Wage determination MA20260011

Residential construction - Massachusetts, revision 1, modified 2026-05-18

Verify against the official document: this page mirrors WD MA20260011 revision 1 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0006-012 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.)$44.3636.63

BOIL0029-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$50.6228.82

BRMA0001-005 (collectively bargained (union) rate, 08/01/2023)

ClassificationBase rateFringes
BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS (SPRINGFIELD CHAPTER)$50.8132.27

CARP0336-003 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
CARPENTERS (FRANKLIN (ERVING, NORTH ORANGE, ORANGE, WARWICK))$43.3327.82

CARP0336-011 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
CARPENTER: ALL OTHER WORK (FRANKLIN (EXCEPT ERVING, ORANGE, NORTH ORANGE, WARWICK))$43.3327.82

CARP0723-003 (collectively bargained (union) rate, 10/01/2024)

ClassificationBase rateFringes
CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT (WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK)$26.5513.02
CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT (ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS)$26.5513.02

CARP2168-008 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
FLOOR LAYER: CARPET$43.2327.79

ELEC0007-005 (collectively bargained (union) rate, 06/29/2025)

ClassificationBase rateFringes
ELECTRICIAN$52.1629.56

ELEV0041-003 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PA$66.4138.44

ENGI0098-008 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 15 BOOM LENGTHS OVER 350 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,$50.7330.58
POWER EQUIPMENT OPERATORS: GROUP 14 BOOM LENGTHS OVER 300 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,$49.2330.58
POWER EQUIPMENT OPERATORS: GROUP 13 BOOM LENGTHS OVER 250 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,$48.2330.58
POWER EQUIPMENT OPERATORS: GROUP 12 BOOM LENGTHS OVER 200 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,$47.2330.58
POWER EQUIPMENT OPERATORS: GROUP 11 BOOM LENGTHS OVER 150 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY,$45.7330.58
POWER EQUIPMENT OPERATORS: GROUP 10 MASTER MECHANIC HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, M$44.7330.58
POWER EQUIPMENT OPERATORS: GROUP 9 OILER HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY$42.7230.58
POWER EQUIPMENT OPERATORS: GROUP 8 TRUCK CRANE CREWS HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, $42.4130.58
POWER EQUIPMENT OPERATORS: GROUP 7 COMPRESSORS UP TO 315 CU FT; SMALL MIXERS WITH SKIP; PUMPS UP TO 4 INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; FORKLIFTS-UP TO 7 FT. LIFT AND U$52.7330.58
POWER EQUIPMENT OPERATORS: GROUP 6 COMPRESSOR (ONE OR TWO) 315 CU FT TO 900 CU FT; PUMPS 4 INCHES TO 16 INCHES (TOTAL DISCHARGE). HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER E$34.4130.58
POWER EQUIPMENT OPERATORS: GROUP 5 HOISTS; CONVEYORS; POWER PAVEMENT BREAKERS; SELF-POWERED CONCRETE PAVEMENT FINISHING MACHINES; TWO BAG MIXERS WITH SKIP; MCCARTHY AND SIMILAR DRI$36.3530.58
POWER EQUIPMENT OPERATORS: GROUP 4 ASPHALT ROLLERS; SELF-POWERED ROLLERS AND COMPACTORS; TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; RUBBER TIRE ROLLER; VIBRATORY ROLLER OR OT$37.4730.58
POWER EQUIPMENT OPERATORS: GROUP 3 COMBINATION BACKHOE/LOADER UP TO 3/4 CU YD; SCRAPERS UP TO 21 CU YD (STRUCK LOAD, SELF PROPELLED OR TRACTOR DRAWN); TIREMAN; FRONT END LOADERS UP$40.7030.58
POWER EQUIPMENT OPERATORS: GROUP 2 ROTARY DRILL WITH MOUNTED COMPRESSOR; COMPRESSOR HOUSE (3 TO 6 COMPRESSORS); ROCK AND EARTH BORING MACHINES (EXCLUDING MCCARTHY AND SIMILAR DRILL$40.9230.58
POWER EQUIPMENT OPERATORS: GROUP 1 SHOVELS; CRAWLERS AND TRUCK CRANES INCLUDING ALL TOWER; SELF-PROPELLED HYDRAULIC CRANES 10 TONS AND OVER; DRAGLINES; CLAM SHELLS; CABLEWAYS; SHAF$41.2330.58

IRON0007-017 (collectively bargained (union) rate, 09/16/2025)

ClassificationBase rateFringes
IRONWORKER$41.8933.90

LABO0022-007 (collectively bargained (union) rate, 12/01/2024)

ClassificationBase rateFringes
LABORERS: GROUP 6 ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE LABORERS (FRANKLIN (ORANGE, WARWICK))$38.9529.70
LABORERS: GROUP 5 FLAGGER (FRANKLIN (ORANGE, WARWICK))$38.9529.70
LABORERS: GROUP 4 BLASTER; POWDERMAN (FRANKLIN (ORANGE, WARWICK))$38.9529.70
LABORERS: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER;HYDRAULIC & SIMILAR SELF POWERED DRILLS (FRANKLIN (ORANGE, WARWICK))$38.9529.70
LABORERS: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENMDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATO$38.9529.70
LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (FRANKLIN (ORANGE, WARWICK))$38.9529.70

LABO0596-003 (collectively bargained (union) rate, 12/01/2021)

ClassificationBase rateFringes
LABORERS: GROUP 5 POWDERMAN AND BLASTER (FRANKLIN (EXCEPT ORANGE, WARWICK))$33.5026.02
LABORERS: GROUP 4 AIR TRACK OPERATORS, BLOCK PAVERS, RAMMERS AND CURB SETTERS (FRANKLIN (EXCEPT ORANGE, WARWICK))$33.2526.02
LABORERS: GROUP 3 PRECAST FLOOR AND ROOF PLANK ERECTORS, SIGN ERECTORS, ASBESTOS REMOVAL LABORERS (FRANKLIN (EXCEPT ORANGE, WARWICK))$33.2526.02
LABORERS: GROUP 2 ASPHALT RAKERS, CARBIDE CORE DRILLER OPERATORS, CHAIN SAW OPERATORS, PIPELAYERS, JACKHAMMER AND PAVING BREAKER OPERATORS, BARCO TYPE JUMPING TAMPERS, LASER BEAM O$32.7526.02
LABORERS: GROUP 1 LABORERS, CARPENTER TENDERS, WRECKING LABORERS (FRANKLIN (EXCEPT ORANGE, WARWICK))$32.5026.02

LABO1421-006 (collectively bargained (union) rate, 12/02/2024)

ClassificationBase rateFringes
LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE$46.2529.70
LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS$45.3529.70
LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY)$42.2529.70
LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS$47.2529.70
LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS$47.0029.70
LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER$46.2529.70

PAIN0035-011 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
PAINTER: SPRAY, SANDBLAST$39.4831.85
PAINTER: BRUSH, TAPER$38.0831.85

PLUM0004-005 (collectively bargained (union) rate, 09/01/2025)

ClassificationBase rateFringes
PLUMBER AND STEAMFITTER (FRANKLIN (ORANGE))$55.0031.57

PLUM0104-002 (collectively bargained (union) rate, 09/17/2025)

ClassificationBase rateFringes
PLUMBER AND STEAMFITTER (FRANKLIN (EXCEPT MONROE, ROWE, AND THE WESTERN PART OF CHARLEMONT)) FOOTNOTE FOR PLUMBERS & STEAMFITTERS: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY,$52.2631.05

PLUM0104-010 (collectively bargained (union) rate, 09/17/2025)

ClassificationBase rateFringes
PLUMBER AND STEAMFITTER (FRANKLIN (MONROE, ROWE, AND THE WESTERN PART OF CHARLEMONT)) FOOTNOTE FOR PLUMBERS & STEAMFITTERS: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVID$52.2631.05

ROOF0248-002 (collectively bargained (union) rate, 07/16/2025)

ClassificationBase rateFringes
ROOFERS (PITCH, SLATE, TILE AND PRECAST CONCRETE)$42.4830.14
ROOFERS (COMPOSITION ROOFERS & DAMP WATERPROOFERS)$42.4830.14

SHEE0063-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER$43.4836.46

TEAM0379-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS$41.8237.35
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MAT$41.5337.35
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $41.2437.35
TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE$41.1437.35
TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT $41.0237.35
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS ($40.9537.35
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MAT$40.7837.35
Full official text of MA20260011 rev 1
"General Decision Number: MA20260011 05/18/2026


State: Massachusetts


Construction Types: Residential


Counties: Massachusetts Counties of 
Franklin




RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up
to and  including 4 stories)


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026


 ASBE0006-012 09/01/2024
                                                     Rates                  Fringes
INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION 
OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, 
COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL 
SYSTEMS.)...........................................$ 44.36                  36.63
----------------------------------------------------------------

 BOIL0029-002 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 50.62                  28.82
----------------------------------------------------------------

 BRMA0001-005 08/01/2023
                                                     Rates                  Fringes
BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE 
MASONS; MARBLE, TILE & TERRAZZO WORKERS 
(SPRINGFIELD CHAPTER)...............................$ 50.81                  32.27
----------------------------------------------------------------

 CARP0336-003 09/01/2025
                                                     Rates                  Fringes
CARPENTERS (FRANKLIN (ERVING, NORTH ORANGE, ORANGE, 
WARWICK))...........................................$ 43.33                  27.82
----------------------------------------------------------------

 CARP0336-011 09/01/2025
                                                     Rates                  Fringes
CARPENTER: ALL OTHER WORK (FRANKLIN (EXCEPT ERVING, 
ORANGE, NORTH ORANGE, WARWICK)).....................$ 43.33                  27.82
----------------------------------------------------------------

 CARP0723-003 10/01/2024
                                                     Rates                  Fringes
CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT 
EXCEEDING 4 STORIES INCLUDING BASEMENT (WOOD 
FRAMING, SIDING AND EXTERIOR TRIM WORK).............$ 26.55                  13.02
CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT 
EXCEEDING 4 STORIES INCLUDING BASEMENT (ALL OTHER 
CARPENTRY WORK ON WOOD FRAME PROJECTS)..............$ 26.55                  13.02
----------------------------------------------------------------

 CARP2168-008 09/01/2025
                                                     Rates                  Fringes
FLOOR LAYER:  CARPET................................$ 43.23                  27.79
----------------------------------------------------------------

 ELEC0007-005 06/29/2025
                                                     Rates                  Fringes
ELECTRICIAN.........................................$ 52.16                  29.56
----------------------------------------------------------------

 ELEV0041-003 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC    FOOTNOTE:    A.VACATION: 
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR 
ALL HOURS WORKED.  8%/OVER 5 YEARS BASED ON REGULAR 
HOURLY RATE FOR ALL HOURS WORKED.     B. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY..............................$ 66.41                  38.44
----------------------------------------------------------------

 ENGI0098-008 06/01/2024
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 15 BOOM LENGTHS 
OVER 350 FEET INCLUDING JIB  HAZARDOUS WASTE 
PREMIUM  $2.00  FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 50.73                  30.58
POWER EQUIPMENT OPERATORS: GROUP 14 BOOM LENGTHS 
OVER 300 FEET INCLUDING JIB  HAZARDOUS WASTE 
PREMIUM  $2.00  FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 49.23                  30.58
POWER EQUIPMENT OPERATORS: GROUP 13 BOOM LENGTHS 
OVER 250 FEET INCLUDING JIB  HAZARDOUS WASTE 
PREMIUM  $2.00  FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 48.23                  30.58
POWER EQUIPMENT OPERATORS: GROUP 12 BOOM LENGTHS 
OVER 200 FEET INCLUDING JIB  HAZARDOUS WASTE 
PREMIUM  $2.00  FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 47.23                  30.58
POWER EQUIPMENT OPERATORS: GROUP 11 BOOM LENGTHS 
OVER 150 FEET INCLUDING JIB  HAZARDOUS WASTE 
PREMIUM  $2.00  FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 45.73                  30.58
POWER EQUIPMENT OPERATORS: GROUP 10 MASTER MECHANIC 
 HAZARDOUS WASTE PREMIUM  $2.00  FOOTNOTE FOR POWER 
EQUIPMENT OPERATORS:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 44.73                  30.58
POWER EQUIPMENT OPERATORS: GROUP  9 OILER  
HAZARDOUS WASTE PREMIUM  $2.00  FOOTNOTE FOR POWER 
EQUIPMENT OPERATORS:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 42.72                  30.58
POWER EQUIPMENT OPERATORS: GROUP  8 TRUCK CRANE 
CREWS  HAZARDOUS WASTE PREMIUM  $2.00  FOOTNOTE FOR 
POWER EQUIPMENT OPERATORS:    A.  PAID HOLIDAYS: 
NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, 
VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY....$ 42.41                  30.58
POWER EQUIPMENT OPERATORS: GROUP  7 COMPRESSORS UP 
TO 315 CU FT; SMALL MIXERS WITH SKIP; PUMPS UP TO 4 
INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; 
FORKLIFTS-UP TO 7 FT. LIFT AND UP TO 3 TON 
CAPACITY; HYDRO BROOM; STUD WELDER.  HAZARDOUS 
WASTE PREMIUM  $2.00  FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 52.73                  30.58
POWER EQUIPMENT OPERATORS: GROUP  6 COMPRESSOR (ONE 
OR TWO) 315 CU FT TO 900 CU FT; PUMPS 4 INCHES TO 
16 INCHES (TOTAL DISCHARGE).  HAZARDOUS WASTE 
PREMIUM  $2.00  FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 34.41                  30.58
POWER EQUIPMENT OPERATORS: GROUP  5 HOISTS; 
CONVEYORS; POWER PAVEMENT BREAKERS; SELF-POWERED 
CONCRETE PAVEMENT FINISHING MACHINES; TWO BAG 
MIXERS WITH SKIP; MCCARTHY AND SIMILAR DRILLS; 
BATCH PLANTS (NOT SELF LOADING); BULK CEMENT 
PLANTS; SELF-PROPELLED MATERIAL SPREADERS;  THREE 
OR MORE 10 KW LIGHT PLANTS; 30 KW OR MORE 
GENERATORS; POWER BROOM.  HAZARDOUS WASTE PREMIUM  
$2.00  FOOTNOTE FOR POWER EQUIPMENT OPERATORS:    
A.  PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY 
AND CHRISTMAS DAY...................................$ 36.35                  30.58
POWER EQUIPMENT OPERATORS: GROUP  4 ASPHALT 
ROLLERS; SELF-POWERED ROLLERS AND COMPACTORS; 
TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; 
RUBBER TIRE ROLLER; VIBRATORY ROLLER OR OTHER TYPE 
OF COMPACTORS INCLUDING MACHINES FOR PULVERIZING 
AND AERATING SOIL; YORK RAKE.  HAZARDOUS WASTE 
PREMIUM  $2.00  FOOTNOTE FOR POWER EQUIPMENT 
OPERATORS:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 37.47                  30.58
POWER EQUIPMENT OPERATORS: GROUP  3 COMBINATION 
BACKHOE/LOADER UP TO 3/4 CU YD; SCRAPERS UP TO 21 
CU YD (STRUCK LOAD, SELF PROPELLED OR TRACTOR 
DRAWN); TIREMAN; FRONT END LOADERS UP TO 4 YDS; 
WELL DRILLERS; ENGINEER OR FIREMAN ON HIGH PRESSURE 
BOILER; SELF-LOADING BATCH PLANT; WELL POINT 
OPERATORS ELECTRIC PUMPS USED IN WELL POINT SYSTEM; 
PUMPS, 16 INCHES AND OVER (TOTAL DISCHARGE); 
COMPRESSOR, ONE OR TWO 900 CU FT AND OVER; POWERED 
GREASE TRUCK; TUNNEL LOCOMOTIVES AND DINGYS; GROUT 
PUMPS; HYDRAULIC JACKS; BOOM TRUCK; HYDRAULIC 
CRANES- UP TO 10 TON.  HAZARDOUS WASTE PREMIUM  
$2.00  FOOTNOTE FOR POWER EQUIPMENT OPERATORS:    
A.  PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY 
AND CHRISTMAS DAY...................................$ 40.70                  30.58
POWER EQUIPMENT OPERATORS: GROUP  2 ROTARY DRILL 
WITH MOUNTED COMPRESSOR; COMPRESSOR HOUSE (3 TO 6 
COMPRESSORS); ROCK AND EARTH BORING MACHINES 
(EXCLUDING MCCARTHY AND SIMILAR DRILLS); FRONT END 
LOADERS 4 CU YDS TO 5 1/2 CU YDS); FORKLIFTS-7 FT 
LIFT AND OVER 3 TON CAPACITY; SCRAPER 21 YDS AND 
OVER (STRUCK LOAD); SONIC HAMMER CONSOLE; 
RECLAIMERS ROAD PLANER/MILLING MACHINE; CAL TRACKS; 
BALLAST REGULATORS; RAIL ANCHOR MACHINES; SWITCH 
TAMPERS, ASPHALT PAVERS; MECHANIC; WELDER AND 
TRANSFER MACHINE.  HAZARDOUS WASTE PREMIUM  $2.00  
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:    A.  PAID 
HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS 
DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS 
DAY.................................................$ 40.92                  30.58
POWER EQUIPMENT OPERATORS: GROUP  1 SHOVELS; 
CRAWLERS AND TRUCK CRANES INCLUDING ALL TOWER; 
SELF-PROPELLED HYDRAULIC CRANES 10 TONS AND OVER; 
DRAGLINES; CLAM SHELLS; CABLEWAYS; SHAFT HOISTS; 
MUCKING MACHINES DERRICKS; BACKHOES; BULLDOZERS; 
GRADALLS; ELEVATING GRADERS; PILE DRIVERS; CONCRETE 
PAVERS; TRENCHING MACHINES; FRONT END LOADERS- 5 
1/2 CU YDS AND OVER; DUAL DRUM PAVER; AUTOMATIC 
GRADER-EXCAVATOR(C.M.I. OR EQUAL); SCRAPERS TOWING 
PAN OR WAGON; TANDEM DOZERS OR PUSH CATS(2 UNITS IN 
TANDEM); SHOTCRETE MACHINE; TUNNEL BORING MACHINE; 
COMBINATION BACKHOE/LOADER 3/4 CU YD HOE OR OVER; 
JET ENGINE DRYER; TREE SHREDDER; POST HOLE DIGGER; 
POST HOLE HAMMER; POST EXTRACTOR; TRUCK MOUNTED 
CONCRETE PUMP WITH BOOM; ROTO-MILL; GRADER; 
HORIZONTAL DRILLING MACHINE; JOHN HENRY ROCK DRILL 
AND SIMILAR EQUIPMENT.  HAZARDOUS WASTE PREMIUM  
$2.00  FOOTNOTE FOR POWER EQUIPMENT OPERATORS:    
A.  PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY 
AND CHRISTMAS DAY...................................$ 41.23                  30.58
----------------------------------------------------------------

 IRON0007-017 09/16/2025
                                                     Rates                  Fringes
IRONWORKER..........................................$ 41.89                  33.90
----------------------------------------------------------------

 LABO0022-007 12/01/2024
                                                     Rates                  Fringes
LABORERS: GROUP 6  ASBESTOS ABATEMENT, TOXIC AND 
HAZARDOUS WASTE LABORERS  (FRANKLIN (ORANGE, 
WARWICK))...........................................$ 38.95                  29.70
LABORERS: GROUP 5 FLAGGER  (FRANKLIN (ORANGE, 
WARWICK))...........................................$ 38.95                  29.70
LABORERS: GROUP 4 BLASTER; POWDERMAN  (FRANKLIN 
(ORANGE, WARWICK))..................................$ 38.95                  29.70
LABORERS: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; 
RAMMER; CURB SETTER;HYDRAULIC & SIMILAR SELF 
POWERED DRILLS   (FRANKLIN (ORANGE, WARWICK)).......$ 38.95                  29.70
LABORERS: GROUP 2 ASPHALT RAKER; FENCE AND GUARD 
RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENMDER; 
PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL 
OPERATOR; WAGON DRILL OPERATOR (FRANKLIN (ORANGE, 
WARWICK))...........................................$ 38.95                  29.70
LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS; 
CEMENT FINISHER TENDERS  (FRANKLIN (ORANGE, 
WARWICK))...........................................$ 38.95                  29.70
----------------------------------------------------------------

 LABO0596-003 12/01/2021
                                                     Rates                  Fringes
LABORERS: GROUP 5 POWDERMAN AND BLASTER  (FRANKLIN 
(EXCEPT ORANGE, WARWICK))...........................$ 33.50                  26.02
LABORERS: GROUP 4 AIR TRACK OPERATORS, BLOCK 
PAVERS, RAMMERS AND CURB SETTERS   (FRANKLIN 
(EXCEPT ORANGE, WARWICK))...........................$ 33.25                  26.02
LABORERS: GROUP 3 PRECAST FLOOR AND ROOF PLANK 
ERECTORS, SIGN ERECTORS, ASBESTOS REMOVAL LABORERS  
 (FRANKLIN (EXCEPT ORANGE, WARWICK))................$ 33.25                  26.02
LABORERS: GROUP 2 ASPHALT RAKERS, CARBIDE CORE 
DRILLER OPERATORS, CHAIN SAW OPERATORS, PIPELAYERS, 
JACKHAMMER AND PAVING BREAKER OPERATORS, BARCO TYPE 
JUMPING TAMPERS, LASER BEAM OPERATORS, CONCRETE 
PUMP OPERATORS, MASON TENDERS, MORTAR MIXERS, 
RIDE-ON MOTORIZED BUGGY OPERATORS, WAGON DRILL 
OPERATORS  (FRANKLIN (EXCEPT ORANGE, WARWICK))......$ 32.75                  26.02
LABORERS: GROUP 1 LABORERS, CARPENTER TENDERS, 
WRECKING LABORERS (FRANKLIN (EXCEPT ORANGE, 
WARWICK))...........................................$ 32.50                  26.02
----------------------------------------------------------------

 LABO1421-006 12/02/2024
                                                     Rates                  Fringes
LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, 
TOXIC AND HAZARDOUS WASTE...........................$ 46.25                  29.70
LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, 
SAWYERS.............................................$ 45.35                  29.70
LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD 
ONLY)...............................................$ 42.25                  29.70
LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, 
LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC 
""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING 
SAWS................................................$ 47.25                  29.70
LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS...$ 47.00                  29.70
LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING 
LABORER.............................................$ 46.25                  29.70
----------------------------------------------------------------

 PAIN0035-011 07/01/2024
                                                     Rates                  Fringes
PAINTER: SPRAY, SANDBLAST...........................$ 39.48                  31.85
PAINTER: BRUSH, TAPER...............................$ 38.08                  31.85
----------------------------------------------------------------

 PLUM0004-005 09/01/2025
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER (FRANKLIN (ORANGE)).........$ 55.00                  31.57
----------------------------------------------------------------

 PLUM0104-002 09/17/2025
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER (FRANKLIN (EXCEPT MONROE, 
ROWE, AND THE WESTERN PART OF CHARLEMONT))    
FOOTNOTE FOR PLUMBERS & STEAMFITTERS:  A.  PAID 
HOLIDAYS:  INDEPENDENCE DAY AND LABOR DAY, PROVIDED 
THE EMPLOYEE HAS BEEN EMPLOYED SEVEN DAYS PRIOR TO 
THE HOLIDAY BY THE SAME EMPLOYER....................$ 52.26                  31.05
----------------------------------------------------------------

 PLUM0104-010 09/17/2025
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER (FRANKLIN (MONROE, ROWE, 
AND THE WESTERN PART OF CHARLEMONT))    FOOTNOTE 
FOR PLUMBERS & STEAMFITTERS:  A.  PAID HOLIDAYS:  
INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE 
EMPLOYEE HAS BEEN EMPLOYED SEVEN DAYS PRIOR TO THE 
HOLIDAY BY THE SAME EMPLOYER........................$ 52.26                  31.05
----------------------------------------------------------------

 ROOF0248-002 07/16/2025
                                                     Rates                  Fringes
ROOFERS (PITCH, SLATE, TILE AND PRECAST CONCRETE)...$ 42.48                  30.14
ROOFERS (COMPOSITION ROOFERS & DAMP WATERPROOFERS)..$ 42.48                  30.14
----------------------------------------------------------------

 SHEE0063-003 07/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 43.48                  36.46
----------------------------------------------------------------

 TEAM0379-004 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING 
EQUIPMENT (DOUBLE HOOKUP)     POWER TRUCKS $.25 
DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) 
$.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN 
HOT ZONE ONLY) $2.00 PREMIUM.     FOOTNOTES:     A. 
 PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY,  INDEPENDENCE DAY, LABOR 
DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY     B.  PAID 
VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF 
SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK 
VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.82                  37.35
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING 
EQUIPMENT OVER 35 TONS  POWER TRUCKS $.25 
DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) 
$.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN 
HOT ZONE ONLY) $2.00 PREMIUM.     FOOTNOTES:     A. 
 PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY,  INDEPENDENCE DAY, LABOR 
DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY     B.  PAID 
VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF 
SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK 
VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.53                  37.35
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING 
EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL 
TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING 
RESTORATION EQUIPMENT  POWER TRUCKS $.25 
DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) 
$.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN 
HOT ZONE ONLY) $2.00 PREMIUM.     FOOTNOTES:     A. 
 PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY,  INDEPENDENCE DAY, LABOR 
DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY     B.  PAID 
VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF 
SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK 
VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 41.24                  37.35
TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT 
 POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK 
(UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE 
HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 
PREMIUM.     FOOTNOTES:     A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,  
INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, 
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY     B.  PAID VACATION:  EMPLOYEES 
WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 
YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS 
OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 
YEARS OF SERVICE....................................$ 41.14                  37.35
TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND 
TIREMAN  POWER TRUCKS $.25 DIFFERENTIAL BY AXLE 
TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY 
AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 
PREMIUM.     FOOTNOTES:     A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,  
INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, 
COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY     B.  PAID VACATION:  EMPLOYEES 
WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 
YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS 
OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 
YEARS OF SERVICE....................................$ 41.02                  37.35
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & 
FORKLIFT OPERATOR  POWER TRUCKS $.25 DIFFERENTIAL 
BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 
DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT 
ZONE ONLY) $2.00 PREMIUM.     FOOTNOTES:     A.  
PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY,  INDEPENDENCE DAY, LABOR 
DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY     B.  PAID 
VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF 
SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK 
VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 40.95                  37.35
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL 
TRUCKS; AND PICKUP TRUCKS  POWER TRUCKS $.25 
DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) 
$.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN 
HOT ZONE ONLY) $2.00 PREMIUM.     FOOTNOTES:     A. 
 PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY, MEMORIAL DAY,  INDEPENDENCE DAY, LABOR 
DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY     B.  PAID 
VACATION:  EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF 
SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK 
VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS 
VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS 
VACATION FOR MORE THAN 10 YEARS OF SERVICE..........$ 40.78                  37.35
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"