Construction Laborer prevailing wage rates in New Mexico
Federal Davis-Bacon rates published in 49 active determinations, 2026
- Active federal Davis-Bacon determinations for New Mexico publish 200 construction laborer classification rates, across 49 determinations covering 33 counties.
- Those published base rates run from $7.25 to $23.69 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting construction laborer rates in New Mexico: .
This page collects every classification in New Mexico's active federal determinations that is a form of construction laborer work (general and specialty construction labor) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
NM20260001 rev 1 · Residential · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER (UNSKILLED) | $8.81 | 0.00 | SUNM1999-001 DOL wage survey rate |
| LABORER (PIPE LAYER) | $8.59 | 0.00 | SUNM1999-001 DOL wage survey rate |
| LABORER (LANDSCAPE WORKER) | $7.25 | 0.00 | SUNM1999-001 DOL wage survey rate |
| LABORER (FENCE ERECTOR) | $8.00 | 0.28 | SUNM1999-001 DOL wage survey rate |
Official document: NM20260001 on SAM.gov.
NM20260002 rev 1 · Residential · McKinley, San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, GENERAL | $7.25 | 0.00 | SUNM1994-001 DOL wage survey rate |
Official document: NM20260002 on SAM.gov.
NM20260003 rev 1 · Residential · Dona Ana, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER (UNSKILLED) | $8.62 | 0.00 | SUNM1999-002 DOL wage survey rate |
| LABORER (PIPE LAYER) | $8.59 | 0.00 | SUNM1999-002 DOL wage survey rate |
| LABORER (LANDSCAPE WORKER) | $7.25 | 0.00 | SUNM1999-002 DOL wage survey rate |
| LABORER (FENCE ERECTOR) | $8.00 | 0.28 | SUNM1999-002 DOL wage survey rate |
Official document: NM20260003 on SAM.gov.
NM20260004 rev 1 · Residential · Cibola, Colfax, Guadalupe, Harding, McKinley, Mora and 7 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, UNSKILLED | $8.13 | 0.00 | SUNM1999-003 DOL wage survey rate |
Official document: NM20260004 on SAM.gov.
NM20260005 rev 1 · Residential · Catron, Chaves, Curry, De Baca, Eddy, Grant and 8 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, UNSKILLED | $8.36 | 0.00 | SUNM1999-004 DOL wage survey rate |
Official document: NM20260005 on SAM.gov.
NM20260006 rev 1 · Residential · Los Alamos, Sandoval, Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, UNSKILLED | $8.18 | 0.00 | SUNM1999-005 DOL wage survey rate |
Official document: NM20260006 on SAM.gov.
NM20260007 rev 1 · Heavy · Curry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: FLAGGER | $10.90 | 0.00 | SUNM2009-001 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.37 | 0.00 | SUNM2009-001 DOL wage survey rate |
Official document: NM20260007 on SAM.gov.
NM20260008 rev 1 · Heavy · Otero
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: FLAGGER | $10.90 | 0.00 | SUNM2009-002 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.37 | 0.00 | SUNM2009-002 DOL wage survey rate |
Official document: NM20260008 on SAM.gov.
NM20260009 rev 1 · Heavy · Taos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: FLAGGER | $10.90 | 0.00 | SUNM2009-003 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.26 | 0.35 | SUNM2009-003 DOL wage survey rate |
Official document: NM20260009 on SAM.gov.
NM20260010 rev 1 · Heavy · Catron, Chaves
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: FLAGGER | $10.90 | 0.00 | SUNM2009-004 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.37 | 0.00 | SUNM2009-004 DOL wage survey rate |
Official document: NM20260010 on SAM.gov.
NM20260011 rev 1 · Heavy · Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley and 5 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: FLAGGER | $10.90 | 0.00 | SUNM2009-005 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.26 | 0.35 | SUNM2009-005 DOL wage survey rate |
Official document: NM20260011 on SAM.gov.
NM20260012 rev 1 · Heavy · De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: FLAGGER | $10.90 | 0.00 | SUNM2009-006 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.37 | 0.00 | SUNM2009-006 DOL wage survey rate |
Official document: NM20260012 on SAM.gov.
NM20260013 rev 1 · Building · Catron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-001 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-001 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-001 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-001 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-001 DOL wage survey rate |
Official document: NM20260013 on SAM.gov.
NM20260014 rev 1 · Building · Chaves
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-002 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-002 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-002 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-002 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $15.93 | 0.25 | SUNM2010-002 DOL wage survey rate |
Official document: NM20260014 on SAM.gov.
NM20260015 rev 2 · Building · Colfax
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $23.69 | 7.89 | LABO0016-005 collectively bargained (union) rate |
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-003 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-003 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 | 1.47 | SUNM2010-003 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.99 | 3.56 | SUNM2010-003 DOL wage survey rate |
| LABORER: ASPHALT RAKER | $10.25 | 0.00 | SUNM2010-003 DOL wage survey rate |
Official document: NM20260015 on SAM.gov.
NM20260016 rev 1 · Building · Curry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-004 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-004 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-004 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-004 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $15.15 | 4.38 | SUNM2010-004 DOL wage survey rate |
Official document: NM20260016 on SAM.gov.
NM20260017 rev 1 · Building · De Baca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-005 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-005 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-005 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-005 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-005 DOL wage survey rate |
Official document: NM20260017 on SAM.gov.
NM20260018 rev 1 · Building · Eddy
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-006 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-006 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-006 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-006 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $10.76 | 2.11 | SUNM2010-006 DOL wage survey rate |
Official document: NM20260018 on SAM.gov.
NM20260019 rev 1 · Building · Grant
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-007 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-007 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-007 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-007 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-007 DOL wage survey rate |
Official document: NM20260019 on SAM.gov.
NM20260020 rev 1 · Building · Lea
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-008 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-008 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-008 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-008 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-008 DOL wage survey rate |
Official document: NM20260020 on SAM.gov.
NM20260021 rev 1 · Building · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-009 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-009 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-009 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-009 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-009 DOL wage survey rate |
Official document: NM20260021 on SAM.gov.
NM20260022 rev 1 · Building · Los Alamos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $23.69 | 7.89 | LABO0016-005 collectively bargained (union) rate |
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-010 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-010 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 | 1.47 | SUNM2010-010 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.99 | 3.56 | SUNM2010-010 DOL wage survey rate |
| LABORER: ASPHALT RAKER | $10.25 | 0.00 | SUNM2010-010 DOL wage survey rate |
Official document: NM20260022 on SAM.gov.
NM20260023 rev 1 · Building · Luna
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-011 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-011 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-011 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-011 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-011 DOL wage survey rate |
Official document: NM20260023 on SAM.gov.
NM20260024 rev 1 · Building · McKinley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $23.69 | 7.89 | LABO0016-005 collectively bargained (union) rate |
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-012 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-012 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 | 1.47 | SUNM2010-012 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $11.96 | 0.35 | SUNM2010-012 DOL wage survey rate |
| LABORER: ASPHALT RAKER | $10.25 | 0.00 | SUNM2010-012 DOL wage survey rate |
Official document: NM20260024 on SAM.gov.
NM20260025 rev 1 · Building · Otero
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-013 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-013 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-013 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-013 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.61 | 3.89 | SUNM2010-013 DOL wage survey rate |
Official document: NM20260025 on SAM.gov.
NM20260026 rev 2 · Building · Rio Arriba
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $23.69 | 7.89 | LABO0016-005 collectively bargained (union) rate |
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-014 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-014 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 | 1.47 | SUNM2010-014 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.71 | 0.00 | SUNM2010-014 DOL wage survey rate |
| LABORER: ASPHALT RAKER | $10.25 | 0.00 | SUNM2010-014 DOL wage survey rate |
Official document: NM20260026 on SAM.gov.
NM20260027 rev 1 · Building · Roosevelt
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-015 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-015 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-015 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-015 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-015 DOL wage survey rate |
Official document: NM20260027 on SAM.gov.
NM20260028 rev 2 · Building · San Miguel
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $23.69 | 7.89 | LABO0016-005 collectively bargained (union) rate |
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-016 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-016 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 | 1.47 | SUNM2010-016 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.78 | 3.56 | SUNM2010-016 DOL wage survey rate |
| LABORER: ASPHALT RAKER | $10.25 | 0.00 | SUNM2010-016 DOL wage survey rate |
Official document: NM20260028 on SAM.gov.
NM20260029 rev 1 · Building · Socorro
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-017 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-017 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-017 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-017 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-017 DOL wage survey rate |
Official document: NM20260029 on SAM.gov.
NM20260030 rev 2 · Building · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $23.69 | 7.89 | LABO0016-005 collectively bargained (union) rate |
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-018 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-018 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 | 1.47 | SUNM2010-018 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.99 | 3.56 | SUNM2010-018 DOL wage survey rate |
| LABORER: ASPHALT RAKER | $10.25 | 0.00 | SUNM2010-018 DOL wage survey rate |
Official document: NM20260030 on SAM.gov.
NM20260031 rev 2 · Building · Cibola, Guadalupe, Harding, Mora, Quay, Taos
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, MASON TENDER BRICK | $23.69 | 7.89 | LABO0016-005 collectively bargained (union) rate |
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-019 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-019 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 | 1.47 | SUNM2010-019 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.99 | 3.56 | SUNM2010-019 DOL wage survey rate |
| LABORER: ASPHALT RAKER | $10.25 | 0.00 | SUNM2010-019 DOL wage survey rate |
Official document: NM20260031 on SAM.gov.
NM20260032 rev 1 · Building · Hidalgo, Sierra
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $13.78 | 2.20 | SUNM2010-020 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 | 0.85 | SUNM2010-020 DOL wage survey rate |
| LABORER: MASON TENDER - BRICK | $13.77 | 4.35 | SUNM2010-020 DOL wage survey rate |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 | 0.24 | SUNM2010-020 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.12 | 3.79 | SUNM2010-020 DOL wage survey rate |
Official document: NM20260032 on SAM.gov.
NM20260033 rev 1 · Highway · Bernalillo, Sandoval, Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, COMMON OR GENERAL (SANDOVAL) | $11.85 | 0.35 | SUNM2011-001 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (BERNALLILO, TORRANCE, AND VALENCIA) | $11.82 | 0.35 | SUNM2011-001 DOL wage survey rate |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER AND CONE SETTER)) | $14.27 | 0.35 | SUNM2011-001 DOL wage survey rate |
Official document: NM20260033 on SAM.gov.
NM20260034 rev 1 · Highway · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $17.13 | 5.04 | SUNM2011-002 DOL wage survey rate |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $10.25 | 0.35 | SUNM2011-002 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $11.21 | 0.35 | SUNM2011-002 DOL wage survey rate |
| LABORER (FLAGGER/CONE SETTER) | $13.55 | 0.35 | SUNM2011-002 DOL wage survey rate |
Official document: NM20260034 on SAM.gov.
NM20260035 rev 1 · Highway · Dona Ana, San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $17.13 | 5.04 | SUNM2011-003 DOL wage survey rate |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $10.25 | 0.35 | SUNM2011-003 DOL wage survey rate |
| LABORER: COMMON OR GENERAL (SAN JUAN) | $11.48 | 0.35 | SUNM2011-003 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (DONA ANA) | $11.95 | 0.35 | SUNM2011-003 DOL wage survey rate |
| LABORER (FLAGGER/CONE SETTER) | $14.27 | 0.35 | SUNM2011-003 DOL wage survey rate |
Official document: NM20260035 on SAM.gov.
NM20260036 rev 1 · Highway · Catron, Chaves, Curry, De Baca, Eddy, Grant and 8 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER, COMMON OR GENERAL (OTERO) | $12.73 | 0.35 | SUNM2011-004 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (LUNA, ROOSEVELT) | $12.56 | 0.35 | SUNM2011-004 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (LEA) | $11.61 | 0.35 | SUNM2011-004 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (GRANT) | $10.62 | 0.35 | SUNM2011-004 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (EDDY) | $11.78 | 0.35 | SUNM2011-004 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (DEBACA) | $11.33 | 0.35 | SUNM2011-004 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (CATRON, CHAVES, CURRY, HIDALGO, LINCOLN, SIERRA, SOCORRO) | $11.67 | 0.35 | SUNM2011-004 DOL wage survey rate |
| LABORER (POWER/AIR TOOL OPERATOR, INCLUDES JACK HAMMER) | $13.91 | 0.86 | SUNM2011-004 DOL wage survey rate |
| LABORER (PIPELAYER) | $19.28 | 0.00 | SUNM2011-004 DOL wage survey rate |
| LABORER (MASON TENDER-BRICK/CEMENT/CONCRETE) | $11.39 | 0.79 | SUNM2011-004 DOL wage survey rate |
| LABORER (GRADE CHECKER) | $16.18 | 1.60 | SUNM2011-004 DOL wage survey rate |
| LABORER (FLAGGER/CONE SETTER) | $12.56 | 0.35 | SUNM2011-004 DOL wage survey rate |
| LABORER (ASPHALT RAKER) | $13.00 | 0.35 | SUNM2011-004 DOL wage survey rate |
Official document: NM20260036 on SAM.gov.
NM20260037 rev 1 · Highway · Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley and 6 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $16.99 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER: ASPHALT RAKER | $14.39 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE (RIO ARRIBA) | $13.33 | 1.97 | SUNM2011-005 DOL wage survey rate |
| LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | $13.04 | 1.78 | SUNM2011-005 DOL wage survey rate |
| LABORER, FLAGGER/CONE SETTER (QUAY) | $12.21 | 0.26 | SUNM2011-005 DOL wage survey rate |
| LABORER, FLAGGER/CONE SETTER (MCKINLEY) | $11.66 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, FLAGGER/CONE SETTER (COLFX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $12.15 | 0.99 | SUNM2011-005 DOL wage survey rate |
| LABORER, FLAGGER/CONE SETTER (CIBOLA) | $13.14 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (UNION) | $10.89 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (TAOS) | $12.61 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (SAN MIGUEL) | $12.56 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (RIO ARRIBA) | $12.28 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (QUAY) | $12.15 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (MORA) | $11.34 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (MCKINLEY) | $11.22 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (HARDING) | $11.57 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (GUADALUPE, LOS ALAMOS) | $11.83 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (COLFAX) | $9.60 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER, COMMON OR GENERAL (CIBOLA) | $12.27 | 0.35 | SUNM2011-005 DOL wage survey rate |
| LABORER (GRADE CHECKER) | $14.67 | 1.60 | SUNM2011-005 DOL wage survey rate |
Official document: NM20260037 on SAM.gov.
NM20260038 rev 1 · Heavy · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $17.18 | 4.53 | SUNM2016-007 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $14.08 | 0.00 | SUNM2016-007 DOL wage survey rate |
Official document: NM20260038 on SAM.gov.
NM20260039 rev 1 · Heavy · Dona Ana
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $16.67 | 3.04 | SUNM2016-008 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $15.68 | 0.35 | SUNM2016-008 DOL wage survey rate |
Official document: NM20260039 on SAM.gov.
NM20260040 rev 1 · Heavy · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $16.67 | 3.04 | SUNM2016-009 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $14.87 | 3.36 | SUNM2016-009 DOL wage survey rate |
Official document: NM20260040 on SAM.gov.
NM20260041 rev 1 · Heavy · Sandoval
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $17.18 | 4.53 | SUNM2016-010 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $15.05 | 0.35 | SUNM2016-010 DOL wage survey rate |
Official document: NM20260041 on SAM.gov.
NM20260042 rev 1 · Heavy · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $16.67 | 3.04 | SUNM2016-011 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $15.34 | 3.63 | SUNM2016-011 DOL wage survey rate |
Official document: NM20260042 on SAM.gov.
NM20260043 rev 1 · Heavy · Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $17.18 | 4.53 | SUNM2016-012 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $14.68 | 1.58 | SUNM2016-012 DOL wage survey rate |
Official document: NM20260043 on SAM.gov.
NM20260044 rev 1 · Building · Bernalillo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.69 | 7.89 | LABO0016-002 collectively bargained (union) rate |
| LABORER: COMMON OR GENERAL | $15.70 | 4.86 | SUNM2016-001 DOL wage survey rate |
Official document: NM20260044 on SAM.gov.
NM20260045 rev 1 · Building · Dona Ana
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.60 | 0.00 | SUNM2016-002 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $16.49 | 4.54 | SUNM2016-002 DOL wage survey rate |
Official document: NM20260045 on SAM.gov.
NM20260046 rev 1 · Building · San Juan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.60 | 0.00 | SUNM2016-003 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.16 | 0.00 | SUNM2016-003 DOL wage survey rate |
Official document: NM20260046 on SAM.gov.
NM20260047 rev 1 · Building · Sandoval
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.72 | 5.61 | SUNM2016-004 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $16.70 | 0.00 | SUNM2016-004 DOL wage survey rate |
Official document: NM20260047 on SAM.gov.
NM20260048 rev 1 · Building · Santa Fe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.60 | 0.00 | SUNM2016-005 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $14.58 | 4.25 | SUNM2016-005 DOL wage survey rate |
Official document: NM20260048 on SAM.gov.
NM20260049 rev 1 · Building · Torrance, Valencia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.72 | 5.61 | SUNM2016-006 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $15.99 | 4.72 | SUNM2016-006 DOL wage survey rate |
Official document: NM20260049 on SAM.gov.
Where to go next
Construction Laborer rates in every state · New Mexico prevailing wage and state law · New Mexico determinations by county · pay calculator
Other trades in New Mexico
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Insulator (Heat & Frost) · Boilermaker · Elevator Constructor · Sprinkler Fitter · Tile Setter · Tile Finisher · Floor Layer · Traffic Control / Striping