Parsed from the official text as a reading aid - zone pay, group definitions and footnotes in the full text below modify specific classifications. Identifier prefixes: union-agreement rates carry the local's id, SU marks DOL survey rates (how to read a determination).
Full official text of NY20260047 rev 2
"General Decision Number: NY20260047 05/18/2026
State: New York
Construction Types: Highway
Counties: New York Counties of
Allegany
Modification Number Publication Date
1 01/30/2026
2 05/18/2026
BRNY0003-016 07/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (HEAVY & HIGHWAY
CONSTRUCTION).......................................$ 38.63 25.05
----------------------------------------------------------------
CARP0276-003 07/01/2024
Rates Fringes
PILEDRIVER HEAVY AND HIGHWAY CONSTRUCTION
FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY AND
LABOR DAY PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED
DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE
PAYROLL WEEK IN WHICH THE HOLIDAY FALLS.............$ 41.66 28.46
CARPENTER HEAVY AND HIGHWAY CONSTRUCTION
FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY AND
LABOR DAY PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED
DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE
PAYROLL WEEK IN WHICH THE HOLIDAY FALLS.............$ 38.18 26.11
----------------------------------------------------------------
CARP0276-018 07/01/2024
Rates Fringes
CARPENTER, PILEDRIVER (HEAVY AND HIGHWAY
CONSTRUCTION) (ALLEGANY COUNTY (THE TOWNSHIP OF
ALFRED))............................................$ 41.66 28.46
CARPENTER (HEAVY AND HIGHWAY CONSTRUCTION)
(ALLEGANY COUNTY (THE TOWNSHIP OF ALFRED))..........$ 38.18 26.11
----------------------------------------------------------------
ELEC1249-003 05/05/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER
UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD WEATHER INFORMATION
SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 31.72 29.87
----------------------------------------------------------------
ELEC1249-004 05/05/2025
Rates Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
(Substation:).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable ins..................................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Substation:)............................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Overhead and
underground distribution and maintenance work and
all overhead and underground transmission line work
including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installat............................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Overhead and underground distribution and
maintenance work and all overhead and underground
transmission line work including any and all fiber
optic ground wire, fiber optic shield wire or any
other like product by any other name manufactured
for the dual purpose of ground fault protection and
fiber optic capabilities :).........................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Switching structures; railroad
catenary installation and maintenance, third rail
type underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cab........................................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Substation:)......................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Overhead and underground
distribution and maintenance work and all overhead
and underground transmission line work including
any and all fiber optic ground wire, fiber optic
shield wire or any other like product by any other
name manufactured for the dual purpose of ground
fault protection and fiber optic capabilities :)....$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching
structures; railroad catenary installation and
maintenance, third rail type underground fluid or
gas filled transmission conduit and cable
installations (including any and all fiber optic
ground product by any other name manufactured for
the dual purpose of ground fault protection and
fiber optic capabilities), pipetype cable
installation and maintenance jobs or projects, and
maintenance bonding of rails; Pipetype cable
installation).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
(Substation:).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead
and underground distribution and maintenance work
and all overhead and underground transmission line
work including any and all fiber optic ground wire,
fiber optic shield wire or any other like product
by any other name manufactured for the dual purpose
of ground fault protection and fiber optic
capabilities :).....................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Switching structures; railroad catenary
installation and maintenance, third rail type
underground fluid or gas filled transmission
conduit and cable installations (including any and
all fiber optic ground product by any other name
manufactured for the dual purpose of ground fault
protection and fiber optic capabilities), pipetype
cable installation and maintenance jobs or
projects, and maintenance bonding of rails;
Pipetype cable installation)........................$ 64.59 42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Substation:).......................................$ 63.14 33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;
RAILROAD CATENARY INSTALLATION AND MAINTENANCE,
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND
MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21
----------------------------------------------------------------
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99
----------------------------------------------------------------
ENGI0158-024 07/01/2025
Rates Fringes
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND
SHAFT). FOR EXCAVATION AND PAVING: FOOTNOTE: A.
PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING
THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND
PAVING CLASSIFICATIONS..............................$ 60.84 35.00
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND
PAVING). FOR EXCAVATION AND PAVING: FOOTNOTE: A.
PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING
THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND
PAVING CLASSIFICATIONS..............................$ 43.26 34.85
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY)
MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW
YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 56.81 35.75
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY)
CRANES 49 TONS AND FOOTNOTE: B. PAID HOLIDAYS:
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 58.38 35.75
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY)
GROUP 5: CRANES 50 TONS AND OVER FOOTNOTE: B.
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY ..........................................$ 59.88 35.75
OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT):
CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH
200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE
HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 51.41 35.00
OPERATING ENGINEER: GROUP 4 (HEAVY AND
HIGHWAY)TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS:
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 61.38 35.75
OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING)
COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER
PROVISIONS FOR COMPRESSORS); DUST COLLECTORS;
GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE
OR COMBINATION); CONCRETE MIXER (16S AND UNDER),
CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER;
MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS
OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO
EXCEED 12"" IN TOTAL CAPACITY; REVINIUS WIDENER;
STEAM CLEANER; TRACTOR FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING
THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 36.61 34.85
OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT):
""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON);
COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED
CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT
NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST
COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES;
LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION);
CONCRETE PAVEMENT SPREADERS AND FINISHERS;
CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP
USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM
TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK
LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT
(MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS
(HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON);
HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED
FORM CARRIER; POST HOLE DIGGER AND POST DRIVER;
POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER
(RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC
PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER
(RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER
(RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER
(RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH
TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP;
WELL POINT AGGREGATE PLANT; BOILER (USED IN
CONJUNCTION WITH PRODUCTION); CEMENT AND BIN
OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200
CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST
COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES;
LIGHT PLANTS (3 OR LESS OF ANY TYPE OR
COMBINATION); CONCRETE PAVER OR MIXER (16S AND
UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN;
FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING
SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING
MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT
GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN
USED FOR PRODUCTION); REVINIUS WIDENER; SHELL
WINDER; STEAM CLEANER; TRACTOR FOOTNOTE: B.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS THE WORKING DAY BEFORE AND THE WORKING DAY
AFTER THE HOLIDAY .................................$ 54.42 35.00
OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A
FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY
HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE
GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR,
RIDE-ON BOILER (USED IN CONJUNCTION WITH
PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED,
BOAT (POWERED), CEMENT AND BIN OPERATOR,
COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS,
WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF
EQUIPMENT), CONCRETE PAVEMENT SPREADER AND
FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER),
CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND,
DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE),
DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE
GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR,
RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER,
RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK
LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED
ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL
POINT FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 51.80 35.75
OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING)
COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED
CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT
NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT
SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST
COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY
TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS
AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL
(WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL
POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE
GRADE MACHINE; FORK LIFT; GUNITE MACHINE;
HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST
HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF
MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO
EXCEED 20"" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC
PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR
WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO
TAMP; WELL POINT FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR
DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF
THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,
PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 40.10 34.85
OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT):
AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE
(TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED);
BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON
AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR
MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX
PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING
PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER);
COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED
CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE
PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT;
DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER
(UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE;
HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE
DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN
PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK
BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER
(TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR
STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE;
PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY
MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM
SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL
ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE;
SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER;
TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER;
WINCH; WINCH CAT FOOTNOTE: B. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE
HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY ...........................................$ 57.21 35.00
OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY)
ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED),
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED),
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS,
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED,
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.),
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE,
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS,
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE,
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER),
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER,
REVINIUS WIDENER, ROLLER (GRADE AND FILL),
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE
PLANT REFRIGERATION EQUIPMENT (FOR SOIL
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER,
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE),
WINCH, WINCH CAT FOOTNOTE: B. PAID HOLIDAYS:
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED
THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 54.68 35.75
OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING)
BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS
SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED);
BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON
AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY
PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS)
EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE
PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS
(TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU.
YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST
(ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE
LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE
MAN; MECHANICAL SLURRY MACHINE; MIXER FOR
STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE;
PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP
CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER;
ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR
SCRAPER; TRACTOR WITH DOZER AND OR PUSHER;
TRENCHER; WINCH FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR
DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF
THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,
PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY
IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE
SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE
HOLIDAY.............................................$ 40.79 34.85
OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT)
AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT);
AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT
PLACER (CMI OR SIMILAR); BLACKTOP SPREADER
(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX
PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE
CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE
PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES
AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE;
DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY
OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY
RATED 15' AND OVER); FRONT END LOADER (4CU YD AND
OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST;
SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER;
MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE
HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES);
MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR
STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9,
QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL;
SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE
ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN
BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER
MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR
(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL
FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE
DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL,
PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY .........$ 58.43 35.00
OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY)
AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT);
AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT
PLACER (CMI OR SIMILAR); BLACKTOP SPREADER
(AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX
PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE
CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE
PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES
AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE;
DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY
OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY
RATED 15' AND OVER); FRONT END LOADER (4CU YD AND
OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST;
SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER;
MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE
HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES);
MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR
STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9,
QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL;
SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE
ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN
BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER
MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR
(MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL
FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY ....................$ 55.38 35.75
OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING)
ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE
(EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP
PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL
MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER
5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL
ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END
LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM);
PILE DRIVER; POWER GRADER WITH ELEVATION LOADER
ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL;
SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER;
TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE
HYDRAULICALLY OPERATED FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;
CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON
WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE
WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING
THE HOLIDAY OR ON THE SCHEDULED WORK DAY
IMMEDIATELY FOLLOWING THE HOLIDAY...................$ 41.26 34.85
----------------------------------------------------------------
IRON0006-001 07/01/2024
Rates Fringes
IRONWORKERS: WINDOW ERECTORS (TOWNSHIPS OF ALFRED,
ALLEN ALMOND, ANDOVER, CENTERVILLE, RUSHFORD, NEW
HUDSON, CUBA, CLARKSVILLE, GENESEE, HUME, CANEADEA,
BELFAST, WIRT, FRIENDSHIP, BOLIVAR, ANGELICA,
AMITY, SCIO, WELLSVILLE, WEST ALMOND, ALMA,
GRANGER, WILLING, INDEPENDENCE).....................$ 33.14 32.30
IRONWORKERS: STRUCTURAL, ORANMENTAL, REINFORCING
STEEL, WELDERS, RIGGERS AND RODMEN (TOWNSHIPS OF
ALFRED, ALLEN ALMOND, ANDOVER, CENTERVILLE,
RUSHFORD, NEW HUDSON, CUBA, CLARKSVILLE, GENESEE,
HUME, CANEADEA, BELFAST, WIRT, FRIENDSHIP, BOLIVAR,
ANGELICA, AMITY, SCIO, WELLSVILLE, WEST ALMOND,
ALMA, GRANGER, WILLING, INDEPENDENCE)...............$ 35.49 32.30
IRONWORKERS: FENCE ERECTORS (TOWNSHIPS OF ALFRED,
ALLEN ALMOND, ANDOVER, CENTERVILLE, RUSHFORD, NEW
HUDSON, CUBA, CLARKSVILLE, GENESEE, HUME, CANEADEA,
BELFAST, WIRT, FRIENDSHIP, BOLIVAR, ANGELICA,
AMITY, SCIO, WELLSVILLE, WEST ALMOND, ALMA,
GRANGER, WILLING, INDEPENDENCE).....................$ 34.06 30.80
----------------------------------------------------------------
IRON0033-008 07/01/2025
Rates Fringes
IRONWORKERS: SHEETER (TWNSHPS OF BIRDSALL, BRUNS,
GROVE AND MIDDLESEX)...............................$ 36.00 30.80
IRONWORKERS: ORNAMENTAL, REINFORCING STONE
DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY
MOVERS FENCE ERECTORS, PRECAST CONCRETE ERECTOR
(TWNSHPS OF BIRDSALL, BRUNS, GROVE AND MIDDLESEX)..$ 35.75 30.80
----------------------------------------------------------------
LABO0621-004 07/01/2025
Rates Fringes
LABORERS: GROUP 2 BLASTERS; FORM SETTER; STONE OR
GRANITE CURB SETTERS; DESIGNATED ASPHALT RAKERS
(NOT TO INCLUD COLD PATCH); TAIL OR SCREW OPERATOR
ON ASPHALT PAVER. ALL ROCK OR DRILLING MACHINE
OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE);
ACETYLENE TORCH OPERATORS; POWDERMEN................$ 34.33 28.69
LABORERS: GROUP 1 FLAGMAN; OUTBOARD AND HAND BOATS;
BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN;
CONCRETE BOOT; GIN BUGGY; HAND OR MECHINE VIBRATOR
JACK HAMMER; MASON TENDER; MORTAR MIXER; PAVE- MENT
BREAKER; HANDLER OF ALL STEEL MESH; SMALL GENERATOR
FOR LABORERS TOOLS, INSTALLATION OF BRIDGE DRAINAGE
PIPE; PIPE LAYERS; VIBRATOR TYPE ROLLERS; TAMPER
DRILL DOCTOR; WATER PUMP OPERATOR (1-1/2"" AND
SINGLE DIAPHRAGAM); NOZZLE (ASPHALT, GUNITE,
SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK
FENCE ERECTION; ROCK SPLITTER AND POWER UNIT;
PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS,
ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING
LABORERS............................................$ 33.93 28.69
----------------------------------------------------------------
PAIN0004-019 05/01/2023
Rates Fringes
PAINTERS: BRIDGE PAINTING (HEAVY & HIGHWAY
CONSTRUCTION).......................................$ 42.06 30.59
----------------------------------------------------------------
PLUM0022-007 04/29/2024
Rates Fringes
PLUMBER/PIPEFITTER: (ZONE 2) ALLEGANY- THE
TOWNSHIPS OF ALLEN, ALMA, AMITY, ANGELICA, BELFAST
BOLIVAR, CANEADEA, CENTERVILLE, CLARKSVILLE, CUBA,
FRIENDSHIP, GENESEE, GRANGER, HUME, NEW HUDSON,
RUSHFORD, SCHIO, WIRT...............................$ 42.20 29.80
----------------------------------------------------------------
SFNY0669-001 01/01/2026
Rates Fringes
SPRINKLER FITTER....................................$ 47.85 28.94
----------------------------------------------------------------
SHEE0112-002 05/01/2023
Rates Fringes
SHEET METAL WORKER..................................$ 35.94 20.89
----------------------------------------------------------------
TEAM0317-001 06/01/2025
Rates Fringes
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING
EQUIPMENT- EUCLID TYPE OR SIMILAR OFF-HIGHWAY
EQUIPMENT, WHERE NOT SELF-LOADED; STRAFFLE (ROSS)
CARRIER; SELF-CONTAINED CONCRETE UNIT, OFF-HIGHWAY
TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE
HITCHED EQUIPMENT SHERE NOT SELF LOADED. FOOTNOTE:
A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY;
CHRISTMAS DAY.......................................$ 35.83 31.58
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS;
FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE
AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS;
TRUCK TIREMAN, TANDEMS; BATCH TRUCK; MECHANICS;
SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR
TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE
VEHICLES; TRUCK MECHANIC, FUEL TRUCK FOOTNOTE: A.
PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY;
CHRISTMAS DAY.......................................$ 35.48 31.58
----------------------------------------------------------------
TEAM0317-005 06/01/2025
Rates Fringes
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 2 SPECIALIZED
EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR
OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED;
STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE
MOBILE UNIT; OFF-HIGHWAY TANDEM BACK DUMP; TWIN
ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE
NOT SELF-LOADED (TOWNSHIPS OF ALMOND, ALFRED,
BURNS, WEST ALMOND) A. PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 35.83 31.58
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 1 YARDMAN;
PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS
(STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS;
DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN,
TANDEMS; BATCH TRUCK; MECHANICS; SEMI- TRAILORS;
LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS;
AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES;
TRUCK MECHANIC; FUEL TRUCK (TOWNSHIPS OF ALMOND,
ALFRED, BURNS, WEST ALMOND) A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE
WORKING DAY AFTER THE HOLIDAY.......................$ 35.48 31.58
----------------------------------------------------------------
----------------------------------------------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject
to the Davis-Bacon Act that were awarded on or between January 1,
2015 and January 29, 2022, and that have not been renewed or
extended on or after January 30, 2022. Executive Order 13658 does
not apply to contracts subject only to the Davis-Bacon Related Acts
regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers
at least $13.65 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing on
the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker
protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
-----------------------------------------------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the �SA� identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
"