Traffic Control / Striping prevailing wage rates in Utah
Federal Davis-Bacon rates published in 32 active determinations, 2026
- Active federal Davis-Bacon determinations for Utah publish 80 traffic control / striping classification rates, across 32 determinations covering 29 counties.
- Those published base rates run from $10.47 to $23.71 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Heavy, Highway.
- Last determination revision affecting traffic control / striping rates in Utah: .
This page collects every classification in Utah's active federal determinations that is a form of traffic control / striping work (pavement marking, signing and work-zone traffic control) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
UT20260007 rev 1 · Highway · Duchesne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.31 | 8.65 | SUUT2019-001 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.33 | 1.72 | SUUT2019-001 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $19.26 | 1.62 | SUUT2019-001 DOL wage survey rate |
Official document: UT20260007 on SAM.gov.
UT20260008 rev 1 · Highway · Emery
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.69 | 2.79 | SUUT2019-002 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-002 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-002 DOL wage survey rate |
Official document: UT20260008 on SAM.gov.
UT20260009 rev 1 · Highway · Garfield
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-003 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-003 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-003 DOL wage survey rate |
Official document: UT20260009 on SAM.gov.
UT20260010 rev 1 · Highway · Grand
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-004 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-004 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-004 DOL wage survey rate |
Official document: UT20260010 on SAM.gov.
UT20260012 rev 1 · Highway · Iron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-005 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-005 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-005 DOL wage survey rate |
Official document: UT20260012 on SAM.gov.
UT20260013 rev 1 · Highway · Kane
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-006 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-006 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-006 DOL wage survey rate |
Official document: UT20260013 on SAM.gov.
UT20260014 rev 1 · Highway · Millard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-007 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $10.47 | 2.53 | SUUT2019-007 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-007 DOL wage survey rate |
Official document: UT20260014 on SAM.gov.
UT20260015 rev 1 · Highway · Piute
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-008 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-008 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-008 DOL wage survey rate |
Official document: UT20260015 on SAM.gov.
UT20260016 rev 1 · Highway · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-009 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-009 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-009 DOL wage survey rate |
Official document: UT20260016 on SAM.gov.
UT20260090 rev 1 · Heavy · Cache
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL (FLAGGER) | $23.71 | 9.78 | LABO0295-002 collectively bargained (union) rate |
Official document: UT20260090 on SAM.gov.
UT20260091 rev 1 · Heavy · Davis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL (FLAGGER) | $23.71 | 9.78 | LABO0295-002 collectively bargained (union) rate |
Official document: UT20260091 on SAM.gov.
UT20260092 rev 1 · Heavy · Juab
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL (FLAGGER) | $23.71 | 9.78 | LABO0295-002 collectively bargained (union) rate |
Official document: UT20260092 on SAM.gov.
UT20260093 rev 1 · Heavy · Utah
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL (FLAGGER) | $23.71 | 9.78 | LABO0295-002 collectively bargained (union) rate |
Official document: UT20260093 on SAM.gov.
UT20260094 rev 1 · Heavy · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL (FLAGGER) | $23.71 | 9.78 | LABO0295-002 collectively bargained (union) rate |
Official document: UT20260094 on SAM.gov.
UT20260095 rev 1 · Heavy · Weber
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL (FLAGGER) | $23.71 | 9.78 | LABO0295-002 collectively bargained (union) rate |
Official document: UT20260095 on SAM.gov.
UT20260096 rev 1 · Heavy · Box Elder, Morgan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL (FLAGGER) | $23.71 | 9.78 | LABO0295-002 collectively bargained (union) rate |
Official document: UT20260096 on SAM.gov.
UT20260097 rev 1 · Heavy · Salt Lake, Tooele
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL (FLAGGER) | $23.71 | 9.78 | LABO0295-002 collectively bargained (union) rate |
Official document: UT20260097 on SAM.gov.
UT20260098 rev 1 · Highway · Sanpete
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.31 | 8.65 | SUUT2019-010 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $15.00 | 4.13 | SUUT2019-010 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $19.26 | 1.62 | SUUT2019-010 DOL wage survey rate |
Official document: UT20260098 on SAM.gov.
UT20260099 rev 1 · Highway · Sevier
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-011 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-011 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-011 DOL wage survey rate |
Official document: UT20260099 on SAM.gov.
UT20260100 rev 1 · Highway · Summit
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.77 | 8.65 | SUUT2019-012 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $15.00 | 4.13 | SUUT2019-012 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $19.26 | 1.62 | SUUT2019-012 DOL wage survey rate |
Official document: UT20260100 on SAM.gov.
UT20260101 rev 1 · Highway · Wasatch
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.31 | 8.65 | SUUT2019-013 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $15.00 | 4.13 | SUUT2019-013 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $20.20 | 1.62 | SUUT2019-013 DOL wage survey rate |
Official document: UT20260101 on SAM.gov.
UT20260102 rev 1 · Highway · Beaver, Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | 2.79 | SUUT2019-014 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.47 | 2.53 | SUUT2019-014 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | 1.62 | SUUT2019-014 DOL wage survey rate |
Official document: UT20260102 on SAM.gov.
UT20260103 rev 1 · Highway · Carbon, Daggett, Rich, Uintah
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.31 | 8.65 | SUUT2019-015 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $15.00 | 4.13 | SUUT2019-015 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $19.26 | 1.62 | SUUT2019-015 DOL wage survey rate |
Official document: UT20260103 on SAM.gov.
UT20260104 rev 1 · Highway · Box Elder
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 7.56 | SUUT2019-016 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $20.59 | 8.65 | SUUT2019-016 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $14.05 | 1.62 | SUUT2019-016 DOL wage survey rate |
Official document: UT20260104 on SAM.gov.
UT20260105 rev 1 · Highway · Cache
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 8.65 | SUUT2019-017 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $20.59 | 8.65 | SUUT2019-017 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $19.52 | 1.62 | SUUT2019-017 DOL wage survey rate |
Official document: UT20260105 on SAM.gov.
UT20260106 rev 1 · Highway · Davis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 8.65 | SUUT2019-018 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $20.59 | 8.65 | SUUT2019-018 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $14.05 | 1.62 | SUUT2019-018 DOL wage survey rate |
Official document: UT20260106 on SAM.gov.
UT20260107 rev 1 · Highway · Juab
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 8.65 | SUUT2019-019 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $13.14 | 1.75 | SUUT2019-019 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $17.60 | 2.53 | SUUT2019-019 DOL wage survey rate |
Official document: UT20260107 on SAM.gov.
UT20260108 rev 1 · Highway · Morgan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 7.56 | SUUT2019-020 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $20.59 | 8.65 | SUUT2019-020 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $14.05 | 1.62 | SUUT2019-020 DOL wage survey rate |
Official document: UT20260108 on SAM.gov.
UT20260109 rev 1 · Highway · Utah
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 8.65 | SUUT2019-021 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $12.58 | 1.75 | SUUT2019-021 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $17.78 | 2.53 | SUUT2019-021 DOL wage survey rate |
Official document: UT20260109 on SAM.gov.
UT20260110 rev 1 · Highway · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 8.65 | SUUT2019-022 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $13.25 | 1.75 | SUUT2019-022 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $17.11 | 2.53 | SUUT2019-022 DOL wage survey rate |
Official document: UT20260110 on SAM.gov.
UT20260111 rev 1 · Highway · Weber
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 7.56 | SUUT2019-023 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $20.59 | 8.65 | SUUT2019-023 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $14.05 | 1.62 | SUUT2019-023 DOL wage survey rate |
Official document: UT20260111 on SAM.gov.
UT20260112 rev 1 · Highway · Salt Lake, Tooele
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | 8.65 | SUUT2019-024 DOL wage survey rate |
| TRAFFIC CONTROL: FLAGGER | $11.31 | 1.57 | SUUT2019-024 DOL wage survey rate |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $17.97 | 1.62 | SUUT2019-024 DOL wage survey rate |
Official document: UT20260112 on SAM.gov.
Where to go next
Traffic Control / Striping rates in every state · Utah prevailing wage and state law · Utah determinations by county · pay calculator
Other trades in Utah
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Drywall Hanger · Plasterer · Insulator (Heat & Frost) · Boilermaker · Sprinkler Fitter · Tile Setter · Tile Finisher