLEBORO); NORFOLK (AVON, HOLBROOK, RANDOLPH, STOUGHTON); PLYMOUTH (BRIDGEWATER, KINGSTON, LAKEVILLE, MIDDLEBORO, PLYMOUTH$39.2827.90

CARP1121-001 (collectively bargained (union) rate, 04/21/2025)

ClassificationBase rateFringes
MILLWRIGHT (SUFFOLK COUNTY)$50.4733.50

CARP1121-005 (collectively bargained (union) rate, 04/21/2025)

ClassificationBase rateFringes
MILLWRIGHT (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET, NORFOLK AND PLYMOUTH COUNTIES)$45.0333.25

ELEC0096-001 (collectively bargained (union) rate, 09/07/2025)

ClassificationBase rateFringes
TELEDATA SYSTEM INSTALLER (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND))$36.1234.51
ELECTRICIAN (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND))$48.1636.20

ELEC0099-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TELEDATA SYSTEM INSTALLER (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, SEEKONK))$42.0919.71
ELECTRICIAN (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, SEEKONK))$56.1124.74

ELEC0103-002 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (ESSEX (AMESBURY, ANDOVER, BOXFORD, GEORGETOWN, GROVELAND, HAVERHILL, LAWRENCE, MERRIMAC, METHUEN, NEWBURY, NEWBURYPORT, NORTH ANDOVER, ROWLEY, SALISBURY, WEST NEWBURY)$66.1737.08

ELEC0103-004 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (ESSEX (BEVERLY, DANVERS, ESSEX, GLOUCESTER, HAMILTON, IPSWICH, MANCHESTER, MARBLEHEAD, MIDDLETON, PEABODY, ROCKPORT, SALEM, TOPSFIELD, WENHAM))$66.1737.08

ELEC0103-005 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, BELMONT, CAMBRIDGE, CONCORD, EVERETT, FRAMINGHAM, HOLLISTON, LEXINGTON, LINCOLN, MALD$66.1737.08

ELEC0104-001 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
LINE CONSTRUCTION: LINEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS $58.4130.19
LINE CONSTRUCTION: GROUNDMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HA$32.1312.70
LINE CONSTRUCTION: EQUIPMENT OPERATOR A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EM$49.6526.72
LINE CONSTRUCTION: CABLEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS$58.4130.19

ELEC0223-002 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
ELECTRICIAN (BARNSTABLE, BRISTOL (EXCEPT ATTLEBORO, NORTH ATTLEBORO, SEEKONK); DUKES; NANTUCKET; PLYMOUTH (EXCEPT HINGHAM AND HULL TWPS); NORFOLK (AVON, HALBROOK, RANDOLPH, SLOUGHT$50.0231.05

ENGI0004-009 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OV$30.8533.70
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. $25.0233.70
POWER EQUIPMENT OPERATORS: GROUP 4 ASSITANT ENGINEER (FIREMAN) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT$46.5233.70
POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINES (1-3 GROUPED); GENERATOR; SIGHTING PLANT; HEATERS (POWER DRIVEN, 1- 5); SYPHON-PULSOMETER; CONC$37.0233.70
POWER EQUIPMENT OPERATORS: GROUP 2 SONIC OR VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER; BULLDOZER; TRACTOR; MECHANIC - MAINTENANCE; YORK RAKE; MULCHING MACHINE; PAVING SCREE$57.1833.70
POWER EQUIPMENT OPERATORS: GROUP 1 POWER SHOVEL; CRANE; TRUCK CRANE; DERRICK; PILE DRIVER; TRENCHING MACHINE; MECHANICAL HOIST PAVEMENT BREAKER; CEMENT CONCRETE PAVER; DRAGLINE; HO$57.8333.70

IRON0007-001 (collectively bargained (union) rate, 09/16/2025)

ClassificationBase rateFringes
IRONWORKER: (AREA 2)$53.4637.67
IRONWORKER: (AREA 1)$57.8737.67

IRON0007-010 (collectively bargained (union) rate, 09/16/2025)

ClassificationBase rateFringes
IRONWORKER (MIDDLESEX (ASHBY, ASHLAND, AYER, BOXBORO, HOLLISTON, HOPKINTON, HUDSON, MARLBORO, SHIRLEY, STOW, TOWNSEND); NORFOLK (MEDWAY))$57.5737.67

IRON0037-002 (collectively bargained (union) rate, 09/16/2025)

ClassificationBase rateFringes
IRONWORKER (BARNSTABLE; BRISTOL (ACUSHNET, ATTLEBORO, BERKLEY, DARTMOUTH, DIGHTON, FAIRHAVEN, FALL RIVER, FREETOWN, MANSFIELD, NEW BEDFORD, NORTH ATTLEBORO, NORTON, RAYNHAM, REHOBO$43.0333.53

LABO0022-006 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
LABORERS: GROUP 6- ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELM$46.2029.70
LABORERS: GROUP 5- FLAGGER (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, ME$27.0129.70
LABORERS: GROUP 4- BLASTER; POWDERMAN (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT,$46.2029.70
LABORERS: GROUP 3- AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMON$46.2029.70
LABORERS: GROUP 2- ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATO$46.2029.70
LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMON$46.2029.70

LABO0022-012 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
LABORERS: GROUP 6- ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLI$46.1029.70
LABORERS: GROUP 5- FLAGGER (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT,$27.0129.70
LABORERS: GROUP 4- BLASTER; POWDERMAN (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDG$38.9529.70
LABORERS: GROUP 3- AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER; HYDRAULIC & SIMILAR SELF POWERE DRILLS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH;$38.9529.70
LABORERS: GROUP 2- ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILLPERATOR $38.9529.70
LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLING$38.9529.70

LABO0022-013 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
LABORERS:(TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR), GROUP 6 HAZARDOUS WASTE WORK WITHIN THE ""HOT"" ZONE. (A PREMIUM OF TWO DOLLARS $2.00 PER HOUR OVER THE BASIC WAGE RA$41.1829.70
LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$46.2029.70
LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$41.1829.70
LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$46.2029.70
LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$47.4829.70
LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$52.5029.70
LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$53.4129.70
LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$58.4329.70
LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$45.4829.70
LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$50.5029.70
LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$53.4129.70
LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$58.4329.70
LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$45.4829.70
LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$50.5029.70
LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$53.4129.70
LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$58.4329.70
LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$45.4829.70
LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$50.5029.70
LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing))$45.4829.70
LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing))$50.5029.70
LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$53.4129.70
LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$58.4329.70
LABORERS: GROUP 2 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR))$50.5029.70
LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$42.9329.70
LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR)$47.9529.70
LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing))$45.4829.70
LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing))$50.5029.70
LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$42.9329.70
LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR))$47.9529.70
LABORERS: GROUP 1 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR))$50.5029.70
LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$42.5829.70
LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$50.2029.70
LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$42.3329.70
LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$47.3529.70
((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$41.1829.70
((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$42.3329.70
((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):)$42.5829.70

LABO1421-001 (collectively bargained (union) rate, 12/02/2024)

ClassificationBase rateFringes
LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE$46.2529.70
LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS$45.3529.70
LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY)$42.2529.70
LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS$47.2529.70
LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS$47.0029.70
LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER$46.2529.70

PAIN0035-001 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
PAINTER BRIDGE (BARNSTABLE BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH (Remainder of NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES))$56.7636.00

PAIN0035-015 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
PAINTER SPAY NEW CONSTRUCTION: SANDBLAST$47.6636.00
PAINTER REPAINT: SPRAY, SANDBLAST$45.7236.00
PAINTER BRUSH, TAPER (Repaint)$44.3236.00
PAINTER BRUSH, TAPER (NEw Construction)$46.2636.00
PAINTER BRIDGE (MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline))$56.7636.00

PLAS0534-001 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY)$49.1940.86

PLUM0004-001 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
PLUMBERS AND PIPEFITTERS (MIDDLESEX (ASHBY, AYER-WEST OF GREENVILLE BRANCH OF BOSTON AND MAINE RAILROAD, FT. DEVENS, GROTON, SHIRLEY, TOWNSEND))$55.0031.57

PLUM0012-001 (collectively bargained (union) rate, 03/02/2025)

ClassificationBase rateFringes
PLUMBER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE,MANCHESTER, MARBLEHEAD, MERRIMAC$69.8436.43

PLUM0012-003 (collectively bargained (union) rate, 03/02/2025)

ClassificationBase rateFringes
PLUMBER, PIPEFITTER, STEAMFITTER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, MANCHE$69.8436.43

PLUM0012-006 (collectively bargained (union) rate, 03/02/2025)

ClassificationBase rateFringes
PLUMBER (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, AND SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, ASHLAND, AYER - EXCEPT W. OF GREENVILLE BRANCH OF BOSTON & MAINE RR, BEDFORD, BEL$69.8436.43

PLUM0537-001 (collectively bargained (union) rate, 03/01/2025)

ClassificationBase rateFringes
PIPEFITTER (MIDDLESEX (ARLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, WAKEFIELD, WINCHESTER AND WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, CANTON CASHAS$66.5839.22

TEAM0379-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS$41.8237.35
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MAT$41.5337.35
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $41.2437.35
TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE$41.1437.35
TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT $41.0237.35
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS ($40.9537.35
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MAT$40.7837.35
Full official text of MA20260008 rev 1
"General Decision Number: MA20260008 05/18/2026


State: Massachusetts


Construction Types: Heavy


Counties: Massachusetts Counties of 
Barnstable, Bristol, Dukes, Essex, 
Middlesex, Nantucket, Norfolk, Plymouth 
and Suffolk




Heavy and Marine Construction Projects



Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026


 BOIL0029-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 50.62                  28.82
----------------------------------------------------------------

 BRMA0001-011 02/01/2023
                                                     Rates                  Fringes
BRICKLAYER/CEMENT MASON (FOXBORO CHAPTER  BRISTOL 
(ATTLEBORO, BERKLEY, DIGHTON, MANSFIELD, NORTH  
ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, 
TAUNTON); NORFOLK, (BELLINGHAM, CANTON, DEDHAM, 
FOXBORO, FRANKLIN, NORFOLK,  NORWOOD, PLAINVILLE, 
SHARON, WALPOLE, WESTRWOOD, WRENTHAM); AND PLYMOUTH 
(LAKEVILLE))........................................$ 60.35                  34.40
----------------------------------------------------------------

 BRMA0001-012 02/01/2023
                                                     Rates                  Fringes
BRICKLAYER (LOWELL CHAPTER  MIDDLESEX (ACTON, 
ASHBY, AYER, BEDFORD, BILLERICA, BOXBORO, CARLISLE, 
CHEMSFORD, DRACUT, DUNSTABALE, FT DEVENS, GROTON, 
LITTLETON, LOWELL, NORTH ACTON, PEPPERELL, SHIRLEY, 
SOUTH ACTON, TEWKSBURY, TOWNSEND, TYNGSBORO, WEST 
ACTON, WESTFORD, WILMINGTON)).......................$ 58.21                  33.71
----------------------------------------------------------------

 BRMA0001-013 08/01/2023
                                                     Rates                  Fringes
BRICKLAYER (LOWELL CHAPTER  MIDDLESEX (ASHLAND, 
FRAMINGHAM, HOLLISTON, HOPKINTON, HUDSON,  MAYNARD, 
NATICK, SHERBVORN, STOW); AND NORFOLK (MEDFIELD, 
MEDWAY, MILLIS))....................................$ 62.40                  34.40
----------------------------------------------------------------

 BRMA0003-001 08/01/2024
                                                     Rates                  Fringes
TERRAZZO FINISHER...................................$ 63.44                  37.33
MARBLE, TILE & TERRAZZO WORKERS.....................$ 64.52                  37.51
MARBLE & TILE FINISHER..............................$ 49.32                  35.26
----------------------------------------------------------------

 BRMA0003-003 08/01/2024
                                                     Rates                  Fringes
BRICKLAYER (BOSTON CHAPTER  MIDDLESEX (ARLINGTON, 
CAMBRIDGE, EVERETT, MALDEN, MEDFORD,  MELROSE, 
SOMERVILLE); NORFOLK (BROOKLINE, MILTON); AND 
SUFFOLK)............................................$ 64.50                  37.54
----------------------------------------------------------------

 BRMA0003-011 08/01/2024
                                                     Rates                  Fringes
BRICKLAYER/CEMENT MASON (LYNN CHAPTER  ESSEX 
(AMESBURY, ANDOVER, BEVERLY, BOXFORD, DANVERS, 
ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, 
HAVERHILL, IPSWICH, LAWRENCE, LYNN, LYNNFIELD, 
MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEN, 
MIDDLETON, NAHANT, NEWBURY, NEWBURYPORT, NORTH 
ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALISBURY, 
SALEM, SAUGUS, SWAMPSCOTT, TOPSFIELD, WAKEFIELD, 
WENHAM, WEST NEWBURY); AND MIDDLESEX (NORTH 
READING, READING, WAKEFIELD)).......................$ 64.50                  37.54
----------------------------------------------------------------

 BRMA0003-012 08/01/2024
                                                     Rates                  Fringes
BRICKLAYER (WALTHAM CHAPTER - MIDDLESEX (BELMONT, 
BURLINGTON, CONCORD, LEXINGTON, LINCOLN, STONEHAM, 
SUDBURY, WALTHAM, WATERTOWN, WAYLAND, WESTON, 
WINCHESTER, WOBURN))................................$ 64.50                  37.54
----------------------------------------------------------------

 BRMA0003-014 08/01/2024
                                                     Rates                  Fringes
BRICKLAYER/CEMENT MASON (QUINCY CHAPTER  PLYMOUTH 
COUNTY (ABINGTON, BRIDGEWATER, BROCKTON, CARVER, 
DUXBURY, EAST BRIDGEWATER, HALIFAX, HANOVER, 
HANSON, HINGHAM, HULL, KINGSTON, MARSHFIELD, 
MIDDLEBORO, NORWELL, PEMBROKE, PLYMOUTH, ROCKLAND, 
SCITUATE, WEST BRIDGEWATER, WHITMAN))...............$ 64.50                  37.54
----------------------------------------------------------------

 BRMA0003-025 08/01/2024
                                                     Rates                  Fringes
BRICKLAYER/CEMENT MASON (NEW BEDFORD CHAPTER  
BARNSTABLE; BRISTOL (ACUSHNET, DARMOUTH, FAIRHAVEN, 
FALL RIVER, FREETOWN, NEW BEDFORD, SOMERSET, 
SWANSEA, WESTPORT); DUKES;  NANTUCKET; PLYMOUTH 
(MARION, MATTAPOISETT, ROCHESTER, WAREHAM)).........$ 64.50                  37.54
----------------------------------------------------------------

 BRMA0003-033 08/01/2024
                                                     Rates                  Fringes
BRICKLAYER, PLASTERER (NEWTON CHAPTER  MIDDLESEX 
(NEWTON); NORFOLK (DOVER, NEEDHAM, WELLESLEY))......$ 64.50                  37.54
----------------------------------------------------------------

 CARP0056-001 08/01/2024
                                                     Rates                  Fringes
PILEDRIVERMAN (ALL OF SUFFOLK COUNTY; AND THOSE 
AREAS OF BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, 
NORFOLK, AND PLYMOUTH COUNTIES SITUATED INSIDE 
BOSTON BELTWAY (I-495) AND NORTH OF CAPE COD CANAL. 
ALL OF DUKES AND NANTUCKET COUNTIES)................$ 55.79                  35.47
----------------------------------------------------------------

 CARP0056-002 08/01/2024
                                                     Rates                  Fringes
PILEDRIVERMAN (THE AREAS OF BARNSTABLE, BRISTOL, 
PLYMOUTH, AND NORFOLK COUNTIES SITUATED OUTSIDE 
BOSTON BELTWAY (I-495) AND SOUTH OF CAPE COD CANAL).$ 51.97                  35.47
----------------------------------------------------------------

 CARP0056-003 08/01/2024
                                                     Rates                  Fringes
PILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX 
COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495))...$ 49.19                  35.47
----------------------------------------------------------------

 CARP0056-004 08/01/2024
                                                     Rates                  Fringes
DIVER TENDER........................................$ 61.70                  35.47
DIVER...............................................$ 78.11                  35.47
----------------------------------------------------------------

 CARP0327-002 09/01/2025
                                                     Rates                  Fringes
CARPENTER (MIDDLESEX (BELMONT, CAMBRIDGE, EVERETT, 
MALDEN, MEDFORD, SOMERVILLE); NORFOLK (BROOKLINE, 
DEDHAM, MILTON); AND SUFFOLK COUNTIES)..............$ 61.19                  31.55
----------------------------------------------------------------

 CARP0339-002 09/01/2025
                                                     Rates                  Fringes
CARPENTER (BRISTOL (ATTLEBOROUGH, NORTH 
ATTLEBOROUGH); ESSEX;  MIDDLESEX (EXCEPT BELMONT, 
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); 
AND NORFOLK (BELLINGHAM, BRAINTREE, CANTON, 
COHASSETT, FOXBORO, FRANKLIN, MEDFIELD, MEDWAY, 
MILLIS, NEEDHAM, NORFOLK, NORWOOD, PLAINVILLE, 
QUINCY, SHARON, WALPOLE, WELLESLEY, WESTWOOD, 
WEYMOUTH, WRENTHAM) COUNTIES).......................$ 50.10                  31.45
----------------------------------------------------------------

 CARP0346-001 09/01/2025
                                                     Rates                  Fringes
CARPENTER (NORFOLK (BRAINTREE, QUINCY, COHASSET, 
WEYMOUTH, ETC.) PLYMOUTH (DUXBURY, HANOVER, HULL, 
HINGHAM, MARSHFIELD, NORWELL, PEMBROKE ROCKLAND, 
SCITUATE))..........................................$ 50.10                  31.45
----------------------------------------------------------------

 CARP0624-002 09/01/2017
                                                     Rates                  Fringes
CARPENTER (DUKES; NANTUCKET)........................$ 46.43                  28.35
----------------------------------------------------------------

 CARP0624-006 09/01/2017
                                                     Rates                  Fringes
CARPENTER (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO & 
NORTH ATTLEBORO);  NORFOLK (AVON, HOLBROOK, 
RANDOLPH, STOUGHTON); PLYMOUTH (BRIDGEWATER, 
KINGSTON, LAKEVILLE, MIDDLEBORO, PLYMOUTH, S. 
HANOVER, WHITMAN))..................................$ 39.28                  27.90
----------------------------------------------------------------

 CARP1121-001 04/21/2025
                                                     Rates                  Fringes
MILLWRIGHT (SUFFOLK COUNTY).........................$ 50.47                  33.50
----------------------------------------------------------------

 CARP1121-005 04/21/2025
                                                     Rates                  Fringes
MILLWRIGHT (BARNSTABLE, BRISTOL, DUKES, ESSEX, 
MIDDLESEX, NANTUCKET, NORFOLK AND PLYMOUTH 
COUNTIES)...........................................$ 45.03                  33.25
----------------------------------------------------------------

 ELEC0096-001 09/07/2025
                                                     Rates                  Fringes
TELEDATA SYSTEM INSTALLER (MIDDLESEX (ASHBY, 
ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, 
HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, 
TOWNSEND))..........................................$ 36.12                  34.51
ELECTRICIAN (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. 
DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, 
PEPPERELL, SHIRLEY, STOW, TOWNSEND))................$ 48.16                  36.20
----------------------------------------------------------------

 ELEC0099-001 06/01/2025
                                                     Rates                  Fringes
TELEDATA SYSTEM INSTALLER (BRISTOL (ATTLEBORO, 
NORTH ATTLEBORO, SEEKONK))..........................$ 42.09                  19.71
ELECTRICIAN (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, 
SEEKONK))...........................................$ 56.11                  24.74
----------------------------------------------------------------

 ELEC0103-002 09/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (ESSEX (AMESBURY, ANDOVER, BOXFORD, 
GEORGETOWN, GROVELAND, HAVERHILL, LAWRENCE, 
MERRIMAC, METHUEN, NEWBURY, NEWBURYPORT, NORTH 
ANDOVER, ROWLEY, SALISBURY, WEST NEWBURY); 
MIDDLESEX (BEDFORD, BILLERICA, BOXBORO, BURLINGTON, 
CARLISLE, CHELMSFORD, DRACUT, DUNSTABLE LITTLETON, 
LOWELL, NORTH READING, TEWKSBURY, TYNGSBORO, 
WESTFORD, WILMINGTON))..............................$ 66.17                  37.08
----------------------------------------------------------------

 ELEC0103-004 09/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (ESSEX (BEVERLY, DANVERS, ESSEX, 
GLOUCESTER, HAMILTON, IPSWICH, MANCHESTER, 
MARBLEHEAD, MIDDLETON, PEABODY, ROCKPORT, SALEM, 
TOPSFIELD, WENHAM)).................................$ 66.17                  37.08
----------------------------------------------------------------

 ELEC0103-005 09/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (ESSEX (LYNN, LYNNFIELD, NAHANT, 
SAUGUS, SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, 
BELMONT, CAMBRIDGE, CONCORD, EVERETT, FRAMINGHAM, 
HOLLISTON, LEXINGTON, LINCOLN, MALDEN, MAYNARD, 
MEDFORD, MELROSE, NATICK, NEWTON, READING, 
SHERBORN, SOMERVILLE, STONEHAM, SUDBURY, WAKEFIELD, 
WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, 
WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, 
CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, 
FRANKLOIN, MEDFIELD, MEDWAY, MILLIS, MILTON, 
NEEDHAM, NORFOLK, NORWO.............................$ 66.17                  37.08
----------------------------------------------------------------

 ELEC0104-001 09/01/2024
                                                     Rates                  Fringes
LINE CONSTRUCTION: LINEMAN    A.  PAID HOLIDAYS:  
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; 
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND 
COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN 
EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE 
LISTED HOLIDAYS.....................................$ 58.41                  30.19
LINE CONSTRUCTION: GROUNDMAN    A.  PAID HOLIDAYS:  
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; 
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND 
COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN 
EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE 
LISTED HOLIDAYS.....................................$ 32.13                  12.70
LINE CONSTRUCTION: EQUIPMENT OPERATOR    A.  PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE 
EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO 
ANY ONE OF THE LISTED HOLIDAYS......................$ 49.65                  26.72
LINE CONSTRUCTION: CABLEMAN    A.  PAID HOLIDAYS:  
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; 
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND 
COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN 
EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE 
LISTED HOLIDAYS.....................................$ 58.41                  30.19
----------------------------------------------------------------

 ELEC0223-002 09/01/2024
                                                     Rates                  Fringes
ELECTRICIAN (BARNSTABLE, BRISTOL (EXCEPT ATTLEBORO, 
NORTH ATTLEBORO, SEEKONK); DUKES; NANTUCKET; 
PLYMOUTH (EXCEPT HINGHAM AND HULL TWPS); NORFOLK 
(AVON, HALBROOK, RANDOLPH, SLOUGHTON))..............$ 50.02                  31.05
----------------------------------------------------------------

 ENGI0004-009 06/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK 
CRANES AND GRADALLS)  HOURLY PREMIUM FOR BOOM 
LENGTHS (INCLUDING JIB):    OVER 150 FT.   +2.18    
OVER 185 FT.   +3.84    OVER 210 FT.   +5.39    
OVER 250 FT.   +8.16    OVER 295 FT. +11.29    OVER 
350 FT. +13.14    FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:   A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, 
VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY......$ 30.85                  33.70
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER 
THAN TRUCK CRANES AND GRADALLS)  HOURLY PREMIUM FOR 
BOOM LENGTHS (INCLUDING JIB):    OVER 150 FT.   
+2.18    OVER 185 FT.   +3.84    OVER 210 FT.   
+5.39    OVER 250 FT.   +8.16    OVER 295 FT. 
+11.29    OVER 350 FT. +13.14    FOOTNOTE FOR POWER 
EQUIPMENT OPERATORS:   A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, 
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, 
CHRISTMAS DAY.......................................$ 25.02                  33.70
POWER EQUIPMENT OPERATORS: GROUP 4 ASSITANT 
ENGINEER (FIREMAN)  HOURLY PREMIUM FOR BOOM LENGTHS 
(INCLUDING JIB):    OVER 150 FT.   +2.18    OVER 
185 FT.   +3.84    OVER 210 FT.   +5.39    OVER 250 
FT.   +8.16    OVER 295 FT. +11.29    OVER 350 FT. 
+13.14    FOOTNOTE FOR POWER EQUIPMENT OPERATORS:   
A.  PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON,S 
BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE 
DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, 
THANKSGIVING DAY, CHRISTMAS DAY.....................$ 46.52                  33.70
POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 
GROUPED); COMPRESSOR; WELDING MACHINES (1-3 
GROUPED);  GENERATOR; SIGHTING PLANT; HEATERS 
(POWER DRIVEN, 1- 5); SYPHON-PULSOMETER; CONCRETE 
MIXER; VALVES CONTROLLING PERMANENT PLANT AIR 
STEAM, CONVEYOR, WELLPOINT SYSTEM (OPERATING)  
HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB):    
OVER 150 FT.   +2.18    OVER 185 FT.   +3.84    
OVER 210 FT.   +5.39    OVER 250 FT.   +8.16    
OVER 295 FT. +11.29    OVER 350 FT. +13.14    
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:   A.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, 
LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, 
THANKSGIVING DAY, CHRISTMAS DAY.....................$ 37.02                  33.70
POWER EQUIPMENT OPERATORS: GROUP 2 SONIC OR 
VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER; 
BULLDOZER; TRACTOR; MECHANIC - MAINTENANCE; YORK 
RAKE; MULCHING MACHINE; PAVING SCREED 
MACHINE;STATIONARY STEAM BOILER; PAVING CONCRETE 
FINISHING MACHINE; GROUT PUMP; PORTABLE STEAM 
BOILER; PORTABLE STEAM GENERATOR; ROLLER; SPREADER; 
ASPHALT PAVER; LOCOMOTIVES OR MACHINES USED IN 
PLACE THEREOF; TAMPER (SELF PROPELLED OR 
TRACTOR-DRAW); CAL TRACKS; BALLAST REGULATOR;RAIL 
ANCHOR MACHINE; SWITCH TAMPER; TIRE TRUCK  HOURLY 
PREMIUM FOR BOOM LENGTHS (INCLUDING JIB):    OVER 
150 FT.   +2.18    OVER 185 FT.   +3.84    OVER 210 
FT.   +5.39    OVER 250 FT.   +8.16    OVER 295 FT. 
+11.29    OVER 350 FT. +13.14    FOOTNOTE FOR POWER 
EQUIPMENT OPERATORS:   A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, 
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, 
CHRISTMAS DAY.......................................$ 57.18                  33.70
POWER EQUIPMENT OPERATORS: GROUP 1 POWER SHOVEL; 
CRANE; TRUCK CRANE; DERRICK; PILE DRIVER; TRENCHING 
MACHINE; MECHANICAL HOIST PAVEMENT BREAKER; CEMENT 
CONCRETE PAVER; DRAGLINE; HOISTING ENGINE; THREE 
DRUM MACHINE; PUMPCRETE MACHINE; LOADERS; SHOVEL 
DOZER; FRONT END LOADER; MUCKING MACHINE; SHAFT 
HOIST; STEAM ENGINE; BACKHOE; GRADALL; CABLE WAY; 
FORK LIFT; CHERRY PICKER; BORING MACHINE; ROTARY 
DRILL; POST HOLE HAMMER; POST HOLE DIGGER; ASPHALT 
PLANT ON JOB SITE; CONCRETE BATCHING AND/OR MIXING 
PLANT ON JOB SITE; CRUSHER PLANT ON JOB SITE; 
PAVING CONCRETE MIXER; TIMBER JACK  HOURLY PREMIUM 
FOR BOOM LENGTHS (INCLUDING JIB):    OVER 150 FT.   
+2.18    OVER 185 FT.   +3.84    OVER 210 FT.   
+5.39    OVER 250 FT.   +8.16    OVER 295 FT. 
+11.29    OVER 350 FT. +13.14    FOOTNOTE FOR POWER 
EQUIPMENT OPERATORS:   A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, 
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, 
CHRISTMAS DAY.......................................$ 57.83                  33.70
----------------------------------------------------------------

 IRON0007-001 09/16/2025
                                                     Rates                  Fringes
IRONWORKER:  (AREA 2)...............................$ 53.46                  37.67
IRONWORKER:  (AREA 1)...............................$ 57.87                  37.67
----------------------------------------------------------------

 IRON0007-010 09/16/2025
                                                     Rates                  Fringes
IRONWORKER (MIDDLESEX (ASHBY, ASHLAND, AYER, 
BOXBORO, HOLLISTON, HOPKINTON, HUDSON, MARLBORO, 
SHIRLEY, STOW, TOWNSEND); NORFOLK (MEDWAY)).........$ 57.57                  37.67
----------------------------------------------------------------

 IRON0037-002 09/16/2025
                                                     Rates                  Fringes
IRONWORKER (BARNSTABLE; BRISTOL (ACUSHNET, 
ATTLEBORO, BERKLEY, DARTMOUTH, DIGHTON, FAIRHAVEN, 
FALL RIVER, FREETOWN, MANSFIELD, NEW BEDFORD, NORTH 
ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, 
SOMERSET, SWANSEA, TAUNTON, WESTPORT); DUKES; 
NANTUCKET; NORFOLK (BILLINGHAM, FRANKLIN, 
PLAINVILLE, WRENTHAM); PLYMOUTH (LAKEVILLE, MARION, 
MATTAPOISETT, MIDDLEBORO, ROCHESTER, WAREHAM))......$ 43.03                  33.53
----------------------------------------------------------------

 LABO0022-006 12/01/2024
                                                     Rates                  Fringes
LABORERS: GROUP 6- ASBESTOS ABATEMENT; TOXIC AND 
HAZARDOUS WASTE LABORERS   (SUFFOLK COUNTY (BOSTON, 
CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); 
MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, 
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, 
READING, SOMERVILLE, STONEHAM, WAKEFIELD, 
WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK 
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.20                  29.70
LABORERS: GROUP 5- FLAGGER   (SUFFOLK COUNTY 
(BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT 
ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, 
BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, 
MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, 
WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK 
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 27.01                  29.70
LABORERS: GROUP 4- BLASTER; POWDERMAN   (SUFFOLK 
COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & 
NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, 
BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, 
MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, 
WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK 
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.20                  29.70
LABORERS: GROUP 3- AIR TRACK OPERATOR; BLOCK PAVER; 
RAMMER; CURB SETTER   (SUFFOLK COUNTY (BOSTON, 
CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); 
MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, 
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, 
READING, SOMERVILLE, STONEHAM, WAKEFIELD, 
WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK 
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.20                  29.70
LABORERS: GROUP 2-  ASPHALT RAKER; FENCE AND GUARD 
RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; 
PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL 
OPERATOR; WAGON DRILL OPERATOR   (SUFFOLK COUNTY 
(BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT 
ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, 
BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, 
MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, 
WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK 
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.20                  29.70
LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS; 
CEMENT FINISHER TENDERS   (SUFFOLK COUNTY (BOSTON, 
CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); 
MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, 
CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, 
READING, SOMERVILLE, STONEHAM, WAKEFIELD, 
WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK 
COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))........$ 46.20                  29.70
----------------------------------------------------------------

 LABO0022-012 12/01/2024
                                                     Rates                  Fringes
LABORERS: GROUP 6- ASBESTOS ABATEMENT; TOXIC AND 
HAZARDOUS WASTE LABORERS   (COUNTIES OF BARNSTABLE; 
BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; 
MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, 
BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, 
MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, 
WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE 
EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON))........$ 46.10                  29.70
LABORERS: GROUP 5- FLAGGER   (COUNTIES OF 
BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; 
PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF 
ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, 
MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, 
WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); 
NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, 
AND MILTON))........................................$ 27.01                  29.70
LABORERS: GROUP 4- BLASTER; POWDERMAN   (COUNTIES 
OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; 
PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF 
ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, 
MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, 
WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); 
NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, 
AND MILTON))........................................$ 38.95                  29.70
LABORERS: GROUP 3- AIR TRACK OPERATOR; BLOCK PAVER; 
RAMMER; CURB SETTER; HYDRAULIC & SIMILAR SELF 
POWERE DRILLS   (COUNTIES OF BARNSTABLE; BRISTOL; 
DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH 
THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, 
CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, 
SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, 
WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION 
OF BROOKLINE, DEDHAM, AND MILTON))..................$ 38.95                  29.70
LABORERS: GROUP 2- ASPHALT RAKER; FENCE AND GUARD 
RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; 
PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL 
OPERATOR; WAGON DRILLPERATOR   (COUNTIES OF 
BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; 
PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF 
ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, 
MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, 
WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); 
NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, 
AND MILTON))........................................$ 38.95                  29.70
LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS; 
CEMENT FINISHER TENDERS   (COUNTIES OF BARNSTABLE; 
BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; 
MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, 
BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, 
MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, 
WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE 
EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON))........$ 38.95                  29.70
----------------------------------------------------------------

 LABO0022-013 12/01/2024
                                                     Rates                  Fringes
LABORERS:(TUNNELS, CAISSON & CYLINDER WORK IN 
COMPRESSED AIR),  GROUP 6 HAZARDOUS WASTE WORK 
WITHIN THE ""HOT"" ZONE. (A PREMIUM OF TWO DOLLARS 
$2.00 PER HOUR OVER THE BASIC WAGE RATE.  FOOTNOTE 
FOR LABORERS:   A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, PATRIOT'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, 
VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY  $ 58.43                  29.70
LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, 
UNDERPINNING AND TEST BORING INDUSTRIES):)..........$ 41.18                  29.70
LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, 
UNDERPINNING AND TEST BORING INDUSTRIES):)..........$ 46.20                  29.70
LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING 
AND TEST BORING INDUSTRIES):).......................$ 41.18                  29.70
LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING 
AND TEST BORING INDUSTRIES):).......................$ 46.20                  29.70
LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 47.48                  29.70
LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 52.50                  29.70
LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 53.41                  29.70
LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 58.43                  29.70
LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 45.48                  29.70
LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 50.50                  29.70
LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 53.41                  29.70
LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 58.43                  29.70
LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 45.48                  29.70
LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 50.50                  29.70
LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 53.41                  29.70
LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 58.43                  29.70
LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 45.48                  29.70
LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 50.50                  29.70
LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING 
TUNNEL (Both New & Existing)).......................$ 45.48                  29.70
LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING 
TUNNEL (Both New & Existing)).......................$ 50.50                  29.70
LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 53.41                  29.70
LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 58.43                  29.70
LABORERS: GROUP 2 ((FREE AIR OPERATION):  SHIELD 
DRIVEN AND LINER PLATE IN FREE AIR))................$ 50.50                  29.70
LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 42.93                  29.70
LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF 
SAME AND TUNNEL IN FREE AIR)........................$ 47.95                  29.70
LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING 
TUNNEL (Both New & Existing)).......................$ 45.48                  29.70
LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING 
TUNNEL (Both New & Existing)).......................$ 50.50                  29.70
LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 42.93                  29.70
LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER 
WORK IN COMPRESSED AIR))............................$ 47.95                  29.70
LABORERS: GROUP 1 ((FREE AIR OPERATION):  SHIELD 
DRIVEN AND LINER PLATE IN FREE AIR))................$ 50.50                  29.70
LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING 
AND TEST BORING INDUSTRIES):).......................$ 42.58                  29.70
LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING 
AND TEST BORING INDUSTRIES):).......................$ 50.20                  29.70
LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, 
UNDERPINNING AND TEST BORING INDUSTRIES):)..........$ 42.33                  29.70
LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, 
UNDERPINNING AND TEST BORING INDUSTRIES):)..........$ 47.35                  29.70
((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING 
INDUSTRIES):).......................................$ 41.18                  29.70
((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING 
INDUSTRIES):).......................................$ 42.33                  29.70
((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING 
INDUSTRIES):).......................................$ 42.58                  29.70
----------------------------------------------------------------

 LABO1421-001 12/02/2024
                                                     Rates                  Fringes
LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, 
TOXIC AND HAZARDOUS WASTE...........................$ 46.25                  29.70
LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, 
SAWYERS.............................................$ 45.35                  29.70
LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD 
ONLY)...............................................$ 42.25                  29.70
LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, 
LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC 
""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING 
SAWS................................................$ 47.25                  29.70
LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS...$ 47.00                  29.70
LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING 
LABORER.............................................$ 46.25                  29.70
----------------------------------------------------------------

 PAIN0035-001 07/01/2024
                                                     Rates                  Fringes
PAINTER BRIDGE (BARNSTABLE BRISTOL; DUKES; ESSEX; 
NANTUCKET; PLYMOUTH (Remainder of NORFOLK; 
MIDDLESEX AND SUFFOLK COUNTIES))....................$ 56.76                  36.00
----------------------------------------------------------------

 PAIN0035-015 07/01/2024
                                                     Rates                  Fringes
PAINTER SPAY NEW CONSTRUCTION: SANDBLAST............$ 47.66                  36.00
PAINTER REPAINT: SPRAY, SANDBLAST...................$ 45.72                  36.00
PAINTER BRUSH, TAPER (Repaint)......................$ 44.32                  36.00
PAINTER BRUSH, TAPER (NEw Construction).............$ 46.26                  36.00
PAINTER BRIDGE (MIDDLESEX (Cambridge, Everett, 
Malden, Medford, Sommerville) SUFFOLK COUNTY 
(Boston, Chelsea) NORFOLK COUNTY (Brookline)).......$ 56.76                  36.00
----------------------------------------------------------------

 PLAS0534-001 07/01/2024
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (ESSEX; MIDDLESEX; 
NORFOLK AND SUFFOLK COUNTY).........................$ 49.19                  40.86
----------------------------------------------------------------

 PLUM0004-001 09/01/2025
                                                     Rates                  Fringes
PLUMBERS AND PIPEFITTERS (MIDDLESEX (ASHBY, 
AYER-WEST OF GREENVILLE BRANCH OF BOSTON AND MAINE 
RAILROAD, FT. DEVENS, GROTON, SHIRLEY, TOWNSEND))...$ 55.00                  31.57
----------------------------------------------------------------

 PLUM0012-001 03/02/2025
                                                     Rates                  Fringes
PLUMBER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, 
BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, 
GROVELAND, HAMILTON, HAVERHILL, IPSWICH, 
LAWRENCE,MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEM, 
MIDDLETON, NEWBURY, NEWBURYPORT, NORTH ANDOVER, 
PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, 
TOPSFIEILD, WENHAM, WEST NEWBURY))..................$ 69.84                  36.43
----------------------------------------------------------------

 PLUM0012-003 03/02/2025
                                                     Rates                  Fringes
PLUMBER, PIPEFITTER, STEAMFITTER (ESSEX (AMES, 
ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, 
GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, 
HAVERHILL, IPSWICH, LAWRENCE, MANCHESTER, 
MARBLEHEAD, MERRIMAC, METHUEN, MIDDLETON, NEWBURY, 
NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, 
ROWLEY, SALEM, SALISBURY, TOPSFIELD, WENHAM, WEST 
NEWBURY))...........................................$ 69.84                  36.43
----------------------------------------------------------------

 PLUM0012-006 03/02/2025
                                                     Rates                  Fringes
PLUMBER (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, 
AND SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, 
ASHLAND, AYER - EXCEPT W. OF GREENVILLE BRANCH OF 
BOSTON & MAINE RR, BEDFORD, BELMONT, BILLERICA, 
BOXBORO, BURLINGTON, CAMBRIDGE, CARLISLE, 
CHELMSFORD, CONCORD, DRACUT, DUNSTABLE, EVERETT, 
FRAMINGHAM, HUDSON, HOLLISTON, HOPKINTON, 
LEXINGTON, LINCOLN, LITTLETON, LOWELL, MALDEN, 
MARLBORO, MAYNARD, MEDFORD, MELROSE, NATICK, 
NEWTON, NORTH READING, PEPPERELL, READING, 
SHERBORN, SOMERVILLE, STONEHAM,  S..................$ 69.84                  36.43
----------------------------------------------------------------

 PLUM0051-005 08/26/2024
                                                     Rates                  Fringes
PLUMBERS AND PIPEFITTERS (BARNSTABLE; BRISTOL; 
DUKES; NANTUCKET; NORFOLK (AVON, HOLBROOK, 
RANDOLPH, STOUGHTON) PLYMOUTH(REMAINDER OF COUNTY)).$ 52.49                  33.60
----------------------------------------------------------------

 PLUM0537-001 03/01/2025
                                                     Rates                  Fringes
PIPEFITTER (MIDDLESEX (ARLINGTON, CAMBRIDGE, 
EVERETT, MALDEN, MEDFORD, MELROSE, READING, 
WAKEFIELD, WINCHESTER AND WOBURN); NORFOLK 
(BELLINGHAM, BRAINTREE, BROOKLINE, CANTON 
CASHASSET, DEDHAM, FOXBORO, FRANKLIN, MILLIS, 
MILTON, SHARON, WALPOLE, WESTWOOD, AND WRENTHAN); 
PLYMOUTH (HINGHAM, HULL, SCITUATE); ESSEX (AMES, 
ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, 
GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, 
HAVERHILL, IPSWICH, LAWRENCE,LYNN, LYNNFIELD, 
MANCHESTER, MARBLEHEAD, MERRIMAC, MET...............$ 66.58                  39.22
----------------------------------------------------------------

 TEAM0379-001 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING 
EQUIPMENT (DOUBLE HOOKUP)      POWER TRUCKS $.25 
DIFFERENTIAL BY AXLE   TUNNEL WORK (UNDERGROUND 
ONLY) $.40 DIFFERENTIAL BY AXLE  HAZARDOUS 
MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM     
FOOTNOTES:     A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, 
VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY   
  B.  PAID VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 
YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 
WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.82                  37.35
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING 
EQUIPMENT OVER 35 TONS  POWER TRUCKS $.25 
DIFFERENTIAL BY AXLE   TUNNEL WORK (UNDERGROUND 
ONLY) $.40 DIFFERENTIAL BY AXLE  HAZARDOUS 
MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM     
FOOTNOTES:     A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, 
VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY   
  B.  PAID VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 
YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 
WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.53                  37.35
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING 
EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL 
TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING 
RESTORATION EQUIPMENT  POWER TRUCKS $.25 
DIFFERENTIAL BY AXLE   TUNNEL WORK (UNDERGROUND 
ONLY) $.40 DIFFERENTIAL BY AXLE  HAZARDOUS 
MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM     
FOOTNOTES:     A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, 
VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY   
  B.  PAID VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 
YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 
WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.24                  37.35
TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT 
 POWER TRUCKS $.25 DIFFERENTIAL BY AXLE   TUNNEL 
WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE  
HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 
PREMIUM     FOOTNOTES:     A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, 
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY     B.  PAID VACATION:  EMPLOYEES 
WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 
YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS 
OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 
YEARS OF SERVICE....................................$ 41.14                  37.35
TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND 
TIREMAN  POWER TRUCKS $.25 DIFFERENTIAL BY AXLE   
TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY 
AXLE  HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 
PREMIUM     FOOTNOTES:     A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, 
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY     B.  PAID VACATION:  EMPLOYEES 
WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 
YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS 
OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 
YEARS OF SERVICE....................................$ 41.02                  37.35
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & 
FORKLIFT OPERATOR  POWER TRUCKS $.25 DIFFERENTIAL 
BY AXLE   TUNNEL WORK (UNDERGROUND ONLY) $.40 
DIFFERENTIAL BY AXLE  HAZARDOUS MATERIALS (IN HOT 
ZONE ONLY) $2.00 PREMIUM     FOOTNOTES:     A.  
PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY     B.  PAID 
VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF 
SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK 
VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 40.95                  37.35
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL 
TRUCKS; AND PICKUP TRUCKS  POWER TRUCKS $.25 
DIFFERENTIAL BY AXLE   TUNNEL WORK (UNDERGROUND 
ONLY) $.40 DIFFERENTIAL BY AXLE  HAZARDOUS 
MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM     
FOOTNOTES:     A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, 
VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY   
  B.  PAID VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 
YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 
WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 40.78                  37.35
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"