Prevailing Wage Index
HomePrevailing wage by stateRhode IslandDeterminations › RI20260001

Wage determination RI20260001

Building, Heavy, Highway construction - Rhode Island, revision 4, modified 2026-07-30

Verify against the official document: this page mirrors WD RI20260001 revision 4 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0006-006 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS O$49.9136.63

ASBE0006-008 (collectively bargained (union) rate, 09/01/2024)

ClassificationBase rateFringes
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$49.9136.63

BOIL0029-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$50.6228.82

BRRI0003-001 (collectively bargained (union) rate, 06/01/2022)

ClassificationBase rateFringes
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER$46.8629.14

BRRI0003-002 (collectively bargained (union) rate, 09/01/2022)

ClassificationBase rateFringes
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER$46.5430.34

BRRI0003-003 (collectively bargained (union) rate, 09/01/2022)

ClassificationBase rateFringes
MARBLE, TILE & TERRAZZO FINISHER$38.7829.61

CARP0330-001 (collectively bargained (union) rate, 06/02/2025)

ClassificationBase rateFringes
DIVER (WHEN NOT DIVING OR TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHE$60.8330.50
DIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER R$48.6830.50
CARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: $.50 $47.8830.50
PILEDRIVER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK $41.5329.35
WELDER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON E$48.6830.50

CARP1121-002 (collectively bargained (union) rate, 04/21/2025)

ClassificationBase rateFringes
MILLWRIGHT$45.7231.50

ELEC0099-002 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNEL$56.1124.74
TELEDATA SYSTEM INSTALLER (WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL. $42.0919.71

ELEV0039-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC (ADDTIONAL FRINGE TO BE PAID A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSG$64.5238.44

ENGI0057-001 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$51.3029.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$49.3029.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$44.9229.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$42.0729.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$48.3529.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$39.1529.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$33.1529.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$45.0029.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON$48.9229.95

ENGI0057-003 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $50.5729.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: +$48.3529.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4: FIREMAN & OILER ON CRANES. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. A$44.3529.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AN$41.5029.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6: BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS $47.6529.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7: WELL POINT INSTALLATION CREW. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT$47.2229.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMP$44.5429.95

ENGI0057-005 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA$46.4529.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA$44.4529.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA$39.1529.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA$25.7529.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA$33.1529.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA$39.7329.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA$43.4329.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA$38.7029.95

IRON0037-001 (collectively bargained (union) rate, 09/16/2025)

ClassificationBase rateFringes
IRONWORKER$43.0333.53

LABO0271-001 (collectively bargained (union) rate, 12/03/2023)

ClassificationBase rateFringes
LABORER (BUILDING CONSTRUCTION): GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Syst$37.0026.90
LABORER (BUILDING CONSTRUCTION): GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for R$37.0026.90
LABORER (BUILDING CONSTRUCTION): GROUP 3: Pre-Cast Floor & Roof Plank Erectors$37.0026.90
LABORER (BUILDING CONSTRUCTION): GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster$37.0026.90
LABORER (BUILDING CONSTRUCTION): GROUP 5: Toxic Waste Remover$39.0026.90

LABO0271-002 (collectively bargained (union) rate, 11/27/2022)

ClassificationBase rateFringes
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 1:Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tend$55.4024.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 2: Change house attendant, powder watchperson, top person on iron$52.9324.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 3: Hazardous waste work within the ""HOT"" zone$42.4524.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside,$46.0024.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 2: Change house attendant, powder watchperson $ 45.00 24.15 LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 3: H$33.0524.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operato$35.7524.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson an$36.5024.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 4: Flagger & signaler$29.0024.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5: Toxic waste remover$33.0524.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW: BOTTOM MAN$41.5024.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW: TOP MAN & LABORER$35.6024.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST BORING: DRILLER$41.9524.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST BORING: LABORER$41.9524.15

PAIN0011-005 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
PAINTER (BRUSH AND ROLLER)$39.5726.60
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL)$41.5726.60
PAINTER (SPRAY, SAND & WATER BLASTING)$42.5726.60
PAINTER (TAPER)$38.8225.80
PAINTER (WALL COVERER)$38.5725.80

PAIN0011-006 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
GLAZIER (SWING STAGE: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: LABOR DAY & CHRISTMAS DAY.)$41.6326.15

PAIN0011-011 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
PAINTER (BRIDGE WORK)$57.8526.40

PAIN0035-008 (collectively bargained (union) rate, 06/01/2011)

ClassificationBase rateFringes
SIGN PAINTER$24.7913.72

PLAS0040-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION) (CEMENT MASON: WORK ON FREE SWINGING SCAFFOLDS UNDER 3 PLANKS WIDTH AND WHICH IS 20 OR MORE FEET ABOVE GROUND AND ANY OFFSET $44.7529.10

PLAS0040-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION)$40.4525.30

PLAS0040-003 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
PLASTERER$45.5229.43

PLUM0051-002 (collectively bargained (union) rate, 08/25/2025)

ClassificationBase rateFringes
PLUMBERS AND PIPEFITTERS$54.3434.50

ROOF0033-004 (collectively bargained (union) rate, 12/01/2025)

ClassificationBase rateFringes
ROOFER$47.4931.44

SFRI0669-001 (collectively bargained (union) rate, 04/01/2025)

ClassificationBase rateFringes
SPRINKLER FITTER$53.7633.44

SHEE0017-002 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER$44.4241.94

TEAM0251-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1: PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, IN$31.8634.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2: TWO-AXLE ON LOW BEDS (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,$32.0134.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3: TWO-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, $32.0634.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4: THREE-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY$32.1134.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5: FOUR- AND FIVE-AXLE EQUIPMENT. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $32.2134.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6: LOW-BED OR BOOM TRAILER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR $32.6134.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7: TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING 2 TRAILERS). (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, ME$32.8134.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 8: SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35 TONS.(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, IND$32.3134.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 9: SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR OVER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, $32.5634.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10: TRACTOR TRAILER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, TH$32.3634.51
Full official text of RI20260001 rev 4
"General Decision Number: RI20260001 07/30/2026


State: Rhode Island


Construction Types: Building, Heavy and Highway


Counties: Rhode Island Counties of 
Bristol, Kent, Newport, Providence and 
Washington




Includes Marine Construction Projects


Modification Number     Publication Date
          2                01/30/2026
          3                05/18/2026
          4                07/30/2026


 ASBE0006-006 09/01/2024
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, 
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, 
BAGGING & DISPOSING OF ALL INSULATION MATERIALS, 
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM 
MECHANICAL SYSTEMS).................................$ 49.91                  36.63
----------------------------------------------------------------

 ASBE0006-008 09/01/2024
                                                     Rates                  Fringes
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF 
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, 
COATINGS & FINISHES TO ALL TYPES OF MECHANICAL 
SYSTEMS)............................................$ 49.91                  36.63
----------------------------------------------------------------

 BOIL0029-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 50.62                  28.82
----------------------------------------------------------------

 BRRI0003-001 06/01/2022
                                                     Rates                  Fringes
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86                  29.14
----------------------------------------------------------------

 BRRI0003-002 09/01/2022
                                                     Rates                  Fringes
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54                  30.34
----------------------------------------------------------------

 BRRI0003-003 09/01/2022
                                                     Rates                  Fringes
MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78                  29.61
----------------------------------------------------------------

 CARP0330-001 06/02/2025
                                                     Rates                  Fringes
DIVER (WHEN NOT DIVING OR TENDING THE DIVER, THE 
DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER 
RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR 
ABOVE THE PILE DRIVER RATE WHEN TENDING THE DIVER.) 
 ...................................................$ 60.83                  30.50
DIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER, 
THE DIVER AND DIVER TENDER SHALL RECEIVE THE 
PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00 
PER HOUR ABOVE THE PILE DRIVER RATE WHEN TENDING 
THE DIVER.)   ......................................$ 48.68                  30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON 
FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC 
UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35 
FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR 
ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL 
GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION 
OR ON SETBACK: $.50 PER HOUR ADDITIONAL.)...........$ 47.88                  30.50
PILEDRIVER (WORK ON FREE-STANDING STACKS, CONCRETE 
SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, 
WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: 
$.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE 
SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND 
ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL. 
THE DESIGNATED PILEDRIVER, KNOWN AS THE ""MONKEY"": 
$1.00 PER HOUR ADDITIONAL...........................$ 41.53                  29.35
WELDER (WORK ON FREE-STANDING STACKS, CONCRETE 
SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, 
WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: 
$.50 PER HOUR ADDITIONAL.  WORK ON EXTERIOR 
CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR MORE 
ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER HOUR 
ADDITIONAL.) .......................................$ 48.68                  30.50
----------------------------------------------------------------

 CARP1121-002 04/21/2025
                                                     Rates                  Fringes
MILLWRIGHT..........................................$ 45.72                  31.50
----------------------------------------------------------------

 ELEC0099-002 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN  (WORK OF A HAZARDOUS NATURE, OR WHERE 
THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, 
EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER 
HOUR ADDITIONAL. WORK IN TUNNELS BELOW GROUND LEVEL 
IN COMBINED SEWER OUTFALL: 20% PER HOUR 
ADDITIONAL.)........................................$ 56.11                  24.74
TELEDATA SYSTEM INSTALLER (WORK OF A HAZARDOUS 
NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE 
FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED 
LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS 
BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20% 
PER HOUR ADDITIONAL.)...............................$ 42.09                  19.71
----------------------------------------------------------------

 ELEV0039-001 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC  (ADDTIONAL FRINGE TO BE PAID A. 
PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% 
BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF 
6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF 
SERVICE AS VACATION PAY CREDIT.)....................$ 64.52                  38.44
----------------------------------------------------------------

 ENGI0057-001 12/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND 
DERRICKS. (BOOM LENGTHS, INCLUDING JIBS:  150 FEET 
AND OVER + $ 2.00;  180 FEET AND OVER + $ 3.00;  
210 FEET AND OVER + $ 4.00;  240 FEET AND OVER + $ 
5.00;  270 FEET AND OVER + $ 7.00;  300 FEET AND 
OVER + $ 8.00;  350 FEET AND OVER + $ 9.00;  400 
FEET AND OVER + $10.00);  (PAID HOLIDAYS:  NEW 
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY 
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, 
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY 
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A 
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)  
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.  
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 51.30                  29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 2: DIGGING MACHINE, ROSS CARRIER, 
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, 
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, 
GRADERS, FRONT END LOADER (3 YDS. AND OVER), 
VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, 
FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL 
BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE 
PLANTS.  (BOOM LENGTHS, INCLUDING JIBS:  150 FEET 
AND OVER + $ 2.00;  180 FEET AND OVER + $ 3.00;  
210 FEET AND OVER + $ 4.00;  240 FEET AND OVER + $ 
5.00;  270 FEET AND OVER + $ 7.00;  300 FEET AND 
OVER + $ 8.00;  350 FEET AND OVER + $ 9.00;  400 
FEET AND OVER + $10.00);  (PAID HOLIDAYS:  NEW 
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY 
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, 
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY 
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A 
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)  
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.  
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 49.30                  29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 3: OILERS ON CRANES. (BOOM LENGTHS, 
INCLUDING JIBS:  150 FEET AND OVER + $ 2.00;  180 
FEET AND OVER + $ 3.00;  210 FEET AND OVER + $ 
4.00;  240 FEET AND OVER + $ 5.00;  270 FEET AND 
OVER + $ 7.00;  300 FEET AND OVER + $ 8.00;  350 
FEET AND OVER + $ 9.00;  400 FEET AND OVER + 
$10.00);  (PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO 
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS 
SHALL BE PAID FOR THE HOLIDAY.)  (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL.  TUNNEL/SHAFT WORK: 
$5.00 PER HOUR ADDITIONAL.).........................$ 44.92                  29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 4: OILER ON CRAWLER BACKHOE. (BOOM 
LENGTHS, INCLUDING JIBS:  150 FEET AND OVER + $ 
2.00;  180 FEET AND OVER + $ 3.00;  210 FEET AND 
OVER + $ 4.00;  240 FEET AND OVER + $ 5.00;  270 
FEET AND OVER + $ 7.00;  300 FEET AND OVER + $ 
8.00;  350 FEET AND OVER + $ 9.00;  400 FEET AND 
OVER + $10.00);  (PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO 
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS 
SHALL BE PAID FOR THE HOLIDAY.)  (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL.  TUNNEL/SHAFT WORK: 
$5.00 PER HOUR ADDITIONAL.)                      ...$ 42.07                  29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 5: BULLDOZER, BOBCATS, SKID STEER 
LOADER, TRACTOR, SCRAPER, COMBINATION LOADER 
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 
YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. 
CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). (BOOM 
LENGTHS, INCLUDING JIBS:  150 FEET AND OVER + 
$2.00;  180 FEET AND OVER + $ 3.00;  210 FEET AND 
OVER + $ 4.00;  240 FEET AND OVER + $ 5.00;  270 
FEET AND OVER + $ 7.00;  300 FEET AND OVER + $ 
8.00;  350 FEET AND OVER + $ 9.00;  400 FEET AND 
OVER + $10.00);  (PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO 
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS 
SHALL BE PAID FOR THE HOLIDAY.)  (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL.  TUNNEL/SHAFT WORK: 
$5.00 PER HOUR ADDITIONAL.).........................$ 48.35                  29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 6: WELL-POINT INSTALLATION CREW. (BOOM 
LENGTHS, INCLUDING JIBS:  150 FEET AND OVER + $ 
2.00;  180 FEET AND OVER + $ 3.00;  210 FEET AND 
OVER + $ 4.00;  240 FEET AND OVER + $ 5.00;  270 
FEET AND OVER + $ 7.00;  300 FEET AND OVER + $ 
8.00;  350 FEET AND OVER + $ 9.00;  400 FEET AND 
OVER + $10.00);  (PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO 
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS 
SHALL BE PAID FOR THE HOLIDAY.)  (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL.  TUNNEL/SHAFT WORK: 
$5.00 PER HOUR ADDITIONAL.).........................$ 39.15                  29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 7: UTILITY ENGINEERS AND SIGNAL 
PERSONS. (BOOM LENGTHS, INCLUDING JIBS:  150 FEET 
AND OVER + $ 2.00;  180 FEET AND OVER + $ 3.00;  
210 FEET AND OVER + $ 4.00;  240 FEET AND OVER + $ 
5.00;  270 FEET AND OVER + $ 7.00;  300 FEET AND 
OVER + $ 8.00;  350 FEET AND OVER + $ 9.00;  400 
FEET AND OVER + $10.00);  (PAID HOLIDAYS:  NEW 
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY 
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, 
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY 
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A 
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)  
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.  
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 33.15                  29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 8: HEATER, CONCRETE MIXER, STONE 
CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT 
PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR 
COMPRESSOR. (BOOM LENGTHS, INCLUDING JIBS:  150 
FEET AND OVER + $ 2.00;  180 FEET AND OVER + $ 
3.00;  210 FEET AND OVER + $ 4.00;  240 FEET AND 
OVER + $ 5.00;  270 FEET AND OVER + $ 7.00;  300 
FEET AND OVER + $ 8.00;  350 FEET AND OVER + $ 
9.00;  400 FEET AND OVER + $10.00);  (PAID 
HOLIDAYS:  NEW YEAR'S DAY, PRESIDENT'S DAY, 
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, 
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, 
CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE 
WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE 
HOLIDAY.)  (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. 
 TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.).....$ 45.00                  29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER 
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, 
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, 
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION 
WORK: GROUP 9: BOAT & TUG OPERATOR. (BOOM LENGTHS, 
INCLUDING JIBS:  150 FEET AND OVER + $ 2.00;  180 
FEET AND OVER + $ 3.00;  210 FEET AND OVER + $ 
4.00;  240 FEET AND OVER + $ 5.00;  270 FEET AND 
OVER + $ 7.00;  300 FEET AND OVER + $ 8.00;  350 
FEET AND OVER + $ 9.00;  400 FEET AND OVER + 
$10.00);  (PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO 
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS 
SHALL BE PAID FOR THE HOLIDAY.)  (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL.  TUNNEL/SHAFT WORK: 
$5.00 PER HOUR ADDITIONAL.).........................$ 48.92                  29.95
----------------------------------------------------------------

 ENGI0057-003 12/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: 
GROUP  1: CRANES, LIGHTERS, BOOM TRUCKS AND 
DERRICKS. (BOOM LENTHS, INCLUDING JIBS:  150 FT. 
AND OVER: + $ 2.00;  180 FT. AND OVER: + $ 3.00;  
210 FT. AND OVER: + $ 4.00;  240 FT. AND OVER: + $ 
5.00;  270 FT. AND OVER: + $ 7.00;  300 FT. AND 
OVER: + $ 8.00;  350 FT. AND OVER: + $ 9.00;  400 
FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S 
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, 
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE 
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY 
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 
PER HOUR ADDITIONAL.)...............................$ 50.57                  29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: 
GROUP  2: DIGGING MACHINE, ROSS CARRIER, 
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, 
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, 
FRONT END LOADER (3 YDS. AND OVER), VIBRATORY 
HAMMER AND VACUUM TRUCK. (BOOM LENTHS, INCLUDING 
JIBS:  150 FT. AND OVER: + $ 2.00;  180 FT. AND 
OVER: + $ 3.00;  210 FT. AND OVER: + $ 4.00;  240 
FT. AND OVER: + $ 5.00;  270 FT. AND OVER: + $ 
7.00;  300 FT. AND OVER: + $ 8.00;  350 FT. AND 
OVER: + $ 9.00;  400 FT. AND OVER: + $10.00) (PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL 
DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS 
DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS 
DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK 
IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE 
HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. 
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)      
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                        ............................$ 48.57                  29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: 
GROUP  3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE 
PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS, 
INCLUDING JIBS:  150 FT. AND OVER: + $ 2.00;  180 
FT. AND OVER: + $ 3.00;  210 FT. AND OVER: + $ 
4.00;  240 FT. AND OVER: + $ 5.00;  270 FT. AND 
OVER: + $ 7.00;  300 FT. AND OVER: + $ 8.00;  350 
FT. AND OVER: + $ 9.00;  400 FT. AND OVER: + 
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S 
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR 
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & 
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN 
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR 
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR 
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR 
ADDITIONAL.)........................................$ 48.35                  29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: 
GROUP  4: FIREMAN & OILER ON CRANES. (BOOM LENTHS, 
INCLUDING JIBS:  150 FT. AND OVER: + $ 2.00;  180 
FT. AND OVER: + $ 3.00;  210 FT. AND OVER: + $ 
4.00;  240 FT. AND OVER: + $ 5.00;  270 FT. AND 
OVER: + $ 7.00;  300 FT. AND OVER: + $ 8.00;  350 
FT. AND OVER: + $ 9.00;  400 FT. AND OVER: + 
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S 
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR 
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & 
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN 
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR 
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR 
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR 
ADDITIONAL.)........................................$ 44.35                  29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: 
GROUP  5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS, 
INCLUDING JIBS:  150 FT. AND OVER: + $ 2.00;  180 
FT. AND OVER: + $ 3.00;  210 FT. AND OVER: + $ 
4.00;  240 FT. AND OVER: + $ 5.00;  270 FT. AND 
OVER: + $ 7.00;  300 FT. AND OVER: + $ 8.00;  350 
FT. AND OVER: + $ 9.00;  400 FT. AND OVER: + 
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S 
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR 
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & 
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN 
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR 
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR 
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR 
ADDITIONAL.)........................................$ 41.50                  29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: 
GROUP  6: BULLDOZER,SKID STEER LOADERS,BOBCATS, 
TRACTOR, GRADER, SCRAPER,COMBINATION LOADER 
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 
YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. 
CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP). (BOOM 
LENTHS, INCLUDING JIBS:  150 FT. AND OVER: + $ 
2.00;  180 FT. AND OVER: + $ 3.00;  210 FT. AND 
OVER: + $ 4.00;  240 FT. AND OVER: + $ 5.00;  270 
FT. AND OVER: + $ 7.00;  300 FT. AND OVER: + $ 
8.00;  350 FT. AND OVER: + $ 9.00;  400 FT. AND 
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE 
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY 
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 
PER HOUR ADDITIONAL.)...............................$ 47.65                  29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: 
GROUP  7: WELL POINT INSTALLATION CREW. (BOOM 
LENTHS, INCLUDING JIBS:  150 FT. AND OVER: + $ 
2.00;  180 FT. AND OVER: + $ 3.00;  210 FT. AND 
OVER: + $ 4.00;  240 FT. AND OVER: + $ 5.00;  270 
FT. AND OVER: + $ 7.00;  300 FT. AND OVER: + $ 
8.00;  350 FT. AND OVER: + $ 9.00;  400 FT. AND 
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE 
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY 
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 
PER HOUR ADDITIONAL.)...............................$ 47.22                  29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: 
GROUP  8: HEATER, CONCRETE MIXER, STONE CRUSHER, 
WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND 
ELECTRIC DRIVEN PUMP & AIR COMPRESSOR. (BOOM 
LENTHS, INCLUDING JIBS:  150 FT. AND OVER: + $ 
2.00;  180 FT. AND OVER: + $ 3.00;  210 FT. AND 
OVER: + $ 4.00;  240 FT. AND OVER: + $ 5.00;  270 
FT. AND OVER: + $ 7.00;  300 FT. AND OVER: + $ 
8.00;  350 FT. AND OVER: + $ 9.00;  400 FT. AND 
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE 
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY 
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: 
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 
PER HOUR ADDITIONAL.)...............................$ 44.54                  29.95
----------------------------------------------------------------

 ENGI0057-005 12/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION 
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE 
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND 
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1: 
CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, 
HOISTS, DERRICKS. (ANY EMPLOYEE WHO WORKS THREE 
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE 
PAID FOR THE HOLIDAY.  PAID HOLIDAYS: NEW YEAR'S 
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, 
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 46.45                  29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION 
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE 
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND 
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2: 
DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN 
HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD 
PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, 
FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, 
DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER 
BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, 
CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER 
MACHINES, ROTATING TELEHANDLERS, SPMT TYPE 
EQUIPMENT. (ANY EMPLOYEE WHO WORKS THREE DAYS IN 
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR 
THE HOLIDAY.  PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY.) DAY, PRESIDENT'S 
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR 
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & 
CHRISTMAS DAY.......................................$ 44.45                  29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION 
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE 
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND 
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3: 
WELLPOINT INSTALLATION AND DRILL/BORING MACHINE 
ASSISTANTS.  (ANY EMPLOYEE WHO WORKS THREE DAYS IN 
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR 
THE HOLIDAY.  PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 39.15                  29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION 
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE 
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND 
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4: 
UTILITY ENGINEERS. (ANY EMPLOYEE WHO WORKS THREE 
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE 
PAID FOR THE HOLIDAY.  PAID HOLIDAYS: NEW YEAR'S 
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, 
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 25.75                  29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION 
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE 
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND 
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5: 
SIGNAL PERSONS. (ANY EMPLOYEE WHO WORKS THREE DAYS 
IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID 
FOR THE HOLIDAY.  PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 33.15                  29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION 
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE 
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND 
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6: 
OILERS ON CRANES AND DECKHANDS.  (ANY EMPLOYEE WHO 
WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY 
FALLS SHALL BE PAID FOR THE HOLIDAY.  PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL 
DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS 
DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS 
DAY.)...............................................$ 39.73                  29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION 
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE 
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND 
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7: 
COMBINATION LOADER / BACKHOES, FRONT-END LOADERS 
(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, 
BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF 
ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, 
OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES.  
(ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN 
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE 
HOLIDAY.  PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 43.43                  29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION 
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE 
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND 
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8: 
GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, 
LIGHT PLANTS, WELDING MACHINES, PUMPS AND 
COMPRESSORS.  (ANY EMPLOYEE WHO WORKS THREE DAYS IN 
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR 
THE HOLIDAY.  PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY 
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, 
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 38.70                  29.95
----------------------------------------------------------------

 IRON0037-001 09/16/2025
                                                     Rates                  Fringes
IRONWORKER..........................................$ 43.03                  33.53
----------------------------------------------------------------

 LABO0271-001 12/03/2023
                                                     Rates                  Fringes
LABORER (BUILDING CONSTRUCTION): GROUP 1:  Laborer, 
Carpenter Tender, Mason Tender, Cement Finisher 
Tender, Scaffold Erector, Wrecking Laborer, 
Asbestos Removal [Non-Mechanical Systems............$ 37.00                  26.90
LABORER (BUILDING CONSTRUCTION): GROUP 2:  Asphalt 
Raker, Adzemen, Pipe Trench Bracer, Demolition 
Burner, Chain Saw Operator, Fence & Guard Rail 
Erector, Setter of Metal Forms for Roadways, Mortar 
Mixer, Pipelayer, Riprap & Dry Stonewall Builder, 
Highway Stone Spreader, Pneumatic Tool Operator, 
Wagon Drill Operator, Tree Trimmer, Barco-Type 
Jumping Tamper, Mechanical Grinder Operator.........$ 37.00                  26.90
LABORER (BUILDING CONSTRUCTION): GROUP 3: Pre-Cast 
Floor & Roof Plank Erectors.........................$ 37.00                  26.90
LABORER (BUILDING CONSTRUCTION): GROUP 4: Air Track 
Operator, Hydraulic & Similar Self-Powered Drill, 
Block Paver, Rammer, Curb Setter, Powderman & 
Blaster.............................................$ 37.00                  26.90
LABORER (BUILDING CONSTRUCTION): GROUP 5:  Toxic 
Waste Remover.......................................$ 39.00                  26.90
----------------------------------------------------------------

 LABO0271-002 11/27/2022
                                                     Rates                  Fringes
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): 
COMPRESSED AIR: GROUP 1:Mucking machine operator, 
tunnel laborer, brake person, track person, miner, 
grout person, lock tender, gauge tender, miner: 
motor person & all others in compressed air ........$ 55.40                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): 
COMPRESSED AIR: GROUP 2: Change house attendant, 
powder watchperson, top person on iron  ............$ 52.93                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): 
COMPRESSED AIR: GROUP 3: Hazardous waste work 
within the ""HOT"" zone...............................$ 42.45                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: 
GROUP 1: Grout person - pumps, brake person, track 
person, form mover & stripper (wood & steel), shaft 
laborer, laborer topside, outside motorperson, 
miner, conveyor operator, miner welder, heading 
motorperson, erecting operator, mucking machine 
operator, nozzle person, rodperson, safety miner, 
shaft & tunnel, steel & rodperson, mole nipper, 
concrete worker, form erector (wood, steel and all 
accessories), cement finisher (this type of work 
only), top signal person, bottom person (when 
heading is 50' from shaft), burner, shield operator 
and TBM operator....................................$ 46.00                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: 
GROUP 2: Change house attendant, powder watchperson $ 45.00                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: 
GROUP 3: Hazardous waste work within the ""HOT"" zone.$ 42.45                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 1: 
Laborer; Carpenter tender; Cement finisher tender; 
Wrecking laborer; Asbestos removers [non-mechanical 
systems]; Plant laborer; Driller in quarries........$ 33.05                  24.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2: 
Adzeperson; Asphalt raker; Barcotype jumping 
tamper; Chain saw operators; Concrete and power 
buggy operator; Concrete saw operator; Demolition 
burner; Fence and guard rail erector; Highway stone 
spreader; Laser beam operator; Mechanical grinder 
operator; Mason tender; Mortar mixer; Pneumatic 
tool operator; Riprap and dry stonewall builder; 
Scaffold erector; Setter of metal forms for 
roadways; Wagon drill operator; Wood chipper 
operator; Pipelayer; Pipe trench bracer  ...........$ 35.75                  24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3: 
Air track drill operator; Hydraulic and similar 
powered drills; Brick paver; Block paver; Rammer 
and curb setter; Powderperson and blaster...........$ 36.50                  24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 4: 
Flagger & signaler..................................$ 29.00                  24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5: 
Toxic waste remover ................................$ 33.05                  24.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR 
CAISSON, UNDERPINNING WORK AND BORING CREW: BOTTOM 
MAN.................................................$ 41.50                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR 
CAISSON, UNDERPINNING WORK AND BORING CREW: TOP MAN 
& LABORER...........................................$ 35.60                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST 
BORING: DRILLER.....................................$ 41.95                  24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST 
BORING: LABORER.....................................$ 41.95                  24.15
----------------------------------------------------------------

 PAIN0011-005 06/01/2025
                                                     Rates                  Fringes
PAINTER (BRUSH AND ROLLER)..........................$ 39.57                  26.60
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & 
STRUCTURAL STEEL)...................................$ 41.57                  26.60
PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57                  26.60
PAINTER (TAPER).....................................$ 38.82                  25.80
PAINTER (WALL COVERER)..............................$ 38.57                  25.80
----------------------------------------------------------------

 PAIN0011-006 06/01/2024
                                                     Rates                  Fringes
GLAZIER (SWING STAGE: $1.00 PER HOUR ADDITIONAL. 
PAID HOLIDAYS: LABOR DAY & CHRISTMAS DAY.)..........$ 41.63                  26.15
----------------------------------------------------------------

 PAIN0011-011 06/01/2024
                                                     Rates                  Fringes
PAINTER (BRIDGE WORK)...............................$ 57.85                  26.40
----------------------------------------------------------------

 PAIN0035-008 06/01/2011
                                                     Rates                  Fringes
SIGN PAINTER........................................$ 24.79                  13.72
----------------------------------------------------------------

 PLAS0040-001 01/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (BUILDING 
CONSTRUCTION) (CEMENT MASON: WORK ON FREE SWINGING 
SCAFFOLDS UNDER 3 PLANKS WIDTH AND WHICH IS 20 OR 
MORE FEET ABOVE GROUND AND ANY OFFSET STRUCTURE: 
$.30 PER HOUR ADDITIONAL.)..........................$ 44.75                  29.10
----------------------------------------------------------------

 PLAS0040-002 01/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY 
CONSTRUCTION).......................................$ 40.45                  25.30
----------------------------------------------------------------

 PLAS0040-003 01/01/2025
                                                     Rates                  Fringes
PLASTERER...........................................$ 45.52                  29.43
----------------------------------------------------------------

 PLUM0051-002 08/25/2025
                                                     Rates                  Fringes
PLUMBERS AND PIPEFITTERS............................$ 54.34                  34.50
----------------------------------------------------------------

 ROOF0033-004 12/01/2025
                                                     Rates                  Fringes
ROOFER..............................................$ 47.49                  31.44
----------------------------------------------------------------

 SFRI0669-001 04/01/2025
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 53.76                  33.44
----------------------------------------------------------------

 SHEE0017-002 06/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 44.42                  41.94
----------------------------------------------------------------

 TEAM0251-001 05/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 1: PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS 
(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS 
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J 
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE 
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY 
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL 
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S 
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST 
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS 
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A 
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL 
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB 
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER 
APPLICABLE RATE.)                ...................$ 31.86                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 2: TWO-AXLE ON LOW BEDS  (ADDITIONAL FRINGE TO BE 
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, 
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS 
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN 
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON 
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR 
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE 
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE 
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR 
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS 
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS 
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD 
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 
PER HOUR OVER APPLICABLE RATE.)                .....$ 32.01                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 3: TWO-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE 
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, 
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS 
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN 
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON 
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR 
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE 
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE 
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR 
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS 
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS 
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD 
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 
PER HOUR OVER APPLICABLE RATE.)                .....$ 32.06                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 4: THREE-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE 
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, 
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS 
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN 
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON 
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR 
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE 
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE 
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR 
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS 
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS 
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD 
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 
PER HOUR OVER APPLICABLE RATE.)                .....$ 32.11                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 5: FOUR- AND FIVE-AXLE EQUIPMENT. (ADDITIONAL 
FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS 
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J 
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE 
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY 
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL 
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S 
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST 
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS 
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A 
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL 
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB 
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER 
APPLICABLE RATE.)                ...................$ 32.21                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 6: LOW-BED OR BOOM TRAILER. (ADDITIONAL FRINGE TO 
BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY 
AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS 
DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE 
EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE 
CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE 
WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT 
LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING 
THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S 
PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID 
VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID 
VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL 
BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR 
EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A 
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL 
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB 
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER 
APPLICABLE RATE.)                ...................$ 32.61                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 7: TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING 
2 TRAILERS). (ADDITIONAL FRINGE TO BE PAID: PAID 
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, 
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS 
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN 
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON 
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR 
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE 
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE 
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR 
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS 
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS 
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD 
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 
PER HOUR OVER APPLICABLE RATE.)                     
   .................................................$ 32.81                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 8: SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35 
TONS.(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: 
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS 
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J 
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE 
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY 
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL 
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S 
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST 
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS 
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A 
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL 
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB 
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER 
APPLICABLE RATE.)                ...................$ 32.31                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
 9: SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR 
OVER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: 
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS 
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J 
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE 
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY 
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL 
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S 
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST 
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS 
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A 
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL 
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB 
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER 
APPLICABLE RATE.)                ...................$ 32.56                  34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 
10: TRACTOR TRAILER. (ADDITIONAL FRINGE TO BE PAID: 
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, 
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS 
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN 
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON 
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR 
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE 
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE 
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR 
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS 
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS 
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD 
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 
PER HOUR OVER APPLICABLE RATE.)                  ...$ 32.36                  34.51
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"

All Rhode Island determinations: county index · Rhode Island prevailing wage · compute pay with the calculator.