Prevailing Wage Index
HomePrevailing wage by stateNew JerseyDeterminations › NJ20260045

Wage determination NJ20260045

Building construction - New Jersey, revision 2, modified 2026-08-13

Verify against the official document: this page mirrors WD NJ20260045 revision 2 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0032-010 (collectively bargained (union) rate, 09/19/2024)

ClassificationBase rateFringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO$51.7446.20

ASBE0089-009 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO$55.8040.80

BRNJ0002-014 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
BRICKLAYER: INCLUDING CAULKING, CLEANING AND POINTING (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL.)$49.6037.96

BRNJ0002-016 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
MASON - STONE (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL)$49.6037.96

BRNJ0004-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
CEMENT MASON$49.6037.96

BRNJ0007-022 (collectively bargained (union) rate, 06/02/2025)

ClassificationBase rateFringes
TILE SETTER$64.9037.28
TILE FINISHER (WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY.)$50.0533.90

CARP0006-010 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17

CARP0029-008 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
SOFT FLOOR LAYER$57.4234.17

CARP0715-007 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCA$58.8435.06

ELEC0102-023 (collectively bargained (union) rate, 06/02/2025)

ClassificationBase rateFringes
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIF$65.4342.86
ELECTRICIAN: CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING) (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIG$69.7244.27

ELEV0084-006 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC (PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY.)$61.4138.44

ENGI0825-020 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA$52.8837.50
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS $56.5937.50
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. Y$58.2237.50
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN$60.1337.50
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH$61.7237.50

IRON0011-016 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
IRONWORKER: STRUCTURAL AND ORNAMENTAL$50.7449.37
IRONWORKER: REINFORCING$48.4449.37

LABO0008-001 (collectively bargained (union) rate, 05/01/2011)

ClassificationBase rateFringes
LABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS A$28.3721.62

LABO0077-002 (collectively bargained (union) rate, 05/01/2022)

ClassificationBase rateFringes
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE$36.5030.22

LABO0077-005 (collectively bargained (union) rate, 05/01/2022)

ClassificationBase rateFringes
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN$35.7530.22

PAIN0711-018 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
DRYWALL FINISHER/TAPER$44.8730.15

PAIN0711-021 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER (WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL.) (WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 F$52.6831.29

PAIN0711-022 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PAINTER: SPRAY$45.5529.86

PLAS0029-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLASTERER$54.6430.95

PLUM0024-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION$62.0945.05

PLUM0274-009 (collectively bargained (union) rate, 05/01/2022)

ClassificationBase rateFringes
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (WARREN COUNTY (TOWNSHIP OF ALLAMUCHY; BOROUGH OF ALPHA; TOWNSHIP OF BLAIRSTOWN; TOWNSHIP OF FRANKLIN (DOES NOT INCLUDE THE TOWNS OF AS$57.9740.22

PLUM0475-015 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (WARREN COUNTY (TOWN OF BELVIDERE; TOWNSHIP OF FRANKLIN (TOWNS OF ASBURY AND NEW VILLAGE ONLY); TOWNSHIPS OF GREENWICH, HARMONY, HOPE, $56.3450.80

SFNJ0669-007 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
SPRINKLER FITTER: FIRE SPRINKLERS$59.1936.51

SHEE0019-016 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (PAID HOLIDAY: ELECTION DAY.)$45.0244.09

SUNJ2004-021 (DOL wage survey rate, 01/02/2009)

ClassificationBase rateFringes
PAINTER: BRUSH AND ROLLER$32.915.77

TEAM0469-005 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS M$48.7842.66
TRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL,$48.6342.66
Full official text of NJ20260045 rev 2
"General Decision Number: NJ20260045 08/13/2026


State: New Jersey


Construction Types: Building


Counties: New Jersey Counties of 
Warren




 


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026
          2                08/13/2026


 ASBE0032-010 09/19/2024
                                                     Rates                  Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES 
THE APPLICATION OF ALL INSULATING MATERIALS, 
PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO 
ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE 
APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS 
AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND 
CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (WARREN 
COUNTY (TOWNSHIPS OF ALLAMUCHY, BLAIRSTOWN AND 
FRELINGHUYSEN; TOWN OF HACKETTSTOWN; TOWNSHIPS OF 
HOPE, INDEPENDENCE, KNOWLTON, LIBERTY AND 
MANSFIELD)).........................................$ 51.74                  46.20
----------------------------------------------------------------

 ASBE0089-009 07/01/2025
                                                     Rates                  Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES 
THE APPLICATION OF ALL INSULATING MATERIALS, 
PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO 
ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE 
APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS 
AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND 
CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (WARREN 
COUNTY (TOWNSHIPS OF FRANKLIN, GREENWICH, HARMONY, 
LOPATCONG, OXFORD, POHATCONG, WASHINGTON AND 
WHITE)) PAID HOLIDAYS:    THE LAST DAY PRIOR TO THE 
CHRISTMAS AND NEW YEAR'S DAY OBSERVED HOLIDAY: 4 
HRS. PAY............................................$ 55.80                  40.80
----------------------------------------------------------------

 BRNJ0002-014 05/01/2025
                                                     Rates                  Fringes
BRICKLAYER: INCLUDING CAULKING, CLEANING AND 
POINTING  (WORK ON HIGH STACKS: 22% PER HOUR 
ADDITIONAL.)........................................$ 49.60                  37.96
----------------------------------------------------------------

 BRNJ0002-016 05/01/2025
                                                     Rates                  Fringes
MASON - STONE (WORK ON HIGH STACKS: 22% PER HOUR 
ADDITIONAL).........................................$ 49.60                  37.96
----------------------------------------------------------------

 BRNJ0004-001 05/01/2025
                                                     Rates                  Fringes
CEMENT MASON........................................$ 49.60                  37.96
----------------------------------------------------------------

 BRNJ0007-022 06/02/2025
                                                     Rates                  Fringes
TILE SETTER.........................................$ 64.90                  37.28
TILE FINISHER (WORK GROUTING ALL EPOXY: $10.00 
ADDITIONAL PER DAY.)................................$ 50.05                  33.90
----------------------------------------------------------------

 CARP0006-009 05/01/2025
                                                     Rates                  Fringes
CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET 
AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR 
EACH ADDITIONAL FIFTY FEET THEREAFTER.)             
                                                    
                                                    
                                                    
                                            ........$ 57.42                  34.17
----------------------------------------------------------------

 CARP0006-010 05/01/2025
                                                     Rates                  Fringes
CARPENTER: INCLUDING ACOUSTICAL CEILING 
INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND 
BLOWN INSULATION....................................$ 57.42                  34.17
----------------------------------------------------------------

 CARP0029-008 05/01/2025
                                                     Rates                  Fringes
SOFT FLOOR LAYER....................................$ 57.42                  34.17
----------------------------------------------------------------

 CARP0715-007 05/01/2025
                                                     Rates                  Fringes
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF 
ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS 
AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR 
OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE 
OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT 
THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH 
ADDITIONAL FIFTY FEET THEREAFTER.)..................$ 58.84                  35.06
----------------------------------------------------------------

 ELEC0102-023 06/02/2025
                                                     Rates                  Fringes
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (WORK 
FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE 
RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF 
A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR 
ADDITIONAL.  WORK WITH, OR THE REMOVAL OF, ASBESTOS 
MATERIALS: 112% TIMES THE JOURNEYMAN RATE.).........$ 65.43                  42.86
ELECTRICIAN: CABLE SPLICER (INCLUDING LOW VOLTAGE 
WIRING) (WORK FORTY FT. OR MORE ABOVE THE GROUND OR 
PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR 
TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% 
PER HOUR ADDITIONAL.  WORK WITH, OR THE REMOVAL OF, 
ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN 
RATE.)..............................................$ 69.72                  44.27
----------------------------------------------------------------

 ELEV0084-006 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC (PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER 
THANKSGIVING DAY, AND CHRISTMAS DAY.) (VACATION PAY 
CREDIT: A WORKER WITH 6 MONTHS BUT LESS THAN 5 
YEARS OF SERVICE RECEIVES TWO WEEKS VACATION; A 
WORKER WITH 5 YEARS OR MORE OF SERVICE RECEIVES 
THREE WEEKS VACATION.)..............................$ 61.41                  38.44
----------------------------------------------------------------

 ENGI0825-020 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS 
WASTE REMOVAL WORK:  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER 
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND 
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR 
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR 
ADDITIONAL.) (PAID HOLIDAYS:  NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION 
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS 
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE 
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, 
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY 
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS 
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE 
HOLIDAY.)...........................................$ 52.88                  37.50
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID 
LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT 
END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, 
GRADE; PUMP, HYDRAULIC (HAZARDOUS WASTE REMOVAL 
WORK:  WORK ON A STATE OR FEDERALLY DESIGNATED 
HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT 
CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL 
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, 
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)  
(PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 
1) THAT THE WORKER WORKS THREE OF THE PRECEDING 
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY 
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE 
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY 
BEFORE AND THE WORK DAY AFTER THE HOLIDAY.).........$ 56.59                  37.50
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; 
BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 
100 FT.);  FORKLIFT; FRONT END LOADER (1 CU. YD. 
AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; 
PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR 
(HAZARDOUS WASTE REMOVAL WORK:  WORK ON A STATE OR 
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE 
THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS 
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS 
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 
20% PER HOUR ADDITIONAL.)(PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) 
THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE 
WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY 
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE 
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY 
BEFORE AND THE WORK DAY AFTER THE HOLIDAY.).........$ 58.22                  37.50
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER 
COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); 
HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER;  FRONT 
END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); 
SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK:  
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS 
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT 
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL 
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, 
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) 
(PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 
1) THAT THE WORKER WORKS THREE OF THE PRECEDING 
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY 
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE 
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY 
BEFORE AND THE WORK DAY AFTER THE HOLIDAY.).........$ 60.13                  37.50
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, 
INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING 
MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND 
STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE 
DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC 
DRILL, SELF-POWERED DRILL); ELEVATING GRADER; 
EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); 
PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF 
LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); 
TRENCHER (HAZARDOUS WASTE REMOVAL WORK:  WORK ON A 
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, 
WHERE THE WORKER IS IN DIRECT CONTACT WITH 
HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE 
EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE 
PROTECTION: 20% PER HOUR ADDITIONAL.)  (PAID 
HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY 
OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) 
THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE 
WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY 
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE 
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY 
BEFORE AND THE WORK DAY AFTER THE HOLIDAY.).........$ 61.72                  37.50
----------------------------------------------------------------

 IRON0011-016 07/01/2024
                                                     Rates                  Fringes
IRONWORKER: STRUCTURAL AND ORNAMENTAL...............$ 50.74                  49.37
IRONWORKER: REINFORCING.............................$ 48.44                  49.37
----------------------------------------------------------------

 LABO0008-001 05/01/2011
                                                     Rates                  Fringes
LABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, 
ENCLOSURE AND DECONTAMINATION OF PERSONAL 
PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING 
AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND 
HAZARDOUS WASTE OR MATERIALS WHICH SHALL INCLUDE 
BUT NOT NECESSARILY BE LIMITED TO: THE ERECTION, 
MOVING, SERVICING AND DISMANTLING OF ALL 
ENCLOSURES, SCAFFOLDING AND BARRICADES; THE 
OPERATION OF ALL TOOLS AND EQUIPMENT NORMALLY USED 
IN THE REMOVAL OR ABATEMENT OF ASBESTOS AND TOXIC 
OR HAZARDOUS WASTE OR MATERIALS; THE LABELING, 
BAGGING, CARTONING, CRATING, OR OTHER PACKAGING OF 
MATERIALS FOR DISPOSAL; THE CLEAN-UP OF THE 
WORKSITE; AND ALL OTHER WORK INCIDENTAL TO THE 
REMOVAL, ABATEMENT, ENCAPSULATION, ENCLOSURE, AND 
DECONTAMINATION OF ASBESTOS AND TOXIC OR HAZARDOUS 
WASTE OR MATERIALS; AND, IN ADDITION, ALL WORK 
TASKS INVOLVED IN THE MAINTENANCE AND OPERATION OF 
ENERGY RESOURCE RECOVERY PLANTS (CO-GENERATION 
PLANTS))............................................$ 28.37                  21.62
----------------------------------------------------------------

 LABO0077-002 05/01/2022
                                                     Rates                  Fringes
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE........$ 36.50                  30.22
----------------------------------------------------------------

 LABO0077-005 05/01/2022
                                                     Rates                  Fringes
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON 
OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL 
OPERATOR AND SCREEDMAN..............................$ 35.75                  30.22
----------------------------------------------------------------

 PAIN0711-018 05/01/2025
                                                     Rates                  Fringes
DRYWALL FINISHER/TAPER..............................$ 44.87                  30.15
----------------------------------------------------------------

 PAIN0711-021 05/01/2025
                                                     Rates                  Fringes
GLAZIER (WORK WELDING OR USING A CUTTING TORCH: 
$1.00 PER HOUR ADDITIONAL.) (WORK ON A SWING STAGE 
SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING 
HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON 
MOTORIZED LIFTS PROVIDED THAT THE HEIGHT OF THE 
LIFT PLATFORM IS ABOVE THE SECOND FLOOR OR ABOVE 
THIRTY FEET: $1.00 PER HOUR ADDITIONAL.)............$ 52.68                  31.29
----------------------------------------------------------------

 PAIN0711-022 05/01/2025
                                                     Rates                  Fringes
PAINTER: SPRAY......................................$ 45.55                  29.86
----------------------------------------------------------------

 PLAS0029-003 05/01/2025
                                                     Rates                  Fringes
PLASTERER...........................................$ 54.64                  30.95
----------------------------------------------------------------

 PLUM0024-001 05/01/2025
                                                     Rates                  Fringes
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION...........$ 62.09                  45.05
----------------------------------------------------------------

 PLUM0274-009 05/01/2022
                                                     Rates                  Fringes
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION 
(WARREN COUNTY (TOWNSHIP OF ALLAMUCHY; BOROUGH OF 
ALPHA; TOWNSHIP OF BLAIRSTOWN; TOWNSHIP OF FRANKLIN 
(DOES NOT INCLUDE THE TOWNS OF ASBURY AND NEW 
VILLAGE); TOWNSHIP OF FRELINGHUYSEN; TOWN OF 
HACKETTSTOWN; TOWNSHIPS OF HARDWICK, INDEPENDENCE, 
KNOWLTON, LIBERTY AND MANSFIELD; TOWNSHIP OF 
POHATCONG (DOES NOT INCLUDE THE TOWNS OF 
CARPENTERSVILLE, RIEGELSVILLE AND WARREN GLEN); 
BOROUGH OF WASHINGTON; TOWNSHIP OF WASHINGTON)).....$ 57.97                  40.22
----------------------------------------------------------------

 PLUM0475-015 05/01/2025
                                                     Rates                  Fringes
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION 
(WARREN COUNTY (TOWN OF BELVIDERE; TOWNSHIP OF 
FRANKLIN (TOWNS OF ASBURY AND NEW VILLAGE ONLY); 
TOWNSHIPS OF GREENWICH, HARMONY, HOPE, LOPATCONG 
AND OXFORD; TOWN OF PHILLIPSBURG; TOWNSHIP OF 
POHATCONG (TOWNS OF CARPENTERSVILLE, RIEGELSVILLE 
AND WARREN GLEN ONLY); TOWNSHIP OF WHITE))..........$ 56.34                  50.80
----------------------------------------------------------------

 ROOF0004-007 06/01/2024
                                                     Rates                  Fringes
ROOFER: INCLUDES ALL TYPES OF ROOFS                 
                                                    
                                                    
                                                    
                                               .....$ 44.52                  32.25
----------------------------------------------------------------

 SFNJ0669-007 04/01/2025
                                                     Rates                  Fringes
SPRINKLER FITTER: FIRE SPRINKLERS...................$ 59.19                  36.51
----------------------------------------------------------------

 SHEE0019-016 06/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER: INCLUDING HVAC DUCT 
INSTALLATION (PAID HOLIDAY: ELECTION DAY.)..........$ 45.02                  44.09
----------------------------------------------------------------

 SUNJ2004-021 01/02/2009
                                                     Rates                  Fringes
PAINTER: BRUSH AND ROLLER...........................$ 32.91                  5.77
----------------------------------------------------------------

 TEAM0469-005 05/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE 
REMOVAL WORK:  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER 
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND 
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR 
RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER 
HOUR ADDITIONAL.    WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE 
REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY 
WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR 
ADDITIONAL.  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS 
NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C 
PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) 
(PAID HOLIDAYS:  NEW YEAR'S DAY, PRESIDENT'S DAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY.)  (VACATION PAY 
CREDIT:  WORKERS WORKING OR RECEIVING PAY FOR 80 
DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION 
(48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID 
VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID 
VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 
DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)).....$ 48.78                  42.66
TRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL 
WORK:  WORK ON A STATE OR FEDERALLY DESIGNATED 
HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT 
CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL 
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, 
SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. 
   WORK ON A STATE OR FEDERALLY DESIGNATED 
HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A 
PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE 
TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL.  WORK ON A 
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE 
WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING 
LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR 
ADDITIONAL.) (PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, 
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.) (VACATION 
PAY CREDIT:  WORKERS WORKING OR RECEIVING PAY FOR 
80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID 
VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS 
PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS 
PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 
145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 
HOURS)).............................................$ 48.63                  42.66
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"

All New Jersey determinations: county index · New Jersey prevailing wage · compute pay with the calculator.