Prevailing Wage Index
HomePrevailing wage by stateNew YorkDeterminations › NY20260018

Wage determination NY20260018

Highway construction - New York, revision 1, modified 2026-05-18

Verify against the official document: this page mirrors WD NY20260018 revision 1 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ELEC0139-003 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN$43.4031.72

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87

ENGI0158-033 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND SHAFT). FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVI$60.8435.00
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND PAVING). FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANK$43.2634.85
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DA$56.8135.75
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS$58.3835.75
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) GROUP 5: CRANES 50 TONS AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING $59.8835.75
OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT): CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEN$51.4135.00
OPERATING ENGINEER: GROUP 4 (HEAVY AND HIGHWAY)TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PR$61.3835.75
OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS$36.6134.85
OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN$54.4235.00
OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST $51.8135.75
OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR$40.1034.85
OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC$57.2135.00
OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ($54.6835.75
OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI$40.7934.85
OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP $58.4335.00
OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP$55.3835.75
OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS$41.2634.85

IRON0006-002 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
IRONWORKERS: IRONWORKER (RODMEN) (TOWNSHIPS OF CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HORNELLSVILLE, HOWARD, JASPER, TROUPSBURG, WEST UNION)$35.4932.30
IRONWORKERS: FENCE ERECTOR (TOWNSHIPS OF CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HORNELLSVILLE, HOWARD, JASPER, TROUPSBURG, WEST UNION)$34.0630.80

IRON0033-009 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKERS: SHEETER (TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, COHOCTON, CORNING, DANSVILLE, ERWIN, HORNBY, LINDLEY, PRATTSBURG, PULTENEY, RATHBONE, THURST$36.0030.80
IRONWORKERS: ORNAMENTAL, REINFORCING STONE DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY MOVERS, FENCE ERECTORS, PRECAST CONCRETE ERECTOR (TWPS OF ADDISON, AVOCA, BATH, BRADFORD$35.7530.80

LABO0785-022 (collectively bargained (union) rate, 07/01/2023)

ClassificationBase rateFringes
LABORER (HEAVY & HIGHWAY), GROUP 2 (ZONE III) ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; BLAST$35.4623.85
LABORER (HEAVY & HIGHWAY), GROUP 1 (ZONE III) LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS; BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHI$35.2623.85

PLUM0267-001 (collectively bargained (union) rate, 05/01/2019)

ClassificationBase rateFringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (TOWNS OF ADDISON, BATH, BRADFORD, CAMPBELL, CANTON, CORNING, ERWIN, HORNBY, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA,$35.5124.57

SUNY1988-001 (DOL wage survey rate, 06/22/1988)

ClassificationBase rateFringes
ROOFER$11.623.21
LABORER$11.022.12

TEAM0317-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONT$35.8331.58
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 1 YARDMAN; PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIR$35.4831.58

TEAM0529-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER: GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI$26.5215.91
TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNT$26.0315.91
TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) (STEUBEN COUNTY: TOWNS OF ADDISON$25.9615.91
Full official text of NY20260018 rev 1
"General Decision Number: NY20260018 05/18/2026


State: New York


Construction Types: Highway


Counties: New York Counties of 
Steuben




 


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026


 ELEC0139-003 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN.........................................$ 43.40                  31.72
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
----------------------------------------------------------------

 ENGI0158-033 07/01/2025
                                                     Rates                  Fringes
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND 
SHAFT). FOR EXCAVATION AND PAVING:  FOOTNOTE:  A. 
PAID HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING 
THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY.  EXCAVATION AND 
PAVING CLASSIFICATIONS..............................$ 60.84                  35.00
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND 
PAVING). FOR EXCAVATION AND PAVING:  FOOTNOTE:  A. 
PAID HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING 
THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY.  EXCAVATION AND 
PAVING CLASSIFICATIONS..............................$ 43.26                  34.85
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) 
MASTER MECHANIC  FOOTNOTE:  B.  PAID HOLIDAYS:  NEW 
YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 56.81                  35.75
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY) 
CRANES 49 TONS AND   FOOTNOTE:  B.  PAID HOLIDAYS:  
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED 
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 58.38                  35.75
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) 
GROUP 5: CRANES 50 TONS AND OVER  FOOTNOTE:  B.  
PAID HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY   ..........................................$ 59.88                  35.75
OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT): 
CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 
200 FEET AND OVER   FOOTNOTE:   B. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE 
HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 51.41                  35.00
OPERATING ENGINEER: GROUP 4 (HEAVY AND 
HIGHWAY)TOWER CRANES  FOOTNOTE:  B.  PAID HOLIDAYS: 
 NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED 
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 61.38                  35.75
OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) 
COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER 
PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; 
GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE 
OR COMBINATION); CONCRETE MIXER (16S AND UNDER), 
CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER; 
MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS 
OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO 
EXCEED 12"" IN TOTAL CAPACITY; REVINIUS WIDENER; 
STEAM CLEANER; TRACTOR  FOOTNOTE:  A. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING 
THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 36.61                  34.85
OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT):  
""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); 
COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED 
CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT 
NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT 
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST 
COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; 
LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION); 
CONCRETE PAVEMENT SPREADERS AND FINISHERS; 
CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP 
USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM 
TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK 
LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT 
(MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS 
(HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON); 
HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED 
FORM CARRIER; POST HOLE DIGGER AND POST DRIVER; 
POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER 
(RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC 
PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER 
(RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER 
(RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER 
(RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH 
TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; 
WELL POINT AGGREGATE PLANT; BOILER (USED IN 
CONJUNCTION WITH PRODUCTION); CEMENT AND BIN 
OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200 
CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT 
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST 
COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; 
LIGHT PLANTS (3 OR LESS OF ANY TYPE OR 
COMBINATION); CONCRETE PAVER OR MIXER (16S AND 
UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN; 
FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING 
SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING 
MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT 
GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN 
USED FOR PRODUCTION); REVINIUS WIDENER; SHELL 
WINDER; STEAM CLEANER; TRACTOR   FOOTNOTE:   B. 
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS THE WORKING DAY BEFORE AND THE WORKING DAY 
AFTER THE HOLIDAY  .................................$ 54.42                  35.00
OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A 
FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY 
HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE 
GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, 
RIDE-ON BOILER (USED IN CONJUNCTION WITH 
PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, 
BOAT (POWERED), CEMENT AND BIN OPERATOR, 
COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, 
WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF 
EQUIPMENT), CONCRETE PAVEMENT SPREADER AND 
FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), 
CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, 
DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), 
DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE 
GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, 
RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, 
RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK 
LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED 
ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL 
POINT  FOOTNOTE:  B.  PAID HOLIDAYS:  NEW YEARS 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 51.81                  35.75
OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) 
COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED 
CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT 
NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT 
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST 
COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY 
TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS 
AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL 
(WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL 
POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE 
GRADE MACHINE; FORK LIFT; GUNITE MACHINE; 
HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST 
HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF 
MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO 
EXCEED 20"" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC 
PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR 
WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO 
TAMP; WELL POINT  FOOTNOTE:  A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF 
THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, 
PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY 
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE 
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 40.10                  34.85
OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT):  
AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE 
(TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); 
BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON 
AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR 
MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX 
PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING 
PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER); 
COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED 
CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE 
PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT; 
DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER 
(UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE; 
HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE 
DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN 
PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK 
BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER 
(TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR 
STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE; 
PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY 
MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM 
SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL 
ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE; 
SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER; 
TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER; 
WINCH; WINCH CAT   FOOTNOTE:   B. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE 
HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY  ...........................................$ 57.21                  35.00
OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) 
ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER 
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS 
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), 
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), 
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT 
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, 
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE 
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, 
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR 
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), 
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER 
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, 
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, 
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR 
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, 
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), 
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER 
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, 
REVINIUS WIDENER, ROLLER (GRADE AND FILL), 
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER 
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM 
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE 
PLANT REFRIGERATION EQUIPMENT (FOR SOIL 
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE 
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK 
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, 
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER 
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), 
WINCH, WINCH CAT  FOOTNOTE:  B.  PAID HOLIDAYS:  
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED 
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 54.68                  35.75
OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) 
BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS 
SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); 
BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON 
AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY 
PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS) 
EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE 
PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS 
(TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU. 
YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST 
(ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE 
LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE 
MAN; MECHANICAL SLURRY MACHINE; MIXER FOR 
STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE; 
PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP 
CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER; 
ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR 
SCRAPER; TRACTOR WITH DOZER AND OR PUSHER; 
TRENCHER; WINCH  FOOTNOTE:  A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF 
THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, 
PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY 
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE 
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE 
HOLIDAY.............................................$ 40.79                  34.85
OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) 
AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); 
AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT 
PLACER (CMI OR SIMILAR); BLACKTOP SPREADER 
(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX 
PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE 
CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE 
PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES 
AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; 
DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY 
OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY 
RATED 15' AND OVER); FRONT END LOADER (4CU YD AND 
OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; 
SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; 
MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE 
HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); 
MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR 
STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, 
QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; 
SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE 
ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN 
BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER 
MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL   
FOOTNOTE:   B. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE 
DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, 
PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE 
AND THE WORKING DAY AFTER THE HOLIDAY      .........$ 58.43                  35.00
OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) 
AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); 
AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT 
PLACER (CMI OR SIMILAR); BLACKTOP SPREADER 
(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX 
PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE 
CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE 
PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES 
AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; 
DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY 
OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY 
RATED 15' AND OVER); FRONT END LOADER (4CU YD AND 
OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; 
SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; 
MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE 
HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); 
MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR 
STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, 
QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; 
SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE 
ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN 
BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER 
MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL  
FOOTNOTE:  B.  PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY   ....................$ 55.38                  35.75
OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) 
ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE 
(EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP 
PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL 
MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER 
5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL 
ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END 
LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM); 
PILE DRIVER; POWER GRADER WITH ELEVATION LOADER 
ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL; 
SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER; 
TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE 
HYDRAULICALLY OPERATED  FOOTNOTE:  A. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON 
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE 
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING 
THE HOLIDAY OR ON THE SCHEDULED WORK DAY 
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 41.26                  34.85
----------------------------------------------------------------

 IRON0006-002 07/01/2024
                                                     Rates                  Fringes
IRONWORKERS: IRONWORKER (RODMEN) (TOWNSHIPS OF 
CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, 
HORNELLSVILLE, HOWARD,  JASPER, TROUPSBURG, WEST 
UNION)..............................................$ 35.49                  32.30
IRONWORKERS: FENCE ERECTOR (TOWNSHIPS OF CANISTEO, 
FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, 
HORNELLSVILLE, HOWARD,  JASPER, TROUPSBURG, WEST 
UNION)..............................................$ 34.06                  30.80
----------------------------------------------------------------

 IRON0033-009 07/01/2025
                                                     Rates                  Fringes
IRONWORKERS: SHEETER (TWPS OF ADDISON, AVOCA, BATH, 
BRADFORD, CAMERON, CAMPBELL, CATON, COHOCTON, 
CORNING, DANSVILLE, ERWIN, HORNBY, LINDLEY, 
PRATTSBURG, PULTENEY, RATHBONE, THURSTON, 
TUSCARORA, URBANA, WAYLAND, WAYNE WOODHULL).........$ 36.00                  30.80
IRONWORKERS: ORNAMENTAL, REINFORCING STONE 
DERRICKMAN,  RIGGER, RODMAN, STRUCTURAL MACHINERY 
MOVERS, FENCE ERECTORS, PRECAST CONCRETE ERECTOR 
(TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, 
CAMPBELL, CATON, COHOCTON, CORNING, DANSVILLE, 
ERWIN, HORNBY, LINDLEY, PRATTSBURG, PULTENEY, 
RATHBONE, THURSTON, TUSCARORA, URBANA, WAYLAND, 
WAYNE WOODHULL).....................................$ 35.75                  30.80
----------------------------------------------------------------

 LABO0785-022 07/01/2023
                                                     Rates                  Fringes
LABORER (HEAVY & HIGHWAY), GROUP 2 (ZONE III) ALL 
ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY 
MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; 
ASPHALT RAKER; POWDERMAN; BLASTERS; FORM SETTERS; 
STONE OR GRANITE CURB SETTERS  FOOTNOTE:    A.  
PAID HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 35.46                  23.85
LABORER (HEAVY & HIGHWAY), GROUP 1 (ZONE III) 
LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS; BULL 
FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE 
BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; 
JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT 
BREAKER; HANDLERS OF ALL STEEL MESH; SMALL 
GENERATORS FOR LABORERS' TOOL; INSTALLATION OF 
BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE 
ROLLERS; TAMPER; DRILL DOCTOR; TAIL OR SCREW 
OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATORS (1- 
1/2"" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, 
GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON 
CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER 
UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, 
ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING 
LABORERS  FOOTNOTE:    A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 35.26                  23.85
----------------------------------------------------------------

 PLUM0267-001 05/01/2019
                                                     Rates                  Fringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC 
WORK (TOWNS OF ADDISON, BATH, BRADFORD, CAMPBELL, 
CANTON, CORNING, ERWIN, HORNBY, LINDLEY, PULTENEY, 
RATHBONE, THURSTON, TUSCARORA, URBANA AND WAYNE 
COUNTIES)...........................................$ 35.51                  24.57
----------------------------------------------------------------

 SUNY1988-001 06/22/1988
                                                     Rates                  Fringes
ROOFER..............................................$ 11.62                  3.21
LABORER.............................................$ 11.02                  2.12
----------------------------------------------------------------

 TEAM0317-004 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 2 SPECIALIZED 
EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR 
OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; 
STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE 
MOBILE UNIT; OFF-HIGHWAY TANDEM BACK DUMP; TWIN 
ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE 
NOT SELF-LOADED  (TOWNSHIPS OF AVOCA, CANISTEO, 
COHOCTON, DANSVILLE, FREEMONT, GREENWOOD, 
HARTSVILLE, HORNELL, HOWARD, JASPER, PRATTSBURG, 
PULTENEY, TROUPSBURG, WEST UNION, WHEELER.)   A.  
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 35.83                  31.58
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 1 YARDMAN; 
PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS 
(STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; 
DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, 
TANDEMS; BATCH TRUCK; MECHANICS; SEMI- TRAILORS; 
LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; 
AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; 
TRUCK MECHANIC; FUEL TRUCK  (TOWNSHIPS OF AVOCA, 
CANISTEO, COHOCTON, DANSVILLE, FREEMONT, GREENWOOD, 
HARTSVILLE, HORNELL, HOWARD, JASPER, PRATTSBURG, 
PULTENEY, TROUPSBURG, WEST UNION, WHEELER.)   A.  
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 35.48                  31.58
----------------------------------------------------------------

 TEAM0529-002 05/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER: GROUP 3 EUCLID-TYPE; OFF HIGHWAY 
EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 
20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE 
DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; 
ASPHALT DISTRIBUTORS; FUEL TRUCK  (STEUBEN COUNTY:  
TOWNS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, 
CAMPBELL, CATON, CORNING, ERWIN, HORNBY, HOWARD, 
LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, 
URBANA, WAYNE, WHEELER AND WOODHULL)  FOOTNOTES:    
A. PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 26.52                  15.91
TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS); 
TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 
YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH 
TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND 
VAC TRUCKS; DUMPSTER (TANDEM)  (STEUBEN COUNTY:  
TOWNS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, 
CAMPBELL, CATON, CORNING, ERWIN, HORNBY, HOWARD, 
LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, 
URBANA, WAYNE, WHEELER AND WOODHULL)  FOOTNOTES:    
A. PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 26.03                  15.91
TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE AXLE); 
DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY 
TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE)  
(STEUBEN COUNTY:  TOWNS OF ADDISON, AVOCA, BATH, 
BRADFORD, CAMERON, CAMPBELL, CATON, CORNING, ERWIN, 
HORNBY, HOWARD, LINDLEY, PULTENEY, RATHBONE, 
THURSTON, TUSCARORA, URBANA, WAYNE, WHEELER AND 
WOODHULL)   FOOTNOTES:    A. PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 25.96                  15.91
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"

All New York determinations: county index · New York prevailing wage · compute pay with the calculator.