Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of NY20260021 rev 2
"General Decision Number: NY20260021 07/30/2026
State: New York
Construction Types: Heavy and Highway
Counties: New York Counties of
Delaware
Heavy Construction
Highway Construction
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
2 07/30/2026
ASBE0040-001 05/01/2025
Rates Fringes
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL
SYSTEMS.)...........................................$ 41.74 27.58
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO
PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING;
VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION
MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT
FROM MECHANICAL SYSTEMS)............................$ 41.74 27.58
----------------------------------------------------------------
BOIL0197-001 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 43.34 27.66
----------------------------------------------------------------
BRNY0003-017 07/01/2025
Rates Fringes
CEMENT MASON (BINGHAMTON CHAPTER)...................$ 38.63 25.05
----------------------------------------------------------------
CARP0277-018 07/01/2025
Rates Fringes
CARPENTER...........................................$ 39.52 27.16
----------------------------------------------------------------
ELEC0325-003 06/01/2025
Rates Fringes
CABLE SPLICER (TOWNSHIPS OF DAVENPORT, DELHI,
DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH,
SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF
COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST
BRANCH OF THE DELAWARE RIVER.)......................$ 50.43 33.29
ELECTRICIAN (TOWNSHIPS OF DAVENPORT, DELHI,
DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH,
SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF
COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST
BRANCH OF THE DELAWARE RIVER.)......................$ 42.68 33.06
----------------------------------------------------------------
ELEC0363-005 04/01/2024
Rates Fringes
ELECTRICIAN (DELAWARE COUNTY (PORTION OF))
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING,
CHRISTMAS DAY.......................................$ 46.50 40.57
----------------------------------------------------------------
ELEC1249-003 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 31.72 29.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER
UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 42.29 30.66
----------------------------------------------------------------
ELEC1249-004 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND
MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;
RAILROAD CATENARY INSTALLATION AND MAINTENANCE,
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Substation:).......................................$ 63.14 33.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installation)........................$ 64.59 42.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
(Substation:).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Overhead and underground
distribution and maintenance work and all overhead
and underground transmission line work including
any and all fiber optic ground wire, fiber optic
shield wire or any other like product by any other
name manufactured for the dual purpose of ground
fault protection and fiber optic capabilities :)....$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Substation:)......................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Switching structures; railroad
catenary installation and maintenance, third rail
type underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cab........................................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Overhead and underground distribution and
maintenance work and all overhead and underground
transmission line work including any and all fiber
optic ground wire, fiber optic shield wire or any
other like product by any other name manufactured
for the dual purpose of ground fault protection and
fiber optic capabilities :).........................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installat............................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Overhead and
underground distribution and maintenance work and
all overhead and underground transmission line work
including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Substation:)............................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable ins..................................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
(Substation:).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 49.25 31.15
----------------------------------------------------------------
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93
----------------------------------------------------------------
ENGI0825-014 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD
AND STREET CONSTRUCTION): GROUP 1
AUTOGRADE-PAVEMENT-PROFILER (CMI ND SIMILAR TYPE);
AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR
TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR
TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES);
CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES);
CRANES (ALL TYPES, INCLUDING OVERHEAD AN STRADDLE
TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND,
FLOATING OR CHICAGO BOOM TYPE);
DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL)
ROTARY DRILL; SELF-PROPELLED, HYDRAULIC DRILL,
SELF-POWERED DRILL DRAGLINES, ELEVATOR GRADERS,
FRONT END LOADERS (5 YDS. AND OVER), GRADALLS,
GRADER: RAGO, HELICOPTERS (COPILOT), HELICOPTERS,
(COMMUNICATION ENGINEER), LOCOMOTIVE (LARGE),
MUCKING MACHINES,PAVEMENT AND CONCRETE BREAKER
(SUPERHAMMER, HOE RAM, BROKK 250 AND SIMILAR
TYPES), PILE DRIVER (LENGTH OF BOOM INCLUDING
LENGTH OF LEADS SHALL DETERMINE PREMIUM RATE
APPLICABLE), PILE DRIVER (LENGTH OF BOOM INCLUDING
LENGTH OF LEADS SHALL DETERMIUM RATE APPLICABLE),
ROADWAY SURFACE GRINDER SCOOPER (LOADER AND
SHOVEL), SHOVELS, TREE CHOOPER WITH BOOM, TRENCH
MACHINES, TUNNEL BORING MACHINES. NOTES:
HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC
PREMIUM .50 FOOTNOTES: A. PAID HOLIDAYS:
NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY,
VETERANS DAY, AND DECORATION DAY PROVIDED THE
EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING
WHICH THE HOLIDAY OCCURS............................$ 61.72 37.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD
AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING
MACHINE, ASPHALT PLANT ENGINEER, ASPHALT
SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING
MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE
MACHINE (CMI AND SIMILAR TYPES); BAR BENDING
MACHINE (POWER), BATCHERS, BATCHING PLANT AND
CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE
SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS
(ALL); CAR DUMPERS (AIROAD); CHIEF OF PARTY;
COMPRESSOR AND BLOWER TYPE UNITS (USED)
INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON
JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING
AND UNLOADING OF CONCRETE, CEMENT, FLY ASH,
INSTANTCRETE, OR SIMILAR TYPE MATERIALS);
COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING
MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE);
CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR
TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125
FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL
(DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS
(MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS;
ELEVATOR; FIREMAN; FORKLIFTS (ECONOMBILE, LULL, AND
SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1
YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2
OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS,
GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE
MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN
CONDUCTION WITH GENERATORS); HOISTS (ROOF,
TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS),
HOPPERS, HOPPERS DOORS (POWER OPERATED);
HYDRO-BLASTER (WHERE REQUIRED); LADDERS
(MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE;
MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS
(EXCEPTING PAVING MIXERS); MOTOR PATROLS AND
GREADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED
RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR
HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED;
PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER
PUMP (REGARDLESS OF SIZE); POST HOLD DIGGER (POST
POUNDER AND AUGER); ROD BENDING MACHINES (POWER);
ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN
PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER
MACHINES (BOOM TYPE); STEEL CUTTING MACHINE,
SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS;
TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION
WITH UNLOADING); WELDER AND REPAIR MACHINES;
CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR;
DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT
ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE
OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL
SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR.
NOTES: HAZMAT PREMIUM 20 PERCENT
HYDROGRAPHIC PREMIUM .50 FOOTNOTES: A. PAID
HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER
ELECTION DAY, VETERANS DAY, AND DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR
WEEK DURING WHICH THE HOLIDAY OCCURS................$ 58.22 37.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD
AND STREET CONSTRUCTION): GROUP 4 BROOMS AND
SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE
SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT
INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL
(1620 H.P.) AND STAGING PUMP; FARM TRACTORS;
FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE
OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE
GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1
YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL
SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE
INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS);
LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS,
CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND
MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH
SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING
SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND
HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING
MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR
STONE BASE; SEEDING EQUIPMENT (OPERATION AND
MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS
(USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE);
STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE;
STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE
ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE,
INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS);
WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN
CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN
100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY
TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING
SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL
POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG
AND MAINTENANCE OF); OFF ROAD BACK DUMPS. NOTES:
HAZMAT PREMIUM 20 PERCENT
HYDROGRAPHIC PREMIUM .50 FOOTNOTES: A. PAID
HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER
ELECTION DAY, VETERANS DAY, AND DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR
WEEK DURING WHICH THE HOLIDAY OCCURS................$ 56.59 37.50
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD
AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE
REPAIR NOTES: HAZMAT PREMIUM 20
PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTES:
A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER
ELECTION DAY, VETERANS DAY, AND DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR
WEEK DURING WHICH THE HOLIDAY OCCURS................$ 52.88 37.50
POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTERS
PILOT NOTES: HAZMAT PREMIUM 20
PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTES:
A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER
ELECTION DAY, VETERANS DAY, AND DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR
WEEK DURING WHICH THE HOLIDAY OCCURS................$ 63.54 37.50
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD
AND STREET CONSTRUCTION - GROUP 2 ""A"" FRAME;
BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS
(RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO
PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH
CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER,
CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE
PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES,
CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES
INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END
LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS
(FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE),
HEATER PLANING; HOISTS: (ALL TYPE HOISTS, SHALL
ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR
HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK
SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER
SIMILAR TYPE HOISTING MACHINES, PORTABLE OR
STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM
RATE TO BE APPLIED IF HOIST"") HYDRAULIC
CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO- BLASTER;
JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR
CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST
TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE;
PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES;
SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF
SIZE); SCRAPERS; SIDEBOOMS; ""STRADDLE"" CARRIER,
ROSE AND SIMILAR TYPES; VACUM TRUCK; WHIP HAMMER;
WINCH TRUCKS (HOISTING).. NOTES: HAZMAT PREMIUM
20 PERCENT HYDROGRAPHIC PREMIUM $0 .50
FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY,
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY
OCCURS..............................................$ 60.13 37.50
----------------------------------------------------------------
ENGI0825-015 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP
2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS
INCLUDING JIB LESS THAN 140 FT ABOVE GROUND);
DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH
BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND).
NOTES: HYDROGRAPHIC PREMIUM .50
HAZMAT PREMIUM 20 PERCENT
TUNNEL PREMIUM .75
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY
OCCURS ..........................................$ 68.58 37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP
7 HELICOPTER PILOT . NOTES: HYDROGRAPHIC PREMIUM
.50 HAZMAT PREMIUM
20 PERCENT TUNNEL PREMIUM
.75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS
DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY
OCCURS ..........................................$ 65.74 37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES): GROUP 1: BACKHOE;
CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS
(5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT),
HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER
(LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES
NOTES: HYDROGRAPHIC PREMIUM
.50 HAZMAT PREMIUM
20% TUNNEL PREMIUM .75
PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER
ELECTION DAY AND VETERANS DAY, DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR
WEEK DURING WHICH THE HOLIDAYS OCCURS...............$ 62.35 37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES): GROUP 2: ""A"" FRAME;
BACKHOE (COMBINATION HOE LOADER); BORING AND
DRILLING MACHINES; DITCHING MACHINES, SMALL,
DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS;
FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5
YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10
TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES);
SIDE BOOMS: WINCH TRUCKS (HOISTING). NOTES:
HYDROGRAPHIC PREMIUM .50
HAZMAT PREMIUM 20%
TUNNEL PREMIUM .75
PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER
ELECTION DAY AND VETERANS DAY, DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR
WEEK DURING WHICH THE HOLIDAYS OCCURS. ..........$ 60.70 37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES): GROUP 3: BACKFILLER;
BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3
IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS
(UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS;
GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING
MACHINE (POWER);TRACTORS; WATER AND SPRINKLER
TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB
SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER
BOATS); TUG MASTER (POWER BOATS). NOTES:
HYDROGRAPHIC PREMIUM .50
HAZMAT PREMIUM 20%
TUNNEL PREMIUM .75
PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER
ELECTION DAY AND VETERANS DAY, DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR
WEEK DURING WHICH THE HOLIDAYS OCCURS. ..........$ 58.56 37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES): GROUP 4: COMPRESSOR
(SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT
PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND
OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION);
PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF
POWER); WELDING MACHINES, GAS OR ELECTRIC
CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE
WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION
AND MAINTENANCE); FRAM TRACTORS. NOTES:
HYDROGRAPHIC PREMIUM .50
HAZMAT PREMIUM 20%
TUNNEL PREMIUM .75
PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER
ELECTION DAY AND VETERANS DAY, DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR
WEEK DURING WHICH THE HOLIDAYS OCCURS. ..........$ 57.10 37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES): GROUP 5: OILER, GREASE,
GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR
NOTES: HYDROGRAPHIC PREMIUM
.50 HAZMAT PREMIUM
20% TUNNEL PREMIUM .75
PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY,
MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER
ELECTION DAY AND VETERANS DAY, DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR
WEEK DURING WHICH THE HOLIDAYS OCCURS. ..........$ 53.34 37.50
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES): GROUP 6: HELICOTER
PILOT NOTES: HYDROGRAPHIC PREMIUM
.50 HAZMAT PREMIUM
20% TUNNEL PREMIUM
.75 PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE
DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER
ELECTION DAY AND VETERANS DAY, DECORATION DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR
WEEK DURING WHICH THE HOLIDAYS OCCURS...............$ 64.28 37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION) : GROUP
3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER,
HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL,
ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM
CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR
TYPE HOISTING MACHINES, PORTABLE OR STATIONARY,
EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR
HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT
HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS.
NOTES: HYDROGRAPHIC PREMIUM .50
HAZMAT PREMIUM 20 PERCENT
TUNNEL PREMIUM .75
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY
OCCURS..............................................$ 61.29 37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 1
CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS
INCLUDING JIB 140 FT AND OVER, ABOVE GROUND);
DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH
BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND).
NOTES: HYDROGRAPHIC PREMIUM .50
HAZMAT PREMIUM 20 PERCENT
TUNNEL PREMIUM .75
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY
OCCURS..............................................$ 70.24 37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 4
AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3
IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND
TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT;
GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD
BENDING MACHINE (POWER); WELDING MACHINES (GAS OR
ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS);
CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS.
NOTES: HYDROGRAPHIC PREMIUM .50
HAZMAT PREMIUM 20 PERCENT
TUNNEL PREMIUM .75
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S
BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND
DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY
IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY
OCCURS..............................................$ 58.63 37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 5
COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS,
DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE:
WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER
TYPE); GENERATOR, SINGLE. NOTES: HYDROGRAPHIC
PREMIUM .50 HAZMAT PREMIUM
20 PERCENT TUNNEL PREMIUM
.75 FOOTNOTE: A. PAID HOLIDAYS:
NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY,
VETERANS DAY AND DECORATION DAY PROVIDED THE
EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING
WHICH THE HOLIDAY OCCURS............................$ 57.10 37.50
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 6
OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC
PREMIUM .50 HAZMAT PREMIUM
20 PERCENT TUNNEL PREMIUM
.75 FOOTNOTE: A. PAID HOLIDAYS:
NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY,
VETERANS DAY AND DECORATION DAY PROVIDED THE
EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING
WHICH THE HOLIDAY OCCURS............................$ 53.34 37.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 1:
OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS
WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE
GROUND. NOTES: TUNNEL PREMIUM $.75
HAZMAT PREMIUM 20% HYDROGRAPHIC
PREMIUM $.50 FOOTNOTES: A. PAID
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY
AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE
DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY
OCCURS..............................................$ 69.96 37.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 2:
OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING
CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB,
LESS THAN 140 FT ABOVE THE GROUND. NOTES: TUNNEL
PREMIUM $.75 HAZMAT PREMIUM
20% HYDROGRAPHIC PREMIUM $.50
FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S
BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION
DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE
CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 68.37 37.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 4:
AIR COMPRESSORS, WELDING MACHINES AND GENERATORS
ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL,
OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER
FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR,
HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY
MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION,
ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY
AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE
CONSTRUCTION JOB SITE, OR IN THE LOADING AND
UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB
SITED OR IN CONJUCTION WITH THE JOB SITE. NOTES:
TUNNEL PREMIUM $.75 HAZMAT PREMIUM
20% HYDROGRAPHIC PREMIUM
$.50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S
BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION
DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE
CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 61.28 37.50
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 5:
OILER NOTES: TUNNEL PREMIUM $.75
HAZMAT PREMIUM 20% HYDROGRAPHIC
PREMIUM $.50 FOOTNOTES: A. PAID
HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY
AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE
DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY
OCCURS..............................................$ 54.07 37.50
POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 3:
HELICOPTER PILOT NOTES: TUNNEL PREMIUM
$.75 HAZMAT PREMIUM 20%
HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A.
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY,
VETERANS DAY AND DECORATION DAY PROVIDED THE
EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN
WHICH THE HOLIDAY OCCURS............................$ 64.85 37.50
----------------------------------------------------------------
IRON0012-001 07/01/2024
Rates Fringes
IRONWORKERS: (SHEETER)..............................$ 38.75 25.48
IRONWORKERS: (STRUCTURAL, ORNAMENTAL, RODMAN,
MACHINERY MOVER, RIGGER, FENCE ERECTOR,
REINFORCING, STONE DERRICKMEN)......................$ 38.50 25.48
----------------------------------------------------------------
LABO0017-004 06/01/2023
Rates Fringes
LABORERS: HEAVY & HIGHWAY: GROUP 2: GENERAL
LABORER, CHUCK TENDER, HANDLING AND SISTRIBUTING OF
DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES
OF LABORERS, AFL-CIO TRADES TENDERS, NIPPER, POWDER
CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS,
CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR
MAN, SPRAYING BRUSHING AND COVERING OF CONCRETE FOR
CURING AND PRESERVATIVE PURPOSES, SCAFFOLD,
BUILDER, CONCRETE CURB AND SIDEWALK FORM SETTER,
PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES,
PLACING AND MAINTENENCE OF ALL FLARES, CONES,
LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND
ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC
CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS,
TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM,
DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL
AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL
PERSON, PIPELAYER, PIPELINING AND RELINING,
WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER,
RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER,
CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR
ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT
BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TARACK,
JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL
PASSER AND OTHER MACHINE OPERATORS, POWER TOOL
OPERATOR, SPRAYER AND NOZZLEMAN ON MULCHING AND
SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL
SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE
CHECKER, ALL BRIDGE WORK, WALK BEHIND
SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR
SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER
OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND
DISMANTLING LABORER (INCLUDING BARMAN, CUTTING
TORCH AND BURNER MAN), SHEETING AND SHORING COMING
UNDER LABORERS JURISDICTION, BIT GRINDER, OPERATOR
OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT
AND JET SEALER, FILLING AND WIRING BASKETS FOR
GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER,
STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW
OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER,
PRE-STRESSED AND PRE-CAST CONCRETE BRICK BLOCK AND
STONE PAVERS, POWER TOOLS USED TO PERFORM WORK
USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE
OPERATOR, FIREPROOF, PLASTER AND ACOUSTIC PUMP,
ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-
REMEDIATION, LEAD OR HAZARDOUS MATERAILS ABATEMENT
WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT
REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS,
ARTIFICIAL TURF, RETAINIGN WALLS, WALK BEHIND
SURFACE PLANER, WELDING RELATED TO LABORERS WORK,
REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY
LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT
LIMITED TO STITCHING, SEAMING, HEAT WELDING,
FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER,
FORM SETTER FOR CONCRETE CURBS AND FLATWORK.
GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE
LAYER, MANHOLE, CAATCH BASIN OR INLET INSTALLING,
LASER MEN. GROUND MAN ON MILLING MACHINE. (TWPS
OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN,
HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY
AND STAMFORD) FOOTNOTE: A. PAID HOLIDAYS: NEW
YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE
EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE
SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY
FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING
SO FOR LEGITIMATE REASONS...........................$ 44.80 32.45
LABORERS: HEAVY & HIGHWAY: GROUP 3: INGERSOLL RAND,
HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL
USING 4"" OR LARGER BIT, ASBESTOS, TOXIC,
BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR
HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE
CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING
FOREMEN, INCLUDING GRADE, PIPE, CONCRETE, CLEARING,
BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC
DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY,
BLASTER AND ASPHALT SCREEDMAN. (TWPS OF ANDES,
BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN,
HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND
STAMFORD) FOOTNOTE: A. PAID HOLIDAYS: NEW
YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE
EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE
SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY
FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING
SO FOR LEGITIMATE REASONS...........................$ 49.40 32.45
LABORERS: HEAVY & HIGHWAY: GROUP 4: ASBESTOS,
TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT
FOREMAN. (TWPS OF ANDES, BOVINA, DAVENPORT,
DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT,
MIDDLETON, ROXBURY AND STAMFORD) FOOTNOTE: A.
PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION
DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY,
PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY
PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK
THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS
PREVENTED FROM DOING SO FOR LEGITIMATE REASONS......$ 54.70 32.45
LABORERS: HEAVY & HIGHWAY: GROUP 1:.............$ 40.80 32.45
----------------------------------------------------------------
LABO0785-014 07/01/2024
Rates Fringes
LABORERS: HEAVY AND HIGHWAY GROUP 1.................$ 35.56 25.60
LABORERS: HEAVY AND HIGHWAY GROUP 2 BULL FLOAT,
CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE
BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR,
JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT
BREAKER, HANDLERS OF ALL STEEL MESH, SMALL
GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF
BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE
ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW
OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1
1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE,
SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK
FENCE ERECTION, ROCK SPLITTER AND POWER UNIT,
PUSHER TYPE CONCRETE SAW AND ALL DRILL DOCTOR TAIL
OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP
OPERATOR (1 1/2'AND SINGLE DIAPHRAM), NOZZLER
(ASPHALT GUNNITE, SEEDING AND SNADBLASTING),
LABORERS ON CHAIN LINK FENCE ERECTION, ROCK
SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW
AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL
OPERATORS, WRECKING LABORERS (TOWNSHIPS OF SIDNEY,
MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND
COLCHESTER) FOOTNOTE A. PAID HOLIDAYS: MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND NEW YEARS DAY.....................$ 35.76 25.60
LABORERS: HEAVY AND HIGHWAY GROUP 3 ALL ROCK OR
DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER
AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND
ASPHALT PAVER, POWERMAN (TOWNSHIPS OF SIDNEY,
MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND
COLCHESTER) FOOTNOTE A. PAID HOLIDAYS: MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND NEW YEARS DAY.....................$ 35.96 25.60
LABORERS: HEAVY AND HIGHWAY GROUP 4 BLASTERS, FORM
SETTERS, STONE OR GRANITE CURB SETTERS (TOWNSHIPS
OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT,
HANCOCK AND COLCHESTER) FOOTNOTE A. PAID
HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS
DAY.................................................$ 36.16 25.60
LABORERS: HEAVY AND HIGHWAY GROUP 5 HAZARDOUS WASTE
REMOVAL (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON,
TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER)
FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY AND NEW YEARS DAY.....................$ 38.76 25.60
----------------------------------------------------------------
PAIN0004-006 05/01/2023
Rates Fringes
PAINTERS: (BRIDGES).................................$ 42.06 30.59
----------------------------------------------------------------
PAIN0677-003 05/01/2025
Rates Fringes
GLAZIER.............................................$ 30.00 31.95
----------------------------------------------------------------
PLUM0021-004 05/01/2025
Rates Fringes
PLUMBER (ZONE 2 MIDDLETOWN AND ROXBERRY TOWNSHIPS).$ 60.66 45.35
----------------------------------------------------------------
PLUM0112-001 05/01/2024
Rates Fringes
PLUMBER AND STEAMFITTER: SOUTHERN ZONE (REMAINDER
OF COUNTY)..........................................$ 42.63 32.24
----------------------------------------------------------------
ROOF0203-001 06/01/2023
Rates Fringes
ROOFER..............................................$ 30.50 19.84
----------------------------------------------------------------
SHEE0112-004 05/01/2023
Rates Fringes
SHEET METAL WORKER..................................$ 35.94 20.89
----------------------------------------------------------------
TEAM0317-010 07/01/2025
Rates Fringes
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 1 PICK-UPS;
PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT
JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS;
RECEIVERS; GREASERS; TRUCK TIREMAN FOOTNOTE: A.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 37.27 29.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 2 TANDEMS;
BATCH TRUCKS; MECHANIC FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 37.27 29.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 3
SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR
TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE
VEHICLES; TRUCK MECHANIC; FUEL TRUCK FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 37.27 29.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 4
SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR
SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT
SELF-LOADED; STRADDLE (ROSS) CARRIER;
SELF-CONTAINED CONCRETE UNIT FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 37.47 29.29
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 5
OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE
EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT
SELF-LOADED FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 37.47 29.29
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to
the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at
least $13.65 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the
contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"