Wage determination NY20260046

Heavy, Highway construction - New York, revision 3, modified 2026-07-30

Verify against the official document: this page mirrors WD NY20260046 revision 3 (retrieved ) for reference. The determination incorporated into your contract governs - read the official copy at SAM.gov.

Rate schedules

Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).

ASBE0040-001 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL SYSTEMS.)$41.7427.58
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAI$41.7427.58

BOIL0197-001 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
BOILERMAKER$43.3427.66

BRNY0002-001 (collectively bargained (union) rate, 07/01/2016)

ClassificationBase rateFringes
BRICKLAYER, CAULKER, CLEANER, POINTER, STONEMASON & CEMENT MASON (ALBANY CHAPTER) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE E$33.8219.95
MARBLE, TILE & TERRAZZO FINISHER (ALBANY CHAPTER) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. HEAVY AN$25.5916.34
MARBLE, TILE LAYER & TERRAZZO WORKER (ALBANY CHAPTER) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. HEAV$32.5919.05

BRNY0002-001 (collectively bargained (union) rate, 07/01/2018)

ClassificationBase rateFringes
CEMENT MASON/CONCRETE FINISHER, HEAVY & HIGHWAY (ALBANY CHAPTER) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOY$37.2319.51

CARP0291-004 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
CARPENTER (HEAVY AND HIGHWAY CONSTRUCTION)$41.0324.50

ELEC0236-003 (collectively bargained (union) rate, 06/01/2024)

ClassificationBase rateFringes
ELECTRICIAN$48.0032.09

ELEC1249-003 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$31.7229.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$47.5731.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$52.8635.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER$42.2930.66

ELEC1249-004 (collectively bargained (union) rate, 05/05/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G$61.5636.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DA$49.2531.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.1433.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co$64.5942.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit $35.3430.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f$55.4031.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled $61.5636.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.2531.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit$49.2531.15

ELEC1249-008 (collectively bargained (union) rate, 01/01/2025)

ClassificationBase rateFringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR$40.816.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY$20.536.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY,$38.736.93

ENGI0158-003 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADE$54.9333.20
POWER EQUIPMENT OPERATORS (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GR$53.9133.20
POWER EQUIPMENT OPERATORS (BUILDING): GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR CO$51.0133.20
POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) BUILDING $55.4233.20

ENGI0158-031 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT $57.3033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL$56.3933.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRIS$63.3033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY$61.8033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA$60.3033.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CH$58.9133.55
POWER EQUIPMENT OPERATORS: GROUP 3$53.8233.55

IRON0012-009 (collectively bargained (union) rate, 07/01/2024)

ClassificationBase rateFringes
IRONWORKERS: SHEETER (BENSON, HOPE, WELLS TOWNSHIPS)$38.7525.48
IRONWORKERS: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN (BENSON, HOPE, WELLS TOWNSHIPS)$38.5025.48
IRONWORKERS:: SHEETER, BUCKER-UP (BENSON, HOPE, WELLS TOWNSHIPS)$38.7525.48

IRON0440-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF COUNTY)$35.5031.39

LABO0035-007 (collectively bargained (union) rate, 07/01/2017)

ClassificationBase rateFringes
LABORER BUILDING CONSTRUCTION (HAZARDOUS WASTE REMOVAL INCLUDES, WETTING,STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHEATHER THEY$24.0020.64
LABORER BUILDING CONSTRUCTION: ASBESTOS REMOVAL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$24.0020.64
LABORER BUILDING CONSTRUCTION: BLASTERS, FORM SETTERS, MOTOR BUGGY OPERATOR (RIDER TYPE) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDE$23.0020.64
LABORER BUILDING CONSTRUCTION: LABORERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$22.5020.64
LABORER BUILDING CONSTRUCTION: PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER LIFT (WALK BEHIND) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR D$22.6520.64
LABORER BUILDING CONSTRUCTION: WAGON DRILL OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. HEAVY $22.9020.64
LABORER GROUP 1: (HEAVY & HIGHWAY CONSTRUCTION:) COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR $28.0523.74
LABORER GROUP 2: (HEAVY & HIGHWAY CONSTRUCTION:) BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MOR$28.2523.74
LABORER GROUP 3 (HEAVY & HIGHWAY CONSTRUCTION:) ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AMD SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWERM$28.4523.74
LABORER GROUP 4: (HEAVY & HIGHWAY CONSTRUCTION:) BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY $28.6523.74
LABORER GROUP 5: (HEAVY & HIGHWAY CONSTRUCTION:) HAZARDOUS WASTE REMOVAL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND $24.0020.64

PAIN0009-015 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
GLAZIER$37.2533.54

PAIN0201-005 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PAINTERS: LEAD ABATEMENT WORKERS, STRUCTURAL STEEL (ZONE #2)$34.5021.69
PAINTERS: PAINTERS, DRYWALL FINISHERS, SPRAY (ZONE #2)$33.5021.69

PAIN0806-006 (collectively bargained (union) rate, 10/01/2014)

ClassificationBase rateFringes
PAINTERS: (STRUCTURAL STEEL AND BRIDGE)$48.7535.63

PLUM0007-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLUMBER AND STEAMFITTER (TOWNS OF ARIETTA, BENSON, HOPE, INDIAN LAKE, LAKE PLEASANT, MOREHOUSE AND WELLS)$55.2629.12

PLUM0112-002 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLUMBER: NORTHERN ZONE (INLET TOWNSHIP)$45.9333.77

PLUM0773-004 (collectively bargained (union) rate, 05/01/2025)

ClassificationBase rateFringes
PLUMBER AND STEAMFITTER$45.8833.60

ROOF0241-001 (collectively bargained (union) rate, 07/01/2025)

ClassificationBase rateFringes
ROOFER$38.0524.27

SFNY0669-001 (collectively bargained (union) rate, 01/01/2026)

ClassificationBase rateFringes
SPRINKLER FITTER$47.8528.94

SHEE0083-002 (collectively bargained (union) rate, 06/01/2019)

ClassificationBase rateFringes
SHEET METAL WORKER A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THESE HOLIDAYS FALL ON A SATURDAY OR S$33.7333.04

TEAM0317-001 (collectively bargained (union) rate, 06/01/2025)

ClassificationBase rateFringes
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDEMS; BATCH TRUC$35.4831.58
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT- EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRAFFLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE UNI$35.8331.58
Full official text of NY20260046 rev 3
"General Decision Number: NY20260046 07/30/2026


State: New York


Construction Types: Heavy and Highway


Counties: New York Counties of 
Hamilton




Heavy Construction

Highway Construction


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026
          3                07/30/2026


 ASBE0040-001 05/01/2025
                                                     Rates                  Fringes
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF 
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, 
COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL 
SYSTEMS.)...........................................$ 41.74                  27.58
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO 
PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; 
VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION 
MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT 
FROM MECHANICAL SYSTEMS)............................$ 41.74                  27.58
----------------------------------------------------------------

 BOIL0197-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER.........................................$ 43.34                  27.66
----------------------------------------------------------------

 BRNY0002-001 07/01/2016
                                                     Rates                  Fringes
BRICKLAYER, CAULKER, CLEANER, POINTER, STONEMASON & 
CEMENT MASON (ALBANY CHAPTER)   FOOTNOTE: A.   PAID 
HOLIDAYS:  MEMORIAL DAY, JULY THE 4TH, LABOR DAY,   
THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED 
(1)   DAY BEFORE AND (1) DAY AFTER THE HOLIDAY......$ 33.82                  19.95
MARBLE, TILE & TERRAZZO FINISHER (ALBANY CHAPTER)   
FOOTNOTE:  A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY.         HEAVY 
AND HIGHWAY CONSTRUCTION............................$ 25.59                  16.34
MARBLE, TILE LAYER & TERRAZZO WORKER (ALBANY 
CHAPTER)   FOOTNOTE:  A.  PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY.         HEAVY 
AND HIGHWAY CONSTRUCTION............................$ 32.59                  19.05
----------------------------------------------------------------

 BRNY0002-001 07/01/2018
                                                     Rates                  Fringes
CEMENT MASON/CONCRETE FINISHER, HEAVY & HIGHWAY 
(ALBANY CHAPTER)   FOOTNOTE: A.   PAID HOLIDAYS:  
MEMORIAL DAY, JULY THE 4TH, LABOR DAY,   
THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED 
(1)   DAY BEFORE AND (1) DAY AFTER THE HOLIDAY......$ 37.23                  19.51
----------------------------------------------------------------

 CARP0291-004 07/01/2024
                                                     Rates                  Fringes
CARPENTER (HEAVY AND HIGHWAY CONSTRUCTION)..........$ 41.03                  24.50
----------------------------------------------------------------

 ELEC0236-003 06/01/2024
                                                     Rates                  Fringes
ELECTRICIAN.........................................$ 48.00                  32.09
----------------------------------------------------------------

 ELEC1249-003 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS FLAGMAN   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 31.72                  29.87
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN (TRUCK DRIVER)   FOOTNOTE:  A.  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29                  30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER 
UNIT)   FOOTNOTE:  A.  NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57                  31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS LINEMAN & TECHNICIAN   FOOTNOTE:  A.  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86                  35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC 
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION 
SYSTEMS MECHANIC   FOOTNOTE:  A.  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY.........................................$ 42.29                  30.66
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
----------------------------------------------------------------

 ENGI0158-003 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS (BUILDING): GROUP A 
SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL 
SWING), GRADALLS, POWER ROAD GRADER, ALL CMI 
EQUIPMENT, FRONT-END RUBBER TIRE LOADER, 
TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING 
MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, 
BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT 
AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND 
UNDER), MAINTENANCE ENGINEER, SELF CONTAINED 
CRAWLER, DRILL-HYDRAULIC ROCK DRILL.  HAZARDOUS 
WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED 
WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR 
RATE.  FOOTNOTE:   A. PAID HOLIDAYS:  NEW YEARS 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY.....................$ 54.93                  33.20
POWER EQUIPMENT OPERATORS (BUILDING): GROUP B 
BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), 
BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, 
LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, 
BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, 
SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, 
SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, 
CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER 
HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, 
THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND 
OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM 
SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD 
AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, 
MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN 
AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER 
LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER  
HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE 
INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER 
REGULAR RATE.  FOOTNOTE:   A. PAID HOLIDAYS:  NEW 
YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY................$ 53.91                  33.20
POWER EQUIPMENT OPERATORS (BUILDING): GROUP C FORK 
LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- 
DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, 
VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST 
COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL 
HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, 
CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND 
OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, 
ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK 
(BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, 
PUMPS  HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS 
ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR 
OVER REGULAR RATE.  FOOTNOTE:   A. PAID HOLIDAYS:  
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY..........$ 51.01                  33.20
POWER EQUIPMENT OPERATORS: GROUP A(1)  CRANE, 
HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, 
PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, 
BOOM TRUCK (OVER 5 TONS)      BUILDING    HAZARDOUS 
WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED 
WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR 
RATE.    FOOTNOTE:   A. PAID HOLIDAYS:  NEW YEARS 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY.  ..................$ 55.42                  33.20
----------------------------------------------------------------

 ENGI0158-031 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, 
AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC 
FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, 
RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 
212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT 
PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM 
TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX  
CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, 
SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, 
CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, 
OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE 
DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, 
DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE 
HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT 
END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER 
(SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), 
HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, 
MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) 
WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, 
PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR 
EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT 
PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC 
SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC 
PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), 
MULCHING MACHINE, OILER, PARAPET CONCRETE OR 
PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, 
TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER 
MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR 
(MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL  
FOOTNOTE:   A. PAID HOLIDAYS:  NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 57.30                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER 
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS 
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), 
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), 
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT 
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, 
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE 
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, 
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR 
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), 
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER 
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, 
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, 
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR 
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, 
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), 
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER 
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, 
REVINIUS WIDENER, ROLLER (GRADE AND FILL), 
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER 
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM 
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE 
PLANT REFRIGERATION EQUIPMENT (FOR SOIL 
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE 
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK 
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, 
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER 
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), 
WINCH, WINCH CAT  FOOTNOTE:   A. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 56.39                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
4 TOWER CRANES  FOOTNOTE:   A. PAID HOLIDAYS:  NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, AND CHRISTMAS DAY............$ 63.30                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
5 CRANES 50 TONS AND OVER  FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 61.80                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
6 CRANES 49 TONS AND BELOW  FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND 
CHRISTMAS DAY.......................................$ 60.30                  33.55
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 
7 MASTER MECHANIC  FOOTNOTE:   A. PAID HOLIDAYS:  
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 58.91                  33.55
POWER EQUIPMENT OPERATORS: GROUP 3..................$ 53.82                  33.55
----------------------------------------------------------------

 IRON0012-009 07/01/2024
                                                     Rates                  Fringes
IRONWORKERS: SHEETER (BENSON, HOPE, WELLS 
TOWNSHIPS)..........................................$ 38.75                  25.48
IRONWORKERS: STRUCTURAL, ORNAMENTAL, RODMAN, 
MACHINERY MOVER, RIGGER, FENCE ERECTOR, 
REINFORCING, STONE DERRICKMEN (BENSON, HOPE, WELLS 
TOWNSHIPS)..........................................$ 38.50                  25.48
IRONWORKERS:: SHEETER, BUCKER-UP (BENSON, HOPE, 
WELLS TOWNSHIPS)....................................$ 38.75                  25.48
----------------------------------------------------------------

 IRON0440-001 07/01/2025
                                                     Rates                  Fringes
IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, 
MACHINERY MOVER, RIGGER, FENCE ERECTOR, 
REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF 
COUNTY).............................................$ 35.50                  31.39
----------------------------------------------------------------

 LABO0035-007 07/01/2017
                                                     Rates                  Fringes
LABORER BUILDING CONSTRUCTION (HAZARDOUS WASTE 
REMOVAL INCLUDES, WETTING,STRIPPING, REMOVAL, 
SCRAPPING, VACCUUMING, BAGGING AND DISPOSING   OF 
ALL INSULATION MATERIALS, WHEATHER   THEY CONTAIN 
ASBESTOS OR NOT, FROM   MECHANICAL SYSTEMS)   
FOOTNOTE:  A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 24.00                  20.64
LABORER BUILDING CONSTRUCTION: ASBESTOS REMOVAL   
FOOTNOTE:  A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 24.00                  20.64
LABORER BUILDING CONSTRUCTION: BLASTERS, FORM 
SETTERS, MOTOR BUGGY OPERATOR (RIDER TYPE)   
FOOTNOTE: A.   PAID HOLIDAYS:  MEMORIAL DAY, JULY 
THE 4TH, LABOR DAY,   THANKGIVING DAY (PROVIDED THE 
EMPLOYEE IS EMPLOYED (1)   DAY BEFORE AND (1) DAY 
AFTER THE HOLIDAY.).................................$ 23.00                  20.64
LABORER BUILDING CONSTRUCTION: LABORERS FOOTNOTE:  
A.  PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 22.50                  20.64
LABORER BUILDING CONSTRUCTION: PIPELAYERS, MOTOR 
MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER 
LIFT (WALK BEHIND) FOOTNOTE: A.   PAID HOLIDAYS:  
MEMORIAL DAY, JULY THE 4TH, LABOR DAY,   
THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED 
(1)   DAY BEFORE AND (1) DAY AFTER THE HOLIDAY......$ 22.65                  20.64
LABORER BUILDING CONSTRUCTION: WAGON DRILL OPERATOR 
  FOOTNOTE:  A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY.         HEAVY 
AND HIGHWAY CONSTRUCTION............................$ 22.90                  20.64
LABORER GROUP 1: (HEAVY & HIGHWAY CONSTRUCTION:) 
COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS  
FOOTNOTE:  A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 28.05                  23.74
LABORER GROUP 2: (HEAVY & HIGHWAY CONSTRUCTION:) 
BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, 
CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE 
VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, 
PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL 
GENERATORS FOR LABORERS'S TOOLS, INSTALLATION OF 
BRIDGE DRAINAGE; PIPELAYERS, VIBRATOR TYPE ROLLERS, 
TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON 
ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND 
SINGLE DIAPHRAM),          NOZZLE (APHLAT, GUNNITE, 
SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK 
FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, 
PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, 
ELECTRIC, OIL, AND AIR TOOL OPERATORS,  WRECKING 
LABORERS  FOOTNOTE:  A.  PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 28.25                  23.74
LABORER GROUP 3 (HEAVY & HIGHWAY CONSTRUCTION:) ALL 
ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY 
MASTER AMD SIMILAR TYPE), ACETYLENE TORCH 
OPERATORS, AND ASPHALT PAVER, POWERMAN  FOOTNOTE:  
A.  PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 28.45                  23.74
LABORER GROUP 4: (HEAVY & HIGHWAY CONSTRUCTION:) 
BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB 
SETTERS  FOOTNOTE:  A.  PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 28.65                  23.74
LABORER GROUP 5: (HEAVY & HIGHWAY CONSTRUCTION:) 
HAZARDOUS WASTE REMOVAL  FOOTNOTE:  A.  PAID 
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 24.00                  20.64
----------------------------------------------------------------

 PAIN0009-015 05/01/2025
                                                     Rates                  Fringes
GLAZIER.............................................$ 37.25                  33.54
----------------------------------------------------------------

 PAIN0201-005 05/01/2025
                                                     Rates                  Fringes
PAINTERS: LEAD ABATEMENT WORKERS, STRUCTURAL STEEL 
(ZONE #2)...........................................$ 34.50                  21.69
PAINTERS: PAINTERS, DRYWALL FINISHERS, SPRAY (ZONE 
#2).................................................$ 33.50                  21.69
----------------------------------------------------------------

 PAIN0806-006 10/01/2014
                                                     Rates                  Fringes
PAINTERS: (STRUCTURAL STEEL AND BRIDGE).............$ 48.75                  35.63
----------------------------------------------------------------

 PLUM0007-002 05/01/2025
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER (TOWNS OF ARIETTA, BENSON, 
HOPE,  INDIAN LAKE, LAKE PLEASANT,  MOREHOUSE AND 
WELLS)..............................................$ 55.26                  29.12
----------------------------------------------------------------

 PLUM0112-002 05/01/2025
                                                     Rates                  Fringes
PLUMBER: NORTHERN ZONE (INLET TOWNSHIP).............$ 45.93                  33.77
----------------------------------------------------------------

 PLUM0773-004 05/01/2025
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER.............................$ 45.88                  33.60
----------------------------------------------------------------

 ROOF0241-001 07/01/2025
                                                     Rates                  Fringes
ROOFER..............................................$ 38.05                  24.27
----------------------------------------------------------------

 SFNY0669-001 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 47.85                  28.94
----------------------------------------------------------------

 SHEE0083-002 06/01/2019
                                                     Rates                  Fringes
SHEET METAL WORKER   A. PAID HOLIDAYS:  NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY.  IF ANY OF 
THESE HOLIDAYS FALL ON A SATURDAY OR SUNDAY, EITHER 
THE PRECEDING FRIDAY OR FOLLOWING MONDAY WILL BE 
OBSERVED AS THE HOLIDAY.............................$ 33.73                  33.04
----------------------------------------------------------------

 TEAM0317-001 06/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; 
FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE 
AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; 
TRUCK TIREMAN, TANDEMS; BATCH TRUCK; MECHANICS; 
SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR 
TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE 
VEHICLES; TRUCK MECHANIC, FUEL TRUCK  FOOTNOTE: A. 
PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY.......................................$ 35.48                  31.58
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING 
EQUIPMENT- EUCLID TYPE OR SIMILAR OFF-HIGHWAY 
EQUIPMENT, WHERE NOT SELF-LOADED; STRAFFLE (ROSS) 
CARRIER; SELF-CONTAINED CONCRETE UNIT, OFF-HIGHWAY 
TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE 
HITCHED EQUIPMENT SHERE NOT SELF LOADED.  FOOTNOTE: 
A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; 
CHRISTMAS DAY.......................................$ 35.83                  31.58
----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.

================================================================

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017.  If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking.  Additional information
on contractor requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to 
the Davis-Bacon Act that were awarded on or between January 1, 
2015 and January 29, 2022, and that have not been renewed or 
extended on or after January 30, 2022. Executive Order 13658 does 
not apply to contracts subject only to the Davis-Bacon Related Acts 
regardless of when they were awarded. If a contract is subject to 
Executive Order 13658, the contractor must pay all covered workers at 
least $13.65 per hour (or the applicable wage rate listed on this wage 
determination, if it is higher) for all hours spent performing on the 
contract from May 11, 2026, through December 31, 2026.  The applicable 
Executive Order minimum wage rate will be adjusted annually.   
Additional information on contractor requirements and worker 
protections under Executive Order 13658 is available at 
www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).


----------------------------------------------------------------

The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.

Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h).  Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the SA identifier took
effect under state law in the state from which the rates were
adopted.

-----------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can
be:

           a) a survey underlying a wage determination
           b) an existing published wage determination
           c) an initial WHD letter setting forth a position on
             a wage determination matter
           d) an initial conformance (additional classification
             and rate) determination

On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:

            Branch of Wage Surveys
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:

            Branch of Construction Wage Determinations
            Wage and Hour Division
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:

            Wage and Hour Administrator
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board
            U.S. Department of Labor
            200 Constitution Avenue, N.W.
            Washington, DC 20210.



================================================================

          END OF GENERAL DECISION"