Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0014-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO$60.8448.38

ASBE0089-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO$55.8040.80

CARP0006-009 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17

CARP0006-013 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17

CARP0715-007 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCA$58.8435.06

ELEC0269-020 (collectively bargained (union) rate, 09/24/2025)

ClassificationBase rateFringes
BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly ro$61.8440.32
ELECTRICIAN: CABLE SPLICER BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to th$68.0244.04

ELEC0351-012 (collectively bargained (union) rate, 09/30/2024)

ClassificationBase rateFringes
ELECTRICIAN AND CABLE SPLICER (BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, T$55.0548.76
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY D$46.5134.39

ENGI0825-021 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA$52.8837.50
POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O$56.5937.50
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH$58.2237.50
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN$60.1337.50
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH$61.7237.50

IRON0399-005 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
IRONWORKER: STRUCTURAL AND ORNAMENTAL$54.2438.40
IRONWORKER: REINFORCING$53.2438.40

LABO0077-008 (collectively bargained (union) rate, 07/01/2012)

ClassificationBase rateFringes
LABORER: MASON TENDER: CEMENT/CONCRETE$29.3523.07

LABO0172-009 (collectively bargained (union) rate, 03/01/2025)

ClassificationBase rateFringes
LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTEC$51.6538.53
LABORER: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WO$50.9538.53

PAIN0711-023 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION)$58.2833.85

PAIN0711-024 (collectively bargained (union) rate, 05/01/2017)

ClassificationBase rateFringes
PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.)$29.0518.91
PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION)$40.1922.72

PLAS0592-036 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER$53.2133.42

PLUM0009-022 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
(BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACH$59.5746.45
PIPEFITTER: SERVICE AND REPAIR (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KN$46.2329.23

PLUM0322-011 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PIPEFITTER (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH $56.3050.76

TEAM0469-007 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER: DUMP TRUCK; FLATBED TRUCK, PICK UP TRUCK (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) (HAZARDOUS WASTE REMOVAL WORK: $48.6342.66
VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 $48.7842.66

TEAM0676-004 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER: OFF THE ROAD TRUCK; FLATBED TRUCK (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) (HAZARDOUS WASTE REMOVAL WORK: WORK ON$44.6534.11
TRUCK DRIVER: DUMP TRUCK; PICKUP TRUCK (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE $44.3034.11
Full official text of NJ20260048 rev 3
"General Decision Number: NJ20260048 08/13/2026


State: New Jersey


Construction Types: Heavy


Counties: New Jersey Counties of 
Burlington




 


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026
          3                08/13/2026


 ASBE0014-003 05/01/2025
                                                     Rates                  Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES 
THE APPLICATION OF ALL INSULATING MATERIALS, 
PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO 
ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE 
APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS 
AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND 
CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (BURLINGTON 
COUNTY (CITY OF BEVERLY; TOWNSHIPS OF CINNAMINSON, 
DELANCO, DELRON, EDGEWATER PARK, EVESHAM, 
HAINESPORT AND LUMBERTON; BOROUGH OF MAPLE SHADE; 
TOWNSHIP OF MEDFORD; BOROUGH OF MEDFORD LAKES; 
TOWNSHIPS OF MOORESTOWN AND MT. LAUREL; BOROUGH OF 
PALMYRA; TOWNSHIP OF RIVERSIDE; BOROUGH OF 
RIVERTON; TOWNSHIPS OF SHAMONG, SOUTHAMPTON, 
TABERNACLE, WESTHAMPTON AND WILLINGBORO)............$ 60.84                  48.38
----------------------------------------------------------------

 ASBE0089-003 07/01/2025
                                                     Rates                  Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES 
THE APPLICATION OF ALL INSULATING MATERIALS, 
PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO 
ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE 
APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS 
AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND 
CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (BURLINGTON 
COUNTY (TOWNSHIPS OF BORDENTOWN, BURLINGTON, 
CHESTERFIELD, EASTHAMPTON, FLORENCE, MANSFIELD, MT. 
HOLLY, NEW HANOVER, NORTH HANOVER, PEMBERTON, 
SPRINGFIELD AND WOODLAND) PAID HOLIDAYS:THE LAST 
DAY PRIOR TO THE CHRISTMAS AND NEW YEAR'S DAY 
OBSERVED HOLIDAY: 4 HRS. PAY........................$ 55.80                  40.80
----------------------------------------------------------------

 CARP0006-009 05/01/2025
                                                     Rates                  Fringes
CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET 
AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR 
EACH ADDITIONAL FIFTY FEET THEREAFTER.).............$ 57.42                  34.17
----------------------------------------------------------------

 CARP0006-013 05/01/2025
                                                     Rates                  Fringes
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY 
FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL 
FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.).........$ 57.42                  34.17
----------------------------------------------------------------

 CARP0454-009 05/01/2023
                                                     Rates                  Fringes
PILEDRIVERMAN (PAID HOLIDAYS: NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; 
PROVIDED THAT THE WORKER WORKS ANY OF THE THREE 
DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE 
HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY.)  
                                                    
                                                    
                                                    
                                                    
              ......................................$ 46.73                  41.69
----------------------------------------------------------------

 CARP0715-007 05/01/2025
                                                     Rates                  Fringes
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF 
ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS 
AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR 
OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE 
OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT 
THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH 
ADDITIONAL FIFTY FEET THEREAFTER.)..................$ 58.84                  35.06
----------------------------------------------------------------

 ELEC0269-020 09/24/2025
                                                     Rates                  Fringes
ELECTRICIAN                                         
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
        BURLINGTON COUNTY (north of a line 
following the west and south limits of Burlington 
Borough from the Delaware River, in a southeasterly 
direction, to the Burlington - Mt. Holly road; 
then, south-southeast along the Burlington - Mt. 
Holly road to the town of Mt. Holly, includes Mt. 
Holly; then, east along the Pennsylvania Railroad 
to the town of New Lisbon, includes New Lisbon; 
then, continuing along the Pennsylvania Railroad to 
the Ocean County line)..............................$ 61.84                  40.32
ELECTRICIAN: CABLE SPLICER BURLINGTON COUNTY (north 
of a line following the west and south limits of 
Burlington Borough from the Delaware River, in a 
southeasterly direction, to the Burlington - Mt. 
Holly road; then, south-southeast along the 
Burlington - Mt. Holly road to the town of Mt. 
Holly, includes Mt. Holly; then, east along the 
Pennsylvania Railroad to the town of New Lisbon, 
includes New Lisbon; then, continuing along the 
Pennsylvania Railroad to the Ocean County line)     
   .................................................$ 68.02                  44.04
----------------------------------------------------------------

 ELEC0351-012 09/30/2024
                                                     Rates                  Fringes
ELECTRICIAN AND CABLE SPLICER (BURLINGTON COUNTY 
(SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH 
LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE 
RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE 
BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST 
ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN 
OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, 
EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF 
NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, 
CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE 
OCEAN COUNTY LINE)..................................$ 55.05                  48.76
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE 
(BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE 
WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM 
THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, 
TO THE BURLINGTON - MT. HOLLY ROAD; THEN, 
SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY 
ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. 
HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD 
TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW 
LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA 
RAILROAD TO THE OCEAN COUNTY LINE)..................$ 46.51                  34.39
----------------------------------------------------------------

 ENGI0825-021 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS 
WASTE REMOVAL WORK:  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER 
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND 
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR 
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR 
ADDITIONAL). PAID HOLIDAYS:  NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION 
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS 
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE 
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, 
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY 
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS 
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE 
HOLIDAY.............................................$ 52.88                  37.50
POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR 
(SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 
CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE 
REMOVAL WORK:  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER 
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND 
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR 
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR 
ADDITIONAL). PAID HOLIDAYS:  NEW YEAR'S DAY, 
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION 
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS 
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE 
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, 
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY 
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS 
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE 
HOLIDAY.............................................$ 56.59                  37.50
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; 
BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 
100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 
CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; 
MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR 
(HAZARDOUS WASTE REMOVAL WORK:  WORK ON A STATE OR 
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE 
THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS 
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS 
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 
20% PER HOUR ADDITIONAL.) PAID HOLIDAYS:  NEW 
YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) 
THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE 
WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY 
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE 
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY 
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 58.22                  37.50
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER 
COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); 
HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER;  FRONT 
END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); 
SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK:  
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS 
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT 
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL 
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, 
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) 
PAID HOLIDAYS:  NEW YEAR'S DAY, WASHINGTON'S 
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 
1) THAT THE WORKER WORKS THREE OF THE PRECEDING 
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY 
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE 
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY 
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 60.13                  37.50
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, 
INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING 
MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND 
STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE 
DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC 
DRILL, SELF-POWERED DRILL); ELEVATING GRADER; 
EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); 
PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF 
LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE) 
(HAZARDOUS WASTE REMOVAL WORK:  WORK ON A STATE OR 
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE 
THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS 
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS 
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 
20% PER HOUR ADDITIONAL.)PAID HOLIDAYS:  NEW YEAR'S 
DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION 
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS 
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE 
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, 
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY 
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS 
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE 
HOLIDAY.............................................$ 61.72                  37.50
----------------------------------------------------------------

 IRON0399-005 07/01/2024
                                                     Rates                  Fringes
IRONWORKER: STRUCTURAL AND ORNAMENTAL...............$ 54.24                  38.40
IRONWORKER: REINFORCING.............................$ 53.24                  38.40
----------------------------------------------------------------

 LABO0077-008 07/01/2012
                                                     Rates                  Fringes
LABORER: MASON TENDER: CEMENT/CONCRETE..............$ 29.35                  23.07
----------------------------------------------------------------

 LABO0172-009 03/01/2025
                                                     Rates                  Fringes
LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK:  
WORK ON  A STATE OR FEDERALLY DESIGNATED HAZARDOUS 
WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR 
LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR 
ADDITIONAL.  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER 
IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL 
PROTECTION: $1.00 PER HOUR ADDITIONAL.) PAID 
HOLIDAYS:   NEW YEAR'S DAY, PRESIDENT'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT 
THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER 
WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF 
FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS 
AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS 
OBSERVED............................................$ 51.65                  38.53
LABORER: COMMON OR GENERAL LABORER; LANDSCAPE 
LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE 
REMOVAL WORK:  WORK ON  A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER 
IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL 
PROTECTION: $3.00 PER HOUR ADDITIONAL.  WORK ON A 
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, 
WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, 
B, OR C PERSONAL PROTECTION: $1.00 PER HOUR 
ADDITIONAL.) PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 
THAT THE WORKER WORKS THREE DAYS FOR THE SAME 
EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS 
CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE 
WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY 
FALLS OR IS OBSERVED................................$ 50.95                  38.53
----------------------------------------------------------------

 PAIN0711-023 05/01/2023
                                                     Rates                  Fringes
PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED 
FOR COMMERCIAL NAVIGATION)..........................$ 58.28                  33.85
----------------------------------------------------------------

 PAIN0711-024 05/01/2017
                                                     Rates                  Fringes
PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON 
PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.)......$ 29.05                  18.91
PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION)........$ 40.19                  22.72
----------------------------------------------------------------

 PLAS0592-036 05/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 53.21                  33.42
----------------------------------------------------------------

 PLUM0009-022 07/01/2025
                                                     Rates                  Fringes
PIPEFITTER                                          
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
   (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM 
THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON 
CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO 
KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. 
HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG 
MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 
EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT 
CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES 
COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD 
ROUTE 530 TO MAGNOLIA ROAD, INCLUDES PEMBERTON 
BOROUGH; THEN, SOUTH ON MAGNOLIA ROAD IN PEMBERTON 
TOWNSHIP TO MAGNOLIA NEW LISBON ROAD (ROUTE 545); 
THEN, SOUTH ON MT. HOLLY MISERY ROAD TO STATE ROAD 
ROUTE 70 EAST; THEN, ALONG STATE ROAD ROUTE 70 EAST 
TO THE OCEAN COUNTY LINE)...........................$ 59.57                  46.45
PIPEFITTER: SERVICE AND REPAIR (BURLINGTON COUNTY 
(NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON 
CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY 
ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL 
IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY 
OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY 
TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD 
ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD 
ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, 
ALONG COUNTY ROAD ROUTE 530 TO MAGNOLIA ROAD, 
INCLUDES PEMBERTON BOROUGH; THEN, SOUTH ON MAGNOLIA 
ROAD IN PEMBERTON TOWNSHIP TO MAGNOLIA NEW LISBON 
ROAD (ROUTE 545); THEN, SOUTH ON MT. HOLLY MISERY 
ROAD TO STATE ROAD ROUTE 70 EAST; THEN, ALONG STATE 
ROAD ROUTE 70 EAST TO THE OCEAN COUNTY LINE)........$ 46.23                  29.23
----------------------------------------------------------------

 PLUM0322-011 05/01/2025
                                                     Rates                  Fringes
PIPEFITTER (BURLINGTON COUNTY (SOUTH OF A LINE 
DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT 
INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD 
ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT 
REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE 
CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. 
HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG 
STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER 
STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 
530, DOES NOT INCLUDE PEMBERTON BOROUGH; THEN, 
SOUTH ON MAGNOLIA ROAD IN PEMBERTON TOWNSHIP TO 
MAGNOLIA NEW LISBON ROAD (ROUTE 545); THEN, SOUTH 
ON MT. HOLLY MISERY RD. TO STATE ROAD ROUTE 70 
EAST; THEN, ALONG STATE ROAD ROUTE 70 EAST TO THE 
OCEAN COUNTY LINE)..................................$ 56.30                  50.76
----------------------------------------------------------------

 TEAM0469-007 05/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: DUMP TRUCK; FLATBED TRUCK, PICK UP 
TRUCK (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM 
THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) 
(HAZARDOUS WASTE REMOVAL WORK:  WORK ON A STATE OR 
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE 
THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS 
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS 
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 
$3.00 PER HOUR ADDITIONAL.    WORK ON A STATE OR 
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A 
ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY 
WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR 
ADDITIONAL.  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS 
NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C 
PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) 
PAID HOLIDAYS:  NEW YEAR'S DAY, PRESIDENT'S DAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY. VACATION PAY 
CREDIT:  WORKERS WORKING OR RECEIVING PAY FOR 80 
DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION 
(48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID 
VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID 
VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 
DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)......$ 48.63                  42.66
TRUCK DRIVER: OFF THE ROAD TRUCK (BURLINGTON COUNTY 
(EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE 
TO THE DELAWARE RIVER)) (HAZARDOUS WASTE REMOVAL 
WORK:  WORK ON A STATE OR FEDERALLY DESIGNATED 
HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT 
CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL 
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, 
SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. 
   WORK ON A STATE OR FEDERALLY DESIGNATED 
HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A 
PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE 
TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL.  WORK ON A 
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE 
WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING 
LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR 
ADDITIONAL.) PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, 
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.            
                                                    
                                                    
                                          VACATION 
PAY CREDIT:  WORKERS WORKING OR RECEIVING PAY FOR 
80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID 
VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS 
PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS 
PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 
145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)..$ 48.78                  42.66
----------------------------------------------------------------

 TEAM0676-004 05/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: OFF THE ROAD TRUCK; FLATBED TRUCK 
(BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE 
NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) 
(HAZARDOUS WASTE REMOVAL WORK:  WORK ON A STATE OR 
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE 
THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS 
MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT 
IS REQUIRED FOR RESPIRATORY, SKIN AND EYE 
PROTECTION: $3.00 PER HOUR ADDITIONAL.  WORK ON A 
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, 
WHERE PERSONAL PROTECTION A, B, C OR D IS NOT 
REQUIRED: $1.00 PER HOUR ADDITIONAL.) SHIFT WORK:  
AN OWNER MANDATED IRREGULAR SHIFT STARING ANY TIME 
OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE 
$1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION 
TO THE REGULAR RATE OF PAY. PAID HOLIDAYS:  NEW 
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION 
DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, 
AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, 
THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) 
PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND 
CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS 
AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK 
IN WHICH THE HOLIDAY OCCURS.BEREAVEMENT PAY:  IN 
CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMIY 
(MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, 
SISTER, CURRENT MOTHER-IN-LAW, CURRENT 
FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE 
ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS 
STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL 
RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE 
BURIAL DAY FALLS ON A REGULAR WORK DAY, AND NOT ON 
DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS..$ 44.65                  34.11
TRUCK DRIVER: DUMP TRUCK; PICKUP TRUCK (BURLINGTON 
COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY 
TURNPIKE TO THE DELAWARE RIVER)) (HAZARDOUS WASTE 
REMOVAL WORK:  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER 
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND 
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR 
RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER 
HOUR ADDITIONAL.)  WORK ON A STATE OR FEDERALLY 
DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL 
PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER 
HOUR ADDITIONAL. SHIFT WORK:  AN OWNER MANDATED 
IRREGULAR SHIFT STARING ANY TIME OTHER THAN BETWEEN 
6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR 
EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE 
OF PAY. PAID HOLIDAYS:  NEW YEAR'S DAY, PRESIDENT'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE 
DAY AFTER THANKSGIVING, AT THE OPTION OF THE 
CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE 
DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE 
WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, 
PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR 
WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE 
HOLIDAY OCCURS. BEREAVEMENT PAY:  IN CASE OF A 
DEATH IN THE WORKER'S IMMEDIATE FAMIY (MOTHER, 
FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, 
CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, 
GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE 
NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, 
PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS 
THE DAY OF DEATH AND THE BURIAL DAY FALLS ON A 
REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, 
VACATION, SATURDAYS OR SUNDAYS......................$ 44.30                  34.11
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"