Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of NY20260011 rev 3
"General Decision Number: NY20260011 07/30/2026
State: New York
Construction Types: Heavy and Highway
Counties: New York Counties of
Niagara
Heavy Construction
Highway Construction
Modification Number Publication Date
1 01/30/2026
2 05/18/2026
3 07/30/2026
BOIL0007-001 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 39.35 33.18
----------------------------------------------------------------
BRNY0045-002 07/01/2023
Rates Fringes
MARBLE MASON........................................$ 36.85 30.80
POINTER, CLEANER AND CAULKER........................$ 36.82 31.33
----------------------------------------------------------------
BRNY0045-002 07/01/2024
Rates Fringes
BRICKLAYER, STONEMASON..............................$ 37.44 32.71
TILE & TERRAZZO WORKER..............................$ 37.85 31.80
TILE, MARBLE & TERRAZZO FINISHER....................$ 34.71 17.54
----------------------------------------------------------------
CARP0276-015 07/01/2024
Rates Fringes
CARPENTER...........................................$ 41.19 29.81
CARPENTER: PILEDRIVER...............................$ 41.19 31.55
----------------------------------------------------------------
ELEC0237-001 05/26/2025
Rates Fringes
ELECTRICIANS........................................$ 44.20 32.90
----------------------------------------------------------------
ELEC1249-003 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 31.72 29.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER
UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 42.29 30.66
----------------------------------------------------------------
ELEC1249-004 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND
MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;
RAILROAD CATENARY INSTALLATION AND MAINTENANCE,
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Substation:).......................................$ 63.14 33.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installation)........................$ 64.59 42.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
(Substation:).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Overhead and underground
distribution and maintenance work and all overhead
and underground transmission line work including
any and all fiber optic ground wire, fiber optic
shield wire or any other like product by any other
name manufactured for the dual purpose of ground
fault protection and fiber optic capabilities :)....$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Substation:)......................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Switching structures; railroad
catenary installation and maintenance, third rail
type underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cab........................................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Overhead and underground distribution and
maintenance work and all overhead and underground
transmission line work including any and all fiber
optic ground wire, fiber optic shield wire or any
other like product by any other name manufactured
for the dual purpose of ground fault protection and
fiber optic capabilities :).........................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installat............................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Overhead and
underground distribution and maintenance work and
all overhead and underground transmission line work
including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Substation:)............................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable ins..................................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
(Substation:).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 49.25 31.15
----------------------------------------------------------------
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93
----------------------------------------------------------------
ENGI0017-007 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND
HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES,
AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP
SPREADERS, BULLDOZERS, CMI GRADING MACHINES,
CABLEWAYS, CLAMBUCKETS, COMBINATION HOE BOOM OR
SHOVEL BOOMATTACHED (EXCEPT FARM TYPE CRAWLER OR
RUBBER TIRED TRACTOR UNLESS USED WITH HYDRAULIC
BACK-HOE), COMPRESSOR (WITH PAING BREAKER
ATTACHED), CONCRETE MIXERS (ONE YARD AND OVER),
CONCRETE PLANNER, CONCRETE PUMP (TRUCK MOUNTED),
CONCRETE SPREADER OPERATOR, CRANE WORK, CRANES
(OVERHEAD OR BRIDGE), CRANE OPERATOR (OVER 100,
200, 300 FEET BOOMS EARN PREMIUMS AS NOTED HEREIN),
DERRICKS, DRAGLINES, EUCLID TYPE BELT LOADERS,
FINISHING MACHINE OPERATORS, FORK-LIFTS AND HOISTS
9 WHEN LIFTING MATERIAL AT AN ELEVATION HIGHER THAN
TWENTY-FIVE FEET), FORM PULLER, GENERATOR AND
COMPRESSOR (POWER DRIVEN-WHEN USED SIMULTANEOUSLY
AND FOR ANY MAKE OF PORTABLE CONCRETE BATCHING
MACHINE), GRADERS, GRADERS (WITH BULLDOZER BLADES),
HOISTS (MULTIPLE DRUM WITH AIR COMPRESOR WHEN USED
SIMULTANEOUSLY FOR MORE THAN ONE PURPOSE), HOISTS -
SINGLE DRUM WHEN USED TO HOIST STEEL), HYDRAULIC
CONCRETE JOINT HAMMERS, HYDRAULIC ROCK DRILL
(INGERSOLL-RAND LM 500 TYPE), HYDRO-AXE, KOLMAN
LOADERS, LOADERS (FRONT & BACK - EXCEPT SMALL
TYPE), LUBRICATION ENGINEERS, MECHANIC, PAVEMENT
BREAKER (EXCEPT HAND OPERATED PAVEMENT BREAKERS),
PILE DRIVING RIGS, PIPE PUSHING RIGS, PIPE PUSHING
MACHINES (MECHANICL AND HYDRAULIC), POST DRIVERS
(EXCEPT TRUCK MOUNTED POST DRIVERS), REAPIR WORK ON
MAINTENANCE WORK UNDER THE SUPERVISION OF A MASTER
MECHANIC, ROLLERS (ALL) (ON FINISH BLACKTOP),
SCOOPMOBILES (ALL), SCRAPTER (EITHER DOUBLE OR
SINGLE BOWL), S-240 LAZER-GUIDED SCREED, SHOVELS,
SNOW-LOADER, STEEL ERECTION, STONE CRUSHERS
(PORTABLE), STONE SPREADERS (POWER DRIVEN),
TRACTORS USE DIN CONJUNCTION WITH SCRAPER WAGONS
(ALL), TREE BANDIT OR SIMILAR CHIPPER, TRANCHERS
(WHEN EXCAVATION OVER SIX FEET IN DEPTH), TUNNEL
MUCKING MACHINES, VIBRATORS (SELF-PROPELLED
RIDING), WELDER NOTES: HAZARDOUS WASTE
2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND
JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM
PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER
GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB
100-199 FT (2.00 OVER GROUP A)...................$ 47.39 34.84
POWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY
CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT),
BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN
BANKS OF TWO AND NOT OVER THREE WITHIN A FIFTY FOOT
RADIUS AND IF FUEL IS STORED, IT WOULD BE STORED
WITHIN THE SAME RADIUS, CONCRETE BLOWERS, CONCRETE
PUMPS, CONVEYORS, CRAWLER OR RUBBER TIRE TRACTOR
(SMALL FARM TYPEWITH BLADE OR BUCKET NOT TO EXCEED
0.5 YD CAPACITY), EARTH DRILLS (ALL), ELEVATORS
(ALL), FORKLIFT WHILE USED TO LIFT MATERIAL NOT
OVER 25 FT, GUNNITE MACHINES, HEATERS (GASOLINE
-USE IN BANKS OF TWO AND NOT OVER THREE WITHIN AN
AREA OF ONE HUDNRED FOOT RADIUS, HIGHLIFT HOISTS
WHILE USED TO LIFT MATERIAL NOT OVER 25 FT,
MATERIAL HOISTS, SINGLE DRUM HOIST FOR HOISTING
MATERIALS OTHER THAN STEEL, LATOURNEAU
TURNATRAILERS, LIGHT AND POWER SYSTEMS 9 GAS OR
DIESEL DRIVEN - TEMPORARY 25 KW CAPACITY OR OVER),
LOADERS 9 SMALL FRONT OR BACK), LOCOMOTIVE, PARTS
ROOM - WHEN A PARTS ROOM IS MANNED IT SHALL BE AN
ENGINEER, PAVEMENT BUSTERS, PIN PULLSER, POST
DRIVERS 9 TRUCK MOUNTED), PUG MACHINE, PUMS OVER 4
INCHES, (ROAD ROLLERS EXCEPT ON FINISH BALCKTOP,
ROAD WIDENER MOUNTED ON A LOADER, ROLLES (SELF
PROPELLED - NOT ON FINISH BLACKTOP AND UNDER 7
TONS), SCOOPMOBILES - WHEN USED AS A STATION ARY
HOIST, OR ONE USED TO LIFT MATERIAL NOT IN EXCESS
OF 25 FEET, SNOW-GO, STONE CRUSHERS AND WINCH
HOISTS MOUNTED ON TRUCKS, TRACTORS, TRENCHERS
EXCAVATING UP TO 6 FT DEEP), TRENCHERS ON THE BACK
OF A JEEP, WELDING MACHINES (FOR 2 BUT NOT OVER 3
GASOLINE OR DIESEL DRIVEN), WINCH TRACTORS NOTES:
HAZARDOUS WASTE 2.50 ZONE PAY:
CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT
(1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM
AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE
BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00
OVER GROUP A).......................................$ 42.89 34.84
POWER EQUIPMENT OPERATOR MASTER MECHANIC (HEAVY AND
HIGHWAY CONSTRUCTION) NOTES: HAZMAT PREMIUM
3.00 ZONE PAY: ADD $1.00 TO GROUP A -
LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50
TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT
ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM
300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE
HOLIDAY. TUNNEL AND SHAFT
CLASSIFICATIONS.....................................$ 48.46 34.84
POWER EQUIPMENT OPERATOR: GROUP A HEAVY AND
HIGHWAY CONSTRUCTION NOTES: HAZARDOUS
WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR
BOOM AND JIB 100-199 FT (1.00 OVER GROUP A)
CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT
(1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM
AND JIB 100-199 FT (2.00 OVER GROUP A)...........$ 47.39 34.84
----------------------------------------------------------------
ENGI0017-008 07/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR: TUNNEL AND SHAFT: MASTER
MECHANIC NOTES: HAZMAT PREMIUM $3.00 ZONE PAY:
ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM
100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM
CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO
GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE
WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY.
TUNNEL AND SHAFT CLASSIFICATIONS....$ 38.06 28.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP
A NOTES: HAZMAT PREMIUM 3.00 ZONE
PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE
PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A-
LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00
TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND
OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S
DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE
WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY..$ 36.29 28.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP
A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL
AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE
ENGINEER (TUNNEL AND SHAFT), MINING MACHINE (MOLE
AND SIMILAR TYPES), MOTOR MAN, MUCKING MACHINE,
SHOVEL, TRIPPER/MAINTENANCE ENGINEER (TUNNEL AND
SHAFT), TUNNEL SHOVEL NOTES: HAZMAT PREMIUM
3.00 ZONE PAY: ADD $1.00 TO GROUP A -
LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50
TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT
ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM
300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE
HOLIDAY.............................................$ 39.29 28.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP
B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE
(TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS,
EXCEEDING 2,000 C.F.M. COMBINED CAPACITY, BUT NOT
TO EXCEED 5,000 C.F.M. WITH A DISTANCE NOT TO
EXCEED 1,500 FEET), CONCRETE PUMP, CRANE (TOPSIDE,
FRONT END LOADER (TOPSIDE), GRAYCO EPOXY MACHINE,
HOIST (2 OR 3 DRUM -- TOPSIDE), MAINTENANCE
ENGINEER (TOPSIDE), MAINTENANCE GREASE MAN,
PERSONNEL HOIST, PUMP CRETE, SHOTCRETE MACHINE,
SHOVEL (TOPSIDE) NOTES: HAZMAT PREMIUM
3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG
BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO
GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT
ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM
300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE
HOLIDAY.............................................$ 34.58 28.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP
C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M.
COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200
C.F.M. BUT NOT TO EXCEED 2,000 C.F.M. WITH A
DISTANCE FOR COMPRESSORS), DUST COLLECTORS,
GENERATORS, PUMPS, WELDING MACHINES (4 OF ANY TYPE
OR COMBINATION) WITH A DISTANCE NOT TO EXCEED 1,500
FEET; CONVEYOR, ELECTRIC PUMP USED INCONJUNCTION
WITH WELL POINT SYSTEM GROUT PUMP OVER 5 CUBIC FEET
(MANUFACTURER'S RATING), HYDRO-BLASTER, MOTORIZED
FORM CARRIER, TRUCK CRANE OILER, WELL POINT NOTES:
HAZMAT PREMIUM 3.00 ZONE PAY:
ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100
FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE
PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A -
LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY
BEFORE AND THE DAY AFTER THE HOLIDAY................$ 28.53 28.10
----------------------------------------------------------------
IRON0009-003 07/01/2025
Rates Fringes
IRONWORKER..........................................$ 36.25 33.12
IRONWORKERS: (SHEETER)..............................$ 36.25 33.12
----------------------------------------------------------------
LABO0091-002 07/01/2017
Rates Fringes
LABORER COMPRESSED AIR GROUP 1 TOP LABORERS
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 26.00 35.96
LABORER GROUP 1 (HEAVY & HIGHWAY CLASSIFICATIONS)
COMMON LABORERS, MULTI-TRADE TENDER,
DECONTAMINATION OF ALL MACHINES, HORIZONTAL
DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES
WITH ATTACHMENTS/ALL WHEEL OR TRACK TYPES
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 26.00 35.96
LABORER GROUP 2 (HEAVY & HIGHWAY CLASSIFICATIONS)
POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS,
JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW;
POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL
TENDERS; MORTAR MIXERS; CONCRETE POLISHING MACHINE;
OPERATION & MAINTENANCE OF ALL ROBOTIC REMOTE
SYSTEMS IN HAZARDOUS ENVIRONMENT; MEN WORKING FROM
SWINGING SCAFFOLD BO'SNS CHAIR, SUSPENDED CAGE OR
BUCKET; ALL OTHER OPERATORS OF MECHANICAL TOOLS,
INCLUDING VIBRATORS REGARDLESS OF TYPE OF POWER AND
BOAT MEN; OPERATION OF ALL TYPES OF VIDEO MACHINERY
USED IN THE INSPECTION OF PIPE; WORK IN CAISSONS
BELOW 8 FEET; CONCRETE MOTOR BUGGY FOOTNOTE: A.
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.30 35.96
LABORER GROUP 3 (HEAVY & HIGHWAY CLASSIFICATIONS)
RESPIRATOR REQUIRED FOR BUSTING FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.50 35.96
LABORER GROUP 4 (HEAVY & HIGHWAY CLASSIFICATIONS)
FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN;
SANDBLASTERS; BURNING TORCH; CONCRETE SAW
OPERATORS; UTILITY PILE DRIVER; TREE TOPPER; GROUT
MACHINE AND GROUT PUMP OPERATOR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.60 35.96
LABORER GROUP 5 (HEAVY & HIGHWAY CLASSIFICATIONS)
LASER BEAM OPERATOR FOOTNOTE: A. PAID HOLIDAYS:
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY.................................................$ 26.85 35.96
LABORER GROUP 6 (HEAVY & HIGHWAY CLASSIFICATIONS)
WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF
CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO
ATMOSPHERIC CONDITIONS (EXCLUDING RESPIRATORS
REQUIRED FOR HAZARDOUS WASTE & TOXIC MATERIALS,
ASBESTOS ABATEMENT OR LEAD ABATEMENT) FOOTNOTE:
A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY.....................$ 27.00 35.96
LABORER GROUP 7 (HEAVY & HIGHWAY CLASSIFICATIONS)
CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE &
TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL
& ASBESTOS; THE REMOVAL OF ASBESTOS FROM ROOFS,
CEILINGS, PIPES, WALLS, BOILERS ETC., AND ALL
MACHINERY, & THE RECOVERING OF SAME; REMOVAL OF
LEAD FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 28.00 35.96
LABORER GROUP 8 (HEAVY & HIGHWAY CLASSIFICATIONS)
GRADE CHECKER & BLASTER FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY.....................$ 28.60 35.96
LABORER GROUP 9 (HEAVY & HIGHWAY CLASSIFICATIONS)
SUPPLIED AIR RESPIRATORS FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY ...................$ 31.00 35.96
----------------------------------------------------------------
PAIN0004-002 05/01/2025
Rates Fringes
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: BRUSH &
ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH
TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET
AND THE EASTERN HALVES OF CAMBRIA AND WILSON)......$ 33.00 28.21
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION:
DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT
NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON,
SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND
WILSON).............................................$ 34.00 28.51
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION:
WALLCOVERING (TOWNSHIPS OF HARTLAND, LOCKPORT
NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON,
SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND
WILSON).............................................$ 33.00 28.21
----------------------------------------------------------------
PAIN0004-005 05/01/2025
Rates Fringes
PAINTERS: PAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA
FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES
OF CAMBRIA AND WILSON).............................$ 33.00 28.21
PAINTERS: SPRAYING, PAPERHANGERS, SAND-BLASTING,
SWINGING SCAFFOLD (TOWNSHIPS OF LEWISTON, NIAGARA
FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES
OF CAMBRIA AND WILSON).............................$ 33.00 28.21
PAINTERS: TAPERS (TOWNSHIPS OF LEWISTON, NIAGARA
FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES
OF CAMBRIA AND WILSON).............................$ 34.00 28.51
----------------------------------------------------------------
PAIN0004-011 05/01/2025
Rates Fringes
GLAZIER.............................................$ 34.68 27.64
----------------------------------------------------------------
PLAS0111-002 07/01/2025
Rates Fringes
CEMENT FINISHER.....................................$ 33.55 34.17
----------------------------------------------------------------
PLUM0022-005 04/29/2024
Rates Fringes
PLUMBER AND STEAMFITTER (ZONE 1)....................$ 42.20 29.80
----------------------------------------------------------------
ROOF0074-002 06/01/2024
Rates Fringes
ROOFERS: COMPOSITION................................$ 34.96 26.03
ROOFERS: SLATE & TILE...............................$ 35.11 26.03
----------------------------------------------------------------
SFNY0669-001 01/01/2026
Rates Fringes
SPRINKLER FITTER....................................$ 47.85 28.94
----------------------------------------------------------------
SHEE0071-002 05/27/2024
Rates Fringes
SHEET METAL WORKER..................................$ 39.50 29.18
----------------------------------------------------------------
TEAM0449-003 07/01/2025
Rates Fringes
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND
OFF-HIGHWAY DUMP TRUCKS (HEAVY & HIGHWAY) WORK ON
A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER
HOUR. FOOTNOTE: A. PENSION $54.00 PER DAY B.
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE
WORKING DAY BEFORE AND AFTER THE HOLIDAY............$ 49.23 8.75
----------------------------------------------------------------
TEAM0449-006 06/01/2025
Rates Fringes
TRUCK DRIVERS: DUMP TRUCK ONLY, EXCLUDES SINGLE
AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A.
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE
WORKING DAY BEFORE AND AFTER THE HOLIDAY............$ 32.00 0.00
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to
the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at
least $13.65 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the
contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"