Prevailing Wage Index
HomePrevailing wage by stateNew YorkDeterminations › NY20260021

Wage determination NY20260021

Heavy, Highway construction - New York, revision 2, modified 2026-07-30

Verify against the official document: this page mirrors WD NY20260021 revision 2 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0040-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL SYSTEMS.)$41.7427.58
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAI$41.7427.58

BOIL0197-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$43.3427.66

BRNY0003-017 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CEMENT MASON (BINGHAMTON CHAPTER)$38.6325.05

CARP0277-018 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CARPENTER$39.5227.16

ELEC0325-003 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
CABLE SPLICER (TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORT$50.4333.29
ELECTRICIAN (TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH $42.6833.06

ELEC0363-005 (collectively bargained (union) rate, 04/01/2024)

ClassificationBase rateFringes
ELECTRICIAN (DELAWARE COUNTY (PORTION OF)) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'$46.5040.57

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93

ENGI0825-014 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 1 AUTOGRADE-PAVEMENT-PROFILER (CMI ND SIMILAR TYPE); AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR$61.7237.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEX$58.2237.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR $56.5937.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTES: A. PAID$52.8837.50
POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTERS PILOT NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIA$63.5437.50
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION - GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) N$60.1337.50

ENGI0825-015 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAG$68.5837.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 7 HELICOPTER PILOT . NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW $65.7437.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELIC$62.3537.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHI$60.7037.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY$58.5637.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4$57.1037.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR NOTES: HYDROGRAPHIC PREMIUM .50$53.3437.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 PAID $64.2837.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION) : GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND$61.2937.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAG$70.2437.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PAR$58.6337.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER$57.1037.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 6 OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: $53.3437.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNNEL PREMIUM $.7$69.9637.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND$68.3737.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT$61.2837.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 5: OILER NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORI$54.0737.50
POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS D$64.8537.50

IRON0012-001 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
IRONWORKERS: (SHEETER)$38.7525.48
IRONWORKERS: (STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN)$38.5025.48

LABO0017-004 (collectively bargained (union) rate, 06/01/2023)

ClassificationBase rateFringes
LABORERS: HEAVY & HIGHWAY: GROUP 2: GENERAL LABORER, CHUCK TENDER, HANDLING AND SISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, AFL-CIO TRADES TEND$44.8032.45
LABORERS: HEAVY & HIGHWAY: GROUP 3: INGERSOLL RAND, HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEA$49.4032.45
LABORERS: HEAVY & HIGHWAY: GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIG$54.7032.45
LABORERS: HEAVY & HIGHWAY: GROUP 1:$40.8032.45

LABO0785-014 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
LABORERS: HEAVY AND HIGHWAY GROUP 1$35.5625.60
LABORERS: HEAVY AND HIGHWAY GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PA$35.7625.60
LABORERS: HEAVY AND HIGHWAY GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN (TOWNSHIPS$35.9625.60
LABORERS: HEAVY AND HIGHWAY GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) FOOTN$36.1625.60
LABORERS: HEAVY AND HIGHWAY GROUP 5 HAZARDOUS WASTE REMOVAL (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) FOOTNOTE A. PAID HOLIDAYS: MEMORIAL$38.7625.60

PAIN0004-006 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
PAINTERS: (BRIDGES)$42.0630.59

PAIN0677-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$30.0031.95

PLUM0112-001 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
PLUMBER AND STEAMFITTER: SOUTHERN ZONE (REMAINDER OF COUNTY)$42.6332.24

ROOF0203-001 (collectively bargained (union) rate, 06/01/2023)

ClassificationBase rateFringes
ROOFER$30.5019.84

SHEE0112-004 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
SHEET METAL WORKER$35.9420.89

TEAM0317-010 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN FO$37.2729.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 2 TANDEMS; BATCH TRUCKS; MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CH$37.2729.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK F$37.2729.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CON$37.4729.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S $37.4729.29
Full official text of NY20260021 rev 2
"General Decision Number: NY20260021 07/30/2026


State: New York


Construction Types: Heavy and Highway


Counties: New York Counties of 
Delaware




Heavy Construction

Highway Construction


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026
          2                07/30/2026


 ASBE0040-001 05/01/2025
                                                     Rates                  Fringes
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF 
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, 
COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL 
SYSTEMS.)...........................................$ 41.74                  27.58
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO 
PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; 
VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION 
MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT 
FROM MECHANICAL SYSTEMS)............................$ 41.74                  27.58
----------------------------------------------------------------

 BOIL0197-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 43.34                  27.66
----------------------------------------------------------------

 BRNY0003-017 07/01/2025
                                                     Rates                  Fringes
CEMENT MASON (BINGHAMTON CHAPTER)...................$ 38.63                  25.05
----------------------------------------------------------------

 CARP0277-018 07/01/2025
                                                     Rates                  Fringes
CARPENTER...........................................$ 39.52                  27.16
----------------------------------------------------------------

 ELEC0325-003 06/01/2025
                                                     Rates                  Fringes
CABLE SPLICER (TOWNSHIPS OF DAVENPORT, DELHI, 
DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, 
SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF 
COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST 
BRANCH OF THE DELAWARE RIVER.)......................$ 50.43                  33.29
ELECTRICIAN (TOWNSHIPS OF DAVENPORT, DELHI, 
DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, 
SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF 
COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST 
BRANCH OF THE DELAWARE RIVER.)......................$ 42.68                  33.06
----------------------------------------------------------------

 ELEC0363-005 04/01/2024
                                                     Rates                  Fringes
ELECTRICIAN (DELAWARE COUNTY (PORTION OF))  
FOOTNOTE:   A. PAID HOLIDAYS:  NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, 
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S 
DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, 
CHRISTMAS DAY.......................................$ 46.50                  40.57
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
----------------------------------------------------------------

 ENGI0825-014 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD 
AND STREET CONSTRUCTION): GROUP 1 
AUTOGRADE-PAVEMENT-PROFILER (CMI ND SIMILAR TYPE); 
AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR 
TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR 
TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES); 
CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES); 
CRANES (ALL TYPES, INCLUDING OVERHEAD AN STRADDLE 
TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND, 
FLOATING OR CHICAGO BOOM TYPE); 
DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL) 
ROTARY DRILL; SELF-PROPELLED, HYDRAULIC DRILL, 
SELF-POWERED DRILL DRAGLINES, ELEVATOR GRADERS, 
FRONT END LOADERS (5 YDS. AND OVER), GRADALLS, 
GRADER: RAGO, HELICOPTERS (COPILOT), HELICOPTERS, 
(COMMUNICATION ENGINEER), LOCOMOTIVE (LARGE), 
MUCKING MACHINES,PAVEMENT AND CONCRETE BREAKER 
(SUPERHAMMER, HOE RAM, BROKK 250 AND SIMILAR 
TYPES), PILE DRIVER (LENGTH OF BOOM INCLUDING 
LENGTH OF LEADS SHALL DETERMINE PREMIUM RATE 
APPLICABLE), PILE DRIVER (LENGTH OF BOOM INCLUDING 
LENGTH OF LEADS SHALL DETERMIUM RATE APPLICABLE), 
ROADWAY SURFACE GRINDER SCOOPER (LOADER AND 
SHOVEL), SHOVELS, TREE CHOOPER WITH BOOM, TRENCH 
MACHINES, TUNNEL BORING MACHINES.  NOTES:          
HAZMAT PREMIUM         20 PERCENT  HYDROGRAPHIC 
PREMIUM   .50    FOOTNOTES:   A. PAID HOLIDAYS:  
NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, 
VETERANS DAY, AND DECORATION DAY PROVIDED THE 
EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING 
WHICH THE HOLIDAY OCCURS............................$ 61.72                  37.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD 
AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING 
MACHINE, ASPHALT PLANT ENGINEER, ASPHALT 
SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING 
MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE 
MACHINE (CMI AND SIMILAR TYPES); BAR BENDING 
MACHINE (POWER), BATCHERS, BATCHING PLANT AND 
CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE 
SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS 
(ALL); CAR DUMPERS (AIROAD); CHIEF  OF PARTY; 
COMPRESSOR AND BLOWER TYPE UNITS (USED) 
INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON 
JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING 
AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, 
INSTANTCRETE, OR SIMILAR TYPE MATERIALS); 
COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING 
MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); 
CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR 
TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 
FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL 
(DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS 
(MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; 
ELEVATOR; FIREMAN; FORKLIFTS (ECONOMBILE, LULL, AND 
SIMILAR TYPES OF  EQUIPMENT); FRONT END LOADERS (1 
YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 
OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, 
GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE 
MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN 
CONDUCTION WITH GENERATORS); HOISTS (ROOF, 
TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS), 
HOPPERS, HOPPERS DOORS (POWER OPERATED); 
HYDRO-BLASTER (WHERE REQUIRED); LADDERS 
(MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; 
MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS 
(EXCEPTING PAVING MIXERS); MOTOR PATROLS AND 
GREADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED 
RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR 
HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; 
PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER 
PUMP (REGARDLESS OF SIZE); POST HOLD DIGGER (POST 
POUNDER AND AUGER); ROD BENDING MACHINES (POWER); 
ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN 
PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER 
MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, 
SERVICES AND MAINTAINS; TAMROCK DRILL;  TRACTORS; 
TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION 
WITH UNLOADING); WELDER AND REPAIR MACHINES; 
CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; 
DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT 
ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE 
OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL 
SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR.  
NOTES:          HAZMAT PREMIUM         20 PERCENT  
HYDROGRAPHIC PREMIUM   .50    FOOTNOTES:   A. PAID 
HOLIDAYS:  NEW YEARS DAY, INDEPENDENCE DAY, 
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER 
ELECTION DAY, VETERANS DAY, AND DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR 
WEEK DURING WHICH THE HOLIDAY OCCURS................$ 58.22                  37.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD 
AND STREET CONSTRUCTION): GROUP 4 BROOMS AND 
SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE 
SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT 
INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL 
(1620 H.P.) AND STAGING PUMP; FARM TRACTORS; 
FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE 
OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE 
GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 
YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL 
SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE 
INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); 
LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, 
CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND 
MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH 
SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING 
SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND 
HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING 
MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR 
STONE BASE; SEEDING EQUIPMENT (OPERATION AND 
MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS 
(USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); 
STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; 
STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE 
ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, 
INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); 
WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN 
CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 
100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY 
TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING 
SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL 
POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG 
AND MAINTENANCE OF); OFF ROAD BACK DUMPS.  NOTES:   
       HAZMAT PREMIUM         20 PERCENT  
HYDROGRAPHIC PREMIUM   .50    FOOTNOTES:   A. PAID 
HOLIDAYS:  NEW YEARS DAY, INDEPENDENCE DAY, 
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER 
ELECTION DAY, VETERANS DAY, AND DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR 
WEEK DURING WHICH THE HOLIDAY OCCURS................$ 56.59                  37.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD 
AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE 
REPAIR  NOTES:          HAZMAT PREMIUM         20 
PERCENT  HYDROGRAPHIC PREMIUM   .50    FOOTNOTES:   
A. PAID HOLIDAYS:  NEW YEARS DAY, INDEPENDENCE DAY, 
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER 
ELECTION DAY, VETERANS DAY, AND DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR 
WEEK DURING WHICH THE HOLIDAY OCCURS................$ 52.88                  37.50
POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTERS 
PILOT  NOTES:          HAZMAT PREMIUM         20 
PERCENT  HYDROGRAPHIC PREMIUM   .50    FOOTNOTES:   
A. PAID HOLIDAYS:  NEW YEARS DAY, INDEPENDENCE DAY, 
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER 
ELECTION DAY, VETERANS DAY, AND DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR 
WEEK DURING WHICH THE HOLIDAY OCCURS................$ 63.54                  37.50
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD 
AND STREET CONSTRUCTION - GROUP 2 ""A"" FRAME; 
BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS 
(RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO 
PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH 
CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, 
CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE 
PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, 
CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES 
INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END 
LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS 
(FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), 
HEATER PLANING; HOISTS: (ALL TYPE HOISTS, SHALL 
ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR 
HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK 
SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER 
SIMILAR TYPE HOISTING MACHINES, PORTABLE OR 
STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM 
RATE TO BE APPLIED IF HOIST"") HYDRAULIC 
CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO- BLASTER; 
JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR 
CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST 
TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; 
PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; 
SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF 
SIZE); SCRAPERS; SIDEBOOMS; ""STRADDLE"" CARRIER, 
ROSE AND SIMILAR TYPES; VACUM TRUCK; WHIP HAMMER; 
WINCH TRUCKS (HOISTING).. NOTES:  HAZMAT PREMIUM    
20 PERCENT  HYDROGRAPHIC PREMIUM  $0 .50    
FOOTNOTES: A. PAID HOLIDAYS:  NEW YEARS DAY, 
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S 
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND 
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY 
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY 
OCCURS..............................................$ 60.13                  37.50
----------------------------------------------------------------

 ENGI0825-015 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS  (STEEL ERECTION): GROUP 
2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS 
INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); 
DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH 
BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). 
 NOTES:  HYDROGRAPHIC PREMIUM                .50  
HAZMAT PREMIUM                       20 PERCENT  
TUNNEL PREMIUM                      .75    
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEARS DAY, 
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S 
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND 
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY 
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY 
OCCURS    ..........................................$ 68.58                  37.50
POWER EQUIPMENT OPERATORS  (STEEL ERECTION): GROUP 
7 HELICOPTER PILOT .   NOTES:  HYDROGRAPHIC PREMIUM 
               .50  HAZMAT PREMIUM                  
     20 PERCENT  TUNNEL PREMIUM                     
 .75    FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEARS 
DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S 
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND 
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY 
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY 
OCCURS    ..........................................$ 65.74                  37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND 
TRANSPORTATION PIPE LINES): GROUP 1: BACKHOE; 
CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS 
(5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), 
HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER 
(LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES  
NOTES:  HYDROGRAPHIC PREMIUM                       
.50  HAZMAT PREMIUM                              
20%  TUNNEL PREMIUM                             .75 
   PAID HOLIDAYS:  A.  NEW YEARS, INDEPENDENCE DAY, 
MEMORIAL DAY,  LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER 
ELECTION DAY AND VETERANS DAY, DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR 
WEEK DURING WHICH THE HOLIDAYS OCCURS...............$ 62.35                  37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND 
TRANSPORTATION PIPE LINES): GROUP 2: ""A"" FRAME; 
BACKHOE (COMBINATION HOE LOADER); BORING AND 
DRILLING MACHINES; DITCHING MACHINES, SMALL, 
DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; 
FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 
YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 
TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); 
SIDE BOOMS: WINCH TRUCKS (HOISTING).  NOTES:  
HYDROGRAPHIC PREMIUM                       .50  
HAZMAT PREMIUM                              20%  
TUNNEL PREMIUM                             .75    
PAID HOLIDAYS:  A.  NEW YEARS, INDEPENDENCE DAY, 
MEMORIAL DAY,  LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER 
ELECTION DAY AND VETERANS DAY, DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR 
WEEK DURING WHICH THE HOLIDAYS OCCURS.    ..........$ 60.70                  37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND 
TRANSPORTATION PIPE LINES): GROUP 3: BACKFILLER; 
BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 
IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS 
(UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; 
GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING 
MACHINE (POWER);TRACTORS; WATER AND SPRINKLER 
TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB 
SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER 
BOATS); TUG MASTER (POWER BOATS).  NOTES:  
HYDROGRAPHIC PREMIUM                       .50  
HAZMAT PREMIUM                              20%  
TUNNEL PREMIUM                             .75    
PAID HOLIDAYS:  A.  NEW YEARS, INDEPENDENCE DAY, 
MEMORIAL DAY,  LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER 
ELECTION DAY AND VETERANS DAY, DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR 
WEEK DURING WHICH THE HOLIDAYS OCCURS.    ..........$ 58.56                  37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND 
TRANSPORTATION PIPE LINES): GROUP 4: COMPRESSOR 
(SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT 
PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND 
OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); 
PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF 
POWER); WELDING MACHINES, GAS OR ELECTRIC 
CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE 
WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION 
AND MAINTENANCE); FRAM TRACTORS.  NOTES:  
HYDROGRAPHIC PREMIUM                       .50  
HAZMAT PREMIUM                              20%  
TUNNEL PREMIUM                             .75    
PAID HOLIDAYS:  A.  NEW YEARS, INDEPENDENCE DAY, 
MEMORIAL DAY,  LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER 
ELECTION DAY AND VETERANS DAY, DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR 
WEEK DURING WHICH THE HOLIDAYS OCCURS.    ..........$ 57.10                  37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND 
TRANSPORTATION PIPE LINES): GROUP 5: OILER, GREASE, 
GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR  
NOTES:  HYDROGRAPHIC PREMIUM                       
.50  HAZMAT PREMIUM                              
20%  TUNNEL PREMIUM                             .75 
   PAID HOLIDAYS:  A.  NEW YEARS, INDEPENDENCE DAY, 
MEMORIAL DAY,  LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER 
ELECTION DAY AND VETERANS DAY, DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR 
WEEK DURING WHICH THE HOLIDAYS OCCURS.    ..........$ 53.34                  37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND 
TRANSPORTATION PIPE LINES): GROUP 6:  HELICOTER 
PILOT  NOTES:  HYDROGRAPHIC PREMIUM                 
      .50  HAZMAT PREMIUM                           
   20%  TUNNEL PREMIUM                             
.75    PAID HOLIDAYS:  A.  NEW YEARS, INDEPENDENCE 
DAY, MEMORIAL DAY,  LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER 
ELECTION DAY AND VETERANS DAY, DECORATION DAY 
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR 
WEEK DURING WHICH THE HOLIDAYS OCCURS...............$ 64.28                  37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION) : GROUP 
3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, 
HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, 
ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM 
CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR 
TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, 
EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR 
HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT 
HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS.  
NOTES:  HYDROGRAPHIC PREMIUM                .50  
HAZMAT PREMIUM                       20 PERCENT  
TUNNEL PREMIUM                      .75    
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEARS DAY, 
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S 
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND 
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY 
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY 
OCCURS..............................................$ 61.29                  37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 1 
 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS 
INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); 
DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH 
BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND).  
NOTES:  HYDROGRAPHIC PREMIUM                .50  
HAZMAT PREMIUM                       20 PERCENT  
TUNNEL PREMIUM                      .75    
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEARS DAY, 
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S 
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND 
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY 
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY 
OCCURS..............................................$ 70.24                  37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 4 
 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 
IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND 
TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; 
GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD 
BENDING MACHINE (POWER); WELDING MACHINES (GAS OR 
ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); 
CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS.  
NOTES:  HYDROGRAPHIC PREMIUM                .50  
HAZMAT PREMIUM                       20 PERCENT  
TUNNEL PREMIUM                      .75    
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEARS DAY, 
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S 
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND 
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY 
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY 
OCCURS..............................................$ 58.63                  37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 5 
 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, 
DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: 
WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER 
TYPE); GENERATOR, SINGLE.  NOTES:  HYDROGRAPHIC 
PREMIUM                .50  HAZMAT PREMIUM          
             20 PERCENT  TUNNEL PREMIUM             
         .75    FOOTNOTE:    A.  PAID HOLIDAYS:  
NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, 
VETERANS DAY AND DECORATION DAY PROVIDED THE 
EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING 
WHICH THE HOLIDAY OCCURS............................$ 57.10                  37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 6 
OILER, STADDLE CARRIER  NOTES:  HYDROGRAPHIC 
PREMIUM                .50  HAZMAT PREMIUM          
             20 PERCENT  TUNNEL PREMIUM             
         .75    FOOTNOTE:    A.  PAID HOLIDAYS:  
NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, 
VETERANS DAY AND DECORATION DAY PROVIDED THE 
EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING 
WHICH THE HOLIDAY OCCURS............................$ 53.34                  37.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 1: 
OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS 
WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE 
GROUND.  NOTES:  TUNNEL PREMIUM                $.75 
 HAZMAT PREMIUM                  20%  HYDROGRAPHIC 
PREMIUM          $.50  FOOTNOTES: A.  PAID 
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY 
AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE 
DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY 
OCCURS..............................................$ 69.96                  37.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 2: 
OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING 
CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, 
LESS THAN 140 FT ABOVE THE GROUND.  NOTES:  TUNNEL 
PREMIUM                $.75  HAZMAT PREMIUM         
         20%  HYDROGRAPHIC PREMIUM          $.50  
FOOTNOTES: A.  PAID HOLIDAYS: NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S 
BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION 
DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE 
CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 68.37                  37.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 4: 
AIR COMPRESSORS, WELDING MACHINES AND GENERATORS 
ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, 
OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER 
FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, 
HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY 
MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, 
ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY 
AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE 
CONSTRUCTION JOB SITE, OR IN THE LOADING AND 
UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB 
SITED OR IN CONJUCTION WITH THE JOB SITE.  NOTES:  
TUNNEL PREMIUM                $.75  HAZMAT PREMIUM  
                20%  HYDROGRAPHIC PREMIUM          
$.50  FOOTNOTES: A.  PAID HOLIDAYS: NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S 
BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION 
DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE 
CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 61.28                  37.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 5: 
OILER  NOTES:  TUNNEL PREMIUM                $.75  
HAZMAT PREMIUM                  20%  HYDROGRAPHIC 
PREMIUM          $.50  FOOTNOTES: A.  PAID 
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY 
AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE 
DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY 
OCCURS..............................................$ 54.07                  37.50
POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 3: 
HELICOPTER PILOT  NOTES:  TUNNEL PREMIUM            
    $.75  HAZMAT PREMIUM                  20%  
HYDROGRAPHIC PREMIUM          $.50  FOOTNOTES: A.  
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, 
VETERANS DAY AND DECORATION DAY PROVIDED THE 
EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN 
WHICH THE HOLIDAY OCCURS............................$ 64.85                  37.50
----------------------------------------------------------------

 IRON0012-001 07/01/2024
                                                     Rates                  Fringes
IRONWORKERS: (SHEETER)..............................$ 38.75                  25.48
IRONWORKERS: (STRUCTURAL, ORNAMENTAL, RODMAN, 
MACHINERY MOVER, RIGGER, FENCE ERECTOR, 
REINFORCING, STONE DERRICKMEN)......................$ 38.50                  25.48
----------------------------------------------------------------

 LABO0017-004 06/01/2023
                                                     Rates                  Fringes
LABORERS: HEAVY & HIGHWAY: GROUP 2: GENERAL 
LABORER, CHUCK TENDER, HANDLING AND SISTRIBUTING OF 
DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES 
OF LABORERS, AFL-CIO TRADES TENDERS, NIPPER, POWDER 
CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, 
CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR 
MAN, SPRAYING BRUSHING AND COVERING OF CONCRETE FOR 
CURING AND PRESERVATIVE PURPOSES, SCAFFOLD, 
BUILDER, CONCRETE CURB AND SIDEWALK FORM SETTER, 
PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, 
PLACING AND MAINTENENCE OF ALL FLARES, CONES, 
LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND 
ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC 
CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, 
TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, 
DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL 
AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL 
PERSON, PIPELAYER, PIPELINING AND RELINING, 
WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER, 
RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER, 
CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR 
ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT 
BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TARACK, 
JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL 
PASSER AND OTHER MACHINE OPERATORS, POWER TOOL 
OPERATOR, SPRAYER AND NOZZLEMAN ON MULCHING AND 
SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL 
SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE 
CHECKER, ALL BRIDGE WORK, WALK BEHIND 
SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR 
SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER 
OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND 
DISMANTLING LABORER (INCLUDING BARMAN, CUTTING 
TORCH AND BURNER MAN), SHEETING AND SHORING COMING 
UNDER LABORERS JURISDICTION, BIT GRINDER, OPERATOR 
OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT 
AND JET SEALER, FILLING AND WIRING BASKETS FOR 
GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, 
STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW 
OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, 
PRE-STRESSED AND PRE-CAST CONCRETE BRICK BLOCK AND 
STONE PAVERS, POWER TOOLS USED TO PERFORM WORK 
USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE 
OPERATOR, FIREPROOF, PLASTER AND ACOUSTIC PUMP, 
ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO- 
REMEDIATION, LEAD OR HAZARDOUS MATERAILS ABATEMENT 
WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT 
REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, 
ARTIFICIAL TURF, RETAINIGN WALLS, WALK BEHIND 
SURFACE PLANER, WELDING RELATED TO LABORERS WORK, 
REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY 
LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT 
LIMITED TO STITCHING, SEAMING, HEAT WELDING, 
FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, 
FORM SETTER FOR CONCRETE CURBS AND FLATWORK.  
GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE 
LAYER, MANHOLE, CAATCH BASIN OR INLET INSTALLING, 
LASER MEN.  GROUND MAN ON MILLING MACHINE.  (TWPS 
OF ANDES, BOVINA, DAVENPORT,  DELHI, FRANKLIN, 
HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY 
AND STAMFORD)  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE 
SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY 
FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING 
SO FOR LEGITIMATE REASONS...........................$ 44.80                  32.45
LABORERS: HEAVY & HIGHWAY: GROUP 3: INGERSOLL RAND, 
HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL 
USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, 
BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR 
HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE 
CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING 
FOREMEN, INCLUDING GRADE, PIPE, CONCRETE, CLEARING, 
BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC 
DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, 
BLASTER AND ASPHALT SCREEDMAN.  (TWPS OF ANDES, 
BOVINA, DAVENPORT,  DELHI, FRANKLIN, HAMDEN, 
HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND 
STAMFORD)  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE 
SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY 
FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING 
SO FOR LEGITIMATE REASONS...........................$ 49.40                  32.45
LABORERS: HEAVY & HIGHWAY: GROUP 4: ASBESTOS, 
TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT 
FOREMAN.   (TWPS OF ANDES, BOVINA, DAVENPORT,  
DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT, 
MIDDLETON, ROXBURY AND STAMFORD)  FOOTNOTE:    A. 
PAID HOLIDAYS:  NEW YEARS DAY, PRESIDENT'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION 
DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, 
PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY 
PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK 
THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS 
PREVENTED FROM DOING SO FOR LEGITIMATE REASONS......$ 54.70                  32.45
LABORERS: HEAVY & HIGHWAY: GROUP 1:.............$ 40.80                  32.45
----------------------------------------------------------------

 LABO0785-014 07/01/2024
                                                     Rates                  Fringes
LABORERS: HEAVY AND HIGHWAY GROUP 1.................$ 35.56                  25.60
LABORERS: HEAVY AND HIGHWAY GROUP 2 BULL FLOAT, 
CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE 
BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, 
JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT 
BREAKER, HANDLERS OF ALL STEEL MESH, SMALL 
GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF 
BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE 
ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW 
OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 
1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE, 
SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK 
FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, 
PUSHER TYPE CONCRETE SAW AND ALL DRILL DOCTOR TAIL 
OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP 
OPERATOR (1 1/2'AND SINGLE DIAPHRAM), NOZZLER 
(ASPHALT GUNNITE, SEEDING AND SNADBLASTING), 
LABORERS ON CHAIN LINK FENCE ERECTION, ROCK 
SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW 
AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL 
OPERATORS, WRECKING LABORERS  (TOWNSHIPS OF SIDNEY, 
MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND 
COLCHESTER)  FOOTNOTE    A. PAID HOLIDAYS: MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY AND NEW YEARS DAY.....................$ 35.76                  25.60
LABORERS: HEAVY AND HIGHWAY GROUP 3 ALL ROCK OR 
DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER 
AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND 
ASPHALT PAVER, POWERMAN  (TOWNSHIPS OF SIDNEY, 
MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND 
COLCHESTER)  FOOTNOTE    A. PAID HOLIDAYS: MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY AND NEW YEARS DAY.....................$ 35.96                  25.60
LABORERS: HEAVY AND HIGHWAY GROUP 4 BLASTERS, FORM 
SETTERS, STONE OR GRANITE CURB SETTERS  (TOWNSHIPS 
OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, 
HANCOCK AND COLCHESTER)  FOOTNOTE    A. PAID 
HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS 
DAY.................................................$ 36.16                  25.60
LABORERS: HEAVY AND HIGHWAY GROUP 5 HAZARDOUS WASTE 
REMOVAL  (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, 
TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER)  
FOOTNOTE    A. PAID HOLIDAYS: MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY AND NEW YEARS DAY.....................$ 38.76                  25.60
----------------------------------------------------------------

 PAIN0004-006 05/01/2023
                                                     Rates                  Fringes
PAINTERS: (BRIDGES).................................$ 42.06                  30.59
----------------------------------------------------------------

 PAIN0677-003 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 30.00                  31.95
----------------------------------------------------------------

 PLUM0021-004 05/01/2025
                                                     Rates                  Fringes
PLUMBER (ZONE 2  MIDDLETOWN AND ROXBERRY TOWNSHIPS).$ 60.66                  45.35
----------------------------------------------------------------

 PLUM0112-001 05/01/2024
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER: SOUTHERN ZONE (REMAINDER 
OF COUNTY)..........................................$ 42.63                  32.24
----------------------------------------------------------------

 ROOF0203-001 06/01/2023
                                                     Rates                  Fringes
ROOFER..............................................$ 30.50                  19.84
----------------------------------------------------------------

 SHEE0112-004 05/01/2023
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 35.94                  20.89
----------------------------------------------------------------

 TEAM0317-010 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 1 PICK-UPS; 
PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT 
JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; 
RECEIVERS; GREASERS; TRUCK TIREMAN  FOOTNOTE:   A. 
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 37.27                  29.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 2 TANDEMS; 
BATCH TRUCKS; MECHANIC  FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 37.27                  29.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 3 
SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR 
TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE 
VEHICLES; TRUCK MECHANIC; FUEL TRUCK  FOOTNOTE:   
A. PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 37.27                  29.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 4 
SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR 
SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT 
SELF-LOADED; STRADDLE (ROSS) CARRIER; 
SELF-CONTAINED CONCRETE UNIT  FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 37.47                  29.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 5 
OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE 
EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT 
SELF-LOADED  FOOTNOTE:   A. PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 37.47                  29.29
----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).


----------------------------------------------------------------

The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.

-----------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can
be:

           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
             a wage determination matter
           d) an initial conformance (additional classification
             and rate) determination

On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:

            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:

            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:

            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.



================================================================

          END OF GENERAL DECISION"

All New York determinations: county index · New York prevailing wage · compute pay with the calculator.