Federal Davis-Bacon rates published in 49 active determinations, 2026
- Active federal Davis-Bacon determinations for New Mexico publish 143 carpenter classification rates, across 49 determinations covering 33 counties.
- Those published base rates run from $10.00 to $29.09 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting carpenter rates in New Mexico: .
This page collects every classification in New Mexico's active federal determinations that is a form of carpenter work (rough and finish carpentry, including form work) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
NM20260001 rev 1 · Residential · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (EXCLUDING SCAFFOLD SETTING, FORM WORK, DRYWALL HANGING, AND INSTALLATION OF SOFT FLOORS, OVERHEAD DOORS, AND BATT INSULATION) | $11.95 | 0.30 | SUNM1999-001 DOL wage survey rate |
Official document: NM20260001 on SAM.gov.
NM20260002 rev 1 · Residential · McKinley, San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (INCLUDING FORMWORK AND FRAMING) | $10.00 | 0.00 | SUNM1994-001 DOL wage survey rate |
Official document: NM20260002 on SAM.gov.
NM20260003 rev 1 · Residential · Dona Ana, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $11.60 | 0.30 | SUNM1999-002 DOL wage survey rate |
| CARPENTER (EXCLUDING SCAFFOLD SETTING, FORM WORK, DRYWALL HANGING, INSTALLATION OF OVERHEAD DOORS, SOFT FLOORS AND BATT INSULATION) | $11.44 | 0.30 | SUNM1999-002 DOL wage survey rate |
Official document: NM20260003 on SAM.gov.
NM20260004 rev 1 · Residential · Cibola, Colfax, Guadalupe, Harding, McKinley, Mora and 7 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (EXCLUDING INSTALLATION OF SOFT FLOORS AND BATT AND BLOWN INSULATION) | $10.85 | 0.30 | SUNM1999-003 DOL wage survey rate |
Official document: NM20260004 on SAM.gov.
NM20260005 rev 1 · Residential · Catron, Chaves, Curry, De Baca, Eddy, Grant and 8 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $10.50 | 0.00 | SUNM1999-004 DOL wage survey rate |
| CARPENTER (EXCLUDING FORM WORK, AND INSTALLATION OF DRYWALL AND SOFT FLOORS) | $11.69 | 0.30 | SUNM1999-004 DOL wage survey rate |
Official document: NM20260005 on SAM.gov.
NM20260006 rev 1 · Residential · Los Alamos, Sandoval, Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (EXCLUDING DRYWALL HANGING) | $12.00 | 0.00 | SUNM1999-005 DOL wage survey rate |
Official document: NM20260006 on SAM.gov.
NM20260007 rev 1 · Heavy · Curry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER | $22.26 | 6.20 | SUNM2009-001 DOL wage survey rate |
Official document: NM20260007 on SAM.gov.
NM20260008 rev 1 · Heavy · Otero
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER | $22.26 | 6.20 | SUNM2009-002 DOL wage survey rate |
Official document: NM20260008 on SAM.gov.
NM20260009 rev 1 · Heavy · Taos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER | $22.26 | 6.20 | SUNM2009-003 DOL wage survey rate |
Official document: NM20260009 on SAM.gov.
NM20260010 rev 1 · Heavy · Catron, Chaves
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER | $22.26 | 6.20 | SUNM2009-004 DOL wage survey rate |
Official document: NM20260010 on SAM.gov.
NM20260011 rev 1 · Heavy · Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley and 5 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER | $22.26 | 6.20 | SUNM2009-005 DOL wage survey rate |
Official document: NM20260011 on SAM.gov.
NM20260012 rev 1 · Heavy · De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER | $22.26 | 6.20 | SUNM2009-006 DOL wage survey rate |
Official document: NM20260012 on SAM.gov.
NM20260013 rev 1 · Building · Catron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $29.09 | 16.20 | CARP1319-008 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $22.13 | 4.03 | SUNM2010-001 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-001 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-001 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-001 DOL wage survey rate |
Official document: NM20260013 on SAM.gov.
NM20260014 rev 1 · Building · Chaves
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (INCLUDING METAL STUD INSTALLATION (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING AND FORM WORK)) | $29.09 | 16.20 | CARP1319-009 collectively bargained (union) rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-002 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-002 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-002 DOL wage survey rate |
Official document: NM20260014 on SAM.gov.
NM20260015 rev 2 · Building · Colfax
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING ONLY) | $24.08 | 10.79 | CARP1353-006 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK | $19.27 | 4.29 | SUNM2010-003 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $18.80 | 5.61 | SUNM2010-003 DOL wage survey rate |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | 5.96 | SUNM2010-003 DOL wage survey rate |
Official document: NM20260015 on SAM.gov.
NM20260016 rev 1 · Building · Curry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $29.09 | 16.20 | CARP1319-008 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.86 | 0.35 | SUNM2010-004 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-004 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-004 DOL wage survey rate |
Official document: NM20260016 on SAM.gov.
NM20260017 rev 1 · Building · De Baca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | 10.79 | CARP1245-004 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $22.13 | 4.03 | SUNM2010-005 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-005 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-005 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-005 DOL wage survey rate |
Official document: NM20260017 on SAM.gov.
NM20260018 rev 1 · Building · Eddy
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | 10.79 | CARP1245-004 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $23.05 | 0.35 | SUNM2010-006 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-006 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-006 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-006 DOL wage survey rate |
Official document: NM20260018 on SAM.gov.
NM20260019 rev 1 · Building · Grant
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (INCLUDING METAL STUD INSTALLATION (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING AND FORM WORK)) | $24.08 | 10.79 | CARP1245-005 collectively bargained (union) rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-007 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-007 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-007 DOL wage survey rate |
Official document: NM20260019 on SAM.gov.
NM20260020 rev 1 · Building · Lea
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $29.09 | 16.20 | CARP1319-008 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.46 | 5.61 | SUNM2010-008 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-008 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-008 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-008 DOL wage survey rate |
Official document: NM20260020 on SAM.gov.
NM20260021 rev 1 · Building · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | 10.79 | CARP1245-004 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $27.11 | 0.35 | SUNM2010-009 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $20.86 | 6.60 | SUNM2010-009 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $27.11 | 0.35 | SUNM2010-009 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $27.11 | 0.35 | SUNM2010-009 DOL wage survey rate |
Official document: NM20260021 on SAM.gov.
NM20260022 rev 1 · Building · Los Alamos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORMWORK) | $24.08 | 10.79 | CARP1353-007 collectively bargained (union) rate |
| CARPENTER (FORM WORK ONLY) | $18.80 | 5.61 | SUNM2010-010 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $19.13 | 0.00 | SUNM2010-010 DOL wage survey rate |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | 5.96 | SUNM2010-010 DOL wage survey rate |
Official document: NM20260022 on SAM.gov.
NM20260023 rev 1 · Building · Luna
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | 10.79 | CARP1245-004 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.86 | 1.30 | SUNM2010-011 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-011 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-011 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-011 DOL wage survey rate |
Official document: NM20260023 on SAM.gov.
NM20260024 rev 1 · Building · McKinley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING ONLY) | $29.09 | 16.20 | CARP1319-007 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK | $17.28 | 3.26 | SUNM2010-012 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $18.80 | 5.61 | SUNM2010-012 DOL wage survey rate |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | 5.96 | SUNM2010-012 DOL wage survey rate |
Official document: NM20260024 on SAM.gov.
NM20260025 rev 1 · Building · Otero
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | 10.79 | CARP1245-004 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.86 | 6.25 | SUNM2010-013 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $20.46 | 5.61 | SUNM2010-013 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-013 DOL wage survey rate |
| CARPENTER (DRYWALL FINISHING/TAPING ONLY) | $20.18 | 4.54 | SUNM2010-013 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-013 DOL wage survey rate |
Official document: NM20260025 on SAM.gov.
NM20260026 rev 2 · Building · Rio Arriba
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING ONLY) | $24.08 | 10.79 | CARP1353-006 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK | $19.27 | 4.29 | SUNM2010-014 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $18.80 | 5.61 | SUNM2010-014 DOL wage survey rate |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | 5.96 | SUNM2010-014 DOL wage survey rate |
Official document: NM20260026 on SAM.gov.
NM20260027 rev 1 · Building · Roosevelt
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | 10.79 | CARP1245-004 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $27.11 | 0.35 | SUNM2010-015 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-015 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-015 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-015 DOL wage survey rate |
Official document: NM20260027 on SAM.gov.
NM20260028 rev 2 · Building · San Miguel
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING AND DRYWALL FINISHING/TAPING ONLY) | $24.08 | 10.79 | CARP1353-005 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORM WORK | $19.27 | 4.29 | SUNM2010-016 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $18.80 | 5.61 | SUNM2010-016 DOL wage survey rate |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | 5.96 | SUNM2010-016 DOL wage survey rate |
Official document: NM20260028 on SAM.gov.
NM20260029 rev 1 · Building · Socorro
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | 10.79 | CARP1245-004 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $22.13 | 4.03 | SUNM2010-017 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-017 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-017 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-017 DOL wage survey rate |
Official document: NM20260029 on SAM.gov.
NM20260030 rev 2 · Building · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING ONLY) | $24.08 | 10.79 | CARP1353-006 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK | $19.27 | 4.29 | SUNM2010-018 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $18.80 | 5.61 | SUNM2010-018 DOL wage survey rate |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | 5.96 | SUNM2010-018 DOL wage survey rate |
Official document: NM20260030 on SAM.gov.
NM20260031 rev 2 · Building · Cibola, Guadalupe, Harding, Mora, Quay, Taos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER: DRYWALL HANGING ONLY (QUAY) | $24.08 | 10.79 | CARP1245-003 collectively bargained (union) rate |
| CARPENTER: DRYWALL HANGING ONLY (CIBOLA) | $29.09 | 16.20 | CARP1319-006 collectively bargained (union) rate |
| CARPENTER: DRYWALL HANGING ONLY (GUADALUPE, HARDING, MORA, AND TAOS) | $24.08 | 10.79 | CARP1353-008 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK | $19.27 | 4.29 | SUNM2010-019 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $18.80 | 5.61 | SUNM2010-019 DOL wage survey rate |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | 5.96 | SUNM2010-019 DOL wage survey rate |
Official document: NM20260031 on SAM.gov.
NM20260032 rev 1 · Building · Hidalgo, Sierra
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | 10.79 | CARP1245-004 collectively bargained (union) rate |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $22.13 | 4.03 | SUNM2010-020 DOL wage survey rate |
| CARPENTER (FORM WORK ONLY) | $19.79 | 6.14 | SUNM2010-020 DOL wage survey rate |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | 2.85 | SUNM2010-020 DOL wage survey rate |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | 0.00 | SUNM2010-020 DOL wage survey rate |
Official document: NM20260032 on SAM.gov.
NM20260033 rev 1 · Highway · Bernalillo, Sandoval, Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER, INCLUDING FORM WORK (SANDOVAL, TORRANCE, AND VALENCIA) | $13.70 | 0.44 | SUNM2011-001 DOL wage survey rate |
| CARPENTER, INCLUDING FORM WORK (BERNALLLILO) | $13.73 | 0.44 | SUNM2011-001 DOL wage survey rate |
Official document: NM20260033 on SAM.gov.
NM20260034 rev 1 · Highway · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (INCLUDES FORM WORK) | $13.88 | 0.44 | SUNM2011-002 DOL wage survey rate |
Official document: NM20260034 on SAM.gov.
NM20260035 rev 1 · Highway · Dona Ana, San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK (SAN JUAN) | $13.42 | 0.44 | SUNM2011-003 DOL wage survey rate |
| CARPENTER, INCLUDES FORM WORK (DONA ANA) | $14.15 | 0.44 | SUNM2011-003 DOL wage survey rate |
Official document: NM20260035 on SAM.gov.
NM20260036 rev 1 · Highway · Catron, Chaves, Curry, De Baca, Eddy, Grant and 8 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK (LUNA) | $13.11 | 0.44 | SUNM2011-004 DOL wage survey rate |
| CARPENTER, INCLUDES FORM WORK (LEA) | $13.30 | 0.44 | SUNM2011-004 DOL wage survey rate |
| CARPENTER, INCLUDES FORM WORK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.93 | 0.44 | SUNM2011-004 DOL wage survey rate |
Official document: NM20260036 on SAM.gov.
NM20260037 rev 1 · Highway · Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley and 6 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK (SAN MIGUEL) | $13.93 | 0.44 | SUNM2011-005 DOL wage survey rate |
| CARPENTER, INCLUDES FORM WORK (MORA) | $14.44 | 0.44 | SUNM2011-005 DOL wage survey rate |
| CARPENTER, INCLUDES FORM WORK (MCKINLEY) | $13.51 | 0.44 | SUNM2011-005 DOL wage survey rate |
| CARPENTER, INCLUDES FORM WORK (GUADALUPE, LOS ALAMOS, COLFAX, HARDING, GUAY, TAOS, UNION) | $13.84 | 0.44 | SUNM2011-005 DOL wage survey rate |
| CARPENTER, INCLUDES FORM WORK (CIBOLA, RIA ARRIBA) | $14.27 | 0.44 | SUNM2011-005 DOL wage survey rate |
Official document: NM20260037 on SAM.gov.
NM20260038 rev 1 · Heavy · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.31 | 13.18 | CARP1319-011 collectively bargained (union) rate |
| CARPENTER, EXCLUDES FORM WORK | $16.43 | 0.00 | SUNM2016-007 DOL wage survey rate |
Official document: NM20260038 on SAM.gov.
NM20260039 rev 1 · Heavy · Dona Ana
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.31 | 13.18 | CARP1319-011 collectively bargained (union) rate |
| CARPENTER, EXCLUDES FORM WORK | $16.43 | 0.00 | SUNM2016-008 DOL wage survey rate |
Official document: NM20260039 on SAM.gov.
NM20260040 rev 1 · Heavy · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.31 | 13.18 | CARP1319-011 collectively bargained (union) rate |
| CARPENTER, EXCLUDES FORM WORK | $16.43 | 0.00 | SUNM2016-009 DOL wage survey rate |
Official document: NM20260040 on SAM.gov.
NM20260041 rev 1 · Heavy · Sandoval
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.31 | 13.18 | CARP1319-011 collectively bargained (union) rate |
| CARPENTER, EXCLUDES FORM WORK | $16.43 | 0.00 | SUNM2016-010 DOL wage survey rate |
Official document: NM20260041 on SAM.gov.
NM20260042 rev 1 · Heavy · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.31 | 13.18 | CARP1319-011 collectively bargained (union) rate |
| CARPENTER, EXCLUDES FORM WORK | $16.43 | 0.00 | SUNM2016-011 DOL wage survey rate |
Official document: NM20260042 on SAM.gov.
NM20260043 rev 1 · Heavy · Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.31 | 13.18 | CARP1319-011 collectively bargained (union) rate |
| CARPENTER, EXCLUDES FORM WORK | $16.43 | 0.00 | SUNM2016-012 DOL wage survey rate |
Official document: NM20260043 on SAM.gov.
NM20260044 rev 1 · Building · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION (EXCLUDES FORM WORK)) | $24.08 | 10.79 | CARP1505-001 collectively bargained (union) rate |
| CARPENTER (FORM WORK ONLY) | $20.41 | 6.25 | SUNM2016-001 DOL wage survey rate |
Official document: NM20260044 on SAM.gov.
NM20260045 rev 1 · Building · Dona Ana
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (EXCLUDES DRYWALL HANGING) | $24.08 | 10.79 | CARP1245-006 collectively bargained (union) rate |
| CARPENTER (DRYWALL HANGING ONLY) | $19.64 | 6.20 | SUNM2016-002 DOL wage survey rate |
Official document: NM20260045 on SAM.gov.
NM20260046 rev 1 · Building · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER | $29.09 | 16.20 | CARP1319-017 collectively bargained (union) rate |
Official document: NM20260046 on SAM.gov.
NM20260047 rev 1 · Building · Sandoval
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $29.09 | 16.20 | CARP1319-018 collectively bargained (union) rate |
| CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION (EXCLUDES FORM WORK)) | $24.08 | 10.79 | CARP1505-001 collectively bargained (union) rate |
Official document: NM20260047 on SAM.gov.
NM20260048 rev 1 · Building · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER, EXCLUDES DRYWALL FINISHING/TAPING | $20.86 | 6.25 | SUNM2016-005 DOL wage survey rate |
| CARPENTER (DRYWALL FINISHING/TAPING ONLY) | $19.64 | 3.91 | SUNM2016-005 DOL wage survey rate |
Official document: NM20260048 on SAM.gov.
NM20260049 rev 1 · Building · Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION (EXCLUDES FORM WORK)) | $24.08 | 10.79 | CARP1505-001 collectively bargained (union) rate |
| CARPENTER (FORM WORK ONLY) | $21.38 | 9.12 | SUNM2016-006 DOL wage survey rate |
Official document: NM20260049 on SAM.gov.
Where to go next
Carpenter rates in every state · New Mexico prevailing wage and state law · New Mexico determinations by county · pay calculator
Other trades in New Mexico
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Insulator (Heat & Frost) · Boilermaker · Elevator Constructor · Sprinkler Fitter · Tile Setter · Tile Finisher · Floor Layer · Traffic Control / Striping