Full official text of NY20260015 rev 3
"General Decision Number: NY20260015 07/30/2026
State: New York
Construction Types: Heavy and Highway
Counties: New York Counties of
Madison
Heavy Construction
Highway Construction
Modification Number Publication Date
1 01/30/2026
2 05/18/2026
3 07/30/2026
BRNY0002-006 07/01/2024
Rates Fringes
BRICKLAYERS, STONE MASONS; CEMENT MASONS,
PLASTERERS, POINTER, CLEANERS & CAULKERS: MADISON
COUNTY (TOWNSHIPS OF SULLIVAN AND CAZENOVIA) (UTICA
CHAPTER)............................................$ 38.30 23.71
BRICKLAYERS, STONE MASONS; CEMENT MASONS,
PLASTERERS, POINTER, CLEANERS & CAULKERS: MADISON
COUNTY, (EXCLUDING TOWNSHIPS OF SULLIVAN AND
CAZENOVIA) (UTICA CHAPTER)..........................$ 38.30 23.71
MARBLE, TILE & TERRAZZO FINISHERS: MADISON COUNTY
(TOWNSHIPS OF SULLIVAN AND CAZENOVIA) (UTICA
CHAPTER)............................................$ 28.52 19.59
MARBLE, TILE & TERRAZZO WORKERS: MADISON COUNTY
(TOWNSHIPS OF SULLIVAN AND CAZENOVIA) (UTICA
CHAPTER)............................................$ 35.85 20.37
MARBLE, TILE & TERRAZZO WORKERS: MADISON COUNTY,
(EXCLUDING TOWNSHIPS OF SULLIVAN AND CAZENOVIA)
(UTICA CHAPTER).....................................$ 35.85 20.37
----------------------------------------------------------------
BRNY0002-011 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY.
FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, JULY
THE 4TH, LABOR DAY, AND THANKSGIVING DAY (PROVIDED
THE EMPLOYEE IS EMPLOYED ONE DAY BEFORE AND ONE DAY
AFTER THE HOLIDAY)..................................$ 37.23 19.51
----------------------------------------------------------------
CARP0277-029 07/01/2025
Rates Fringes
CARPENTER...........................................$ 44.52 27.16
----------------------------------------------------------------
ELEC0043-001 06/01/2025
Rates Fringes
CABLE SPLICER.......................................$ 55.55 35.03
ELECTRICIAN.........................................$ 50.50 35.03
----------------------------------------------------------------
ELEC1249-003 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 31.72 29.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER
UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 42.29 30.66
----------------------------------------------------------------
ELEC1249-004 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND
MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;
RAILROAD CATENARY INSTALLATION AND MAINTENANCE,
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Substation:).......................................$ 63.14 33.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installation)........................$ 64.59 42.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
(Substation:).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Overhead and underground
distribution and maintenance work and all overhead
and underground transmission line work including
any and all fiber optic ground wire, fiber optic
shield wire or any other like product by any other
name manufactured for the dual purpose of ground
fault protection and fiber optic capabilities :)....$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Substation:)......................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Switching structures; railroad
catenary installation and maintenance, third rail
type underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cab........................................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Overhead and underground distribution and
maintenance work and all overhead and underground
transmission line work including any and all fiber
optic ground wire, fiber optic shield wire or any
other like product by any other name manufactured
for the dual purpose of ground fault protection and
fiber optic capabilities :).........................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installat............................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Overhead and
underground distribution and maintenance work and
all overhead and underground transmission line work
including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Substation:)............................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable ins..................................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
(Substation:).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 49.25 31.15
----------------------------------------------------------------
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93
----------------------------------------------------------------
ENGI0158-020 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB
MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED
CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE
GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER
TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR
SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER
(CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK
, CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE
PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF
PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY
PICKER, DERRICKS (STEEL ERECTION), DRAGLINE,
OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE
DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE,
DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE
HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT
END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER
(SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM),
HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST,
MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP)
WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER,
PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR
EQUIVALENT), SCRAPER, FIREMAN, FORK LIFT, FORM
TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS
(HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON,
HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER
(WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE
OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER,
TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER
MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR
(MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL
FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 55.85 33.40
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER,
BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS
RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER,
BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY
DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE,
CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND
ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS
CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S),
CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL
POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END
LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION
ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER),
HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER
AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT
OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE
SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER,
PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE
DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER
HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER
(GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER,
SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW,
RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY
MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR
SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER,
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE),
WINCH, WINCH CAT FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 54.97 33.40
POWER EQUIPMENT OPERATORS: GROUP 3..................$ 51.69 33.40
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES
FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 65.51 33.40
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS
AND OVER FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 60.35 33.40
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS
AND BELOW FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 58.85 33.40
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC
FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 57.20 33.40
----------------------------------------------------------------
IRON0060-008 07/01/2025
Rates Fringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING,
PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER &
RIGGER, FENCE ERECTOR, STONE DERRICKMAN WELDER,
SHEETER, SHEETER BUCKER-UP (TOWNSHIPS OF CAZENOVIA,
DERUYTER, FENNER, GEORGETOWN, LENOX, LINCOLN,
NELSON, SMITHFIELD AND SULLIVAN)....................$ 37.16 30.68
----------------------------------------------------------------
IRON0440-006 07/01/2025
Rates Fringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN,
MACHINERY MOVER, RIGGER, FENCE ERECTOR,
REINFORCEMENT, AND STONE DERRICKMAN (TOWNSHIPS OF
BROOKFIELD, EATON, HAMILTON, LEBANON, MADISON,
ONEIDA, AND STOCKBRIDGE)............................$ 35.50 31.39
----------------------------------------------------------------
LABO0035-006 07/01/2017
Rates Fringes
LABORER GROUP 1 LABORER, FLAGMEN, OUTBOARD AND HAND
BOATS FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 28.05 23.74
LABORER GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE
AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR
MACHINE VIBRATOR, JACK HAMMER, MASON TENDER, MORTAR
MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL
MESH, SMALL GENERATORS FOR LABORERS TOOLS,
INSTALLATION OF BRIDGE DRAINAGE PIPE LAYERS,
VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL
OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP
OPERATOR (L-1/2"" AND SINGLE DIAPHRAGM), NOZZLE
(ASPHALT, GUNNITE, SEEDING AND SAND BLASTING),
LABORERS ON CHAIN LINK FENCE ERECTION, ROCK
SPLITTER AND POWER UNIT, PUSHER TYPE CONCRET SAW
AND ALL OTHER GAS, ELECTIC, OIL, AND AIR TOOL
OPERATORS, WRECKING LABORERS. FOOTNOTE: PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY.......................................$ 28.25 23.74
LABORER GROUP 3 ALL ROCK OR DRILLING MACHINE
OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE)
ACETYLENE TORCH OPERATORS, ASPHALT PAVER,
POWDERMAN. FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 28.45 23.74
LABORER GROUP 4 BLASTERS, FORM SETTERS, STONE OR
GRANITE CURB SETTERS. FOOTNOTE: PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 28.65 23.74
----------------------------------------------------------------
PAIN0004-020 05/01/2023
Rates Fringes
PAINTERS: (BRIDGES).................................$ 42.06 30.59
----------------------------------------------------------------
PLUM0112-011 05/01/2025
Rates Fringes
PLUMBER, INCLUDING STEAMFITTING (NORTHERN ZONE
TOWNSHIPS OF BROOKFIELD, EATON, FENNER, HAMILTON,
LEBANON, LENOX, LINCOLN, MADISON, NELSON, ONEIDA,
SMITHFIELD, STOCKBRIDGE)............................$ 45.93 33.77
PLUMBER, INCLUDING STEAMFITTING (SOUTHERN ZONE
TOWNSHIP OF GEORGETOWN).............................$ 44.91 33.31
----------------------------------------------------------------
PLUM0267-007 05/01/2019
Rates Fringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC
WORK (THE TOWNSHIPS WHICH ADJOIN THE EASTERN
BORDERS OF ONONDAGA COUNTY).........................$ 35.51 24.57
----------------------------------------------------------------
ROOF0195-001 07/01/2025
Rates Fringes
ROOFER..............................................$ 35.80 25.99
----------------------------------------------------------------
SFNY0669-001 01/01/2026
Rates Fringes
SPRINKLER FITTER....................................$ 47.85 28.94
----------------------------------------------------------------
SHEE0058-001 05/01/2025
Rates Fringes
SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS)....$ 36.29 23.31
SHEET METAL WORKER (PROJECTS OVER $10 MILLION)......$ 46.29 23.31
----------------------------------------------------------------
SUNY1992-001 09/21/1992
Rates Fringes
GLAZIER.............................................$ 15.76 2.80
LABORER.............................................$ 13.37 3.67
PAINTER.............................................$ 16.84 2.86
POWER EQUIPMENT OPERATOR - BACKHOE..................$ 19.08 7.50
----------------------------------------------------------------
TEAM0317-011 06/01/2025
Rates Fringes
TRUCK DRIVER GROUP 1 PICKUPS, PANEL TRUCKS, FLATBOY
MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE-AXLE DUMP
TRUCKS, DUPSTERS, RECEIVERS, GREASERS, TRUCK
TIREMEN, TANDEMS AND BATCH TRUCKS, SEMI-TRAILERS,
LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, &
AGITATOR, MIXER TRUCKS & DUMPCRETE TYPE VEHICLES,
FUEL TRUCKS FOOTNOTES: PAID HOLIDAYS: NEW
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR
DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY. WORK ON HAZARDOUS
WASTE SITES RECEIVE ADDITIONAL $1.50/HR.............$ 35.48 31.58
TRUCK DRIVER GROUP 2 SPECIALIZED EARTH MOVING
EQUIPMENT-EUCLID TYPE, OR SIMILAR OFF-HIGHWAY
EQUIPMENT, WHERE NOT SELF LOADED,STRADDLE (ROSS)
CARRIER, AND SELF-CONTAINED CONCRETE MOBILE UNIT,
OFF-HIGHWAY TANDEM BACK-DUMP, TWIN ENGINE EUIPMENT
AND DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF LOADED.
FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE
HAS WORKED THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY. WORK ON HAZARDOUS WASTE
SITES RECEIVE ADDITIONAL $1.50/HR...................$ 35.83 31.58
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to
the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at
least $13.65 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the
contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"