Building, Heavy, Highway construction - New York, revision 2, modified 2026-05-18

Verify against the official document: this page mirrors WD NY20260002 revision 2 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0040-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAI$41.7427.58
ASBESTOS/INSULATOR WORKER (SCOPE OF WORK: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE, COVERINGS, COATING AND FINISHING TO ALL TYPES OF MECHANICAL SYSTEMS.)$41.7427.58

BOIL0197-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$43.3427.66

BRNY0002-019 (collectively bargained (union) rate, 12/03/2025)

ClassificationBase rateFringes
BRICKLAYER (BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CAULKERS & CLEANERS)$41.7922.33

CARP0279-006 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY AND HIGHWAY CONSTRUCTION (COLUMBIA AND GREENE COUNTIES))$44.7231.23

CARP0291-005 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CARPENTERS: (WASHINGTON COUNTY BUILDING)$36.3824.65
CARPENTERS: (SARATOGA COUNTY BUILDING)$36.3824.65

CARP0291-008 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION (ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES)$44.2824.50
CARPENTERS & SOFT FLOOR LAYERS: BUILDING CONSTRUCTION (EXCLUDING MONTGOMERY COUNTY) (ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES)$36.3824.65

CARP0291-010 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
CARPENTERS: DIVERS$69.2824.50
CARPENTERS: (DIVERS (DRY DAY))$45.2824.50
CARPENTERS: (CARPENTERS)$44.2824.50

ELEC0236-001 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE (THAT PORTION NORTH OF A LINE FOLLOWING THE SOUTH LIMITS OF THE CITY OF CATSKILL); MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHO$48.0032.09

ELEC0363-004 (collectively bargained (union) rate, 04/01/2024)

ClassificationBase rateFringes
ELECTRICIAN (GREENE COUNTY (PORTION OF)) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S $46.5040.57

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21

ELEC1249-007 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S$43.3530.73
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S$54.1935.69
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S$43.5330.75
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S$49.2531.15
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S$48.7731.31
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S$32.5129.93

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99

ELEV0035-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA (TOWNS OF CLAVERACK, HILLSDALE, GHENT, STOCKPORT, AUSTERLITZ, CANAAN, NEW LEBANON, CHATHAM, KINDERHOOK, STYVESANT AND GREENPORT); FULTON; GRE$57.7338.44

ELEV0138-004 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
ELEVATOR MECHANIC (COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE, GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY (THE TOWNS OF HUNTER AND CATSKILL)) FOOTNO$76.1238.98

ENGI0158-008 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DU$51.0133.20
POWER EQUIPMENT OPERATOR: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) EXCLUDING $55.4233.20
POWER EQUIPMENT OPERATOR (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRA$53.9133.20
POWER EQUIPMENT OPERATOR (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER$54.9333.20

ENGI0158-026 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 3$53.8233.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CH$58.9133.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA$60.3033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY$61.8033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRIS$63.3033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL$56.3933.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT $57.3033.55

IRON0012-011 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MA$38.5025.48
IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA,$38.7525.48
IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHA$38.7525.48

IRON0440-007 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (FULTON (TWPS. OF CAROGA, EPHRATAH, OPPENHEIM, STRATFORD); M$35.5031.39

LABO0017-001 (collectively bargained (union) rate, 07/01/2019)

ClassificationBase rateFringes
LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRE$48.0027.15
LABORER GROUP 3: Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"""" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materi$43.1527.15
LABORER GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER,$38.9027.15
LABORER GROUP 1: FLAGPERSON, GATEPERSON (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENC$34.1527.15
LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) HEAVY & HIGHWAY) GROUP 2- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION$43.1527.15
LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) HEAVY & HIGHWAY) GROUP 1- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION$38.9027.15

LABO0035-001 (collectively bargained (union) rate, 07/01/2017)

ClassificationBase rateFringes
LABORERS BUILDING CONSTRUCTION, WAGON DRILL OPERATOR (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. $22.9020.64
LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER LIFT (WALK BEHIND) (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MO$22.6520.64
LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))$22.5020.64
LABORERS BUILDING CONSTRUCTION, HAZARDOUS WASTE REMOVAL INCLUDES WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY$24.0020.64
LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM SETTERS, MOTORBUGGY OPERATOR (RIDER TYPE) (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE$23.0020.64
LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHN$24.0020.64
LABORERS (HEAVY & HIGHWAY) GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHAR$28.6523.74
LABORERS (HEAVY & HIGHWAY) GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN FULTON ($28.4523.74
LABORERS (HEAVY & HIGHWAY) GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PA$28.2523.74
LABORERS (HEAVY & HIGHWAY) GROUP 1: COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MI$28.0523.74

LABO0157-001 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHA$41.6926.75
LABORER HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGO$39.7926.75
LABORER HEAVY & HIGHWAY: GROUP 3: ALL ROCK DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATOR, AND ASPHALT PAVER, POWDERMAN FULTON (TWPS. $39.5926.75
LABORER HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVE$39.3926.75
LABORER HEAVY & HIGHWAY: GROUP 1: Common laborers, flagman, outboard & hand boats FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TW$39.1926.75

LABO0190-001 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
LABORERS: BUILDING: GROUP 2 HAZARDOUS WASTE REMOVAL COMMERCIAL PROJECTS VALUED AT $800,000 OR LESS AND/OR INDUSTRIAL PROJECTS VALUED AT $100,000 OR LESS EXCLUDING DEMOLITION WORK, $37.5126.68
LABORERS: BUILDING: GROUP 1 COMMON LABORERS ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON, SARATOGA)$36.1626.68

LABO0190-002 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
LABORERS: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLIT$44.1927.65
LABORERS: HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, C$42.2927.65
LABORERS: HEAVY & HIGHWAY: GROUP 3: ALL ROCK AIR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN ALBANY;$42.0927.65
LABORERS: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATED BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, P$41.8927.65
LABORERS: HEAVY & HIGHWAY: GROUP 1: COMMON LABORERS, FLAGMEN, OUTBOARD AND HAND BOATS ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN,$41.6927.65

LABO0235-006 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER; ASPHALT SCREEDMAN; DRILLERS (ALL); LASER BEAM OPERATOR; FORM SETTER/ALIGNERS; BLASTERS COLUMBIA (TWPS. OF GREENPORT, CLAVERACK, HIL$43.9027.80
LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWDERMAN; HIGHSCALERS POWER BUGGY$42.8027.80
LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON; PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES; TRAFFIC CONTROL CUSTODIAL WORK; TRAFFIC DIRECTORS; TEMPORARY $36.4527.80

PAIN0009-013 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$37.2533.54

PAIN0155-002 (collectively bargained (union) rate, 05/01/2021)

ClassificationBase rateFringes
PAINTERS:: SPRAY RATE (COLUMBIA AND GREENE COUNTIES)$36.9424.66
PAINTERS: PAINTER/PAPERHANGER (COLUMBIA AND GREENE COUNTIES)$35.9424.66
PAINTERS: LEAD ABATEMENT WORK (COLUMBIA AND GREENE COUNTIES)$35.9424.66
PAINTERS: DRYWALL FINISHER (COLUMBIA AND GREENE COUNTIES)$35.9424.66

PAIN0201-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PAINTERS: ZONE 2 (PAINTERS, DRYWALL FINISHERS, SPRAY) ZONE #2 ALL OF WASHINGTON COUNTY$33.5021.69
PAINTERS: ZONE 2 (LEAD ABATEMENT WORKERS, STRUCTURAL STEEL) ZONE #2 ALL OF WASHINGTON COUNTY$34.5021.69
PAINTERS: ZONE 1 (PAINTERS, DRYWALL FINISHERS, SPRAY) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA$33.5021.69
PAINTERS: ZONE 1 (LEAD ABATEMENT WORKERS, STRUCTURAL STEEL) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA$34.5021.69

PAIN0806-002 (collectively bargained (union) rate, 10/01/2024)

ClassificationBase rateFringes
PAINTERS: STRUCTURAL STEEL AND BRIDGE (ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON)$56.2555.14

PLUM0007-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLUMBER/PIPEFITTER (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY; SARATOGA (TOWNS OF CHARLTON, CLIFTON PARK, GALWAY, HALFMOON, MILTON, STILLWATER AND WATER$55.2629.12

PLUM0112-019 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF CANAJOHARIE AND MINDEN)$31.4031.70

PLUM0773-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLUMBER/PIPEFITTER (SARATOGA (REMAINDER OF COUNTY); WASHINGTON COUNTY:)$44.8833.60

ROOF0203-003 (collectively bargained (union) rate, 06/01/2023)

ClassificationBase rateFringes
ROOFER (SCHOHARIE COUNTY:)$30.5019.84

ROOF0241-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
ROOFER$38.0524.27

SFNY0669-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER$47.8528.94

SHEE0083-001 (collectively bargained (union) rate, 06/01/2019)

ClassificationBase rateFringes
SHEET METAL WORKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. IF ANY OF THESE HOLIDAYS FALL ON A SATURD$33.7333.04

TEAM0294-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: GROUP 5 (HEAVY & HIGHWAY) OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF-LOADED FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR$41.6931.42
TRUCK DRIVERS: GROUP 4 (HEAVY & HIGHWAY) SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CON$41.5231.42
TRUCK DRIVERS: GROUP 3 (HEAVY & HIGHWAY) SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANIC, FUEL TRUCK F$41.3831.42
TRUCK DRIVERS: GROUP 2 (HEAVY & HIGHWAY) TANDEMS, BATCH TRUCKS, MECHANICS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, C$41.2931.42
TRUCK DRIVERS: GROUP 1 (HEAVY & HIGHWAY) PICK-UPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE AXLE DUMP TRUCKS, DUMPSTERS, RECEIVERS, GREASERS, TRUCK TIREMAN FOO$41.2331.42

TEAM0294-004 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 2 EUCLID OR SIMILAR EQUIPMENT, LOWBOY OR LOWBOY TRAILERS (EXCLUDING MONTGOMERY COUNTY) FOOTNOTES: A. ONE WEEK VACATION AFTER 1 YEAR; 2 $33.9530.79
TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 1 STRAIGHT, WINCH, TRANSIT MIX ON JOB SITE, ROAD OILERS, DUMP, PANEL, PICK-UP, WATER AND FUEL TRUCKS ON SITE (INCLUDING NOZZLE) (EXCLUD$33.6530.79
Full official text of NY20260002 rev 2
"General Decision Number: NY20260002 05/18/2026


State: New York


Construction Types: Building, Heavy and Highway


Counties: New York Counties of 
Albany, Columbia, Fulton, Greene, 
Montgomery, Rensselaer, Saratoga, 
Schenectady, Schoharie and Washington




Excludes Building Construction in COLUMBIA, FULTON, GREENE & MONTGOMERY Counties


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026


 ASBE0040-002 05/01/2025
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO 
PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; 
VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION 
MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT 
FROM MECHANCIAL SYSTEMS)............................$ 41.74                  27.58
ASBESTOS/INSULATOR WORKER (SCOPE OF WORK:  INCLUDES 
 APPLICATION OF ALL INSULATING  MATERIALS, 
PROTECTIVE, COVERINGS, COATING AND  FINISHING TO 
ALL TYPES OF MECHANICAL SYSTEMS.)...................$ 41.74                  27.58
----------------------------------------------------------------

 BOIL0197-002 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 43.34                  27.66
----------------------------------------------------------------

 BRNY0002-019 12/03/2025
                                                     Rates                  Fringes
BRICKLAYER (BRICKLAYERS, STONE MASONS, CEMENT 
MASONS, PLASTERERS, POINTERS, CAULKERS & CLEANERS)..$ 41.79                  22.33
----------------------------------------------------------------

 CARP0279-006 07/01/2025
                                                     Rates                  Fringes
CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS 
(HEAVY AND HIGHWAY CONSTRUCTION (COLUMBIA AND 
GREENE COUNTIES))...................................$ 44.72                  31.23
----------------------------------------------------------------

 CARP0291-005 07/01/2025
                                                     Rates                  Fringes
CARPENTERS: (WASHINGTON COUNTY  BUILDING)...........$ 36.38                  24.65
CARPENTERS: (SARATOGA COUNTY  BUILDING).............$ 36.38                  24.65
----------------------------------------------------------------

 CARP0291-008 07/01/2025
                                                     Rates                  Fringes
CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION (ALBANY, 
FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND 
SCHOHARIE COUNTIES).................................$ 44.28                  24.50
CARPENTERS & SOFT FLOOR LAYERS: BUILDING 
CONSTRUCTION (EXCLUDING MONTGOMERY COUNTY) (ALBANY, 
FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND 
SCHOHARIE COUNTIES).................................$ 36.38                  24.65
----------------------------------------------------------------

 CARP0291-010 07/01/2024
                                                     Rates                  Fringes
CARPENTERS: DIVERS..................................$ 69.28                  24.50
CARPENTERS: (DIVERS (DRY DAY))......................$ 45.28                  24.50
CARPENTERS: (CARPENTERS)............................$ 44.28                  24.50
----------------------------------------------------------------

 ELEC0236-001 06/01/2024
                                                     Rates                  Fringes
ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE (THAT 
PORTION NORTH OF A LINE FOLLOWING THE SOUTH LIMITS  
OF THE CITY OF CATSKILL); MONTGOMERY; RENSSELAER, 
SARATOGA; SCHENECTADY; SCHOHARIE; WASHINGTON).......$ 48.00                  32.09
----------------------------------------------------------------

 ELEC0363-004 04/01/2024
                                                     Rates                  Fringes
ELECTRICIAN (GREENE COUNTY (PORTION OF))  FOOTNOTE: 
  A. PAID HOLIDAYS:  NEW YEAR'S DAY, PRESIDENT'S 
DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, 
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS 
DAY.................................................$ 46.50                  40.57
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
----------------------------------------------------------------

 ELEC1249-007 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING 
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE 
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS 
AND ROAD WEATHER INFORMATION SYSTEMS: MECHANIC 
(COLUMBIA COUNTY). PAID HOLIDAYS:   A.   MEMORIAL 
DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY...................................$ 43.35                  30.73
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING 
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE 
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS 
AND ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND 
TECHNICIAN (COLUMBIA COUNTY). PAID HOLIDAYS:   A.   
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 54.19                  35.69
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING 
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE 
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS 
AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN 
TRUCK DRIVER (TRACTOR-TRAILER UNIT). PAID HOLIDAYS: 
  A.   MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK 
STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE 
OR TWO DAYS AFTER THE HOLIDAY. (COLUMBIA COUNTY)....$ 43.53                  30.75
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING 
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE 
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS 
AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN 
TRUCK DRIVER (COLUMBIA COUNTY). PAID HOLIDAYS:   A. 
  MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, 
GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK 
STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE 
OR TWO DAYS AFTER THE HOLIDAY.......................$ 49.25                  31.15
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING 
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE 
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS 
AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN 
DIGGING MACHINE OPERATOR (COLUMBIA COUNTY)..........$ 48.77                  31.31
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING 
ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE 
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS 
AND ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN 
(COLUMBIA COUNTY). PAID HOLIDAYS:   A.   MEMORIAL 
DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY...................................$ 32.51                  29.93
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
----------------------------------------------------------------

 ELEV0035-001 01/01/2025
                                                     Rates                  Fringes
ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA (TOWNS OF 
CLAVERACK, HILLSDALE, GHENT, STOCKPORT, AUSTERLITZ, 
CANAAN, NEW LEBANON, CHATHAM, KINDERHOOK, STYVESANT 
AND GREENPORT); FULTON; GREENE (TOWNS OF DURHAM, 
GREENVILLE, NEW BALTIMORE, COXCSACKIE AND ATHENS); 
MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, 
SCHOHARIE AND WASHINGTON COUNTIES).   FOOTNOTE:    
A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR 
HOURLY RATE FOR ALL HOURS WORKED.  8%/OVER 5 YEARS 
BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.  
   B. PAID HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY..............................$ 57.73                  38.44
----------------------------------------------------------------

 ELEV0138-004 01/01/2026
                                                     Rates                  Fringes
ELEVATOR MECHANIC (COLUMBIA COUNTY (THE TOWNS OF 
ANCRAM, CLERMONT, COPAKE, GALLATIN, GERMANTOWN, 
LIVINGSTON, AND TAGHKANIC); GREEN COUNTY (THE TOWNS 
OF HUNTER AND CATSKILL))  FOOTNOTE:    A.VACATION: 
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR 
ALL HOURS WORKED.  8%/OVER 5 YEARS BASED ON REGULAR 
HOURLY RATE FOR ALL HOURS WORKED.     B. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY..............................$ 76.12                  38.98
----------------------------------------------------------------

 ENGI0158-008 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH 
LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, 
BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, 
MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, 
WELDING MACHINE, WELL POINT, MECHANICAL HEATER, 
GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, 
ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE 
DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE 
MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), 
SEEDING, AND MULCHING MACHINES, PUMPS  (EXCLUDING 
MONTGOMERY COUNTY)   HAZARDOUS WORK - ANYTIME 
OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR 
ABOVE, $2.50 PER HOUR OVER REGULAR RATE.  FOOTNOTE: 
  A. PAID HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY.......................................$ 51.01                  33.20
POWER EQUIPMENT OPERATOR: GROUP A(1)  CRANE, 
HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, 
PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, 
BOOM TRUCK (OVER 5 TONS)      EXCLUDING MONTGOMERY 
COUNTY    GROUP A(1):  CRANE PREMIUMS:   1  OVER 
150'- $1.00   2  OVER 200'- $2.00    HAZARDOUS WORK 
- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH 
LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. 
 FOOTNOTE:   A. PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY.....................$ 55.42                  33.20
POWER EQUIPMENT OPERATOR (BUILDING): GROUP B 
BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), 
BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, 
LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, 
BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, 
SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, 
SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, 
CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER 
HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, 
THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND 
OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM 
SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD 
AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, 
MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN 
AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER 
LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER  
(EXCLUDING MONTGOMERY COUNTY)   HAZARDOUS WORK - 
ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL 
C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.  
FOOTNOTE:   A. PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY.....................$ 53.91                  33.20
POWER EQUIPMENT OPERATOR (BUILDING): GROUP A 
SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL 
SWING), GRADALLS, POWER ROAD GRADER, ALL CMI 
EQUIPMENT, FRONT-END RUBBER TIRE LOADER, 
TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING 
MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, 
BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT 
AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND 
UNDER), MAINTENANCE ENGINEER, SELF CONTAINED 
CRAWLER, DRILL-HYDRAULIC ROCK DRILL.  (EXCLUDING 
MONTGOMERY COUNTY)   HAZARDOUS WORK - ANYTIME 
OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR 
ABOVE, $2.50 PER HOUR OVER REGULAR RATE.  FOOTNOTE: 
  A. PAID HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY.......................................$ 54.93                  33.20
----------------------------------------------------------------

 ENGI0158-026 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 3..................$ 53.82                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
7 MASTER MECHANIC  FOOTNOTE:   A. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 58.91                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
6 CRANES 49 TONS AND BELOW  FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 60.30                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
5 CRANES 50 TONS AND OVER  FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 61.80                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
4 TOWER CRANES  FOOTNOTE:   A. PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY............$ 63.30                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER 
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS 
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), 
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), 
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT 
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, 
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE 
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, 
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR 
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), 
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER 
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, 
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, 
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR 
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, 
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), 
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER 
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, 
REVINIUS WIDENER, ROLLER (GRADE AND FILL), 
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER 
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM 
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE 
PLANT REFRIGERATION EQUIPMENT (FOR SOIL 
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE 
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK 
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, 
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER 
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), 
WINCH, WINCH CAT  FOOTNOTE:   A. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 56.39                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, 
AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC 
FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, 
RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 
212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT 
PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM 
TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX  
CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, 
SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, 
CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, 
OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE 
DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, 
DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE 
HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT 
END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER 
(SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), 
HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, 
MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) 
WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, 
PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR 
EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT 
PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC 
SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC 
PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), 
MULCHING MACHINE, OILER, PARAPET CONCRETE OR 
PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, 
TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER 
MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL  
FOOTNOTE:   A. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 57.30                  33.55
----------------------------------------------------------------

 IRON0012-011 07/01/2024
                                                     Rates                  Fringes
IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, 
MACHINERY MOVER, RIGGER, FENCE ERECTOR, 
REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA; 
FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, 
MAYFIELD, NORTHAMPTON AND PERTH); GREENE,  
MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, 
MOHAWK AND ROOT); RENSSELAER, SARATOGA; 
SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)...$ 38.50                  25.48
IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA; 
FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, 
MAYFIELD, NORTHAMPTON AND PERTH); GREENE,  
MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, 
MOHAWK AND ROOT); RENSSELAER, SARATOGA; 
SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)...$ 38.75                  25.48
IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON 
(ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, 
NORTHAMPTON AND PERTH); GREENE,  MONTGOMERY 
(AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND 
ROOT); RENSSELAER, SARATOGA; SCHENECTADY; 
SCHOHARIE; AND WASHINGTON COUNTIES:)................$ 38.75                  25.48
----------------------------------------------------------------

 IRON0440-007 07/01/2025
                                                     Rates                  Fringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, 
MACHINERY MOVER, RIGGER, FENCE ERECTOR, 
REINFORCEMENT, AND STONE DERRICKMAN (FULTON (TWPS. 
OF CAROGA, EPHRATAH, OPPENHEIM, STRATFORD); 
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN, PALATINE, 
ST. JOHNSVILLE):)...................................$ 35.50                  31.39
----------------------------------------------------------------

 LABO0017-001 07/01/2019
                                                     Rates                  Fringes
LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS 
MATERIAL ABATEMENT FOREMAN  (GREENE COUNTY 
(TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)   FOOTNOTE: 
  A.  PAID HOLIDAYS:  NEW YEARS DAY, PRESIDENT'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S 
BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE 
SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY 
FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING 
SO FOR LEGITIMATE REASONS...........................$ 48.00                  27.15
LABORER GROUP 3:   Ingersoll Rand heavy duty 
crawler-master HCMZ, any drill using a 4"""" or 
larger bit, asbestos, toxic, bio-remediation, 
phyto-remediation, lead or hazardous material 
abatement when protective clothing and equipment is 
required, all working foremen including grade, pipe 
concrete, clearing, blacktop, drill, paving and 
blaster etc., Hydraulic drill or similar, forklift 
for masonry only, Blaster and asphalt screedman    
GREENE COUNTY (TOWNSHIP OF CATSKILL)   HEAVY & 
HIGHWAY    FOOTNOTE:   a.  PAID HOLIDAYS:  New 
Years Day, President's Day, Memorial Day, 
Independence Day, Lincoln's Birthday, Labor Day, 
Election Day, Veterans Day, Thanksgiving Day, 
Christmas Day, provided the employee is an employee 
of the company prior to the scheduled holiday and 
reports to work the first day following the holiday 
unless prevented from doing so for legitimate 
reasons.............................................$ 43.15                  27.15
LABORER GROUP 2: GENERAL LABORERS, CHUCK TENDER, 
HANDLING AND DISTRIBUTING DRINKING WATER, 
DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, 
NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE 
LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, 
MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF 
CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, 
TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CURB 
AND SIDEWALK FORM SETTER; PERMANENT TRAFFIC 
STRIPING AND REFLECTIVE DEVICES, PLACING AND 
MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, 
BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY 
REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, 
CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT 
OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, 
PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, 
ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, 
PIPELAYER, PIPE LINING AND RELINING, WELLPOINTS, 
CONDUIT AND DUCT LAYER, WIRE PULLER, RIP RAP AND 
DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL, 
ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC, 
JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING 
HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL, 
GUNITE AND SAND BLASTING, COAL PASSER AND OTHER 
MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND 
NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL 
GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, 
ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, 
WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER, 
GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER 
AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, 
WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, 
CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING 
COMING UNDER LABORERS JURISDICTION, BIT GRINDER, 
OPERATOR OF FORM PIN PULLER AND DRIVERS, 
SANDBLASTING, JOINT AND JET SEALER, FILLING AND 
WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN 
MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE 
PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK 
LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST 
CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS 
USED TO PERFORM WORK USUALLY DONE BY LABORERS, 
POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, 
PLASTER AND CAUSTIC PUMP, ASBESTOS, TOXIC, 
BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR 
HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE 
CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH 
CUTTER, RETENTION LINERS, ARTIFICIAL TURF, 
RETAINING WALLS, WALK BEHIND SURFACE PLANER, 
WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED 
EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL 
TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO 
STITCHING, SEAMING, HEAT WELDING, FIREPROOF 
SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM 
SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE 
NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, 
MANHOLE, CATCH BASIN OR INLET INSTALLING, LASER 
MEN.  GROUND MAN ON MILLING MACHINE  (GREENE COUNTY 
(TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)   FOOTNOTE: 
  A.  PAID HOLIDAYS:  NEW YEARS DAY, PRESIDENT'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S 
BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE 
SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY 
FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING 
SO FOR LEGITIMATE REASONS...........................$ 38.90                  27.15
LABORER GROUP 1: FLAGPERSON, GATEPERSON    (GREENE 
COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)  
FOOTNOTE:   A.  PAID HOLIDAYS:  NEW YEARS DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, 
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY 
PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK 
THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS 
PREVENTED FROM DOING SO FOR LEGITIMATE REASONS......$ 34.15                  27.15
LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE 
ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) 
HEAVY & HIGHWAY) GROUP 2- ASBESTOS, TOXIC, 
BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR 
HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE 
CLOTHING AND EQUIPMENT IS REQUIRED      (COLUMBIA 
COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK, 
CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE, 
TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND 
THE CITY OF HUDSON)   ..............................$ 43.15                  27.15
LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE 
ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) 
HEAVY & HIGHWAY) GROUP 1- ASBESTOS, TOXIC, 
BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR 
HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE 
EQUIPMENT AND CLOTHING ARE NOT REQUIRED   (COLUMBIA 
COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK, 
CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE, 
TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND 
THE CITY OF HUDSON) HEAVY & HIGHWAY  ...............$ 38.90                  27.15
----------------------------------------------------------------

 LABO0035-001 07/01/2017
                                                     Rates                  Fringes
LABORERS BUILDING CONSTRUCTION, WAGON DRILL 
OPERATOR (FULTON (TWPS OF CAROGA, EPHRATA, 
OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF 
CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. 
JOHNSVILLE)) FOOTNOTE:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 22.90                  20.64
LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR 
MIXERS, MOTOR  BUGGY OPERATOR (WALK BEHIND)  POWER 
LIFT (WALK BEHIND) (FULTON (TWPS OF CAROGA, 
EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS 
OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. 
JOHNSVILLE)).   FOOTNOTE:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 22.65                  20.64
LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON 
(TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); 
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND 
PALATINE, ROOT AND ST. JOHNSVILLE)) FOOTNOTE:    A. 
 PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 22.50                  20.64
LABORERS BUILDING CONSTRUCTION, HAZARDOUS WASTE 
REMOVAL INCLUDES WETTING, STRIPPING, REMOVAL, 
SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL 
INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS 
OR NOT, FROM MECHANICAL SYSTEMS (FULTON (TWPS OF 
CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); 
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND 
PALATINE, ROOT AND ST. JOHNSVILLE))  FOOTNOTE:    
A.  PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.    ..................................$ 24.00                  20.64
LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM 
SETTERS,  MOTORBUGGY OPERATOR (RIDER  TYPE) (FULTON 
(TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); 
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND 
PALATINE, ROOT AND ST. JOHNSVILLE)). PAID HOLIDAYS: 
  A.   MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK 
STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE 
OR TWO DAYS AFTER THE HOLIDAY.......................$ 23.00                  20.64
LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL 
(FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND 
STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN 
AND PALATINE, ROOT AND ST. JOHNSVILLE)) FOOTNOTE:   
 A.  PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 24.00                  20.64
LABORERS (HEAVY & HIGHWAY) GROUP 4: BLASTERERS, 
FORM SETTERS, STONE OR GRANITE CURB SETTERS  FULTON 
(TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); 
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND 
PALATINE, ROOT AND ST. JOHNSVILLE  FOOTNOTE:    A.  
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 28.65                  23.74
LABORERS (HEAVY & HIGHWAY) GROUP 3: ALL ROCK OR 
DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER 
AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND 
ASPHALT PAVER, POWDERMAN  FULTON (TWPS OF CAROGA, 
EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS 
OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. 
JOHNSVILLE)  FOOTNOTE:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 28.45                  23.74
LABORERS (HEAVY & HIGHWAY) GROUP 2: BULL FLOAT, 
CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE 
BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, 
JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT 
BREAKER, HANDLERS OF ALL STEEL MESH, SMALL 
GENERATORS FOR LABORER'S TOOLS, INSTALLATION OF 
BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, 
TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON 
ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND 
SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, 
SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK 
FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, 
PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, 
ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING 
LABORERS  FULTON (TWPS OF CAROGA, EPHRATA, 
OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF 
CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. 
JOHNSVILLE)  FOOTNOTE:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 28.25                  23.74
LABORERS (HEAVY & HIGHWAY)  GROUP 1: COMMON 
LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS  FULTON 
(TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); 
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND 
PALATINE, ROOT AND ST. JOHNSVILLE)  FOOTNOTE:    A. 
 PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 28.05                  23.74
----------------------------------------------------------------

 LABO0157-001 07/01/2023
                                                     Rates                  Fringes
LABORER HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE 
REMOVAL  FULTON (TWPS. OF BLEEKER, MAYFIELD, 
NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); 
MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, 
AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, 
HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS 
FALLS, PROVIDENCE, GREENFIELD, WILTON, 
NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, 
CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); 
SCHENECTADY AND SCHOHARIE COUNTIES..................$ 41.69                  26.75
LABORER HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM 
SETTERS, STONE OR GRANITE CURB SETTERS  FULTON 
(TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, 
JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. 
OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND 
FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, 
CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, 
GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, 
MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA 
AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE 
COUNTIES............................................$ 39.79                  26.75
LABORER HEAVY & HIGHWAY: GROUP 3: ALL ROCK DRILLING 
MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR 
TYPE), ACETYLENE TORCH OPERATOR, AND ASPHALT PAVER, 
POWDERMAN  FULTON (TWPS. OF BLEEKER, MAYFIELD, 
NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); 
MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, 
AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, 
HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS 
FALLS, PROVIDENCE, GREENFIELD, WILTON, 
NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, 
CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); 
SCHENECTADY AND SCHOHARIE COUNTIES..................$ 39.59                  26.75
LABORER HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN 
SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN 
BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON 
TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF 
ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' 
TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, 
VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL 
OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP 
OPERATOR (1 1/2"") AND SINGLE DIAPHRAGM), NOZZLE 
(ASPHALT, GUNNITE, SEEDING, AND SAND BLASTING), 
LABORERS ON CHAIN FENCE ERECTION, ROCK SPLITTER AND 
POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER 
GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS, 
WRECKING LABORERS     FULTON (TWPS. OF BLEEKER, 
MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND 
PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, 
CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA 
(TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, 
SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, 
NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, 
CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); 
SCHENECTADY AND SCHOHARIE COUNTIES.  ...............$ 39.39                  26.75
LABORER HEAVY & HIGHWAY: GROUP 1: Common laborers, 
flagman, outboard & hand boats     FULTON (TWPS. OF 
BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, 
BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, 
GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA 
(TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, 
SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, 
NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, 
CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); 
SCHENECTADY AND SCHOHARIE COUNTIES..................$ 39.19                  26.75
----------------------------------------------------------------

 LABO0190-001 07/01/2024
                                                     Rates                  Fringes
LABORERS: BUILDING: GROUP 2 HAZARDOUS WASTE REMOVAL 
COMMERCIAL PROJECTS VALUED AT $800,000 OR LESS 
AND/OR INDUSTRIAL PROJECTS VALUED AT $100,000 OR 
LESS EXCLUDING DEMOLITION WORK, (COMPLETE RAZING OF 
STRUCTURES) WILL RECEIVE 75% OF BASIC WAGE SCALE 
WITH FULL FRINGES WILL APPLY  ALBANY; GREEN; 
RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA 
COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON, 
SARATOGA)...........................................$ 37.51                  26.68
LABORERS: BUILDING: GROUP 1 COMMON LABORERS  
ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON 
COUNTY, SARATOGA COUNTY (TOWNSHIPS OF STILLWATER, 
HALFMOON, SARATOGA).................................$ 36.16                  26.68
----------------------------------------------------------------

 LABO0190-002 07/01/2024
                                                     Rates                  Fringes
LABORERS: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE 
REMOVAL  ALBANY; RENSSELAER; COLUMBIA (TWPS. OF 
STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, 
CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT 
CATSKILL TOWNSHIP). WASHINGTON COUNTY.  SARATAGO 
COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA) 
 FOOTNOTE:   PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY 
AND CHRISTMAS DAY...................................$ 44.19                  27.65
LABORERS: HEAVY & HIGHWAY: GROUP 4: BLASTERERS, 
FORM SETTERS, STONE OR GRANITE CURB SETTERS  
ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, 
STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, 
CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL 
TOWNSHIP). WASHINGTON COUNTY.  SARATAGO COUNTY 
(TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)  
FOOTNOTE:   PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY 
AND CHRISTMAS DAY...................................$ 42.29                  27.65
LABORERS: HEAVY & HIGHWAY: GROUP 3: ALL ROCK AIR 
DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER 
AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND 
ASPHALT PAVER, POWDERMAN  ALBANY; RENSSELAER; 
COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, 
KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, 
AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). 
WASHINGTON COUNTY.  SARATAGO COUNTY (TOWNSHIPS OF 
STILLWATER, HALFMOON SARATOGA)  FOOTNOTE:   PAID 
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY..$ 42.09                  27.65
LABORERS: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, 
CHAIN SAW, CONCRETE AGGREGATED BIN, CONCRETE 
BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, 
JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT 
BREAKER, HANDLERS OF ALL STEEL MESH, SMALL 
GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF 
BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, 
TAMPERS, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON 
ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND 
SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, 
SEEDING, AND SAND BLASTING) LABORERS ON CHAIN LINK 
FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, 
PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, 
ELECTRIC, OIL, AIR TOOL OPERATORS, AND WRECKING   
ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, 
STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, 
CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL 
TOWNSHIP). WASHINGTON COUNTY.  SARATAGO COUNTY 
(TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)  
FOOTNOTE:   PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY 
AND CHRISTMAS DAY...................................$ 41.89                  27.65
LABORERS: HEAVY & HIGHWAY: GROUP 1: COMMON 
LABORERS, FLAGMEN, OUTBOARD AND HAND BOATS  ALBANY; 
RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, 
STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, 
CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL 
TOWNSHIP). WASHINGTON COUNTY.  SARATAGO COUNTY 
(TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)  
FOOTNOTE:   PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY 
AND CHRISTMAS DAY...................................$ 41.69                  27.65
----------------------------------------------------------------

 LABO0235-006 05/01/2023
                                                     Rates                  Fringes
LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER; 
ASPHALT SCREEDMAN; DRILLERS (ALL); LASER BEAM 
OPERATOR; FORM SETTER/ALIGNERS; BLASTERS  COLUMBIA 
(TWPS. OF GREENPORT, CLAVERACK, HILLSDALE, 
LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE, 
CLERMONT, GALLATIN, ANCRAM)  FOOTNOTE:  A. PAID 
HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD 
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 43.90                  27.80
LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, 
DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; 
PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; 
POWDERMAN; HIGHSCALERS POWER BUGGY OPERATOR; STEEL 
ROD CARRIER; VIBRATORY OPERATOR; OTHER MACHINE 
OPERATOR; WRECKING; VIBRATOR OPERATOR-COMPACTOR; 
GUNITE AND SANDBLASTING; WATER PUMP 2"" OR UNDER; 
NIPPER; CHUCKER; ASPHALT WORKERS  COLUMBIA (TWPS. 
OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, 
GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, 
ANCRAM)  FOOTNOTE:  A. PAID HOLIDAYS: NEW YEARS 
DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS 
DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 42.80                  27.80
LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON; 
PLACING AND MAINTENANCE OF ALL FLARES, CONES, 
LIGHTS, SIGNS, BARRICADES; TRAFFIC CONTROL 
CUSTODIAL WORK; TRAFFIC DIRECTORS; TEMPORARY HEAT 
OR LIGHT TENDERS; TOOL ROOMS  COLUMBIA (TWPS. OF 
GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, 
GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, 
ANCRAM)  FOOTNOTE:  A. PAID HOLIDAYS: NEW YEARS 
DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS 
DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 36.45                  27.80
----------------------------------------------------------------

 PAIN0009-013 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 37.25                  33.54
----------------------------------------------------------------

 PAIN0155-002 05/01/2021
                                                     Rates                  Fringes
PAINTERS:: SPRAY RATE (COLUMBIA AND GREENE 
COUNTIES)...........................................$ 36.94                  24.66
PAINTERS: PAINTER/PAPERHANGER (COLUMBIA AND GREENE 
COUNTIES)...........................................$ 35.94                  24.66
PAINTERS: LEAD ABATEMENT WORK (COLUMBIA AND GREENE 
COUNTIES)...........................................$ 35.94                  24.66
PAINTERS: DRYWALL FINISHER (COLUMBIA AND GREENE 
COUNTIES)...........................................$ 35.94                  24.66
----------------------------------------------------------------

 PAIN0201-001 05/01/2025
                                                     Rates                  Fringes
PAINTERS: ZONE 2 (PAINTERS, DRYWALL FINISHERS, 
SPRAY) ZONE #2   ALL OF WASHINGTON COUNTY...........$ 33.50                  21.69
PAINTERS: ZONE 2 (LEAD ABATEMENT WORKERS, 
STRUCTURAL STEEL) ZONE #2   ALL OF WASHINGTON 
COUNTY..............................................$ 34.50                  21.69
PAINTERS: ZONE 1 (PAINTERS, DRYWALL FINISHERS, 
SPRAY) ZONE #1   ENTIRE COUNTIES OF ALBANY, FULTON, 
MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND 
SARATOGA............................................$ 33.50                  21.69
PAINTERS: ZONE 1 (LEAD ABATEMENT WORKERS, 
STRUCTURAL STEEL) ZONE #1   ENTIRE COUNTIES OF 
ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, 
SCHENECTADY AND SARATOGA............................$ 34.50                  21.69
----------------------------------------------------------------

 PAIN0806-002 10/01/2024
                                                     Rates                  Fringes
PAINTERS: STRUCTURAL STEEL AND BRIDGE (ALBANY, 
COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER, 
SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON)....$ 56.25                  55.14
----------------------------------------------------------------

 PLUM0007-001 05/01/2025
                                                     Rates                  Fringes
PLUMBER/PIPEFITTER (ALBANY; COLUMBIA; FULTON; 
GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY; 
SARATOGA (TOWNS OF CHARLTON, CLIFTON PARK, GALWAY, 
HALFMOON, MILTON, STILLWATER AND WATERFORD))........$ 55.26                  29.12
----------------------------------------------------------------

 PLUM0112-019 05/01/2023
                                                     Rates                  Fringes
PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF 
CANAJOHARIE AND MINDEN).............................$ 31.40                  31.70
----------------------------------------------------------------

 PLUM0773-002 05/01/2025
                                                     Rates                  Fringes
PLUMBER/PIPEFITTER (SARATOGA (REMAINDER OF COUNTY); 
WASHINGTON COUNTY:).................................$ 44.88                  33.60
----------------------------------------------------------------

 ROOF0203-003 06/01/2023
                                                     Rates                  Fringes
ROOFER (SCHOHARIE COUNTY:)..........................$ 30.50                  19.84
----------------------------------------------------------------

 ROOF0241-001 07/01/2025
                                                     Rates                  Fringes
ROOFER..............................................$ 38.05                  24.27
----------------------------------------------------------------

 SFNY0669-001 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 47.85                  28.94
----------------------------------------------------------------

 SHEE0083-001 06/01/2019
                                                     Rates                  Fringes
SHEET METAL WORKER     FOOTNOTE:  A. PAID HOLIDAYS: 
 NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY.  IF ANY 
OF THESE HOLIDAYS FALL ON A SATURDAY OR SUNDAY, 
EITHER THE PRECEDING FRIDAY OR FOLLOWING MONDAY 
WILL BE OBSERVED AS THE HOLIDAY.....................$ 33.73                  33.04
----------------------------------------------------------------

 TEAM0294-003 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: GROUP 5 (HEAVY & HIGHWAY) 
OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT 
AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF-LOADED  
FOOTNOTE:    A. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE 
HOLIDAY.............................................$ 41.69                  31.42
TRUCK DRIVERS: GROUP 4 (HEAVY & HIGHWAY) 
SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR 
SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT 
SELF-LOADED, STRADDLE (ROSS) CARRIER, 
SELF-CONTAINED CONCRETE UNIT  FOOTNOTE:    A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE AND THE DAY AFTER THE HOLIDAY................$ 41.52                  31.42
TRUCK DRIVERS: GROUP 3 (HEAVY & HIGHWAY) 
SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR 
TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE 
VEHICLES, TRUCK MECHANIC, FUEL TRUCK  FOOTNOTE:    
A. PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE AND THE DAY AFTER THE HOLIDAY................$ 41.38                  31.42
TRUCK DRIVERS: GROUP 2 (HEAVY & HIGHWAY) TANDEMS, 
BATCH TRUCKS, MECHANICS  FOOTNOTE:    A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE AND THE DAY AFTER THE HOLIDAY................$ 41.29                  31.42
TRUCK DRIVERS: GROUP 1 (HEAVY & HIGHWAY) PICK-UPS, 
PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT 
JOBS), SINGLE AXLE DUMP TRUCKS, DUMPSTERS, 
RECEIVERS, GREASERS, TRUCK TIREMAN  FOOTNOTE:    A. 
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE AND THE DAY AFTER THE HOLIDAY................$ 41.23                  31.42
----------------------------------------------------------------

 TEAM0294-004 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 2 
EUCLID OR SIMILAR EQUIPMENT, LOWBOY OR LOWBOY 
TRAILERS  (EXCLUDING MONTGOMERY COUNTY)   
FOOTNOTES:   A.  ONE WEEK VACATION AFTER 1 YEAR; 2 
WEEKS VACATION AFTER 5 YEARS........................$ 33.95                  30.79
TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 1 
STRAIGHT, WINCH, TRANSIT MIX ON JOB SITE, ROAD 
OILERS, DUMP, PANEL, PICK-UP, WATER AND FUEL TRUCKS 
ON SITE (INCLUDING NOZZLE)  (EXCLUDING MONTGOMERY 
COUNTY)   FOOTNOTES:   A.  ONE WEEK VACATION AFTER 
1 YEAR; 2 WEEKS VACATION AFTER 5 YEARS..............$ 33.65                  30.79
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"

All New York determinations: county index · New York prevailing wage · compute pay with the calculator.