Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of CT20260017 rev 2
"General Decision Number: CT20260017 05/18/2026
State: Connecticut
Construction Types: Heavy
Counties: Connecticut Counties of
New London
Modification Number Publication Date
1 01/23/2026
2 05/18/2026
BRCT0001-011 01/05/2026
Rates Fringes
BRICKLAYER..........................................$ 46.09 36.29
----------------------------------------------------------------
CARP0326-004 05/06/2024
Rates Fringes
CARPENTERS, PILEDRIVERS.............................$ 42.03 29.19
CARPENTER (DIVERS)..................................$ 50.49 29.19
CARPENTER (DIVER TENDERS)...........................$ 42.03 29.19
----------------------------------------------------------------
CARP1121-006 01/05/2026
Rates Fringes
MILLWRIGHT..........................................$ 45.14 30.24
----------------------------------------------------------------
ELEC0035-011 06/01/2025
Rates Fringes
ELECTRICIAN (BOZRAH, COLCHESTER, FRANKLIN,
GRISWOLD, LEBANON, LEDYARD, LISBON, MONTVILLE,
NORTH STONINGTON, NORWICH, PRESTON, SALEM, SPRAGUE,
STONINGTON AND VOLUNTOWN)...........................$ 48.25 36.67
----------------------------------------------------------------
ELEC0090-003 06/01/2025
Rates Fringes
ELECTRICIAN (EAST LYME, GROTON, NEW LONDON, OLD
LYME, WATERFORD, PLUS THE PART OF LEDYARD WHEREIN
THE PROPERTY OF THE SUBMARINE BASE IS LOCATED)......$ 46.48 38.05
----------------------------------------------------------------
ENGI0478-001 04/06/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING
MACHINES, LIGHTER DERRICK, CONCRETE FINISHING
MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER
(SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 51.92 29.80
POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR,
GRADALL, MASTER MECHANIC, HOISTING ENGINEER (ALL
TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED
TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE
POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT
1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE
(SLOPES SHAPING, LASER OR GPS, ECT.) A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 51.92 29.80
POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER
2 CUBIC YARDS; PILE DRIVER($3.00 PREMIUM WHEN
OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW
YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 52.92 29.80
POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END
LOADER(7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND
OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 53.33 29.80
POWER EQUIPMENT OPERATORS: GROUP 18 MAINTENANCE
ENGINEER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 42.20 29.80
POWER EQUIPMENT OPERATORS: GROUP 17 GENERATOR
OPERATOR, COMPRESSOR OPERATOR, PUMP
OPERATOR,WELDING MACHINE OPERATOR; HEATER OPERATOR.
A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 43.06 29.80
POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR
OPERATOR, TOW MOTOR OPERATOR (SOLID TIRE NO ROUGH
TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 43.60 29.80
POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY
BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; (MINIMUM
FOR ANY JOB REQUIRING A CDL LICENSE) . A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 44.70 29.80
POWER EQUIPMENT OPERATORS: GROUP 14 COMPRESSOR
BATTERY OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S
DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 45.12 29.80
POWER EQUIPMENT OPERATORS: GROUP 13 PORTABLE
ASPHALT PLANT OPERATOR, PORTABLE CONCRETE PLANT
OPERATOR, PORTABLE CRUSHER PLANT OPERATOR, PORTABLE
GROUT PLANT OPERATOR, PORTABLE WATER FILTRATION
PLANT OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY,
GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED
THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH
THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED,
THE WORKING DAY BEFORE AND THE WORKING DAY AFTER
THE HOLIDAY.........................................$ 47.91 29.80
POWER EQUIPMENT OPERATORS: GROUP 12 WELLPOINT
OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 45.87 29.80
POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR,
EARTH ROLLER, POWER PAVEMENT BREAKER (WHIPHAMMER),
ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW
YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 45.96 29.80
POWER EQUIPMENT OPERATORS: GROUP 10 VIBRATORY
HAMMER,ICE MACHINE, DIESEL & AIR, HAMMER, ETC. A.
PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 45.96 29.80
POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END
LOADER (UNDER 3 CUBIC YARDS), SKID STEER LOADER
(REGARDLESS OF ATTACHMENTS), BOBCAT OR SIMILAR,
FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT
(INCLUDING HYDROSEEDER), VACUUM EXACAVATION TRUCK
AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR
GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 48.67 29.80
POWER EQUIPMENT OPERATORS: GROUP 8 MECHANIC,
GREASE TRUCK OPERATOR, HYDOBLASTER, BARRIER MOVER,
POWER STONE SPREADER, WELDER, WORK BOAT UNDER 26
FT. TRANSFER MACHINE. A. PAID HOLIDAYS: NEW YEAR'S
DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 49.25 29.80
POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT
ROLLER, CONCRETE SAWS AND CUTTERS (RIDE ON TYPES),
VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER,
SNOOPER, SKIDDER, MILLING MACHINE (24"" AND UNDER
MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 49.25 29.80
POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END
LOADER (3 CU. YDS. UP TO 7 CU. YARDS), BULLDOZER
(ROUGH GRADE DOZER) . A. PAID HOLIDAYS: NEW YEAR'S
DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 50.22 29.80
POWER EQUIPMENT OPERATORS: GROUP 5 SPECIALTY
RAILROAD EQUIPMENT, ASPHALT SPREADER, ASPHALT
RECLAIMING MACHINE, LINE GRIDER, CONCRETE PUMPS,
DRILLS WITH SELF CONTAINED POWER UNITS, BORING
MACHINE, POST HOLE DIGGER, AUGER, POUNDER, WELL
DIGGER, MILLING MACHINE (OVER 24' MANDREL), SIDE
BOOM, COMBINATION HOE AND LOADER, DIRECTIONAL
DRILLER A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 50.63 29.80
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES (UNDER
100 TON RATED CAPACITY) HAZARDOUS WASTE PREMIUM
$3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH
BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA.
CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50
EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET -
$5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300
FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING
JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR
ERECTING STRUCTURAL STEEL OR STONE, HOISTING
ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED
CAPACITY AND OVER) BAUER DRILL/CAISSON 3)
CRANES(UNDER 100 TON RATED CAPACITY) A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 56.79 29.80
POWER EQUIPMENT OPERATORS: GROUP 2 CRANES (100
TON CAPACITY & OVER) BAUER DRILL/CAISSON
HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER
CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB,
150 FEET - $1.50 EXTRA. CRANE WITH BOOM,
INCLUDING JIB, 200 FEET - $2.50 EXTRA. CRANE
WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA.
CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00
EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400 FEET -
$10.00 EXTRA 1) CRANE HANDLING OR ERECTING
STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2
DRUMS OR OVER) 2) CRANES(100 TON RATED CAPACITY
AND OVER) BAUER DRILL/CAISSON 3) CRANES(UNDER 100
TON RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S
DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 57.78 29.80
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING
OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING
ENGINEER (2 DRUMS OR OVER) HAZARDOUS WASTE PREMIUM
$3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH
BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA.
CRANE WITH BOOM, INCLUDING JIB, 200 FEET - $2.50
EXTRA. CRANE WITH BOOM, INCLUDING JIB, 250 FEET -
$5.00 EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300
FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING
JIB, 400 FEET - $10.00 EXTRA 1) CRANE HANDLING OR
ERECTING STRUCTURAL STEEL OR STONE, HOISTING
ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED
CAPACITY AND OVER) BAUER DRILL/CAISSON 3)
CRANES(UNDER 100 TON RATED CAPACITY) A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 58.19 29.80
----------------------------------------------------------------
ENGI0478-008 04/06/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: RUBBER TIRE
BACKHOE/EXCAVATOR A. PAID HOLIDAYS: NEW YEAR'S
DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 51.92 29.80
POWER EQUIPMENT OPERATOR: MECHANIC A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 49.25 29.80
POWER EQUIPMENT OPERATOR: MAINTENANCE
ENGINEER/OILER A. PAID HOLIDAYS: NEW YEAR'S DAY,
GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED
THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH
THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED,
THE WORKING DAY BEFORE AND THE WORKING DAY AFTER
THE HOLIDAY.........................................$ 42.20 29.80
POWER EQUIPMENT OPERATOR: GRADER/BLADE A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 51.42 29.80
POWER EQUIPMENT OPERATOR: FRONT END LOADER (UNDER 3
CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY,
GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED
THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH
THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED,
THE WORKING DAY BEFORE AND THE WORKING DAY AFTER
THE HOLIDAY.........................................$ 48.67 29.80
POWER EQUIPMENT OPERATOR: FRONT END LOADER (7 CUBIC
YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY,
GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED
THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH
THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED,
THE WORKING DAY BEFORE AND THE WORKING DAY AFTER
THE HOLIDAY.........................................$ 53.33 29.80
POWER EQUIPMENT OPERATOR: FRONT END LOADER (3 CUBIC
YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW
YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 50.22 29.80
POWER EQUIPMENT OPERATOR: FORKLIFT A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 48.67 29.80
POWER EQUIPMENT OPERATOR: EARTH ROLLER A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 45.96 29.80
POWER EQUIPMENT OPERATOR: DRILLS WITH SELF
CONTAINED POWER UNITS; DIRECTIONAL DRILLER A.
PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 50.63 29.80
POWER EQUIPMENT OPERATOR: CRANES (UNDER 100 TON
RATED CAPACITY) A. PAID HOLIDAYS: NEW YEAR'S
DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY. B. CRANE WITH BOOM,
INCLUDING JIB, 150 FEET - $1.50 EXTRA . CRANE
WITH BOOM, INCLUDING JIB, 200 FEET- $2.50 EXTRA.
CRANE WITH BOOM, INCLUDING JIB, 250 FEET - $5.00
EXTRA. CRANE WITH BOOM, INCLUDING JIB, 300
FEET - $7.00 EXTRA. CRANE WITH BOOM, INCLUDING
JIB, 400 FEET - $10.00 EXTRA........................$ 56.79 29.80
POWER EQUIPMENT OPERATOR: CRANES (100 TON CAPACITY
& OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY. B. CRANE WITH BOOM, INCLUDING JIB, 150
FEET - $1.50 EXTRA . CRANE WITH BOOM,
INCLUDING JIB, 200 FEET- $2.50 EXTRA. CRANE
WITH BOOM, INCLUDING JIB, 250 FEET - $5.00 EXTRA.
CRANE WITH BOOM, INCLUDING JIB, 300 FEET - $7.00
EXTRA. CRANE WITH BOOM, INCLUDING JIB, 400
FEET - $10.00 EXTRA.................................$ 57.78 29.80
POWER EQUIPMENT OPERATOR: CRANE HANDLING OR
ERECTING STRUCTURAL STEEL OR STONE A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY. B. CRANE
WITH BOOM, INCLUDING JIB, 150 FEET - $1.50 EXTRA .
CRANE WITH BOOM, INCLUDING JIB, 200 FEET-
$2.50 EXTRA. CRANE WITH BOOM, INCLUDING JIB,
250 FEET - $5.00 EXTRA. CRANE WITH BOOM,
INCLUDING JIB, 300 FEET - $7.00 EXTRA. CRANE
WITH BOOM, INCLUDING JIB, 400 FEET - $10.00 EXTRA...$ 58.19 29.80
POWER EQUIPMENT OPERATOR: BULLDOZER FINE GRADE
(INCLUDES SLOPES, SHAPING, LASER OR GPS) A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 51.92 29.80
POWER EQUIPMENT OPERATOR: BULLDOZER (ROUGH GRADE
DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 50.22 29.80
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR UNDER 2
CUBIC YARDS A. PAID HOLIDAYS: NEW YEAR'S DAY,
GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED
THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH
THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED,
THE WORKING DAY BEFORE AND THE WORKING DAY AFTER
THE HOLIDAY.........................................$ 51.92 29.80
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR 2 CUBIC
YARDS AND OVER A. PAID HOLIDAYS: NEW YEAR'S DAY,
GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED
THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH
THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED,
THE WORKING DAY BEFORE AND THE WORKING DAY AFTER
THE HOLIDAY.........................................$ 52.92 29.80
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER A.
PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 50.63 29.80
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 49.77 29.80
POWER EQUIPMENT OPERATOR: ASPHALT PAVER A. PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 50.63 29.80
----------------------------------------------------------------
IRON0015-008 06/02/2025
Rates Fringes
IRONWORKER: REINFORCING AND STRUCTURAL A. PAID
HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON
THE PAYROLL FOR THE 5 CONSECUTIVE WORK DAYS PRIOR
TO LABOR DAY........................................$ 45.25 43.62
----------------------------------------------------------------
LABO0146-002 04/06/2025
Rates Fringes
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND
CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE
OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO
EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE
FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 45.01 28.85
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND
CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE
ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A.
PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE
SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS,
WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 42.24 28.85
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND
CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN,
TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER,
GAUGE TENDERS A. PAID HOLIDAYS: ON TUNNEL WORK
ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.
NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN
HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK
DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 44.22 28.85
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND
CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID
HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE
SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS,
WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 44.42 28.85
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND
LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN,
MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN,
SHAFT AND TUNNEL, STEEL AND RODMEN, SHIELD AND
ERECTOR, ARM OPERATOR, CABLE TENDERS A. PAID
HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE
SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS,
WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 37.93 28.85
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND
LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND
TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO
EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE
FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 36.96 28.85
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT,
CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR:
MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO
EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE
FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 37.93 28.85
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT,
CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR:
LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID
HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE
SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS,
WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 36.85 28.85
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT,
CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR:
BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS
A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO
EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE
FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 36.96 28.85
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE
AND CAULKING TUNNEL: FORM ERECTORS A. PAID
HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE
SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS,
WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY
PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 37.29 28.85
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE
AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS
AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK
ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.
NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN
HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK
DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY
FOLLOWING THE HOLIDAY...............................$ 36.96 28.85
----------------------------------------------------------------
LABO0146-005 04/06/2025
Rates Fringes
LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH
PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY
THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A
HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO
WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT
WORN.)..............................................$ 38.70 28.85
LABORERS GROUP 8 ACETYLENE BURNER (HOURS WORKED
WITH A TORCH).......................................$ 36.70 28.85
LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN..........$ 21.42 28.85
LABORERS GROUP 6 TOXIC WASTE REMOVER................$ 37.70 28.85
LABORERS GROUP 5 BLASTERS...........................$ 37.45 28.85
LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL..............$ 38.70 28.85
LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT
BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN
BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS,
BLOCK PAVER AND CURB SETTER.......................$ 36.20 28.85
LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND
GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND
POWDERMEN...........................................$ 35.95 28.85
LABORERS GROUP 1 LABORERS (UNSKILLED), CONCRETE
SPECIALIST..........................................$ 35.70 28.85
----------------------------------------------------------------
PAIN0011-013 06/01/2021
Rates Fringes
PAINTER (STEEL ONLY)................................$ 38.42 22.90
PAINTER (SPRAY ONLY)................................$ 39.42 22.90
PAINTER (BRUSH AND ROLLER)..........................$ 36.42 22.90
----------------------------------------------------------------
SUCT2002-012 12/16/2008
Rates Fringes
TRUCK DRIVER: 3 AXLE & SEMI - TRUCK................$ 19.93 7.01
CEMENT MASON/CONCRETE FINISHER......................$ 25.52 8.49
----------------------------------------------------------------
TEAM0064-001 04/06/2025
Rates Fringes
TRUCK DRIVERS: SPECIALIZED (EARTH MOVING EQUIPMENT
OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND
SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS
WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER
HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE
EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE
AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE
FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS
EXCUSED.............................................$ 36.44 32.68
TRUCK DRIVERS: SNORKLE TRUCK HAZARDOUS WASTE
REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR.
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE
EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE
AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE
FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS
EXCUSED.............................................$ 36.54 32.68
TRUCK DRIVERS: HEAVY DUTY TRAILER UP TO 40 TONS
HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL
$1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY,
PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS
OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE
AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY,
UNLESS EXCUSED......................................$ 37.39 32.68
TRUCK DRIVERS: HEAVY DUTY TRAILER 40 TONS AND OVER
HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL
$1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY,
PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS
OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE
AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY,
UNLESS EXCUSED......................................$ 38.66 32.68
TRUCK DRIVERS: 4 AXLE READY MIX HAZARDOUS WASTE
REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR.
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE
EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE
AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE
FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS
EXCUSED.............................................$ 37.19 32.68
TRUCK DRIVERS: 4 AXLE HAZARDOUS WASTE REMOVAL
WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE
EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE
AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE
FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS
EXCUSED.............................................$ 36.39 32.68
TRUCK DRIVERS: 3 AXLE READY MIX HAZARDOUS WASTE
REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR.
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE
EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE
AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE
FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS
EXCUSED.............................................$ 36.33 32.68
TRUCK DRIVERS: 3 AXLE HAZARDOUS WASTE REMOVAL
WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE
EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE
AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE
FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS
EXCUSED.............................................$ 36.27 32.68
TRUCK DRIVERS: 2 AXLE READY MIX HAZARDOUS WASTE
REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR.
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE
EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE
AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE
FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS
EXCUSED.............................................$ 36.27 32.68
TRUCK DRIVERS: 2 AXLE HAZARDOUS WASTE REMOVAL
WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE
EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE
AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE
FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS
EXCUSED.............................................$ 36.16 32.68
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
"