Heavy Equipment Operator prevailing wage rates in Utah
Federal Davis-Bacon rates published in 80 active determinations, 2026
- Active federal Davis-Bacon determinations for Utah publish 556 heavy equipment operator classification rates, across 80 determinations covering 29 counties.
- Those published base rates run from $7.25 to $41.71 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in Utah: .
This page collects every classification in Utah's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
UT20260002 rev 1 · Residential · Beaver, Carbon, Daggett, Duchesne, Emery, Garfield and 6 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR - BACKHOE | $7.25 | 0.00 | SUUT1997-002 DOL wage survey rate |
Official document: UT20260002 on SAM.gov.
UT20260004 rev 1 · Residential · Kane, San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR - BACKHOE | $8.75 | 0.00 | SUUT1994-002 DOL wage survey rate |
Official document: UT20260004 on SAM.gov.
UT20260006 rev 1 · Residential · Kane, Millard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: TRENCHING MACHINES | $7.25 | 0.00 | SUUT1997-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: CRANES, DERRICKS, DRAGLINES | $7.25 | 0.00 | SUUT1997-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: BULLDOZERS | $7.25 | 0.00 | SUUT1997-004 DOL wage survey rate |
Official document: UT20260006 on SAM.gov.
UT20260007 rev 1 · Highway · Duchesne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $27.15 | 13.59 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: ROLLER | $23.50 | 4.97 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $26.52 | 13.33 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $27.81 | 7.26 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: MECHANIC | $27.43 | 15.65 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: LOADER | $25.37 | 15.65 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $27.92 | 15.65 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: BULLDOZER | $24.21 | 1.59 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $19.60 | 7.41 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-001 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.33 | 5.83 | SUUT2019-001 DOL wage survey rate |
Official document: UT20260007 on SAM.gov.
UT20260008 rev 1 · Highway · Emery
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: ROLLER | $22.74 | 6.50 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: MECHANIC | $25.24 | 10.96 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: LOADER | $22.53 | 6.92 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $17.54 | 5.65 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-002 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.47 | 4.89 | SUUT2019-002 DOL wage survey rate |
Official document: UT20260008 on SAM.gov.
UT20260009 rev 1 · Highway · Garfield
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: ROLLER | $20.23 | 5.61 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: MECHANIC | $25.24 | 10.96 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: LOADER | $22.53 | 6.92 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $18.29 | 5.65 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-003 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.10 | 5.97 | SUUT2019-003 DOL wage survey rate |
Official document: UT20260009 on SAM.gov.
UT20260010 rev 1 · Highway · Grand
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: ROLLER | $20.23 | 5.61 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: MECHANIC | $25.24 | 10.96 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: LOADER | $22.53 | 6.92 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $18.29 | 5.65 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-004 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.10 | 5.97 | SUUT2019-004 DOL wage survey rate |
Official document: UT20260010 on SAM.gov.
UT20260011 rev 1 · Heavy · Summit
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER(UNDER 2 CU. YDS.), OILER | $36.55 | 18.62 | ENGI0003-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BULLDOZER, FRONT END LOADER(2 TO 5 CU. YDS.), GRADE SETTER, OIL DISTRIBUTOR, SCRAPER | $37.79 | 18.62 | ENGI0003-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER(OVER 5 CU.YDS.) | $39.01 | 18.62 | ENGI0003-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1)MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION | $41.71 | 18.62 | ENGI0003-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $36.55 | 18.62 | ENGI0003-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT ((7) ROLLER(DIRT AND GRADE COMPACTION)) | $34.25 | 18.62 | ENGI0003-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT ((2A)BLADE/GRADER) | $40.32 | 18.62 | ENGI0003-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | 17.57 | ENGI0003-056 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | 11.88 | ENGI0003-056 collectively bargained (union) rate |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE AND WATER/SEWER LINE CONSTRUCTION) | $19.98 | 0.00 | SUUT2008-040 DOL wage survey rate |
| OPERATOR: CRANE | $28.97 | 9.40 | SUUT2008-040 DOL wage survey rate |
Official document: UT20260011 on SAM.gov.
UT20260012 rev 1 · Highway · Iron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: ROLLER | $20.23 | 5.61 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: MECHANIC | $25.24 | 10.96 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: LOADER | $22.53 | 6.92 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $18.29 | 5.65 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-005 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.10 | 5.97 | SUUT2019-005 DOL wage survey rate |
Official document: UT20260012 on SAM.gov.
UT20260013 rev 1 · Highway · Kane
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: ROLLER | $20.23 | 5.61 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: MECHANIC | $25.24 | 10.96 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: LOADER | $22.33 | 6.92 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $18.29 | 5.65 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-006 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.71 | 5.47 | SUUT2019-006 DOL wage survey rate |
Official document: UT20260013 on SAM.gov.
UT20260014 rev 1 · Highway · Millard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: ROLLER | $18.19 | 5.07 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: MECHANIC | $25.24 | 10.96 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: LOADER | $23.73 | 6.92 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $18.29 | 5.65 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-007 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.70 | 6.02 | SUUT2019-007 DOL wage survey rate |
Official document: UT20260014 on SAM.gov.
UT20260015 rev 1 · Highway · Piute
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: ROLLER | $20.23 | 5.61 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: MECHANIC | $25.24 | 10.96 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: LOADER | $22.53 | 6.92 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $18.29 | 5.65 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-008 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.37 | 15.65 | SUUT2019-008 DOL wage survey rate |
Official document: UT20260015 on SAM.gov.
UT20260016 rev 1 · Highway · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: ROLLER | $25.56 | 6.12 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: MECHANIC | $25.24 | 10.96 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: LOADER | $23.83 | 12.18 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $18.29 | 5.65 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-009 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.10 | 5.97 | SUUT2019-009 DOL wage survey rate |
Official document: UT20260016 on SAM.gov.
UT20260017 rev 1 · Heavy · Beaver, Emery, Grand, Kane, Piute, Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR | $30.78 | 16.09 | ENGI0003-046 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | 11.88 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | 17.57 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | 0.00 | SUUT2008-033 DOL wage survey rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | 0.00 | SUUT2008-033 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $11.38 | 0.00 | SUUT2008-033 DOL wage survey rate |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | 0.00 | SUUT2008-033 DOL wage survey rate |
Official document: UT20260017 on SAM.gov.
UT20260018 rev 1 · Heavy · Carbon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $11.62 | 0.00 | SUUT2008-034 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $15.89 | 4.75 | SUUT2008-034 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $14.08 | 0.00 | SUUT2008-034 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.55 | 0.00 | SUUT2008-034 DOL wage survey rate |
Official document: UT20260018 on SAM.gov.
UT20260019 rev 2 · Heavy · Iron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR. (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $30.78 | 16.09 | ENGI0003-046 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT OILER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $22.03 | 11.88 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $35.68 | 17.57 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | 0.00 | SUUT2008-025 DOL wage survey rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | 0.00 | SUUT2008-025 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $11.38 | 0.00 | SUUT2008-025 DOL wage survey rate |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | 0.00 | SUUT2008-025 DOL wage survey rate |
Official document: UT20260019 on SAM.gov.
UT20260020 rev 1 · Heavy · Millard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR | $30.78 | 16.09 | ENGI0003-046 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | 11.88 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | 17.57 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | 0.00 | SUUT2008-026 DOL wage survey rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | 0.00 | SUUT2008-026 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $11.38 | 0.00 | SUUT2008-026 DOL wage survey rate |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | 0.00 | SUUT2008-026 DOL wage survey rate |
Official document: UT20260020 on SAM.gov.
UT20260021 rev 1 · Heavy · Rich
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $11.62 | 0.00 | SUUT2008-027 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $15.89 | 4.75 | SUUT2008-027 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $14.08 | 0.00 | SUUT2008-027 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.55 | 0.00 | SUUT2008-027 DOL wage survey rate |
Official document: UT20260021 on SAM.gov.
UT20260022 rev 1 · Heavy · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (3)BACKHOE: EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION | $30.78 | 16.09 | ENGI0003-047 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | 11.88 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | 17.57 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: EXCAVATOR (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.75 | 0.00 | SUUT2008-028 DOL wage survey rate |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | 0.00 | SUUT2008-028 DOL wage survey rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | 0.00 | SUUT2008-028 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $11.38 | 0.00 | SUUT2008-028 DOL wage survey rate |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | 0.00 | SUUT2008-028 DOL wage survey rate |
Official document: UT20260022 on SAM.gov.
UT20260023 rev 1 · Heavy · Uintah
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $11.62 | 0.00 | SUUT2008-031 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $15.89 | 4.75 | SUUT2008-031 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $14.08 | 0.00 | SUUT2008-031 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.55 | 0.00 | SUUT2008-031 DOL wage survey rate |
Official document: UT20260023 on SAM.gov.
UT20260024 rev 1 · Heavy · Wasatch
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $11.62 | 0.00 | SUUT2008-032 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $15.89 | 4.75 | SUUT2008-032 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $14.08 | 0.00 | SUUT2008-032 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.00 | 0.00 | SUUT2008-032 DOL wage survey rate |
Official document: UT20260024 on SAM.gov.
UT20260025 rev 1 · Heavy · Daggett
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $11.62 | 0.00 | SUUT2008-022 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $15.89 | 4.75 | SUUT2008-022 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $14.08 | 0.00 | SUUT2008-022 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.55 | 0.00 | SUUT2008-022 DOL wage survey rate |
Official document: UT20260025 on SAM.gov.
UT20260026 rev 1 · Heavy · Duchesne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $11.62 | 0.00 | SUUT2008-023 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $15.89 | 4.75 | SUUT2008-023 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $14.08 | 0.00 | SUUT2008-023 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.55 | 0.00 | SUUT2008-023 DOL wage survey rate |
Official document: UT20260026 on SAM.gov.
UT20260027 rev 1 · Heavy · Sanpete
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $11.62 | 0.00 | SUUT2008-029 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $15.89 | 4.75 | SUUT2008-029 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $14.08 | 0.00 | SUUT2008-029 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.55 | 0.00 | SUUT2008-029 DOL wage survey rate |
Official document: UT20260027 on SAM.gov.
UT20260028 rev 1 · Heavy · Garfield
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | 11.88 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | 17.57 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | 0.00 | SUUT2008-024 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $11.38 | 0.00 | SUUT2008-024 DOL wage survey rate |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | 0.00 | SUUT2008-024 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.67 | 0.00 | SUUT2008-024 DOL wage survey rate |
Official document: UT20260028 on SAM.gov.
UT20260029 rev 1 · Heavy · Sevier
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | 11.88 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | 17.57 | ENGI0003-054 collectively bargained (union) rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | 0.00 | SUUT2008-030 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $12.00 | 0.00 | SUUT2008-030 DOL wage survey rate |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | 0.00 | SUUT2008-030 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | 0.00 | SUUT2008-030 DOL wage survey rate |
Official document: UT20260029 on SAM.gov.
UT20260030 rev 1 · Residential · Cache
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $16.14 | 0.00 | SUUT2008-045 DOL wage survey rate |
Official document: UT20260030 on SAM.gov.
UT20260031 rev 1 · Residential · Davis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $16.14 | 0.00 | SUUT2008-046 DOL wage survey rate |
Official document: UT20260031 on SAM.gov.
UT20260032 rev 1 · Residential · Juab
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $16.14 | 0.00 | SUUT2008-047 DOL wage survey rate |
Official document: UT20260032 on SAM.gov.
UT20260033 rev 1 · Residential · Morgan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $16.14 | 0.00 | SUUT2008-048 DOL wage survey rate |
Official document: UT20260033 on SAM.gov.
UT20260034 rev 1 · Residential · Salt Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $14.89 | 0.00 | SUUT2008-049 DOL wage survey rate |
Official document: UT20260034 on SAM.gov.
UT20260035 rev 1 · Residential · Summit
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $14.89 | 0.00 | SUUT2008-050 DOL wage survey rate |
Official document: UT20260035 on SAM.gov.
UT20260036 rev 1 · Residential · Tooele
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $14.89 | 0.00 | SUUT2008-051 DOL wage survey rate |
Official document: UT20260036 on SAM.gov.
UT20260037 rev 1 · Residential · Utah
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $16.14 | 0.00 | SUUT2008-052 DOL wage survey rate |
Official document: UT20260037 on SAM.gov.
UT20260038 rev 1 · Residential · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $16.14 | 0.00 | SUUT2008-053 DOL wage survey rate |
Official document: UT20260038 on SAM.gov.
UT20260039 rev 1 · Residential · Weber
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | 15.65 | ENGI0003-052 collectively bargained (union) rate |
| OPERATOR: TRACKHOE | $16.14 | 0.00 | SUUT2008-054 DOL wage survey rate |
Official document: UT20260039 on SAM.gov.
UT20260069 rev 1 · Building · Beaver
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-001 DOL wage survey rate |
Official document: UT20260069 on SAM.gov.
UT20260070 rev 1 · Building · Carbon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-002 DOL wage survey rate |
Official document: UT20260070 on SAM.gov.
UT20260071 rev 1 · Building · Garfield
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.41 | 0.79 | SUUT2012-003 DOL wage survey rate |
Official document: UT20260071 on SAM.gov.
UT20260072 rev 1 · Building · Grand
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-004 DOL wage survey rate |
Official document: UT20260072 on SAM.gov.
UT20260073 rev 1 · Building · Iron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-005 DOL wage survey rate |
Official document: UT20260073 on SAM.gov.
UT20260074 rev 1 · Building · Piute
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-006 DOL wage survey rate |
Official document: UT20260074 on SAM.gov.
UT20260075 rev 1 · Building · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-007 DOL wage survey rate |
Official document: UT20260075 on SAM.gov.
UT20260076 rev 1 · Building · Sanpete
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-008 DOL wage survey rate |
Official document: UT20260076 on SAM.gov.
UT20260077 rev 1 · Building · Uintah
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-009 DOL wage survey rate |
Official document: UT20260077 on SAM.gov.
UT20260078 rev 1 · Building · Wasatch
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-010 DOL wage survey rate |
Official document: UT20260078 on SAM.gov.
UT20260079 rev 1 · Building · Daggett, Duchesne, Rich, Summit
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-011 DOL wage survey rate |
Official document: UT20260079 on SAM.gov.
UT20260080 rev 1 · Building · Emery, Kane, Millard, Sevier, Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | 0.79 | SUUT2012-012 DOL wage survey rate |
Official document: UT20260080 on SAM.gov.
UT20260081 rev 1 · Building · Box Elder
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-013 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | 0.00 | SUUT2012-013 DOL wage survey rate |
Official document: UT20260081 on SAM.gov.
UT20260082 rev 1 · Building · Cache
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-014 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | 0.00 | SUUT2012-014 DOL wage survey rate |
Official document: UT20260082 on SAM.gov.
UT20260083 rev 1 · Building · Davis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-015 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | 0.00 | SUUT2012-015 DOL wage survey rate |
Official document: UT20260083 on SAM.gov.
UT20260084 rev 1 · Building · Juab
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-016 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | 0.00 | SUUT2012-016 DOL wage survey rate |
Official document: UT20260084 on SAM.gov.
UT20260085 rev 1 · Building · Salt Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-017 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.48 | 0.00 | SUUT2012-017 DOL wage survey rate |
Official document: UT20260085 on SAM.gov.
UT20260086 rev 1 · Building · Tooele
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-018 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.48 | 0.00 | SUUT2012-018 DOL wage survey rate |
Official document: UT20260086 on SAM.gov.
UT20260087 rev 1 · Building · Utah
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-019 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | 0.00 | SUUT2012-019 DOL wage survey rate |
Official document: UT20260087 on SAM.gov.
UT20260088 rev 1 · Building · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-020 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | 0.00 | SUUT2012-020 DOL wage survey rate |
Official document: UT20260088 on SAM.gov.
UT20260089 rev 1 · Building · Morgan, Weber
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: LOADER | $19.34 | 0.00 | SUUT2012-021 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | 0.00 | SUUT2012-021 DOL wage survey rate |
Official document: UT20260089 on SAM.gov.
UT20260090 rev 1 · Heavy · Cache
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | 16.09 | ENGI0003-034 collectively bargained (union) rate |
| OPERATOR: LOADER | $24.30 | 5.67 | SUUT2018-001 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | 0.00 | SUUT2018-001 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.67 | 5.17 | SUUT2018-001 DOL wage survey rate |
Official document: UT20260090 on SAM.gov.
UT20260091 rev 1 · Heavy · Davis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | 16.09 | ENGI0003-034 collectively bargained (union) rate |
| OPERATOR: LOADER | $23.86 | 5.75 | SUUT2018-002 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | 0.00 | SUUT2018-002 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.61 | 5.17 | SUUT2018-002 DOL wage survey rate |
Official document: UT20260091 on SAM.gov.
UT20260092 rev 1 · Heavy · Juab
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | 16.09 | ENGI0003-034 collectively bargained (union) rate |
| OPERATOR: LOADER | $26.81 | 13.03 | SUUT2018-003 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | 0.00 | SUUT2018-003 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.44 | 10.04 | SUUT2018-003 DOL wage survey rate |
Official document: UT20260092 on SAM.gov.
UT20260093 rev 1 · Heavy · Utah
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | 16.09 | ENGI0003-034 collectively bargained (union) rate |
| OPERATOR: LOADER | $28.16 | 11.90 | SUUT2018-004 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | 0.00 | SUUT2018-004 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.47 | 11.24 | SUUT2018-004 DOL wage survey rate |
Official document: UT20260093 on SAM.gov.
UT20260094 rev 1 · Heavy · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | 16.09 | ENGI0003-034 collectively bargained (union) rate |
| OPERATOR: LOADER | $25.23 | 13.03 | SUUT2018-005 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | 0.00 | SUUT2018-005 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.50 | 10.04 | SUUT2018-005 DOL wage survey rate |
Official document: UT20260094 on SAM.gov.
UT20260095 rev 1 · Heavy · Weber
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | 16.09 | ENGI0003-034 collectively bargained (union) rate |
| OPERATOR: LOADER | $24.00 | 4.22 | SUUT2018-006 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | 0.00 | SUUT2018-006 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.00 | 4.22 | SUUT2018-006 DOL wage survey rate |
Official document: UT20260095 on SAM.gov.
UT20260096 rev 1 · Heavy · Box Elder, Morgan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | 16.09 | ENGI0003-034 collectively bargained (union) rate |
| OPERATOR: LOADER | $24.02 | 5.67 | SUUT2018-007 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | 0.00 | SUUT2018-007 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.61 | 5.17 | SUUT2018-007 DOL wage survey rate |
Official document: UT20260096 on SAM.gov.
UT20260097 rev 1 · Heavy · Salt Lake, Tooele
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $33.04 | 16.09 | ENGI0003-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $31.99 | 17.64 | ENGI0003-035 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | 0.00 | SUUT2018-008 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.40 | 16.96 | SUUT2018-008 DOL wage survey rate |
Official document: UT20260097 on SAM.gov.
UT20260098 rev 1 · Highway · Sanpete
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $26.14 | 12.31 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: ROLLER | $23.46 | 15.65 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | 15.65 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $27.81 | 7.26 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: MECHANIC | $27.43 | 15.65 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: LOADER | $25.37 | 15.65 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $27.92 | 15.65 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: BULLDOZER | $24.21 | 1.59 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $20.28 | 7.41 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-010 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.33 | 5.83 | SUUT2019-010 DOL wage survey rate |
Official document: UT20260098 on SAM.gov.
UT20260099 rev 1 · Highway · Sevier
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $35.45 | 17.64 | ENGI0003-020 collectively bargained (union) rate |
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: ROLLER | $20.23 | 5.61 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $26.53 | 6.00 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: LOADER | $20.63 | 6.92 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $23.69 | 5.95 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.77 | 4.40 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $18.29 | 5.65 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-011 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.10 | 5.97 | SUUT2019-011 DOL wage survey rate |
Official document: UT20260099 on SAM.gov.
UT20260100 rev 1 · Highway · Summit
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $26.14 | 12.31 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: ROLLER | $27.66 | 11.03 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | 15.65 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $27.81 | 7.26 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: MECHANIC | $27.43 | 15.65 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: LOADER | $25.37 | 15.65 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $27.92 | 15.65 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: BULLDOZER | $24.21 | 1.59 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $20.28 | 7.41 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-012 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.01 | 6.88 | SUUT2019-012 DOL wage survey rate |
Official document: UT20260100 on SAM.gov.
UT20260101 rev 1 · Highway · Wasatch
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $25.98 | 15.65 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: ROLLER | $23.46 | 15.65 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | 15.65 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: MILLING MACHINE | $27.81 | 7.26 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: MECHANIC | $27.55 | 15.65 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: LOADER | $25.37 | 15.65 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $27.92 | 15.65 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | 6.55 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: BULLDOZER | $24.21 | 1.59 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: BROOM/SWEEPER | $20.28 | 7.41 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | 3.31 | SUUT2019-013 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.33 | 5.83 | SUUT2019-013 DOL wage survey rate |
Official document: UT20260101 on SAM.gov.
UT20260102 rev 1 · Highway · Beaver, Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | 5.45 | SUUT2019-014 DOL wage survey rate |
| OPERATOR: ROLLER | $20.23 | 5.61 | SUUT2019-014 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | 8.13 | SUUT2019-014 DOL wage survey rate |
| OPERATOR: OILER | $19.00 | 5.44 | SUUT2019-014 DOL wage survey rate |
Official document: UT20260102 on SAM.gov.
Showing the first 400 of 556 published heavy equipment operator rates. The rest are on the individual determination pages linked above, each of which carries the full official text.
Where to go next
Heavy Equipment Operator rates in every state · Utah prevailing wage and state law · Utah determinations by county · pay calculator
Other trades in Utah
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Drywall Hanger · Plasterer · Insulator (Heat & Frost) · Boilermaker · Sprinkler Fitter · Tile Setter · Tile Finisher · Traffic Control / Striping