Tile Setter prevailing wage rates in Minnesota
Federal Davis-Bacon rates published in 92 active determinations, 2026
- Active federal Davis-Bacon determinations for Minnesota publish 173 tile setter classification rates, across 92 determinations covering 86 counties.
- Those published base rates run from $7.25 to $50.80 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting tile setter rates in Minnesota: .
This page collects every classification in Minnesota's active federal determinations that is a form of tile setter work (ceramic tile, marble and terrazzo setting) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
MN20260008 rev 1 · Residential · McLeod, Sibley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| MARBLE SETTER | $45.47 | 26.33 | BRMN0001-009 collectively bargained (union) rate |
| TERRAZZO WORKER/SETTER (MECHANIC) | $44.36 | 22.35 | BRMN0001-035 collectively bargained (union) rate |
| TERRAZZO WORKER/SETTER (FINISHER) | $42.67 | 22.04 | BRMN0001-035 collectively bargained (union) rate |
| TERRAZZO WORKER/SETTER (BASE MACHINE) | $40.60 | 21.94 | BRMN0001-035 collectively bargained (union) rate |
Official document: MN20260008 on SAM.gov.
MN20260012 rev 1 · Residential · Kanabec, Mille Lacs, Pine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE SETTER | $7.25 | 0.00 | SUMN1991-001 DOL wage survey rate |
Official document: MN20260012 on SAM.gov.
MN20260014 rev 1 · Residential · Lincoln, Lyon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE SETTER | $12.00 | 0.00 | SUMN1990-016 DOL wage survey rate |
Official document: MN20260014 on SAM.gov.
MN20260026 rev 1 · Residential · Cook, Koochiching, Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| MARBLE SETTER | $45.47 | 26.33 | BRMN0001-004 collectively bargained (union) rate |
Official document: MN20260026 on SAM.gov.
MN20260027 rev 2 · Building · Aitkin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $43.77 | 32.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260027 on SAM.gov.
MN20260028 rev 2 · Building · Anoka
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260028 on SAM.gov.
MN20260029 rev 2 · Building · Becker
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $43.73 | 20.73 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $17.44 | 5.81 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260029 on SAM.gov.
MN20260030 rev 2 · Building · Beltrami
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $43.77 | 32.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260030 on SAM.gov.
MN20260031 rev 2 · Building · Benton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $46.27 | 26.64 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.64 | 12.47 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260031 on SAM.gov.
MN20260032 rev 2 · Building · Big Stone
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260032 on SAM.gov.
MN20260033 rev 2 · Building · Blue Earth
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.92 | 21.50 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260033 on SAM.gov.
MN20260034 rev 2 · Building · Brown
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $38.91 | 19.40 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $44.90 | 5.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260034 on SAM.gov.
MN20260035 rev 2 · Building · Carlton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $41.02 | 35.15 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260035 on SAM.gov.
MN20260036 rev 2 · Building · Carver
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260036 on SAM.gov.
MN20260037 rev 2 · Building · Cass
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $41.96 | 22.50 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $43.77 | 32.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260037 on SAM.gov.
MN20260038 rev 2 · Building · Chippewa
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $38.91 | 19.40 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260038 on SAM.gov.
MN20260039 rev 2 · Building · Chisago
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260039 on SAM.gov.
MN20260040 rev 2 · Building · Clay
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $34.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $17.44 | 5.81 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260040 on SAM.gov.
MN20260041 rev 2 · Building · Clearwater
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.11 | 30.59 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260041 on SAM.gov.
MN20260042 rev 2 · Building · Cook
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $41.02 | 35.15 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260042 on SAM.gov.
MN20260043 rev 2 · Building · Cottonwood
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $36.07 | 26.30 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260043 on SAM.gov.
MN20260044 rev 2 · Building · Crow Wing
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $41.96 | 22.50 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $43.77 | 32.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260044 on SAM.gov.
MN20260045 rev 2 · Building · Dakota
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260045 on SAM.gov.
MN20260046 rev 2 · Building · Dodge
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $39.49 | 18.82 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $42.80 | 28.58 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260046 on SAM.gov.
MN20260047 rev 2 · Building · Douglas
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $25.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260047 on SAM.gov.
MN20260048 rev 2 · Building · Faribault
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.75 | 0.82 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260048 on SAM.gov.
MN20260049 rev 2 · Building · Fillmore
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $45.25 | 0.91 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260049 on SAM.gov.
MN20260050 rev 2 · Building · Freeborn
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.89 | 22.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260050 on SAM.gov.
MN20260051 rev 2 · Building · Goodhue
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260051 on SAM.gov.
MN20260052 rev 2 · Building · Grant
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260052 on SAM.gov.
MN20260053 rev 2 · Building · Hennepin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260053 on SAM.gov.
MN20260054 rev 2 · Building · Houston
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $44.90 | 5.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260054 on SAM.gov.
MN20260055 rev 2 · Building · Hubbard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $43.73 | 20.73 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $43.77 | 32.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260055 on SAM.gov.
MN20260056 rev 2 · Building · Isanti
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $46.27 | 26.64 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $42.76 | 30.32 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260056 on SAM.gov.
MN20260057 rev 2 · Building · Itasca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $48.27 | 24.14 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $43.77 | 32.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260057 on SAM.gov.
MN20260058 rev 2 · Building · Jackson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260058 on SAM.gov.
MN20260059 rev 2 · Building · Kanabec
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $48.27 | 24.14 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $42.76 | 30.32 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260059 on SAM.gov.
MN20260060 rev 2 · Building · Kandiyohi
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $38.91 | 19.40 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $25.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260060 on SAM.gov.
MN20260062 rev 2 · Building · Koochiching
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $48.27 | 24.14 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $43.77 | 32.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260062 on SAM.gov.
MN20260063 rev 2 · Building · Lac Qui Parle
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $31.58 | 17.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260063 on SAM.gov.
MN20260064 rev 2 · Building · Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $41.02 | 35.15 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260064 on SAM.gov.
MN20260065 rev 2 · Building · Lake of the Woods, Lake of the Woods
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.11 | 30.59 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260065 on SAM.gov.
MN20260066 rev 2 · Building · Le Sueur
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $45.32 | 22.29 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.92 | 21.50 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260066 on SAM.gov.
MN20260067 rev 2 · Building · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $18.25 | 5.99 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260067 on SAM.gov.
MN20260068 rev 2 · Building · Lyon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $43.73 | 20.73 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $18.75 | 6.10 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260068 on SAM.gov.
MN20260069 rev 2 · Building · Mahnomen
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE SETTER | $40.19 | 13.33 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260069 on SAM.gov.
MN20260070 rev 2 · Building · Marshall
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.19 | 13.33 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260070 on SAM.gov.
MN20260071 rev 2 · Building · Martin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $31.65 | 20.76 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $44.90 | 5.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260071 on SAM.gov.
MN20260072 rev 2 · Building · McLeod
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $45.32 | 22.29 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.19 | 13.33 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260072 on SAM.gov.
MN20260073 rev 2 · Building · Meeker
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $45.32 | 22.29 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.64 | 12.47 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260073 on SAM.gov.
MN20260074 rev 2 · Building · Mille Lacs
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $46.27 | 26.64 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.64 | 12.47 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260074 on SAM.gov.
MN20260075 rev 2 · Building · Morrison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $41.96 | 22.50 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $44.49 | 19.98 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260075 on SAM.gov.
MN20260076 rev 2 · Building · Mower
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $38.91 | 19.40 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.89 | 22.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260076 on SAM.gov.
MN20260077 rev 2 · Building · Murray
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260077 on SAM.gov.
MN20260078 rev 2 · Building · Nicollet
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $38.91 | 19.40 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.92 | 21.50 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260078 on SAM.gov.
MN20260079 rev 2 · Building · Nobles
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260079 on SAM.gov.
MN20260080 rev 2 · Building · Norman
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE SETTER | $40.19 | 13.33 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260080 on SAM.gov.
MN20260081 rev 2 · Building · Olmsted
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.54 | 23.94 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $42.80 | 28.58 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260081 on SAM.gov.
MN20260082 rev 2 · Building · Otter Tail
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $43.73 | 20.73 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $17.44 | 5.81 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260082 on SAM.gov.
MN20260083 rev 2 · Building · Pennington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.19 | 13.33 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260083 on SAM.gov.
MN20260084 rev 2 · Building · Pine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $41.02 | 35.15 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260084 on SAM.gov.
MN20260085 rev 2 · Building · Pipestone
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $43.73 | 20.73 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260085 on SAM.gov.
MN20260086 rev 2 · Building · Polk
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.19 | 13.33 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260086 on SAM.gov.
MN20260087 rev 2 · Building · Pope
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $38.91 | 19.40 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $25.00 | 0.00 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260087 on SAM.gov.
MN20260088 rev 2 · Building · Ramsey
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260088 on SAM.gov.
MN20260089 rev 2 · Building · Red Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.19 | 13.33 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260089 on SAM.gov.
MN20260090 rev 2 · Building · Redwood
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $43.73 | 20.73 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $27.10 | 9.89 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260090 on SAM.gov.
MN20260091 rev 2 · Building · Renville
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $38.91 | 19.40 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.06 | 11.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260091 on SAM.gov.
MN20260092 rev 2 · Building · Rice
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $45.32 | 22.29 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260092 on SAM.gov.
MN20260093 rev 2 · Building · Rock
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260093 on SAM.gov.
MN20260094 rev 2 · Building · Roseau
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.82 | 10.90 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260094 on SAM.gov.
MN20260095 rev 2 · Building · Scott
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260095 on SAM.gov.
MN20260096 rev 2 · Building · Sherburne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $44.49 | 19.98 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260096 on SAM.gov.
MN20260097 rev 2 · Building · Sibley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $45.32 | 22.29 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.89 | 22.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260097 on SAM.gov.
MN20260098 rev 2 · Building · St Louis
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $41.02 | 35.15 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260098 on SAM.gov.
MN20260099 rev 2 · Building · Stearns
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $46.27 | 26.64 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $40.64 | 12.47 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260099 on SAM.gov.
MN20260100 rev 2 · Building · Steele
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.89 | 22.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260100 on SAM.gov.
MN20260101 rev 2 · Building · Stevens
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260101 on SAM.gov.
MN20260102 rev 2 · Building · Swift
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $38.91 | 19.40 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260102 on SAM.gov.
MN20260103 rev 2 · Building · Todd
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $43.73 | 20.73 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $44.49 | 19.98 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260103 on SAM.gov.
MN20260104 rev 2 · Building · Traverse
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260104 on SAM.gov.
MN20260105 rev 2 · Building · Wabasha
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.54 | 23.94 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $42.80 | 28.58 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260105 on SAM.gov.
MN20260106 rev 2 · Building · Wadena
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $43.73 | 20.73 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $43.77 | 32.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260106 on SAM.gov.
MN20260107 rev 2 · Building · Waseca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $40.53 | 19.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.89 | 22.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260107 on SAM.gov.
MN20260108 rev 2 · Building · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260108 on SAM.gov.
MN20260109 rev 2 · Building · Watonwan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $39.49 | 18.82 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $44.90 | 5.65 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260109 on SAM.gov.
MN20260110 rev 2 · Building · Wilkin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.58 | 16.83 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $17.44 | 5.81 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260110 on SAM.gov.
MN20260111 rev 2 · Building · Winona
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $37.54 | 23.94 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $37.89 | 22.02 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260111 on SAM.gov.
MN20260112 rev 2 · Building · Wright
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $50.80 | 27.89 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $47.52 | 31.14 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260112 on SAM.gov.
MN20260113 rev 2 · Building · Yellow Medicine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TERRAZZO WORKER | $28.47 | 14.19 | SAMN2025-001 collectively bargained (union) rate |
| TILE SETTER | $26.10 | 6.11 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260113 on SAM.gov.
MN20260233 rev 2 · Heavy, Highway · Aitkin, Cass, Crow Wing, Kanabec, Mille Lacs, Morrison and 2 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE SETTER | $30.66 | 10.53 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260233 on SAM.gov.
MN20260239 rev 2 · Heavy, Highway · Anoka, Carver, Chisago, Dakota, Hennepin, Ramsey and 2 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE SETTER | $34.76 | 23.29 | SAMN2025-001 collectively bargained (union) rate |
Official document: MN20260239 on SAM.gov.
Where to go next
Tile Setter rates in every state · Minnesota prevailing wage and state law · Minnesota determinations by county · pay calculator
Other trades in Minnesota
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Drywall Hanger · Plasterer · Glazier · Millwright · Boilermaker · Elevator Constructor · Sprinkler Fitter · Piledriver · Tile Finisher · Floor Layer · Line Constructor / Lineman · Traffic Control / Striping