Prevailing Wage Index
HomePrevailing wage by stateNew YorkDeterminations › NY20260041

Wage determination NY20260041

Highway construction - New York, revision 1, modified 2026-05-18

Verify against the official document: this page mirrors WD NY20260041 revision 1 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

BRNY0003-007 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER: CEMENT MASONS (ROCHESTER CHAPTER)$38.6325.05

CARP0276-009 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
CARPENTERS, INCLUDING DRYWALL HANGING (TOWNSHIPS OF GENESEE FALLS, CASTILE, PERRY, WARSAW, GAINSVILLE AND PIKE)$41.1929.81

CARP0276-012 (collectively bargained (union) rate, 07/01/2019)

ClassificationBase rateFringes
MILLWRIGHT (WYOMING COUNTY (TOWNSHIPS OF ARCADE, ATTICA, BENNINGTON, COVINGTON, EAGLES, JAVA, MIDDLEBURY, ORANGEVILLE, SHELDON, WETHERFIELD))$34.6026.35
CARPENTER (WYOMING COUNTY (TOWNSHIPS OF ARCADE, ATTICA, BENNINGTON, COVINGTON, EAGLES, JAVA, MIDDLEBURY, ORANGEVILLE, SHELDON, WETHERFIELD))$41.1929.81

CARP0276-012 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
MILLWRIGHT (WYOMING COUNTY (TOWNSHIPS OF ARCADE, ATTICA, BENNINGTON, COVINGTON, EAGLES, JAVA, MIDDLEBURY, ORANGEVILLE, SHELDON, WETHERFIELD))$34.6026.35
CARPENTER (WYOMING COUNTY (TOWNSHIPS OF ARCADE, ATTICA, BENNINGTON, COVINGTON, EAGLES, JAVA, MIDDLEBURY, ORANGEVILLE, SHELDON, WETHERFIELD))$41.1929.81

CARP1163-002 (collectively bargained (union) rate, 07/01/2014)

ClassificationBase rateFringes
CARPENTERS: (PILEDRIVERS)$29.0018.89

ELEC0041-001 (collectively bargained (union) rate, 04/01/2014)

ClassificationBase rateFringes
CABLE SPLICER (TOWNSHIPS OF ARCADE, ATTICA, BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON WETHERFIELD)$36.7323.39
ELECTRICIAN (TOWNSHIPS OF ARCADE, ATTICA, BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON WETHERFIELD)$44.5036.06

ELEC0041-001 (collectively bargained (union) rate, 05/26/2025)

ClassificationBase rateFringes
CABLE SPLICER (TOWNSHIPS OF ARCADE, ATTICA, BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON WETHERFIELD)$36.7323.39
ELECTRICIAN (TOWNSHIPS OF ARCADE, ATTICA, BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON WETHERFIELD)$44.5036.06

ELEC0041-002 (collectively bargained (union) rate, 05/26/2025)

ClassificationBase rateFringes
COMMUNICATIONS SYSTEM (SOUND WIREMAN) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE $44.5036.05
COMMUNICATIONS SYSTEM (MASTER TECHNICIAN) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTS$44.5036.05
COMMUNICATIONS SYSTEM (INSTALLER) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLAN$22.9021.38
COMMUNICATIONS SYSTEM (CABLER) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, $14.2014.02

ELEC0086-004 (collectively bargained (union) rate, 05/26/2025)

ClassificationBase rateFringes
ELECTRICIAN (REMAINDER OF COUNTY)$44.3030.20

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99

ENGI0017-006 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MEACHANIC NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDE$48.4636.89
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 400 TONS & OVER NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-IND$52.6436.89
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 200 - 399 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDE$52.1436.89
POWER EQUIPMENT OPERATORS: GROUP 4 CRANES 61 - 199 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEP$51.6436.89
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES 5 - 60 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPEN$50.6436.89
POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 OR LESS), COMPRESSORS: (ANY $42.8936.89
POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER, AUTOMATIC F$47.3936.89

IRON0006-004 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
IRONWORKERS: STRUCTURAL, ORNAMENTAL, REINFORCING STEEL, WELDERS, RIGGERS, RODMAN (TOWNSHIPS OF BENNINGTON, SHELDON, JAVA, ARCADE, ATTICA, ORANGEVILLE, WETHERSFIELD, EAGLE, WARSAW, $35.4932.30
IRONWORKERS: FENCE ERECTOR (TOWNSHIPS OF BENNINGTON, SHELDON, JAVA, ARCADE, ATTICA, ORANGEVILLE, WETHERSFIELD, EAGLE, WARSAW, GAINSVILLE, PIKE)$34.0630.80

IRON0033-006 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKERS: SHEETER (WYOMING COUNTY (TWPS. CASTILE, COVINGTON, MIDDLEBURY, PERRY))$36.0030.80
IRONWORKERS: ORNAMENTAL, REINFORCING STONE DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY MOVERS FENCE ERECTORS, PRECAST CONCRETE ERECTOR (WYOMING COUNTY (TWPS. CASTILE, COVINGTO$35.7530.80

LABO0435-005 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
LABORERS: GROUP 5 HAZARDOUS WASTE REMOVAL FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE E$35.4425.30
LABORERS: GROUP 4 BLASTERS FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WOR$34.6925.30
LABORERS: GROUP 3 RAKERS, DRILLERS, PIPELAYERS, AND TORCH OPERATORS FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHR$33.8625.30
LABORERS: GROUP 2 LABORERS FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WOR$33.6625.30
LABORERS: GROUP 1 FLAGGERS FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WOR$32.9625.30

PAIN0004-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PAINTER: BRUSH & ROLLER$33.0028.21
PAINTER (WALLCOVERING)$33.0028.21
PAINTER (DRYWALL/TAPING)$34.0028.51

PAIN0004-013 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$34.6827.64

PLUM0022-003 (collectively bargained (union) rate, 04/29/2024)

ClassificationBase rateFringes
STEAMFITTER (ZONE 1)$42.2029.80
PIPEFITTER (ZONE 1)$42.2029.80

ROOF0074-002 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
ROOFERS: SLATE & TILE$35.1126.03
ROOFERS: COMPOSITION$34.9626.03

SHEE0071-002 (collectively bargained (union) rate, 05/27/2024)

ClassificationBase rateFringes
SHEET METAL WORKER$39.5029.18

TEAM0118-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT SHERE NOT SELF-LOADED. HAZARDOUS WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 P$31.7927.77
TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE UN$31.6427.77
TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK. HAZARDOUS WASTE SI$31.4927.77
TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCK; MECHANICS. HAZARDOUS WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; IND$31.4427.77
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN. HAZARDOUS WASTE SIT$31.3927.77

TEAM0449-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: ((GENESEE COUNTY: TOWNSHIPS OF ALABAMA, PEMBROKE, AND DARIEN) (ORLEANS COUNTY: TOWNSHIPS OF YATES, RIDGEWAY, AND SHELBY) (WYOMING COUNTY: TOWNSHIPS OF BENNINGTON, SH$49.238.75
Full official text of NY20260041 rev 1
"General Decision Number: NY20260041 05/18/2026


State: New York


Construction Types: Highway


Counties: New York Counties of 
Wyoming




 


Modification Number     Publication Date
          0                01/02/2026
          1                05/18/2026


 BRNY0003-007 07/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER: CEMENT MASONS 
(ROCHESTER CHAPTER).................................$ 38.63                  25.05
----------------------------------------------------------------

 CARP0276-009 07/01/2024
                                                     Rates                  Fringes
CARPENTERS, INCLUDING DRYWALL HANGING (TOWNSHIPS OF 
GENESEE FALLS, CASTILE, PERRY, WARSAW, GAINSVILLE 
AND PIKE)...........................................$ 41.19                  29.81
----------------------------------------------------------------

 CARP0276-012 07/01/2019
                                                     Rates                  Fringes
MILLWRIGHT (WYOMING COUNTY (TOWNSHIPS OF ARCADE, 
ATTICA, BENNINGTON, COVINGTON, EAGLES, JAVA, 
MIDDLEBURY, ORANGEVILLE, SHELDON, WETHERFIELD)).....$ 34.60                  26.35
CARPENTER (WYOMING COUNTY (TOWNSHIPS OF ARCADE, 
ATTICA, BENNINGTON, COVINGTON, EAGLES, JAVA, 
MIDDLEBURY, ORANGEVILLE, SHELDON, WETHERFIELD)).....$ 41.19                  29.81
----------------------------------------------------------------

 CARP0276-012 07/01/2024
                                                     Rates                  Fringes
MILLWRIGHT (WYOMING COUNTY (TOWNSHIPS OF ARCADE, 
ATTICA, BENNINGTON, COVINGTON, EAGLES, JAVA, 
MIDDLEBURY, ORANGEVILLE, SHELDON, WETHERFIELD)).....$ 34.60                  26.35
CARPENTER (WYOMING COUNTY (TOWNSHIPS OF ARCADE, 
ATTICA, BENNINGTON, COVINGTON, EAGLES, JAVA, 
MIDDLEBURY, ORANGEVILLE, SHELDON, WETHERFIELD)).....$ 41.19                  29.81
----------------------------------------------------------------

 CARP1163-002 07/01/2014
                                                     Rates                  Fringes
CARPENTERS: (PILEDRIVERS)...........................$ 29.00                  18.89
----------------------------------------------------------------

 ELEC0041-001 04/01/2014
                                                     Rates                  Fringes
CABLE SPLICER (TOWNSHIPS OF ARCADE, ATTICA, 
BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON 
WETHERFIELD)........................................$ 36.73                  23.39
ELECTRICIAN (TOWNSHIPS OF ARCADE, ATTICA, 
BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON 
WETHERFIELD)........................................$ 44.50                  36.06
----------------------------------------------------------------

 ELEC0041-001 05/26/2025
                                                     Rates                  Fringes
CABLE SPLICER (TOWNSHIPS OF ARCADE, ATTICA, 
BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON 
WETHERFIELD)........................................$ 36.73                  23.39
ELECTRICIAN (TOWNSHIPS OF ARCADE, ATTICA, 
BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON 
WETHERFIELD)........................................$ 44.50                  36.06
----------------------------------------------------------------

 ELEC0041-002 05/26/2025
                                                     Rates                  Fringes
COMMUNICATIONS SYSTEM (SOUND WIREMAN) WORK COVERS 
LOW VOLTAGE CONSTRUCTION, INSTALLATION, 
MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES 
(VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, 
TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, 
TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER 
OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, 
MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA 
NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN 
(INTEGRATED SYSTEMS DIGITAL NETWORK).  ALSO, 
INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, 
INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING 
SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; 
INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND 
CABLING FROM VDT'S TO COMPUTERS.  THIS WORK DOES 
NOT APPLY TO NEW CONSTRUCTION, OR TO THE 
INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE 
ABOVE WORK.    FOOTNOTE:   A. PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, 
CHRISTMAS DAY.......................................$ 44.50                  36.05
COMMUNICATIONS SYSTEM (MASTER TECHNICIAN) WORK 
COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, 
MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES 
(VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, 
TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, 
TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER 
OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, 
MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA 
NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN 
(INTEGRATED SYSTEMS DIGITAL NETWORK).  ALSO, 
INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, 
INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING 
SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; 
INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND 
CABLING FROM VDT'S TO COMPUTERS.  THIS WORK DOES 
NOT APPLY TO NEW CONSTRUCTION, OR TO THE 
INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE 
ABOVE WORK.    FOOTNOTE:   A. PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, 
CHRISTMAS DAY.......................................$ 44.50                  36.05
COMMUNICATIONS SYSTEM (INSTALLER) WORK COVERS LOW 
VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, 
AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND 
VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA 
INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, 
CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND 
EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, 
V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN 
(LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS 
DIGITAL NETWORK).  ALSO, INSTALLATION OF SOUND 
SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, 
STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA 
SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF 
SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM 
VDT'S TO COMPUTERS.  THIS WORK DOES NOT APPLY TO 
NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY 
SYSTEMS AND BOXES FOR THE ABOVE WORK.    FOOTNOTE:  
 A. PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE 
DAY AFTER THANKSGIVING, CHRISTMAS DAY...............$ 22.90                  21.38
COMMUNICATIONS SYSTEM (CABLER) WORK COVERS LOW 
VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, 
AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND 
VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA 
INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, 
CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND 
EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, 
V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN 
(LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS 
DIGITAL NETWORK).  ALSO, INSTALLATION OF SOUND 
SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, 
STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA 
SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF 
SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM 
VDT'S TO COMPUTERS.  THIS WORK DOES NOT APPLY TO 
NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY 
SYSTEMS AND BOXES FOR THE ABOVE WORK.    FOOTNOTE:  
 A. PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE 
DAY AFTER THANKSGIVING, CHRISTMAS DAY...............$ 14.20                  14.02
----------------------------------------------------------------

 ELEC0086-004 05/26/2025
                                                     Rates                  Fringes
ELECTRICIAN (REMAINDER OF COUNTY)...................$ 44.30                  30.20
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
----------------------------------------------------------------

 ENGI0017-006 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MEACHANIC 
 NOTE:    HAZARDOUS WASTE PREMIUM    $2.50          
TUNNEL WORK          $1.00   FOOTNOTES:     A. PAID 
HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; 
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; 
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED 
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 48.46                  36.89
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 400 TONS 
& OVER  NOTE:    HAZARDOUS WASTE PREMIUM    $2.50   
       TUNNEL WORK          $1.00   FOOTNOTES:     
A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; 
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; 
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED 
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 52.64                  36.89
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 200 - 399 
TONS  NOTE:    HAZARDOUS WASTE PREMIUM    $2.50     
     TUNNEL WORK          $1.00   FOOTNOTES:     A. 
PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; 
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; 
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED 
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 52.14                  36.89
POWER EQUIPMENT OPERATORS: GROUP 4 CRANES 61 - 199 
TONS  NOTE:    HAZARDOUS WASTE PREMIUM    $2.50     
     TUNNEL WORK          $1.00   FOOTNOTES:     A. 
PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; 
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; 
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED 
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 51.64                  36.89
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES 5 - 60 
TONS  NOTE:    HAZARDOUS WASTE PREMIUM    $2.50     
     TUNNEL WORK          $1.00   FOOTNOTES:     A. 
PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; 
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; 
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED 
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 50.64                  36.89
POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, 
CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, 
CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 
OR LESS), COMPRESSORS:  (ANY SIZE, BUT SUBJECT TO 
OTHER PROVISIONS FOR COMPRESSORS, DUST COLLECTORS, 
GENERATORS, MECHANICAL HEATERS, PUMPS, WELDING 
MACHINES (FOUR OF ANY TYPE OR COMBINATION), 
CONCRETE MIXER (1/2 CU. YD. AND UNDER), FIREMAN, 
FORM TAMPER, FUEL TRUCK, HEATING BOILER (USED FOR 
TEMPRORY HEAT), JEEP TRENCHER, POWER HEATERMAN, 
POWER PLANT IN EXCESS OF 10 K.W., PUMP (4"" OR 
OVER), REVINIUS WIDENER, STEM CLEANER, STUMP 
CHIPPING MACHINE, WELDING MACHINE (1 MACHINE  VER 
300 AMPS OR 2 OR 3 MACHINES REGARDLESS OF AMPS).  
NOTE:    HAZARDOUS WASTE PREMIUM    $2.50          
TUNNEL WORK          $1.00   FOOTNOTES:     A. PAID 
HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; 
C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; 
F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED 
THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY........$ 42.89                  36.89
POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL 
BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND 
CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT 
SPREADER OR PAVER, AUTOMATIC FINE GRADE MACHINE 
(CMI AND SIMILAR TYPE), ARCHER HOIST, BACKHOE AND 
PULL HOE (TRACTOR MOUNTED AND RUBBER MOUNTED), BACK 
FILLING MACHINE, BELT PLACE (CMI AND SIMILAR), 
BENDING MACHINE (PIPE), BITUMINOUS SPREADER AND 
MIXER, BLACK TOP PLANT (AUTOMATED), BLACK TOP PLANT 
(NON-AUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR 
TRACK MOUNTED), BLOWER FOR BURNING BRUSH, BOILER 
(WHEN USED FOR POWER), BOOM TRUCKS, BORING MACHINE, 
BULLDOZER, CABLEWAY CAGE HOIST, CAISSON AUGER, 
CENTRAL MIX PLANT (AND ALL CONCRETE BATCHING 
PLANTS), CHERRY PICKER (OVER 5 TONS), CHERRY PICKER 
(UNDER 5 TONS), CHIPPING MACHINE AND CHIP SPREADER, 
CONCRETE CURB AND GUTTER MACHINES, CONCRETE CURING 
MACHINE, CONCRETE MIXER (OVER 1/2 CU. YD.) CONCRETE 
PAVEMENT SPREADERS AND FINISHERS, CONCRETE PAVER, 
CONCRETE PUMP, CONCRETE SAW (SELF-PROPELLED), 
CONVEYOR, CORE DRILL, CRANE, CRUSHER, DERRICK 
OPERATOR, DRAGLINE, DREDGE, DRILL RIG (TRACTOR 
MOUNTED), DUAL DRUM PAVER, ELECTRIC PUMP USED IN 
CONJUNCTION WITH WELL POINT SYSTEMS, ELEVATING 
GRADER SELF- PROPELLED OR TOWED), ELEVATOR 
EXCAVATOR (ALL PURPOSE, HYDRAULCALLY OPERATED) FARM 
TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, 
FORKLIFT, FRONT END LOADER, GENERATOR (10 OUTLETS 
OR MORE), GRADALL, GRADER, GROUT OR GUNITE MACHINE, 
HEAD TOWER, HOIST-ONE DRUM, HOISTING ENGINE, 
HYDRAULIC BOOM, HYDRAULIC HAMMER, (SELF PROPELLED), 
HYDRAULIC PIPE JACK MACHINE (OR SIMILAR TYPE 
MACHINE), HYDRAULIC SYSTEM PUMPS, HYDRO CRANE, 
HYDRO HAMMER (OR SIMILAR TYPE), INDUSTRIAL TRACTOR, 
JERSEY SPREADER, KOLMAN PLANT LOADER (AND SIMILAR 
TYPE LOADERS), LOCOMOTIVE, LUBRICATION TRUCK, 
MAINTENANCE ENGINEER, MAINTENANCE LUBRICATION UNIT 
OR TRUCK, MINE HOIST, MIXR FOR STABILIZED BASE 
(SELF-PROPELLED), MONORAIL, MOTORIZED HYDRAULIC PIN 
PULLER, MOTORIZED HYDRAULIC SEEDER MUCKING MACHINE, 
MULCHING MACHINE, MULTIPLE DRUM HOIST (MORE THAN 1 
DRUM IN USE), OVERHEAD CRANE, PEINE CRANE (OR 
SIMILAR TYPE), PILE DRIVER, PLANT ENGINEER, 
PNEUMATIC MIXER, POST HOLE DIGGER, POWER BOOM, PUMP 
CRETE, PUSH OR SNATCH CAT, QUARRY MASTER OR 
EQUIVALENT ROAD WIDENER, ROCK BIT SHARPENER (ALL 
TYPES), ROLLER (ALL), ROLLING MACHIN (PIPE), 
ROTOMILL, SCOOPMOBILE, SHOVEL, SIDE BOOM, SKIMMER, 
SLIP FORM PAVER (CMI AND SIMILAR TYPE, FIRST AND 
SECOND OPERATOR), SNORKEL, STRATO-TOWER, STUMP 
CHIPPING MACHINE, TIRE TRUCK AND REPAIR,  TOWED 
ROLLER, TRACTOR DRAWN BELT TYPE GRADER/LOADER, 
TRACTOR SHOVEL, TRACTOR WITH TOWED ACCESSORIES, 
TRACTORS (WHEN USING WINCH POWER), TRACTORS, 
TRENCHER, TRUCK CRANE, TUNNEL SHOVEL, TUBE FINISHER 
(CMI AND SIMILAR TYPE), VIBRATORY COMPACTOR, VIBRO 
TAMP, WELL DRILLING MACHINE, WELL POINT, WINCH,  
WINCH TRUCK WITH ""A"" FRAME.  NOTE:    HAZARDOUS 
WASTE PREMIUM    $2.50          TUNNEL WORK         
 $1.00   FOOTNOTES:     A. PAID HOLIDAYS: A-NEW 
YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; 
D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, 
PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND 
THE DAY AFTER THE HOLIDAY...........................$ 47.39                  36.89
----------------------------------------------------------------

 IRON0006-004 07/01/2024
                                                     Rates                  Fringes
IRONWORKERS: STRUCTURAL, ORNAMENTAL, REINFORCING 
STEEL, WELDERS, RIGGERS, RODMAN (TOWNSHIPS OF 
BENNINGTON, SHELDON, JAVA,  ARCADE,  ATTICA, 
ORANGEVILLE, WETHERSFIELD, EAGLE, WARSAW, 
GAINSVILLE, PIKE)...................................$ 35.49                  32.30
IRONWORKERS: FENCE ERECTOR (TOWNSHIPS OF 
BENNINGTON, SHELDON, JAVA,  ARCADE,  ATTICA, 
ORANGEVILLE, WETHERSFIELD, EAGLE, WARSAW, 
GAINSVILLE, PIKE)...................................$ 34.06                  30.80
----------------------------------------------------------------

 IRON0033-006 07/01/2025
                                                     Rates                  Fringes
IRONWORKERS: SHEETER (WYOMING COUNTY (TWPS. 
CASTILE, COVINGTON,  MIDDLEBURY, PERRY))............$ 36.00                  30.80
IRONWORKERS: ORNAMENTAL, REINFORCING STONE 
DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY 
MOVERS   FENCE ERECTORS, PRECAST CONCRETE ERECTOR 
(WYOMING COUNTY (TWPS. CASTILE, COVINGTON,  
MIDDLEBURY, PERRY)).................................$ 35.75                  30.80
----------------------------------------------------------------

 LABO0435-005 07/01/2024
                                                     Rates                  Fringes
LABORERS: GROUP 5 HAZARDOUS WASTE REMOVAL  
FOOTNOTES:    A. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 35.44                  25.30
LABORERS: GROUP 4 BLASTERS  FOOTNOTES:    A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 34.69                  25.30
LABORERS: GROUP 3 RAKERS, DRILLERS, PIPELAYERS, AND 
TORCH OPERATORS  FOOTNOTES:    A. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, 
PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY 
BEFORE AND THE WORKING DAY AFTER THE HOLIDAY........$ 33.86                  25.30
LABORERS: GROUP 2 LABORERS  FOOTNOTES:    A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 33.66                  25.30
LABORERS: GROUP 1 FLAGGERS  FOOTNOTES:    A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 32.96                  25.30
----------------------------------------------------------------

 PAIN0004-003 05/01/2025
                                                     Rates                  Fringes
PAINTER: BRUSH & ROLLER.............................$ 33.00                  28.21
PAINTER (WALLCOVERING)..............................$ 33.00                  28.21
PAINTER (DRYWALL/TAPING)............................$ 34.00                  28.51
----------------------------------------------------------------

 PAIN0004-013 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 34.68                  27.64
----------------------------------------------------------------

 PLUM0022-003 04/29/2024
                                                     Rates                  Fringes
STEAMFITTER (ZONE 1)................................$ 42.20                  29.80
PIPEFITTER (ZONE 1).................................$ 42.20                  29.80
----------------------------------------------------------------

 ROOF0074-002 06/01/2024
                                                     Rates                  Fringes
ROOFERS: SLATE & TILE...............................$ 35.11                  26.03
ROOFERS: COMPOSITION................................$ 34.96                  26.03
----------------------------------------------------------------

 SHEE0071-002 05/27/2024
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 39.50                  29.18
----------------------------------------------------------------

 TEAM0118-003 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK 
DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED 
EQUIPMENT SHERE NOT SELF-LOADED.  HAZARDOUS WASTE 
SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR  
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL 
DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY  .....................................$ 31.79                  27.77
TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING 
EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY 
EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) 
CARRIER; SELF-CONTAINED CONCRETE UNIT.  HAZARDOUS 
WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER 
HOUR  FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; 
THANKSGIVING DAY; CHRISTMAS DAY.....................$ 31.64                  27.77
TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY 
TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER 
TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; 
FUEL TRUCK.  HAZARDOUS WASTE SITE WORK RECEIVES AN 
ADDITIONAL $1.50 PER HOUR  FOOTNOTE: A. PAID 
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.49                  27.77
TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCK; 
MECHANICS.  HAZARDOUS WASTE SITE WORK RECEIVES AN 
ADDITIONAL $1.50 PER HOUR  FOOTNOTE: A. PAID 
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.44                  27.77
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; 
FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE 
AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; 
TRUCK TIREMAN.  HAZARDOUS WASTE SITE WORK RECEIVES 
AN ADDITIONAL $1.50 PER HOUR  FOOTNOTE: A. PAID 
HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY.....$ 31.39                  27.77
----------------------------------------------------------------

 TEAM0449-001 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: ((GENESEE COUNTY: TOWNSHIPS OF 
ALABAMA, PEMBROKE, AND DARIEN)  (ORLEANS COUNTY: 
TOWNSHIPS OF YATES, RIDGEWAY, AND SHELBY)  (WYOMING 
COUNTY: TOWNSHIPS OF BENNINGTON, SHELDON, JAVA, AND 
ARCADE))............................................$ 49.23                  8.75
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"

All New York determinations: county index · New York prevailing wage · compute pay with the calculator.