Heavy Equipment Operator prevailing wage rates in Rhode Island
Federal Davis-Bacon rates published in 3 active determinations, 2026
- Active federal Davis-Bacon determinations for Rhode Island publish 26 heavy equipment operator classification rates, across 3 determinations covering 5 counties.
- Those published base rates run from $11.71 to $51.30 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in Rhode Island: .
This page collects every classification in Rhode Island's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
RI20260001 rev 4 · Building, Heavy, Highway · Bristol, Kent, Newport, Providence, Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $51.30 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $49.30 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $44.92 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $42.07 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $48.35 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $39.15 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $33.15 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $45.00 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CON | $48.92 | 29.95 | ENGI0057-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + | $50.57 | 29.95 | ENGI0057-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + | $48.35 | 29.95 | ENGI0057-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4: FIREMAN & OILER ON CRANES. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. A | $44.35 | 29.95 | ENGI0057-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AN | $41.50 | 29.95 | ENGI0057-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6: BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS | $47.65 | 29.95 | ENGI0057-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7: WELL POINT INSTALLATION CREW. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT | $47.22 | 29.95 | ENGI0057-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMP | $44.54 | 29.95 | ENGI0057-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA | $46.45 | 29.95 | ENGI0057-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA | $44.45 | 29.95 | ENGI0057-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA | $39.15 | 29.95 | ENGI0057-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA | $25.75 | 29.95 | ENGI0057-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA | $33.15 | 29.95 | ENGI0057-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA | $39.73 | 29.95 | ENGI0057-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA | $43.43 | 29.95 | ENGI0057-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WA | $38.70 | 29.95 | ENGI0057-005 collectively bargained (union) rate |
Official document: RI20260001 on SAM.gov.
RI20260002 rev 2 · Residential · Bristol, Kent, Providence, Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (BACKHOE) | $20.27 | 8.98 | SURI1999-002 DOL wage survey rate |
Official document: RI20260002 on SAM.gov.
RI20260003 rev 2 · Residential · Newport
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (BACKHOE & BULLDOZER) | $11.71 | 2.33 | SURI1999-003 DOL wage survey rate |
Official document: RI20260003 on SAM.gov.
Where to go next
Heavy Equipment Operator rates in every state · Rhode Island prevailing wage and state law · Rhode Island determinations by county · pay calculator
Other trades in Rhode Island
Plumber · Carpenter · Construction Laborer · Truck Driver · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Insulator (Heat & Frost)