Construction Laborer prevailing wage rates in District of Columbia
Federal Davis-Bacon rates published in 3 active determinations, 2026
- Active federal Davis-Bacon determinations for District of Columbia publish 30 construction laborer classification rates, across 3 determinations covering 1 county.
- Those published base rates run from $11.67 to $51.82 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting construction laborer rates in District of Columbia: .
This page collects every classification in District of Columbia's active federal determinations that is a form of construction laborer work (general and specialty construction labor) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
DC20260001 rev 6 · Heavy, Highway · Washington, D.C.
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 - CARLAODERS, CHOKER SETTER, CONCRETE CREWMAN, CRUSHED FEEDER, DEMOLITION LABORERS, INCLUDING SALVAGING AL | $33.25 | 8.70 | LABO0011-003 collectively bargained (union) rate |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 - COMBINED AIR AND WATER NOZZLEMAN, CEMENT HANDLER, DOPE POT FIREMAN (NONMECHANICAL), FORM CLEANING MACHIN | $34.27 | 8.70 | LABO0011-003 collectively bargained (union) rate |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 - MULTI-SECTION PIPE LAYER, NON-METALLIC CLAY AND CONCRETE PIPE LAYER (INCLUDING CAULKER, COLLARMAN, JOINT | $34.27 | 8.70 | LABO0011-003 collectively bargained (union) rate |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 - ASPHALT BLOCK PNEUMATIC CUTTER, ASPHALT ROLLER, WALKER, CHAINSAW OPERATOR WITH ATTACHMENT, CONCRETE SAW | $34.32 | 8.70 | LABO0011-003 collectively bargained (union) rate |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 - ASPHALT SCREEDER, BIG DRILLS, CUT OF THE HOLE DRILLS (1 1/2"" PISTON OR LARGER), DOWN THE HOLE DRILLS (3 | $35.00 | 8.70 | LABO0011-003 collectively bargained (union) rate |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 - POWDERMAN, MASTER FORM SETTERS | $35.93 | 8.70 | LABO0011-003 collectively bargained (union) rate |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 - BRICK PAVER (ASPHALT BLOCK PAVER, ASPHALT BLOCK SAWMAN, ASPHALT BLOCK GRINDER, HASTINGS BLOCK OR SIMILAR | $36.81 | 8.70 | LABO0011-003 collectively bargained (union) rate |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 - LICENSED POWDERMEN | $37.95 | 8.70 | LABO0011-003 collectively bargained (union) rate |
| LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-M | $32.25 | 8.70 | LABO0011-004 collectively bargained (union) rate |
| LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATER | $32.25 | 8.70 | LABO0011-004 collectively bargained (union) rate |
| LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 1 - BRAKEMAN, BULL GANG, DUMPER, TRACKMEN, CONCRETE MAN | $34.41 | 8.70 | LABO0011-005 collectively bargained (union) rate |
| LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 2 - CHUCK TENDER, POWDERMEN IN PRIME HOUSE, FORM SETTERS AND MOVERS, NIPPERS, CA | $35.48 | 8.70 | LABO0011-005 collectively bargained (union) rate |
| LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 3 - MINERS, RE-BAR UNDERGROUND, CONCRETE OR GUNNITE NOZZLEMEN, POWDERMEN, TIMBER | $38.17 | 8.70 | LABO0011-005 collectively bargained (union) rate |
| LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 4 - MUCKING MACHINE OPERATOR (AIR) | $39.29 | 8.70 | LABO0011-005 collectively bargained (union) rate |
| LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (1-14) AND HOURS (7) | $44.04 | 8.70 | LABO0011-006 collectively bargained (union) rate |
| LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (14-18) AND HOURS (6) | $51.82 | 8.70 | LABO0011-006 collectively bargained (union) rate |
| LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR (PAVING AND INCIDENTAL GRADING) | $24.30 | 8.74 | LABO0011-007 collectively bargained (union) rate |
| LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER (PAVING AND INCIDENTAL GRADING) | $23.86 | 8.74 | LABO0011-007 collectively bargained (union) rate |
| LABORERS: JACK HAMMER (PAVING AND INCIDENTAL GRADING) | $23.89 | 8.74 | LABO0011-007 collectively bargained (union) rate |
| LABORERS: LABORER (PAVING AND INCIDENTAL GRADING) | $23.06 | 8.74 | LABO0011-007 collectively bargained (union) rate |
| LABORERS: SAND SETTER & FORM SETTER (PAVING AND INCIDENTAL GRADING) | $25.10 | 8.74 | LABO0011-007 collectively bargained (union) rate |
| LABORERS: ASPHALT SHOVELER (PAVING AND INCIDENTAL GRADING) | $23.27 | 8.74 | LABO0011-007 collectively bargained (union) rate |
| LABORERS: BRICK MASONRY WORK (MASON TENDERS) | $24.31 | 8.70 | LABO0011-008 collectively bargained (union) rate |
| LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS, MORTARMEN) | $24.96 | 8.70 | LABO0011-008 collectively bargained (union) rate |
Official document: DC20260001 on SAM.gov.
DC20260002 rev 3 · Building · Washington, D.C.
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: SKILLED | $30.47 | 8.70 | LABO0011-009 collectively bargained (union) rate |
| LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW O | $11.67 | 0.00 | SUDC2009-003 DOL wage survey rate |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.40 | 2.85 | SUDC2009-003 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $13.04 | 2.80 | SUDC2009-003 DOL wage survey rate |
Official document: DC20260002 on SAM.gov.
DC20260003 rev 1 · Residential · Washington, D.C.
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW O | $12.59 | 0.00 | SUDC2009-004 DOL wage survey rate |
| LABORER: COMMON OR GENERAL | $12.54 | 0.00 | SUDC2009-004 DOL wage survey rate |
Official document: DC20260003 on SAM.gov.
Where to go next
Construction Laborer rates in every state · District of Columbia prevailing wage and state law · District of Columbia determinations by county · pay calculator
Other trades in District of Columbia
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Painter · Insulator (Heat & Frost) · Line Constructor / Lineman