Prevailing Wage Index
HomePrevailing wage by stateNew YorkDeterminations › NY20260042

Wage determination NY20260042

Highway construction - New York, revision 2, modified 2026-05-18

Verify against the official document: this page mirrors WD NY20260042 revision 2 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

BRNY0003-031 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (ITHACA CHAPTER)$38.6325.05

CARP0277-012 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CARPENTER$39.5227.16

ELEC0043-011 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN$50.5035.03

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99

ELEV0062-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PA$58.4438.44

ENGI0158-020 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS$57.2033.40
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMP$58.8533.40
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPL$60.3533.40
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WO$65.5133.40
POWER EQUIPMENT OPERATORS: GROUP 3$51.6933.40
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED)$54.9733.40
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R$55.8533.40

IRON0060-011 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN WELDER, SHEETER, SHEETER BUCKER-UP)$37.1630.68

LABO0785-018 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
LABORER GROUP 1 (HEAVY & HIGHWAY:) LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS$35.5625.60
LABORER (HEAVY & HIGHWAY): GROUP 5 HAZARDOUS WASTE REMOVAL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, P$38.7625.60
LABORER (HEAVY & HIGHWAY): GROUP 4 BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THAN$36.1625.60
LABORER (HEAVY & HIGHWAY): GROUP 3 ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN FOOTNOTE: A. PAID$35.9625.60
LABORER (HEAVY & HIGHWAY): GROUP 2 BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER; MORTAR MIXER; PAV$35.7625.60

PAIN0677-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$30.0027.59

PLUM0112-006 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
PLUMBER: SOUTHERN ZONE (TOWNSHIP OF MARATHON)$44.9133.31

PLUM0267-003 (collectively bargained (union) rate, 05/01/2019)

ClassificationBase rateFringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (REMAINING TOWNSHIPS)$35.5124.57

ROOF0195-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
ROOFER$35.8025.99

SFNY0669-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER$47.8528.94

SHEE0058-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
SHEET METAL WORKER (PROJECTS OVER $10 MILLION)$46.2923.31
SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS)$36.2923.31

TEAM0317-007 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE MOBI$35.8331.58
TRUCK DRIVER GROUP 1 YARDMAN; PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDEMS; BATC$35.4831.58
Full official text of NY20260042 rev 2
"General Decision Number: NY20260042 05/18/2026


State: New York


Construction Types: Highway


Counties: New York Counties of 
Cortland




 


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026


 BRNY0003-031 07/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (ITHACA CHAPTER).....$ 38.63                  25.05
----------------------------------------------------------------

 CARP0277-012 07/01/2025
                                                     Rates                  Fringes
CARPENTER...........................................$ 39.52                  27.16
----------------------------------------------------------------

 ELEC0043-011 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN.........................................$ 50.50                  35.03
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
----------------------------------------------------------------

 ELEV0062-002 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC    FOOTNOTE:    A.VACATION: 
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR 
ALL HOURS WORKED.  8%/OVER 5 YEARS BASED ON REGULAR 
HOURLY RATE FOR ALL HOURS WORKED.     B. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY..............................$ 58.44                  38.44
----------------------------------------------------------------

 ENGI0158-020 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC  
FOOTNOTE:    A.  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 57.20                  33.40
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 49 TONS 
AND BELOW  FOOTNOTE:    A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 58.85                  33.40
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 50 TONS 
AND OVER  FOOTNOTE:    A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 60.35                  33.40
POWER EQUIPMENT OPERATORS: GROUP 4 TOWER CRANES  
FOOTNOTE:    A.  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 65.51                  33.40
POWER EQUIPMENT OPERATORS: GROUP 3..................$ 51.69                  33.40
POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, 
BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS 
RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, 
BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY 
DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, 
CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND 
ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS 
CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), 
CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL 
POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END 
LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION 
ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), 
HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER 
AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT 
OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE 
SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, 
PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE 
DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER 
HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER 
(GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, 
SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, 
RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY 
MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR 
SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE 
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK 
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, 
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER 
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), 
WINCH, WINCH CAT  FOOTNOTE:    A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE 
EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 54.97                  33.40
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB 
MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED 
CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE 
GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER 
TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR 
SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER 
(CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK 
, CABLEWAY, CAISSON AUGER, CENTRAL MIX  CONCRETE 
PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF 
PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY 
PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, 
OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE 
DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, 
DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE 
HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT 
END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER 
(SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), 
HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, 
MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) 
WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, 
PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR 
EQUIVALENT), SCRAPER, FIREMAN, FORK LIFT, FORM 
TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS 
(HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, 
HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER 
(WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE 
OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, 
TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER 
MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL  
FOOTNOTE:    A.  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 55.85                  33.40
----------------------------------------------------------------

 IRON0060-011 07/01/2025
                                                     Rates                  Fringes
IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, 
PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & 
RIGGER, FENCE ERECTOR, STONE DERRICKMAN WELDER, 
SHEETER, SHEETER BUCKER-UP).........................$ 37.16                  30.68
----------------------------------------------------------------

 LABO0785-018 07/01/2024
                                                     Rates                  Fringes
LABORER GROUP 1 (HEAVY & HIGHWAY:) LABORERS; 
FLAGGERS; OUTBOARD AND HAND BOATS...................$ 35.56                  25.60
LABORER (HEAVY & HIGHWAY): GROUP 5 HAZARDOUS WASTE 
REMOVAL  FOOTNOTE:    A.  PAID HOLIDAYS:   NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 38.76                  25.60
LABORER (HEAVY & HIGHWAY): GROUP 4 BLASTERS; FORM 
SETTERS; STONE OR GRANITE CURB SETTERS  FOOTNOTE:   
 A.  PAID HOLIDAYS:   NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 36.16                  25.60
LABORER (HEAVY & HIGHWAY): GROUP 3 ALL ROCK OR 
DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND 
SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT 
RAKER; POWDERMAN  FOOTNOTE:    A.  PAID HOLIDAYS:   
NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; 
LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, 
PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE 
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 35.96                  25.60
LABORER (HEAVY & HIGHWAY): GROUP 2 BULL FLOAT; 
CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE 
BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; 
JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT 
BREAKER; HANDLERS OF ALL STEEL MESH; SMALL 
GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF 
BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE 
ROLLERS; TAMPERS; DRILL DOCTOR; TAIL OR SCREW 
OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATOR 
(1-1/2"" AND SINGLE DIAPHRAM);  NOZZLE (ASPHALT, 
GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON 
CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER 
UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, 
ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING 
LABORERS  FOOTNOTE:    A.  PAID HOLIDAYS:   NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 35.76                  25.60
----------------------------------------------------------------

 PAIN0677-002 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 30.00                  27.59
----------------------------------------------------------------

 PLUM0112-006 05/01/2024
                                                     Rates                  Fringes
PLUMBER: SOUTHERN ZONE (TOWNSHIP OF MARATHON).......$ 44.91                  33.31
----------------------------------------------------------------

 PLUM0267-003 05/01/2019
                                                     Rates                  Fringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC 
WORK (REMAINING TOWNSHIPS)..........................$ 35.51                  24.57
----------------------------------------------------------------

 ROOF0195-001 07/01/2025
                                                     Rates                  Fringes
ROOFER..............................................$ 35.80                  25.99
----------------------------------------------------------------

 SFNY0669-001 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 47.85                  28.94
----------------------------------------------------------------

 SHEE0058-001 05/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER (PROJECTS OVER $10 MILLION)......$ 46.29                  23.31
SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS)....$ 36.29                  23.31
----------------------------------------------------------------

 TEAM0317-007 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER GROUP 2 SPECIALIZED EARTH MOVING 
EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY 
EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) 
CARRIER; SELF-CONTAINED CONCRETE MOBILE UNIT; 
OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE 
EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT 
SELF-LOADED  FOOTNOTE:     A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED 
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE 
HOLIDAY.............................................$ 35.83                  31.58
TRUCK DRIVER GROUP 1 YARDMAN; PICKUPS; PANEL 
TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); 
SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; 
GREASERS; TRUCK TIREMAN, TANDEMS; BATCH TRUCK; 
MECHANICS; SEMI- TRAILORS; LOW-BOY TRUCKS; ASPHALT 
DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND 
DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK 
 FOOTNOTE:     A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED 
EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE 
HOLIDAY.............................................$ 35.48                  31.58
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject 
to the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers 
at least $13.65 per hour (or the applicable wage rate listed on this 
wage determination, if it is higher) for all hours spent performing on 
the contract from May 11, 2026, through December 31, 2026.  The 
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
                a wage determination matter
           d) an initial conformance (additional classification
                and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:
            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.
================================================================
          END OF GENERAL DECISION
"

All New York determinations: county index · New York prevailing wage · compute pay with the calculator.