Tile Finisher prevailing wage rates in Minnesota
Federal Davis-Bacon rates published in 73 active determinations, 2026
- Active federal Davis-Bacon determinations for Minnesota publish 73 tile finisher classification rates, across 73 determinations covering 72 counties.
- Those published base rates run from $14.00 to $39.24 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Residential.
- Last determination revision affecting tile finisher rates in Minnesota: .
This page collects every classification in Minnesota's active federal determinations that is a form of tile finisher work (grouting and finishing behind the tile setter) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
MN20260008 rev 1 · Residential · McLeod, Sibley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.50 | 8.20 | BRMN0001-023 collectively bargained (union) rate |
Official document: MN20260008 on SAM.gov.
MN20260026 rev 1 · Residential · Cook, Koochiching, Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.23 | 22.05 | BRMN0001-021 collectively bargained (union) rate |
Official document: MN20260026 on SAM.gov.
MN20260027 rev 2 · Building · Aitkin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $32.03 | 22.32 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260027 on SAM.gov.
MN20260028 rev 2 · Building · Anoka
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260028 on SAM.gov.
MN20260029 rev 2 · Building · Becker
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $22.80 | 5.39 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260029 on SAM.gov.
MN20260030 rev 2 · Building · Beltrami
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $18.49 | 20.24 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260030 on SAM.gov.
MN20260031 rev 2 · Building · Benton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260031 on SAM.gov.
MN20260033 rev 2 · Building · Blue Earth
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $20.90 | 5.17 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260033 on SAM.gov.
MN20260034 rev 2 · Building · Brown
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $20.90 | 5.17 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260034 on SAM.gov.
MN20260035 rev 2 · Building · Carlton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $34.16 | 23.92 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260035 on SAM.gov.
MN20260036 rev 2 · Building · Carver
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260036 on SAM.gov.
MN20260037 rev 2 · Building · Cass
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $24.55 | 8.56 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260037 on SAM.gov.
MN20260038 rev 2 · Building · Chippewa
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 1.50 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260038 on SAM.gov.
MN20260039 rev 2 · Building · Chisago
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $35.15 | 24.36 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260039 on SAM.gov.
MN20260041 rev 2 · Building · Clearwater
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260041 on SAM.gov.
MN20260044 rev 2 · Building · Crow Wing
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $24.55 | 8.56 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260044 on SAM.gov.
MN20260045 rev 2 · Building · Dakota
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260045 on SAM.gov.
MN20260046 rev 2 · Building · Dodge
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.76 | 6.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260046 on SAM.gov.
MN20260047 rev 2 · Building · Douglas
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260047 on SAM.gov.
MN20260048 rev 2 · Building · Faribault
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $33.25 | 0.67 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260048 on SAM.gov.
MN20260049 rev 2 · Building · Fillmore
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.76 | 6.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260049 on SAM.gov.
MN20260050 rev 2 · Building · Freeborn
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.40 | 5.38 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260050 on SAM.gov.
MN20260051 rev 2 · Building · Goodhue
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260051 on SAM.gov.
MN20260053 rev 2 · Building · Hennepin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260053 on SAM.gov.
MN20260054 rev 2 · Building · Houston
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $20.00 | 4.75 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260054 on SAM.gov.
MN20260055 rev 2 · Building · Hubbard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260055 on SAM.gov.
MN20260056 rev 2 · Building · Isanti
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $35.15 | 24.36 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260056 on SAM.gov.
MN20260057 rev 2 · Building · Itasca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $32.03 | 22.32 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260057 on SAM.gov.
MN20260058 rev 2 · Building · Jackson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $22.80 | 5.39 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260058 on SAM.gov.
MN20260059 rev 2 · Building · Kanabec
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $29.45 | 20.33 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260059 on SAM.gov.
MN20260060 rev 2 · Building · Kandiyohi
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260060 on SAM.gov.
MN20260061 rev 2 · Building · Kittson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $15.66 | 4.27 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260061 on SAM.gov.
MN20260062 rev 2 · Building · Koochiching
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $32.03 | 22.32 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260062 on SAM.gov.
MN20260064 rev 2 · Building · Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $34.16 | 23.92 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260064 on SAM.gov.
MN20260065 rev 2 · Building · Lake of the Woods, Lake of the Woods
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260065 on SAM.gov.
MN20260066 rev 2 · Building · Le Sueur
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $24.92 | 7.75 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260066 on SAM.gov.
MN20260067 rev 2 · Building · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $18.25 | 5.99 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260067 on SAM.gov.
MN20260070 rev 2 · Building · Marshall
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260070 on SAM.gov.
MN20260071 rev 2 · Building · Martin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $20.90 | 5.17 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260071 on SAM.gov.
MN20260072 rev 2 · Building · McLeod
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.70 | 6.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260072 on SAM.gov.
MN20260073 rev 2 · Building · Meeker
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.70 | 6.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260073 on SAM.gov.
MN20260074 rev 2 · Building · Mille Lacs
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $26.98 | 7.25 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260074 on SAM.gov.
MN20260075 rev 2 · Building · Morrison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $26.98 | 7.25 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260075 on SAM.gov.
MN20260076 rev 2 · Building · Mower
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.76 | 6.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260076 on SAM.gov.
MN20260078 rev 2 · Building · Nicollet
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $20.90 | 5.17 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260078 on SAM.gov.
MN20260081 rev 2 · Building · Olmsted
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.76 | 6.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260081 on SAM.gov.
MN20260082 rev 2 · Building · Otter Tail
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.21 | 5.46 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260082 on SAM.gov.
MN20260083 rev 2 · Building · Pennington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260083 on SAM.gov.
MN20260084 rev 2 · Building · Pine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.80 | 23.31 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260084 on SAM.gov.
MN20260086 rev 2 · Building · Polk
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $22.80 | 5.39 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260086 on SAM.gov.
MN20260087 rev 2 · Building · Pope
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260087 on SAM.gov.
MN20260088 rev 2 · Building · Ramsey
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260088 on SAM.gov.
MN20260091 rev 2 · Building · Renville
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $17.00 | 2.41 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260091 on SAM.gov.
MN20260092 rev 2 · Building · Rice
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260092 on SAM.gov.
MN20260094 rev 2 · Building · Roseau
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260094 on SAM.gov.
MN20260095 rev 2 · Building · Scott
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260095 on SAM.gov.
MN20260096 rev 2 · Building · Sherburne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $33.29 | 15.28 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260096 on SAM.gov.
MN20260097 rev 2 · Building · Sibley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $24.92 | 7.75 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260097 on SAM.gov.
MN20260098 rev 2 · Building · St Louis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $34.16 | 23.92 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260098 on SAM.gov.
MN20260099 rev 2 · Building · Stearns
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.70 | 6.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260099 on SAM.gov.
MN20260100 rev 2 · Building · Steele
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.40 | 5.38 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260100 on SAM.gov.
MN20260101 rev 2 · Building · Stevens
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $20.50 | 1.50 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260101 on SAM.gov.
MN20260103 rev 2 · Building · Todd
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $14.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260103 on SAM.gov.
MN20260104 rev 2 · Building · Traverse
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $22.80 | 5.39 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260104 on SAM.gov.
MN20260105 rev 2 · Building · Wabasha
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.76 | 6.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260105 on SAM.gov.
MN20260106 rev 2 · Building · Wadena
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.21 | 5.46 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260106 on SAM.gov.
MN20260107 rev 2 · Building · Waseca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $33.25 | 0.67 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260107 on SAM.gov.
MN20260108 rev 2 · Building · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260108 on SAM.gov.
MN20260109 rev 2 · Building · Watonwan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $20.90 | 5.17 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260109 on SAM.gov.
MN20260110 rev 2 · Building · Wilkin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $22.80 | 5.39 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260110 on SAM.gov.
MN20260111 rev 2 · Building · Winona
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.21 | 10.41 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260111 on SAM.gov.
MN20260112 rev 2 · Building · Wright
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $39.24 | 24.88 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260112 on SAM.gov.
MN20260113 rev 2 · Building · Yellow Medicine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $26.10 | 6.11 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260113 on SAM.gov.
Where to go next
Tile Finisher rates in every state · Minnesota prevailing wage and state law · Minnesota determinations by county · pay calculator
Other trades in Minnesota
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Drywall Hanger · Plasterer · Glazier · Millwright · Boilermaker · Elevator Constructor · Sprinkler Fitter · Piledriver · Tile Setter · Floor Layer · Line Constructor / Lineman · Traffic Control / Striping