Prevailing Wage Index
HomePrevailing wage by stateNew YorkDeterminations › NY20260011

Wage determination NY20260011

Heavy, Highway construction - New York, revision 3, modified 2026-07-30

Verify against the official document: this page mirrors WD NY20260011 revision 3 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

BOIL0007-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$39.3533.18

BRNY0045-002 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
MARBLE MASON$36.8530.80
POINTER, CLEANER AND CAULKER$36.8231.33

BRNY0045-002 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
BRICKLAYER, STONEMASON$37.4432.71
TILE & TERRAZZO WORKER$37.8531.80
TILE, MARBLE & TERRAZZO FINISHER$34.7117.54

CARP0276-015 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
CARPENTER$41.1929.81
CARPENTER: PILEDRIVER$41.1931.55

ELEC0237-001 (collectively bargained (union) rate, 05/26/2025)

ClassificationBase rateFringes
ELECTRICIANS$44.2032.90

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93

ENGI0017-007 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES, AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP SPREADERS, BULLDOZERS, CMI GRADING MACHINES, CAB$47.3934.84
POWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT), BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN BANKS OF TWO AND NOT OVER THRE$42.8934.84
POWER EQUIPMENT OPERATOR MASTER MECHANIC (HEAVY AND HIGHWAY CONSTRUCTION) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1$48.4634.84
POWER EQUIPMENT OPERATOR: GROUP A HEAVY AND HIGHWAY CONSTRUCTION NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM$47.3934.84

ENGI0017-008 (collectively bargained (union) rate, 07/01/2016)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATOR: TUNNEL AND SHAFT: MASTER MECHANIC NOTES: HAZMAT PREMIUM $3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP $38.0628.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG $36.2928.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE ENGINEER (TUNNEL AND SHAFT), MINING$39.2928.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS, EXCEEDING 2,000 C.F.M. COMBINE$34.5828.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M. COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200 C.F.M. BUT NOT TO EXCEED 2,000 C.$28.5328.10

IRON0009-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER$36.2533.12
IRONWORKERS: (SHEETER)$36.2533.12

LABO0091-002 (collectively bargained (union) rate, 07/01/2017)

ClassificationBase rateFringes
LABORER COMPRESSED AIR GROUP 1 TOP LABORERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY$26.0035.96
LABORER GROUP 1 (HEAVY & HIGHWAY CLASSIFICATIONS) COMMON LABORERS, MULTI-TRADE TENDER, DECONTAMINATION OF ALL MACHINES, HORIZONTAL DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES W$26.0035.96
LABORER GROUP 2 (HEAVY & HIGHWAY CLASSIFICATIONS) POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; POWDER MONKEY; BLACK TOP RAKERS;$26.3035.96
LABORER GROUP 3 (HEAVY & HIGHWAY CLASSIFICATIONS) RESPIRATOR REQUIRED FOR BUSTING FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING $26.5035.96
LABORER GROUP 4 (HEAVY & HIGHWAY CLASSIFICATIONS) FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN; SANDBLASTERS; BURNING TORCH; CONCRETE SAW OPERATORS; UTILITY PILE DRIVER; TREE TOPP$26.6035.96
LABORER GROUP 5 (HEAVY & HIGHWAY CLASSIFICATIONS) LASER BEAM OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTM$26.8535.96
LABORER GROUP 6 (HEAVY & HIGHWAY CLASSIFICATIONS) WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO ATMOSPHERIC CONDITIONS (EXCLUDING RESPIRA$27.0035.96
LABORER GROUP 7 (HEAVY & HIGHWAY CLASSIFICATIONS) CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE & TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL & ASBESTOS; THE REMOVAL OF$28.0035.96
LABORER GROUP 8 (HEAVY & HIGHWAY CLASSIFICATIONS) GRADE CHECKER & BLASTER FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHR$28.6035.96
LABORER GROUP 9 (HEAVY & HIGHWAY CLASSIFICATIONS) SUPPLIED AIR RESPIRATORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CH$31.0035.96

PAIN0004-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: BRUSH & ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AN$33.0028.21
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AN$34.0028.51
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: WALLCOVERING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND $33.0028.21

PAIN0004-005 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PAINTERS: PAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON)$33.0028.21
PAINTERS: SPRAYING, PAPERHANGERS, SAND-BLASTING, SWINGING SCAFFOLD (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON)$33.0028.21
PAINTERS: TAPERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON)$34.0028.51

PAIN0004-011 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$34.6827.64

PLAS0111-002 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CEMENT FINISHER$33.5534.17

PLUM0022-005 (collectively bargained (union) rate, 04/29/2024)

ClassificationBase rateFringes
PLUMBER AND STEAMFITTER (ZONE 1)$42.2029.80

ROOF0074-002 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
ROOFERS: COMPOSITION$34.9626.03
ROOFERS: SLATE & TILE$35.1126.03

SFNY0669-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER$47.8528.94

SHEE0071-002 (collectively bargained (union) rate, 05/27/2024)

ClassificationBase rateFringes
SHEET METAL WORKER$39.5029.18

TEAM0449-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS (HEAVY & HIGHWAY) WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR. FOOTNOTE: A. PENSION $54.00 PE$49.238.75

TEAM0449-006 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGI$32.000.00
Full official text of NY20260011 rev 3
"General Decision Number: NY20260011 07/30/2026


State: New York


Construction Types: Heavy and Highway


Counties: New York Counties of 
Niagara




Heavy Construction

Highway Construction


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026
          3                07/30/2026


 BOIL0007-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 39.35                  33.18
----------------------------------------------------------------

 BRNY0045-002 07/01/2023
                                                     Rates                  Fringes
MARBLE MASON........................................$ 36.85                  30.80
POINTER, CLEANER AND CAULKER........................$ 36.82                  31.33
----------------------------------------------------------------

 BRNY0045-002 07/01/2024
                                                     Rates                  Fringes
BRICKLAYER, STONEMASON..............................$ 37.44                  32.71
TILE & TERRAZZO WORKER..............................$ 37.85                  31.80
TILE, MARBLE & TERRAZZO FINISHER....................$ 34.71                  17.54
----------------------------------------------------------------

 CARP0276-015 07/01/2024
                                                     Rates                  Fringes
CARPENTER...........................................$ 41.19                  29.81
CARPENTER: PILEDRIVER...............................$ 41.19                  31.55
----------------------------------------------------------------

 ELEC0237-001 05/26/2025
                                                     Rates                  Fringes
ELECTRICIANS........................................$ 44.20                  32.90
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
----------------------------------------------------------------

 ENGI0017-007 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND 
HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES, 
AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP 
SPREADERS, BULLDOZERS, CMI GRADING  MACHINES, 
CABLEWAYS, CLAMBUCKETS, COMBINATION HOE BOOM OR 
SHOVEL BOOMATTACHED (EXCEPT FARM TYPE CRAWLER OR 
RUBBER TIRED TRACTOR UNLESS USED WITH HYDRAULIC 
BACK-HOE), COMPRESSOR (WITH PAING BREAKER 
ATTACHED), CONCRETE MIXERS (ONE YARD AND OVER), 
CONCRETE PLANNER, CONCRETE PUMP (TRUCK MOUNTED), 
CONCRETE SPREADER OPERATOR, CRANE WORK, CRANES 
(OVERHEAD OR BRIDGE), CRANE OPERATOR (OVER 100, 
200, 300 FEET BOOMS EARN PREMIUMS AS NOTED HEREIN), 
DERRICKS, DRAGLINES, EUCLID TYPE BELT LOADERS, 
FINISHING MACHINE OPERATORS, FORK-LIFTS AND HOISTS 
9 WHEN LIFTING MATERIAL AT AN ELEVATION HIGHER THAN 
TWENTY-FIVE FEET), FORM PULLER, GENERATOR AND 
COMPRESSOR (POWER DRIVEN-WHEN USED SIMULTANEOUSLY 
AND FOR ANY MAKE OF PORTABLE CONCRETE BATCHING 
MACHINE), GRADERS, GRADERS (WITH BULLDOZER BLADES), 
HOISTS (MULTIPLE DRUM WITH AIR COMPRESOR WHEN USED 
SIMULTANEOUSLY FOR MORE THAN ONE PURPOSE), HOISTS - 
SINGLE DRUM WHEN USED TO HOIST STEEL), HYDRAULIC 
CONCRETE JOINT HAMMERS, HYDRAULIC ROCK DRILL 
(INGERSOLL-RAND LM 500 TYPE), HYDRO-AXE, KOLMAN 
LOADERS, LOADERS (FRONT & BACK - EXCEPT SMALL 
TYPE), LUBRICATION ENGINEERS, MECHANIC, PAVEMENT 
BREAKER (EXCEPT HAND OPERATED PAVEMENT BREAKERS), 
PILE DRIVING RIGS, PIPE PUSHING RIGS, PIPE PUSHING 
MACHINES (MECHANICL AND HYDRAULIC), POST DRIVERS 
(EXCEPT TRUCK MOUNTED POST DRIVERS), REAPIR WORK ON 
MAINTENANCE WORK UNDER THE SUPERVISION OF A MASTER 
MECHANIC, ROLLERS (ALL) (ON FINISH BLACKTOP), 
SCOOPMOBILES (ALL), SCRAPTER (EITHER DOUBLE OR 
SINGLE BOWL), S-240 LAZER-GUIDED SCREED, SHOVELS, 
SNOW-LOADER, STEEL ERECTION, STONE CRUSHERS 
(PORTABLE), STONE SPREADERS (POWER DRIVEN), 
TRACTORS USE DIN CONJUNCTION WITH SCRAPER WAGONS 
(ALL), TREE BANDIT OR SIMILAR CHIPPER, TRANCHERS 
(WHEN EXCAVATION OVER SIX FEET IN DEPTH), TUNNEL 
MUCKING MACHINES, VIBRATORS (SELF-PROPELLED 
RIDING), WELDER  NOTES:            HAZARDOUS WASTE  
   2.50  ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND 
JIB 100-199 FT    (1.00 OVER GROUP A)  CRANE BOOM 
PREMIUM FOR BOOM AND JIB 100-199 FT    (1.50 OVER 
GROUP A)    CRANE BOOM PREMIUM FOR BOOM AND JIB 
100-199 FT    (2.00 OVER GROUP A)...................$ 47.39                  34.84
POWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY 
CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT), 
BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN 
BANKS OF TWO AND NOT OVER THREE WITHIN A FIFTY FOOT 
RADIUS AND IF FUEL IS STORED, IT WOULD BE STORED 
WITHIN THE SAME RADIUS, CONCRETE BLOWERS, CONCRETE 
PUMPS, CONVEYORS, CRAWLER OR RUBBER TIRE TRACTOR 
(SMALL FARM TYPEWITH BLADE OR BUCKET NOT TO EXCEED 
0.5 YD CAPACITY), EARTH DRILLS (ALL), ELEVATORS 
(ALL), FORKLIFT WHILE USED TO LIFT MATERIAL NOT 
OVER 25 FT, GUNNITE MACHINES, HEATERS (GASOLINE 
-USE IN BANKS OF TWO AND NOT OVER THREE WITHIN AN 
AREA OF ONE HUDNRED FOOT RADIUS, HIGHLIFT HOISTS 
WHILE USED TO LIFT MATERIAL NOT OVER 25 FT, 
MATERIAL HOISTS, SINGLE DRUM HOIST FOR HOISTING 
MATERIALS OTHER THAN STEEL, LATOURNEAU 
TURNATRAILERS, LIGHT AND POWER SYSTEMS 9 GAS OR 
DIESEL DRIVEN - TEMPORARY 25 KW CAPACITY OR OVER), 
LOADERS 9 SMALL FRONT OR BACK), LOCOMOTIVE, PARTS 
ROOM - WHEN A PARTS ROOM IS MANNED IT SHALL BE AN 
ENGINEER, PAVEMENT BUSTERS, PIN PULLSER, POST 
DRIVERS 9 TRUCK MOUNTED), PUG MACHINE, PUMS OVER 4 
INCHES, (ROAD ROLLERS EXCEPT ON FINISH BALCKTOP, 
ROAD WIDENER MOUNTED ON A LOADER, ROLLES (SELF 
PROPELLED - NOT ON FINISH BLACKTOP AND UNDER 7 
TONS), SCOOPMOBILES - WHEN USED AS A STATION ARY 
HOIST, OR ONE USED TO LIFT MATERIAL NOT IN EXCESS 
OF 25 FEET, SNOW-GO, STONE CRUSHERS AND WINCH 
HOISTS MOUNTED ON TRUCKS, TRACTORS, TRENCHERS 
EXCAVATING UP TO 6 FT DEEP), TRENCHERS ON THE BACK 
OF A JEEP, WELDING MACHINES (FOR 2 BUT NOT OVER 3 
GASOLINE OR DIESEL DRIVEN), WINCH TRACTORS   NOTES: 
           HAZARDOUS WASTE     2.50  ZONE PAY: 
CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT    
(1.00 OVER GROUP A)  CRANE BOOM PREMIUM FOR BOOM 
AND JIB 100-199 FT    (1.50 OVER GROUP A)    CRANE 
BOOM PREMIUM FOR BOOM AND JIB 100-199 FT    (2.00 
OVER GROUP A).......................................$ 42.89                  34.84
POWER EQUIPMENT OPERATOR MASTER MECHANIC (HEAVY AND 
HIGHWAY CONSTRUCTION)   NOTES:  HAZMAT PREMIUM      
          3.00  ZONE PAY:   ADD $1.00 TO GROUP A - 
LONG BOOM CRANE PREMIUM 100 FT - 199 FT   ADD $1.50 
TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT 
  ADD $2.00  TO GGROUP A - LONG BOOM CRANE PREMIUM 
300 FT AND OVER  FOOTNOTE:   A.   PAID HOLIDAYS:  
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; 
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED 
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE 
HOLIDAY.                 TUNNEL AND SHAFT 
CLASSIFICATIONS.....................................$ 48.46                  34.84
POWER EQUIPMENT OPERATOR: GROUP A     HEAVY AND 
HIGHWAY CONSTRUCTION    NOTES:            HAZARDOUS 
WASTE     2.50  ZONE PAY: CRANE BOOM PREMIUM FOR 
BOOM AND JIB 100-199 FT    (1.00 OVER GROUP A)  
CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT    
(1.50 OVER GROUP A)  CRANE BOOM PREMIUM FOR BOOM 
AND JIB 100-199 FT    (2.00 OVER GROUP A)...........$ 47.39                  34.84
----------------------------------------------------------------

 ENGI0017-008 07/01/2016
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR: TUNNEL AND SHAFT: MASTER 
MECHANIC   NOTES:  HAZMAT PREMIUM  $3.00  ZONE PAY: 
  ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 
100 FT - 199 FT   ADD $1.50 TO GROUP A- LONG BOOM 
CRANE PREMIUM 200 FT - 299 FT   ADD $2.00  TO 
GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER  
FOOTNOTE:   A.   PAID HOLIDAYS:  NEW YEAR'S DAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; 
THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE 
WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. 
                TUNNEL AND SHAFT CLASSIFICATIONS....$ 38.06                  28.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP 
A  NOTES:  HAZMAT PREMIUM                3.00  ZONE 
PAY:   ADD $1.00 TO GROUP A - LONG BOOM CRANE 
PREMIUM 100 FT - 199 FT   ADD $1.50 TO GROUP A- 
LONG BOOM CRANE PREMIUM 200 FT - 299 FT   ADD $2.00 
 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND 
OVER  FOOTNOTE:   A.   PAID HOLIDAYS:  NEW YEAR'S 
DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; 
THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE 
WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY..$ 36.29                  28.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP 
A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL 
AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE 
ENGINEER (TUNNEL AND SHAFT), MINING MACHINE (MOLE 
AND SIMILAR TYPES), MOTOR MAN, MUCKING MACHINE, 
SHOVEL, TRIPPER/MAINTENANCE ENGINEER (TUNNEL AND 
SHAFT), TUNNEL SHOVEL  NOTES:  HAZMAT PREMIUM       
         3.00  ZONE PAY:   ADD $1.00 TO GROUP A - 
LONG BOOM CRANE PREMIUM 100 FT - 199 FT   ADD $1.50 
TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT 
  ADD $2.00  TO GGROUP A - LONG BOOM CRANE PREMIUM 
300 FT AND OVER  FOOTNOTE:   A.   PAID HOLIDAYS:  
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; 
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED 
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE 
HOLIDAY.............................................$ 39.29                  28.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP 
B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE 
(TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS, 
EXCEEDING 2,000 C.F.M. COMBINED CAPACITY, BUT NOT 
TO EXCEED 5,000 C.F.M. WITH A DISTANCE NOT TO 
EXCEED 1,500 FEET), CONCRETE PUMP, CRANE (TOPSIDE, 
FRONT END LOADER (TOPSIDE), GRAYCO EPOXY MACHINE, 
HOIST (2 OR 3 DRUM -- TOPSIDE), MAINTENANCE 
ENGINEER (TOPSIDE), MAINTENANCE GREASE MAN, 
PERSONNEL HOIST, PUMP CRETE, SHOTCRETE MACHINE, 
SHOVEL (TOPSIDE)  NOTES:  HAZMAT PREMIUM            
    3.00  ZONE PAY:   ADD $1.00 TO GROUP A - LONG 
BOOM CRANE PREMIUM 100 FT - 199 FT   ADD $1.50 TO 
GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT   
ADD $2.00  TO GGROUP A - LONG BOOM CRANE PREMIUM 
300 FT AND OVER  FOOTNOTE:   A.   PAID HOLIDAYS:  
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; 
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED 
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE 
HOLIDAY.............................................$ 34.58                  28.10
POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP 
C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M. 
COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200 
C.F.M. BUT NOT TO EXCEED 2,000 C.F.M. WITH A 
DISTANCE FOR COMPRESSORS), DUST COLLECTORS, 
GENERATORS, PUMPS, WELDING MACHINES (4 OF ANY TYPE 
OR COMBINATION) WITH A DISTANCE NOT TO EXCEED 1,500 
FEET; CONVEYOR, ELECTRIC PUMP USED INCONJUNCTION 
WITH WELL POINT SYSTEM GROUT PUMP OVER 5 CUBIC FEET 
(MANUFACTURER'S RATING), HYDRO-BLASTER, MOTORIZED 
FORM CARRIER, TRUCK CRANE OILER, WELL POINT  NOTES: 
 HAZMAT PREMIUM                3.00  ZONE PAY:   
ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 
FT - 199 FT   ADD $1.50 TO GROUP A- LONG BOOM CRANE 
PREMIUM 200 FT - 299 FT   ADD $2.00  TO GGROUP A - 
LONG BOOM CRANE PREMIUM 300 FT AND OVER  FOOTNOTE:  
 A.   PAID HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY 
BEFORE AND THE DAY AFTER THE HOLIDAY................$ 28.53                  28.10
----------------------------------------------------------------

 IRON0009-003 07/01/2025
                                                     Rates                  Fringes
IRONWORKER..........................................$ 36.25                  33.12
IRONWORKERS: (SHEETER)..............................$ 36.25                  33.12
----------------------------------------------------------------

 LABO0091-002 07/01/2017
                                                     Rates                  Fringes
LABORER COMPRESSED AIR GROUP 1 TOP LABORERS  
FOOTNOTE:  A. PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 26.00                  35.96
LABORER GROUP 1 (HEAVY & HIGHWAY CLASSIFICATIONS) 
COMMON LABORERS, MULTI-TRADE TENDER, 
DECONTAMINATION OF ALL MACHINES, HORIZONTAL 
DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES 
WITH ATTACHMENTS/ALL WHEEL OR TRACK TYPES  
FOOTNOTE:  A. PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 26.00                  35.96
LABORER GROUP 2 (HEAVY & HIGHWAY CLASSIFICATIONS) 
POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, 
JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; 
POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL 
TENDERS; MORTAR MIXERS; CONCRETE POLISHING MACHINE; 
OPERATION & MAINTENANCE OF ALL ROBOTIC REMOTE 
SYSTEMS IN HAZARDOUS ENVIRONMENT; MEN WORKING FROM 
SWINGING SCAFFOLD BO'SNS CHAIR, SUSPENDED CAGE OR 
BUCKET; ALL OTHER OPERATORS OF MECHANICAL TOOLS, 
INCLUDING VIBRATORS REGARDLESS OF TYPE OF POWER AND 
BOAT MEN; OPERATION OF ALL TYPES OF VIDEO MACHINERY 
USED IN THE INSPECTION OF PIPE; WORK IN CAISSONS 
BELOW 8 FEET; CONCRETE MOTOR BUGGY  FOOTNOTE:  A. 
PAID HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.30                  35.96
LABORER GROUP 3 (HEAVY & HIGHWAY CLASSIFICATIONS) 
RESPIRATOR REQUIRED FOR BUSTING  FOOTNOTE:  A. PAID 
HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.50                  35.96
LABORER GROUP 4 (HEAVY & HIGHWAY CLASSIFICATIONS) 
FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN; 
SANDBLASTERS; BURNING TORCH; CONCRETE SAW 
OPERATORS; UTILITY PILE DRIVER; TREE TOPPER; GROUT 
MACHINE AND GROUT PUMP OPERATOR  FOOTNOTE:  A. PAID 
HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.60                  35.96
LABORER GROUP 5 (HEAVY & HIGHWAY CLASSIFICATIONS) 
LASER BEAM OPERATOR  FOOTNOTE:  A. PAID HOLIDAYS:  
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY.................................................$ 26.85                  35.96
LABORER GROUP 6 (HEAVY & HIGHWAY CLASSIFICATIONS) 
WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF 
CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO 
ATMOSPHERIC CONDITIONS (EXCLUDING RESPIRATORS 
REQUIRED FOR HAZARDOUS WASTE & TOXIC MATERIALS, 
ASBESTOS ABATEMENT OR LEAD ABATEMENT)  FOOTNOTE:  
A. PAID HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY.....................$ 27.00                  35.96
LABORER GROUP 7 (HEAVY & HIGHWAY CLASSIFICATIONS) 
CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE & 
TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL 
& ASBESTOS; THE REMOVAL OF ASBESTOS FROM ROOFS, 
CEILINGS, PIPES, WALLS, BOILERS ETC., AND ALL 
MACHINERY, & THE RECOVERING OF SAME; REMOVAL OF 
LEAD  FOOTNOTE:  A. PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 28.00                  35.96
LABORER GROUP 8 (HEAVY & HIGHWAY CLASSIFICATIONS) 
GRADE CHECKER & BLASTER  FOOTNOTE:  A. PAID 
HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY.....................$ 28.60                  35.96
LABORER GROUP 9 (HEAVY & HIGHWAY CLASSIFICATIONS) 
SUPPLIED AIR RESPIRATORS  FOOTNOTE:  A. PAID 
HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY  ...................$ 31.00                  35.96
----------------------------------------------------------------

 PAIN0004-002 05/01/2025
                                                     Rates                  Fringes
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: BRUSH & 
ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT  NORTH 
TONAWANDA, NEWFANE,  PENDLETON, ROYALTON, SOMERSET  
AND THE EASTERN HALVES OF  CAMBRIA AND WILSON)......$ 33.00                  28.21
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: 
DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT  
NORTH TONAWANDA, NEWFANE,  PENDLETON, ROYALTON, 
SOMERSET  AND THE EASTERN HALVES OF  CAMBRIA AND 
WILSON).............................................$ 34.00                  28.51
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: 
WALLCOVERING (TOWNSHIPS OF HARTLAND, LOCKPORT  
NORTH TONAWANDA, NEWFANE,  PENDLETON, ROYALTON, 
SOMERSET  AND THE EASTERN HALVES OF  CAMBRIA AND 
WILSON).............................................$ 33.00                  28.21
----------------------------------------------------------------

 PAIN0004-005 05/01/2025
                                                     Rates                  Fringes
PAINTERS: PAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA  
FALLS, PORTER, WHEATFIELD AND  THE WESTERN HALVES 
OF CAMBRIA  AND WILSON).............................$ 33.00                  28.21
PAINTERS: SPRAYING, PAPERHANGERS, SAND-BLASTING, 
SWINGING SCAFFOLD (TOWNSHIPS OF LEWISTON, NIAGARA  
FALLS, PORTER, WHEATFIELD AND  THE WESTERN HALVES 
OF CAMBRIA  AND WILSON).............................$ 33.00                  28.21
PAINTERS: TAPERS (TOWNSHIPS OF LEWISTON, NIAGARA  
FALLS, PORTER, WHEATFIELD AND  THE WESTERN HALVES 
OF CAMBRIA  AND WILSON).............................$ 34.00                  28.51
----------------------------------------------------------------

 PAIN0004-011 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 34.68                  27.64
----------------------------------------------------------------

 PLAS0111-002 07/01/2025
                                                     Rates                  Fringes
CEMENT FINISHER.....................................$ 33.55                  34.17
----------------------------------------------------------------

 PLUM0022-005 04/29/2024
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER (ZONE 1)....................$ 42.20                  29.80
----------------------------------------------------------------

 ROOF0074-002 06/01/2024
                                                     Rates                  Fringes
ROOFERS: COMPOSITION................................$ 34.96                  26.03
ROOFERS: SLATE & TILE...............................$ 35.11                  26.03
----------------------------------------------------------------

 SFNY0669-001 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 47.85                  28.94
----------------------------------------------------------------

 SHEE0071-002 05/27/2024
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 39.50                  29.18
----------------------------------------------------------------

 TEAM0449-003 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND 
OFF-HIGHWAY DUMP TRUCKS (HEAVY & HIGHWAY)  WORK ON 
A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER 
HOUR.   FOOTNOTE: A. PENSION $54.00 PER DAY  B. 
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND AFTER THE HOLIDAY............$ 49.23                  8.75
----------------------------------------------------------------

 TEAM0449-006 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: DUMP TRUCK ONLY, EXCLUDES SINGLE 
AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A. 
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND AFTER THE HOLIDAY............$ 32.00                  0.00
----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).


----------------------------------------------------------------

The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.

-----------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can
be:

           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
             a wage determination matter
           d) an initial conformance (additional classification
             and rate) determination

On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:

            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:

            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:

            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.



================================================================

          END OF GENERAL DECISION"

All New York determinations: county index · New York prevailing wage · compute pay with the calculator.