Cement Mason / Concrete Finisher prevailing wage rates in Wisconsin
Federal Davis-Bacon rates published in 34 active determinations, 2026
- Active federal Davis-Bacon determinations for Wisconsin publish 55 cement mason / concrete finisher classification rates, across 34 determinations covering 72 counties.
- Those published base rates run from $23.10 to $47.22 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting cement mason / concrete finisher rates in Wisconsin: .
This page collects every classification in Wisconsin's active federal determinations that is a form of cement mason / concrete finisher work (placing and finishing concrete) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
WI20260001 rev 1 · Building · Milwaukee, Ozaukee, Washington, Waukesha
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $43.27 | 25.69 | PLAS0599-004 collectively bargained (union) rate |
Official document: WI20260001 on SAM.gov.
WI20260003 rev 1 · Building · La Crosse
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $37.25 | 27.84 | PLAS0599-006 collectively bargained (union) rate |
Official document: WI20260003 on SAM.gov.
WI20260004 rev 1 · Building · Kenosha
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $38.04 | 31.38 | PLAS0599-009 collectively bargained (union) rate |
Official document: WI20260004 on SAM.gov.
WI20260005 rev 1 · Building · Dane
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $40.28 | 27.54 | PLAS0599-001 collectively bargained (union) rate |
Official document: WI20260005 on SAM.gov.
WI20260006 rev 1 · Building · Chippewa, Eau Claire
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $37.25 | 27.84 | PLAS0599-008 collectively bargained (union) rate |
Official document: WI20260006 on SAM.gov.
WI20260007 rev 1 · Building · Douglas
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $47.22 | 31.90 | PLAS0633-048 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER | $47.22 | 31.90 | PLAS0633-048 collectively bargained (union) rate |
Official document: WI20260007 on SAM.gov.
WI20260008 rev 1 · Heavy · Adams, Ashland, Barron, Bayfield, Brown, Buffalo and 66 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLAD | $46.01 | 29.31 | BRWI0002-005 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER: AREA D: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES | $42.28 | 26.43 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER, AREA F: KENOSHA AND RACINE COUNTIES | $37.33 | 31.38 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER, AREA E: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK COUNTIES | $41.16 | 27.54 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES | $40.06 | 28.65 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES | $47.22 | 31.90 | PLAS0599-002 collectively bargained (union) rate |
Official document: WI20260008 on SAM.gov.
WI20260009 rev 1 · Building · Racine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $38.04 | 31.38 | PLAS0599-009 collectively bargained (union) rate |
Official document: WI20260009 on SAM.gov.
WI20260010 rev 1 · Highway · Adams, Ashland, Barron, Bayfield, Brown, Buffalo and 66 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLAD | $46.01 | 29.31 | BRWI0002-005 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER: AREA D: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES | $42.28 | 26.43 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER, AREA F: KENOSHA AND RACINE COUNTIES | $37.33 | 31.38 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER, AREA E: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK COUNTIES | $41.16 | 27.54 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES | $40.06 | 28.65 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES | $47.22 | 31.90 | PLAS0599-002 collectively bargained (union) rate |
Official document: WI20260010 on SAM.gov.
WI20260011 rev 1 · Building · Adams, Ashland, Barron, Bayfield, Buffalo, Burnett and 46 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (WALWORTH COUNTY) | $40.50 | 28.90 | BRWI0004-003 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER (PEPIN COUNTY) | $37.25 | 27.84 | PLAS0599-003 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) | $37.25 | 27.84 | PLAS0599-007 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES) | $43.27 | 25.69 | PLAS0599-011 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER (BAYFIELD, PRICE, AND SAWYER COUNTIES) | $47.22 | 31.90 | PLAS0633-046 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER (BAYFIELD, PRICE, AND SAWYER COUNTIES) | $47.22 | 31.90 | PLAS0633-046 collectively bargained (union) rate |
Official document: WI20260011 on SAM.gov.
WI20260012 rev 1 · Building · Rock
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $40.28 | 27.54 | PLAS0599-001 collectively bargained (union) rate |
Official document: WI20260012 on SAM.gov.
WI20260015 rev 1 · Heavy · Adams, Ashland, Barron, Bayfield, Brown, Buffalo and 66 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (ADAMS, BARRON, BROWN, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JEFFERSON, KEWAUNEE, LANGLAD | $46.01 | 29.31 | BRWI0002-005 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER: AREA D: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES | $42.28 | 26.43 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER, AREA F: KENOSHA AND RACINE COUNTIES | $37.33 | 31.38 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER, AREA E: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK COUNTIES | $41.16 | 27.54 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER AREA C: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE, MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES | $40.06 | 28.65 | PLAS0599-002 collectively bargained (union) rate |
| CEMENT MASON/CONCRETE FINISHER AREA A: ASHLAND, BURNETT, BAYFIELD, DOUGLAS, IRON, PRICE, SAWYER, AND WASHBURN COUNTIES | $47.22 | 31.90 | PLAS0599-002 collectively bargained (union) rate |
Official document: WI20260015 on SAM.gov.
WI20260017 rev 1 · Residential · Ashland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.11 | 1.49 | SUWI2012-001 DOL wage survey rate |
Official document: WI20260017 on SAM.gov.
WI20260018 rev 1 · Residential · Monroe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $25.64 | 1.49 | SUWI2012-002 DOL wage survey rate |
Official document: WI20260018 on SAM.gov.
WI20260019 rev 1 · Residential · Rusk
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.11 | 1.49 | SUWI2012-003 DOL wage survey rate |
Official document: WI20260019 on SAM.gov.
WI20260020 rev 1 · Residential · Adams, Florence, Green Lake, Juneau, Marinette, Marquette and 6 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.11 | 1.49 | SUWI2012-004 DOL wage survey rate |
Official document: WI20260020 on SAM.gov.
WI20260021 rev 1 · Residential · Barron, Bayfield, Burnett, Forest, Iron, Langlade and 8 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.11 | 1.49 | SUWI2012-005 DOL wage survey rate |
Official document: WI20260021 on SAM.gov.
WI20260022 rev 1 · Residential · Buffalo, Clark, Crawford, Dunn, Grant, Jackson and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $25.64 | 1.49 | SUWI2012-006 DOL wage survey rate |
Official document: WI20260022 on SAM.gov.
WI20260023 rev 1 · Residential · Dodge, Green, Jefferson, Lafayette, Sauk, Walworth
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.11 | 1.49 | SUWI2012-007 DOL wage survey rate |
Official document: WI20260023 on SAM.gov.
WI20260024 rev 1 · Residential · Door, Manitowoc
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.11 | 1.49 | SUWI2012-008 DOL wage survey rate |
Official document: WI20260024 on SAM.gov.
WI20260025 rev 2 · Residential · Chippewa
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-009 DOL wage survey rate |
Official document: WI20260025 on SAM.gov.
WI20260026 rev 1 · Residential · Kenosha
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $23.64 | 6.42 | SUWI2012-010 DOL wage survey rate |
Official document: WI20260026 on SAM.gov.
WI20260027 rev 1 · Residential · Milwaukee
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $23.10 | 4.59 | SUWI2012-011 DOL wage survey rate |
Official document: WI20260027 on SAM.gov.
WI20260028 rev 1 · Residential · Racine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $23.64 | 6.42 | SUWI2012-012 DOL wage survey rate |
Official document: WI20260028 on SAM.gov.
WI20260029 rev 1 · Residential · Rock
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-013 DOL wage survey rate |
Official document: WI20260029 on SAM.gov.
WI20260030 rev 2 · Residential · Sheboygan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-014 DOL wage survey rate |
Official document: WI20260030 on SAM.gov.
WI20260031 rev 1 · Residential · Waukesha
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $23.64 | 6.42 | SUWI2012-015 DOL wage survey rate |
Official document: WI20260031 on SAM.gov.
WI20260032 rev 2 · Residential · Winnebago
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-016 DOL wage survey rate |
Official document: WI20260032 on SAM.gov.
WI20260033 rev 2 · Residential · Brown, Kewaunee, Oconto
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-017 DOL wage survey rate |
Official document: WI20260033 on SAM.gov.
WI20260034 rev 2 · Residential · Calumet, Outagamie
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-018 DOL wage survey rate |
Official document: WI20260034 on SAM.gov.
WI20260035 rev 1 · Residential · Columbia, Dane, Iowa
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-019 DOL wage survey rate |
Official document: WI20260035 on SAM.gov.
WI20260036 rev 2 · Residential · Douglas, Fond Du Lac, Marathon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-020 DOL wage survey rate |
Official document: WI20260036 on SAM.gov.
WI20260037 rev 2 · Residential · Eau Claire, La Crosse, Pierce, St Croix
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.37 | 7.29 | SUWI2012-021 DOL wage survey rate |
Official document: WI20260037 on SAM.gov.
WI20260038 rev 1 · Residential · Ozaukee, Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $23.64 | 6.42 | SUWI2012-022 DOL wage survey rate |
Official document: WI20260038 on SAM.gov.
Where to go next
Cement Mason / Concrete Finisher rates in every state · Wisconsin prevailing wage and state law · Wisconsin determinations by county · pay calculator
Other trades in Wisconsin
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Bricklayer / Mason · Roofer · Painter · Plasterer · Glazier · Insulator (Heat & Frost) · Millwright · Boilermaker · Sprinkler Fitter · Piledriver · Tile Setter · Floor Layer · Line Constructor / Lineman