Prevailing Wage Index
HomePrevailing wage by stateNew YorkDeterminations › NY20260045

Wage determination NY20260045

Building, Heavy, Highway construction - New York, revision 2, modified 2026-05-18

Verify against the official document: this page mirrors WD NY20260045 revision 2 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0030-001 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHE$38.5025.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOP$43.2527.29

ASBE0030-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHE$38.5025.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOP$43.2527.29

BOIL0197-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$43.3427.66

BRNY0003-014 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
MARBLE MASONS, TILE LAYER, TERRAZZO WORKER: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA))$34.3428.46
CEMENT MASONS: HEAVY & HIGHWAY CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA))$38.6325.05
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA C$34.3428.46

BRNY0003-015 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (BINGHAMTON CHAPTER TIOGA COUNTY (TOWNSHIPS OF BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD, PARTS OF CANDOR, NICHOLS $38.6325.05

BRNY0008-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER (HEAVY & HIGHWAY CONSTRUCTION)$38.6325.05
BRICKLAYER (BUILDING CONSTRUCTION MARBLE, TILE AND TERRAZZO FINISHERS)$34.4420.38
BRICKLAYER (BUILDING CONSTRUCTION BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS, TUCKERS)$34.3428.46

CARP0277-011 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
MILLWRIGHT BUILDING CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AF$31.6921.92
CARPENTERS: (HEAVY & HIGHWAY CONSTRUCTION) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND $39.5227.16
CARPENTER BUILDING CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFT$31.6921.92

ELEC0139-008 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (BARTON AND NICHOLS TOWNSHIPS)$43.4031.72

ELEC0241-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (CANDOR AND SPENCER TOWNSHIPS)$44.5031.89

ELEC0325-004 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
ELECTRICIAN (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS)$42.6833.06
CABLE SPLICER (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS)$50.4333.29

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99

ELEV0062-002 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PA$58.4438.44

ENGI0158-007 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCKS OVER 5 TONS BUILDING H$51.7132.80
POWER EQUIPMENT OPERATORS: BUILDING: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPR$46.5432.80
POWER EQUIPMENT OPERATORS: BUILDING: GROUP B BACKHOES (RUBBER TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRA$48.8532.80
POWER EQUIPMENT OPERATORS: BUILDING: GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE, FULL SWING), GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER$49.3132.80

ENGI0158-030 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS: GROUP 3$53.8233.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CH$58.9133.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA$60.3033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY$61.8033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRIS$63.3033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL$56.3933.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT $57.3033.55

IRON0060-006 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN, WELDER, SHEETER, SHEETER BUCKER-UP)$37.1630.68

LABO0785-011 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
LABORERS: HEAVY AND HIGHWAY GROUP 5: HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL D$38.7625.60
LABORERS: HEAVY AND HIGHWAY GROUP 4: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOT$36.1625.60
LABORERS: HEAVY AND HIGHWAY GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN TOWNSHIPS$35.9625.60
LABORERS: HEAVY AND HIGHWAY GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, P$35.7625.60
LABORERS: HEAVY AND HIGHWAY GROUP 1: COMMON LABORERS, FLAGGERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL$35.5625.60
LABORERS: GROUP 3 (BUILDING) ASBESTOS ABATEMENT AND HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLID$28.5022.46
LABORERS: GROUP 2 (BUILDING) MASONARY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT, BLASTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTN$28.5022.46
LABORERS: GROUP 1 (BUILDING) BASIC LABORER TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE D$26.5022.46

LABO0785-019 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
LABORER: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING D$38.7625.60
LABORER: HEAVY & HIGHWAY: GROUP 4: BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE $35.7625.60
LABORER: HEAVY & HIGHWAY: GROUP 3: ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN REMAINDER OF COUN$35.9625.60
LABORER: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER; MORTAR MIXER; PAV$36.1625.60
LABORER: HEAVY & HIGHWAY: GROUP 1: LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR$35.5625.60

PAIN0004-032 (collectively bargained (union) rate, 05/01/2024)

ClassificationBase rateFringes
PAINTERS: (SWING SCAFFOLD, BOATSWAIN CHAIR, SPRAY, SANDBLASTING, STEAM CLEANING, ACID AND HIGH PRESSURE WATER, PAPERHANGERS, VINYL HANGERS, POWER GRINDERS W/RESPIRATOR)$29.1023.83
PAINTERS: (STRUCTURAL STEEL (BUILDINGS) SPRAY WORK).$ 29.10 23.83 PAINTERS: (SPRAY WORK/STEEPLE JACK (OVER 100 FT))$29.5023.83
PAINTERS: (SPRAY EPOXY)$30.0023.83
PAINTERS: (PAINTERS AND TAPERS)$29.9323.83
PAINTERS: (EPOXY-BRUSH & ROLLER)$29.6023.83

PAIN0677-003 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$30.0031.95

PLUM0112-007 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF NEWARK VALLEY AND OWEGO)$44.9133.31

PLUM0267-005 (collectively bargained (union) rate, 05/01/2019)

ClassificationBase rateFringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (THE TOWNS OF BARTON, BERKSHIRE, CANDOR, NICHOLS, RICHFORD, SPENCER AND TIOGA)$35.5124.57

ROOF0203-001 (collectively bargained (union) rate, 06/01/2023)

ClassificationBase rateFringes
ROOFER$30.5019.84

SFNY0669-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER$47.8528.94

SHEE0112-004 (collectively bargained (union) rate, 05/01/2023)

ClassificationBase rateFringes
SHEET METAL WORKER$35.9420.89

TEAM0529-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI $26.5215.91
TRUCK DRIVER GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTE$26.0315.91
TRUCK DRIVER GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) FOOTNOTES: A. PAID HOLIDAYS: NEW Y$25.9615.91
Full official text of NY20260045 rev 2
"General Decision Number: NY20260045 05/18/2026


State: New York


Construction Types: Building, Heavy and Highway


Counties: New York Counties of 
Tioga




Building Construction Projects

Heavy Construction Projects

Highway Construction Projects


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026


 ASBE0030-001 05/01/2023
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK:  DUTIES 
LIMITED TO PREPARATION, WETTING, STRIPPING, 
REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND 
DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY 
CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM).....$ 38.50                  25.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF 
ALL  MATERIALS, PROTECTIVE COVERINGS, COATINGS AND 
FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS.  
ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO 
OPENINGS AND PENETRATIONS IN WALLS, FLOORS, 
CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)....$ 43.25                  27.29
----------------------------------------------------------------

 ASBE0030-001 05/01/2025
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK:  DUTIES 
LIMITED TO PREPARATION, WETTING, STRIPPING, 
REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND 
DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY 
CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM).....$ 38.50                  25.04
ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF 
ALL  MATERIALS, PROTECTIVE COVERINGS, COATINGS AND 
FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS.  
ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO 
OPENINGS AND PENETRATIONS IN WALLS, FLOORS, 
CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)....$ 43.25                  27.29
----------------------------------------------------------------

 BOIL0197-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 43.34                  27.66
----------------------------------------------------------------

 BRNY0003-014 07/01/2025
                                                     Rates                  Fringes
MARBLE MASONS, TILE LAYER, TERRAZZO WORKER: 
BUILDING CONSTRUCTION (CORNING CHAPTER  TIOGA 
COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF 
NICHOLS AND TIOGA)).................................$ 34.34                  28.46
CEMENT MASONS: HEAVY & HIGHWAY CONSTRUCTION 
(CORNING CHAPTER  TIOGA COUNTY (TOWNSHIPS OF 
BARTON, SPENCER AND PART OF NICHOLS AND TIOGA)).....$ 38.63                  25.05
BRICKLAYERS, CEMENT MASONS,  PLASTERERS, STONE 
MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE 
MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING 
CONSTRUCTION (CORNING CHAPTER  TIOGA COUNTY 
(TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS 
AND TIOGA)).........................................$ 34.34                  28.46
----------------------------------------------------------------

 BRNY0003-015 07/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY 
CONSTRUCTION (BINGHAMTON CHAPTER    TIOGA COUNTY 
(TOWNSHIPS OF BERKSHIRE, NEWARK VALLEY, OWEGO, 
RICHFORD, PARTS OF CANDOR, NICHOLS AND TIOGA))......$ 38.63                  25.05
----------------------------------------------------------------

 BRNY0008-003 07/01/2025
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER (HEAVY & HIGHWAY 
CONSTRUCTION).......................................$ 38.63                  25.05
BRICKLAYER (BUILDING CONSTRUCTION  MARBLE, TILE AND 
TERRAZZO FINISHERS).................................$ 34.44                  20.38
BRICKLAYER (BUILDING CONSTRUCTION  BRICKLAYERS, 
CEMENT MASONS, PLASTERERS, STONE MASONS, TILE 
SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, 
CAULKERS, TUCKERS)..................................$ 34.34                  28.46
----------------------------------------------------------------

 CARP0277-011 07/01/2025
                                                     Rates                  Fringes
MILLWRIGHT BUILDING CONSTRUCTION   FOOTNOTE: A.   
PAID HOLIDAYS:  MEMORIAL DAY, JULY THE 4TH, LABOR 
DAY,   THANKGIVING DAY (PROVIDED THE EMPLOYEE IS 
EMPLOYED (1)   DAY BEFORE AND (1) DAY AFTER THE 
HOLIDAY.............................................$ 31.69                  21.92
CARPENTERS: (HEAVY & HIGHWAY CONSTRUCTION)   
FOOTNOTE: A.   PAID HOLIDAYS:  MEMORIAL DAY, JULY 
THE 4TH, LABOR DAY,   THANKGIVING DAY (PROVIDED THE 
EMPLOYEE IS EMPLOYED (1)   DAY BEFORE AND (1) DAY 
AFTER THE HOLIDAY...................................$ 39.52                  27.16
CARPENTER BUILDING CONSTRUCTION    FOOTNOTE: A.   
PAID HOLIDAYS:  MEMORIAL DAY, JULY THE 4TH, LABOR 
DAY,   THANKGIVING DAY (PROVIDED THE EMPLOYEE IS 
EMPLOYED (1)   DAY BEFORE AND (1) DAY AFTER THE 
HOLIDAY.............................................$ 31.69                  21.92
----------------------------------------------------------------

 ELEC0139-008 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (BARTON AND NICHOLS TOWNSHIPS)..........$ 43.40                  31.72
----------------------------------------------------------------

 ELEC0241-001 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (CANDOR AND SPENCER TOWNSHIPS)..........$ 44.50                  31.89
----------------------------------------------------------------

 ELEC0325-004 06/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (BERKSHIRE, NEWARK VALLEY, OWEGO, 
RICHFORD AND TIOGA TOWNSHIPS).......................$ 42.68                  33.06
CABLE SPLICER (BERKSHIRE, NEWARK VALLEY, OWEGO, 
RICHFORD AND TIOGA TOWNSHIPS).......................$ 50.43                  33.29
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
----------------------------------------------------------------

 ELEV0062-002 01/01/2025
                                                     Rates                  Fringes
ELEVATOR MECHANIC    FOOTNOTE:    A.VACATION: 
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR 
ALL HOURS WORKED.  8%/OVER 5 YEARS BASED ON REGULAR 
HOURLY RATE FOR ALL HOURS WORKED.     B. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY..............................$ 58.44                  38.44
----------------------------------------------------------------

 ENGI0158-007 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP A(1)  CRANE, 
HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, 
PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, 
BOOM TRUCKS OVER 5 TONS    BUILDING    HAZARDOUS 
WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH 
LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. 
   FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY.         ...........$ 51.71                  32.80
POWER EQUIPMENT OPERATORS: BUILDING: GROUP C FORK 
LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND 
HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, 
PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST 
COLLECTOR, SELDING MACHINE, WELL POINT, MECHANICAL 
HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, 
CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND 
OVER, MURPHY TYPE DISEL GENERATOR, CONVEYOR, 
ELEVATORS, CONCRETE MIXER AND BELTCRETE POWER PACK 
(BELCRETE SYSTEM SEEDING AND MULCHING MACHINES 
PUMPS.  HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS 
ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR 
OVER REGULAR RATE.  FOOTNOTE:    A.  PAID HOLIDAYS: 
 NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY..........$ 46.54                  32.80
POWER EQUIPMENT OPERATORS: BUILDING: GROUP B 
BACKHOES (RUBBER TIRED BACKHOE/LOADER COMBINATION), 
BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, 
LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, 
BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, 
SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, 
SIDE BOOMS, HYDRO HAMMER, CONCRETE SPREADER, 
CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER 
HOISTING (SINGLE DRUM), HOIST TWO DRUM OR MORE, 
THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND 
OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM 
SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORE 
AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, 
MODEL CHB VIBROTAMP OR SIMILAR MACHINE, BATCH BIN 
AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER 
LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER.  
HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE 
INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER 
REGULAR RATE.  FOOTNOTE:    A.  PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY................$ 48.85                  32.80
POWER EQUIPMENT OPERATORS: BUILDING: GROUP A 
SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE, FULL 
SWING), GRADALLS, POWER ROAD GRADER ALL CMI 
EQUIPMENT, FRONT-END RUBBER TIRE LOADER, 
TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING 
MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, 
BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT, 
TRACTOR ROAD PAVER, BOOM TRUCKS 5 TONS AND UNDER, 
MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER 
DRILL-HYDRAULIC ROCK DRILL.  HAZARDOUS WORK- 
ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL 
C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE.  
FOOTNOTE:    A.  PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY.....................$ 49.31                  32.80
----------------------------------------------------------------

 ENGI0158-030 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 3..................$ 53.82                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
7 MASTER MECHANIC  FOOTNOTE:   A. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 58.91                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
6 CRANES 49 TONS AND BELOW  FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 60.30                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
5 CRANES 50 TONS AND OVER  FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 61.80                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
4 TOWER CRANES  FOOTNOTE:   A. PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY............$ 63.30                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER 
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS 
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), 
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), 
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT 
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, 
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE 
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, 
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR 
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), 
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER 
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, 
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, 
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR 
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, 
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), 
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER 
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, 
REVINIUS WIDENER, ROLLER (GRADE AND FILL), 
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER 
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM 
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE 
PLANT REFRIGERATION EQUIPMENT (FOR SOIL 
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE 
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK 
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, 
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER 
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), 
WINCH, WINCH CAT  FOOTNOTE:   A. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 56.39                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, 
AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC 
FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, 
RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 
212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT 
PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM 
TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX  
CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, 
SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, 
CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, 
OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE 
DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, 
DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE 
HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT 
END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER 
(SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), 
HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, 
MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) 
WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, 
PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR 
EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT 
PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC 
SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC 
PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), 
MULCHING MACHINE, OILER, PARAPET CONCRETE OR 
PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, 
TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER 
MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL  
FOOTNOTE:   A. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 57.30                  33.55
----------------------------------------------------------------

 IRON0060-006 07/01/2025
                                                     Rates                  Fringes
IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, 
PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & 
RIGGER, FENCE ERECTOR, STONE DERRICKMAN, WELDER, 
SHEETER, SHEETER BUCKER-UP).........................$ 37.16                  30.68
----------------------------------------------------------------

 LABO0785-011 07/01/2024
                                                     Rates                  Fringes
LABORERS: HEAVY AND HIGHWAY GROUP 5:  HAZARDOUS 
WASTE REMOVAL  TOWNSHIPS OF RICHFORD, BERKSHIRE, 
NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS  
FOOTNOTE    A.  PAID HOLIDAYS:  MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY AND NEW YEAR'S DAY....................$ 38.76                  25.60
LABORERS: HEAVY AND HIGHWAY GROUP 4:  BLASTERS, 
FORM SETTERS, STONE OR GRANITE CURB SETTERS    
TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, 
OWEGO, TIOGA, BARTON AND NICHOLS  FOOTNOTE    A.  
PAID HOLIDAYS:  MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW 
YEAR'S DAY.  .......................................$ 36.16                  25.60
LABORERS: HEAVY AND HIGHWAY GROUP 3:  ALL ROCK OR 
DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER 
AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND 
ASPHALT PAVER, POWERMAN    TOWNSHIPS OF RICHFORD, 
BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND 
NICHOLS  FOOTNOTE    A.  PAID HOLIDAYS:  MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY AND NEW YEAR'S DAY....................$ 35.96                  25.60
LABORERS: HEAVY AND HIGHWAY GROUP 2:  BULL FLOAT, 
CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE 
BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, 
JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT 
BREAKER, HANDLERS OF ALL STEEL MESH, SMALL 
GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF 
BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE 
ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW 
OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 
1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE, 
SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK 
FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, 
PUSHER TYPE CONCRETE SAW AND ALL OPERATOR (1 1/2' 
AND SINGLE DEAPHRAM), NOZZLER (ASPHALT GUNNITE, 
SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK 
FENCE ERECTION, OTHER GAS ELECTRIC, OIL AND AIR 
TOOL OPERATORS, WRECKING LABORERS    TOWNSHIPS OF 
RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, 
BARTON AND NICHOLS  FOOTNOTE    A.  PAID HOLIDAYS:  
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY. 
 ...................................................$ 35.76                  25.60
LABORERS: HEAVY AND HIGHWAY GROUP 1:  COMMON 
LABORERS, FLAGGERS  TOWNSHIPS OF RICHFORD, 
BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND 
NICHOLS  FOOTNOTE    A.  PAID HOLIDAYS:  MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY AND NEW YEAR'S DAY....................$ 35.56                  25.60
LABORERS: GROUP 3 (BUILDING) ASBESTOS ABATEMENT AND 
HAZARDOUS WASTE REMOVAL   TOWNSHIPS OF RICHFORD, 
BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND 
NICHOLS  FOOTNOTE    A.  PAID HOLIDAYS:  MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY AND NEW YEAR'S DAY....................$ 28.50                  22.46
LABORERS: GROUP 2 (BUILDING) MASONARY FORKLIFTS, 
BOB CATS, ROCK DRILLING EQUIPMENT, BLASTERS  
TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, 
OWEGO, TIOGA, BARTON AND NICHOLS  FOOTNOTE    A.  
PAID HOLIDAYS:  MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW 
YEAR'S DAY..........................................$ 28.50                  22.46
LABORERS: GROUP 1 (BUILDING) BASIC LABORER  
TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, 
OWEGO, TIOGA, BARTON AND NICHOLS  FOOTNOTE    A.  
PAID HOLIDAYS:  MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW 
YEAR'S DAY..........................................$ 26.50                  22.46
----------------------------------------------------------------

 LABO0785-019 07/01/2024
                                                     Rates                  Fringes
LABORER: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE 
REMOVAL  REMAINDER OF COUNTY  FOOTNOTE:    A.  PAID 
HOLIDAYS:   NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 38.76                  25.60
LABORER: HEAVY & HIGHWAY: GROUP 4: BLASTERS; FORM 
SETTERS; STONE OR GRANITE CURB SETTERS  REMAINDER 
OF COUNTY  FOOTNOTE:    A.  PAID HOLIDAYS:   NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 35.76                  25.60
LABORER: HEAVY & HIGHWAY: GROUP 3: ALL ROCK OR 
DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND 
SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT 
RAKER; POWDERMAN  REMAINDER OF COUNTY  FOOTNOTE:    
A.  PAID HOLIDAYS:   NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 35.96                  25.60
LABORER: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT; 
CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE 
BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; 
JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT 
BREAKER; HANDLERS OF ALL STEEL MESH; SMALL 
GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF 
BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE 
ROLLERS; TAMPERS; DRILL DOCTOR; TAIL OR SCREW 
OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATOR 
(1-1/2"" AND SINGLE DIAPHRAM);  NOZZLE (ASPHALT, 
GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON 
CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER 
UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, 
ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING 
LABORERS  REMAINDER OF COUNTY  FOOTNOTE:    A.  
PAID HOLIDAYS:   NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 36.16                  25.60
LABORER: HEAVY & HIGHWAY: GROUP 1: LABORERS; 
FLAGGERS; OUTBOARD AND HAND BOATS  REMAINDER OF 
COUNTY  FOOTNOTE:    A.  PAID HOLIDAYS:   NEW 
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR 
DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 35.56                  25.60
----------------------------------------------------------------

 PAIN0004-032 05/01/2024
                                                     Rates                  Fringes
PAINTERS: (SWING SCAFFOLD, BOATSWAIN CHAIR, SPRAY, 
SANDBLASTING, STEAM CLEANING, ACID AND HIGH 
PRESSURE WATER, PAPERHANGERS, VINYL HANGERS, POWER 
GRINDERS W/RESPIRATOR)..............................$ 29.10                  23.83
PAINTERS: (STRUCTURAL STEEL (BUILDINGS) SPRAY WORK).$ 29.10                  23.83
PAINTERS: (SPRAY WORK/STEEPLE JACK (OVER 100 FT))...$ 29.50                  23.83
PAINTERS: (SPRAY EPOXY).............................$ 30.00                  23.83
PAINTERS: (PAINTERS AND TAPERS).....................$ 29.93                  23.83
PAINTERS: (EPOXY-BRUSH & ROLLER)....................$ 29.60                  23.83
----------------------------------------------------------------

 PAIN0677-003 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 30.00                  31.95
----------------------------------------------------------------

 PLUM0112-007 05/01/2025
                                                     Rates                  Fringes
PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF 
NEWARK VALLEY  AND OWEGO)...........................$ 44.91                  33.31
----------------------------------------------------------------

 PLUM0267-005 05/01/2019
                                                     Rates                  Fringes
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC 
WORK (THE TOWNS OF BARTON, BERKSHIRE, CANDOR, 
NICHOLS, RICHFORD,  SPENCER AND TIOGA)..............$ 35.51                  24.57
----------------------------------------------------------------

 ROOF0203-001 06/01/2023
                                                     Rates                  Fringes
ROOFER..............................................$ 30.50                  19.84
----------------------------------------------------------------

 SFNY0669-001 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 47.85                  28.94
----------------------------------------------------------------

 SHEE0112-004 05/01/2023
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 35.94                  20.89
----------------------------------------------------------------

 TEAM0529-001 05/01/2025
                                                     Rates                  Fringes
TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY 
EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 
20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE 
DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; 
ASPHALT DISTRIBUTORS; FUEL TRUCK  FOOTNOTES:    A. 
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 26.52                  15.91
TRUCK DRIVER GROUP 2 DUMP TRUCK (OVER 10 YDS); 
TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 
YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH 
TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND 
VAC TRUCKS; DUMPSTER (TANDEM)  FOOTNOTES:    A. 
PAID HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE 
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE 
HOLIDAY.............................................$ 26.03                  15.91
TRUCK DRIVER GROUP 1 FLAT BED TRUCK (SINGLE AXLE); 
DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY 
TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE)  
FOOTNOTES:    A. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE 
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE 
WORKING DAY AFTER THE HOLIDAY.......................$ 25.96                  15.91
----------------------------------------------------------------

----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).


----------------------------------------------------------------

The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
""""SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The """"SU"""" identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The """"SA"""" identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the ?SA? identifier took
effect under state law in the state from which the rates were
adopted.

-----------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can
be:

           a) a survey underlying a wage determination
           b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination

On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:

            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:

            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:

            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.



================================================================

          END OF GENERAL DECISION"

All New York determinations: county index · New York prevailing wage · compute pay with the calculator.