Wage determination NV20260073
Heavy construction - Nevada, revision 1, modified 2026-07-30
- NV20260073 (revision 1) is the active federal Davis-Bacon wage determination for Heavy construction in Washoe County, Nevada - last modified , per the U.S. Department of Labor.
- It sets minimum base rates plus fringe benefits for 81 job classifications across 1 rate schedule.
Verify against the official document: this page mirrors WD NV20260073 revision 1 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.
Rate schedules
Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
SANV2025-001 (collectively bargained (union) rate, 10/01/2025)
| Classification | Base rate | Fringes |
|---|---|---|
| Air Balance Technician: Journeyman | $59.85 | 33.51 |
| Boilermaker: Journeyman | $76.62 | 0.00 |
| Bricklayer: Journeyman | $45.94 | 18.44 |
| Carpenter: Journeyman | $43.13 | 25.29 |
| Cement Mason: Journeyman | $43.06 | 13.86 |
| Electrician-Lineman/Groundman/Heavy Equipment Operator: Equipment Specialist | $54.50 | 22.88 |
| Electrician-Lineman/Groundman/Heavy Equipment Operator: Groundman | $41.68 | 22.23 |
| Electrician-Lineman/Groundman/Heavy Equipment Operator: Lineman | $72.26 | 26.05 |
| Electrician-Neon Sign: Journeyman | $64.86 | 0.00 |
| Electrician-Wireman: Cable Splicer | $55.78 | 30.66 |
| Electrician-Wireman: Wireman | $48.50 | 29.99 |
| Fence Erector: Journeyman | $35.70 | 17.58 |
| Flagperson: Journeyman | $33.58 | 17.58 |
| Highway Stripers: Journeyman | $38.20 | 17.58 |
| Hod Carrier-Brick Mason Tender: Journeyman | $35.95 | 17.58 |
| Ironworker: Journeyman | $51.85 | 39.12 |
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 |
| Laborers: Furniture Mover | $31.79 | 17.58 |
| Laborers: Group 1 (All cleanup work of debris, grounds, and building including windows and tile; Dumpmen or Spotter (other than asphalt); Handling and Servicing of Flares, Watchmen | $35.45 | 17.58 |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 |
| Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hand trowels or hand floating; Marking edg | $39.13 | 17.58 |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model T\/\/M-2A, Gardner Denver Model DN143 and similar type drills (in accordance with Memorand | $35.95 | 17.58 |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all powder and explosives of any type, regardless of method used | $36.25 | 17.58 |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking and Highway Striping work includes but is not limited to: All work by any method preformed in connection | $38.20 | 17.58 |
| Laborers: Landscape | $30.29 | 17.58 |
| Lubrication and Service Engineer: Lubrication and Service Engineer (mobile and grease rack) | $43.33 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 1 (Cranes over 100 tons; Derrick over 100 tons; Self-Propelled Boom Type Lifting Devices over 100 tons) | $53.61 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 1 Oiler | $45.48 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 1 Truck Crane Oiler | $47.44 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 2 (Cranes over 45 tons up to and including 100 tons; Derrick, 100 tons and under; Self-Propelled Boom Type Lifting Device, ove | $52.10 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 2 Oiler | $45.27 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 2 Truck Crane Oiler | $47.19 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 3 (Cranes, 45 tons and under; Self-Propelled Boom Type Lifting Device, 45 tons and under) | $50.86 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 3 Hydraulic | $46.64 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 3 Oiler | $45.05 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 3 Truck Crane Oiler | $46.97 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 4 (Chicago Boom; Forklift, 10 tons and over; 59; Heavy Duty Repairman/Welder) | $49.13 | 34.85 |
| Operating Engineers Steel Fabricator & Erector: Group 5 (Boom Cat) | $48.03 | 34.85 |
| Operating Engineers: Group 10 (Boom-Type Backfilling Machine; Bridge Crane; Cary-Lift or similar; Chemical Grouting Machine; Derricks (two (2) Group 10 Operators required when swin | $44.59 | 34.85 |
| Operating Engineers: Group 10A (Backhoe-Hydraulic (up to and including one (1) cu. yd.); Backhoe (up to and including one (1) cu. yd.) (Cable); CMI Dual Lane Auto-Grader SP30 or si | $44.78 | 34.85 |
| Operating Engineers: Group 11 (Automatic Asphalt or Concrete Slip-Form Paver; Automatic Railroad Car Dumper; Canal Trimmer; Cary Lift, Campbell or similar type; Cranes (over twenty | $45.02 | 34.85 |
| Operating Engineers: Group 11A (Band Wagons (in conjunction with Wheel Excavators); Operator of Helicopter (when used in construction work); Loader (over twelve (12) cu. yds.); Mul | $46.66 | 34.85 |
| Operating Engineers: Group 11B (Holland Loader or similar or Loader (over 18 cu. yds.)) | $47.47 | 34.85 |
| Operating Engineers: Group 1A (Oiler (Construction); Partsman) | $41.07 | 34.85 |
| Operating Engineers: Group 2 (Compressor Operator; Material Loader and/or Conveyor Operator (handling building materials); Pump Operator) | $41.60 | 34.85 |
| Operating Engineers: Group 3 (Bobcat or similar loader, 1/4 cu. yd. or less; Concrete Curing Machines (streets, highways, airports, canals); Conveyor Belt Operator (tunnel); Forkli | $41.87 | 34.85 |
| Operating Engineers: Group 4 (Concrete Mixer Operator, Skip type; Dinky Operator; Forklift (20' or over) or Lumber Stacker; Ross Carrier; Skip Loader Operator (under one (1) cu. yd | $42.61 | 34.85 |
| Operating Engineers: Group 5 (Concrete Mixers (over one (1) cu. yd.); Concrete Pumps or Pumpcrete Guns; Elevator and Material Hoist (one (1) drum); Groundman for Asphalt Milling an | $42.92 | 34.85 |
| Operating Engineers: Group 6 (Auger type drilling equipment up to and including 30 ft. depth digging capacity M.R.C.; Boom Truck or Dual-Purpose a-Frame Truck; B.L.H. Lima Road Pac | $43.08 | 34.85 |
| Operating Engineers: Group 7 (Auger type drilling equipment over 30 ft. depth digging capacity M.R.C.; Compressor (over 2); Concrete Conveyor or Concrete Pump, truck or equipment m | $43.33 | 34.85 |
| Operating Engineers: Group 8 (Articulated on-Site Dump Trucks; Asphalt Plant Engineer; Asphalt Milling Machine; Cast-In-Place Pipe-Laying Machine; Combination Slusher and Motor Ope | $43.87 | 34.85 |
| Operating Engineers: Group 9 (Chicago Boom; Combination Backhoe and Loader (up to and including 3/8 cu. yd.); Combination Mixer and Compressor (gunite); Heavy Duty Repairman and/or | $44.24 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 1 (Derrick Barge Pedestal mounted over 100 tons; Clamshells over 7 cu. yds.; Self-Propelled Boom Type Lifting Device, over 100 tons; | $53.08 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 1 Oiler | $45.68 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 1 Truck Crane Oiler | $47.57 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 2 (Derrick Barge Pedestal mounted 45 tons up to and including 100 tons; Clamshells up to and including 7 cu. yds.; Self-Propelled Boo | $45.50 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 2 Truck Crane Oiler | $47.41 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 3 (Derrick Barge Pedestal mounted under 45 tons; Self-Propelled Boom Type Lifting Device 45 tons and under; Skid/Scow Piledriver, any | $50.09 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 3 Oiler | $45.27 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 3 Truck Crane Oiler | $47.19 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 4 (Assistant Operator in lieu of Assistant to Engineer; Forklift, 10 tons and over; Heavy Duty Repairman/Welder) | $48.58 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 6 (Deck Engineer) | $44.19 | 34.85 |
| Operating Engineers-Cranes & Piledriver: Group 8 (Deckhand; Fireman) | $44.44 | 34.85 |
| Piledriver: Certified Welder | $44.63 | 25.29 |
| Piledriver: Diver-Diving (Wet Pay) | $97.98 | 25.29 |
| Piledriver: Journeyman Driverman | $43.63 | 25.29 |
| Piledriver: Stand By Diver | $48.99 | 25.29 |
| Piledriver: Tender | $47.99 | 25.29 |
| Plasterer: Journeyman | $42.19 | 16.43 |
| Plumber/Pipefitter: Journeyman | $53.38 | 27.72 |
| Sheet Metal Worker: Journeyman | $47.51 | 33.14 |
| Tile Setter/Terrazzo Worker/Marble Mason: Terrazzo/Marble Mason - Journeyman | $55.32 | 0.00 |
| Tile Setter/Terrazzo Worker/Marble Mason: Tile Setter - Journeyman | $53.78 | 0.00 |
| Tile Setter/Terrazzo Works/Mable Mason - Finisher | $43.46 | 0.00 |
| Traffic Barrier Erector | $35.45 | 17.58 |
| Truck Driver | $34.68 | 0.00 |
| Well Driller | $35.29 | 0.00 |
Full official text of NV20260073 rev 1
"General Decision Number: NV20260073 07/30/2026
State: Nevada
Construction Types: Heavy
Counties: Nevada Counties of
Washoe
Modification Number Publication Date
0 06/22/2026
1 07/30/2026
SANV2025-001 10/01/2025
Rates Fringes
Air Balance Technician: Journeyman .................$ 59.85 33.51
Boilermaker: Journeyman.............................$ 76.62 0.00
Bricklayer: Journeyman..............................$ 45.94 18.44
Carpenter: Journeyman...............................$ 43.13 25.29
Cement Mason: Journeyman ...........................$ 43.06 13.86
Electrician-Lineman/Groundman/Heavy Equipment
Operator: Equipment Specialist......................$ 54.50 22.88
Electrician-Lineman/Groundman/Heavy Equipment
Operator: Groundman.................................$ 41.68 22.23
Electrician-Lineman/Groundman/Heavy Equipment
Operator: Lineman...................................$ 72.26 26.05
Electrician-Neon Sign: Journeyman...................$ 64.86 0.00
Electrician-Wireman: Cable Splicer..................$ 55.78 30.66
Electrician-Wireman: Wireman........................$ 48.50 29.99
Fence Erector: Journeyman...........................$ 35.70 17.58
Flagperson: Journeyman..............................$ 33.58 17.58
Highway Stripers: Journeyman........................$ 38.20 17.58
Hod Carrier-Brick Mason Tender: Journeyman .........$ 35.95 17.58
Ironworker: Journeyman .............................$ 51.85 39.12
Laborers: (Group 6) Gunmen, Materialmen ............$ 35.25 17.58
Laborers: (Group 6) Nozzleman, Rodmen ..............$ 35.25 17.58
Laborers: (Group 6) Reboundmen .....................$ 35.60 17.58
Laborers: Furniture Mover...........................$ 31.79 17.58
Laborers: Group 1 (All cleanup work of debris,
grounds, and building including windows and tile;
Dumpmen or Spotter (other than asphalt); Handling
and Servicing of Flares, Watchmen; General Laborer;
Guideposts and Highway Signs; Guardrail Erection
and Dismantling; Limber, Brushloader and Piler;
Pavement Marking and Highway Striping; Traffic
Barrier Erector; Tending to portable space heaters;
Profilograph work all types manual, self propelled
or carts; Gabion basket, building, handling,
installation and rigging; Dry set paver work;
Traffic Barrier Erector)............................$ 35.45 17.58
Laborers: Group 1-A (Flagger).......................$ 33.58 17.58
Laborers: Group 2 (Choker setter or Rigger
(clearing work only) Pittsburgh; Chipper and
similar type brush shredders; Concrete worker (wet
or dry) all concrete work not listed in Group 3
included but not limited to: concrete forms
stripping, handling, cleaning, oiling and moving to
the next point of installation.; Crusher or Grizzly
Tender; Greasing Dowels; Guinea Chaser (Stakemen);
Panel Forms (wood or metal) handling, cleaning and
stripping of Loading and unloading, (Carrying and
handling of all rods and material for use in
reinforcing concrete; Railroad Trackmen
(maintenance, repair or builders); Sloper;
Semi-Skilled Wrecker (salvaging of building
materials other than those listed in Group 3);
Waterproofing work; Epoxy rebar/dowels and
anchoring dowel baskets; Placement pouring of
concrete including any epoxy resin or similar
materials, rodding, spreading and tamping concrete,
brooming or brushing, hand application of curing
compounds, applying topping (wet or dry) colors or
grits, and exposed finishes for architectural work;
Concrete patching, dry packing, chipping, stoning,
and grouting; Concrete cold weather/rain protection
and curing; Placement /anchoring of all earth
stabilization/filters fabrics; Mechanically
stabilized Earth (MSE) and Keystone type retaining
walls rigging, placing, aligning, backfilling and
installation of dead men and any stabilization
components).........................................$ 35.55 17.58
Laborers: Group 3 (Asphalt Workers (Ironers,
Shovelers, Cutting Machine); Buggymobile; Chainsaw,
Faller, Logloader and Bucker; Compactor (all
types); Concrete Mixer under 1/2 yard; Concrete Pan
Work (Breadpan type), handling, cleaning\stripping;
Concrete Saw, Chipping, Grinding, Sanding,
Vibrator; Cribbing, Shoring, Lagging, Trench
Jacking, Hand-Guided Lagging Hammer; Curbing or
Divider machine; Curb Setter (precast or cut);
Ditching Machine (hand-guided); Drillers Helper,
Chuck Tender; Fence erector including safety, chain
link, turtle, field and barbe wire fencing; Form
Raiser, Slip Forms; Grouting of Concrete Walls,
Windows and Door Jams; Headerboardmen; Jackhammer,
Pavement Breaker, Air Spade; Mastic Worker (wet or
dry); Pipewrapper, Kettlemen, Potmen, and men
applying asphalt, creosote and similar type
materials; All Power Tools (air, gas, or electric),
Post Driver; Riprap-Stonepaver and RockSlinger,
including placing of sack concrete wet or dry
Rototiller; Rigging and Signaling in connection
with Laborers' work; Sandblaster, Potmen, Gunmen or
Nozzlemen water blasting not covered in group 6;
Vibra-screed; All demolition and wrecking work
including but not limited to any torch work
cutting, burning, plasma are, dust control, and
salvaging (removing and salvaging of all materials,
windows, doors, plumbing, and electrical fixtures)
and use of customary tools and equipment for
demolition and wrecking; All underpinning
foundation work, digging and underpinning pits,
removal of debris with tuggers or other methods,
cutting, handling and installing all shoring boards
and lagging boards used for underpinning and
foundation work, placement and tying of steel
reinforcing for underpinning piers, all tiebacks
and soil nail work drilling and grouting, all
soldier beam work and us of customary tools and
equipment for underpinning foundation work).........$ 35.70 17.58
Laborers: Group 3A (Concrete Specialist; Setting
screeds; Screed pins; Curb forms and curb and
gutter forms; Using Darby and push floats; Hand
trowels or hand floating; Marking edging; Using
base cove or step tools; Spreading and finishing
gypsum; Concrete grinding machines (the terms do
not include Rotomill machines for highway overlay
grinding); Troweling machines; Floating machines;
Finishing of epoxy or resin materials; Operation of
skill saw; Laser Screed; Laser Level; Curb and
Slipform machines; Stamps or other means or
texturing; Any new devices which are beneficial to
the construction of or with concrete or related
products.)..........................................$ 39.13 17.58
Laborers: Group 4 (Burning and Welding in
connection with Laborers' work; Joy Drill Model
T\/\/M-2A, Gardner Denver Model DN143 and similar
type drills (in accordance with Memorandum of
Understanding between Laborers and Operating
Engineers dated at Miami, Florida, Feb. 3, 1954)
and Track Drillers, Diamond Core Drillers, Wagon
Drillers, Mechanical Drillers on Multiple Units;
High scalers including but not limited to laying,
anchoring, pinning, cabling and stretching of any
rock fall netting, mesh or wire fabric and use of
customary tools and equipment for high scaling;
Concrete pump operator; Heavy Duty Vibrator with
Stinger 5"" diameter or over; Pipelayer, Caulker and
Bander; Pipelayer-waterline, Sewerline, Gasoline,
Conduit and all other types of composition for any
purpose buried under ground outside of building
including, stringing, trench shoring, backfilling
sanding, caution taping, all walk behind equipment
and spotting; Laborer work in connection with micro
tunneling, directional drilling and pipe-jacking;
Cathodic protection, grounding for pipe work;
Cleaning of Utility Lines; Slip Lining of Utility
Lines (including operation of Equipment); TV
Monitoring and Grouting of Utility Lines; Asphalt
Rakers and Asphalt dump Man; All mechanical and
pressurized pipe work, including the installation
of pipe above and below ground, cathodic
protection, bolt up, and support installation in
connection to water conveyance).....................$ 35.95 17.58
Laborers: Group 5 (Construction Specialists;
Blasters and Powdermen, all work of loading,
placing, and blasting of all powder and explosives
of any type, regardless of method used for such
loading and placing; Asbestos removal; Lead
abatement; Hazardous waste; Material removal).......$ 36.25 17.58
Laborers: Group 5A (Pavement Marking and Highway
Striping; Pavement Marking and Highway Striping
work includes but is not limited to: All work by
any method preformed in connection with the
permanent or temporary application and installation
of pavement marking of any kind, brand, type or
style on parking lots, airfields, highways, streets
and other such surfaces and all work performed in
connection with removal of pavement.)...............$ 38.20 17.58
Laborers: Landscape.................................$ 30.29 17.58
Lubrication and Service Engineer: Lubrication and
Service Engineer (mobile and grease rack)...........$ 43.33 34.85
Operating Engineers Steel Fabricator & Erector:
Group 1 (Cranes over 100 tons; Derrick over 100
tons; Self-Propelled Boom Type Lifting Devices over
100 tons)...........................................$ 53.61 34.85
Operating Engineers Steel Fabricator & Erector:
Group 1 Oiler.......................................$ 45.48 34.85
Operating Engineers Steel Fabricator & Erector:
Group 1 Truck Crane Oiler...........................$ 47.44 34.85
Operating Engineers Steel Fabricator & Erector:
Group 2 (Cranes over 45 tons up to and including
100 tons; Derrick, 100 tons and under;
Self-Propelled Boom Type Lifting Device, over 45
tons; Tower Crane)..................................$ 52.10 34.85
Operating Engineers Steel Fabricator & Erector:
Group 2 Oiler.......................................$ 45.27 34.85
Operating Engineers Steel Fabricator & Erector:
Group 2 Truck Crane Oiler...........................$ 47.19 34.85
Operating Engineers Steel Fabricator & Erector:
Group 3 (Cranes, 45 tons and under; Self-Propelled
Boom Type Lifting Device, 45 tons and under)........$ 50.86 34.85
Operating Engineers Steel Fabricator & Erector:
Group 3 Hydraulic...................................$ 46.64 34.85
Operating Engineers Steel Fabricator & Erector:
Group 3 Oiler.......................................$ 45.05 34.85
Operating Engineers Steel Fabricator & Erector:
Group 3 Truck Crane Oiler...........................$ 46.97 34.85
Operating Engineers Steel Fabricator & Erector:
Group 4 (Chicago Boom; Forklift, 10 tons and over;
59; Heavy Duty Repairman/Welder)....................$ 49.13 34.85
Operating Engineers Steel Fabricator & Erector:
Group 5 (Boom Cat)..................................$ 48.03 34.85
Operating Engineers: Group 10 (Boom-Type
Backfilling Machine; Bridge Crane; Cary-Lift or
similar; Chemical Grouting Machine; Derricks (two
(2) Group 10 Operators required when swing engine
remote from hoist); Derrick Barges (except
excavation work); Euclid Loader and similar types;
Heavy Duty Repairman; Heavy Duty Rotary Drill Rigs;
Lift-Slab (Vagtborg and similar types); Loader
(over two and one-half (2 1/2 cu. yds. up to and
including four (4) cu. yds.); Locomotive (over one
hundred (100) tons, single or multiple units);
Multiple-Engine Earthmoving Machines (Euclid
Dozers, etc.); Pre-Stress Wire Wrapping Machine;
Rubber-Tired Scraper, Self-Loading; Single-Engine
Scraper (over thirty-five (35) cu. yds.); Shuttle
Car (Reclaim Station); Train Loading Station;
Trenching Machine multi-engine with sloping
attachments (Jefco or similar); Vacuum Cooling
Plant; Whirley Crane (up to and including
twenty-five (25) tons)).............................$ 44.59 34.85
Operating Engineers: Group 10A (Backhoe-Hydraulic
(up to and including one (1) cu. yd.); Backhoe (up
to and including one (1) cu. yd.) (Cable); CMI Dual
Lane Auto-Grader SP30 or similar type; Cranes (not
over twenty-five (25) tons) (hammerhead and
gantry); Finish Blade; Gradalls (up to and
including one (1) cu. yd.); Motor Patrol Operator;
Power Shovels, Clamshells, Draglines, Cranes (up to
and including one (1) cu. yd.); Rubber-Tired
Scraper, Self-Loading (twin engine); Self-Propelled
Boom-Type Lifting Device, center mount (over 10
tons up to and including 25 tons))..................$ 44.78 34.85
Operating Engineers: Group 11 (Automatic Asphalt or
Concrete Slip-Form Paver; Automatic Railroad Car
Dumper; Canal Trimmer; Cary Lift, Campbell or
similar type; Cranes (over twenty-five (25) tons);
Euclid Loader when controlled from the Pullcat;
Finish Blade; Gradesetter, Grade Checker; Highline
Cableway Operator; Loader (over four (4) cu. yds.
up to and including twelve (12) cu. yds.);
Multi-Engine Earthmoving Equipment (up to and
including seventy-five (75) cu. yds. struck
m.r.c.); Multi-Engine Scrapers (when used to Push
Pull; Power Shovels, Clamshells, Draglines,
Backhoes Gradalls (over one (1) cu. yd. and up to
and including seven (7) cu. yds. m.r.c.);
Self-Propelled Boom-Type Lifting Device (center
mount) (over 25 tons m.r.c.); Self-Propelled
Compactor (with multiple-propulsion power units);
Single-Engine Rubber-Tired Earthmoving Machine,
with Tandem Scraper; Slip-Form Paver (concrete or
asphalt); Tandem Cats and Scraper; Tower Crane
Mobile (including Rail Mount); Truck Mounted
Hydraulic Crane when remote control equipped (over
10 tons up to and including 25 tons); Universal
Liebher and Tower Cranes (and similar types); Wheel
Excavator (up to and including seven hundred fifty
(750) cu. yds. per hour); Whirley Cranes (over
twenty-five (25) tons)).............................$ 45.02 34.85
Operating Engineers: Group 11A (Band Wagons (in
conjunction with Wheel Excavators); Operator of
Helicopter (when used in construction work); Loader
(over twelve (12) cu. yds.); Multi-Engine
Earthmoving Equipment (over seventy-five (75) cu.
yds. ""struck"" m.r.c.); Power Shovels. Clamshells,
Draglines, Backhoes, and Gradalls (over seven 7 cu.
yds. m.r.c.); Remote-Controlled Earth Moving
Equipment; Wheel Excavator (over seven hundred
fifty (750) cu. yds. per hour)).....................$ 46.66 34.85
Operating Engineers: Group 11B (Holland Loader or
similar or Loader (over 18 cu. yds.))...............$ 47.47 34.85
Operating Engineers: Group 1A (Oiler
(Construction); Partsman)...........................$ 41.07 34.85
Operating Engineers: Group 2 (Compressor Operator;
Material Loader and/or Conveyor Operator (handling
building materials); Pump Operator).................$ 41.60 34.85
Operating Engineers: Group 3 (Bobcat or similar
loader, 1/4 cu. yd. or less; Concrete Curing
Machines (streets, highways, airports, canals);
Conveyor Belt Operator (tunnel); Forklift (under
20); Engineer Generating Plant (500 K.W.); Mixer
Box Operator (concrete plant); Motorman;
Rodman/Chainman; Rotomist Operator; Oiler (truck
crane)).............................................$ 41.87 34.85
Operating Engineers: Group 4 (Concrete Mixer
Operator, Skip type; Dinky Operator; Forklift (20'
or over) or Lumber Stacker; Ross Carrier; Skip
Loader Operator (under one (1) cu. yd.); Tie
Spacer).............................................$ 42.61 34.85
Operating Engineers: Group 5 (Concrete Mixers (over
one (1) cu. yd.); Concrete Pumps or Pumpcrete Guns;
Elevator and Material Hoist (one (1) drum);
Groundman for Asphalt Milling and similar)..........$ 42.92 34.85
Operating Engineers: Group 6 (Auger type drilling
equipment up to and including 30 ft. depth digging
capacity M.R.C.; Boom Truck or Dual-Purpose a-Frame
Truck; B.L.H. Lima Road Pactor or similar; Chip Box
Spreader (Flaherty type or similar); Concrete Batch
Plant (wet or dry); Concrete Saws (highways,
streets, airports, canals); Locomotives (over
thirty (30) tons); Maginnis International Full Slab
Vibrator (airports, highways, canals and
warehouses); Mechanical Finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar
types); Mechanical Burn, Curb and/or Curb and
Gutter Machine (concrete or asphalt); Pavement
Breaker, Truck Mounted, with compressor
combination; Pavement Breaker or Tamper (with or
without compressor combination); Power Jumbo
Operator (setting slip-forms, etc., in tunnels);
Roller Operator (except asphalt); Self-Propelled
Tape Machine; Self-Propelled Compactor (single
engine); Self-Propelled Power Sweeper Operator;
Slip-Form Pump (power-driven by hydraulic,
electric, air, gas, etc. lifting device for
concrete forms); Small Rubber-Tired Tractors;
Snooper Crane, Paxton-Mitchell or similar;
Stationary Pipe Wrapping, Cleaning and Bending
Machine Operator)...................................$ 43.08 34.85
Operating Engineers: Group 7 (Auger type drilling
equipment over 30 ft. depth digging capacity
M.R.C.; Compressor (over 2); Concrete Conveyor or
Concrete Pump, truck or equipment mounted (any
assistance required shall be performed by an
Assistant to Engineer) Boom length to apply;
Concrete Conveyor, Building Site; Drilling and
Boring Machine, vertical and horizontal (not to
apply to waterliners, wagon drills or jack
hammers); Crusher Plant Engineer; Generators;
Kolman Loader; Material Hoist (two (2) or more
drums); Mine or Shaft Hoist; Pipe Bending Machines
(pipeline only); Pipe Cleaning Machines
(tractor-propelled and supported); Pipe Wrapping
Machines (tractor-propelled and supported);
Portable Crushing and Screening Plants; Post
Driller And/or Driver; Pumps (over 2); Screedman
(except asphaltic or concrete paving);
Self-Propelled Boom-Type Lifting Device (center
mount) (on ten (10) ton capacity or less); Slusher
Operator; Soil Tester (Certified); Soils and
Materials Tester; Surface Heater and Planer
Operator; Trenching Machine (maximum digging
capacity three (3) ft. depth) (Any assistance in
the operation, if needed, shall be performed by an
Assistant to Engineer); Truck-Type Loader; Welding
Machines (gasoline or diesel))......................$ 43.33 34.85
Operating Engineers: Group 8 (Articulated on-Site
Dump Trucks; Asphalt Plant Engineer; Asphalt
Milling Machine; Cast-In-Place Pipe-Laying Machine;
Combination Slusher and Motor Operator; Concrete
Batch Plant (multiple units); Dozer Operator; Drill
Doctor; Elevating Grader Operator; Stiff Frame Off
Road Haul Trucks; Grooving and Grinding Machine
(highways); Ken Seal Operator; Marination Plant;
Loader (up to and including two and one-half (2
1/2) cu. yds); Mechanical Finishers or Spreader
Machine (asphalt, Barber-Greene or similar);
Shuttle Buggy; Mechanical Trench Shield;
Mixermobile; Push Cats; Road Oil Mixing Machine
Operator Wood-Mixer (and other similar Pugmill
equipment); Roller Operator (asphalt); Rubber-Tired
Earthmoving Equipment (up to and including
thirty-five (35) cu. yds. ""struck"" M.R.C., Euclids,
T-Pulls, DW10, 20, 21 and similar); Water Pull;
Screedman (Barber-Greene and similar) (asphaltic or
concrete paving); Self-Propelled Compactors with
Dozer; Hyster 450, Cat 825 or similar; Sheepfoot;
Small Tractor (with boom); Soil Stabilizer (P & H
or equal); Timber Skidder (rubber-tired) or similar
equipment; Track Loader; Tractor-Drawn Scraper;
Tractor Operator; Tractor-Mounted Compressor Drill
Combination; Trenching Machine Operator (over three
(3) feet depth); Tri-Batch Paver; Tunnel Badger or
Tunnel Boring Machine Operator; Tunnel Mole Boring
Machine; Vermeer T-600b Rock Cutter; Vacuum Truck
(excludes trailer mounted vacuums)).................$ 43.87 34.85
Operating Engineers: Group 9 (Chicago Boom;
Combination Backhoe and Loader (up to and including
3/8 cu. yd.); Combination Mixer and Compressor
(gunite); Heavy Duty Repairman and/or Welder; Lull
Hi-Lift (twenty (20) feet or over); Mucking
Machine; Sub-Grader (Gurries or other types);
Tractor (with Boom) (06 or larger);
Track-Laying-Type Earthmoving Machine (single
engine with tandem scrapers)).......................$ 44.24 34.85
Operating Engineers-Cranes & Piledriver: Group 1
(Derrick Barge Pedestal mounted over 100 tons;
Clamshells over 7 cu. yds.; Self-Propelled Boom
Type Lifting Device, over 100 tons; Truck Crane or
Crawler, land or barge mounted over 100 tons).......$ 53.08 34.85
Operating Engineers-Cranes & Piledriver: Group 1
Oiler...............................................$ 45.68 34.85
Operating Engineers-Cranes & Piledriver: Group 1
Truck Crane Oiler...................................$ 47.57 34.85
Operating Engineers-Cranes & Piledriver: Group 2
(Derrick Barge Pedestal mounted 45 tons up to and
including 100 tons; Clamshells up to and including
7 cu. yds.; Self-Propelled Boom Type Lifting Device
over 45 tons; Truck Crane or Crawler, land or barge
mounted, over 45 tons up to and including 100 tons).$ 51.54 34.85
Operating Engineers-Cranes & Piledriver: Group 2
Oiler...............................................$ 45.50 34.85
Operating Engineers-Cranes & Piledriver: Group 2
Truck Crane Oiler...................................$ 47.41 34.85
Operating Engineers-Cranes & Piledriver: Group 3
(Derrick Barge Pedestal mounted under 45 tons;
Self-Propelled Boom Type Lifting Device 45 tons and
under; Skid/Scow Piledriver, any tonnage; Truck
Crane or Crawler, land or barge mounted 45 tons and
under)..............................................$ 50.09 34.85
Operating Engineers-Cranes & Piledriver: Group 3
Oiler...............................................$ 45.27 34.85
Operating Engineers-Cranes & Piledriver: Group 3
Truck Crane Oiler...................................$ 47.19 34.85
Operating Engineers-Cranes & Piledriver: Group 4
(Assistant Operator in lieu of Assistant to
Engineer; Forklift, 10 tons and over; Heavy Duty
Repairman/Welder)...................................$ 48.58 34.85
Operating Engineers-Cranes & Piledriver: Group 6
(Deck Engineer).....................................$ 44.19 34.85
Operating Engineers-Cranes & Piledriver: Group 8
(Deckhand; Fireman).................................$ 44.44 34.85
Piledriver: Certified Welder........................$ 44.63 25.29
Piledriver: Diver-Diving (Wet Pay)..................$ 97.98 25.29
Piledriver: Journeyman Driverman....................$ 43.63 25.29
Piledriver: Stand By Diver..........................$ 48.99 25.29
Piledriver: Tender..................................$ 47.99 25.29
Plasterer: Journeyman ..............................$ 42.19 16.43
Plumber/Pipefitter: Journeyman .....................$ 53.38 27.72
Sheet Metal Worker: Journeyman .....................$ 47.51 33.14
Tile Setter/Terrazzo Worker/Marble Mason:
Terrazzo/Marble Mason - Journeyman..................$ 55.32 0.00
Tile Setter/Terrazzo Worker/Marble Mason: Tile
Setter - Journeyman.................................$ 53.78 0.00
Tile Setter/Terrazzo Works/Mable Mason - Finisher...$ 43.46 0.00
Traffic Barrier Erector.............................$ 35.45 17.58
Truck Driver........................................$ 34.68 0.00
Well Driller........................................$ 35.29 0.00
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
"
All Nevada determinations: county index · Nevada prevailing wage · compute pay with the calculator.