Heavy Equipment Operator prevailing wage rates in New Mexico
Federal Davis-Bacon rates published in 46 active determinations, 2026
- Active federal Davis-Bacon determinations for New Mexico publish 284 heavy equipment operator classification rates, across 46 determinations covering 33 counties.
- Those published base rates run from $8.75 to $31.43 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in New Mexico: .
This page collects every classification in New Mexico's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
NM20260001 rev 1 · Residential · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (BACKHOE) | $12.59 | 0.00 | SUNM1999-001 DOL wage survey rate |
Official document: NM20260001 on SAM.gov.
NM20260002 rev 1 · Residential · McKinley, San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (BACKHOE) | $8.75 | 0.00 | SUNM1994-001 DOL wage survey rate |
Official document: NM20260002 on SAM.gov.
NM20260003 rev 1 · Residential · Dona Ana, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (BACKHOE) | $12.59 | 0.00 | SUNM1999-002 DOL wage survey rate |
Official document: NM20260003 on SAM.gov.
NM20260007 rev 1 · Heavy · Curry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCRAPER | $14.03 | 0.00 | SUNM2009-001 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $22.69 | 3.74 | SUNM2009-001 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $22.36 | 5.27 | SUNM2009-001 DOL wage survey rate |
| OPERATOR: BACKHOE | $14.03 | 0.00 | SUNM2009-001 DOL wage survey rate |
Official document: NM20260007 on SAM.gov.
NM20260008 rev 1 · Heavy · Otero
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCRAPER | $14.03 | 0.00 | SUNM2009-002 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $22.07 | 5.05 | SUNM2009-002 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $21.70 | 4.73 | SUNM2009-002 DOL wage survey rate |
| OPERATOR: BACKHOE | $14.03 | 0.00 | SUNM2009-002 DOL wage survey rate |
Official document: NM20260008 on SAM.gov.
NM20260009 rev 1 · Heavy · Taos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCRAPER | $14.03 | 0.00 | SUNM2009-003 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $17.43 | 0.26 | SUNM2009-003 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $18.79 | 2.35 | SUNM2009-003 DOL wage survey rate |
| OPERATOR: BACKHOE | $17.00 | 0.00 | SUNM2009-003 DOL wage survey rate |
Official document: NM20260009 on SAM.gov.
NM20260010 rev 1 · Heavy · Catron, Chaves
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCRAPER | $14.03 | 0.00 | SUNM2009-004 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $22.07 | 5.05 | SUNM2009-004 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $18.79 | 2.35 | SUNM2009-004 DOL wage survey rate |
| OPERATOR: BACKHOE | $14.03 | 0.00 | SUNM2009-004 DOL wage survey rate |
Official document: NM20260010 on SAM.gov.
NM20260011 rev 1 · Heavy · Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley and 5 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCRAPER | $14.03 | 0.00 | SUNM2009-005 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $17.43 | 0.26 | SUNM2009-005 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $18.79 | 2.35 | SUNM2009-005 DOL wage survey rate |
| OPERATOR: BACKHOE | $17.00 | 0.00 | SUNM2009-005 DOL wage survey rate |
Official document: NM20260011 on SAM.gov.
NM20260012 rev 1 · Heavy · De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: SCRAPER | $14.03 | 0.00 | SUNM2009-006 DOL wage survey rate |
| OPERATOR: LOADER (FRONT END) | $22.07 | 5.05 | SUNM2009-006 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $18.79 | 2.35 | SUNM2009-006 DOL wage survey rate |
| OPERATOR: BACKHOE | $14.03 | 0.00 | SUNM2009-006 DOL wage survey rate |
Official document: NM20260012 on SAM.gov.
NM20260013 rev 1 · Building · Catron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-001 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-001 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-001 DOL wage survey rate |
Official document: NM20260013 on SAM.gov.
NM20260014 rev 1 · Building · Chaves
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-002 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-002 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-002 DOL wage survey rate |
Official document: NM20260014 on SAM.gov.
NM20260015 rev 2 · Building · Colfax
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | $27.70 | 4.65 | ENGI0953-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-009 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $20.33 | 4.94 | SUNM2010-003 DOL wage survey rate |
| OPERATOR: FORKLIFT | $20.86 | 4.60 | SUNM2010-003 DOL wage survey rate |
| OPERATOR: CRANE | $24.38 | 4.60 | SUNM2010-003 DOL wage survey rate |
| OPERATOR: BACKHOE | $18.79 | 3.47 | SUNM2010-003 DOL wage survey rate |
Official document: NM20260015 on SAM.gov.
NM20260016 rev 1 · Building · Curry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $22.04 | 4.70 | SUNM2010-004 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-004 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-004 DOL wage survey rate |
Official document: NM20260016 on SAM.gov.
NM20260017 rev 1 · Building · De Baca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-005 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-005 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-005 DOL wage survey rate |
Official document: NM20260017 on SAM.gov.
NM20260018 rev 1 · Building · Eddy
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-006 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-006 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-006 DOL wage survey rate |
Official document: NM20260018 on SAM.gov.
NM20260019 rev 1 · Building · Grant
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) BACKHOE, CRANE) | $31.43 | 4.65 | ENGI0953-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-006 collectively bargained (union) rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $13.47 | 4.10 | SUNM2010-007 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-007 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-007 DOL wage survey rate |
Official document: NM20260019 on SAM.gov.
NM20260020 rev 1 · Building · Lea
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-008 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-008 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-008 DOL wage survey rate |
Official document: NM20260020 on SAM.gov.
NM20260021 rev 1 · Building · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-009 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-009 DOL wage survey rate |
| OPERATOR: BACKHOE | $23.89 | 2.61 | SUNM2010-009 DOL wage survey rate |
Official document: NM20260021 on SAM.gov.
NM20260022 rev 1 · Building · Los Alamos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID L27.70ADER) | $27.70 | 4.65 | ENGI0953-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-010 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $19.76 | 4.84 | SUNM2010-010 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $20.33 | 4.94 | SUNM2010-010 DOL wage survey rate |
| OPERATOR: FORKLIFT | $20.86 | 4.60 | SUNM2010-010 DOL wage survey rate |
| OPERATOR: CRANE | $24.38 | 4.60 | SUNM2010-010 DOL wage survey rate |
| OPERATOR: BACKHOE | $18.79 | 3.47 | SUNM2010-010 DOL wage survey rate |
Official document: NM20260022 on SAM.gov.
NM20260023 rev 1 · Building · Luna
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8)CRANE) | $31.43 | 4.65 | ENGI0953-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-011 collectively bargained (union) rate |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $16.80 | 4.43 | SUNM2010-011 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-011 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-011 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-011 DOL wage survey rate |
Official document: NM20260023 on SAM.gov.
NM20260024 rev 1 · Building · McKinley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | $27.24 | 4.65 | ENGI0953-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-013 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $20.33 | 4.94 | SUNM2010-012 DOL wage survey rate |
| OPERATOR: FORKLIFT | $20.86 | 4.60 | SUNM2010-012 DOL wage survey rate |
| OPERATOR: CRANE | $24.38 | 4.60 | SUNM2010-012 DOL wage survey rate |
| OPERATOR: BACKHOE | $13.77 | 0.26 | SUNM2010-012 DOL wage survey rate |
Official document: NM20260024 on SAM.gov.
NM20260025 rev 1 · Building · Otero
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | $27.70 | 4.65 | ENGI0953-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-012 collectively bargained (union) rate |
| OPERATOR: LOADER (FRONT END) | $21.55 | 4.97 | SUNM2010-013 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $21.40 | 4.95 | SUNM2010-013 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-013 DOL wage survey rate |
| OPERATOR: BACKHOE | $20.95 | 4.73 | SUNM2010-013 DOL wage survey rate |
Official document: NM20260025 on SAM.gov.
NM20260026 rev 2 · Building · Rio Arriba
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | $27.24 | 4.65 | ENGI0953-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-013 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $20.33 | 4.94 | SUNM2010-014 DOL wage survey rate |
| OPERATOR: FORKLIFT | $20.86 | 4.60 | SUNM2010-014 DOL wage survey rate |
| OPERATOR: CRANE | $24.38 | 4.60 | SUNM2010-014 DOL wage survey rate |
| OPERATOR: BACKHOE | $18.79 | 3.47 | SUNM2010-014 DOL wage survey rate |
Official document: NM20260026 on SAM.gov.
NM20260027 rev 1 · Building · Roosevelt
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-015 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-015 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-015 DOL wage survey rate |
Official document: NM20260027 on SAM.gov.
NM20260028 rev 2 · Building · San Miguel
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | $27.24 | 4.65 | ENGI0953-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-013 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $20.33 | 4.94 | SUNM2010-016 DOL wage survey rate |
| OPERATOR: FORKLIFT | $20.86 | 4.60 | SUNM2010-016 DOL wage survey rate |
| OPERATOR: CRANE | $24.38 | 4.60 | SUNM2010-016 DOL wage survey rate |
| OPERATOR: BACKHOE | $18.79 | 3.47 | SUNM2010-016 DOL wage survey rate |
Official document: NM20260028 on SAM.gov.
NM20260029 rev 1 · Building · Socorro
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-017 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-017 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-017 DOL wage survey rate |
Official document: NM20260029 on SAM.gov.
NM20260030 rev 2 · Building · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | $27.24 | 4.65 | ENGI0953-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-013 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $20.33 | 4.94 | SUNM2010-018 DOL wage survey rate |
| OPERATOR: FORKLIFT | $20.86 | 4.60 | SUNM2010-018 DOL wage survey rate |
| OPERATOR: CRANE | $24.38 | 4.60 | SUNM2010-018 DOL wage survey rate |
| OPERATOR: BACKHOE | $18.79 | 3.47 | SUNM2010-018 DOL wage survey rate |
Official document: NM20260030 on SAM.gov.
NM20260031 rev 2 · Building · Cibola, Guadalupe, Harding, Mora, Quay, Taos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) | $27.70 | 4.65 | ENGI0953-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-008 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $20.33 | 4.94 | SUNM2010-019 DOL wage survey rate |
| OPERATOR: FORKLIFT | $20.86 | 4.60 | SUNM2010-019 DOL wage survey rate |
| OPERATOR: CRANE | $24.38 | 4.60 | SUNM2010-019 DOL wage survey rate |
| OPERATOR: BACKHOE | $18.79 | 3.47 | SUNM2010-019 DOL wage survey rate |
Official document: NM20260031 on SAM.gov.
NM20260032 rev 1 · Building · Hidalgo, Sierra
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | 4.65 | ENGI0953-007 collectively bargained (union) rate |
| OPERATOR: GRADER/BLADE | $21.39 | 4.94 | SUNM2010-020 DOL wage survey rate |
| OPERATOR: FORKLIFT | $21.13 | 4.83 | SUNM2010-020 DOL wage survey rate |
| OPERATOR: BACKHOE | $22.13 | 4.30 | SUNM2010-020 DOL wage survey rate |
Official document: NM20260032 on SAM.gov.
NM20260033 rev 1 · Highway · Bernalillo, Sandoval, Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER (BERNALILO, SANDOVAL, TORRANCE, & VALENCIA) | $22.08 | 8.72 | SUNM2011-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SANDOVAL, TORRANCE, VALENCIA) | $16.59 | 0.26 | SUNM2011-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BERNALLILO) | $16.78 | 0.26 | SUNM2011-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (SANDOVAL, TORRANCE, VALENCIA) | $14.91 | 0.26 | SUNM2011-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (BERNALLILO) | $14.73 | 0.26 | SUNM2011-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $15.22 | 0.26 | SUNM2011-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR/TRACKHOE) | $20.10 | 0.26 | SUNM2011-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (BROOM SWEEPER) | $16.67 | 1.57 | SUNM2011-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE) | $20.92 | 3.62 | SUNM2011-001 DOL wage survey rate |
Official document: NM20260033 on SAM.gov.
NM20260034 rev 1 · Highway · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $22.08 | 8.72 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: MECHANIC | $23.24 | 1.51 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $16.43 | 0.26 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $17.64 | 1.51 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $16.67 | 1.57 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $12.00 | 0.26 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $15.22 | 0.26 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT AND DIRT)) | $16.27 | 1.51 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $15.73 | 0.26 | SUNM2011-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/TRACKHOE) | $17.20 | 0.26 | SUNM2011-002 DOL wage survey rate |
Official document: NM20260034 on SAM.gov.
NM20260035 rev 1 · Highway · Dona Ana, San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: TRENCHER (SAN JUAN) | $15.93 | 0.26 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: TRENCHER (DONA ANA) | $15.22 | 0.26 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (SAN JUAN) | $12.91 | 1.60 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (DONA ANA) | $16.27 | 1.51 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: OILER | $22.08 | 8.72 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: MECHANIC | $23.24 | 1.51 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $17.64 | 1.51 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $14.56 | 0.26 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (SAN JUAN) | $16.27 | 1.51 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (DONA ANA) | $17.74 | 0.26 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $16.26 | 0.26 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (LOADER(FRONT END)) | $16.53 | 0.26 | SUNM2011-003 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (BROOM SWEEPER) | $16.67 | 1.57 | SUNM2011-003 DOL wage survey rate |
Official document: NM20260035 on SAM.gov.
NM20260036 rev 1 · Highway · Catron, Chaves, Curry, De Baca, Eddy, Grant and 8 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: TRACTOR | $15.40 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: SCREED | $15.70 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: SCRAPER | $15.91 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (LEA) | $17.41 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (DEBACA) | $14.19 | 0.75 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (CATRON, CHAVES, CURRY, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $15.86 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: OILER | $15.79 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: MECHANIC (LEA) | $20.69 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: MECHANIC (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $19.44 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $16.12 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $18.02 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $17.16 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $16.25 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $18.06 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (LEA) | $16.88 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (EDDY) | $14.87 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $19.92 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $16.31 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $17.82 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $16.59 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR) | $14.50 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (CRUSHER) | $16.53 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (BROOM) | $15.48 | 0.26 | SUNM2011-004 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | $15.42 | 0.26 | SUNM2011-004 DOL wage survey rate |
Official document: NM20260036 on SAM.gov.
NM20260037 rev 1 · Highway · Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley and 6 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: TRACTOR | $16.84 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: SCREED | $15.96 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: SCRAPER | $15.91 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROTOMILL | $15.80 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (QUAY) | $14.74 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (MCKINLEY) | $16.49 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $14.39 | 0.98 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (QUAY) | $15.99 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (MCKINLEY) | $14.95 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $15.87 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: OILER | $14.29 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: MECHANIC | $17.48 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (QUAY).$ 16.10 0.26 POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MORA).$ 16.21 0.26 POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MCKI | $16.13 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (HARDING) | $19.37 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (COLFAX) | $15.72 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CIBOLA, GUADALUPE, LOS ALAMOS, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $16.27 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (QUAY) | $19.50 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $17.48 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $17.16 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER (QUAY) | $14.89 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $14.97 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $18.06 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (QUAY) | $16.27 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (MCKINLEY) | $16.70 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (HARDING) | $20.74 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CIBOLA, COLFAX, GUADALUPE, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $16.80 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $16.26 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $16.89 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR) | $14.50 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (CRUSHER) | $16.53 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (BROOM OPERATOR) | $15.72 | 0.26 | SUNM2011-005 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: (ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | $16.43 | 1.51 | SUNM2011-005 DOL wage survey rate |
Official document: NM20260037 on SAM.gov.
NM20260038 rev 1 · Heavy · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER | $18.83 | 0.00 | SUNM2016-007 DOL wage survey rate |
| OPERATOR: OILER | $18.23 | 0.00 | SUNM2016-007 DOL wage survey rate |
| OPERATOR: LOADER | $16.80 | 0.00 | SUNM2016-007 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $19.02 | 0.00 | SUNM2016-007 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.00 | 0.00 | SUNM2016-007 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.06 | 0.00 | SUNM2016-007 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.96 | 5.29 | SUNM2016-007 DOL wage survey rate |
Official document: NM20260038 on SAM.gov.
NM20260039 rev 1 · Heavy · Dona Ana
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER | $18.83 | 0.00 | SUNM2016-008 DOL wage survey rate |
| OPERATOR: OILER | $18.23 | 0.00 | SUNM2016-008 DOL wage survey rate |
| OPERATOR: LOADER | $18.30 | 0.00 | SUNM2016-008 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $19.02 | 0.00 | SUNM2016-008 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.00 | 0.00 | SUNM2016-008 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.06 | 0.00 | SUNM2016-008 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.85 | 4.19 | SUNM2016-008 DOL wage survey rate |
Official document: NM20260039 on SAM.gov.
NM20260040 rev 1 · Heavy · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER | $18.83 | 0.00 | SUNM2016-009 DOL wage survey rate |
| OPERATOR: OILER | $18.23 | 0.00 | SUNM2016-009 DOL wage survey rate |
| OPERATOR: LOADER | $18.30 | 0.00 | SUNM2016-009 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $19.02 | 0.00 | SUNM2016-009 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.00 | 0.00 | SUNM2016-009 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.06 | 0.00 | SUNM2016-009 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.85 | 4.19 | SUNM2016-009 DOL wage survey rate |
Official document: NM20260040 on SAM.gov.
NM20260041 rev 1 · Heavy · Sandoval
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER | $18.83 | 0.00 | SUNM2016-010 DOL wage survey rate |
| OPERATOR: OILER | $18.23 | 0.00 | SUNM2016-010 DOL wage survey rate |
| OPERATOR: LOADER | $18.83 | 0.00 | SUNM2016-010 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $19.02 | 0.00 | SUNM2016-010 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.00 | 0.00 | SUNM2016-010 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.06 | 0.00 | SUNM2016-010 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.03 | 0.00 | SUNM2016-010 DOL wage survey rate |
Official document: NM20260041 on SAM.gov.
NM20260042 rev 1 · Heavy · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER | $18.83 | 0.00 | SUNM2016-011 DOL wage survey rate |
| OPERATOR: OILER | $18.23 | 0.00 | SUNM2016-011 DOL wage survey rate |
| OPERATOR: LOADER | $18.30 | 0.00 | SUNM2016-011 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $19.02 | 0.00 | SUNM2016-011 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.00 | 0.00 | SUNM2016-011 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.06 | 0.00 | SUNM2016-011 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.12 | 6.18 | SUNM2016-011 DOL wage survey rate |
Official document: NM20260042 on SAM.gov.
NM20260043 rev 1 · Heavy · Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: ROLLER | $18.83 | 0.00 | SUNM2016-012 DOL wage survey rate |
| OPERATOR: OILER | $18.23 | 0.00 | SUNM2016-012 DOL wage survey rate |
| OPERATOR: LOADER | $18.56 | 0.00 | SUNM2016-012 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $19.02 | 0.00 | SUNM2016-012 DOL wage survey rate |
| OPERATOR: BULLDOZER | $21.00 | 0.00 | SUNM2016-012 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.06 | 0.00 | SUNM2016-012 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.07 | 0.00 | SUNM2016-012 DOL wage survey rate |
Official document: NM20260043 on SAM.gov.
NM20260044 rev 1 · Building · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | 5.15 | SUNM2016-001 DOL wage survey rate |
Official document: NM20260044 on SAM.gov.
NM20260045 rev 1 · Building · Dona Ana
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.73 | 4.51 | SUNM2016-002 DOL wage survey rate |
Official document: NM20260045 on SAM.gov.
NM20260046 rev 1 · Building · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.73 | 4.51 | SUNM2016-003 DOL wage survey rate |
Official document: NM20260046 on SAM.gov.
NM20260047 rev 1 · Building · Sandoval
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.97 | 5.16 | SUNM2016-004 DOL wage survey rate |
Official document: NM20260047 on SAM.gov.
NM20260048 rev 1 · Building · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.73 | 4.51 | SUNM2016-005 DOL wage survey rate |
Official document: NM20260048 on SAM.gov.
NM20260049 rev 1 · Building · Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.97 | 5.16 | SUNM2016-006 DOL wage survey rate |
Official document: NM20260049 on SAM.gov.
Where to go next
Heavy Equipment Operator rates in every state · New Mexico prevailing wage and state law · New Mexico determinations by county · pay calculator
Other trades in New Mexico
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Insulator (Heat & Frost) · Boilermaker · Elevator Constructor · Sprinkler Fitter · Tile Setter · Tile Finisher · Floor Layer · Traffic Control / Striping