Building, Heavy, Highway construction - New York, revision 2, modified 2026-05-18
Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of NY20260034 rev 2
"General Decision Number: NY20260034 05/18/2026
State: New York
Construction Types: Building, Heavy and Highway
Counties: New York Counties of
Orleans
Building Construction Projects
Heavy Construction Projects
Highway Construction Projects
Modification Number Publication Date
1 01/30/2026
2 05/18/2026
ASBE0026-003 06/01/2025
Rates Fringes
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO
PREPARATION; WETTING; STRIPPING; REMOVAL;
SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL
INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS
OR NOT, FROM MECHANICAL SYSTEMS)....................$ 40.26 25.41
ASBESTOS WORKER/HEAT & FROST INSULATOR ((INCLUDES
THE APPLICATION OF ALL INSULATING MATERIALS,
PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL
TYPES OF MECHANICAL SYSTEMS. ALSO, THE APPLICATION
OF FIRESTOOPING MATERIAL OPENINGS AND PENETRATIONS
IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL
LEAD ABATEMENT))....................................$ 40.26 25.41
----------------------------------------------------------------
BOIL0007-001 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 39.35 33.18
----------------------------------------------------------------
BRNY0003-011 07/01/2025
Rates Fringes
MARBLE, TILE AND TERRAZZO FINISHERS: BUILDING
CONSTRUCTION (BUFFALO CHAPTER)......................$ 35.71 18.26
MARBLE TILE AND TERRAZZO WORKERS: BUILDING
CONSTRUCTION (BUFFALO CHAPTER)......................$ 37.85 31.80
CEMENT MASONS: HEAVY/HIGHWAY CONSTRUCTION (BUFFALO
CHAPTER)............................................$ 38.63 25.05
BRICKLAYERS, STONE MASONS, PLASTERERS, CEMENT
MASONS, POINTER, CLEANER & CAULKERS: BUILDING
CONSTRUCTION (BUFFALO CHAPTER)......................$ 37.44 32.71
----------------------------------------------------------------
CARP0276-017 07/01/2019
Rates Fringes
MILLWRIGHT..........................................$ 31.93 25.11
CARPENTER...........................................$ 34.26 25.94
----------------------------------------------------------------
CARP0276-017 07/01/2024
Rates Fringes
MILLWRIGHT..........................................$ 31.93 25.11
CARPENTER...........................................$ 34.26 25.94
----------------------------------------------------------------
ELEC0086-006 05/26/2025
Rates Fringes
ELECTRICIAN (CLARENDEON, KENDALL AND MURRAY
TOWNSHIPS)..........................................$ 44.30 30.20
----------------------------------------------------------------
ELEC0237-002 05/29/2017
Rates Fringes
CABLE SPLICER (REMAINDER OF COUNTY).................$ 37.40 27.44
ELECTRICIAN (REMAINDER OF COUNTY)...................$ 44.20 32.90
----------------------------------------------------------------
ELEC0237-002 05/26/2025
Rates Fringes
CABLE SPLICER (REMAINDER OF COUNTY).................$ 37.40 27.44
ELECTRICIAN (REMAINDER OF COUNTY)...................$ 44.20 32.90
----------------------------------------------------------------
ELEC1249-003 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER
UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 31.72 29.87
----------------------------------------------------------------
ELEC1249-004 05/05/2025
Rates Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
(Substation:).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable ins..................................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Substation:)............................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Overhead and
underground distribution and maintenance work and
all overhead and underground transmission line work
including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installat............................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Overhead and underground distribution and
maintenance work and all overhead and underground
transmission line work including any and all fiber
optic ground wire, fiber optic shield wire or any
other like product by any other name manufactured
for the dual purpose of ground fault protection and
fiber optic capabilities :).........................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Switching structures; railroad
catenary installation and maintenance, third rail
type underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cab........................................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Substation:)......................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Overhead and underground
distribution and maintenance work and all overhead
and underground transmission line work including
any and all fiber optic ground wire, fiber optic
shield wire or any other like product by any other
name manufactured for the dual purpose of ground
fault protection and fiber optic capabilities :)....$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
(Substation:).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installation)........................$ 64.59 42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Substation:).......................................$ 63.14 33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;
RAILROAD CATENARY INSTALLATION AND MAINTENANCE,
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND
MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21
----------------------------------------------------------------
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99
----------------------------------------------------------------
ENGI0017-004 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: GROUP 7 (BUILDING/HEAVY
AND HIGHWAY) MASTER MECHANIC NOTE: HAZARDOUS
WASTE PREMIUM $2.50 TUNNEL WORK
$1.00 FOOTNOTES: A. PAID
HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY;
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY;
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 45.47 35.40
POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING/HEAVY
AND HIGHWAY) CRANES 400 TONS & OVER NOTE:
HAZARDOUS WASTE PREMIUM $2.50 TUNNEL
WORK $1.00 FOOTNOTES: A.
PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY;
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY;
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 49.48 35.40
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING/HEAVY
AND HIGHWAY) CRANES 200 - 399 TONS NOTE:
HAZARDOUS WASTE PREMIUM $2.50 TUNNEL
WORK $1.00 FOOTNOTES: A.
PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY;
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY;
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 48.98 35.40
POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING/HEAVY
AND HIGHWAY) CRANES 61 - 199 TONS NOTE:
HAZARDOUS WASTE PREMIUM $2.50 TUNNEL
WORK $1.00 FOOTNOTES: A.
PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY;
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY;
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 48.48 35.40
POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING/HEAVY
AND HIGHWAY) CRANES 5 - 60 TONS NOTE: HAZARDOUS
WASTE PREMIUM $2.50 TUNNEL WORK
$1.00 FOOTNOTES: A. PAID
HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY;
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY;
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 47.48 35.40
POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING/HEAVY
AND HIGHWAY) AGGREGATE BIN, CMI AND SIMILAR TYPE
CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND
CHIP SPREADER, COMPRESSORS (4 OR LESS),
COMPRESSORS: (ANY SIZE, BUT SUBJECT TO OTHER
PROVISIONS FOR COMPRESSORS, DUST COLLECTORS,
GENERATORS, MECHANICAL HEATERS, PUMPS, WELDING
MACHINES (FOUR OF ANY TYPE OR COMBINATION),
CONCRETE MIXER (1/2 CU. YD. AND UNDER), FIREMAN,
FORM TAMPER, FUEL TRUCK, HEATING BOILER (USED FOR
TEMPRORY HEAT), JEEP TRENCHER, POWER HEATERMAN,
POWER PLANT IN EXCESS OF 10 K.W., PUMP (4"" OR
OVER), REVINIUS WIDENER, STEM CLEANER, STUMP
CHIPPING MACHINE, WELDING MACHINE (1 MACHINE OVER
300 AMPS OR 2 OR 3 MACHINES REGARDLESS OF AMPS).
NOTE: HAZARDOUS WASTE PREMIUM $2.50
TUNNEL WORK $1.00 FOOTNOTES:
A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL
DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING
DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS
WORKED THE DAY BEFORE AND THE DAY AFTER THE
HOLIDAY.............................................$ 39.14 35.40
POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING/HEAVY
AND HIGHWAY) AIR HOIST, ALL BOOM TYPE EQUIPMENT
(100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER
HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER,
AUTOMATIC FINE GRADE MACHINE (CMI AND SIMILAR
TYPE), ARCHER HOIST, BACKHOE AND PULL HOE (TRACTOR
MOUNTED AND RUBBER MOUNTED), BACK FILLING MACHINE,
BELT PLACE (CMI AND SIMILAR), BENDING MACHINE
(PIPE), BITUMINOUS SPREADER AND MIXER, BLACK TOP
PLANT (AUTOMATED), BLACK TOP PLANT (NON-AUTOMATED),
BLAST OR ROTARY DRILL (TRUCK OR TRACK MOUNTED),
BLOWER FOR BURNING BRUSH, BOILER (WHEN USED FOR
POWER), BOOM TRUCKS, BORING MACHINE, BULLDOZER,
CABLEWAY CAGE HOIST, CAISSON AUGER, CENTRAL MIX
PLANT (AND ALL CONCRETE BATCHING PLANTS), CHERRY
PICKER (OVER 5 TONS), CHERRY PICKER (UNDER 5 TONS),
CHIPPING MACHINE AND CHIP SPREADER, CONCRETE CURB
AND GUTTER MACHINES, CONCRETE CURING MACHINE,
CONCRETE MIXER (OVER 1/2 CU. YD.) CONCRETE PAVEMENT
SPREADERS AND FINISHERS, CONCRETE PAVER, CONCRETE
PUMP, CONCRETE SAW (SELF-PROPELLED), CONVEYOR, CORE
DRILL, CRANE, CRUSHER, DERRICK OPERATOR, DRAGLINE,
DREDGE, DRILL RIG (TRACTOR MOUNTED), DUAL DRUM
PAVER, ELECTRIC PUMP USED IN CONJUNCTION WITH WELL
POINT SYSTEMS, ELEVATING GRADER SELF- PROPELLED OR
TOWED), ELEVATOR EXCAVATOR (ALL PURPOSE,
HYDRAULCALLY OPERATED) FARM TRACTOR WITH
ACCESSORIES, FINE GRADE MACHINE, FORKLIFT, FRONT
END LOADER, GENERATOR (10 OUTLETS OR MORE),
GRADALL, GRADER, GROUT OR GUNITE MACHINE, HEAD
TOWER, HOIST-ONE DRUM, HOISTING ENGINE, HYDRAULIC
BOOM, HYDRAULIC HAMMER, (SELF PROPELLED), HYDRAULIC
PIPE JACK MACHINE (OR SIMILAR TYPE MACHINE),
HYDRAULIC SYSTEM PUMPS, HYDRO CRANE, HYDRO HAMMER
(OR SIMILAR TYPE), INDUSTRIAL TRACTOR, JERSEY
SPREADER, KOLMAN PLANT LOADER (AND SIMILAR TYPE
LOADERS), LOCOMOTIVE, LUBRICATION TRUCK,
MAINTENANCE ENGINEER, MAINTENANCE LUBRICATION UNIT
OR TRUCK, MINE HOIST, MIXR FOR STABILIZED BASE
(SELF-PROPELLED), MONORAIL, MOTORIZED HYDRAULIC PIN
PULLER, MOTORIZED HYDRAULIC SEEDER MUCKING MACHINE,
MULCHING MACHINE, MULTIPLE DRUM HOIST (MORE THAN 1
DRUM IN USE), OVERHEAD CRANE, PEINE CRANE (OR
SIMILAR TYPE), PILE DRIVER, PLANT ENGINEER,
PNEUMATIC MIXER, POST HOLE DIGGER, POWER BOOM, PUMP
CRETE, PUSH OR SNATCH CAT, QUARRY MASTER OR
EQUIVALENT ROAD WIDENER, ROCK BIT SHARPENER (ALL
TYPES), ROLLER (ALL), ROLLING MACHIN (PIPE),
ROTOMILL, SCOOPMOBILE, SHOVEL, SIDE BOOM, SKIMMER,
SLIP FORM PAVER (CMI AND SIMILAR TYPE, FIRST AND
SECOND OPERATOR), SNORKEL, STRATO-TOWER, STUMP
CHIPPING MACHINE, TIRE TRUCK AND REPAIR, TOWED
ROLLER, TRACTOR DRAWN BELT TYPE GRADER/LOADER,
TRACTOR SHOVEL, TRACTOR WITH TOWED ACCESSORIES,
TRACTORS (WHEN USING WINCH POWER), TRACTORS,
TRENCHER, TRUCK CRANE, TUNNEL SHOVEL, TUBE FINISHER
(CMI AND SIMILAR TYPE), VIBRATORY COMPACTOR, VIBRO
TAMP, WELL DRILLING MACHINE, WELL POINT, WINCH,
WINCH TRUCK WITH ""A"" FRAME. NOTE: HAZARDOUS
WASTE PREMIUM $2.50 TUNNEL WORK
$1.00 FOOTNOTES: A. PAID
HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY;
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY;
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 44.23 35.40
----------------------------------------------------------------
IRON0009-001 07/01/2025
Rates Fringes
IRONWORKERS: SHEETER (REMAINDER OF COUNTY)..........$ 36.25 33.12
IRONWORKERS: IRONWORKER (REMAINDER OF COUNTY).......$ 36.25 33.12
----------------------------------------------------------------
IRON0033-011 07/01/2025
Rates Fringes
IRONWORKERS:: SHEETER (TOWNSHIPS OF BARRE, CARLTON,
CLARENDON, GAINES KENDALL AND MURRAY)...............$ 36.00 30.80
IRONWORKERS: ORNAMENTAL, REINFORCING STONE
DERRICKMAN, RIGGER, RODMAN, STRUCTURAL, MACHINERY
MOVERS, FENCE ERECTORS, PRECAST CONCRETE ERECTOR
(TOWNSHIPS OF BARRE, CARLTON, CLARENDON, GAINES
KENDALL AND MURRAY).................................$ 35.75 30.80
----------------------------------------------------------------
LABO0435-004 07/01/2024
Rates Fringes
LABORERS: GROUP 5 (HEAVY/HIGHWAY) HAZARDOUS WASTE
REMOVAL FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED
THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND
THE WORKING DAY AFTER THE HOLIDAY...................$ 35.44 25.30
LABORERS: GROUP 4 (HEAVY/HIGHWAY) BLASTERS
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 34.69 25.30
LABORERS: GROUP 3 (HEAVY/HIGHWAY) RAKERS, DRILLERS,
PIPELAYERS, AND TORCH OPERATORS FOOTNOTES: A.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 33.86 25.30
LABORERS: GROUP 2 (HEAVY/HIGHWAY) LABORERS
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 33.66 25.30
LABORERS: GROUP 1 (HEAVY/HIGHWAY) FLAGGERS
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 32.96 25.30
----------------------------------------------------------------
PAIN0004-003 05/01/2025
Rates Fringes
PAINTER: BRUSH & ROLLER.............................$ 33.00 28.21
PAINTER (WALLCOVERING)..............................$ 33.00 28.21
PAINTER (DRYWALL/TAPING)............................$ 34.00 28.51
----------------------------------------------------------------
PAIN0004-013 05/01/2025
Rates Fringes
GLAZIER.............................................$ 34.68 27.64
----------------------------------------------------------------
PLUM0013-003 05/06/2025
Rates Fringes
PLUMBER AND STEAMFITTER (TOWNSHIPS OF ALBION,
BARRE, CARLTON, CLARENDON, GAINES, KENDALL AND
MURRAY).............................................$ 42.68 27.88
----------------------------------------------------------------
PLUM0022-006 04/29/2024
Rates Fringes
PLUMBER AND STEAMFITTER: (ZONE 1)..................$ 42.20 29.80
----------------------------------------------------------------
ROOF0074-002 06/01/2024
Rates Fringes
ROOFERS: SLATE & TILE...............................$ 35.11 26.03
ROOFERS: COMPOSITION................................$ 34.96 26.03
----------------------------------------------------------------
SFNY0669-001 01/01/2026
Rates Fringes
SPRINKLER FITTER....................................$ 47.85 28.94
----------------------------------------------------------------
SHEE0071-002 05/27/2024
Rates Fringes
SHEET METAL WORKER..................................$ 39.50 29.18
----------------------------------------------------------------
TEAM0118-003 07/01/2025
Rates Fringes
TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK
DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED
EQUIPMENT SHERE NOT SELF-LOADED. HAZARDOUS WASTE
SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL
DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY;
CHRISTMAS DAY .....................................$ 31.79 27.77
TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING
EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY
EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS)
CARRIER; SELF-CONTAINED CONCRETE UNIT. HAZARDOUS
WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER
HOUR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY;
MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY;
THANKSGIVING DAY; CHRISTMAS DAY.....................$ 31.64 27.77
TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY
TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER
TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC;
FUEL TRUCK. HAZARDOUS WASTE SITE WORK RECEIVES AN
ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.49 27.77
TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCK;
MECHANICS. HAZARDOUS WASTE SITE WORK RECEIVES AN
ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.44 27.77
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS;
FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE
AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS;
TRUCK TIREMAN. HAZARDOUS WASTE SITE WORK RECEIVES
AN ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.39 27.77
----------------------------------------------------------------
TEAM0449-001 07/01/2025
Rates Fringes
TRUCK DRIVERS: ((GENESEE COUNTY: TOWNSHIPS OF
ALABAMA, PEMBROKE, AND DARIEN) (ORLEANS COUNTY:
TOWNSHIPS OF YATES, RIDGEWAY, AND SHELBY) (WYOMING
COUNTY: TOWNSHIPS OF BENNINGTON, SHELDON, JAVA, AND
ARCADE))............................................$ 49.23 8.75
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to
the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at
least $13.65 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the
contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""""SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The """"SU"""" identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The """"SA"""" identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the ?SA? identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"