Federal Davis-Bacon rates published in 23 active determinations, 2026

The official source: binding Davis-Bacon and Service Contract Act wage determinations are published by the U.S. Department of Labor at SAM.gov Wage Determinations. This site indexes them and links every determination to its official document - the determination incorporated into a contract governs.

This page collects every classification in Connecticut's active federal determinations that is a form of construction laborer work (general and specialty construction labor) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.

Published rates by determination

CT20260001 rev 2 · Highway · Fairfield, Litchfield, Middlesex, New Haven, Tolland, Windham

Classification as publishedBase rateFringesRate schedule
LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO E$38.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 8: ACETYLENE BURNER (HOURS WORKED WITH A TORCH)$36.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN$21.4228.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 6 TOXIC WASTE REMOVER$37.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 5 BLASTERS$37.4528.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL$38.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER$36.2028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN$35.9528.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST$35.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, I$45.0128.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONL$42.2428.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON$44.2228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $44.4228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODM$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'$36.8528.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONL$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA$37.2928.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D$36.9628.85LABO0146-002
collectively bargained (union) rate

Official document: CT20260001 on SAM.gov.

CT20260002 rev 2 · Highway · New London

Classification as publishedBase rateFringesRate schedule
LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO E$38.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 8: ACETYLENE BURNER (HOURS WORKED WITH A TORCH)$36.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN$21.4228.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 6 TOXIC WASTE REMOVER$37.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 5 BLASTERS$37.4528.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL$38.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER$36.2028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN$35.9528.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST$35.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, I$45.0128.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONL$42.2428.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON$44.2228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $44.4228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODM$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'$36.8528.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONL$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA$37.2928.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D$36.9628.85LABO0146-002
collectively bargained (union) rate

Official document: CT20260002 on SAM.gov.

CT20260003 rev 2 · Highway · Hartford

Classification as publishedBase rateFringesRate schedule
LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO E$38.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 8: ACETYLENE BURNER (HOURS WORKED WITH A TORCH)$36.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN$21.4228.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 6 TOXIC WASTE REMOVER$37.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 5 BLASTERS$37.4528.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL$38.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER$36.2028.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN$35.9528.85LABO0146-001
collectively bargained (union) rate
LABORERS: GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST$35.7028.85LABO0146-001
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, I$45.0128.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONL$42.2428.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON$44.2228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $44.4228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODM$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'$36.8528.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONL$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA$37.2928.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D$36.9628.85LABO0146-002
collectively bargained (union) rate

Official document: CT20260003 on SAM.gov.

CT20260004 rev 1 · Residential · Litchfield, Windham

Classification as publishedBase rateFringesRate schedule
LABORERS: UNSKILLED$13.172.89SUCT1992-001
DOL wage survey rate
LABORERS: LANDSCAPE WORKERS$8.000.49SUCT1992-001
DOL wage survey rate

Official document: CT20260004 on SAM.gov.

CT20260007 rev 1 · Residential · Fairfield

Classification as publishedBase rateFringesRate schedule
LABORERS: LANDSCAPE$14.964.63SUCT2002-002
DOL wage survey rate
LABORERS: COMMON OR GENERAL$13.134.24SUCT2002-002
DOL wage survey rate

Official document: CT20260007 on SAM.gov.

CT20260008 rev 2 · Residential · Hartford

Classification as publishedBase rateFringesRate schedule
LABORERS: LANDSCAPE$14.964.63SUCT2002-003
DOL wage survey rate
LABORERS: COMMON OR GENERAL$13.091.63SUCT2002-003
DOL wage survey rate

Official document: CT20260008 on SAM.gov.

CT20260009 rev 2 · Residential · Middlesex

Classification as publishedBase rateFringesRate schedule
LABORERS: LANDSCAPE$14.964.63SUCT2002-004
DOL wage survey rate
LABORERS: COMMON OR GENERAL$10.661.63SUCT2002-004
DOL wage survey rate

Official document: CT20260009 on SAM.gov.

CT20260010 rev 1 · Residential · New Haven

Classification as publishedBase rateFringesRate schedule
LABORERS: LANDSCAPE$14.964.63SUCT2002-005
DOL wage survey rate
LABORERS: COMMON OR GENERAL$10.661.63SUCT2002-005
DOL wage survey rate

Official document: CT20260010 on SAM.gov.

CT20260011 rev 2 · Residential · New London

Classification as publishedBase rateFringesRate schedule
LABORERS: LANDSCAPE$14.964.63SUCT2002-006
DOL wage survey rate
LABORERS: COMMON OR GENERAL$13.231.63SUCT2002-006
DOL wage survey rate

Official document: CT20260011 on SAM.gov.

CT20260012 rev 2 · Residential · Tolland

Classification as publishedBase rateFringesRate schedule
LABORERS: LANDSCAPE$14.964.63SUCT2002-007
DOL wage survey rate
LABORERS: COMMON OR GENERAL$16.671.63SUCT2002-007
DOL wage survey rate

Official document: CT20260012 on SAM.gov.

CT20260013 rev 2 · Heavy · Fairfield

Classification as publishedBase rateFringesRate schedule
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, I$45.0128.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONL$42.2428.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON$44.2228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $44.4228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODM$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'$36.8528.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONL$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA$37.2928.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMP$38.7028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 8: ACETYLENE BURNER (HOURS WORKED WITH A TORCH)$36.7028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN$21.4228.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 6 TOXIC WASTE REMOVER$37.7028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 5 BLASTERS$37.4528.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL$38.7028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER$36.2028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN$35.9528.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST$35.7028.85LABO0146-003
collectively bargained (union) rate

Official document: CT20260013 on SAM.gov.

CT20260014 rev 2 · Heavy · Hartford

Classification as publishedBase rateFringesRate schedule
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, I$45.0128.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONL$42.2428.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON$44.2228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $44.4228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODM$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'$36.8528.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONL$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA$37.2928.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMP$38.7028.85LABO0146-004
collectively bargained (union) rate
LABORERS GROUP 8 ACETYLENE BURNER (HOURS WORKED WITH A TORCH)$36.7028.85LABO0146-004
collectively bargained (union) rate
LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN$21.4228.85LABO0146-004
collectively bargained (union) rate
LABORERS GROUP 6 TOXIC WASTE REMOVER$37.7028.85LABO0146-004
collectively bargained (union) rate
LABORERS GROUP 5 BLASTERS$37.4528.85LABO0146-004
collectively bargained (union) rate
LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL$38.7028.85LABO0146-004
collectively bargained (union) rate
LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER$36.2028.85LABO0146-004
collectively bargained (union) rate
LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN$35.9528.85LABO0146-004
collectively bargained (union) rate
LABORERS GROUP 1 LABORERS (UNSKILLED),CONCRETE SPECIALIST$35.7028.85LABO0146-004
collectively bargained (union) rate
LABORER: COMMON OR GENERAL$21.035.30SUCT2002-009
DOL wage survey rate

Official document: CT20260014 on SAM.gov.

CT20260015 rev 2 · Heavy · Middlesex, Tolland

Classification as publishedBase rateFringesRate schedule
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, I$45.0128.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONL$42.2428.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON$44.2228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $44.4228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODM$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'$36.8528.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONL$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA$37.2928.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMP$38.7028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 8 ACETYLENE BURNER (HOURS WORKED WITH A TORCH)$36.7028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN$21.4228.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 6 TOXIC WASTE REMOVER$37.7028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 5 BLASTERS$37.4528.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL$38.7028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER$36.2028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN$35.9528.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST$35.7028.85LABO0146-005
collectively bargained (union) rate

Official document: CT20260015 on SAM.gov.

CT20260016 rev 2 · Heavy · New Haven

Classification as publishedBase rateFringesRate schedule
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, I$45.0128.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONL$42.2428.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON$44.2228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $44.4228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODM$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'$36.8528.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONL$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA$37.2928.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMP$38.7028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 8: ACETYLENE BURNER (HOURS WORKED WITH A TORCH)$36.7028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN$21.4228.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 6 TOXIC WASTE REMOVER$37.7028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 5 BLASTERS$37.4528.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL$38.7028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER$36.2028.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN$35.9528.85LABO0146-003
collectively bargained (union) rate
LABORERS GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST$35.7028.85LABO0146-003
collectively bargained (union) rate

Official document: CT20260016 on SAM.gov.

CT20260017 rev 2 · Heavy · New London

Classification as publishedBase rateFringesRate schedule
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, I$45.0128.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONL$42.2428.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON$44.2228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, $44.4228.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODM$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE$37.9328.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'$36.8528.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONL$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA$37.2928.85LABO0146-002
collectively bargained (union) rate
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D$36.9628.85LABO0146-002
collectively bargained (union) rate
LABORERS GROUP 9 TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMP$38.7028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 8 ACETYLENE BURNER (HOURS WORKED WITH A TORCH)$36.7028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 7 TRAFFIC CONTROL SIGNALMAN$21.4228.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 6 TOXIC WASTE REMOVER$37.7028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 5 BLASTERS$37.4528.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 4 ASBESTOS/LEAD REMOVAL$38.7028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER (HANDHELD), MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CURB SETTER$36.2028.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN$35.9528.85LABO0146-005
collectively bargained (union) rate
LABORERS GROUP 1 LABORERS (UNSKILLED), CONCRETE SPECIALIST$35.7028.85LABO0146-005
collectively bargained (union) rate

Official document: CT20260017 on SAM.gov.

CT20260019 rev 2 · Building · Litchfield

Classification as publishedBase rateFringesRate schedule
LABORER (COMMON OR GENERAL)$35.7028.85LABO0665-001
collectively bargained (union) rate

Official document: CT20260019 on SAM.gov.

CT20260020 rev 2 · Building · Fairfield

Classification as publishedBase rateFringesRate schedule
LABORER:MASON TENDER-CEMENT/CONCRETE$35.7028.85LABO0230-002
collectively bargained (union) rate
LABORER: COMMON OR GENERAL$33.8125.18TEAM0191-001
collectively bargained (union) rate

Official document: CT20260020 on SAM.gov.

CT20260021 rev 2 · Building · Hartford

Classification as publishedBase rateFringesRate schedule
LABORER: MASON TENDER-CEMENT/CONCRETE$35.7028.85LABO0230-001
collectively bargained (union) rate
LABORER: COMMON OR GENERAL$35.7028.85LABO0230-001
collectively bargained (union) rate

Official document: CT20260021 on SAM.gov.

CT20260022 rev 2 · Building · Middlesex

Classification as publishedBase rateFringesRate schedule
LABORER: MASON TENDER-CEMENT/CONCRETE$35.7028.85LABO0230-001
collectively bargained (union) rate
LABORER: COMMON OR GENERAL$35.7028.85LABO0230-001
collectively bargained (union) rate

Official document: CT20260022 on SAM.gov.

CT20260023 rev 2 · Building · New Haven

Classification as publishedBase rateFringesRate schedule
LABORER: MASON TENDER- CEMENT/CONCRETE$35.7028.85LABO0455-001
collectively bargained (union) rate
LABORER: COMMON OR GENERAL$27.8518.04SUCT2016-005
DOL wage survey rate

Official document: CT20260023 on SAM.gov.

CT20260024 rev 2 · Building · New London

Classification as publishedBase rateFringesRate schedule
LABORER: MASON TENDER-CEMENT/CONCRETE$35.7028.85LABO0230-001
collectively bargained (union) rate
LABORER: COMMON OR GENERAL$35.7028.85LABO0230-001
collectively bargained (union) rate

Official document: CT20260024 on SAM.gov.

CT20260025 rev 2 · Building · Tolland

Classification as publishedBase rateFringesRate schedule
LABORER: MASON TENDER-CEMENT/CONCRETE$35.7028.85LABO0230-001
collectively bargained (union) rate
LABORER: COMMON OR GENERAL$35.7028.85LABO0230-001
collectively bargained (union) rate

Official document: CT20260025 on SAM.gov.

CT20260026 rev 2 · Building · Windham

Classification as publishedBase rateFringesRate schedule
LABORER: MASON TENDER-CEMENT/CONCRETE$35.7028.85LABO0230-001
collectively bargained (union) rate
LABORER: COMMON OR GENERAL$35.7028.85LABO0230-001
collectively bargained (union) rate

Official document: CT20260026 on SAM.gov.