Prevailing Wage Index
HomePrevailing wage by stateNew YorkDeterminations › NY20260031

Wage determination NY20260031

Building, Heavy, Highway construction - New York, revision 2, modified 2026-05-18

Verify against the official document: this page mirrors WD NY20260031 revision 2 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0030-001 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHE$38.5025.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOP$43.2527.29

ASBE0030-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHE$38.5025.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOP$43.2527.29

BOIL0197-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$43.3427.66

BRNY0002-002 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
BRICKLAYERS & STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CLEANERS & CAULKERS: BUILDING CONSTRUCTION (UTICA CHAPTER)$39.2422.02
BRICKLAYER, MARBLE, TILE & TERRAZZO FINISHERS (UTICA CHAPTER) BUILDING CONSTRUCTION$28.5219.59
BRICKLAYER, MARBLE, TILE & TERRAZZO WORKERS (UTICA CHAPTER) BUILDING CONSTRUCTION$35.8520.37

BRNY0002-010 (collectively bargained (union) rate, 06/01/2018)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER, HEAVY/HIGHWAY CONSTRUCION (UTICA CHAPTER) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, AND THANKSGIVING DAY (PROVIDED THE EMPL$37.2319.51

CARP0277-005 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CARPENTER: PILEDRIVER (BUILDING CONSTRUCTION)$30.8521.32
CARPENTER: CARPENTERS, MILLWRIGHTS (BUILDING CONSTRUCTION)$30.8521.32
CARPENTER (HEAVY & HIGHWAY CONSTRUCTION)$44.5227.16

ELEC0043-005 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN$50.5035.03
CABLE SPLICER$55.5535.03

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99

ELEV0035-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR CONSTRUCTOR FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B.$57.7338.44

ENGI0158-004 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP C (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) FORK LIFT, HIGH LIFT, LUL$51.0133.20
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) BACKHOE, (TRACTOR MOUNTED$53.9133.20
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) SHOVEL, ALL BACKHOE (EXCE$54.9333.20
POWER EQUIPMENT OPERATORS: BUILDING: GROUP A(1): CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE. HERKIMER COUNTY (AREA E$55.4233.20

ENGI0158-012 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: BUILDING GROUP 4 MASTER MECHANIC HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) PREMIUMS: HAZ$57.0132.45
POWER EQUIPMENT OPERATORS: BUILDING GROUP 3 COMPRESSOR (UP TO 500 C.F.), CONCRETE PAVE ROR MIXER (UNDER 16S), CONCRETE PAVEMENT SPREADERS AND FINISHERS (NOT AUTOMATED), CONVEYOR (O$51.4232.45
POWER EQUIPMENT OPERATORS: BUILDING GROUP 2 ""A"" FRAME TRUCK, BLACKTOP PLANT (NON AUTOMATIC), ALL BACK DUMPS, BORING MACHINE, BULLDOZER, CAGEHOIST, CENTRAL MIX PLANT (NON AUTOMATE$53.9932.45
POWER EQUIPMENT OPERATORS: BUILDING GROUP 1 AIR PLAKO, ASPHALT AND BLACKTOP ROLLER, AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT), AUTOMATED FINE GRADE MACHINE (CMI), BACKHOE, EL$54.9032.45

ENGI0158-017 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 7 (HEAVY & HIGHWAY) MASTER MECHANIC HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOT$58.9133.55
POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY & HIGHWAY) CRANES 49 TONS AND BELOW HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FA$60.3033.55
POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY & HIGHWAY) CRANES 50 TONS AND OVER HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FAL$61.8033.55
POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY & HIGHWAY) TOWER CRANES HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOT$63.3033.55
POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY & HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALL$53.8233.55
POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY & HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL$56.3933.55
POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY & HIGHWAY) ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT $57.3033.55

ENGI0158-022 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FO$57.0132.45
POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND BELOW HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE $57.9032.45
POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY AND HIGHWAY) CRANES 50 TONS AND OVER HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE F$59.4032.45
POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY AND HIGHWAY) TOWER CRANES HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTN$60.9032.45
POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY AND HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BA$51.4232.45
POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP $53.9932.45
POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY AND HIGHWAY) ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEP$54.9032.45

IRON0440-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF COUNTY)$35.5031.39

LABO0035-005 (collectively bargained (union) rate, 07/01/2017)

ClassificationBase rateFringes
LABORERS: GROUP 4: (HEAVY & HIGHWAY CONSTRUCTION:) BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA$28.6523.74
LABORERS: GROUP 3: (HEAVY & HIGHWAY CONSTRUCTION:) ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AMD SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POW$28.4523.74
LABORERS: GROUP 2: (HEAVY & HIGHWAY CONSTRUCTION:) BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, M$28.2523.74
LABORERS: GROUP 1: (HEAVY & HIGHWAY CONSTRUCTION:) COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABO$28.0523.74
LABORERS: BUILDING CONSTRUCTION: WAGON DRILL OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$22.9020.64
LABORERS: BUILDING CONSTRUCTION: PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER LIFT (WALK BEHIND) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR$22.6520.64
LABORERS: BUILDING CONSTRUCTION: LABORERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$22.5020.64
LABORERS: BUILDING CONSTRUCTION: HAZARDOUS WASTE REMOVAL (HAZARDOUS WASTE REMOVAL INCLUDES, WETTING,STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSULATI$24.0020.64
LABORERS: BUILDING CONSTRUCTION: BLASTERS, FORM SETTERS, MOTORBUGGY OPERATOR (RIDER TYPE) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, AND THANKSGIVING DAY (P$23.0020.64
LABORERS: BUILDING CONSTRUCTION: ASBESTOS REMOVAL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$24.0020.64

PAIN0004-025 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
PAINTERS: SPRAY, SANDBLASTING, STRUCTURAL STEEL (BUILDING CONSTRUCTION)$27.7726.23
PAINTERS: BRUSH & ROLL, DRYWALL TAPING/FINISHING (BUILDING CONSTRUCTION)$27.2726.23

PAIN0677-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$30.0027.59

PLUM0112-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLUMBER, INCLUDING STEAMFITTING (NORTHERN ZONE)$45.9333.77

ROOF0195-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
ROOFER$35.8025.99

SFNY0669-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER$47.8528.94

SHEE0058-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER (PROJECTS OVER $10 MILLION)$46.2923.31
SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS)$36.2923.31
Full official text of NY20260031 rev 2
"General Decision Number: NY20260031 05/18/2026


State: New York


Construction Types: Building, Heavy and Highway


Counties: New York Counties of 
Herkimer




Building Construction Projects

Heavy Construction Projects

Highway Construction Projects


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026


 ASBE0030-001 05/01/2023
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK:  DUTIES 
LIMITED TO PREPARATION, WETTING, STRIPPING, 
REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND 
DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY 
CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM).....$ 38.50                  25.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF 
ALL  MATERIALS, PROTECTIVE COVERINGS, COATINGS AND 
FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS.  
ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO 
OPENINGS AND PENETRATIONS IN WALLS, FLOORS, 
CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)....$ 43.25                  27.29
----------------------------------------------------------------

 ASBE0030-001 05/01/2025
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK:  DUTIES 
LIMITED TO PREPARATION, WETTING, STRIPPING, 
REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND 
DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY 
CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM).....$ 38.50                  25.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF 
ALL  MATERIALS, PROTECTIVE COVERINGS, COATINGS AND 
FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS.  
ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO 
OPENINGS AND PENETRATIONS IN WALLS, FLOORS, 
CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)....$ 43.25                  27.29
----------------------------------------------------------------

 BOIL0197-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 43.34                  27.66
----------------------------------------------------------------

 BRNY0002-002 07/01/2024
                                                     Rates                  Fringes
BRICKLAYERS & STONE MASONS, CEMENT MASONS, 
PLASTERERS, POINTERS, CLEANERS &  CAULKERS: 
BUILDING CONSTRUCTION (UTICA CHAPTER)...............$ 39.24                  22.02
BRICKLAYER, MARBLE, TILE & TERRAZZO FINISHERS 
(UTICA CHAPTER) BUILDING CONSTRUCTION...............$ 28.52                  19.59
BRICKLAYER, MARBLE, TILE & TERRAZZO  WORKERS (UTICA 
CHAPTER) BUILDING CONSTRUCTION......................$ 35.85                  20.37
----------------------------------------------------------------

 BRNY0002-010 06/01/2018
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER, HEAVY/HIGHWAY 
CONSTRUCION (UTICA CHAPTER)   FOOTNOTE:   A.  PAID 
HOLIDAYS:  MEMORIAL DAY, JULY THE 4TH, LABOR DAY, 
AND THANKSGIVING DAY (PROVIDED THE EMPLOYEE IS 
EMPLOYED ONE DAY BEFORE AND ONE DAY AFTER THE 
HOLIDAY)............................................$ 37.23                  19.51
----------------------------------------------------------------

 CARP0277-005 07/01/2025
                                                     Rates                  Fringes
CARPENTER: PILEDRIVER (BUILDING CONSTRUCTION).......$ 30.85                  21.32
CARPENTER: CARPENTERS, MILLWRIGHTS (BUILDING 
CONSTRUCTION).......................................$ 30.85                  21.32
CARPENTER (HEAVY & HIGHWAY CONSTRUCTION)............$ 44.52                  27.16
----------------------------------------------------------------

 ELEC0043-005 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN.........................................$ 50.50                  35.03
CABLE SPLICER.......................................$ 55.55                  35.03
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
----------------------------------------------------------------

 ELEV0035-002 01/01/2025
                                                     Rates                  Fringes
ELEVATOR CONSTRUCTOR   FOOTNOTE:    A.VACATION: 
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR 
ALL HOURS WORKED.  8%/OVER 5 YEARS BASED ON REGULAR 
HOURLY RATE FOR ALL HOURS WORKED.     B. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY..............................$ 57.73                  38.44
----------------------------------------------------------------

 ENGI0158-004 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP C 
(HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH 
AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE 
FALLS)) FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN 
AND HEAVY- DUTY GREASER, BOILERS, AND STEAM 
GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR 
COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL 
POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY 
LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE 
PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, 
CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE 
POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING 
MACHINES, PUMPS  FOOTNOTE:    A.  PAID HOLIDAYS:  
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR 
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY............$ 51.01                  33.20
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B 
(HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH 
AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE 
FALLS)) BACKHOE, (TRACTOR MOUNTED RUBBER TIRED 
EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, 
PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU 
GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP 
ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, 
TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, 
HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING 
MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE 
DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, 
POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND 
SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD 
HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS 
(ONE DRUM), POST  HOLE DIGGER, MODEL CHB VIBRO-TAMP 
OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, 
DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK 
EXCAVATOR 5/8 CU. YD. OR SMALLER....................$ 53.91                  33.20
POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A 
(HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH 
AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE 
FALLS)) SHOVEL, ALL BACKHOE (EXCEPT TRACTOR MOUNTED 
RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, 
POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END 
RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY 
MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX 
PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED 
ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER.......$ 54.93                  33.20
POWER EQUIPMENT OPERATORS: BUILDING: GROUP A(1):   
CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE 
CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, 
DRAGLINE.      HERKIMER COUNTY (AREA EAST OF A LINE 
RUNNING NORTH AND SOUTH THROUGH THE RAILROAD 
STATION AT LITTLE FALLS)    GROUP A(1):  CRANE 
PREMIUMS     1  OVER 150' :ADD $1.00                
        2  OVER 200' : ADD  $2.00...................$ 55.42                  33.20
----------------------------------------------------------------

 ENGI0158-012 07/01/2024
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: BUILDING GROUP 4 MASTER 
MECHANIC     HERKIMER COUNTY (AREA WEST OF A LINE 
RUNNING NORTH AND SOUTH THROUGH THE RAILROAD 
STATION AT LITTLE FALLS)  PREMIUMS:    HAZMAT WORK  
                           2.50    QUAD 9 BULLDOZER 
OR MULTIBOWL SCRAPER    .50    FOOTNOTE:    A.  
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED FIVE 
CONSECUTIVE WORKING DAYS BEFORE AND THE WORKING DAY 
AFTER THE HOLIDAY...................................$ 57.01                  32.45
POWER EQUIPMENT OPERATORS: BUILDING GROUP 3 
COMPRESSOR (UP TO 500 C.F.), CONCRETE PAVE ROR 
MIXER (UNDER 16S), CONCRETE PAVEMENT SPREADERS AND 
FINISHERS (NOT AUTOMATED), CONVEYOR (OVER 12 FT), 
ELECTRIC SUBMERSIBLE PUMP (4"" AND OVER), FARM 
TRACTOR WITH OR WITHOUT ACCESSORIES, FINE GRADE 
MACHINE (NOT AUTOMATED), FIREMAN, FORM TAMPER, 
GENERATOR (2,500 WATTS AND OVER), HYDRAULIC PUMP, 
MECHANICAL HEATERS (MORE THAN 2 WHOSW COMBINED 
OUTPUT EXCEEDS 640,000 BTU PER HOUR (MANUFACTURER'S 
RATING) PLUS ONE SELF CONTAINED HEATING UNIT 
(SUNDOG, AIR HEAT TYPE, NEW HOLLAND HAY DRYER TYPE 
EXCLUDED), POWER HEATERMAN (HAY DRYER), PUMPS 
(WATER AND TRASH), REVINUS WIDENER (ROAD WIDENER), 
SINGLE LIGHT PLANT, STEAM CLEANER OR JENNY, TRACTOR 
WITH OR WITHOUT TOWED ACCESSORIES  HERKIMER COUNTY 
(AREA WEST OF A LINE RUNNING NORTH AND SOUTH 
THROUGH THE RAILROAD STATION AT LITTLE FALLS)  
PREMIUMS:    HAZMAT WORK                            
 2.50    QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER    
.50    FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE 
EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS 
BEFORE AND THE WORKING DAY AFTER THE HOLIDAY........$ 51.42                  32.45
POWER EQUIPMENT OPERATORS: BUILDING GROUP 2 ""A"" 
FRAME TRUCK, BLACKTOP PLANT (NON AUTOMATIC), ALL 
BACK DUMPS, BORING MACHINE, BULLDOZER, CAGEHOIST, 
CENTRAL MIX PLANT (NON AUTOMATED), CHERRY PICKER 15 
TONS AND UNDER), THAN 5), CONCRETE PAVER (SINGLE 
DRUM OVER 16S), CORE BORING MACHINE, DRILL RIGS 
(TRACTOR MOUNTED), ELEVATOR (AS A MATERIAL HOIST), 
FORK LIFT (ALL OTHERS), FRONT END LOADER (UNDER 4 
C.Y.), GUNITE MACHINE, HIGH PRESSURE BOILER 915 LBS 
& OVER), HOIST (ONE DRUM), HYDRAULIC BREAKING 
HAMMER (DROP HAMMER), KOLMAN PLANT LOADER 
(SCREENING GRAVEL), MAINTENANCE GREASE MAN, MIZER 
FOR STABILIZED BASE (SELF PROPELLED SEAMAN MIXER), 
MONRAIL MACHINE, PARAPET CONCRETE OR PAVEMENT 
GRINDER, PARTS MAN, POST HOLE DIGGER (TRUCK OR 
TRACTOR MOUNTED), POWER SWEEPER (WAYNE OR SIMILAR), 
GROUT PUMP, PUMP- CRETE OR SQEEZE-CRETE, ROAD 
WIDENER (FRONT END OF GRADER OR SELF PROP.), 
ROLLER, SELF CONTAINED HYDRAULIC BENCH DRILL, SHELL 
WINDER (MOTORIZED), SNORKEL (OVERHEAD ARMS), 
SNOWBLOWER CONTROL MAN, TRENCHING MACHINE (DIGGING 
CAPACITY OF 4 FT OR LESS), TUGGER HOIST, VIBROTAMP, 
WELL DRILL, WELL POINT SYSTEM, WINCH (MOTOR 
DRIVEN), WINCH CAT, WINCH TRUCK  HERKIMER COUNTY 
(AREA WEST OF A LINE RUNNING NORTH AND SOUTH 
THROUGH THE RAILROAD STATION AT LITTLE FALLS)  
PREMIUMS:    HAZMAT WORK                            
 2.50    QUAD 9 BULLDOZER OR MULTIBOWL SCRAPER    
.50    FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE 
EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS 
BEFORE AND THE WORKING DAY AFTER THE HOLIDAY........$ 53.99                  32.45
POWER EQUIPMENT OPERATORS: BUILDING GROUP 1 AIR 
PLAKO, ASPHALT AND BLACKTOP ROLLER, AUTOMATED 
CONCRETE SPREADER (CMI OR EQUIVALENT), AUTOMATED 
FINE GRADE MACHINE (CMI), BACKHOE, ELT PALCER, 
BLACKTOP SPREADER (SUCH AS BARBER GREEN & BLAW 
KNOX), BLACKTOP PLANT (AUTOMATED), BLAST OR ROTARY 
DRILL (TRUCK OR CAT MOUNTED), BOOM TRUCK, CABLEWAY, 
CAISSON AUGER, CENTRAL MIX PLANT (AUTOMATED), 
CHERRY PICKER (15 TONS), CONCRETE PUMP, CRANE, 
CRUSHER (ROCK), DERRICK, DIESEL POWER UNIT, 
DRAGLINE, DREDGE, DUAL DRUM PAVER, ELEVATING GRADER 
(SELF-PROPELLED), ELEVATOR HOIST (2 CAGE), 
EXCAVATOR (ALL PURPOSE-HYDRAULICALLY OPERATED), 
FORK LIFT (LOED AND LULL AND OTHER ROUGH TERRAIN 
TYPE), FRONT END LOADER (4 C.Y. AND OVER), GRADALL, 
GRADER (POWER), HEAD TOWER (SAURMAN OR EQUAL), HOST 
( 2 OR 3 DRUM), HYDROBLASTER (LASER PUMP), WORK 
BOAT OPERATOR (LCM), LIGHT PLANTS (COMPRESSORS AND 
GENERATORS), LOCOMOTIVE,MAINTENANCE ENGINEER, 
MAINTENANCE WELDER, MINE HOIST, MUCKING MACHINE OR 
MOLE, OVERHEAD CRANE -FIXED PERMANENT, PILE DRIVER, 
QUARRY MASTER OR EQUIVALENT, REFRIGERATION 
EQUIPMENT (FOR SOIL STABILIZATION), SCRAPER SEA 
MULE, SHOVEL, SIDE BOOM, SLIP FORM PAVER, STRADDLE 
BUGGY (ROSS CARRIER, LUMBER CARRIER), TRACTOR DRAWN 
BELT TYPE LOADER (EUCLID LOADER), TRANCHING MACHINE 
(DIGGING CAPACITY OF OVER 4 FT DEPTH), TRUCK CRANE 
(OPERATOR), TRUCK OF TRAILER MOUNTED LOG CHIPPER 
(SELF FEEDER), TUG OPERATOR (MANNED, RENTED 
EQUIPMENT EXCLUDED), TUNNEL SHOVEL, VIBRO OR SONIC 
HAMMER CONTROLS (WHEN NOT MOUNTED IN PROXIMITY TO 
THE RIG OPERATOR  HERKIMER COUNTY (AREA WEST OF A 
LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD 
STATION AT LITTLE FALLS)  PREMIUMS:    HAZMAT WORK  
                           2.50    QUAD 9 BULLDOZER 
OR MULTIBOWL SCRAPER    .50    CRANE PREMIUMS (ADD 
TO GROUP 1 RATE):    ALL LATTIC BOOM CRANES (65 TON 
CAPACITY AND OVER)          GROUP 1 RATE PLUS 1.25  
  ALL HYDRAULIC CRANES (100 TON CAPACITY AND OVER)  
       GROUP 1 RATE PLUS 1.75    ALL HYDRAULIC 
CRANES (80 TON CAPACITY TO 99 TON CAPACITY) GROUP 1 
RATE PLUS  1.25    ALL HYDRAULIC CRANES (65 TON 
CAPACITY TO 79 TON CAPACITY) GROUP 1 RATE PLUS  
1.10     FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE 
EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS 
BEFORE AND THE WORKING DAY AFTER THE HOLIDAY........$ 54.90                  32.45
----------------------------------------------------------------

 ENGI0158-017 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 7 (HEAVY & 
HIGHWAY) MASTER MECHANIC  HERKIMER COUNTY (AREA 
EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE 
RAILROAD STATION AT LITTLE FALLS)  FOOTNOTE:    A.  
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 58.91                  33.55
POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY & 
HIGHWAY) CRANES 49 TONS AND BELOW  HERKIMER COUNTY 
(AREA EAST OF A LINE RUNNING NORTH AND SOUTH 
THROUGH THE RAILROAD STATION AT LITTLE FALLS)  
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 60.30                  33.55
POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY & 
HIGHWAY) CRANES 50 TONS AND OVER  HERKIMER COUNTY 
(AREA EAST OF A LINE RUNNING NORTH AND SOUTH 
THROUGH THE RAILROAD STATION AT LITTLE FALLS)  
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 61.80                  33.55
POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY & 
HIGHWAY) TOWER CRANES  HERKIMER COUNTY (AREA EAST 
OF A LINE RUNNING NORTH AND SOUTH THROUGH THE 
RAILROAD STATION AT LITTLE FALLS)  FOOTNOTE:    A.  
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 63.30                  33.55
POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY & 
HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED 
HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE 
GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, 
RIDE-ON BOILER (USED IN CONJUNCTION WITH 
PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, 
BOAT (POWERED), CEMENT AND BIN OPERATOR, 
COMPRESSORS, DUST COLLECTORS, FORK LIFT, 
GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, 
HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT 
SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S 
AND UNDER), CONCRETE SAW (SELF-PROPELLED), 
CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE 
LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR 
WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, 
RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, 
RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, 
RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, 
TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), 
VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT  
HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH 
AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE 
FALLS)  FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 53.82                  33.55
POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY & 
HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, 
RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, 
BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT 
(NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR 
TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, 
CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE 
BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND 
UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, 
SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL 
RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 
CU. YD.), GREASEMAN/LUBRICATION ENGINEER, 
HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE 
DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR 
TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE 
MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL 
MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND 
UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, 
POWER BROOM (TOWED), POWER HEATERMAN, POWER 
SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), 
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER 
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM 
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE 
PLANT REFRIGERATION EQUIPMENT (FOR SOIL 
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE 
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK 
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, 
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER 
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), 
WINCH, WINCH CAT  HERKIMER COUNTY (AREA EAST OF A 
LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD 
STATION AT LITTLE FALLS)  FOOTNOTE:    A.  PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 56.39                  33.55
POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY & 
HIGHWAY) ASPHALT CURB MACHINE, SELF PROPELLED, 
SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), 
AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR 
MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL 
SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING 
MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT 
(AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, 
CENTRAL MIX  CONCRETE PLANT (AUTOMATED), CONCRETE 
CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE 
PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL 
ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR 
STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, 
DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM 
PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY 
OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 
4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR 
EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, 
MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE 
OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND 
SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 
H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), 
SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE 
MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), 
HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING 
SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, 
OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE 
BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE 
LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER 
(SELF FEEDER), TUG OPERATOR (MANNED RENTED 
EQUIPMENT EXCLUDED), TUNNEL SHOVEL  HERKIMER COUNTY 
(AREA EAST OF A LINE RUNNING NORTH AND SOUTH 
THROUGH THE RAILROAD STATION AT LITTLE FALLS)  
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 57.30                  33.55
----------------------------------------------------------------

 ENGI0158-022 07/01/2024
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 7 (HEAVY AND 
HIGHWAY) MASTER MECHANIC  HERKIMER COUNTY (AREA 
WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE 
RAILROAD STATION AT LITTLE FALLS)  FOOTNOTE:    A.  
PAID HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 57.01                  32.45
POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY AND 
HIGHWAY) CRANES 49 TONS AND BELOW  HERKIMER COUNTY 
(AREA WEST OF A LINE RUNNING NORTH AND SOUTH 
THROUGH THE RAILROAD STATION AT LITTLE FALLS)  
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 57.90                  32.45
POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY AND 
HIGHWAY) CRANES 50 TONS AND OVER  HERKIMER COUNTY 
(AREA WEST OF A LINE RUNNING NORTH AND SOUTH 
THROUGH THE RAILROAD STATION AT LITTLE FALLS)  
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 59.40                  32.45
POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY AND 
HIGHWAY) TOWER CRANES  HERKIMER COUNTY (AREA WEST 
OF A LINE RUNNING NORTH AND SOUTH THROUGH THE 
RAILROAD STATION AT LITTLE FALLS)  FOOTNOTE:    A.  
PAID HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 60.90                  32.45
POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY AND 
HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED 
HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE 
GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, 
RIDE-ON BOILER (USED IN CONJUNCTION WITH 
PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, 
BOAT (POWERED), CEMENT AND BIN OPERATOR, 
COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, 
WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF 
EQUIPMENT), CONCRETE PAVEMENT SPREADER AND 
FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), 
CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, 
DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), 
DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE 
GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, 
RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, 
RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK 
LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED 
ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL 
POINT  HERKIMER COUNTY (AREA WEST OF A LINE RUNNING 
NORTH AND SOUTH THROUGH THE RAILROAD STATION AT 
LITTLE FALLS)  FOOTNOTE:    A.  PAID HOLIDAYS:  NEW 
YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED 
THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND 
THE WORKING DAY AFTER THE HOLIDAY...................$ 51.42                  32.45
POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY AND 
HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, 
RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, 
BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT 
(NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR 
TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, 
CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE 
BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND 
UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, 
SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL 
RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 
CU. YD.), GREASEMAN/LUBRICATION ENGINEER, 
HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE 
DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR 
TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE 
MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL 
MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND 
UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, 
POWER BROOM (TOWED), POWER HEATERMAN, POWER 
SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), 
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER 
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM 
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE 
PLANT REFRIGERATION EQUIPMENT (FOR SOIL 
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE 
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK 
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, 
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER 
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), 
WINCH, WINCH CAT  HERKIMER COUNTY (AREA WEST OF A 
LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD 
STATION AT LITTLE FALLS)  FOOTNOTE:    A.  PAID 
HOLIDAYS:  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 53.99                  32.45
POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY AND 
HIGHWAY) ASPHALT CURB MACHINE, SELF PROPELLED, 
SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), 
AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR 
MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL 
SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING 
MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT 
(AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, 
CENTRAL MIX  CONCRETE PLANT (AUTOMATED), CONCRETE 
CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE 
PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL 
ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR 
STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, 
DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM 
PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY 
OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 
4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR 
EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, 
MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE 
OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND 
SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 
H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), 
SCRAPER, FIREMAN, FORK LIFT, FORM TAMPER, GROUT 
PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC 
SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC 
PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), 
MULCHING MACHINE, OILER, PARAPET CONCRETE OR 
PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, 
TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER 
MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL  
(HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH 
AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE 
FALLS)  FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEARS 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 54.90                  32.45
----------------------------------------------------------------

 IRON0440-001 07/01/2025
                                                     Rates                  Fringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, 
MACHINERY MOVER, RIGGER, FENCE ERECTOR, 
REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF 
COUNTY).............................................$ 35.50                  31.39
----------------------------------------------------------------

 LABO0035-005 07/01/2017
                                                     Rates                  Fringes
LABORERS: GROUP 4: (HEAVY & HIGHWAY CONSTRUCTION:) 
BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB 
SETTERS  FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 28.65                  23.74
LABORERS: GROUP 3: (HEAVY & HIGHWAY CONSTRUCTION:) 
ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT 
QUARRY MASTER AMD SIMILAR TYPE), ACETYLENE TORCH 
OPERATORS, AND ASPHALT PAVER, POWERMAN  FOOTNOTE:   
 A.  PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 28.45                  23.74
LABORERS: GROUP 2: (HEAVY & HIGHWAY CONSTRUCTION:) 
BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, 
CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE 
VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, 
PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL 
GENERATORS FOR LABORERS'S TOOLS, INSTALLATION OF 
BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, 
TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON 
ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND 
SINGLE DIAPHRAM), NOZZLE (APHLAT, GUNNITE, SEEDING 
AND SAND BLASTING), LABORERS ON CHAIN LINK FENCE 
ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE 
CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AND 
AIR TOOL OPERATORS, WRECKING LABORERS  FOOTNOTE:    
A.  PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 28.25                  23.74
LABORERS: GROUP 1: (HEAVY & HIGHWAY CONSTRUCTION:) 
COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS  
FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 28.05                  23.74
LABORERS: BUILDING CONSTRUCTION: WAGON DRILL 
OPERATOR  FOOTNOTE:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 22.90                  20.64
LABORERS: BUILDING CONSTRUCTION: PIPELAYERS, MOTOR 
MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER 
LIFT (WALK BEHIND)   FOOTNOTE:   A.  PAID HOLIDAYS: 
 MEMORIAL DAY, JULY THE 4TH, LABOR DAY, AND 
THANKSGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED 
ONE DAY BEFORE AND ONE DAY AFTER THE HOLIDAY).......$ 22.65                  20.64
LABORERS: BUILDING CONSTRUCTION: LABORERS  
FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 22.50                  20.64
LABORERS: BUILDING CONSTRUCTION: HAZARDOUS WASTE 
REMOVAL (HAZARDOUS WASTE REMOVAL INCLUDES, 
WETTING,STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, 
BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, 
WHEATHER THEY CONTAIN ASBESTOS OR NOT, FROM 
MECHANICAL SYSTEMS)   FOOTNOTE:    A.  PAID 
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.  ....................................$ 24.00                  20.64
LABORERS: BUILDING CONSTRUCTION: BLASTERS, FORM 
SETTERS, MOTORBUGGY OPERATOR (RIDER TYPE)   
FOOTNOTE:   A.  PAID HOLIDAYS:  MEMORIAL DAY, JULY 
THE 4TH, LABOR DAY, AND THANKSGIVING DAY (PROVIDED 
THE EMPLOYEE IS EMPLOYED ONE DAY BEFORE AND ONE DAY 
AFTER THE HOLIDAY)..................................$ 23.00                  20.64
LABORERS: BUILDING CONSTRUCTION: ASBESTOS REMOVAL  
FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 24.00                  20.64
----------------------------------------------------------------

 PAIN0004-025 05/01/2024
                                                     Rates                  Fringes
PAINTERS: SPRAY, SANDBLASTING, STRUCTURAL STEEL 
(BUILDING CONSTRUCTION).............................$ 27.77                  26.23
PAINTERS: BRUSH & ROLL, DRYWALL TAPING/FINISHING 
(BUILDING CONSTRUCTION).............................$ 27.27                  26.23
----------------------------------------------------------------

 PAIN0677-002 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 30.00                  27.59
----------------------------------------------------------------

 PLUM0112-003 05/01/2025
                                                     Rates                  Fringes
PLUMBER, INCLUDING STEAMFITTING (NORTHERN ZONE).....$ 45.93                  33.77
----------------------------------------------------------------

 ROOF0195-001 07/01/2025
                                                     Rates                  Fringes
ROOFER..............................................$ 35.80                  25.99
----------------------------------------------------------------

 SFNY0669-001 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 47.85                  28.94
----------------------------------------------------------------

 SHEE0058-001 05/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER (PROJECTS OVER $10 MILLION)......$ 46.29                  23.31
SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS)....$ 36.29                  23.31
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).


----------------------------------------------------------------

The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
""""SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The """"SU"""" identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The """"SA"""" identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the ?SA? identifier took
effect under state law in the state from which the rates were
adopted.

-----------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can
be:

           a) a survey underlying a wage determination
           b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination

On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:

            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:

            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:

            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.



================================================================

          END OF GENERAL DECISION"

All New York determinations: county index · New York prevailing wage · compute pay with the calculator.