Prevailing Wage Index
HomePrevailing wage by stateWashingtonDeterminations › WA20260051

Wage determination WA20260051

Heavy construction - Washington, revision 1, modified 2026-05-18

Verify against the official document: this page mirrors WD WA20260051 revision 1 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

CARP0096-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
MILLWRIGHT$55.3922.38

CARP0360-005 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
CARPENTER, INCLUDES FORM WORK$63.9819.13

ELEC0076-005 (collectively bargained (union) rate, 08/31/2025)

ClassificationBase rateFringes
ELECTRICIAN$65.1426.56

ENGI0612-014 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 CRANES-A FRAME-10 TONS AND UNDER; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS; BOOM TRUCK 10 TONS AND UNDER ZONE DIFFERENTIAL (ADD TO ZONE 1$55.1327.32
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WAST$58.8927.32
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WAST$59.5627.32
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WAST$62.9927.32
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WAST$62.1227.32
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WAST$61.2227.32
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WAST$60.3227.32

IRON0086-012 (collectively bargained (union) rate, 07/07/2025)

ClassificationBase rateFringes
IRONWORKER (REINFORCING & STRUCTURAL)$57.9434.52

LABO0252-003 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, P$52.3117.01
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, P$51.5216.99
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, P$50.3816.96
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, P$40.8816.72

PAIN0300-005 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
PAINTER (BRUSH, ROLLER AND SPRAY)$41.2414.70

PLAS0528-004 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER$54.1621.27

SUWA2009-042 (DOL wage survey rate, 08/07/2009)

ClassificationBase rateFringes
TRUCK DRIVER: 10 YARD TRUCK$24.618.34
TRUCK DRIVER: WATER TRUCK$24.368.30
TRUCK DRIVER: DUMP TRUCK$22.825.86
PIPEFITTER$33.306.51
OPERATOR: ROLLER$25.258.20
OPERATOR: MECHANIC$25.000.00
OPERATOR: BULLDOZER$29.260.00
LABORER: LANDSCAPE$14.670.00
FENCE ERECTOR$15.000.00
Full official text of WA20260051 rev 1
"General Decision Number: WA20260051 05/18/2026


State: Washington


Construction Types: Heavy


Counties: Washington Counties of 
Lewis




 


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026


 CARP0096-004 06/01/2025
                                                     Rates                  Fringes
MILLWRIGHT..........................................$ 55.39                  22.38
----------------------------------------------------------------

 CARP0360-005 06/01/2025
                                                     Rates                  Fringes
CARPENTER, INCLUDES FORM WORK.......................$ 63.98                  19.13
----------------------------------------------------------------

 ELEC0076-005 08/31/2025
                                                     Rates                  Fringes
ELECTRICIAN.........................................$ 65.14                  26.56
----------------------------------------------------------------

 ENGI0612-014 06/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 CRANES-A 
FRAME-10 TONS AND UNDER; FORKLIFT: UNDER 3000 LBS 
WITH ATTACHMENTS; BOOM TRUCK 10 TONS AND UNDER   
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):  ZONE 2 
(26-45 RADIUS MILES) = $1.00  ZONE 3 (OVER 45 
RADIUS MILES) - $1.30    BASEPOINTS:  CENTRALIA, 
OLYMPIA, TACOMA      HANDLING OF HAZARDOUS WASTE 
MATERIALS:  PERSONNEL IN ALL CRAFT CLASSIFICATIONS 
SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED 
HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR 
COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP 
SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE 
AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT 
SITE SAFETY PLAN.      H-1 BASE WAGE RATE WHEN ON A 
HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH 
PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE 
RATE PLUS $0.50 PER HOUR.          H-2 CLASS ""C"" 
SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR.      H-3 
CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER 
HOUR.      H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS 
$2.00 PER HOUR......................................$ 55.13                  27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 
CRANES-THRU 19 TONS WITH ATTACHMENTS; A-FRAME CRANE 
OVER 10 TONS; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 
METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH 
ATTACHMENTS; OILER; GRADER-NONFINISHING; BOOM TRUCK 
OVER 10 TONS                                        
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                ZONE DIFFERENTIAL (ADD TO ZONE 1 
RATES):  ZONE 2 (26-45 RADIUS MILES) = $1.00  ZONE 
3 (OVER 45 RADIUS MILES) - $1.30    BASEPOINTS:  
CENTRALIA, OLYMPIA, TACOMA      HANDLING OF 
HAZARDOUS WASTE MATERIALS:  PERSONNEL IN ALL CRAFT 
CLASSIFICATIONS SUBJECT TO WORKING INSIDE A 
FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE 
ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE 
FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF 
HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC 
HAZARDOUS WASTE PROJECT SITE SAFETY PLAN.      H-1 
BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN 
NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" 
SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR.          
H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER 
HOUR.      H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS 
$1.50 PER HOUR.      H-4 CLASS ""A"" SUIT - BASE WAGE 
RATE PLUS $2.00 PER HOUR............................$ 58.89                  27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 
20 TONS THRU 44 TONS WITH ATTACHMENTS; 
CRANE-OVERHEAD, BRIDGE TYPE-20 TONS THROUGH 44 
TONS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC 
TONS; LOADER- UNDER 6 YARDS; DRILLING MACHINE; 
GRADER-FINISHING                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                             ZONE 
DIFFERENTIAL (ADD TO ZONE 1 RATES):  ZONE 2 (26-45 
RADIUS MILES) = $1.00  ZONE 3 (OVER 45 RADIUS 
MILES) - $1.30    BASEPOINTS:  CENTRALIA, OLYMPIA, 
TACOMA      HANDLING OF HAZARDOUS WASTE MATERIALS:  
PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO 
WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS 
PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN 
ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE 
RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS 
OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT 
SITE SAFETY PLAN.      H-1 BASE WAGE RATE WHEN ON A 
HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH 
PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE 
RATE PLUS $0.50 PER HOUR.          H-2 CLASS ""C"" 
SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR.      H-3 
CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER 
HOUR.      H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS 
$2.00 PER HOUR......................................$ 59.56                  27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA 
CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING 
JIB WITH ATTACHMENTS)                               
                                                    
                                                    
                                                    
                                                    
                                                    
               ZONE DIFFERENTIAL (ADD TO ZONE 1 
RATES):  ZONE 2 (26-45 RADIUS MILES) = $1.00  ZONE 
3 (OVER 45 RADIUS MILES) - $1.30    BASEPOINTS:  
CENTRALIA, OLYMPIA, TACOMA      HANDLING OF 
HAZARDOUS WASTE MATERIALS:  PERSONNEL IN ALL CRAFT 
CLASSIFICATIONS SUBJECT TO WORKING INSIDE A 
FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE 
ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE 
FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF 
HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC 
HAZARDOUS WASTE PROJECT SITE SAFETY PLAN.      H-1 
BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN 
NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" 
SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR.          
H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER 
HOUR.      H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS 
$1.50 PER HOUR.      H-4 CLASS ""A"" SUIT - BASE WAGE 
RATE PLUS $2.00 PER HOUR............................$ 62.99                  27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 
200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB 
WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN 
HEIGHT, BASE TO BOOM; EXCAVATOR/TRACKHOE, BACKHOE: 
OVER 90 METRIC TONS                                 
                                                    
                                                    
                                                    
                                              ZONE 
DIFFERENTIAL (ADD TO ZONE 1 RATES):  ZONE 2 (26-45 
RADIUS MILES) = $1.00  ZONE 3 (OVER 45 RADIUS 
MILES) - $1.30    BASEPOINTS:  CENTRALIA, OLYMPIA, 
TACOMA      HANDLING OF HAZARDOUS WASTE MATERIALS:  
PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO 
WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS 
PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN 
ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE 
RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS 
OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT 
SITE SAFETY PLAN.      H-1 BASE WAGE RATE WHEN ON A 
HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH 
PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE 
RATE PLUS $0.50 PER HOUR.          H-2 CLASS ""C"" 
SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR.      H-3 
CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER 
HOUR.      H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS 
$2.00 PER HOUR......................................$ 62.12                  27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 
100 TONS THRU 199 TONS, OR 150 FT OF BOOM 
(INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, 
BRIDGE TYPE, 100 TONS AND OVER; TOWER CRANE UP TO 
175 FT IN HEIGHT BASE TO BOOM; EXCAVATOR/TRACKHOE, 
BACKHOE: OVER 50 METRIC TONS TO 90 METRIC TONS; 
LOADERS-8 YARDS AND OVER                            
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
         ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):  
ZONE 2 (26-45 RADIUS MILES) = $1.00  ZONE 3 (OVER 
45 RADIUS MILES) - $1.30    BASEPOINTS:  CENTRALIA, 
OLYMPIA, TACOMA      HANDLING OF HAZARDOUS WASTE 
MATERIALS:  PERSONNEL IN ALL CRAFT CLASSIFICATIONS 
SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED 
HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR 
COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP 
SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE 
AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT 
SITE SAFETY PLAN.      H-1 BASE WAGE RATE WHEN ON A 
HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH 
PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE 
RATE PLUS $0.50 PER HOUR.          H-2 CLASS ""C"" 
SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR.      H-3 
CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER 
HOUR.      H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS 
$2.00 PER HOUR......................................$ 61.22                  27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 
TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING 
JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 
45 TONS THRU 99 TONS; DERRICKS ON BUILDING WORK; 
EXCAVATOR/TRACKHOE, BACKHOE: OVER 30 METRIC TONS TO 
50 METRIC TONS; LOADERS- 6 YARDS TO, BUT NOT 
INCLUDING, 8 YARDS                                  
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                        ZONE DIFFERENTIAL (ADD TO 
ZONE 1 RATES):  ZONE 2 (26-45 RADIUS MILES) = $1.00 
 ZONE 3 (OVER 45 RADIUS MILES) - $1.30    
BASEPOINTS:  CENTRALIA, OLYMPIA, TACOMA      
HANDLING OF HAZARDOUS WASTE MATERIALS:  PERSONNEL 
IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING 
INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER 
SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE 
WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE 
LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE 
SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN.  
    H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE 
SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, 
CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER 
HOUR.          H-2 CLASS ""C"" SUIT - BASE WAGE RATE 
PLUS $1.00 PER HOUR.      H-3 CLASS ""B"" SUIT - BASE 
WAGE RATE PLUS $1.50 PER HOUR.      H-4 CLASS ""A"" 
SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR...........$ 60.32                  27.32
----------------------------------------------------------------

 IRON0086-012 07/07/2025
                                                     Rates                  Fringes
IRONWORKER (REINFORCING & STRUCTURAL)...............$ 57.94                  34.52
----------------------------------------------------------------

 LABO0252-003 06/01/2025
                                                     Rates                  Fringes
LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON 
TENDER-CEMENT/CONCRETE; GRADE CHECKER               
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                       ZONE DIFFERENTIAL (ADD TO 
ZONE 1 RATES):  ZONE 2 - $1.00  ZONE 3 - $1.30  
BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, 
SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, 
ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND 
BREMERTON    ZONE 1 - PROJECTS WITHIN 25 RADIUS 
MILES OF THE RESPECTIVE CITY HALL   ZONE 2 - MORE 
THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE 
RESPECTIVE CITY HALL   ZONE 3 - MORE THAN 45 RADIUS 
MILES FROM THE RESPECTIVE CITY HALL.................$ 52.31                  17.01
LABORER: ZONE 1: GROUP 4 CHIPPING GUNS (OVER 30 
LBS); PIPE LAYER                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                    ZONE 
DIFFERENTIAL (ADD TO ZONE 1 RATES):  ZONE 2 - $1.00 
 ZONE 3 - $1.30  BASE POINTS: BELLINGHAM, MT. 
VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, 
CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. 
ANGELES, AND BREMERTON    ZONE 1 - PROJECTS WITHIN 
25 RADIUS MILES OF THE RESPECTIVE CITY HALL   ZONE 
2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM 
THE RESPECTIVE CITY HALL   ZONE 3 - MORE THAN 45 
RADIUS MILES FROM THE RESPECTIVE CITY HALL..........$ 51.52                  16.99
LABORER: ZONE 1: GROUP 3 CHIPPING GUNS (UNDER 30 
LBS); GENERAL OR COMMON LABORER                     
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                              ZONE 
DIFFERENTIAL (ADD TO ZONE 1 RATES):  ZONE 2 - $1.00 
 ZONE 3 - $1.30  BASE POINTS: BELLINGHAM, MT. 
VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, 
CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. 
ANGELES, AND BREMERTON    ZONE 1 - PROJECTS WITHIN 
25 RADIUS MILES OF THE RESPECTIVE CITY HALL   ZONE 
2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM 
THE RESPECTIVE CITY HALL   ZONE 3 - MORE THAN 45 
RADIUS MILES FROM THE RESPECTIVE CITY HALL..........$ 50.38                  16.96
LABORER: ZONE 1: GROUP 2 FLAGGER                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
                                                    
           ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): 
 ZONE 2 - $1.00  ZONE 3 - $1.30  BASE POINTS: 
BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, 
TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. 
TOWNSEND, PT. ANGELES, AND BREMERTON    ZONE 1 - 
PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE 
CITY HALL   ZONE 2 - MORE THAN 25 BUT LESS THAN 45 
RADIUS MILES FROM THE RESPECTIVE CITY HALL   ZONE 3 
- MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE 
CITY HALL...........................................$ 40.88                  16.72
----------------------------------------------------------------

 PAIN0300-005 07/01/2025
                                                     Rates                  Fringes
PAINTER (BRUSH, ROLLER AND SPRAY)...................$ 41.24                  14.70
----------------------------------------------------------------

 PLAS0528-004 06/01/2024
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 54.16                  21.27
----------------------------------------------------------------

 SUWA2009-042 08/07/2009
                                                     Rates                  Fringes
TRUCK DRIVER: 10  YARD TRUCK........................$ 24.61                  8.34
TRUCK DRIVER:  WATER TRUCK..........................$ 24.36                  8.30
TRUCK DRIVER:  DUMP TRUCK...........................$ 22.82                  5.86
PIPEFITTER..........................................$ 33.30                  6.51
OPERATOR:  ROLLER...................................$ 25.25                  8.20
OPERATOR:  MECHANIC.................................$ 25.00                  0.00
OPERATOR:  BULLDOZER................................$ 29.26                  0.00
LABORER:  LANDSCAPE.................................$ 14.67                  0.00
FENCE ERECTOR.......................................$ 15.00                  0.00
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"

All Washington determinations: county index · Washington prevailing wage · compute pay with the calculator.