Wage determination NY20260005

Building, Heavy, Highway construction - New York, revision 2, modified 2026-05-18

Verify against the official document: this page mirrors WD NY20260005 revision 2 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0030-001 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHE$38.5025.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOP$43.2527.29

ASBE0030-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHE$38.5025.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOP$43.2527.29

BOIL0007-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$39.3533.18

BRNY0003-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER: HEAVY AND HIGHWAY CONSTRUCTION (CORNING CHAPTER)$38.6325.05
BUILDING CONSTRUCTION: MARBLE, TILE AND TERRAZZO FINISHERS (CORNING CHAPTER)$34.4420.38
BUILDING CONSTRUCTION: MARBLE MASON, TILE LAYERS AND TERRAZZO WORKERS (CORNING CHAPTER)$34.6925.76
BUILDING CONSTRUCTION: BRICKLAYERS, CEMENT MASONS, STONE MASONS, POINTERS, CAULKERS AND CLEANERS (CORNING CHAPTER)$33.2630.21

CARP0277-016 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CARPENTER, MILLWRIGHTS & PILEDRIVERS, BUILDING CONSTRUCTION (CHEMUNG COUNTY)$31.5923.24
CARPENTER, HIGHWAY CONSTRUCTION (SCHUYLER COUNTY)$39.5227.16
CARPENTER, HEAVY & HIGHWAY CONSTRUCTION (CHEMUNG COUNTY)$39.5227.16
CARPENTER, BUILDING CONSTRUCTION (CHEMUNG COUNTY)$31.5923.24

ELEC0139-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (CHEMUNG COUNTY)$43.4031.72

ELEC0241-003 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (SCHUYLER COUNTY (TOWNSHIPS OF CATHARINE, CAYUTA AND HECTOR))$44.5031.89

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99

ELEV0062-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC (CHEMUNG COUNTY:) FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL H$58.4438.44

ENGI0158-024 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND SHAFT). FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVI$60.8435.00
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND PAVING). FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANK$43.2634.85
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DA$56.8135.75
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS$58.3835.75
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) GROUP 5: CRANES 50 TONS AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING $59.8835.75
OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT): CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEN$51.4135.00
OPERATING ENGINEER: GROUP 4 (HEAVY AND HIGHWAY)TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PR$61.3835.75
OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS$36.6134.85
OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN$54.4235.00
OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST $51.8035.75
OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR$40.1034.85
OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC$57.2135.00
OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ($54.6835.75
OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI$40.7934.85
OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP $58.4335.00
OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP$55.3835.75
OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS$41.2634.85

ENGI0158-037 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 8 (BUILDING CONSTRUCTION) TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND$50.1435.20
POWER EQUIPMENT OPERATORS: GROUP 7 (BUILDING CONSTRUCTION) CRANES 251 AND OVER TONS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIV$50.6435.20
POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING CONSTRUCTION) CRANES 25-250 TONS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA$49.6435.20
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) CRANES UP TO AND INCLUDING 25 TONS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,$47.6435.20
POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING CONSTRUCTION) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DA$39.6435.20
POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE (3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR LESS, OR NOT TO EXCEED 1200 CFM C$39.6435.20
POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AND SIMI$42.3435.20
POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE EIGHTHS$43.1435.20

IRON0033-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER-RIGGER, FENCE ERECTOR, PRE-CAST CONCRETE ERECTOR, REINFORCING, STONE DERRICKMAN (CHEMUNG; SCHUYLER (TWPS. OF DIX, ORAN$35.7530.80
IRONWORKERS:: SHEETER (CHEMUNG; SCHUYLER (TWPS. OF DIX, ORANGE, REDING AND TRYON).)$36.0030.80

IRON0060-010 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRET ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN WELDER, SHEETER, SHEETER BUCKER-UP (SCHUYLER CO$37.1630.68

LABO0785-016 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
LABORERS: HEAVY & HIGHWAY: GROUP 5 TOXIC WASTE REMOVAL SCHUYLER (TWPS. OF CATHERINE - INCLUDING THE VILLAGE OF ODESSA) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; IND$38.7625.60
LABORERS: HEAVY & HIGHWAY: GROUP 4 BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS SCHUYLER (TWPS. OF CATHERINE - INCLUDING THE VILLAGE OF ODESSA) FOOTNOTE: A. PAID HOLIDAYS:$36.1625.60
LABORERS: HEAVY & HIGHWAY: GROUP 3 ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN SCHUYLER (TWPS. O$35.9625.60
LABORERS: HEAVY & HIGHWAY: GROUP 2 BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER; MORTAR MIXER; PAV$35.7625.60
LABORERS: HEAVY & HIGHWAY: GROUP 1 LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS SCHUYLER (TWPS. OF CATHERINE - INCLUDING THE VILLAGE OF ODESSA) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'$35.5625.60

LABO0785-021 (collectively bargained (union) rate, 07/01/2022)

ClassificationBase rateFringes
LABORER GROUP 2 (ZONE III) (CHEMUNG AND SCHUYLER (EXCEPT CATHERINE TOWNSHIP): HEAVY & HIGHWAY)$33.2022.51
LABORER GROUP 2 (CHEMUNG AND SCHUYLER (EXCEPT CATHERINE TOWNSHIP): HEAVY & HIGHWAY (ZONE III))$33.2022.51
LABORER GROUP 1-(ZONE III) (CHEMUNG AND SCHUYLER (EXCEPT CATHERINE TOWNSHIP): HEAVY & HIGHWAY)$33.0022.51
LABORER GROUP 1 (CHEMUNG AND SCHUYLER (EXCEPT CATHERINE TOWNSHIP): HEAVY & HIGHWAY (ZONE III))$33.0022.51

PAIN0004-016 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PAINTERS: (STRUCTURAL STEEL, EPOXY BRUSH OR ROLL)$27.3823.78
PAINTERS: (STEEPLEJACK)$28.1323.78
PAINTERS: (SPRAY WORK/SPRAY EPOXY, SWING CHAIR OR SWING SCAFFOLD)$27.1323.78
PAINTERS: (SAND BLASTING/STEAM CLEANING, ACID OR HIGH PRESSURE WATER)$27.1323.78
PAINTERS: (PAPER OR VINYL HANGERS)$27.4423.78
PAINTERS: (PAINTERS)$26.1323.78

PAIN0677-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$30.0031.95

PLUM0267-003 (collectively bargained (union) rate, 05/01/2019)

ClassificationBase rateFringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (REMAINING TOWNSHIPS)$35.5124.57

ROOF0203-002 (collectively bargained (union) rate, 06/01/2023)

ClassificationBase rateFringes
ROOFER$30.5019.84

SFNY0669-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER$47.8528.94

SHEE0112-004 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
SHEET METAL WORKER$35.9420.89

TEAM0529-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI $26.5215.91
TRUCK DRIVER GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTE$26.0315.91
TRUCK DRIVER GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) FOOTNOTES: A. PAID HOLIDAYS: NEW Y$25.9615.91
Full official text of NY20260005 rev 2
"General Decision Number: NY20260005 05/18/2026


State: New York


Construction Types: Building, Heavy and Highway


Counties: New York Counties of 
Chemung and Schuyler




Excludes building and heavy construction in Schuyler County 


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026


 ASBE0030-001 05/01/2023
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK:  DUTIES 
LIMITED TO PREPARATION, WETTING, STRIPPING, 
REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND 
DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY 
CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM).....$ 38.50                  25.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF 
ALL  MATERIALS, PROTECTIVE COVERINGS, COATINGS AND 
FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS.  
ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO 
OPENINGS AND PENETRATIONS IN WALLS, FLOORS, 
CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)....$ 43.25                  27.29
----------------------------------------------------------------

 ASBE0030-001 05/01/2025
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK:  DUTIES 
LIMITED TO PREPARATION, WETTING, STRIPPING, 
REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND 
DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY 
CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM).....$ 38.50                  25.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF 
ALL  MATERIALS, PROTECTIVE COVERINGS, COATINGS AND 
FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS.  
ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO 
OPENINGS AND PENETRATIONS IN WALLS, FLOORS, 
CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)....$ 43.25                  27.29
----------------------------------------------------------------

 BOIL0007-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 39.35                  33.18
----------------------------------------------------------------

 BRNY0003-003 07/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER: HEAVY AND HIGHWAY 
CONSTRUCTION (CORNING CHAPTER)......................$ 38.63                  25.05
BUILDING CONSTRUCTION: MARBLE, TILE AND TERRAZZO 
FINISHERS (CORNING CHAPTER).........................$ 34.44                  20.38
BUILDING CONSTRUCTION: MARBLE MASON, TILE LAYERS 
AND TERRAZZO WORKERS (CORNING CHAPTER)..............$ 34.69                  25.76
BUILDING CONSTRUCTION: BRICKLAYERS, CEMENT MASONS, 
STONE MASONS, POINTERS, CAULKERS AND CLEANERS 
(CORNING CHAPTER)...................................$ 33.26                  30.21
----------------------------------------------------------------

 CARP0277-016 07/01/2025
                                                     Rates                  Fringes
CARPENTER, MILLWRIGHTS & PILEDRIVERS, BUILDING 
CONSTRUCTION (CHEMUNG COUNTY).......................$ 31.59                  23.24
CARPENTER, HIGHWAY CONSTRUCTION (SCHUYLER COUNTY)...$ 39.52                  27.16
CARPENTER, HEAVY & HIGHWAY CONSTRUCTION (CHEMUNG 
COUNTY).............................................$ 39.52                  27.16
CARPENTER, BUILDING CONSTRUCTION (CHEMUNG COUNTY)...$ 31.59                  23.24
----------------------------------------------------------------

 ELEC0139-001 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (CHEMUNG COUNTY)........................$ 43.40                  31.72
----------------------------------------------------------------

 ELEC0241-003 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (SCHUYLER COUNTY (TOWNSHIPS OF 
CATHARINE, CAYUTA AND HECTOR))......................$ 44.50                  31.89
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
----------------------------------------------------------------

 ELEV0062-001 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC (CHEMUNG COUNTY:) FOOTNOTE:    
A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR 
HOURLY RATE FOR ALL HOURS WORKED.  8%/OVER 5 YEARS 
BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.  
   B. PAID HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY..............................$ 58.44                  38.44
----------------------------------------------------------------

 ENGI0158-024 07/01/2025
                                                     Rates                  Fringes
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND 
SHAFT). FOR EXCAVATION AND PAVING:  FOOTNOTE:  A. 
PAID HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING 
THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY.  EXCAVATION AND 
PAVING CLASSIFICATIONS..............................$ 60.84                  35.00
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND 
PAVING). FOR EXCAVATION AND PAVING:  FOOTNOTE:  A. 
PAID HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING 
THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY.  EXCAVATION AND 
PAVING CLASSIFICATIONS..............................$ 43.26                  34.85
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) 
MASTER MECHANIC  FOOTNOTE:  B.  PAID HOLIDAYS:  NEW 
YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 56.81                  35.75
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY) 
CRANES 49 TONS AND   FOOTNOTE:  B.  PAID HOLIDAYS:  
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED 
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 58.38                  35.75
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) 
GROUP 5: CRANES 50 TONS AND OVER  FOOTNOTE:  B.  
PAID HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY   ..........................................$ 59.88                  35.75
OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT): 
CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 
200 FEET AND OVER   FOOTNOTE:   B. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE 
HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 51.41                  35.00
OPERATING ENGINEER: GROUP 4 (HEAVY AND 
HIGHWAY)TOWER CRANES  FOOTNOTE:  B.  PAID HOLIDAYS: 
 NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED 
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 61.38                  35.75
OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) 
COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER 
PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; 
GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE 
OR COMBINATION); CONCRETE MIXER (16S AND UNDER), 
CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER; 
MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS 
OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO 
EXCEED 12"" IN TOTAL CAPACITY; REVINIUS WIDENER; 
STEAM CLEANER; TRACTOR  FOOTNOTE:  A. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING 
THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 36.61                  34.85
OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT):  
""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); 
COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED 
CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT 
NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT 
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST 
COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; 
LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION); 
CONCRETE PAVEMENT SPREADERS AND FINISHERS; 
CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP 
USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM 
TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK 
LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT 
(MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS 
(HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON); 
HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED 
FORM CARRIER; POST HOLE DIGGER AND POST DRIVER; 
POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER 
(RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC 
PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER 
(RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER 
(RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER 
(RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH 
TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; 
WELL POINT AGGREGATE PLANT; BOILER (USED IN 
CONJUNCTION WITH PRODUCTION); CEMENT AND BIN 
OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200 
CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT 
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST 
COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; 
LIGHT PLANTS (3 OR LESS OF ANY TYPE OR 
COMBINATION); CONCRETE PAVER OR MIXER (16S AND 
UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN; 
FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING 
SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING 
MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT 
GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN 
USED FOR PRODUCTION); REVINIUS WIDENER; SHELL 
WINDER; STEAM CLEANER; TRACTOR   FOOTNOTE:   B. 
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS THE WORKING DAY BEFORE AND THE WORKING DAY 
AFTER THE HOLIDAY  .................................$ 54.42                  35.00
OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A 
FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY 
HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE 
GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, 
RIDE-ON BOILER (USED IN CONJUNCTION WITH 
PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, 
BOAT (POWERED), CEMENT AND BIN OPERATOR, 
COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, 
WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF 
EQUIPMENT), CONCRETE PAVEMENT SPREADER AND 
FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), 
CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, 
DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), 
DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE 
GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, 
RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, 
RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK 
LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED 
ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL 
POINT  FOOTNOTE:  B.  PAID HOLIDAYS:  NEW YEARS 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 51.80                  35.75
OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) 
COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED 
CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT 
NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT 
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST 
COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY 
TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS 
AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL 
(WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL 
POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE 
GRADE MACHINE; FORK LIFT; GUNITE MACHINE; 
HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST 
HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF 
MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO 
EXCEED 20"" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC 
PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR 
WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO 
TAMP; WELL POINT  FOOTNOTE:  A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF 
THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, 
PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY 
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE 
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 40.10                  34.85
OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT):  
AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE 
(TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); 
BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON 
AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR 
MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX 
PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING 
PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER); 
COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED 
CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE 
PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT; 
DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER 
(UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE; 
HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE 
DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN 
PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK 
BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER 
(TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR 
STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE; 
PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY 
MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM 
SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL 
ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE; 
SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER; 
TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER; 
WINCH; WINCH CAT   FOOTNOTE:   B. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE 
HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY  ...........................................$ 57.21                  35.00
OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) 
ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER 
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS 
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), 
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), 
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT 
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, 
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE 
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, 
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR 
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), 
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER 
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, 
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, 
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR 
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, 
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), 
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER 
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, 
REVINIUS WIDENER, ROLLER (GRADE AND FILL), 
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER 
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM 
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE 
PLANT REFRIGERATION EQUIPMENT (FOR SOIL 
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE 
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK 
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, 
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER 
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), 
WINCH, WINCH CAT  FOOTNOTE:  B.  PAID HOLIDAYS:  
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED 
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 54.68                  35.75
OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) 
BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS 
SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); 
BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON 
AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY 
PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS) 
EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE 
PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS 
(TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU. 
YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST 
(ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE 
LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE 
MAN; MECHANICAL SLURRY MACHINE; MIXER FOR 
STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE; 
PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP 
CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER; 
ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR 
SCRAPER; TRACTOR WITH DOZER AND OR PUSHER; 
TRENCHER; WINCH  FOOTNOTE:  A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF 
THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, 
PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY 
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE 
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 40.79                  34.85
OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) 
AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); 
AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT 
PLACER (CMI OR SIMILAR); BLACKTOP SPREADER 
(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX 
PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE 
CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE 
PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES 
AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; 
DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY 
OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY 
RATED 15' AND OVER); FRONT END LOADER (4CU YD AND 
OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; 
SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; 
MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE 
HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); 
MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR 
STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, 
QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; 
SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE 
ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN 
BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER 
MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL   
FOOTNOTE:   B. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE 
DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, 
PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE 
AND THE WORKING DAY AFTER THE HOLIDAY      .........$ 58.43                  35.00
OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) 
AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); 
AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT 
PLACER (CMI OR SIMILAR); BLACKTOP SPREADER 
(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX 
PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE 
CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE 
PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES 
AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; 
DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY 
OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY 
RATED 15' AND OVER); FRONT END LOADER (4CU YD AND 
OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; 
SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; 
MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE 
HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); 
MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR 
STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, 
QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; 
SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE 
ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN 
BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER 
MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL  
FOOTNOTE:  B.  PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 55.38                  35.75
OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) 
ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE 
(EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP 
PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL 
MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER 
5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL 
ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END 
LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM); 
PILE DRIVER; POWER GRADER WITH ELEVATION LOADER 
ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL; 
SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER; 
TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE 
HYDRAULICALLY OPERATED  FOOTNOTE:  A. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING 
THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 41.26                  34.85
----------------------------------------------------------------

 ENGI0158-037 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 8 (BUILDING 
CONSTRUCTION) TOWER CRANES  FOOTNOTE:  A.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE 
WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON 
THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 50.14                  35.20
POWER EQUIPMENT OPERATORS: GROUP 7 (BUILDING 
CONSTRUCTION) CRANES 251 AND OVER TONS  FOOTNOTE:  
A.  PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE 
WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON 
THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 50.64                  35.20
POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING 
CONSTRUCTION) CRANES 25-250 TONS  FOOTNOTE:  A.  
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE 
WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON 
THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 49.64                  35.20
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING 
CONSTRUCTION) CRANES UP TO AND INCLUDING 25 TONS  
FOOTNOTE:  A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY 
PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 47.64                  35.20
POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING 
CONSTRUCTION)   FOOTNOTE:  A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED 
THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY 
PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 39.64                  35.20
POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING 
CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE 
(3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR 
LESS, OR NOT TO EXCEED 1200 CFM COMBINED CAPACITY, 
FIREMAN, LONGITUDINAL FLOAT, MECHANICAL HEATER 
PUMPS (REGARDLESS OF MOTIVE POWER) NO MORE THAN 
THREE (3) IN NUMBER, NOT TO EXCEED TWELVE (12) 
INCHES TOTAL CAPACITY, ROLLER (FILL AND 
GRADE)RUBBER TIRED TRACTOR WELDING MACHINE OR 
MECHANICAL CONVEYOR (OVER 12FT. IN LENGTH) 
EXCEPTION: SINGLE GASOLINE DRIVEN WELDING MACHINE 
UP TO 300AMPS NEED NOT BE MANNED.  FOOTNOTE:  A.  
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ON THE 
WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON 
THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 39.64                  35.20
POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING 
CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE, 
BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR 
TYPE MACHINES, BELT CRETE AND SIMILAR TYPE 
MACHINES, BITUMINOUS SPREADING MACHINE 3/8 YD. 
CAPACITY OR LESS(FACTORY RATING), BULLDOZER, 
CARRY-ALL TYPE SCRAPER, COMPRESSORS: FOUR (4) NOT 
TO EXCEED 2000 CFM COMBINED CAPACITY; OR THREE (3) 
OR LESS WITH MORE THAN1200 CFM BUT NOT TO EXCEED 
2000 CFM, CONCRETE MIXER, CONCRETE PLACER, CONCRETE 
PUMP, DINKY LOCOMOTIVES (ALL TYPES), ELEVATING 
GRADER, ELEVATOR FINE GRADE AND FINISH, ROLLERS, 
FINE GRADE MACHINES(ALL KINDS), FORKLIFT WITH 
FACTORY RATING OF LESS THAN FIFTEEN(15) FEET OF 
LIFT, FRONT END LOADER, GUNITE PUMPING MACHINE, 
HIGH PRESSURE BOILER, HOIST (1 OR 2 DRUMS), 
MAINTENANCE ENGINEER (MECHANIC), MECHANICAL SLURRY 
MACHINE (ALL KINDS), MEGA MIXERS AND SIMILAR TYPE 
MACHINES, MOTOR GRADER, POST HOLE DIGGER, PUMPS 
(REGARDLESS OF MOTIVE POWER) NO MORE THAN FOUR (4) 
IN NUMBER NOT TO EXCEED TWENTY (20) INCHES IN TOTAL 
CAPACITY, SHOT CRETE PUMPING MACHINE, SIDE BOOM 
TRACTOR, SKID STEER LOADER WITH  ATTACHMENTS, STONE 
CRUSHER TOURNADOZER AND SIMILAR TYPES TOURNAPULL 
AND SIMILAR TYPES, TRENCHING MACHINES, WELL DRILL, 
WELLPOINT SYSTEM EXCEPTION: SINGLE ELECTRIC PUMPS 
UP TO AND INCLUDING FOUR (4) INCHES NEED NOT BE 
MANNED.  FOOTNOTE:  A.  PAID HOLIDAYS:  NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY 
PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 42.34                  35.20
POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING 
CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING 
MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND 
SIMILAR MACHINES OVER THREE EIGHTHS CU.YD. CAPACITY 
(FACT. RATING);CARRIER MOUNTED BACKHOES THAT SWING 
360 DEGREES BIG GENERATOR PLANT HOIST (ON STEEL 
ERECTION) BRIDGE CRANE (ALL TYPES), CABLEWAY, 
CAISSON AUGER AND SIMILAR TYPE MACHINE, CRANE, 
DERRICK, DREDGE, EXCAVATOR ALL PURPOSE 
HYDRAULICALLY OPERATED, FORKLIFT (WITH FACTORY 
RATING OF FIFTEEN FT. OR MORE OF LIFT),HOIST (ON 
STEEL ERECTION), HYDRAULIC/KRUPP DRILL TYPE MUCKING 
MACHINES, REMOTE CONTROLLED EXCAVATOR WITH 
ATTACHMENTS (BROKK TYPE OR SIMILAR), ROSS CARRIER  
(AND SIMILAR TYPE), THREE-DRUM HOIST(WHEN ALL THREE 
DRUMS ARE IN USE)  FOOTNOTE:  A.  PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, 
PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY 
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE 
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 43.14                  35.20
----------------------------------------------------------------

 IRON0033-002 07/01/2025
                                                     Rates                  Fringes
IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, 
MACHINERY MOVER-RIGGER, FENCE ERECTOR, PRE-CAST 
CONCRETE ERECTOR, REINFORCING, STONE DERRICKMAN 
(CHEMUNG; SCHUYLER (TWPS. OF DIX, ORANGE, REDING 
AND TRYON).)........................................$ 35.75                  30.80
IRONWORKERS:: SHEETER (CHEMUNG; SCHUYLER (TWPS. OF 
DIX, ORANGE, REDING AND TRYON).)....................$ 36.00                  30.80
----------------------------------------------------------------

 IRON0060-010 07/01/2025
                                                     Rates                  Fringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING, 
PRE-CAST CONCRET ERECTOR, MACHINERY MOVER & RIGGER, 
FENCE ERECTOR, STONE DERRICKMAN WELDER, SHEETER, 
SHEETER BUCKER-UP (SCHUYLER COUNTY (TOWNSHIPS OF 
CATHARINE, CAYUTA, HECTOR AND MONTOUR)).............$ 37.16                  30.68
----------------------------------------------------------------

 LABO0785-016 07/01/2024
                                                     Rates                  Fringes
LABORERS: HEAVY & HIGHWAY: GROUP 5 TOXIC WASTE 
REMOVAL  SCHUYLER (TWPS. OF CATHERINE - INCLUDING 
THE VILLAGE OF ODESSA)  FOOTNOTE:    A.  PAID 
HOLIDAYS:   NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 38.76                  25.60
LABORERS: HEAVY & HIGHWAY: GROUP 4 BLASTERS; FORM 
SETTERS; STONE OR GRANITE CURB SETTERS  SCHUYLER 
(TWPS. OF CATHERINE - INCLUDING THE VILLAGE OF 
ODESSA)  FOOTNOTE:    A.  PAID HOLIDAYS:   NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 36.16                  25.60
LABORERS: HEAVY & HIGHWAY: GROUP 3 ALL ROCK OR 
DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND 
SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT 
RAKER; POWDERMAN  SCHUYLER (TWPS. OF CATHERINE - 
INCLUDING THE VILLAGE OF ODESSA)  FOOTNOTE:    A.  
PAID HOLIDAYS:   NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 35.96                  25.60
LABORERS: HEAVY & HIGHWAY: GROUP 2 BULL FLOAT; 
CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE 
BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; 
JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT 
BREAKER; HANDLERS OF ALL STEEL MESH; SMALL 
GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF 
BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE 
ROLLERS; TAMPERS; DRILL DOCTOR; TAIL OR SCREW 
OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATOR 
(1-1/2"" AND SINGLE DIAPHRAM);  NOZZLE (ASPHALT, 
GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON 
CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER 
UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, 
ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING 
LABORERS  SCHUYLER (TWPS. OF CATHERINE - INCLUDING 
THE VILLAGE OF ODESSA)  FOOTNOTE:    A.  PAID 
HOLIDAYS:   NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 35.76                  25.60
LABORERS: HEAVY & HIGHWAY: GROUP 1 LABORERS; 
FLAGGERS; OUTBOARD AND HAND BOATS  SCHUYLER (TWPS. 
OF CATHERINE - INCLUDING THE VILLAGE OF ODESSA)  
FOOTNOTE:    A.  PAID HOLIDAYS:   NEW YEAR'S DAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; 
THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 35.56                  25.60
----------------------------------------------------------------

 LABO0785-021 07/01/2022
                                                     Rates                  Fringes
LABORER GROUP 2 (ZONE III) (CHEMUNG AND SCHUYLER 
(EXCEPT CATHERINE TOWNSHIP):  HEAVY & HIGHWAY)..$ 33.20                  22.51
LABORER GROUP 2 (CHEMUNG AND SCHUYLER (EXCEPT 
CATHERINE TOWNSHIP):  HEAVY & HIGHWAY (ZONE 
III))...............................................$ 33.20                  22.51
LABORER GROUP 1-(ZONE III) (CHEMUNG AND SCHUYLER 
(EXCEPT CATHERINE TOWNSHIP):  HEAVY & HIGHWAY)..$ 33.00                  22.51
LABORER GROUP 1 (CHEMUNG AND SCHUYLER (EXCEPT 
CATHERINE TOWNSHIP):  HEAVY & HIGHWAY (ZONE 
III))...............................................$ 33.00                  22.51
----------------------------------------------------------------

 PAIN0004-016 05/01/2025
                                                     Rates                  Fringes
PAINTERS: (STRUCTURAL STEEL, EPOXY BRUSH OR ROLL)...$ 27.38                  23.78
PAINTERS: (STEEPLEJACK).............................$ 28.13                  23.78
PAINTERS: (SPRAY WORK/SPRAY EPOXY, SWING CHAIR OR 
SWING SCAFFOLD).....................................$ 27.13                  23.78
PAINTERS: (SAND BLASTING/STEAM CLEANING, ACID OR 
HIGH PRESSURE WATER)................................$ 27.13                  23.78
PAINTERS: (PAPER OR VINYL HANGERS)..................$ 27.44                  23.78
PAINTERS: (PAINTERS)................................$ 26.13                  23.78
----------------------------------------------------------------

 PAIN0677-003 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 30.00                  31.95
----------------------------------------------------------------

 PLUM0267-003 05/01/2019
                                                     Rates                  Fringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC 
WORK (REMAINING TOWNSHIPS)..........................$ 35.51                  24.57
----------------------------------------------------------------

 ROOF0203-002 06/01/2023
                                                     Rates                  Fringes
ROOFER..............................................$ 30.50                  19.84
----------------------------------------------------------------

 SFNY0669-001 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 47.85                  28.94
----------------------------------------------------------------

 SHEE0112-004 05/01/2023
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 35.94                  20.89
----------------------------------------------------------------

 TEAM0529-001 05/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY 
EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 
20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE 
DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; 
ASPHALT DISTRIBUTORS; FUEL TRUCK  FOOTNOTES:    A. 
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 26.52                  15.91
TRUCK DRIVER GROUP 2 DUMP TRUCK (OVER 10 YDS); 
TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 
YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH 
TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND 
VAC TRUCKS; DUMPSTER (TANDEM)  FOOTNOTES:    A. 
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 26.03                  15.91
TRUCK DRIVER GROUP 1 FLAT BED TRUCK (SINGLE AXLE); 
DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY 
TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE)  
FOOTNOTES:    A. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 25.96                  15.91
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"