Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of NJ20260055 rev 3
"General Decision Number: NJ20260055 08/13/2026
State: New Jersey
Construction Types: Heavy
Counties: New Jersey Counties of
Hunterdon
Modification Number Publication Date
1 01/30/2026
2 05/18/2026
3 08/13/2026
BRNJ0004-001 05/01/2025
Rates Fringes
CEMENT MASON........................................$ 49.60 37.96
----------------------------------------------------------------
CARP0006-014 05/01/2025
Rates Fringes
CARPENTER (THE FIRST SIXTY FEET AT THE REGULAR
RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL
FIFTY FEET THEREAFTER.).............................$ 57.42 34.17
----------------------------------------------------------------
CARP0715-007 05/01/2025
Rates Fringes
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF
ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS
AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR
OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE
OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT
THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH
ADDITIONAL FIFTY FEET THEREAFTER.)..................$ 58.84 35.06
----------------------------------------------------------------
CARP1556-003 05/01/2024
Rates Fringes
CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) (WORK
ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION
AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND
WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED
PRODUCTS: $0.25 PER HOUR ADDITIONAL.) WORK ON
HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A
HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE
WORKER COMES INTO CONTACT WITH
HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND
WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS
REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE
PROTECTION: 20% PER HOUR ADDITIONAL.................$ 52.02 39.23
CARPENTER: DOCK BUILDER (ALL OTHER WORK) (WORK ON
LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND
THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND
WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED
PRODUCTS: $0.25 PER HOUR ADDITIONAL.) WORK ON
HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A
HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE
WORKER COMES INTO CONTACT WITH
HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND
WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS
REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE
PROTECTION: 20% PER HOUR ADDITIONAL.................$ 52.98 52.44
----------------------------------------------------------------
ELEC0102-024 06/02/2025
Rates Fringes
ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIPS OF
ALEXANDRIA AND BETHLEHEM; BOROUGHS OF BLOOMSBURY
AND CALIFON; TOWN OF CLINTON; TOWNSHIP OF CLINTON;
TOWNSHIP OF DELAWARE (WEST OF A LINE FOLLOWING
COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO
THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL
(EAST OF STATE HWY. 31); TOWNSHIP OF FRANKLIN;
BOROUGHS OF FRENCHTOWN, GLEN GARDNER, HAMPTON AND
HIGH BRIDGE; TOWNSHIPS OF HOLLAND AND KINGWOOD;
BOROUGH OF LEBANON; TOWNSHIP OF LEBANON; BOROUGH OF
MILFORD; TOWNSHIP OF RARITAN (EAST OF STATE HWY. 31
AND NORTH OF COUNTY ROUTE 523); TOWNSHIPS OF
READINGTON, TEWKSBURY AND UNION) WORK FORTY FT. OR
MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES
NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR
HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL.
(WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS:
112% TIMES THE JOURNEYPERSON RATE.).................$ 64.53 42.27
ELECTRICIAN: CABLE SPLICER (HUNTERDON COUNTY
(TOWNSHIPS OF ALEXANDRIA AND BETHLEHEM; BOROUGHS OF
BLOOMSBURY AND CALIFON; TOWN OF CLINTON; TOWNSHIP
OF CLINTON; TOWNSHIP OF DELAWARE (WEST OF A LINE
FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER
NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF
EAST AMWELL (EAST OF STATE HWY. 31); TOWNSHIP OF
FRANKLIN; BOROUGHS OF FRENCHTOWN, GLEN GARDNER,
HAMPTON AND HIGH BRIDGE; TOWNSHIPS OF HOLLAND AND
KINGWOOD; BOROUGH OF LEBANON; TOWNSHIP OF LEBANON;
BOROUGH OF MILFORD; TOWNSHIP OF RARITAN (EAST OF
STATE HWY. 31 AND NORTH OF COUNTY ROUTE 523);
TOWNSHIPS OF READINGTON, TEWKSBURY AND UNION) (WORK
FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE
RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF
A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR
ADDITIONAL.) WORK WITH, OR THE REMOVAL OF, ASBESTOS
MATERIALS: 112% TIMES THE JOURNEYPERSON RATE........$ 71.97 46.42
----------------------------------------------------------------
ELEC0269-022 01/05/2026
Rates Fringes
ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIP OF DELAWARE
(EAST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE
DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE);
TOWNSHIP OF EAST AMWELL (WEST OF STATE HWY. 31);
BOROUGH OF FLEMINGTON; CITY OF LAMBERTVILLE;
TOWNSHIP OF RARITAN (WEST OF STATE HWY. 31 AND
SOUTH OF COUNTY ROUTE 523); BOROUGH OF STOCKTON;
TOWNSHIP OF WEST AMWELL))...........................$ 63.82 41.99
----------------------------------------------------------------
ENGI0825-021 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS
WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR
ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR,
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE
HOLIDAY.............................................$ 52.88 37.50
POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR
(SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1
CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE
REMOVAL WORK: WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR
ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR,
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE
HOLIDAY.............................................$ 56.59 37.50
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER;
BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN
100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1
CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL;
MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR
(HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE
THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION:
20% PER HOUR ADDITIONAL.)PAID HOLIDAYS: NEW YEAR'S
DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR,
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE
HOLIDAY.............................................$ 58.22 37.50
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER
COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH);
HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT
END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.);
SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
1) THAT THE WORKER WORKS THREE OF THE PRECEDING
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 60.13 37.50
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE,
INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING
MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND
STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE
DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC
DRILL, SELF-POWERED DRILL); ELEVATING GRADER;
EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER);
PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF
LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE)
(HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR
FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE
THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS
MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS
REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION:
20% PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW
YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1)
THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE
WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 61.72 37.50
----------------------------------------------------------------
IRON0011-009 07/01/2025
Rates Fringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER
(HUNTERDON COUNTY (WESTERN HALF OF COUNTY)).........$ 52.24 50.32
IRONWORKER: REINFORCING (HUNTERDON COUNTY (WESTERN
HALF OF COUNTY))....................................$ 49.94 50.32
----------------------------------------------------------------
IRON0399-017 07/01/2024
Rates Fringes
IRONWORKER: REINFORCING (HUNTERDON COUNTY (EASTERN
HALF OF COUNTY))....................................$ 53.24 38.40
IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER
(HUNTERDON COUNTY (EASTERN HALF OF COUNTY)).........$ 54.24 38.40
----------------------------------------------------------------
LABO0077-008 07/01/2012
Rates Fringes
LABORER: MASON TENDER: CEMENT/CONCRETE..............$ 29.35 23.07
----------------------------------------------------------------
LABO0172-009 03/01/2025
Rates Fringes
LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR
LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR
ADDITIONAL. WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER
IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL
PROTECTION: $1.00 PER HOUR ADDITIONAL.) PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT
THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER
WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF
FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS
AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS
OBSERVED............................................$ 51.65 38.53
LABORER: COMMON OR GENERAL LABORER; LANDSCAPE
LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE
REMOVAL WORK: WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER
IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL
PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE,
WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A,
B, OR C PERSONAL PROTECTION: $1.00 PER HOUR
ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
THAT THE WORKER WORKS THREE DAYS FOR THE SAME
EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS
CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE
WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY
FALLS OR IS OBSERVED................................$ 50.95 38.53
----------------------------------------------------------------
PAIN0711-023 05/01/2023
Rates Fringes
PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED
FOR COMMERCIAL NAVIGATION)..........................$ 58.28 33.85
----------------------------------------------------------------
PAIN0711-024 05/01/2017
Rates Fringes
PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON
PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.)......$ 29.05 18.91
PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION)........$ 40.19 22.72
----------------------------------------------------------------
PLUM0009-026 07/01/2025
Rates Fringes
PLUMBER/PIPEFITTER (HUNTERDON COUNTY (SOUTH OF A
LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES
THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST.
THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING
ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT.
12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT.
31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.);
THEN, MAKING A LEFT TURN IN A NORTHEASTERLY
DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK
RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR
OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH
COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A
RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.);
THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609
(MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602
(WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO
RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH
ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT.
607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT.
607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607
(RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.) UNTIL IT REACHES THE
HUNTERDON/MERCER COUNTY LINE))......................$ 59.57 46.45
PLUMBER/PIPEFITTER: SERVICE AND REPAIR (HUNTERDON
COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE
BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING
ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513;
THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN,
CONTINUING ALONG RT. 12 TO RT. 31/202; THEN,
CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL
RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A
NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR
OLD YORK RD.); THEN, CONTINUING ALONG RT. 514
(AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE
INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S
RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT.
609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG
COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES
COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A
RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN,
CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.)
UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO
KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A
LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN
AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING
ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS
HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE
HUNTERDON/MERCER COUNTY LINE))......................$ 46.23 29.23
----------------------------------------------------------------
PLUM0024-019 05/01/2025
Rates Fringes
PLUMBER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN
FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE
RIVER, CONTINUING ALONG BRIDGE ST. THROUGH
FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT.
513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT.
31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT.
514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A
LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514
(AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING
ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO
REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT.
609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO
COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING
SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL
IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.);
THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE
RD.); THEN, CONTINUING SOUTH ALONG RT. 602
(WERTSVILLE RD.) UNTIL IT REACHES RT. 607
(RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT.
607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607
(RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON -
MERCER COUNTY LINE))................................$ 62.09 45.05
----------------------------------------------------------------
PLUM0475-018 05/01/2025
Rates Fringes
PIPEFITTER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN
FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE
RIVER, CONTINUING ALONG BRIDGE ST. THROUGH
FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT.
513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT.
31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT.
514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A
LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514
(AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING
ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO
REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT.
609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO
COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING
SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL
IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.);
THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE
RD.); THEN, CONTINUING SOUTH ALONG RT. 602
(WERTSVILLE RD.) UNTIL IT REACHES RT. 607
(RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT.
607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607
(RILEYVILLE RD., ALSO KNOWN AS HOPEWELL -
WERTSVILLE RD.) UNTIL IT REACHES THE
HUNTERDON/MERCER COUNTY LINE))......................$ 56.34 50.80
----------------------------------------------------------------
TEAM0469-008 05/01/2025
Rates Fringes
TRUCK DRIVER: DUMP TRUCK; FLATBED TRUCK; PICK UP
TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE,
WHERE THE WORKER IS IN DIRECT CONTACT WITH
HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE
EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE
PROTECTION: $3.00 PER HOUR ADDITIONAL.) WORK ON A
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE,
IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR
ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER
HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS
NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C
PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.
(PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,
THANKSGIVING DAY AND CHRISTMAS DAY.) VACATION PAY
CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80
DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION
(48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID
VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID
VACATION (120 HOURS); 15 YEARS SENIORITY AND 145
DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)......$ 48.63 42.66
TRUCK DRIVER: OFF THE ROAD TRUCK
(HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL.
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL
PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK
DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE
OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE
THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL
A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR
ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.) VACATION
PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR
80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID
VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS
PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS
PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND
145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)..$ 48.78 42.66
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
"